Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012

Size: px
Start display at page:

Download "Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012"

Transcription

1 Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration Presented by Mike Carlson September 20,

2 Denver International Airport 5 Runways 12,000 /. (3,658m) x 150 /. (46m) 1 Runway 16,000 /. (4,877m) x 200 /. (61m) 53 Square Miles (137 Square Kilometers) 5 th busiest airport in the U.S. 2

3 DIA is located 34 miles (56 kilometers) northeast of Denver 3

4 Trigger to acquire Multi-Function Equipment 4

5 December 21,

6 Planning - Equipment Count DIA Snow Equipment Count December

7 2006 Blizzard Review Inaccurate forecasting Holiday week Heavy snow fall rates Strong winds/low visibility 22 (55.9cm) of snow 35 hour storm duration Airport opened 22 hours after snow stopped 5,000 stranded passengers Airline losses = approximately US$60+ million 7

8 Time to Re-Think a Few Things Update DIA Snow and Ice Control Plan Evaluate new equipment Multi-function Contract out portions of the Airport Snow Melters 8

9 Goals & Objectives Come to a consensus on: Acquisition of additional snow equipment (which kind?) Utilization of snow melters and contractors on the terminal ramp Implementation plan (multi-year) 9

10 Priority 1 Map 10

11 Snow Plan Levels of Snow Alert Type Amount of Snow (cm) Equipment needed Personnel needed Cautionary Level A Level B Snow Emergency Up to 1 (2.5 cm) 1-3 (2.5 to 7.6 cm) 3-10 (10.1 to 25.4 cm) >10 (25.4 cm) 35 pieces pieces pieces pieces

12 Snow Removal Equipment Traditional Equipment Oshkosh Blower - 20 units Oshkosh Plow/Pusher -24 units Oshkosh Broom - 24 units 12

13 Crossroads for Snow Program Decision Point 40% of the existing snow removal equipment is nearing the end of its useful life Average age of the replacement equipment is 16 years Snow program will require a significant investment regardless of direction Multi-function equipment was becoming industry standard Conduct Cost-Benefit Analysis to justify multi-function equipment direction 13

14 DIA Cost-Benefit Analysis Process Weather Analysis 80-Year Plan NOAA data Define Annual Snow Events Airline Flight Schedule Peak winter day (March 10, 2006) Official Airline Guide (OAG) Snow Equipment Teams 2006 Conventional Team Transition Team Full Conventional Team Multi-Function Team Airline Operating Costs Current fleet mix Cost per minute of operation Runway Capacity Rates Arrivals & Departures During poor weather conditions (snow) Number of runways open (1 to 6) Snow Team Travel Routes & Clearing Times Old Priority 1 pavement New Priority 1 pavement East & West runway/taxiway teams Annual Delay Savings Comparison Based on runway closures Each snow event Each equipment team configuration Determine the cost and benefits of using multi-function vs. conventional airfield snow removal equipment 14

15 Cost-Benefit Analysis Summary Largest annual operational delay savings (US $5,554,558) accrues from changes to Priority 1 pavement areas (conventional equipment) Second largest annual operational delay savings (US $4,212,071) accrues from implementing multifunction snow equipment teams Total Saving=$9,766,629 15

16 Multi-function vs. Full Conventional Comparison Project Costs Multi-function (US$ millions) Full Conventional (US$ millions) Equipment $31.0 $21.3 Facilities $7.2 $7.2 Labor $3.5 $13.1 Contracts $0.0 $0.0 Total Projected Costs $41.8 $41.6 Operational Delay Savings $60.1 $27.0 Operational Net Value $18.3 $14.6 Passenger Time Savings (Consistent with FAA Methodology) $65.0 $29.5 Total Economic Present Value $83.3 $

17 Why Multi-function? Multi-function Full Conventional 10 year net operational benefit: $18,327,993 NPV Labor 192 Maintenance Time 15 minute / runway Full recovery faster than full- conventional Equipment cost $31,000,000 NPV Safe year net operational deficit: -$14,620,617 NPV Labor 318 Maintenance Time 30 minutes / runway Full recovery slower than multi-function Equipment cost $21,304,520 NPV Safe 17

18 Specifications Request For Proposal DIA s needs identified and modeled during the development of the updated snow removal plan Apparatus identified to meet U.S. Advisory Circular standards FAA Airport Improvement Program funding eligibility Team evaluated and made recommendations Procure approximately 37 pieces of MFE from one manufacturer or multiple manufacturers 18

