ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/03/2012 BUILDING SURVEY DATE

Size: px
Start display at page:

Download "ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/03/2012 BUILDING SURVEY DATE"

Transcription

1 S. FOURTH ST. CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.863 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,043,000 CLASSROOMS / LIBRARY BUILDING GROSS SQUARE FEET 46,933 NUMBER OF BUILDING STORIES 4 BUILDING SURVEY DATE CCJM: Josh Polasky (M), Stanley Panek (E) ORIGINAL YEAR OF CONSTRUCTION /03/2012 B U I L D I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y TRADE E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR ($) GOOD ($) (5-10 YEARS) (10-20 YEARS) POOR ($) (1-5 YEARS) EXCELLENT ($) (20+ YEARS) TOTAL ($) $/GSF PERCENT OF BUILDING TOTAL (%) MECHANICAL 1,620,100 62,800 23,600 1,706, PLUMBING 419,800 92, , FIRE PROTECTION 110, , ELECTRICAL 476,600 12, , COMMUNICATIONS 224, , TOTAL % OF TOTAL 2,627, , ,000 36,300 3,043, CRITICAL ITEM REMEDIATION COST: $93,600 REFER TO CRITICAL ITEM SUMMARY ON FOLLOWING PAGE. NOTE: Cost Estimates are Construction Costs are in 2013 dollars to Replace in Kind unless otherwise noted PAGE 1

2 F L A G G H A L L C R I T I C A L I S S U E S S U M M A R Y CODE RELATED ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE PLUMBING Sanitary Waste There is no ventilation/exhaust in any of the bathrooms. 62, , Exceeded Replace CODE RELATED ITEMS COST 62, , SYSTEM/COMPONENT FAILURE ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE MECHANICAL HVAC Controls These controls are basically non-functioning. 31,000 31, Exceeded Replace SYSTEM/COMPONENT FAILURE ITEMS COST 31,000 31, NOTE: Cost Estimates are Construction Costs are in 2013 dollars to remediate noted issue. CRITICAL ISSUES COST 93, , PAGE 2

3 Text106 M E C H A N I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y PROCESS COOLING SYSTEM STEAM AND CONDENSTATE SYSTEM AIR HANDLER LABORATORY EXHAUST SYSTEM KITCHEN EXHAUST SYSTEM HVAC CONTROLS SYSTEM SYSTEM/COMPONENT Cooling System Steam and Condensate System Air Handling System Mechanical Room Exhaust Fan Laboratory Exhaust Fan #1 Laboratory Exhaust Fan #2 Laboratory Exhaust Fan #3 Kitchen Hood Exhaust System HVAC Controls MECHANICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 62,800 62, , ,000 1,085,700 1,085,700 4,900 4,900 8,600 8,600 8,600 8,600 6,400 6,400 29,500 29,500 31,000 31,000 1,620,100 62,800 23,600 1,706, PAGE 3

4 Text6 C O O L I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description No central cooling system exists in Flagg hall. There are window units of various ages and conditions throughout the building. Overall Condition Date Installed 01/01/1990 Equipment Tag Manufacturer Model Number HP/kW Material Comments Rooms #124e and #124w share an exterior Comfortmaker condenser unit (serves approximately 500 sq ft and is years old). It is functional but in poor condition with insulation peeling off the exterior piping. The rooms this unit serves didn't appear to be in regular use. There is also a single Liebert unit (2-3 ton) serving a computer room we didn't have access to. The condenser is located outside on the north side of the building. Age was unavailable, but it is functional and in fair condition. Fair Remaining Useful Life 7 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Recommendation Replacement Cost $62,800 Replace Comfortmaker unit. Comfortmaker condenser is in poor condition. Liebert unit is in fair condition with about 10 years useful life left PAGE 4

5 Text6 C O O L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Exterior condenser unit Liebert Unit PAGE 5

6 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M A S S E S S M E N T D A T A Item ID Description Campus steam enters the building through basement room #57 (8" pipe) at 5 lbs of pressure. The primary source of heat for the entire building (46,933 sq ft) is fin tube radiation (steam), there are no heat exchangers. The pipes are insulated with a mixture of original and newer insulation. There is evidence of many small leaks being repaired over the years. Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number HP/kW Material Comments Two functional AHUs exist in the building and each contains functional steam heating coils, although only one AHU is currently in use. There are two condensate receivers/pumps, one gravity and one vacuum. All steam equipment is thought to be original to the building (1955) with minor repairs and replacements done since then. These pump systems are functional but show corrosion. The overall system is old and not in good condition. The 3rd floor has minor steam leaks and overheating exists throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $469,000 The building systems of Flagg Hall are old and at the end of their useful life. Multiple facilities staff told us the building is slated for demolition. Flagg Hall was built as a dorm in 1955 and converted to an art building in the 70's. Abandoned building equipment is prevalent in mechanical rooms #57 and #500 (the penthouse). There is enough abandoned equipment (AHUs, boiler tanks, heat exchangers, pumps, hot water tanks, etc.) to prevent major renovation without removing much of it PAGE 6

7 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M S U R V E Y P H O T O G R A P H S Typical common area radiator Typical classroom radiator Vacuum condensate pump system Vacuum condensate pump system Picture #2 Mechanical room steam pipe Gravity condensate pump PAGE 7

8 Gravity condensate pump Picture#2 Gravity condensate pump Picture #3 Vacuum condensate pump tag PAGE 8

9 Text6 A I R H A N D L I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description The air handling system consists of original equipment (1955) that is mostly abandoned. Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number HP/kW Material Two AHUs exist in the building penthouse (51.S-1 and 51.UV-1), each consisting of supply and return fans. Both systems are supposedly functional, but neither is in use. One fan was notable for not having any belts. Both supply fans contain steam heating coils that are functional to the best of our knowledge. According to fan maps, these air handlers served a partial area of the basement as well as partial areas of the 1st and 2nd floors. Fan maps reveal the following data from when the air handlers were being used: 51.S-1 served 2861 sq ft, 32,903 cu ft, and pushed 19,000 CFM. 51.UV-1 served 7649 sq ft, 72,668 cu ft, and pushed 4490 CFM. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Recommendation Replacement Cost $1,085,700 Remove abandoned equipment. Redesign entire ventilation system PAGE 9

10 Text6 A I R H A N D L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Penthouse air handler fan (unused) Penthouse air handler fan (unused) In penthouse In penthouse Air intake into penthouse (for air handling units) Air handler motor in penthouse PAGE 10

11 Another air handler motor in penthouse The newest of the penthouse air handling units - steam pipes leading to heating coils visible PAGE 11

12 Text6 M E C H A N I C A L R O O M E X H A U S T F A N A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Mechanical room #57 has an exhaust fan located in the SE corner of the room that vents directly outside. It is old and extremely dusty but functional. No other information is available. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $4, PAGE 12

13 Text6 M E C H A N I C A L R O O M E X H A U S T F A N S U R V E Y P H O T O G R A P H S Mechanical room exhaust fan Mechanical room exhaust fan Picture # PAGE 13

14 Text6 L A B O R A T O R Y E X H A U S T F A N # 1 A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/2008 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Since Flagg became an art building, a specially vented painting studio has been added (room #123). Two small exhaust fans exist in this room and are functional. Tags were inaccessible but they both look to be in good condition. Excellent Remaining Useful Life 25 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $8, PAGE 14

