DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2008/2009 BUDGET ESTIMATES PROCUREMENT OF AMMUNITION, NAVY AND MARINE CORPS BUDGET ACTIVITY 1

Size: px
Start display at page:

Download "DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2008/2009 BUDGET ESTIMATES PROCUREMENT OF AMMUNITION, NAVY AND MARINE CORPS BUDGET ACTIVITY 1"

Transcription

1 H I () 2008/2009 I III I 2007 II, I II 1

2 epartment of efense ppropriations ct, 2007 rocurement of mmunition, avy and arine orps or construction, procurement, production, and modification of ammunition, and accessories therefor; specialized equipment and training devices; expansion of public and private plants, including ammunition facilities, authorized by section 2854 of title 10, nited tates ode, and the land necessary therefor, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and overnment and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $767,314,000, to remain available for obligation until eptember 30, 2009.

3 "In accordance with the resident's anagement genda, udget and erformance Integration initiative, this program has been assessed using the rogram ssessment ating ool (). emarks regarding program performance and plans for performance improvement can be located at the xpectmore.gov website."

4 H ($ I II) II , & I 1, H 1,

5 H ($ I II) II:, & I II , , , & I 1,

6 H 2008 XHII -1 II: 1508, & I : II I I I QI QI QI II 01:, II I K, HI II I I & I I K I X IH/54 II II I II H HI II & I HI II II H $5 II ,

7 III: II/ II I III H I : II, & I \ 1 rogram lement for ode Items: , ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $1,146.9 $133.7 $122.7 $113.5 $184.6 $144.6 $158.4 $168.0 $172.0 ont ont II II: he -109 : he procurement of the -109 is to improve the war reserve posture. he -111: he procurement is for expenditure replacement and to maintain war reserve. he -111/ is a thermally protected 500 lb bomb filled with plastic bonded explosive (X-109) to enhance its insensitivity. he -33 onical ins, -86 and -85 ins, K 83 onical ins: rocurement to replace expenditures and maintain war reserve. he -110: he procurement is for expenditure replacement and to maintain war reserve. he -110/ is a 1,000 lb eneral urpose hermally rotected omb that is loaded with plastic bonded explosive (X-109) to enhance its insensitive munitions performance. K 77 ombs: rocurement to sustain training requirements over the to avoid further impact of an already degraded War eserve stockpile. ual ode aser uided ombs: he funding for ual ode aser uided ombs provides for a procurement of retrofit kits to integrate /I guidance to the inventory. etrofit of components will be done at the contractor's facility and is included in the unit price of the retrofit kit. Z: Includes funds for -143 fuzes. rior to 06 funds were included for -33, -140, -159 and ulti-ode irect ttack oving arget apability: his funding is to procure non-developmental ulti-ode irect ttack oving arget capable weapons for fixed wing aircraft through a competitive procurement contract planned for 08. he intent of this procurement is to address a documented ( ) gap in and oving arget capability for fixed wing aircraft and to ensure a viable industrial base by awarding to multiple vendors. his acquisition will ensure avy and arine orps fixed wing direct attack capacity now and capability as aser averick leaves the inventory. omb ubcomponents: he omb ubcomponents line funding is to procure rming Wires, adapters, lugs, nose plugs, etc. roduct Improvement rogram (I): he I cost element funds efforts to include: investigation into alternative hardware coating materials to meet the nvironmental rotection gency's more stringent requirements; incorporating design changes to the bomb bodies; incorporating Insensitive unitions explosive fill; and incorporating fuze engineering changes for manufacturing/production enhancements and to improve fuze system reliability. he growth in the funding requested for product improvement is driven by the efforts to increase fuze system reliability and to incorporate those solutions into the production process. /I: roduction ngineering upport () and Integrated ogistics upport (I) are continuing efforts in support of the procurement of bombs and ancillary components. hese efforts include: providing recommendations and assisting in rapid resolution of maintenance procedure discrepancies to achieve optimum asset readiness; audits; pre-award surveys; post award surveys; post award conferences; flight testing; irst rticle esting; or any other technical problems which may arise. hese funds are provided in parallel with the buy of end items. olumns may not add due to rounding orm 2454, un 86-1 HI I I 1 III: xhibit -40, udget Item ustification (xhibit -40, page 1 of 9)

8 III: xhibit -5 ost nalysis Weapon ystem : II/ II II, & I / 1-1 I , otal ost (ollars in housands) ost ode lement of ost I rior ears ode otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost 98,414 75,883 90, ,381 Q I I 26, ,211 9, , , Q (ote 1) 16,600 1, ,579 18,208 1, ,387 Q (ote 1) 4,987 2, ,543 Q Z 8, ,999 Q2170 K 83 I I 3, , , , Q ,735 2, ,322 1,994 2, ,410 4,600 3, ,208 3,268 3, ,033 Q ,873 5, ,047 2,802 5, ,120 3,259 6, ,759 6,393 6, ,511 Q2194 K , , , , , ,326 Q2196 uzes (ote 2) 1,550 2, , Q2198 (ote 3) 5,217 10, ,090 2,150 10, , Q , , , ,400 Q2197 ombs ubcomponents 5,125 4,445 4,970 5,000 Q2200 ulti-ode irect ttack oving arget apability (ote 4) , ,140 4,810 10, ,062 I Q2800 I (Z) 145 Q2800 I () 111 Q2800 I ( ) / 27,101 25,360 20,520 18,903 Q2830 H ( ) 6,001 3,091 3,078 4,095 Q2830 (Z) 8,296 9,600 9,150 9,970 Q2830 ( & ) 12,804 12,669 8,292 4,838 H 7,317 20,742 1,701 22,710 Q2850 I (I) 6,771 20,092 1,051 22,060 Q I Q2893 I Q2894 I otal 1,146, , , , ,594 otes: and -86 procurements are alternated to reach economic order quantities. 2. Includes funds for -143 fuzes. reviously this line also included funds for -33, -140, -159, and ual ode procurement will be completed in 07. Included in the ual ode is $3.6 of ongressional dd to qualify and integrate nhance W II on /-18. multi-mode capability will be procured in the ulti-ode irect ttack oving arget apability weapon beginning in costs include non-recurring costs for qualification and irst rticle est for two vendors as well as recurring costs. 2446, 86 olumns may not add due to rounding -1 HI I I 1 (page 2 of 9) (xhibit -5, ost nalysis) (xhibit -5, page 2 of 9)

9 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , 1Q2 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs vailable ow ate evisions vailable , K I, I I , K I, I I - II,, K an 08 eb 09 II,, K an 09 eb ,873 5, K I, I 12/30/ ,802 5, K I, I I ,259 6, K I, I I ,393 6, K I, I I - II,, K eb 06 an 08 II,, K eb 07 ar 08 II,, K eb 08 ar 09 II,, K eb 09 ar ,735 2, K I, I 12/30/ ,994 2, K I, I I ,600 3, K I, I I ,268 3, K I, I I - II,, K eb 06 ar 07 II,, K an 07 ul 08 II,, K an 08 ar 09 II,, K an 09 ar I I , K I, I I - I, I, an 06 pr , K I, I 11/30/ ar 07 ec , K I, I I - an 08 ul , K I, I I - an 09 pr 09-1 HI I orm , 87 I 1 (page 3 of 9) xhibit -5, rocurement History and lanning (xhibit -5, page 3 of 9)

10 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , 1Q2 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs vailable ow ate evisions vailable ,987 2, K I, I 12/30/ eb 08 an ,600 1, K I, I 1/30/ pr 07 pr ,208 1, K I, I I - an 09 ul ,217 10, I I ,150 10, I I - KH I I, H, ec 06 ug 07 KH I I, H, un 07 ar Z , I 5/30/ K I, K, W ec 06 an 08 uzes ,550 2, K I, I 3/17/ ul 07 an 08 K , K I, I I - II,, K ul 06 un , K I, I 12/30/ eb 08 ov , K I, I I - eb 09 ug 09-1 HI I orm , 87 I 1 (page 4 of 9) xhibit -5, rocurement History and lanning (xhibit -5, page 4 of 9)