19 Performance Standards/Tests Specific Performance Standards were outlined in the Request for Proposal for each of the key functions of the MFE Carrier Vehicle Sweeper/Airblast Unit Displacement Plows Other Delivery 19

20 Equipment Tested Overassen Vammas Boschung Oshkosh/MB 20

21

22 Multi-function Equipment 16 Boschung 24 Oshkosh/MB 2 MB 22

23 Boschung Boschung unit offered mission specific advantages for the taxiway and rapid response teams 23

24 Multi-function Equipment - Boschung -16 Jet Broom units 8 Units with 3 rd Axle 4 units with summer kits Rubber removal FOD control Spall repair 4 units chemical spreaders 4 units sand spreaders mph (40-48 km/hr) 24

25 Multifunction Equipment Oshkosh/MB 24 units MB mph (40-48 km/h) 2 units mph (40-48 km/h) AIP funded (75%) 25

26 Budgeting and Costs Equipment Costs (US$) Federal Grants (US$) Net Cost (US$) Oshkosh $17,189,003 $12,764,718 $4,424,285 Boschung $15,424,460 $15,424,460 Radios $110,000 $110,000 Total $32,723,463 $12,764,718 $19,958,745 26

27 MFE Delivery Schedule 2008 Boschung Oshkosh/MB August 4 4 September 13 October 4 5 November 2 December 4 February (2009) 4 August (2012) 2* Total * MB 27

28 Benefits of Multi-function Equipment Faster cleaning Smaller Conga line Fewer Full Time Employees (FTE s) One piece of equipment performing up to three functions (pushing, brooming & blowing) 28

29 Equipment Life Cycle Unknown on MFE at this time. Assume a 15 year useful life at 300 operating hours/year Established Life Cycles for Other Runway Equipment Front Mount Runway Brooms 12 years Blowers 15 years Single Axle 4 x 4 with 24 ft. Plow 15 years Tandem with Runway Sander and 24 ft. Plow 10 years 29

30 Operating Cost of MFE (Based on 4 Years) Maintenance & Labor Costs/Year Oshkosh/MB - $19,466 Boschung - $19,045 30

31 Multi-Function Teams Runway Team Taxiway Team 31

32 Push SAND CHEM Broom SU CHEM BL SAND Equipment Drivers / 24 hrs. 4 Boschung 8 Drivers 1 Blowers 2 Drivers 1 Pusher 2 Drivers 1 Broom 2 Drivers 1 Field Supr. 2 Drivers

33 Equipment Speed: mph RW Plow Time: min. 1 Pass on RW BL SA BL SU CH SU SU F CH BL Equipment Drivers / 24 hrs. SA 15 MB s MulT FX 30 Drivers 6 Blowers 12 Drivers 2 Sanders 4 Drivers BL BL BL 2 Chemical 4 Drivers 2 Maint. Supr. 4 Drivers 1 Ops. Supr. 2 Drivers 1 FricTon 2 Drivers

34 BL Equipment Speed: mph RW Plow Time: min. 1 Pass on RW BL SA BL SU CH SU SU F CH SA BL BL BL

35 Equipment Speed: mph RW Plow Time: min. 1 Pass on RW BL SA SU CH SU BL SU F CH SA Equipment Drivers / 24 hrs. 11 MB s MulT Fx 22 Drivers BL 4 Blowers 8 Drivers 2 Brooms 4 Drivers 2 Chemical 4 Drivers BL 2 Maint. Supr. 4 Drivers 1 Ops. Supr. 2 Drivers 1 FricTon 2 Drivers

36 BL Equipment Speed: mph RW Plow Time: min. 1 Pass on RW BL SA CH SU SU SU F CH SA BL BL

37 37

38 38

39 39

40 40

41 Average Runway Closure Time Season Average 2006/ / / / / /

42 Questions? Contact Information Mike Carlson Airport Operations Manager

43 Extra Slides Following slides are all extra to reference for any questions that may come up after the presentation. 43

44 Regulations FAA Standards - Winter Operations Advisory Circular: Airport Winter Safety and Operations (150/ C) - Sufficient equipment to clear 1 (2.5 cm) of snow from: - Primary runways - Principal taxiways to ramp - Emergency access roads - Ramp area to accommodate anticipated aircraft operations - WITHIN 30 MINUTES 44