15 Text6 L A B O R A T O R Y E X H A U S T F A N # 1 S U R V E Y P H O T O G R A P H S Painting studio exhaust fan #1 Picture #1 Painting studio exhaust fan #1 Picture # PAGE 15

16 Text6 L A B O R A T O R Y E X H A U S T F A N # 2 A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/2008 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Since Flagg became an art building, a specially vented painting studio has been added (room #123). Two small exhaust fans exist in this room and are functional. Tags were inaccessible but the units are functional and both appear in good condition. Excellent Remaining Useful Life 25 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $8, PAGE 16

17 Text6 L A B O R A T O R Y E X H A U S T F A N # 2 S U R V E Y P H O T O G R A P H S Painting studio exhaust fan # PAGE 17

18 Text6 L A B O R A T O R Y E X H A U S T F A N # 3 A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/2008 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Since Flagg became an art building, a specially vented spray painting studio has been added. The small room was inaccessible, but from outside there appears to be a hood type ventilation system which vents directly outside. This appears to be a newer system in good condition. Excellent Remaining Useful Life 25 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $6, PAGE 18

19 Text6 L A B O R A T O R Y E X H A U S T F A N # 3 S U R V E Y P H O T O G R A P H S Spray painting hood vent from outside PAGE 19

20 Text6 K I T C H E N H O O D E X H A U S T S Y S T E M A S S E S S M E N T D A T A Item ID Description It is important to note that Flagg Hall no longer has a kitchen, it was converted to workshop area in the 70s. Two kitchen hood fans are still functional (from construction in 1955) and are used for woodshop/workshop purposes. They vent to the roof. The interior portion of both hood fans are corroded and old, but functional. All vents on the roof, including for the kitchen hood fans, are badly weathered. Overall Condition Poor Date Installed 01/01/1955 Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity HP/kW Voltage Material Recommendation Remove hood exhaust systems and do not replace them. Replacement Cost $29,500 Comments This equipment no longer used for its original purpose PAGE 20

21 Text6 K I T C H E N H O O D E X H A U S T S Y S T E M S U R V E Y P H O T O G R A P H S Hood #1 Picture #1 Hood #1 Picture #2 Hood #2 Picture #1 Hood #2 Picture #2 Roof vent fans (one or both have to be for kitchen hoods) PAGE 21

22 Text6 H V A C C O N T R O L S A S S E S S M E N T D A T A Item ID Description Controls are pneumatic and the compressor system is relatively new (10 years or less). It's an Ingersoll-Rand (serial # ) and in good condition. Overall Condition Date Installed 01/01/1970 Equipment Tag Manufacturer Model Number HP/kW Material Comments Critical Issues Critical Repair Estimate $31,000 Thermostats of various age exist throughout the building, but staff consider most of them broken and the heating system largely unregulated; overheating is common. They thought three zone thermostats might be functional. There is one electric thermostat on the 4th floor, functionality unknown. Critical rating is for thermostats, pneumatic system is good. Poor Remaining Useful Life Exceeded Nominal Useful Life: 18 Years Serial Number Size/Capacity Voltage Recommendation Not Available Not Available Not Available Not Available Not Available Not Available Not Available Not Available Replacement Cost $31,000 Survey and replace all thermostats. Keep pneumatic system. Overheating is common and students often open windows during cold weather to regulate temperature. These controls are basically non-functioning PAGE 22

23 Text6 H V A C C O N T R O L S S U R V E Y P H O T O G R A P H S Compressor System Compressor System Picture #2 Compressor System tag #1 compressor tag #2 Thermostat example #1 Thermostat example # PAGE 23

24 Thermostat example #3 Example thermostat PAGE 24

25 Text106 P L U M B I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DOMESTIC COLD WATER SYSTEM PLUMBING FIXTURES SYSTEM SANITARY WASTE AND VENT SYSTEM STORM DRAINAGE SYSTEM SUB-SOIL DRAINAGE SYSTEM SYSTEM/COMPONENT Domestic Cold Water System Plumbing Fixtures Sanitary Waste Storm Drainage System Sub-Soil Drainage System PLUMBING TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 96,100 96,100 92,400 92, , , , ,700 51,600 51, ,800 92, , PAGE 25

26 Text6 D O M E S T I C C O L D W A T E R S Y S T E M A S S E S S M E N T D A T A Item ID Description Campus water enters the basement of the building in mech. room #57. The piping is a mix of original galvanized steel and newer copper (3rd and 4th floors). The system has had minor repairs and replacements over the years. Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number HP/kW Material Comments It services toilets, sinks, fountains, and urinals throughout the building. It uses campus pressure and has no pumps. Critical rating is due to age, few problems have been reported with this system. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $96,100 This building has no domestic hot water system PAGE 26

27 Text6 D O M E S T I C C O L D W A T E R S Y S T E M S U R V E Y P H O T O G R A P H S Incoming domestic cold water pipe PAGE 27

28 Text6 P L U M B I N G F I X T U R E S A S S E S S M E N T D A T A Item ID Description Flagg Hall has toilets, urinals, fountains, and sinks (bathroom and janitor) throughout. There are 2-3 showers leftover from the building being a dorm; they're mostly used now as cleaning areas for art projects. Overall Condition Date Installed 01/01/1970 Equipment Tag Manufacturer Model Number HP/kW Material Comments The fixtures are mostly original except for fountains and ADA upgrades. All flushes are manual and all sinks are manual. Fountains are modern and electrically cooled. The fixtures are generally old but in functional condition with few problems reported. Approximate count: toilets standard sinks urinals art/janitor sinks and showers fountains Fair Remaining Useful Life 7 Years Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $92,400 A few sinks have attached electric heater tanks for hot water. We didn't assess these and considered them furniture PAGE 28

29 Text6 P L U M B I N G F I X T U R E S S U R V E Y P H O T O G R A P H S Chilled water fountain Additional fountains Typical men's bathroom sinks and urinals Typical toilets Janitor/art sink w/ electric heater Janitor/art sink (basement) PAGE 29

30 Janitor/art shower PAGE 30

31 Text6 S A N I T A R Y W A S T E A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Critical Issues Critical Repair Estimate $62,600 In mechanical room # 57 there is a sewage ejector pump (duplex) that is original to the building (1955). It is old but functional with few reported problems. There is no other information available. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $131,300 Install ventilation in all bathrooms. There is no ventilation/exhaust in any of the bathrooms PAGE 31

32 Text6 S A N I T A R Y W A S T E S U R V E Y P H O T O G R A P H S Sewage ejector pump system Sewage ejector pump system Picture # PAGE 32

33 Text6 S T O R M D R A I N A G E S Y S T E M A S S E S S M E N T D A T A Item ID Description Storm drains and pipes are original to the building (1995) and in working order. Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number HP/kW Material Comments The storm drainage system will continue to work for the foreseeable future. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Recommendation Replacement Cost $140,700 Replace storm drain in loading dock and fix broken concrete. Staff reported minor foundation leakage at various points in the basement. The storm drain by the loading dock (North side of building) gets plugged up regularly with leaves and dirt - everything in the area flows in that direction. Staff reports the concrete around the drain is broken PAGE 33

34 Text6 S T O R M D R A I N A G E S Y S T E M S U R V E Y P H O T O G R A P H S Roof drain Loading ramp and dock PAGE 34