11 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , 1Q2 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs vailable ow ate evisions vailable K 83 I I , K I, I 12/30/ an 07 an , K I, I I - an 07 ay , K I, I I - an 08 ep , K I, I I - an 09 ep 09 ulti-ode irect ttack oving arget , I 11/30/ pr 08 pr ,810 10, I I - an 09 ug HI I orm , 87 I 1 (page 5 of 9) xhibit -5, rocurement History and lanning (xhibit -5, page 5 of 9)

12 III: 2008/2009 I H, 21 II/ II Weapon ystem -1 I II, & I , roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure I 2006 I 2007 I / Q ual ode ockheed artin ockheed artin I 2008 I 2009 I / Q ual ode ockheed artin ockheed artin emarks: 0 orm 2445, 87 revious editions are obsolete -1 HI I III: 311 / KH I, H, H II I I I QI. he represents the rate for joint service procurements. Item o. 1 (page 6 of 9) xhibit -21, roduction chedule (xhibit -21, page 6 of 9)

13 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 I II, & I , eneral urpose ombs roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure -109, K , K , eneral ynamics , K uzes K, ocket enter, W I 2006 I 2007 I / Q , , , ,873 1, , ,802 2, , , , , , , ,994 1, I 05 7, , , 05 3, , , ,600 16,600 Z K 05 9, , , ,550 1,550 I 2008 I 2009 I / Q , , , , , , , ,393 6, , , , , , , , ,268 3, , , , , , , ,657 Z 07 1, , emarks: H II I I I QI. he represents the rate for joint service procurements. orm 2445, 87 revious editions are obsolete -1 HI I III: 311 / 244 Item o. 1 (page 7 of 9) xhibit -21, roduction chedule (xhibit -21, page 7 of 9)

14 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 I II, & I , eneral urpose ombs roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure -139 uze K, ocket enter, W 12,000 24,000 74, KI, H ulti-ode irect ttack arget iscal ear 2006 iscal ear 2007 I / Q uze KI (1) 03 33, , ,322 K 05 9, K 06 8, ,665 I 2008 I 2009 I / Q Z KI (1) 03 33, ,322 3,322 0 K 06 8, ulti-ode irect ttack arget , , ,650 emarks: H II I I I QI. he contract was initially awarded for the -139/ configuratio. our months after contract award, the contract was 1. eliveries modified to on procure the KI the contract -139/ for -139 configuration. have been KI delayed. then had he to recertify contract their was initially design awarded for the / for configuration the -139/ whichconfiguration, but subsequently modified to procure the -139/ configuration. KI had to qualify the / configuration, leading to the delivery schedule slip. orm 2445, 87 revious editions are obsolete -1 HI I III: 311 / 244 Item o. 1 (page 8 of 9) xhibit -21, roduction chedule (xhibit -21, page 8 of 9)

15 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 I II, & I , roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure -111, K , K ulti-ode irect ttack arget I 2010 I 2011 I / Q , , , , ,208 4,551 13, ulti-ode irect ttack arget 09 4, , I 2012 I 2013 I / Q 2011 alendar ear 2012 alendar ear 2013 emarks: orm 2445, 87 revious editions are obsolete -1 HI I III: 311 / , K H II I I I QI. he represents the rate for joint service procurements. Item o.1 (page 9 of 9) xhibit -21, roduction chedule (xhibit -21, page 9 of 9)

16 III: I III H : II/ II I II, & I \ 1 rogram lement for ode Items: , I I K II () ther elated rogram lements rior ears I ode o omplete otal rogram Quantity 50,716 3,400 3,400 1, ,861 ost ($) $1,151.5 $81.5 $84.7 $33.6 $25.9 $26.9 $19.3 $3.0 $3.0 $1,429.3 Initial pares ($) otal ($) $1,151.5 $81.5 $84.7 $33.6 $25.9 $26.9 $19.3 $3.0 $3.0 $1,429.3 nit ost ($) Quantity - on dd 7,890 7,890 ollars - on dd $161.1 II II: peration esert torm confirmed the need for a more accurate weapon delivery capability in adverse weather conditions and from medium/high altitudes. ailure to satisfy this requirement will allow the enemy to continue to take advantage of the sanctuary of weather and/or prevent air power from prosecuting a conflict on its terms. is an ir orce and avy munitions program to correct these shortfalls, with the ir orce as the executive service. upgrades the existing inventory of general purpose bombs (K 84, -109/, K83, and K82) by integrating them with a guidance kit consisting of a global positioning system aided inertial navigation system (/I). provides an accurate (13 meters) adverse weather capability that is integrated on the -52, -2, -1, -16, /- 18///, -14, -15, -22, -10, and -8. he avy is responsible for fielding a ll-p-ound () system; procuring components as required to satisfy that system (tail kits, airborne test equipment, cables, and support equipment). 06 through 11 reflect quantities necessary to meet on uclear rdnance equirements (). educed procurement quantities beginning in 08 are driven by a change in. elective vailability nti-poofing odule () is incorporated into production lots beginning with 05. portion of the 08 through 13 funds was realigned to eneral urpose ombs (I ) in support of the epartment of avy's ulti-ode irect ttack oving arget apability. he total production buy for is 203,750 units (142,889 for and 60,861 for avy, not including any ). here is no requirement for initial spares because of the 20 year warranty. 07 includes $1.0 ongressional dd for I roduction acility ustainment. olumns may not add due to rounding orm 2454, un 86-1 HI I I 2 III: xhibit -40, udget Item ustifcation (xhibit -40, page 1 of 5)

17 III: xhibit -5 ost nalysis II/ II I ode -1 I II, & I \ , I I K II () ost ode lement of ost I ode rior ears Weapon ystem otal ost in thousands of dollars 2008 : 2009 otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost 100 I HI 1,012,347 3,400 20,658 70,237 3,400 21,364 72,638 1,145 22,176 25, ,019 19, II H () 2,096 1,110 1, Z 36, WH 28,363 otal ecurring lyaway 1,079,485 3,400 20,984 71,347 3,400 21,717 73,838 1,145 22,831 26, ,607 20, I QI 2, II 9, H I 1, I H * 41,409 5,552 6,259 5,215 3, I 3,774 2,325 2, otal on-ecurring 59,448 9,380 10,093 6,737 5,108 otal Weapon lyaway 1,138,933 3,400 23,743 80,727 3,400 24,686 83,931 1,145 28,714 32, ,616 25, (HI) / I I QI 4, I II (I) 6, II otal leet upport 12, otal Weapon ystem 1,151,454 3,400 23,965 81,481 3,400 24,903 84,671 1,145 29,374 33, ,525 25,946 Initial pares otal rogram ost 1,151,454 3,400 23,965 81,481 3,400 24,903 84,671 1,145 29,374 33, ,525 25,946 (on-dd) 100 ir ehicle 157, uzes 3, ontractor Incentive 166 otal 161,087 ote: 07 roduction ech upport includes $1.0 ongressional dd for I roduction acility ustainment 2446, 86-1 HI I I 2 (page 2 of 5) xhibit -5, ost nalysis (xhibit -5, page 2 of 5)

18 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , I I K II () 1 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable ot ,658 ot ,364 ot ,176 ot ,019 glin, ption / glin, ption / glin, 12/1/2007 / glin, ption /, I I, ar 06 ar 07 / (1) /, I I, ov 06 ar 08 / /, I I, ar 08 ar 09 / /, I I, ar 09 ar 10 / / otes: (1) pecifications have been waived due to 's status as an acquisition reform pilot program. -1 HI I orm , 87 I 2 (page 3 of 5) xhibit -5, rocurement History and lanning (xhibit -5, page 3 of 5)

19 2008/2009 roduction chedule -21 II/ II Weapon ystem -1 I II, & I / , oint irect ttack unition () roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure connell ouglas t. ouis, I 2006 I 2007 I / Q connell ouglas ot ot ot ot ot ot I 2008 I 2009 I / Q ot ot ot ot ot ot ot ot emarks: represents I quantities ( and ). orm 2445, / 244 revious editions are obsolete -1 HI I I. 2 (page 4 of 5) xhibit -21, roduction chedule (xhibit -21, page 4 of 5)