45 Snow Program Summary DIA Snow Program Cost Benefit Analysis US$ millions Project Costs: (1) 5% NPV 10% NPV Equipment $31.0 $24.7 Facilities $9.5 $7.5 Labor $3.5 $2.9 Contracts $63.9 $50.3 Total Projected Costs $107.9 $85.4 Operational Savings Delay Savings $134.1 $104.2 Other Operational Savings $8.6 $6.7 Total Operational Savings $142.7 $111.0 Operational Net Value $34.8 $25.6 Passenger Time Savings $154.5 $120.0 Total Economic Present Value $189.3 $145.6 DIA Reputation (Customer Service) $Priceless$ Average Cost per Enplaned Passenger ($) $0.519 Average Cost per 1000-lb Landed Weight ($) $

46 SAND CHEM SU CHEM SAND BL Equipment (per side) Drivers / 24 hrs. 4 Boschung 8 Drivers 1 Blowers 2 Drivers 1 Field Supr. 2 Drivers 6 (per side) 12 (per side)

47 Equipment Speed: mph RW Plow Time: min. 1 Pass on RW SA SU CH SU BL SU F CH Equipment Drivers / 24 hrs. SA 15 MB s MulT FX 30 Drivers 4 Blowers 8 Drivers 2 Sanders 4 Drivers 2 Chemical 4 Drivers 2 Maint. Supr. 4 Drivers 1 Ops. Supr. 2 Drivers 1 FricTon 2 Drivers BL

48 BL Equipment Speed: mph RW Plow Time: min. 1 Pass on RW SA SU CH SU SU F CH SA BL

49 Equipment Speed: mph RW Plow Time: min. 1 Pass on RW SA SU CH SU BL SU F CH Equipment Drivers / 24 hrs. SA 11 MB s MulT Fx 22 Drivers BL 2 Blowers 4 Drivers 2 Sanders 4 Drivers 2 Chemical 4 Drivers 2 Maint. Supr. 4 Drivers 1 Ops. Supr. 2 Drivers 1 FricTon 2 Drivers

50 BL Equipment Speed: mph RW Plow Time: min. 1 Pass on RW SA SU CH SU SU F CH SA BL

51 51

52 52

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM Purpose: The Public Transportation Department and contracted provider will provide safe transportation for AnchorRIDES customers and employees during severe weather or emergency conditions. AnchorRIDES

More information

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently

More information

Winter Operations GENEVA CASE. AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter )

Winter Operations GENEVA CASE. AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter ) Winter Operations GENEVA CASE AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter 2009-2010) GENEVA CLIMATE IN A NUTSHELL Altitude 391 m / 1283 ft. The climate is temperate. Traditionally mild winters

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM Purpose: The Public Transportation Department (PTD) and AnchorRIDES paratransit contractor will provide transportation in as safe a manner as effectively possible. Paratransit vehicles primarily operate

More information

Edmonton International Airport

Edmonton International Airport Edmonton International Airport ZVL Airside Operations Winter Operations Program 2012/13 September 10, 2012 ZVL_pla.dgn Default 12/17/07 5:10:28 PM AIRSIDE WINTER OPERATIONS PROGRAM (AER-002P) DISTRIBUTION/REVISION

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

Edmonton International Airport

Edmonton International Airport Edmonton International Airport ZVL Airside Operations Winter Operations Program 2017/18 September, 2017 AIRSIDE WINTER OPERATIONS PROGRAM (AER-002P) DISTRIBUTION/REVISION LIST Distribution Edmonton Airports

More information

EXPLORING GSE, AIRFIELD EQUIPMENT AND INFRASTRUCTURE AIRFIELD LIGHTING THROWING LIGHT ON AGL TECHNOLOGY

EXPLORING GSE, AIRFIELD EQUIPMENT AND INFRASTRUCTURE   AIRFIELD LIGHTING THROWING LIGHT ON AGL TECHNOLOGY EXPLORING GSE, AIRFIELD EQUIPMENT AND INFRASTRUCTURE WWW.AIRSIDEINT.COM WINTER 2017 #AIRSIDEINT AIRFIELD LIGHTING THROWING LIGHT ON AGL TECHNOLOGY PLAYING IT SAFE ON THE RAMP LOOKING BACK TO inter airport

More information

Auburn Lewiston Airport. Snow and Ice Removal Plan

Auburn Lewiston Airport. Snow and Ice Removal Plan Auburn Lewiston Airport Snow and Ice Removal Plan SNOW AND ICE REMOVAL PLAN The Auburn-Lewiston Airport has established this Snow and Ice Plan as the instruction and guideline for managing winter weather