35 Text6 S U B - S O I L D R A I N A G E S Y S T E M A S S E S S M E N T D A T A Item ID Description Flagg Hall has no sump pump and all subsoil drainage is original to the building (1955). Staff reports minor foundation leakage at various points in the basement. Overall Condition Poor Date Installed 01/01/1955 Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Recommendation Survey foundation for source of leaks. Replacement Cost $51, PAGE 35

36 Text106 F I R E P R O T E C T I O N D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y FIRE ALARM SYSTEM STANDPIPE SYSTEM SYSTEM/COMPONENT Fire Alarm System Stand Pipe FIRE PROTECTION TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 91,600 91,600 19,300 19, , , PAGE 36

37 Text6 F I R E A L A R M S Y S T E M A S S E S S M E N T D A T A Item ID Description Fire Alarm consists of pull stations located in corridors. Connection to campus by aux loop. Overall Condition Poor Date Installed 06/25/1974 Remaining Useful Life Exceeded Nominal Useful Life: 20 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity HP/kW Voltage Material Replacement Cost $91,600 Comments Building slated for demolition PAGE 37

38 Text6 F I R E A L A R M S Y S T E M S U R V E Y P H O T O G R A P H S DSC00449.JPG Pull Station PAGE 38

39 Text6 S T A N D P I P E A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1955 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Fire protection for Flagg hall consists of stand pipes in the stairwells, original to the building (1955). Access is through fire hose cabinets. Hoses are all removed and fire extinguishers have been placed in some cabinets. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $19, PAGE 39

40 Text6 S T A N D P I P E S U R V E Y P H O T O G R A P H S Typical fire hose cabinet Typical fire hose cabinet open PAGE 40

41 Text106 E L E C T R I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y LOW VOLTAGE SYSTEM EMERGENCY POWER SYSTEM INTERIOR LIGHTING EMERGENCY LIGHTING SYSTEM EXIT LIGHTING SYSTEM EXTERIOR LIGHTING SYSTEM SYSTEM/COMPONENT Low Voltage System Emergency Power System Interior Lighting System Emergency Lighting System Exit Lighting System Exterior Lighting System ELECTRICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 142, ,100 28,800 28, , ,700 14,800 14,800 12,700 12,700 13,200 13, ,600 12, , PAGE 41

42 Text6 L O W V O L T A G E S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 02/09/1954 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Flagg Building receives 120/208 Volt -3 Phase power from Noble Hall. Main panelboard is 600 A 120/208 V. Original kitchen was dismantled. Kitchen space is occupied by art shop. Art shop has new panelboards. Majority of distribution equipment is original. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity SQ. D 600A Voltage 120/208 Replacement Cost $142, PAGE 42

43 Text6 L O W V O L T A G E S Y S T E M S U R V E Y P H O T O G R A P H S Main Service Basement Panel Shop Panel PAGE 43

44 Text6 E M E R G E N C Y P O W E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/19/1955 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Original EM power panel has been connected before main switch of the main panel. Load consists of original emergency lights in stairways. Poor Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Serial Number Size/Capacity Voltage Replacement Cost $28, PAGE 44

45 Text6 E M E R G E N C Y P O W E R S Y S T E M S U R V E Y P H O T O G R A P H S Emergency Panel next to Main Panel PAGE 45

46 Text6 I N T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 04/24/1996 Equipment Tag Manufacturer Model Number Item ID Material Classrooms have 2 lamp type fluorescent surface fixtures. Corridors pended fixtures with T-12 lamps. Poor Remaining Useful Life 4 Years Nominal Useful Life: 25 Years Serial Number Size/Capacity Voltage 120 V Replacement Cost $277, PAGE 46

47 Text6 I N T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Corridor Lighting shop lighting Corridor Lighting PAGE 47

48 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Stairway have original incandescent emergency light fixtures Overall Condition Poor Date Installed 12/12/1955 Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity Voltage Material Replacement Cost $14, PAGE 48

49 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Emergency lighting Emergency lighting PAGE 49

50 Text6 E X I T L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description Existing Exit Signs were updated in 2010 All Signs are LED type. Overall Condition Date Installed 01/11/2010 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Excellent Remaining Useful Life 20 Years Nominal Useful Life: 25 Years Serial Number Size/Capacity Voltage 120 Replacement Cost $12, PAGE 50

51 Text6 E X I T L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Typical Exit Sign PAGE 51

52 Text6 E X T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Exterior Consist of canopy lights and Campus light poles. Overall Condition Poor Date Installed 01/06/1954 Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity Voltage 120 Material Replacement Cost $13,200 Comments Building slated for demolition PAGE 52

53 Text6 E X T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Canopy Lighting Site light PAGE 53

54 Text106 C O M M U N I C A T I O N S D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DATA SYSTEM CCTV SYSTEM SYSTEM/COMPONENT Communication Infrastructure System CCTV Systems COMMUNICATIONS TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 170, ,700 53,300 53, , , PAGE 54

55 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M A S S E S S M E N T D A T A Item ID Description The building is fed with 12 strands of single mode fiber and 50 copper pairs with each pair grounded and individually protected by a fuse/surge arrestor. Fiber and copper originate from Node #2. The building IDF is located in room 57 on the lower level. Fiber distributes from the building IDF to the hub room (telecommunication room) within 100 meters of end-use equipment and lands at rack mounted fiber switches within the hub room. Overall Condition There is 1 hub room located in room 126 within the building. The hub room is equipped with 2 free standing racks, wire management, and overhead basket cable tray. The hub room has a technology ground bar tied into the building grounding system as well as a dedicated electrical panel. The room also has a dedicated cooling system (Liebert split system with remote condensing unit). Outlet standards typically have 1"C stubbed to cable management. Standard outlet consists of two network cables and two data jacks. Station cable consists of Cat 6e (Mohawk Advancenet). The building is typically equipped with WIFI throughout (coverage not noted) Good Date Installed UIUC network upgrade complete (date range 2006 to 2012) Remaining Useful Life 20 Years Nominal Useful Life: 20 Years Replacement Cost $170, PAGE 55

56 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M S U R V E Y P H O T O G R A P H S Bldg 89 IDF Hub room racks Hub room cooling unit Hub room ground bar PAGE 56

57 Text6 C C T V S Y S T E M S A S S E S S M E N T D A T A Item ID Description Building has Security cameras located at all entrances and shops.monitoring is located in Art and Design building Overall Condition Good Date Installed 03/05/2008 Remaining Useful Life 15 Years Nominal Useful Life: 20 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity HP/kW Voltage Material Replacement Cost $53, PAGE 57