20 2008/2009 roduction chedule II/ II -1 Weapon ystem -1 I II, & I roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure connell ouglas t. ouis, I 2010 I 2011 I / Q connell ouglas ot ot ot ot I / Q emarks: represents I quantities ( and ). orm 2445, 87 revious editions are obsolete 311 / I 2012 I , oint irect ttack unition () HI I I. 2 (page 5 of 5) xhibit -21, roduction chedule (xhibit -21, page 5 of 5)

21 III: I III H : II/ II I II, & I \ 1 rogram lement for ode Items: , I K ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $161.4 $26.7 $15.4 $30.3 $36.1 $38.1 $39.5 $40.2 $40.9 ont ont II II: rocurements are to establish an inventory of rocket components in accordance with the on-uclear rdnance equirement () and to maintain those inventory levels as training and combat usage occurs. he miscellaneous components provide for procurement of various rocket components not to exceed a total cost of 500K per year per component. roduct improvements address deficiencies in the safety, reliability and producibility of irborne ocket ystems. pecific projects include insensitive munitions improvements to the rocket motors, safety improvements to Warheads, and reliability improvements to the 2.75" launchers. rior years figures reflect 2001 to and prior are in the 2.75-inch rockets line. olumns may not add due to rounding orm 2454, un 86-1 HI I I 3 III: (xhibit -40, page 1 of 6)

22 III: xhibit -5 ost nalysis Weapon ystem : I K, II/ II II, & I / 1-1 I , I K ollars in housands ost ode lement of ost I rior ears ode otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q5030 W-1/ I WH 2,888 36, ,027 14, ,484 20, ,050 20, ,091 Q5040 K 66 K 77,596 8, ,354 12, ,719 6, ,945 11, ,518 Q5041 K71 K 34,577 2,665 4, ,278 1,500 4, ,624 1,500 4, ,763 Q H03 9,834 6, ,029 Q I I WH (H06) 2,385 Q5080 K146 (229) H WH 2,447 3,563 1, ,438 1,197 1, ,524 7,923 1, ,317 6,826 1, ,084 Q5090 K149 (2551 H) WH 4, ,905 5, ,777 8, ,623 Q5100 K34 WH 9,304 Q5200 K 2,067 3, , Q " H 110 7, Q5897 W-11/ 1, , Q5800 I II (I) 1, Q5830 I 6,323 1,674 1,390 1,655 1,676 Q5850 I (I) 6, ,404 1,256 1,463 Q5860 I Q5870 I 4, Q I Q5893 I 1, otal 161,392 26,717 15,411 30,323 36,079 olumns may not add due to rounding 2446, 86-1 HI I I 3 (xhibit -5, page 2 of 6)

23 III: HI I XHII (-5) Weapon ystem. I K,. II/ II. -1 I H II, & I \ , I K 1Q5 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable *K 66 K , HI / , HI / , HI / , HI / - I 03/ /2008 I 05/ /2008 I 05/ /2009 I 05/ /2010 K146 (229) H WH *K149 (2551 H) WH ,563 1, I / X ,197 1, I / X ,923 1, I / X ,826 1, I / X , HI / , HI / , HI / - W II H I, II H 01/ /2007 W II H I, II H 04/ /2008 W II H I, II H 04/ /2009 W II H I, II H 04/ /2010 I 05/ /2008 I 05/ /2009 I 05/ / H , I / X W II H I, II H 01/ /2007 *W-1/ I WH , HI / - -1 HI I I 03/ /2007 orm , 87 I 3 (xhibit -5, page 3 of 6)

24 III: HI I XHII (-5) Weapon ystem. I K,. II/ II. -1 I H II, & I \ , I K 1Q5 ost lement/iscalear Qty nit ost ocation of Issue ate , HI / , HI / , HI / - ontract ethod & ype ontractor and ocation ward ate ate of irst elivery I 05/ /2008 I 05/ /2009 I 05/ /2010 pecs ate evisions vailable ow vailable W-11/ , / X , / X W II H I, II H 01/ /2009 W II H I, II H 01/ / " H , / K71 K ,665 4, I / X ,500 4, I / X ,500 4, I / X W II H I, II H 04/ /2007 W II H I, II H 04/ /2009 W II H I, II H 04/ /2010 K , I / X , I / X W II H I, II H 04/ /2009 W II H I, II H 04/ /2010 otes: * ricing is provided by the rmy and incorporates other services' buys. -1 HI I orm , 87 I 3 (xhibit -5, page 4 of 6)

25 III: 08/09 I H, -21 II/ II Weapon ystem -1 I II, & I , I K, roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure K 66 ocket otor I K K 71 ocket otor W, IH K K146 (229) H WH W, IH K K149 (2551 H) I K I 2006 I 2007 I / Q K66 kt tr/en yn K66 kt tr/en yn K66 kt tr/en yn K66 kt tr/en yn K71 kt tr/w IH K71 kt tr/w IH K146 (229) H WH K146 (229) H WH K149 (2551 H) WH I 2008 I 2009 I / Q K66 kt tr/en yn K66 kt tr/en yn K66 kt tr/en yn K66 kt tr/en yn K71 kt tr/w IH K71 kt tr/w IH K71 kt tr/w IH K146 (229) H WH K146 (229) H WH K146 (229) H WH K149 (2551 H) WH K149 (2551 H) WH K149 (2551 H) WH emarks: III: (xhibit -21, page 5 of 6) orm 2445, 87-1 HI I 311 / 244 I. 3 xhibit -21 roduction chedule

26 III: 08/09 I H, -21 II/ II Weapon ystem -1 I II, & I , I K, roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure K 66 ocket otor I K K 71 ocket otor W, IH K K146 (229) H WH W, IH K K149 (2551 H) I K I 2010 I 2011 I / Q K66 kt tr/en yn K66 kt tr/en yn K71 kt tr/w IH K146 (229) H WH K146 (229) H WH K149 (2551)/en yn K149 (2551 H) WH K149 (2551 H) WH I / Q K149 (2551 H) WH emarks: orm 2445, 87-1 HI I 311 / 244 I. 3 xhibit -21 roduction chedule 2012 I 2012 I 2013 ebruary-07 III: (xhibit -21, page 6 of 6)

27 III: I III H : II/ II I II, & I \ 1 rogram lement for ode Items: , HI II ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $147.2 $23.8 $16.1 $12.7 $21.9 $22.9 $23.2 $23.6 $24.1 ont ont his line funds procurement of 20 ammunition used with various aircraft gun systems. he 20 ammunition procurements fall into two categories: arget ractice () and High xplosive Incendiary (HI). he rounds are used for training and also include arget ractice - racer (-) rounds. he HI rounds are used for warfighting and also include emi rmor iercing High xplosive Incendiary (HI) rounds. ounds are procured in both linkless and linked configurations. he linkless (or bulk) rounds are used in the 611/2 un ystems in the /-18 ircraft. he linked rounds are used in the 197 gun on H-1 aircraft. ll 20 ammunition is procured by the oint unitions ommand, ock Island, Illinois. olumns may not add due to rounding orm 2454, un 86-1 HI I I 4 III: (xhibit -40, page 1 of 5)

28 III: xhibit -5 ost nalysis Weapon ystem : II/ II II, & I / 1-1 I , HI II ollars in housands ost ode lement of ost I rior ears ode otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q IK,, , , , , , , ,672 Q IK, HI 46,336 49, , , , ,758 Q IK,, , , , , , , ,007 Q IK, HI 15, , , , , , ,465 54, ,512 Q IK, HI (I ) 2,079 Q IK, HI 20, , Q4200 I 6, , Q IKI,, 756 Q4800 I II (I) 2, Q4830 I II 15,993 2,824 1,650 1,897 2,104 Q4850 I (I) 6, Q4894 I 55 otal 147,230 23,848 16,076 12,651 21,887 olumns may not add due to rounding 2446, 86-1 HI I I 4 (xhibit -5, page 2 of 5)