More information

2014 / 2015 PRESEASON WICHITA MID-CONTINENT AIRPORT. Snow and Ice Control Committee (SICC) WINTER OPERATIONS AND SAFETY MEETING

2014 / 2015 PRESEASON WICHITA MID-CONTINENT AIRPORT. Snow and Ice Control Committee (SICC) WINTER OPERATIONS AND SAFETY MEETING 2014 / 2015 PRESEASON WICHITA MID-CONTINENT AIRPORT Snow and Ice Control Committee (SICC) WINTER OPERATIONS AND SAFETY MEETING WELCOME & INTRODUCTIONS TY RICHARDSON AIRPORT OPERATIONS SICC SNOW & ICE CONTROL

More information

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

Snow Response in an Urban Setting

Snow Response in an Urban Setting Snow Response in an Urban Setting Pat Kennedy, PE Denver Street Maintenance Road and Street Supervisors Conference October 15, 2013 Yakima, WA 2 Denver Agenda Population ~600,000 Metropolitan area 2.5

More information

Transportation and Road Weather

Transportation and Road Weather Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-18-2014 Transportation and Road Weather Rhonda Young University of Wyoming Let us know

More information

Edmonton International Airport YXD City Centre Airport

Edmonton International Airport YXD City Centre Airport Table of Contents Edmonton International Airport YXD City Centre Airport Airside Operations Winter Operations Program 2012/13 September 10, 2012 Table of Contents AIRSIDE WINTER OPERATIONS PROGRAM (AER-002P)

More information

NEWS RELEASE. Province boosts winter highway safety measures

NEWS RELEASE. Province boosts winter highway safety measures For Immediate Release 2018TRAN0045-000567 April 4, 2018 NEWS RELEASE Province boosts winter highway safety measures VICTORIA Following an intense winter, the is undertaking several improvements to make

More information

Advances in Weather Technology

Advances in Weather Technology Advances in Weather Technology Dr. G. Brant Foote National Center for Atmospheric Research 16 May 2001 NCAR Research Results in Aviation Weather Built on the foundation of the nation s long-standing investment

More information

MDSS and Advanced Forecasting STSMO Weather Workshop Dave Huft, SDDOT Research Program Manager September 12, 2017

MDSS and Advanced Forecasting STSMO Weather Workshop Dave Huft, SDDOT Research Program Manager September 12, 2017 Connecting South Dakota and the Nation MDSS and Advanced Forecasting STSMO Weather Workshop Dave Huft, SDDOT Research Program Manager September 12, 2017 1 Weather Impacts & Strategies Winter perceived

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

SNOW CONTROL OPERATIONS

SNOW CONTROL OPERATIONS SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

NCAR UCAR. 50 th Anniversary Lecture

NCAR UCAR. 50 th Anniversary Lecture NCAR & UCAR 50 th Anniversary Lecture Turbulence, Wind Shear, Toxin Attacks, and Other Things That Go Bump In the Night: Applied Research for Real-Life Problems Bill Mahoney National Center for Atmospheric

More information

Winter Maintenance on Ontario s Highways

Winter Maintenance on Ontario s Highways Ministry of Transportation Winter Maintenance on Ontario s Highways MTO Eastern Region November 18, 2015, Northumberland County Council Outline 1. Winter Maintenance Areas - Eastern Region 2. Winter Maintenance

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

City of Lee s Summit Public Works Operations

City of Lee s Summit Public Works Operations City of Lee s Summit Public Works Operations 2015 2016 Snow Operations August 3, 2015 GOAL The City of Lee s Summit s snow and ice goal is to provide a high level of customer service to our citizens within

More information

MONTGOMERY COUNTY SNOW PLAN

MONTGOMERY COUNTY SNOW PLAN 2018 2019 MONTGOMERY COUNTY SNOW PLAN COMMUNICATION DURING SNOW/ICE SITUATIONS Communication will be established prior/during all winter storms between the Sheriff s Office, Public Works Department, and

More information

Karl Reichle. Mark Owens. and. present :

Karl Reichle. Mark Owens. and. present : Connecticut s own Karl Reichle and Mark Owens present : Hey, Where s Connecticut? Cell phones If yours goes off, Don t worry,we know what you do for a living. Just step out into the hall and take care

More information

WINTER STORM Annex II

WINTER STORM Annex II WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential

More information

John A. Carlson Snow and Ice Removal

John A. Carlson Snow and Ice Removal John A. Carlson Snow and Ice Removal A. Introduction 1. The purpose of the Snow and Ice Removal Operation Plan is to provide all personnel who are involved in snow and ice removal a single source document,

More information

2010/2011 Winter Weather Summary

2010/2011 Winter Weather Summary 2010/2011 Winter Weather Summary Number of Days of Snow Alerts* Precipitation Snow Rain October 0 6 Trace.91 inches November 0 16 1.1 inches.47 inches December 2 20 17.9 inches 1.54 inches 7.5" first alert

More information

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal YORK REGION DISTRICT SCHOOL BOARD Procedure #NP464.0, Snow/Ice Clearance and Removal Application The Snow/Ice Clearance and Removal procedure addresses the practices to be followed with regards to the

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

ALASKA ITS. Vehicles and Observations in the cloud

ALASKA ITS. Vehicles and Observations in the cloud ALASKA ITS Vehicles and Observations in the cloud 1 YOUR PRESENTERS Wilf Nixon, Salt Institute Mark DeVries, Vaisala Dan Schacher, ADOT&PF 2 Today s Agenda A Cloud Based Overview connected and autonomous

More information

UDOT Weather Program Traffic Operations Center

UDOT Weather Program Traffic Operations Center UDOT Weather Program Traffic Operations Center Presentation Goals You MUST account for weather in your Traffic Management program Provide you with information on proven tools and strategies You NEED a

More information

S N O W P L A N / Keflavík International Airport

S N O W P L A N / Keflavík International Airport S N O W P L A N 2 0 1 8 / 2 0 1 9 Keflavík International Airport TABLE OF CONTENTS 1 Aim of the document/introduction... 3 2 General... 3 3 Snow Removal, Airside... 3 3.1 How snow removal works... 3 3.2

More information

Winter Maintenance Report

Winter Maintenance Report 98.4 Official State Snowfall 150 Truck Stations 1,813 Full-time and Backup Snowfighters 840 Plow trucks - includes 47 reserve plows 30,585 Lane Miles 85% Frequency Achieving Bare Lanes 2017-18 Winter Maintenance

More information

Dunn County Snow Removal Policy

Dunn County Snow Removal Policy Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern

More information

WE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be

WE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be Q30001.pptx WE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be submitted to the voters of that municipality for

More information

Evaluation of Epoke Bulk Spreader for Winter Maintenance

Evaluation of Epoke Bulk Spreader for Winter Maintenance Evaluation of Epoke Bulk Spreader for Winter Maintenance State Job Number: 134651 William H. Schneider, IV Christopher M. Miller William A. Holik Mallory Crow Research Objectives 1. Evaluate existing data

More information

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT (2) Tractors with Front End Loader and Box Blade (1) Unit used to load sand and salt mix (1) Unit used to remove plowed snow in parking

More information

Winter Maintenance on Provincial Highways

Winter Maintenance on Provincial Highways Winter Maintenance on Provincial Highways Thunder Bay District Municipal League Wayne Prystanski, A/Regional Director, Northwestern Region February 27, 2015 Outline 1. AMC s in NW Region 2. Winter Maintenance

More information

Why a Manual? Strategic; Operational When we do it, who does it Tactical; Technical How we do it and with what The Benefits of a Manual Consolidates a

Why a Manual? Strategic; Operational When we do it, who does it Tactical; Technical How we do it and with what The Benefits of a Manual Consolidates a By The Book: Developing a Winter Weather Operations Manual Preparing A Comprehensive Plan for Snow and Ice Control Program PARK,KS. PUBLIC WORKS 1 PARK,KS. PUBLIC WORKS 2 By The Book: Developing a Winter

More information

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions

More information

Plows Truck Drivers. tations. Winter Maintenance Report. 30,546 Lane Miles 87% 174,000 40,000. Total Cost of Winter $ Million

Plows Truck Drivers. tations. Winter Maintenance Report. 30,546 Lane Miles 87% 174,000 40,000. Total Cost of Winter $ Million 2014-15 Winter Maintenance Report 30,546 Lane Miles At A Glance Total Cost of Winter $ 87.9 Million 87% Frequency Achieving Bare Lanes 1,514 Full-time 327 Backup Drivers 839 Plows 39.4 Statewide Snowfall