58 Text6 L E G A C Y A S S E T D E S C R I P T I O N : F L A G G H A L L Flagg Hall contains four floors, a basement, and a penthouse. The building consists of mechanical and electrical rooms, building service storage, administrative offices, class and research laboratories, and a conference room. The Life Safety Code classifies the building as Business Occupancy. Flagg Hall has a manual and automatic fire alarm system. Manual pull stations are located at all exits on the fourth, third, second, and first floor. Automatic fire detection is located adjacent to the elevator on all floors. There exists no occupant notification. The building fire alarm control panel located in Stair 1on the first floor, is an unidentifiable model. Flagg Hall has separate conduit connecting exit signage and various corridor lighting fixtures serving as emergency lighting. There exists no observable emergency power system. Flagg Hall is a non-sprinklered building with a Class II standpipe system located in all four floors and the basement. There exists no fire department connection for the building. OCCUPANT LOAD/EXITING Penthouse Floor: 3 occupants; one exit required (1 exit provided); the exit width including stairs/doors provides capacity for 150 occupants. Door and stair widths are sufficient for occupants served. Fourth Floor: 108 occupants; two exits required (2 exits provided); the exit width including stairs/doors provides capacity for 343 occupants. Door and stair widths are sufficient for occupants served. Third Floor: 148 occupants; two exits required (2 exits provided); the exit width including stairs/doors provides capacity for 343 occupants. Door and stair widths are sufficient for occupants served. Second Floor: 145 occupants; two exits required (3 exits provided); the exit width including stairs/doors provides capacity for 520 occupants. Door and stair widths are sufficient for occupants served. First Floor (LED): 147 occupants; 2 exits required (4 exits provided); 30" exit door width required (229" provided); door and corridor widths are sufficient for occupants served. Basement Floor: 75 occupants; two exits required (3 exits provided); the exit width including stairs/doors provides capacity for 508 occupants. Door and stair widths are sufficient for occupants served PAGE 58

59 F L A G G H A L L L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS ITEMS REQ /8/2002 Flooring: Replace 568, , , REQ /8/2002 Windows: Replace 538, , , REQ /8/2002 Interior Partitions and Doors: Replace & 1,356, ,356,600 1,356,600 Finish REQ /8/2002 Exterior Closure: Replace 25, ,100 25, REQ /25/2005 Means of Egress: Stair Enclosure 68, ,900 68, REQ /25/2005 Fire Barrier: Unprotected Penetrations 29, ,100 29,100 GENERAL LEGACY ITEMS TOTALS 2,586, ,586,200 2,586,200 TOTALS 2,586, ,586,200 2,586,200 % OF LEGACY VALUE Poor = VFA Priorities 1,2, and 3; Fair VFA Priority 4; and Code VFA Priority PAGE 59

60 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Remove asbestos flooring and replace with VCT Integrity Flooring: Replace (Legacy) Poor Percent Complete 0.0 Recommendation Remove flooring and replace A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 568, Estimated Remaining Cost: 568, Action Date 10/8/2005 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Replace windows Integrity Windows: Replace (Legacy) Poor Percent Complete 0.0 Recommendation Replace windows. Each opening has three windows per standard opening plus stairwell windows. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 538, Estimated Remaining Cost: 538, Action Date 10/8/ PAGE 60

61 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Replace interior partitions and refinish. Integrity Interior Partitions and Doors: Replace & Finish (Legacy) Poor Percent Complete 0.0 Recommendation Replace interior partitons and refinish A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 1,356, Estimated Remaining Cost: 1,356, Action Date 10/8/2005 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Replace windows and exterior doors. Integrity Exterior Closure: Replace (Legacy) Poor Percent Complete 0.0 Recommendation Replace exterior closure elements. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 25, Estimated Remaining Cost: 25, Action Date 10/8/ PAGE 61

62 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 3/25/2005 Description There exists unenclosed stairs, Stair 1, 2, and 3, that discharges into the level of exit discharge. This is not compliant with NFPA 101 Section Requirement Category Requirement Name Condition Life Safety Means of Egress: Stair Enclosure (Legacy) Poor Percent Complete 0.0 Recommendation Stair 1: Fourth and Third Floor - Install one new 1 1/2 hour fire rated door assembly in Stair 1 and remove existing door assembly. Second Floor - Install one new 1-1/2 hour fire rated door assembly in Stair 1 and remove existing door assembly. Repeat for first and basement floor. Stair 3: Fourth and Third Floor - Install one new 2 hour fire rated door assembly in Stair 3 and remove existing door assembly. Second Floor - Install one new 1-1/2 hour fire rated door assembly in Stair 3 and remove existing door assembly. Repeat for first and basement floor. Stair 2: Second Floor - Install two new 1-1/2 hour fire rated door assemblies in Corridor 220. First Floor - Install two new 1-1/2 hour fire rated doors assemblies in vestibule from Corridor 120. Demo door to Room 124E and install new1-1/2 hour fire rated door assembly. Demo non fire rated interior window assembly and replace with 1-1/2 hour fire rated partition. Basement Floor - Demo door to Room 051 and 053 and install new 1-1/2 hour fire rated door assemblies Adjustment factor of 1.6 used to account for additional costs typically associated with retrofit work, working with existing construction, and significant unknowns/variables due to complexity. Estimated Cost 68, Estimated Remaining Cost: 68, Action Date 3/25/ PAGE 62

63 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 3/25/2005 Description Requirement Category Requirement Name Condition There exists ductwork, conduit, pipes, and similar building service equipment, without fire protection, penetrating a fire barrier. This occurs in the following areas: Third Floor - Pipe chase near Room 319; Basement - Room 023, 045, 057, 060, and Stair 3. This is not compliant with NFPA 101 Section Life Safety Fire Barrier: Unprotected Penetrations (Legacy) Poor Percent Complete 0.0 Recommendation Seal openings with approved through-penetration firestopping system. Adjustment factor of 1.2 used to account for additional costs typically associated with retrofit work, and/or working with existing construction. Estimated Cost 29, Estimated Remaining Cost: 29, Action Date 3/25/ PAGE 63

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/11/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/11/2013 BUILDING SURVEY DATE 0912 201 HAZELWOOD DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.137 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,205,100 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/20/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/20/2013 BUILDING SURVEY DATE 0563 201 NORTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.000 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 14,009,500 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/7/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/7/2013 BUILDING SURVEY DATE 0011 107 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.073 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,611,400 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/9/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/9/2013 BUILDING SURVEY DATE 0165 1207 WEST GREGORY DRIVE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.045 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 21,466,200 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/07/2012 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/07/2012 BUILDING SURVEY DATE 0017 1011 W. SPRINGFIELD AVE URBANA, ILLINOIS SYSTEM CONDITION INDEX.357 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 10,390,500 COMPUTER BUILDING GROSS SQUARE FEET 45,346

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0055 105 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.469 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,945,100 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/07/2012 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/07/2012 BUILDING SURVEY DATE 0095 100 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.070 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,101,000 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/05/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/05/2013 BUILDING SURVEY DATE 0116 600 SOUTH MATHEWS AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.610 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 38,384,200 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE 0106 807/809 SOUTH WRIGHT STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.133 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 11,587,300 OFFICE BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/12/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/12/2013 BUILDING SURVEY DATE 0034 1304 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.233 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 9,521,600 LABORATORY BUILDING GROSS SQUARE FEET

More information

COST SEGREGATION. For Building Owners

COST SEGREGATION. For Building Owners 180 Montgomery Street Suite 1950 San Francisco, CA 94104 phone : 415.394.7200 fax : 415.398.6501 web : moskowitzllp.com COST SEGREGATION For Building Owners 2 Moskowitz, LLP What is Cost Segregation? Cost

More information

Cold Weather Preparation

Cold Weather Preparation 0-0.0 January 2012 Country of Origin: United Kingdom Cold Weather Preparation Introduction In addition to the freezing of sprinkler pipes and general water pipes, low temperatures can damage boilers, compressors,

More information

SAFETY GROUP 430 SAFETY WALK-THROUGH CHECKLIST

SAFETY GROUP 430 SAFETY WALK-THROUGH CHECKLIST SAFETY GROUP 430 SAFETY WALK-THROUGH CHECKLIST Service Department Dealership Name: Date: Address: Contact Name/Title: GENERAL 1. Is a 15-minute continuous plumbed or gravity fed eyewash station installed,

More information

10-year industry best core warranty. 2-year warranty on balance of unit.