29 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , HI II ost lement/iscalear Qty nit ost ($) ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable 20 IK,, ,314, , K I, I. / - eneral ynamics, arion, I ug-05 pr , , K I, I. / - pr-07 pr , , K I, I. / - pr-08 pr , , K I, I. / - pr-09 pr IK, HI ,618, , K I, I / - eneral ynamics, arion, I ep-05 pr , , K I, I / - pr-07 pr , , K I, I / - pr-08 pr , , K I, I / - pr-09 pr IK,, , , K I, I / - eneral ynamics, arion, I ug-05 pr , , K I, I / - pr-07 pr , , K I, I / - pr-08 pr , , K I, I / - pr-09 pr IK, HI , , K I, I / - / ug-06 ep , , K I, I / - pr-08 pr , , K I, I / - pr-08 pr , , K I, I / - pr-09 pr IK, HI , , K I, I / - pr-08 pr , , K I, I / - pr-09 pr-10 I , W, I / - pr-08 pr , W, I / - pr-09 pr-10 otes: ricing provided by the rmy incorporates other services' buys. -1 HI I orm , 87 I 4 (xhibit -5, page 3 of 5)

30 I H, -21 II/ II Weapon ystem -1 I II, & I /-1 HI II roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure 20 IK, HI K 20, IK,, K I 2006 I 2007 I / Q IK, HI eneral ynamics , IK,, I 2008 I 2009 I / Q IK, HI eneral ynamics , IK,, orm 2445, 87 revious editions are obsolete 311 / HI I I 4-21 xhibit 4 of 5

31 I H, -21 II/ II Weapon ystem -1 I II, & I / HI II roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure 20 IK, HI K 20, IK,, K I 2010 I 2011 I / Q IK, HI , IK,, orm 2445, / 244 revious editions are obsolete -1 HI I I 4-21 xhibit 5 of 5

32 III: I III H : II/ II I II, & I \ 1 rogram lement for ode Items: , I ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $451.1 $55.8 $44.4 $36.3 $49.6 $52.6 $55.4 $66.7 $67.9 ont ont II II: ractice ombs are a low cost alternative to expenditures of live bombs for training. he K 76 simulates an unretarded K 80 series bomb. It is a 25 lb. cast iron shape with a breach hole for a K 4 or X-3 signal which provides a smoke signal or flash upon impact. he -48 simulates retard bombs. It is a 10 lb. thin cased cylindrical bomb with a breach hole for a K 4 or X-3 signal which provides a smoke signal or flash upon impact. he -48 on-hermally protected, K 83 Inert and K 82 Inert are full-sized ractice ombs. hey are K 80 series bomb bodies filled with an inert material and have the same weight, size, center of gravity and ballistics of a live bomb. hese items are procured by the rmy as a ingle anager for onventional mmunition. he aser uided raining ound () is procured directly by the avy. his round enhances the effective use of the W II aser uided ombs () precision guided weapon which requires coordination between the aircrew and the laser designator. evelopment of delivery options and multi-aircraft tactics require extensive cost effective training. he aser uided raining ound () is capable of replicating the kinematics of s to provide increased basic training capability and follow-on advanced tactics development and is suitable for launch from all avy and arine orps aircraft used to deploy s. provides actual hardware for aircrew and tactics development at a greatly reduced cost while maintaining stockpiles. he roduction ngineering upport and Integrated ogistics upport are continuing annualized efforts associated with ongoing procurements of the ractice ombs associated ignal artridge, -45/, K 76,, fins and other practice weapons. hese efforts include: maintenance of rocurement ata ackages; participation in post-award conference; first article and quality assurance testing; technical manual updates; evaluation of engineering change proposals; and response to fleet inquiries. he iscellaneous Items line includes low cost items such as 70 series cables, K 89 dapters, rming Wires, ugs, ose lugs, etc. olumns may not add due to rounding orm 2454, un 86-1 HI I I 5 III: xhibit -40, udget Item ustification (xhibit -40, page 1 of 7)

33 III: xhibit -5 ost nalysis Weapon ystem : II/ II II, & I / 1-1 I , I ollars in housands ost ode lement of ost I rior ears ode otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q1062 I I 2,000 2,000 2,000 2,000 Q1010 K , , , , , , , ,431 Q1040 K 82 I 20, ,732 5,684 1, ,915 5,190 1, ,019 4,400 1, ,079 Q1060 K 83 I 2,000 1, ,064 3,450 1, , ,400 2, ,353 Q , , , , Q1300 I II 8,000 2, ,102 7,941 2, ,418 6,000 2, ,266 9,000 2, ,931 H Q1800 I II (I) Q1830 I ()- 5,130 3,854 4,495 4,604 Q1850 I (I) Q1894 I otal 451,161 55,810 44,393 36,339 49, , 86 olumns may not add due to rounding -1 HI I I 5 (page 2 of 7) xhibit -5, ost nalysis (xhibit -5, page 2 of 7)

34 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , I 1Q1 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable , , K I, I 11/30/ an 07 ay , , K I, I I - eb 07 eb , , K I, I I - eb 08 ug , , K I, I. I0 - eb 09 ug 09 I II ,000 2, I I ,941 2, I I ,000 2, I I ,000 2, I I - KH I I, H, ug 06 ep 07 KH I I, H, pr 07 ul 08 KH I I, H, ar 08 pr 09 KH I I, H, ar 09 ec 09 K , K I, I I - I,, pr 06 ep , K I, I I - I,, eb 07 ar , K I, I I - I,, eb 08 ar , , K I, I I - I,, eb 09 ar 10-1 HI I orm , 87 I 5 (page 3 of 7) xhibit -5, rocurement History and lanning (xhibit -5, page 3 of 7)

35 III: HI I XHII (-5) Weapon ystem.. II/ II. -1 I H II, & I \ , I 1Q1 ost lement/iscalear Qty nit ost ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable K 82 I , , K I, I 9/30/ ,684 1,040.66, K I, I I ,190 1,352.50, K I, I I ,400 1,381.57, K I, I I - II,, K eb 06 an 07 II,, K eb 07 an 08 II,, K eb 08 an 09 II,, K eb 09 an 10 K 83 I ,000 1,531.90, K I, I 9/30/ ,450 1,671.30, K I, I I ,400 2, K I, I I - II,, K eb 06 ug 07 II,, K an 07 ar 08 II,, K an 09 ct 09 orm , 87-1 HI I I 5 (page 4 of 7) xhibit -5, rocurement History and lanning (xhibit -5, page 4 of 7)

36 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 omenclature rocurement of mmunition, avy & arine orps roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure K , , K 82 I (K) 54,000 96, , * I 2006 I 2007 I / Q K 76 (I H) K82(237)(I H) I 2008 I 2009 I / Q K 76(973) (I H) K82 (237) (I H) emarks: orm 2445, 87 revious editions are obsolete III: , I 1,080,100 *H II I I I QI. -1 hopping ist Item o. 5 (age 5 of 7) xhibit -21, roduction chedule (xhibit -21, page5 of 7)

37 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 omenclature rocurement of mmunition, avy & arine orps roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure KH-I K 83 Inert * I 2006 I 2007 I / Q aser uided raining ound ockheed artin (1) ockheed artin ockheed artin K 83 I (511) I 2008 I 2009 I / Q aser uided raining ound ockheed artin ockheed artin ockheed artin ockheed artin K 83 I (511) emarks: orm 2445, 87 revious editions are obsolete III: , I H II I I I QI. (1) ince submission of the 07 resident's udget, the quantity of s has been reduced to fund an that modified these training rounds to achieve accuracies closer to tactical s for more realistic training. -1 HI I I. 5 (page 6 of 7) xhibit -21, roduction chedule (xhibit -21, page 6 of 7)

38 III: 2008/2009 I H, -21 II/ II Weapon ystem -1 Item omenclature rocurement of mmunition, avy & arine orps roduction ate rocurement eadtimes anufacturer's rior fter Initial eorder nit of Item ame and ocation X to ct 1 ct 1 fg fg otal easure KH-I K K 83 Inert K 82 I I 2010 I 2011 I / Q K 76 (I H) K 82 I (I H) K 83 I aser uided raining ound KH-I KH-I I 2012 I 2013 Q I / emarks orm 2445, ul 87 revious editions are obsolete III: 311/ , I -1 HI I I. 5 (page 7 of 7) xhibit -21, roduction chedule (xhibit -21, page 7 of 7)