More information

ROLLING RIVER SCHOOL DIVISION POLICY

ROLLING RIVER SCHOOL DIVISION POLICY ROLLING RIVER SCHOOL DIVISION POLICY Transportation Storm EBCD/P The School Division is responsible for the safe transportation of students on school buses. The Division shall exercise due care and caution

More information

Lessons Learned Using ESRI s Network Analyst to Optimize Snow Treatment Routes in Kentucky

Lessons Learned Using ESRI s Network Analyst to Optimize Snow Treatment Routes in Kentucky Lessons Learned Using ESRI s Network Analyst to Optimize Snow Treatment Routes in Kentucky Ben Blandford, PhD Eric Green, PE, PhD Candidate Kentucky Transportation Center University of Kentucky Overview

More information

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES Page 1 of 5 Volume: Operation Section: 20.00 Number: 20.09 Subject: Weather Watches, Warnings, Advisory s and Spotter Activation Date Issued: 28 March

More information

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots SNOW AND ICE CONTROL SERVICES - (4) SEPARATE DEPARTMENTS SCHEDULE C REQUEST FOR PROPOSAL 2244 Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots 1.0 General

More information

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION: BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION: The Roads Department of Boone County is responsible for providing snow removal for approximately 1100 miles of county roads. The Roads

More information

Home Owners. Age Male/Female. Snow removal for his/her driveway or private property

Home Owners. Age Male/Female. Snow removal for his/her driveway or private property Buyer Personas Home Owners Home Owners Age 25-55 Male/Female Snow removal for his/her driveway or private property Uses and Preferences Products: Small to mid-size truck plows, UTV/ATV plows to keep driveways

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

Town of Oconomowoc Snow & Ice Control Policy

Town of Oconomowoc Snow & Ice Control Policy Town of Oconomowoc Snow & Ice Control Policy Introduction The purpose of this policy is to provide a detailed overview of the Town s snow & ice control operations including its goals and objectives. All

More information

Traffic Flow Impact (TFI)

Traffic Flow Impact (TFI) Traffic Flow Impact (TFI) Michael P. Matthews 27 October 2015 Sponsor: Yong Li, FAA ATO AJV-73 Technical Analysis & Operational Requirements Distribution Statement A. Approved for public release; distribution

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016 ! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient

More information

2014 Annual Mitigation Plan Review Meeting

2014 Annual Mitigation Plan Review Meeting 2014 Annual Mitigation Plan Review Meeting Highland County EMA MEETING OBJECTIVES Understand Your Natural Disaster Risk Review of Previous Plans Current Plan Status Future Activity Plan/Needs of Each Community

More information

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800) Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,

More information

Weather Information for Road Managers

Weather Information for Road Managers Weather Information for Road Managers by Paul A. Pisano, Lynette C. Goodwin and Andrew D. Stern How Does Weather Affect Roads? The complex interactions between weather and roads have major affects on traffic

More information

Facilities Operations Procedure for the Management of Snow and Ice

Facilities Operations Procedure for the Management of Snow and Ice Facilities Operations Procedure for the Management of Snow and Ice EFSOPS-005 Issued 4/25/02 Revised 9/1/02; 11/5/03; 4/29/05; 11/12/08; 11/18/14 Please direct any questions or comments about the applicability

More information

Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study

Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study Zhirui Ye (WTI) Xianming Shi (WTI) Christopher K. Strong (City of Oshkosh) 12 th AASHTO-TRB TRB Maintenance Management

More information

WHITE PAPER. Winter Tires

WHITE PAPER. Winter Tires WHITE PAPER Winter Tires WHITE PAPER Introduction According to the Federal Highway Administration accidents caused by winter weather result in 150,000 injuries and 2,000 deaths each year on average. In

More information

RESOLUTION NO INTRODUCTION

RESOLUTION NO INTRODUCTION RESOLUTION NO. 0824 A RESOLUTION TO ESTABLISH THIS CITY S SNOW AND ICE CONTROL POLICY DURING WINTER MONTHS, SPECIFICALLY DEFINED AS NOVEMBER THROUGH MARCH. BE IT RESOLVED BY THE CITY COUNCIL OF SOLON,

More information

Deploying the Winter Maintenance Support System (MDSS) in Iowa

Deploying the Winter Maintenance Support System (MDSS) in Iowa Deploying the Winter Maintenance Support System (MDSS) in Iowa Dennis A. Kroeger Center for Transportation Research and Education Iowa State University Ames, IA 50010-8632 kroeger@iastate.edu Dennis Burkheimer