10-year industry best core warranty. 2-year warranty on balance of unit. MODEL FEATURES MERV-8 filters Fully insulated case Large cores for high efficiency No condensate pan or drain required AHRI Certified Rainhood included Access door for easy maintenance and Cleaning Integral

More information

ATTACHMENT Mitigating Systems

ATTACHMENT Mitigating Systems ATTACHMENT 71111.01 INSPECTABLE AREA: Adverse Weather Protection CORNERSTONE: Initiating Events Mitigating Systems EFFECTIVE DATE: January 1, 2010 INSPECTION BASES: Weather conditions leading to loss of

More information

Business: Address, City, State, zip code

Business: Address, City, State, zip code Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim

More information

TERM 1185 ONLINE APPRENTICESHIP CLASS NUMBERS

TERM 1185 ONLINE APPRENTICESHIP CLASS NUMBERS Term Subject Area Catalog # Description Class Nbr Fee 1185 MPOA 1800 Basic Welding 1159 0.00 1185 ASTA 1804 Starting & Charging Systems 1007 0.00 1185 ASTA 1805 Ignition Systems 1008 0.00 1185 ASTA 1817

More information

Today s A/C systems include:

Today s A/C systems include: * www.sgvenergywise.org Replac ing your A/C system REQUIRES a permit from your c ity - it s important. WHY? Because A/C (air conditioning) is a SYSTEM, not just one piece of equipment. The thermostat,

More information

STATE OF COLORADO DESIGN CRITERIA FOR POTABLE WATER SYSTEMS WATER QUALITY CONTROL DIVISION. Price: $5.00. Revised March 31, 1997

STATE OF COLORADO DESIGN CRITERIA FOR POTABLE WATER SYSTEMS WATER QUALITY CONTROL DIVISION. Price: $5.00. Revised March 31, 1997 STATE OF COLORADO DESIGN CRITERIA FOR POTABLE WATER SYSTEMS WATER QUALITY CONTROL DIVISION Revised March 31, 1997 Price: $5.00 a. an arrangement where the water pipe to be injected with chlorine enters

More information

Annex B Natural No-Notice Event

Annex B Natural No-Notice Event Annex B Natural No-Notice Event Version: 1.0 Effective: 10/01/2015 Revision Date: 10/01/2015 Approved By: John Pitcher Purpose The purpose of Natural No-Notice Event Annex is to ensure the safety of BHCC

More information

Judson ISD BOND ADVISORY COMMITEE. BAC Meeting #1 / December LPA

Judson ISD BOND ADVISORY COMMITEE. BAC Meeting #1 / December LPA Judson ISD BOND ADVISORY COMMITEE BAC Meeting #1 / December 1. 2015 LPA 15 min Introductions & Overview 10 min Perspective Poll 30 min Thought Starter Exercise 30 min Table Topic Groups (ES, MS, HS, District

More information

Welcome. HVAC Change Out Regulations and Rater Verification California Track

Welcome. HVAC Change Out Regulations and Rater Verification California Track Welcome HVAC Change Out Regulations and Rater Verification -------------------------------- California Track Douglas Beaman Douglas Beaman Associates 612 13 th Street Modesto, CA 95354 (209) 524-1000 Doug@DougBeaman.com

More information

MAINTENANCE EVALUATION CHECKLIST HYDRAULIC ELEVATORS

MAINTENANCE EVALUATION CHECKLIST HYDRAULIC ELEVATORS Manufacturer: Model: Evaluation Performed By: INTRODUCTION: This checklist will enable the user to make an objective appraisal of the condition of the equipment. Given the variety and complexity of the

More information

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10 Develop a Disaster Preparedness Plan Assess your risks of natural and manmade disasters Purchase adequate insurance and ensure that you have the types of coverage you may need Keep employee contact information

More information

Lessons Learned From Labs 21. Retrofitting of Chemistry Laboratories University of Toronto

Lessons Learned From Labs 21. Retrofitting of Chemistry Laboratories University of Toronto Lessons Learned From Labs 21 Retrofitting of Chemistry Laboratories University of Toronto Presented by: Mike Dymarski, PhD Technical and Administrative Manager Department of Chemistry University of Toronto.

More information

Pinellas County Capital Improvement Program, FY2006 Through FY2011 Project Summary Report

Pinellas County Capital Improvement Program, FY2006 Through FY2011 Project Summary Report Function : General Government Services Activity : Judicial Project No: 923 Title: Courts/Jails Future Expansion Cost Center: 8160500 Department: General Services Primary Fund: 0401 CIE: No Sub-cost Center:

More information

Parallel Requirements of Construction Standards for Accessibility ANSI, UFAS and ADAAG

Parallel Requirements of Construction Standards for Accessibility ANSI, UFAS and ADAAG Total # of spaces: # of accessible spaces: Parallel Requirements of Construction Standards for Accessibility PARKING Cite 4.3 Cite 4.6 Cite 4.6 required number; however, the number of accessible spaces

More information

ADMINISTRATION BUILDING

ADMINISTRATION BUILDING TORNADO PROCEDURES Tornadoes are nature s most violent storms, and over a small area, the most destructive. A tornado s whirling winds may reach 300 miles per hour or more. Generally short-lived and fast

More information

New Paint in Bowl Area - Paint on Aisles Risers, Walls, Soffits and Railings. Lower Level Platform Riser Seating

New Paint in Bowl Area - Paint on Aisles Risers, Walls, Soffits and Railings. Lower Level Platform Riser Seating R E N O V A T I O N S P H A S E I I K E L L M U Ñ O Z A R C H I T E C T S 0 7. 0 9. 2 0 1 2 C O N C E P T D E S I G N B A S E P R O J E C T S C O P E : R E N O V A T E C O N C O U R S E A N D F I N I

More information

BV SERIES. VERTICAL BLOWER COIL UNITS Nominal Sizes 2 thru 10 Ton

BV SERIES. VERTICAL BLOWER COIL UNITS Nominal Sizes 2 thru 10 Ton BV SERIES VERTICAL BLOWER COIL UNITS Nominal Sizes 2 thru 10 Ton MAGIC AIRE BV SERIES FAN COILS ARE ETL LISTED TO U.S. AND CANADIAN SAFETY STANDARDS AND ARE ASSEMBLED TO ORDER FOR COMPETITIVE DELIVERY.