39 III: I III H : II/ II -40 II, & I \ 1 rogram lement for ode Items: -1 I , I I/ I ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $265.4 $28.1 $36.8 $44.3 $47.3 $52.1 $55.2 $56.2 $57.2 ont ont II II: artridge ctated evices () scape ystem/ife upport evices : hese items, such as safety/arming devices, sequence controls, shielded mild detonating cords, gas generators, initiators, thrusters, thermal batteries, etc, are used in aircraft emergency escape systems. he total number and type of devices installed varies with the type of aircraft, for example: /-18(136); -3(105); -6(45), -45(76), /-8(90) and H-1(27). hese explosives have finite service lives and are replaced during scheduled maintenance. n aircraft may be grounded if a single one of these items does not meet the standard. he devices age at the same rate whether the aircraft is operating in a war time or peace time environment, and thus the requirement is calendar driven. ife support devices such as the ea Water ctivated elease ystem -12/ eck rew ife est Inflator, and the -8/ automatic life vest inflator are essential to crew survival after ejection or being thrown overboard. he budget request provides funding for the procurement of aval ircrew ommon jection eat () items, -74/ initiators/-146/ artridge, -57/ and -64/utters (-18 I) and other miscellaneous devices. Weapons/tores elease artridges: hese items are used to release the weapons/stores from aircraft. he -22 impulse cartridges are used to eject sonobuoys from aircraft. he budget request also provides for -107 Impulse artridges and the -22/ Initiator artridge. ropellant ctuated evices (): his program provides funding for rocket motors, rocket catapults and catapults used to eject aircrew from disabled aircraft. he program is structured to meet replacement requirements that are based on aircraft inventories and the escape rocket/catapults service lives. he devices age at the same rate whether operating in a war or peace-time environment, and thus the requirement is calendar driven. n aircraft containing a single escape rocket/catapult not up to man-rated standards is grounded for safety-of-flight. pare inventories are limited to the lowest level that can be maintained without causing aircraft grounding due to shortfalls. evices are also used to function as part of aircraft emergency safety systems. he 2008 budget request provides continued funding for the procurement of K 122 parachute deployment rocket motors, K 123/124 underseat rocket motors, various miscellaneous devices, roduct Improvement rograms (I), and associated production engineering and integrated logistics support. Integrated ogistics upport : Integrated ogistics upport (I) efforts will provide I planning, maintenance standardization, supply support, other technical I production efforts. roduction ngineering upport : roduction ngineering upport () efforts include the development/review of procurement requests, monitoring of the production, disposition of waivers and deviations, and technical support for irst rticle esting/ot cceptance esting. roduct Improvement rograms : roduct Improvement rograms (I) are conducted as part of a continuing effort to correct deficiencies in areas of safety, reliability, maintainability, producibility, and to increase the service life of s and s. eginning in 08 I and will be combined into one budget line item, , with a new title of artridge ctuated evices/ropellant ctuated evices (/). 07 includes $2.9 ongressional lus-up for the oint Water ctivated elease ystems (W). olumns may not add due to rounding orm 2454, un 86-1 HI I I 6 III: (xhibit -40, page 1 of 4)

40 III: xhibit -5 ost nalysis Weapon ystem : / II/ II II, & I / 1-1 I , I I/ I ollars in housands ost ode lement of ost I rior ears ode otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q nit ost otal ost Q / III. (64) 105, , , , , , , ,991 Q I (95) 60, , , , , , ,060 Q8060 H (W) 264 3,924 1, , , , Q / I (09) 15, ,379 15, ,203 15, ,062 15, ,128 Q8120 oint Water ctivated elease ystems (W) 2,900 Q8070 K 122 H K (29)* 296 3, , Q8071 K 123 K (30)* 49 9, , Q8081 K 124 K (31)* 107 9, , Q8800 I II (I) ,078 1,103 Q8820 III I* Q8830 I ()- 2,991 3,093 4,222 4,340 Q8840 QI Q8850 I (I) 1,280 1,369 2,517 2,638 Q8860 I 1,971 2,097 3,158 3,210 Q I (95/W19) 249 1, Q II/-146 (W15/16) 1,054 1,166 1,907 1,961 Q8300 IW I 730 2,269 1,369 1,693 Q8600 I I $500K (1) 13,148 15,264 19,678 21,786 otal 265,442 28,120 36,762 44,255 47,314 (1) iscellaneous evices encompasses the remaining 835 distinct devices procured under this budget item. hese devices have yearly budget requirements that typically do not exceed $500K. olumns may not add due to rounding. * dded from I beginning in , 86-1 HI I I 6 (xhibit -5, page 2 of 4)

41 III: HI I XHII (-5) Weapon ystem. /. II/ II. -1 I H , I I/ II, & I \ 1 I 1Q8 ost lement/iscalear Qty nit ost ($000) ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable -107 I (95) , I 10/15/ HI, I., I II, 12/20/2005 7/18/ , I 10/15/2006-4/30/2007 4/24/ , I 10/15/2007-4/30/2008 4/25/ , I 10/15/2008-4/30/2009 4/25/ / III. (64) , I 7/15/ I, I, WI 12/12/2005 6/10/ , I 10/15/2006-4/30/2007 4/24/ , I 10/15/2007-4/30/2008 4/25/ , I 10/15/2008-4/30/2009 4/25/ / I (09) , I 12/30/ , I 10/30/ X I I, I, 9/21/2006 7/31/2007 X I I, I, 4/30/2007 4/24/ , I 10/30/2007-4/30/2008 4/25/ , I 10/30/2008-4/30/2009 4/25/ HI I orm , 87 I 6 (xhibit -5, page 3 of 4)

42 III: HI I XHII (-5) Weapon ystem. /. II/ II. -1 I H , I I/ II, & I \ 1 I 1Q8 ost lement/iscalear Qty nit ost ($000) ocation of Issue ate ontract ethod & ype ontractor and ocation ward ate ate of irst elivery pecs ate evisions vailable ow vailable K 122 H K (29) , I 10/30/2007-4/30/2008 4/25/ , I 10/30/2008-4/30/2009 4/25/2010 K 123 K (30) , I 10/30/2007-4/30/2008 4/25/ , I 10/30/2008-4/30/2009 4/25/2010 K 124 K (31) , I 10/30/2007-4/30/2008 4/25/ , I 10/30/2008-4/30/2009 4/25/2010 H (W) , I 10/27/ I-K /, IX 5/4/2006 9/30/ , I 10/27/2006-4/30/2007 4/24/ , I 10/27/2007-4/30/2008 4/25/ , I 10/27/2008-4/30/2009 4/25/2010 otes: -1 HI I orm , 87 I 6 (xhibit -5, page 4 of 4)

43 III: I III H : II/ II I II, & I \ 1 rogram lement for ode Items: , I K ther elated rogram lements rior ears I ode o omplete otal rogram Quantity ont ont ost ($) $106.6 $10.5 $11.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ont ont II II: his program provides funding for rocket motors, rocket catapults and catapults used to eject aircrewmen from disabled aircraft. he program is structured to meet replacement requirements that are based on aircraft inventories and the escape rocket/catapults service lives. he devices age at the same rate whether operating in a war or peace-time environment, and thus the requirement is calendar driven. n aircraft containing a single escape rocket/catapult not up to man-rated standards is grounded for safety-of-flight. pare inventories are limited to the lowest level that can be maintained without causing aircraft grounding due to shortfalls. evices are also used to function as part of aircraft emergency safety systems. roduction ngineering upport () efforts include the development/review of procurement requests, production monitoring, disposition of waivers and deviations, and technical support for irst rticle esting/ot cceptance esting. Integrated ogistics upport (I) efforts will provide I planning, maintenance standardization, supply support and other technical I production efforts. ulti-year roduct Improvement rograms (I) consists of programs to ensure producibility and safety for the K 122, K 123, K 124, K 100, K 101, K 86, K 87, K 88 s (K propellant and lead free double base), K 121 ; and K 79, K 109, K 113, K 205 ocket otors. eginning in 08 I and will be combined into one budget line item, , with a new title of artridge ctuated evices/ropellant ctuated evices (/). olumns may not add due to rounding orm 2454, un 86-1 HI I I 7 III: (xhibit -40, page 1 of 3)

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2005 BUDGET ESTIMATES PROCUREMENT OF AMMUNITION, NAVY AND MARINE CORPS BUDGET ACTIVITY 1