More information

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014 Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)

More information

Plan for operational nowcasting system implementation in Pulkovo airport (St. Petersburg, Russia)

Plan for operational nowcasting system implementation in Pulkovo airport (St. Petersburg, Russia) Plan for operational nowcasting system implementation in Pulkovo airport (St. Petersburg, Russia) Pulkovo airport (St. Petersburg, Russia) is one of the biggest airports in the Russian Federation (150

More information

Edmonton International Airport

Edmonton International Airport Edmonton International Airport ZVL Airside Operations inter Operations Program 2014/15 September 01, 2014 gate gate I.L.S. LOCALIZER26 08 HOLD BAY 08 PAPI HOLD BAY 16 OUTFIELD RY08/26 I.L.S. GLIDEPATH

More information

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,

More information

SNOW CREW CALL IN SHEET

SNOW CREW CALL IN SHEET Western State Colorado University Snow Removal The purpose of the Campus Snow Removal Information is to educate the campus, community as to the standard operating procedures used in the control of winter

More information

TOWN OF GRAND FALLS WINDSOR

TOWN OF GRAND FALLS WINDSOR TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned

More information

Title: Storm of the Century: Documenting the 1993 Superstorm

Title: Storm of the Century: Documenting the 1993 Superstorm A. PAIIF 2011 Cover Page Title: Storm of the Century: Documenting the 1993 Superstorm Point of Contact: Name: Alex Granger Email: alex.granger@noaa.gov Phone Number: 571-555-9278 Mailing Address: Research

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Wind prediction to support reduced aircraft wake vortex separation standards

Wind prediction to support reduced aircraft wake vortex separation standards Wind prediction to support reduced aircraft wake vortex separation standards Rodney Cole Weather Sensing Group WakeNet-2 Europe Dec 1, 2004 Wakenet-2 Europe-1 Outline Overview of closely spaced parallel

More information

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA)

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) June 18, 2012 Evaluation of De-Icing and Anti-Icing Technologies OPERA Project Number: 2010-2 Project Sponsor:

More information

ADMINISTRATIVE PROCEDURES

ADMINISTRATIVE PROCEDURES PROCEDURES NO: A-AD-109-14 ADMINISTRATIVE PROCEDURES SUBJECT: A. Communications For the purpose of communicating the policies, regulations, administrative procedures, and parental expectations of Transportation

More information

Drivers % Winter Maintenance Report 30,517 46, , Statewide Snowfall Average. Truck Stations. Full-time Backup.

Drivers % Winter Maintenance Report 30,517 46, , Statewide Snowfall Average. Truck Stations. Full-time Backup. 2016-17 Winter Maintenance Report At A Glance 30,517 Snow and Ice Lane Miles 54 Statewide Snowfall Average 150 Truck Stations Total Cost of Winter $ 97 Million 87% Frequency Achieving Bare Lanes 1,779

More information

Doppler Weather Radars and Weather Decision Support for DP Vessels

Doppler Weather Radars and Weather Decision Support for DP Vessels Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 14-15, 2014 RISK SESSION Doppler Weather Radars and By Michael D. Eilts and Mike Arellano Weather Decision Technologies, Inc.

More information

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter

More information

Winter guide for HGV drivers

Winter guide for HGV drivers Winter guide for HGV drivers How to keep safe during the winter period Know your responsibilities, be informed and be prepared: As a professional driver, it is your responsibility to make allowance for

More information

City of Punta Gorda Community Emergency Management Plan 2013

City of Punta Gorda Community Emergency Management Plan 2013 City of Punta Gorda Community Emergency Management Plan 2013 Hurricane Andrew- August 24, 1992 Category 5 hurricane. The second-most-destructive hurricane in U.S. history. The first named storm of the

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE

AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE MONSTERPLOW.CA 647-967-PLOW DELIVERING ALL-INCLUSIVE SEASONAL SNOW & ICE COVERAGE SERVICE SPECIFICS UNLIMITED SERVICE OVER 1 CM Guaranteed service for every

More information

GUIDELINES FOR SCHOOL DELAYS AND CLOSINGS DUE TO INCLEMENT WEATHER

GUIDELINES FOR SCHOOL DELAYS AND CLOSINGS DUE TO INCLEMENT WEATHER Dear Parents, Patrons and Staff: This communication is meant to aid you in your daily decisions to send your children to school. As the school, we check road and weather conditions many times during a