More information

October By Kimberly Paarlberg, RA, Senior Staff Architect and Dave Bowman, Manager of Codes, ICC

October By Kimberly Paarlberg, RA, Senior Staff Architect and Dave Bowman, Manager of Codes, ICC 45 Be Prepared to Weather the Storm New Scoping in the 2015 IBC for Storm Shelters Using the ICC 500 ICC/NSSA Standard for the Design and Construction of Storm Shelters By Kimberly Paarlberg, RA, Senior

More information

HomeWorks Construction

HomeWorks Construction 1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com

More information

SELF-AUDIT CHECKLIST

SELF-AUDIT CHECKLIST SELF-AUDIT CHECKLIST Service Department Location: Date: Conducted By: Dept: GENERAL 1. Is proper footwear worn in the Service Department? ( ) ( ) ( ) ( ) 2. Are smoking rules posted where there is a serious

More information

Kjeltec 2300 Analyzer Unit

Kjeltec 2300 Analyzer Unit Kjeltec 2300 Analyzer Unit Automatic distillation and approved colorimetric titration for analysis of Kjeldahl nitrogen/protein, ammonium- nitrogen, TKN, Direct distillation (DD), volatile acids/ bases

More information

B6VMAX Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS

B6VMAX Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS TECHNICAL SPECIFICATIONS B6VMAX Series Air Handler with TXV 13-19 SEER Residential System 18,000-60,000 Btuh (Heat Pump & Air Conditioner) R-410A Refrigerant The B6VMAX Series of air handlers, when combined

More information

E-Invoice. Total. ibuild,inc. Subtotal. Sales Tax (0.0%) 3000 S Jamiaca Ct Suite 210 Aurora, CO Date 12/2/

E-Invoice. Total. ibuild,inc. Subtotal. Sales Tax (0.0%) 3000 S Jamiaca Ct Suite 210 Aurora, CO Date 12/2/ Item Description Qty U/M Rate 3 Bedroom 2 1/2 Bath Two Story 1962 Square Feet Flooring Misc Flooring 100% Solution Dyed BCF Polyester 970 0.00T Misc Flooring 5lbs 3/8 Rebond pad 970 0.00T Misc Flooring

More information

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

FACILITIES CONDITIONS ASSESSMENTS

FACILITIES CONDITIONS ASSESSMENTS FACILITIES CONDITIONS ASSESSMENTS DRAFT REPORT for October, 0 FACILITIES CONDITIONS ASSESSMENTS NORFOLK PUBLIC SCHOOLS TABLE of CONTENTS SCOPE of the WORK. FACILITIES ASSESSMENT DEFINITIONS FACILITY CONDITIONS

More information

Modular contactors for installation into distribution

Modular contactors for installation into distribution Modular contactors for installation into distribution boards Modular contactors for installation into distribution boards Modular contactor for installation into distribution board Description Modular

More information

PASADENA UNIFIED SCHOOL DISTRICT MEASURE TT CITIZENS' OVERSIGHT COMMITTEE HISTORICAL SUMMARY OF PROJECTS

PASADENA UNIFIED SCHOOL DISTRICT MEASURE TT CITIZENS' OVERSIGHT COMMITTEE HISTORICAL SUMMARY OF PROJECTS PROJECT EXPENSES Allendale Elementary Measure Y Closeouts MY 0 31,906 0 Totals for Allendale Elementary 0 31,906 0 Altadena Elementary Three Shade Structures TT 90,512 90,187 90,187 Altadena Elementary

More information

Storing, using and disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements

Storing, using and disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements Storing, using disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements Radiation Protection Control (Ionising Radiation) Regulations 2000 Requirements for

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2015/2016 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

General. High Winds. High winds are a common hazard in the UAE.

General. High Winds. High winds are a common hazard in the UAE. General guidance for employers and workers in inclement weather conditions Date: March 2017 OSHAD 2017 This document is and shall remain the property of OSHAD. The document may only be used for the purposes

More information

Clearlake Closure / Cocoa Jr/Sr Conversion Project

Clearlake Closure / Cocoa Jr/Sr Conversion Project Clearlake Closure / Cocoa Jr/Sr Conversion Project Description Budget COMMENTS Contracted Services Detail Total Design Criteria Professional 0 In-House Design/Build GMP 1,100,055 Cocoa HS conversion 540,906

More information

1040 SLIDING MALL FRONT

1040 SLIDING MALL FRONT APRIL, 00 00 SLIDING MALL FRONT INDEX INDEX... ELEVATIONS/VERTICAL SECTION DETAILS... HORIZONTAL SECTION DETAILS... EGRESS DOOR... - STACK AREA LAYOUT... - SIZE LIMITATIONS... HARDWARE...0 LAWS AND BUILDING

More information

OnSight PROS Report Professional Documentation

OnSight PROS Report Professional Documentation OnSight PROS Report Professional Documentation The Attached Report is performed by OnSight PROS, LLC Certified Field Inspectors and thus should not be confused with an inspection performed by Licensed

More information

Keeping Your Lab Safe: Healthy Laboratory. Presenter: Jeff Rogers. April, 2009

Keeping Your Lab Safe: Healthy Laboratory. Presenter: Jeff Rogers. April, 2009 Keeping Your Lab Safe: A Guide to Maintaining a Safe and Healthy Laboratory Presenter: Jeff Rogers April, 2009 U. Kentucky Accident Figure 1 View of the fume hood where the accident occurred. Notice the

More information

Temple City Unified School District Committed to 21 st Century Academic Excellence

Temple City Unified School District Committed to 21 st Century Academic Excellence Temple City Unified School Committed to 21 st Century Academic Excellence Board of Education Members Vinson Bell Kenneth Knollenberg Lawrence A. Marston John Pomeroy Robert S. Ridley Superintendent Kathryn

More information

1. Staff members should be cognizant of the emergency procedures that relate to:

1. Staff members should be cognizant of the emergency procedures that relate to: EMERGENCY PROCEDURES Emergency Procedures 1. Staff members should be cognizant of the emergency procedures that relate to: a. Prevention of Assaults b. Holding and Dispersing Students in Individual School

More information

The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong.

The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong. ABOUT The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong. The Annex lies in the crossroads of art, fashion, film, music and photography worlds. The Annex,

More information

1. Wind turbines are designed to operate within specified design criteria. Often the operating environment extends beyond these limits and causes

1. Wind turbines are designed to operate within specified design criteria. Often the operating environment extends beyond these limits and causes 1 2 1. Wind turbines are designed to operate within specified design criteria. Often the operating environment extends beyond these limits and causes outages. How these outages are classified can be challenging

More information

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s 4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s Sewerage Masahiro Hikino* and Gaku Sato** *Planning Section, Planning and Coordinating Division, Bureau of Sewerage, Tokyo Metropolitan Government

More information

ENH4X. Product Specifications HORIZONTAL EVAPORATOR COILS ALL CASED N COIL MODELS WARRANTY*

ENH4X. Product Specifications HORIZONTAL EVAPORATOR COILS ALL CASED N COIL MODELS WARRANTY* ENVIRONMENTALLY SOUND REFRIGERANT ENH4X Product Specifications HORIZONTAL EVAPORATOR COILS ALL CASED N COIL MODELS 2 thru 5 Tons Available for environmentally sound R 410A systems Copper tube / aluminum

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Home Inspection Report

Home Inspection Report Home Inspection Report Michael Donitzen 3460 White Oak Drive Harrisonburg, Va 22801 540-830-0259 VA Lic# 2705151782~WVa Lic# HI8300259-0515~NRPP Radon #102759RT WV Radon # RT000575~CMI Mold # 81931~NACHI#

More information

REMARKS. WALLS Damaged q yes q no

REMARKS. WALLS Damaged q yes q no KITCHEN CEILING Damaged q yes q no q tiles q nail pops q stains/tested dry q advise small cosmetic repairs WALLS Damaged q yes q no q vinyl q nail pops q stains/tested dry q advise small cosmetic repairs

More information

Ground Penetrating Radar & By Mike Kelty Western Technologies Inc.