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2005 BUDGET ESTIMATES PROCUREMENT OF AMMUNITION, NAVY AND MARINE CORPS BUDGET ACTIVITY 1 H I () 2005 I III I 2004 II, I II 1 epartment of the avy 2005 rocurement rogram xhibit -1 II: 1508 rocurement of mmunition, avy/arine orps : ebruary 2004 ------------------------------------------------------------------------------------------------------------------------------------,

More information

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2002 AMENDED BUDGET SUBMISSION JUSTIFICATION OF ESTIMATES JUNE 2001 WEAPONS PROCUREMENT, NAVY

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2002 AMENDED BUDGET SUBMISSION JUSTIFICATION OF ESTIMATES JUNE 2001 WEAPONS PROCUREMENT, NAVY D F H FIS (F) 2002 DD DG SISSI SIFII F SIS 2001 WS, SSIFID D F H F 2002 G S 2001 ($ I IIS) II: WS, II F 2000 F 2001 F 2002 01. ISI ISSIS 487.0 440.6 576.0 02. H ISSIS 727.9 791.1 644.7 03. DS D D QI 116.0

More information

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006)

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006) SUBPART 217.1--MULTIYEAR CONTRACTING (Revised December 19, 2006) 217.103 Definitions. As used in this subpart-- Advance procurement means an exception to the full funding policy that allows acquisition

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002 COST ($ in Thousands) Actual FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 2738 Weather Service 19,057 11,202 14,488 16,617 16,824 17,131 17,458 Continuing TBD Quantity of RDT&E Articles 0 0 0 0 0

More information

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification February 2004 PE NUMBER: 6424F PE TITLE: B-2 Advanced Technology Exhibit R-2, RDT&E Budget Item Justification February 24 6424F B-2 Advanced Technology Cost ($ in Millions) 3843 Total Program Element (PE) Cost B-2 Advanced

More information

Air Force Integration of Weather In Mission Planning/Execution

Air Force Integration of Weather In Mission Planning/Execution Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Integration of Weather In Mission Planning/Execution Friends and Partners in Aviation Meeting 13 July 2006

More information

If this addendum issued appears incomplete, notify the architect immediately.

If this addendum issued appears incomplete, notify the architect immediately. U # ilm treams at the undee heater P Project #0 ecember 06 his addendum is issued by the wner to all known bidders prior to receipt of Proposal. idders shall acknowledge receipt of this ddendum by so indicating

More information

Air Force Research Laboratory

Air Force Research Laboratory Air Force Research Laboratory Lidar Wind Sensing for Improved Precision Airdrop and Gunship Wind Sensing 27 Jun 2016 Integrity Service Excellence Wesley Jones InfoSciTex AFRL RQQD 1 AFRL PAD FCC and MS&A

More information

GASB 34. Basic Financial Statements M D & A

GASB 34. Basic Financial Statements M D & A GASB 34 Basic Financial Statements M D & A In June 1999, the Governmental Accounting Standards Board issued Statement No. 34 (GASB 34) which fundamentally changed the financial reporting model for state

More information

Industrial/Commercial Evaporative Coolers Specification Guide

Industrial/Commercial Evaporative Coolers Specification Guide Industrial/ommercial vaporative oolers pecification uide IIIO I O O: / 00 / 0 / 0 / 00 / 00 / 0 / 0 / 00 // 0 V OI. OIO eavy gauge galvanized steel is used for cabinet panels and other load bearing components.

More information

Consultants: firms Consultants: individuals

Consultants: firms Consultants: individuals Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

STATUS OF THE WIGOS DEMONSTRATION PROJECTS

STATUS OF THE WIGOS DEMONSTRATION PROJECTS STATUS OF THE WIGOS DEMONSTRATION PROJECTS Demonstration Project Morocco Strengthening Moroccan RIC Capacities (Submitted by Rabia Merrouchi, National Meteorological Service of Morocco (DMN)) February

More information

Protective Coatings: Non-lead orange paint RAL red (optional) non-lead paint Hot dipped galvanized conforming to ASTM A-153.

Protective Coatings: Non-lead orange paint RAL red (optional) non-lead paint Hot dipped galvanized conforming to ASTM A-153. Technical Services: Tel: (66) 500-76 / Fax: (01) 71-7317 www.grinnell.com Grinnell Mechanical Products Grooved Fittings, Ductile Iron & Fabricated Steel General Description Grooved fittings provide an

More information

Punjab Cities Program (P156972)

Punjab Cities Program (P156972) Public Disclosure Authorized SOUTH ASIA Pakistan Social, Urban, Rural and Resilience Global Practice Global Practice Requesting Unit: SACPK Responsible Unit: GSU12 IBRD/IDA Program-for-Results Financing

More information

SECTION H CHEMICAL WEAPONS DESTRUCTION FACILITIES REQUIRED UNDER PARTS IV(A) OF THE VERIFICATION ANNEX OF THE CONVENTION

SECTION H CHEMICAL WEAPONS DESTRUCTION FACILITIES REQUIRED UNDER PARTS IV(A) OF THE VERIFICATION ANNEX OF THE CONVENTION Declarations Forms Section H SECTION H CHEMICAL WEAPONS DESTRUCTION FACILITIES REQUIRED UNDER PARTS IV(A) OF THE VERIFICATION ANNEX OF THE CONVENTION OPCW NOVEMBER 2008 Version 2008 LIST OF CONTENTS 1.

More information

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety.

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. DESCRIPTION This contract covers the needs for the lab testing of coal used by Commonwealth facilities.

More information

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft.

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft. ASE 379L Group #2: Homework #4 James Carlson Due: Feb. 15, 2008 Henri Kjellberg Leah Olson Emily Svrcek Requirements The spacecraft shall be launched to Earth orbit using a launch vehicle selected by the

More information

Single pyro altimeter AltiUno SMT operating instructions

Single pyro altimeter AltiUno SMT operating instructions Single pyro altimeter AltiUno SMT operating instructions Version date Author Comments 1.0 09/03/2014 Boris du Reau Initial version 1.1 11/03/2014 Boris du Reau Updated version 1.2 27/03/2014 Boris du Reau

More information

Streamlined Annual PHA Plan (Small PHAs)

Streamlined Annual PHA Plan (Small PHAs) Streamlined Annual PHA Plan (Small PHAs) U.S. Department of Housing and Urban Development Office of Public and Indian Housing OMB No. 2577-0226 Expires: 02/29/2016 Purpose. The 5-Year and Annual PHA Plans

More information

User Manual. 1000BASE-T1 SFP Module

User Manual. 1000BASE-T1 SFP Module User anual 1000-1 odule Version 0.3 05. June 2017 echnica ngineering Gmb eopoldstraße 236 80807 ünchen Germany ax: +49-89-200-072430 mail: nfo@technica-engineering.de www.technica-engineering.de ndex 1

More information

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial

More information

CHAMPION MARQUIS SPECIFICATIONS GUIDE UIDE FOR COMMERCIAL MODELS

CHAMPION MARQUIS SPECIFICATIONS GUIDE UIDE FOR COMMERCIAL MODELS I O I IO I IIIO I IIIO I O OI O IIIO I O O: / 00 / 0 / 0 / 00 / 00 / 0 / 0 / 00 // 00 V OI. OIO eavy gauge galvanized steel is used for cabinet panels and other load bearing components. Vacuumformed plastic

More information

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

State GIS Officer/GIS Data

State GIS Officer/GIS Data State GIS Officer/GIS Data This Act creates the position of state Geographic Information Systems (GIS) officer. The Act: requires the state GIS officer to adopt or veto the GIS data standards and a statewide

More information

2009 NOISE MANAGEMENT REPORT. Working with our Community for a Quieter Future

2009 NOISE MANAGEMENT REPORT. Working with our Community for a Quieter Future 29 I T PT orking with our ommunity for a Quieter Future T rea of esponsibility autical iles for ircraft rriving/eparting at Toronto Pearson Figure 1 Toronto Pearson International irport oise anagement

More information

Fin design mission. Team Members

Fin design mission. Team Members Fin design mission Team Members Mission: Your team will determine the best fin design for a model rocket. You will compare highest altitude, flight characteristics, and weathercocking. You will report

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Right of Way Mapping TxDOT Internal Audit Division Objective To determine the efficiency and effectiveness of district mapping procedures. Opinion Based on the audit scope areas reviewed,