More information

Snow Measurement Guidelines for National Weather Service Snow Spotters

Snow Measurement Guidelines for National Weather Service Snow Spotters Snow Measurement Guidelines for National Weather Service Snow Spotters National Weather Service Forecast Office Northern Indiana October 2004 Table of Contents Introduction 3 Definitions.. 3 Relaying Real

More information

City of Laramie, Wyoming SNOW AND ICE POLICY

City of Laramie, Wyoming SNOW AND ICE POLICY City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

FHWA Road Weather Management Program Update

FHWA Road Weather Management Program Update FHWA Road Weather Management Program Update 2015 Winter Maintenance Peer Exchange Bloomington, MN September 21-25, 2015 Gabe Guevara FHWA Office of Operations Road Weather Management Team 2015 Winter Maintenance

More information

10 th Annual Road Salt Symposium. Thursday, February 3, 2011

10 th Annual Road Salt Symposium. Thursday, February 3, 2011 10 th Annual Road Salt Symposium Thursday, February 3, 2011 Where We Were Where We Are Where We re Going... David Redig, Maintenance Operations Superintendent - Mn/DOT District 6 Snow Plow Evolution 1973

More information

Snow and Ice Management

Snow and Ice Management Snow and Ice Management within MS4 SWPPP Overview Mn/DOT Metro District is covered by a Municipal Separate Storm Sewer System General NPDES Permit. Six Minimum Control Measures in MS4 SWPPP. Means our

More information

Commercial Salt Applicator Certification

Commercial Salt Applicator Certification Commercial Salt Applicator Certification An Overview of New Hampshire s Program 13 th Annual Road Salt Symposium February 6, 2014 Eric Williams TOURISM COMMUTE EMERGENCY PARKING LOT SAFETY WANTS NEEDS

More information

Director, Operations Services, Met-Ed

Director, Operations Services, Met-Ed Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast

More information

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director Active Traffic & Safety Management System for Interstate 77 in Virginia Chris McDonald, PE VDOT Southwest Regional Operations Director Interstate 77 at Fancy Gap Mountain Mile markers 0-15 Built in late

More information

J11.3 Aviation service enhancements across the National Weather Service Central Region

J11.3 Aviation service enhancements across the National Weather Service Central Region J11.3 Aviation service enhancements across the National Weather Service Central Region Brian P. Walawender * National Weather Service Central Region HQ, Kansas City, MO Jennifer A. Zeltwanger National

More information

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation

More information

Denver International Airport MDSS Demonstration Verification Report for the Season

Denver International Airport MDSS Demonstration Verification Report for the Season Denver International Airport MDSS Demonstration Verification Report for the 2015-2016 Season Prepared by the University Corporation for Atmospheric Research Research Applications Division (RAL) Seth Linden

More information

1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator

1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator 1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator The Ohio Department of Transportation ODOT has approximately 5500 full-time employees

More information

Municipality of Grey Highlands Policy

Municipality of Grey Highlands Policy Municipality of Grey Highlands Policy Policy Name: Maintenance Standards Plan for Municipal Roadways Policy Number: A09-T-02 Department: Transportation & Environmental Services Authority: Director of Transportation

More information

Materials in Snow and Ice Control MATERIALS. Winter Maintenance Materials 1/9/2015. OTA Winter Conference 2014

Materials in Snow and Ice Control MATERIALS. Winter Maintenance Materials 1/9/2015. OTA Winter Conference 2014 Materials in Snow and Ice Control OTA Winter Conference 2014 MATERIALS Solid Liquid Winter Maintenance Materials What materials are available for use in winter operations? How do these materials work?

More information

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) 1.0 PURPOSE: It is the goal and intent of the City of Rochester to provide timely, efficient

More information

MaineDOT Snow and Ice Control

MaineDOT Snow and Ice Control Maine State Library Maine State Documents Transportation Documents Transportation 10-1-2007 MaineDOT Snow and Ice Control Maine Department of Transportation Follow this and additional works at: http://digitalmaine.com/mdot_docs

More information

Progress in Aviation Weather Forecasting for ATM Decision Making FPAW 2010

Progress in Aviation Weather Forecasting for ATM Decision Making FPAW 2010 Progress in Aviation Weather Forecasting for ATM Decision Making FPAW 2010 Jim Evans Marilyn Wolfson 21 October 2010-1 Overview (1) Integration with storm avoidance models and ATC route usage models (2)

More information