Ground Penetrating Radar & By Mike Kelty Western Technologies Inc. Ground Penetrating Radar & Thermorgraphy By Mike Kelty Western Technologies Inc. Overview Types of Locating Methods/Equipment How GPR Works GPR Applications How Thermography Works Thermography Applications

More information

Chemical Health and Safety General Program

Chemical Health and Safety General Program Chemical Health and Safety General Program I. Objective To establish minimum requirements for storage, handling and use of chemicals. II. Scope This process applies to employees and operations involved

More information

ENVIRONMENTALLY SOUND R 410A REFRIGERANT

ENVIRONMENTALLY SOUND R 410A REFRIGERANT ENVIRONMENTALLY SOUND REFRIGERANT N4H3 Performance Series Product Specifications EFFICIENT 13 SEER HEAT PUMP ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase,

More information

Back to Basics: Realizing Cabling Determines Design. F. Patrick Mahoney, CSI CDT, RCDD Direct Supply - Aptura

Back to Basics: Realizing Cabling Determines Design. F. Patrick Mahoney, CSI CDT, RCDD Direct Supply - Aptura Back to Basics: Realizing Cabling Determines Design F. Patrick Mahoney, CSI CDT, RCDD Direct Supply - Aptura Back to Basics: Realizing Cabling Determines Design Cabling distribution design implementation

More information

6 Securing of the delivery and acceptance

6 Securing of the delivery and acceptance 6 Securing of the delivery and acceptance Sector/Field Ox activities 1 Building Energy consumption 2 Spaces 3 Envelope, walls, roof, base floors, windows and doors Total energy consumption by types of

More information

Check Sheet Only FOR PPI s

Check Sheet Only FOR PPI s Page 1 Check Sheet Only FOR PPI s Weather conditions at the time of the inspection: ( ) Dry ( ) Wet ( ) Intermittent rain Access: Are there any areas and/or section to which access should be gained ( )

More information

GB5BM Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Air Handler WARRANTY

GB5BM Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Air Handler WARRANTY TECHNICAL SPECIFICATIONS GB5BM Series Air Handler 13 SEER Residential System 18,000-60,000 Btuh (Heat Pump & Air Conditioner) The GB5BM Series of air handlers, when combined with our heat pump or air conditioner,

More information

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH)

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) ORGANIZATION: FACILITY: FACILITY USE: 35-LAKE COUNTY SCHOOL DISTRICT UMATILLA MIDDLE ALL DISTRICT: 35 LAKE COUNTY SCHOOL DISTRICT FACILITY: 41-A UMATILLA MIDDLE Primary Use: MIDDLE Grades Housed: 06-08

More information

EXISTING PANEL "22C" CIR.# TYPE DESCRIPTION VOLTAGE 208Y/120V WIRE SIZE EXISTING PANELBOARD SCHEDULE PHASE WIRE NEUTRAL AIC MAIN % (E) 400A MLO

EXISTING PANEL 22C CIR.# TYPE DESCRIPTION VOLTAGE 208Y/120V WIRE SIZE EXISTING PANELBOARD SCHEDULE PHASE WIRE NEUTRAL AIC MAIN % (E) 400A MLO EXISTING PANEL "22C" DESCRIPTION VOLTAGE 208Y/120V WIRE SIZE EXISTING PANELBOARD SCHEDULE PHASE WIRE NEUTRAL AIC MAIN 3 4 100% (E) 400A MLO COND BREAKER LOAD LOAD BREAKER PHASE. SIZE AMP P (KVA) (KVA)

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

UCONN 2000 Year 16 Proposed FY 2011 Authorized Projects Attachment A Storrs & Regional Campuses Project Name Phase III Funding Arjona & Monteith (new

UCONN 2000 Year 16 Proposed FY 2011 Authorized Projects Attachment A Storrs & Regional Campuses Project Name Phase III Funding Arjona & Monteith (new UCONN 2000 Year 16 Proposed FY 2011 Authorized Projects Attachment A Storrs & Regional Campuses Project Name Phase III Funding Arjona & Monteith (new classroom buildings) $ 45,900,000 Avery Point Campus

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

Facilities Management

Facilities Management Policy Number: 700.20 Title: Chemical Fume Hood Policy Implementation Date: 2002 Last Audited: August, 2017 Last Revised: October 23rd, 2017 Facilities Management Introduction The laboratory chemical fume

More information

AIR CONDITIONER (SPLIT TYPE) SERVICE MANUAL

AIR CONDITIONER (SPLIT TYPE) SERVICE MANUAL AIR CONDITIONER (SPLIT TYPE) SERVICE MANUAL FILE No. A10-023-1 REVISION 1 : Mar.2012 Re-edit version.( file volume down) Contents have NOT been changed. Model name: RAS-M10PKVP-E RAS-M13PKVP-E RAS-M16PKVP-E

More information

SECTION 1 - WHAT IS A BTU METER? BTU's = Flow x ΔT Any ISTEC BTU Meter System consists of the following main components:

SECTION 1 - WHAT IS A BTU METER? BTU's = Flow x ΔT Any ISTEC BTU Meter System consists of the following main components: SECTION 1 - WHAT IS A BTU METER? ISTEC BTU Meters measure energy usage by multiplying flow rate and temperature difference. As the water (or other liquid) passes through these lines, the multi-wing turbine

More information

Andrew Rhodes. The Hilton Baltimore Convention Center Hotel

Andrew Rhodes. The Hilton Baltimore Convention Center Hotel Andrew Rhodes The Pennsylvania State University Architectural Engineering Mechanical Mechanical Technical Report #1 ASHRAE Standard 62.1: Ventilation Compliance Evaluation Faculty Advisor: Dr. William

More information

West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y,

West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y, West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y, 2 0 1 4 1. 2. 3. 4. 5. Meeting Number One Programming Scope Definition Meeting Number Two Programming

More information

Getting to know you and your home.

Getting to know you and your home. Getting to know you and your home. Date of Meeting Customer Name(s) Property Address Sales Associate Seller Assessment Please share with me why you re moving. What is your ideal timeframe in making this

More information

MODEL: WB009GMFI19HLD (120V) Wall Mount DC Inverter Fan Coil Unit 9,000 BTUH

MODEL: WB009GMFI19HLD (120V) Wall Mount DC Inverter Fan Coil Unit 9,000 BTUH MODEL: WB009GMFI19HLD (120V) Wall Mount DC Inverter Fan Coil Unit 9,000 BTUH No. Part Name Quantity BOM code List Price Remark 1 Panel assembly 1 201132890609 2 Air filter 2 201132890704 5 Display box

More information

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760)

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760) 1 Insured: Property: Venice Motel 1114 N. Golden State Blvd Turlock, CA 95380 Claim Rep.: Don Draughon Business: (818) 721-4280 Estimator: Michael Miller Business: (760) 985-9951 Contractor: Business:

More information

Getting to Know You and Your Home.

Getting to Know You and Your Home. Getting to Know You and Your Home. Date of Meeting Customer Name Property Address Sales Associate Seller Assessment Please share with me why you re moving. What is your ideal timeframe in making this move?

More information

HEAT TRANSFER AND EXCHANGERS

HEAT TRANSFER AND EXCHANGERS HEAT TRANSFER AND EXCHANGERS Although heat-transfer rates can be computed with reasonable accuracy for clean or new pipe, the effect of dirty or corroded pipe surfaces cannot he satisfactorily estimated.