More information

DRF RELIABILITY DATA

DRF RELIABILITY DATA Y K-ambda 9--0 X alculated values of - omponent derating -~ ain components temperature rise list -~ lectrolytic capacitor lifetime -9 Vibration test -0 bnormal est -~ hermal shock test - est results are

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

Acknowledgment of Aramco Asia. Supplier Code of Conduct

Acknowledgment of Aramco Asia. Supplier Code of Conduct Acknowledgment of Aramco Asia Supplier Code of Conduct (Applicable to Vendors, Manufacturers, and Contractors) Aramco Asia is committed to the highest ethical and legal standards in the conduct of its

More information

Department Mission: Non-Mandated Services: TITLE 33

Department Mission: Non-Mandated Services: TITLE 33 Department: Veterans FY 2019 Proposed Budget Department Mission: To give aid and assistance to any veteran, the spouse or dependents of the veteran or the survivors of the veteran in applying for all benefits

More information

Presented at the 2012 SCEA/ISPA Joint Annual Conference and Training Workshop -

Presented at the 2012 SCEA/ISPA Joint Annual Conference and Training Workshop - Agenda Problem With decreased quantities driving up costs, the program was tasked to find a way to procure requirements under existing funding Approach Strategy: How to do more without more MYP planning

More information

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012 Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration Presented by Mike Carlson September 20, 2012 1 Denver International Airport 5 Runways 12,000 /. (3,658m)

More information

March 4, 2013 Eric P. Smith JWST Program Office

March 4, 2013 Eric P. Smith JWST Program Office March 4, 2013 Eric P. Smith JWST Program Office 1 SIMPLIFIED SCHEDULE OTE = Optical Telescope Element OTIS = Optical Telescope + ISIM k months of project funded critical path (mission pacing) schedule

More information

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT: RESOLUTION 2017-08 A RESOLUTION OF THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT APPROVING PROPOSED BUDGET(S) FOR FISCAL YEAR 2017/2018 AND SETTING A PUBLIC HEARING THEREON

More information

Winter Preparation for Severe Weather Events

Winter Preparation for Severe Weather Events Winter Preparation for Severe Weather Events Jule Tate, Associate Director, Event Analysis Richard Hackman, Senior Reliability Advisor, Reliability Risk Management Mark Olson, Senior Engineer, Reliability

More information

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Operations Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: December 2, 2013 SUBJECT/REPORT NO: Winter Control

More information

Northwest Construction Consumer Council

Northwest Construction Consumer Council Presentation to: Northwest Construction Consumer Council Chatt Smith Manager of Project Controls - Jacobs Critical Success Factors Structured Work Process - JSTEPS sm Best in Class FEL Best Practices/JVEPS

More information

Machine Gun Sight (MGS)

Machine Gun Sight (MGS) Machine Gun Sight (MGS) Crew Served Weapon Sight (Model: MGS-XXX) 2016 Company Proprietary The Machine Gun Sight (MGS) Tested with 20,000+ rounds Background IT&T successfully introduced red-dot sights

More information

L-3 Avionics Systems SkyWatch Traffic Advisory System

L-3 Avionics Systems SkyWatch Traffic Advisory System Cirrus Design Section 9 Pilot s Operating Handbook and FAA Approved Airplane Flight Manual Supplement for L-3 Avionics Systems SkyWatch Traffic Advisory System When the L-3 Avionics Systems SkyWatch 497

More information

Benefits of PERT/CPM. 2018, Jayant Rajgopal

Benefits of PERT/CPM. 2018, Jayant Rajgopal Project: ny set of complex, interrelated activities aimed at some specific goal. Typically, characterized by a clear starting point and a clear end point. Examples: onstruction (buildings, roads, bridges,

More information

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT I. General PROCUREMENT PLAN YEAR 2016/2017

More information

Winter Ready DC District of Columbia Public Service Commission

Winter Ready DC District of Columbia Public Service Commission Winter Ready DC District of Columbia Public Service Commission Presented by: Michael Poncia, Vice President, Customer Operations, Pepco Holdings October 26, 2017 Preparing our System Improving our system

More information

LINEAR PROGRAMMING MODULE Part 1 - Model Formulation INTRODUCTION

LINEAR PROGRAMMING MODULE Part 1 - Model Formulation INTRODUCTION Name: LINEAR PROGRAMMING MODULE Part 1 - Model Formulation INTRODUCTION In general, a mathematical model is either deterministic or probabilistic. For example, the models and algorithms shown in the Graph-Optimization

More information

Forecasting Workbench in PRMS TM. Master Production Schedule. Material Requirements Plan. Work Order/ FPO Maintenance. Soft Bill Maintenance

Forecasting Workbench in PRMS TM. Master Production Schedule. Material Requirements Plan. Work Order/ FPO Maintenance. Soft Bill Maintenance Forecasting Workbench in PRMS TM SHOP FLOOR CONTROL Work Order/ FPO Maintenance Auto Allocation to Lots Pick Slip Print Master Production Schedule Material Requirements Plan Soft Bill Maintenance Stage

More information

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016. Town of Havana, Fl. Response to Review of Electric Utility Hurricane Preparedness and Restoration Actions- Applies only to Hermine and Irma. Maria and Nate posed no serious threat to Havana. Staging for

More information

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013 Eutelsat practice & views on long term sustainability COPUOS/SCST - LTS Workshop Vienna, 14 February 2013 Introduction Introduction to Eutelsat Originally set up in 1977 as an intergovernmental organisation

More information

DEMING PRECISION BOMBING RANGE (PBR) NO

DEMING PRECISION BOMBING RANGE (PBR) NO DEMING PRECISION BOMBING RANGE (PBR) NO. 24 REMEDIAL INVESTIGATION (RI) / FEASIBILITY STUDY (FS) SIERRA COUNTY, NEW MEXICO FORMERLY USED DEFENSE SITES (FUDS) 237 # K06NM041001 217 200 80 252 PROJECT 237

More information

Federal Aviation Administration

Federal Aviation Administration High Ice Water Content Research International Collaboration and Field Campaign Presented to: FPAW By: Tom Bond Date: Statement of Need Over the past 10+ years, it has been recognized that jet engine powerloss

More information

Miniature Day/Night Sight (MDNS) Development

Miniature Day/Night Sight (MDNS) Development Miniature Day/Night Sight (MDNS) Development 1 MDNS Development Presented to NDIA Small Arms Symposium 2 MDNS Agenda Mission Statement MDNS Goals Acquisition Strategy Subsystems Integration 3 MDNS Mission

More information

AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE

AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE AWARD-WINNING SEASONAL SNOW & ICE MAINTENANCE MONSTERPLOW.CA 647-967-PLOW DELIVERING ALL-INCLUSIVE SEASONAL SNOW & ICE COVERAGE SERVICE SPECIFICS UNLIMITED SERVICE OVER 1 CM Guaranteed service for every

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

ITTC Recommended Procedures and Guidelines Performance, Propulsion 1978 ITTC Performance Prediction Method

ITTC Recommended Procedures and Guidelines Performance, Propulsion 1978 ITTC Performance Prediction Method I ecommended 1978 I erformance rediction ethod 7.5 0 age 1 of 9 008 evision able of ontents 1978 I erformance rediction ethod... 1. UOE OF OEUE.... EIION OF OEUE....1 Introduction.... efinition of the

More information

NM1. Moulded Case Circuit Breaker NM1 P-084. Moulded Case Circuit Breakers. 2. Type designation. 1. General. 3. Classification N M 1- /

NM1. Moulded Case Circuit Breaker NM1 P-084. Moulded Case Circuit Breakers. 2. Type designation. 1. General. 3. Classification N M 1- / P0. Type designation N M / Type of Npole for P breaker* pplication: lank: for power distribution; : for motor protection elease type and accessory code (please refer to table on page 9) Number of poles

More information

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart)

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart) Table G - 6. Actions Identified by the () (From Master Action Chart) Multi-Hazard Plan, 2017 Action Comments 5 All-Hazards Local Planning & Regulations Update the Operations Plan on an annual basis. Work