More information

12 Moderator And Moderator System

12 Moderator And Moderator System 12 Moderator And Moderator System 12.1 Introduction Nuclear fuel produces heat by fission. In the fission process, fissile atoms split after absorbing slow neutrons. This releases fast neutrons and generates

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Objectives 106 CHAPTER 2 WORK

Objectives 106 CHAPTER 2 WORK Objectives Explain the relationship between work done in electrical systems, charge moved, and the potential difference. Calculate the amount of electrical charge in coulombs moving past a point in a circuit.

More information

Temple City Unified School District Committed to 21 st Century Academic Excellence

Temple City Unified School District Committed to 21 st Century Academic Excellence Temple City Unified School Committed to 21 st Century Academic Excellence Board of Education Members Vinson Bell George M. Goold Kenneth Knollenberg Lawrence A. Marston John Pomeroy Superintendent Kathryn

More information

Building Envelope Requirements Overview Page 3-4

Building Envelope Requirements Overview Page 3-4 Building Envelope Requirements Overview Page 3-4 The benefit of a high reflectance surface is obvious: while dark surfaces absorb the sun s energy (visible light, invisible infrared. and ultraviolet radiation)

More information

PHOS 15 LED PROJECTOR

PHOS 15 LED PROJECTOR PHOS 15 LED PROJECTOR SPECIFICATIONS Item:.. PHOS 15 Body:.... Aluminium Available Colours:... White / Black / Silver Weight:.... 1.9 kg On / Off Switch:..... Not Available Environmental Conditions:.....

More information

Risk Assessment and Mitigation. Hurricane Checklist

Risk Assessment and Mitigation. Hurricane Checklist Risk Assessment and Mitigation Hurricane Checklist Hurricane Checklist Hurricanes are severe tropical storms with sustained winds of at least 74 miles per hour. Hurricane winds can reach 160 miles per

More information

TECHNICAL MANUAL 820 LX / 910 LX / 1300 LX

TECHNICAL MANUAL 820 LX / 910 LX / 1300 LX TECHNICAL MANUAL 820 LX / 910 LX / 1300 LX LANCER reserves the right to modify, constantly its documentation for its improvement. The values of adjustments indicated in the displays of this manual are

More information

W O O D L A N D S R O A D A L T R I N C H A M C H E S H I R E

W O O D L A N D S R O A D A L T R I N C H A M C H E S H I R E C H A R T E R E D V A L U A T I O N S U R V E Y O R S & E S T A T E A G E N T S W O O D L A N D S R O A D A L T R I N C H A M C H E S H I R E ALTIN COURT IS AN EXCLUSIVE DEVELOPMENT OF JUST THREE STUNNING

More information

Industrial Generator Set Accessories

Industrial Generator Set Accessories Industrial Generator Set Accessories Sound Enclosures KD/KM/KV Models General Information Measuring Sound Level The unit of measurement for sound level is the decibel (db) that is calculated using the

More information

Series 3000 and XE-Series Engineering Data

Series 3000 and XE-Series Engineering Data Series 3000 and XE-Series Engineering Data A C A U S T R A L I A Series 3000 and XE-Series Engineering Data The NEW era of Series 3000 and XE-Series Cooling Towers continue to exceed the industry standard

More information

Industrial Generator Set Accessories

Industrial Generator Set Accessories Industrial Generator Set Accessories Sound Enclosures KD/KM/KV Models Measuring Sound Level General Information Sound Pressure (LpA) and Sound Power (LwA) The unit of measurement for sound level is the

More information

7. New Business 7.1 New items that the Committee or District Staff would like to discuss.

7. New Business 7.1 New items that the Committee or District Staff would like to discuss. TEMPLE CITY UNIFIED SCHOOL DISTRICT CITIZENS OVERSIGHT COMMITTEE MEETING AGENDA January 22, 2015, 5:30 PM Dr. Doug Sears Learning Center, Room 1 (Posted January 21, 2015) 1. Call to Order 2. Roll Call

More information

EFFICIENT 13 SEER HEAT PUMP ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase, 60 Hz

EFFICIENT 13 SEER HEAT PUMP ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase, 60 Hz ENVIRONMENTALLY SOUND REFRIGERANT N4H3 Performance Series Product Specifications EFFICIENT 13 SEER HEAT PUMP ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase,

More information

Singer. Incremental Comfort Systems. K, EK Vintage F. Last Manufactured: Replacement Parts List No Revision C 04/2012

Singer. Incremental Comfort Systems. K, EK Vintage F. Last Manufactured: Replacement Parts List No Revision C 04/2012 Replacement Parts List No. 055231000 Revision C 04/2012 Singer Incremental Comfort Systems K, EK 07-15 Vintage F Last Manufactured: 1976 To find your Daikin Applied parts distributor, call 1-800-377-2787

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION rdmore, P tlantic City, NJ REQUEST FOR INFORMTION PROJECT: Renaissance Hotel Renovations RFI NUMBER:.0 FXB Engineering TTN: David Drake Christy Dr #0 Chadds Ford, P 0phone 0000000000fax Requested Date:

More information

LUCKY STAR ST HELENA BAY EMERGENCY INTERVENTION PLAN

LUCKY STAR ST HELENA BAY EMERGENCY INTERVENTION PLAN LUCKY STAR ST HELENA BAY EMERGENCY INTERVENTION PLAN WATER CRISIS SEPTEMBER 2017 Abstract The current water crisis in the Western Cape is one of Lucky Star Operations highest risk for business continuity.

More information

END4X, ENW4X, ENA4X. Product Specifications VERTICAL EVAPORATOR COILS ALL N COIL MODELS CASED N COILS UNCASED N COILS ENA4X WARRANTY*

END4X, ENW4X, ENA4X. Product Specifications VERTICAL EVAPORATOR COILS ALL N COIL MODELS CASED N COILS UNCASED N COILS ENA4X WARRANTY* ENVIRONMENTALLY SOUND REFRIGERANT VERTICAL EVAPORATOR COILS ALL N COIL MODELS 1½ thru 5 Tons Available for environmentally sound R 410A systems Copper tube / aluminum fin N coil with latest high tech fin

More information

Chimney Sizing. Project Name: Location: Type Appliance: Hot Water Heater Incinerator. LP Gas #2 Oil #6 Oil Wood/Coal Waste (Type ) Appliance Input:

Chimney Sizing. Project Name: Location: Type Appliance: Hot Water Heater Incinerator. LP Gas #2 Oil #6 Oil Wood/Coal Waste (Type ) Appliance Input: Chimney Sizing Project Name: Location: Type Appliance: Type Fuel: Appliance Input: Boiler Hot Water Heater Incinerator Natural Gas LP Gas #2 Oil #6 Oil Wood/Coal Waste (Type ) BTU Hp Lbs/hr Height Above

More information

University of Moratuwa, Sri Lanka. EE3231: Design of Electrical Installation

University of Moratuwa, Sri Lanka. EE3231: Design of Electrical Installation University of Moratuwa, Sri Lanka B.Sc. Engineering Level 4 Semester 1 Examination EE3231: Design of Electrical Installation Time allowed: 2 Hours January 2010 Additional Material: Not required INSTRUCTIONS

More information

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH)

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) ORGANIZATION: FACILITY: FACILITY USE: 51-PASCO COUNTY SCHOOL DISTRICT SOUTHEAST BUS GARAGE ALL DISTRICT: 51 PASCO COUNTY SCHOOL DISTRICT FACILITY: 55-F SOUTHEAST BUS GARAGE Primary Use: TRANSPORTATION

More information