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4 IV. GENERAL FUND 001 DESCRIPTIONS... 6 V. DEBT SERVICE FUNDS... 9

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania

More information

Adopted Budget Presented for Board Approval June 21, 2017

Adopted Budget Presented for Board Approval June 21, 2017 2017-2018 Adopted Presented for Board Approval June 21, 2017 Prepared by Candace Reines, Assistant Superintendent Business Services Christopher Rabing, Director of Fiscal Services FINANCIAL REPORTS School

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 V. DEBT SERVICE FUNDS... 6

More information

AWOS. Automated Weather Observing Systems COASTAL

AWOS. Automated Weather Observing Systems COASTAL AWOS Automated Weather Observing Systems COASTAL Environmental Systems Monitor Monitor Your Your World World Coastal s Experience & Expertise Since 1981, Coastal Environmental Systems, Inc. (Coastal) has

More information

Navy League Sea-Air-Space Expo 2013

Navy League Sea-Air-Space Expo 2013 Navy League Sea-Air-Space Expo 2013 Decision-making superiority delivered. All rights reserved. Insitu is a Boeing Company. 1 Insitu Snapshot Leading provider of Small Long-Endurance Unmanned Aircraft

More information

Systems. Department Mission: Mandated Services: Department Overview: Successes and Challenges:

Systems. Department Mission: Mandated Services: Department Overview: Successes and Challenges: Department: Geographic Information Systems FY 2018 Proposed Budget Department Mission: The mission of the Klamath County Geographic Information Systems (GIS) department is to provide maintenance of and

More information

ISEmax CAM40/CAS40. Technical Information

ISEmax CAM40/CAS40. Technical Information Technical Information Online measurement of nutrient parameters Ion-selective electrode system for the continuous measurement of ammonium and nitrate Application The ion-selective electrode system works

More information

The current status, functions, challenges and needs of South Sudan Meteorological Department (SSMD)

The current status, functions, challenges and needs of South Sudan Meteorological Department (SSMD) The current status, functions, challenges and needs of South Sudan Meteorological Department (SSMD) Presented: by Mojwok Ogawi Modo, South Sudan Meteorological Department. Background The present SSMD was

More information

Chris Doerr Phone: Aircraft Cost Calculator, LLC 1341 W. Mequon Road, Suite 205, Mequon, WI Powered by ACC:

Chris Doerr Phone: Aircraft Cost Calculator, LLC 1341 W. Mequon Road, Suite 205, Mequon, WI Powered by ACC: Annual & Hourly Cost Detail Embraer Legacy 650 GENERAL PARAMETERS Min Crew / Max Passengers 2 / 13 Seats Full Range (NM / SM) 3569.48 / 4107.68 Normal Cruise Speed (KTS / MPH) 435.83 / 501.54 Average Pre-Owned

More information

Sales Analysis User Manual

Sales Analysis User Manual Sales Analysis User Manual Confidential Information This document contains proprietary and valuable, confidential trade secret information of APPX Software, Inc., Richmond, Virginia Notice of Authorship

More information

Technology of Rocket

Technology of Rocket Technology of Rocket Parts of Rocket There are four major parts of rocket Structural system Propulsion system Guidance system Payload system Structural system The structural system of a rocket includes

More information

FY2011 Capital Budget Reprogramming

FY2011 Capital Budget Reprogramming Finance & Administration Committee Action Item III-A December 2, 2010 FY2011 Capital Budget Reprogramming Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Absolute encoders multiturn

Absolute encoders multiturn elektronischer electronic multiturn, Multiturn, magnetic magnetisch Sendix M66 / M68 (shaft / hollow shaft) The Sendix M6 with Energy Harvesting Technology is an electronic multiturn encoder in miniature

More information

AM23 - Texas A&M University Health Science Purchase Order

AM23 - Texas A&M University Health Science Purchase Order Page 1 of 7 AM23 - Texas A&M University Health Science Purchase Order P.O. Date: 9/22/2016 Purchase Order Number AM23-17-P033061 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D

More information

UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification Date: February 2008

UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification Date: February 2008 Exhibit R-2, RDT&E Budget Item Justification : February 2008 APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE: Joint/Allied Coalition Information Sharing/PE 0301144K ($ in millions) FY 2007 FY 2008

More information

ATTACHMENT Mitigating Systems

ATTACHMENT Mitigating Systems ATTACHMENT 71111.01 INSPECTABLE AREA: Adverse Weather Protection CORNERSTONE: Initiating Events Mitigating Systems EFFECTIVE DATE: January 1, 2010 INSPECTION BASES: Weather conditions leading to loss of

More information

Overload Relays. SIRIUS 3RU1 Thermal Overload Relays. 3RU11 for standard applications. 5/46 Siemens LV 1 AO 2011

Overload Relays. SIRIUS 3RU1 Thermal Overload Relays. 3RU11 for standard applications. 5/46 Siemens LV 1 AO 2011 SIRIUS 3RU1 Thermal Overview 1 2 7 3 4 6 "Increased safety" type of EEx e according to ATEX directive 94/9/EC The 3RU11 thermal overload relays are suitable for the overload of explosion-proof motors with

More information

Stop TB workshop on grant negotiation and implementation. The workplan and budget: from proposal to implementation. Geneva, December

Stop TB workshop on grant negotiation and implementation. The workplan and budget: from proposal to implementation. Geneva, December Stop TB workshop on grant negotiation and implementation The workplan and budget: from proposal to implementation Geneva, 11-14 December Agenda 3 main topics 1. How do we move from workplans and budgets

More information

G200 & CL605 Analysis

G200 & CL605 Analysis G200 & CL605 Analysis Annual & Hourly Cost Detail Gulfstream G200 GENERAL PARAMETERS Min Crew / Max Passengers 2 / 8 Seats Full Range (NM / SM) 3051.75 / 3511.89 Normal Cruise Speed (KTS / MPH) 447.53

More information

Facilities Management

Facilities Management Policy Number: 700.20 Title: Chemical Fume Hood Policy Implementation Date: 2002 Last Audited: August, 2017 Last Revised: October 23rd, 2017 Facilities Management Introduction The laboratory chemical fume

More information

Government Furnished Property Process Implementation Training

Government Furnished Property Process Implementation Training Government Furnished Property Process Implementation Training Presented by: Carol Vigna, OSD AT&L DPAP carol.a.vigna.civ@mail.mil Pam Rooney, Support to OSD AT&L DPAP www.dodprocurementtoolbox.com Defense

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 Background Information The Four

More information

Synthetic Weather Radar: Offshore Precipitation Capability

Synthetic Weather Radar: Offshore Precipitation Capability Synthetic Weather Radar: Offshore Precipitation Capability Mark S. Veillette 5 December 2017 Sponsors: Randy Bass, FAA ANG-C6 and Rogan Flowers, FAA AJM-33 DISTRIBUTION STATEMENT A: Approved for public

More information

Administration by the CER of the Carbon Revenue Levy

Administration by the CER of the Carbon Revenue Levy Administration by the CER of the Carbon Revenue Levy DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/10/171 23 rd September 2010 Clive Bowers cbowers@cer.ie The Commission for

More information

POLICY ISSUE (INFORMATION)

POLICY ISSUE (INFORMATION) POLICY ISSUE (INFORMATION) August 12, 2011 SECY-11-0112 FOR: FROM: SUBJECT: The Commissioners Michael R. Johnson, Director /RA/ Office of New Reactors STAFF ASSESSMENT OF SELECTED SMALL MODULAR REACTOR

More information

INFINITY AIMING REFERENCE COLLIMATOR

INFINITY AIMING REFERENCE COLLIMATOR INFINITY AIMING REFERENCE COLLIMATOR "Aiming point, aiming post, deflection 2800, refer." No longer will this catch phrase signal the beginning of the number 5 cannoneer's 100-pace relay dash with two

More information

The Vaisala AUTOSONDE AS41 OPERATIONAL EFFICIENCY AND RELIABILITY TO A TOTALLY NEW LEVEL.

The Vaisala AUTOSONDE AS41 OPERATIONAL EFFICIENCY AND RELIABILITY TO A TOTALLY NEW LEVEL. The Vaisala AUTOSONDE AS41 OPERATIONAL EFFICIENCY AND RELIABILITY TO A TOTALLY NEW LEVEL. Weather Data Benefit For Society The four most important things about weather prediction are quality, reliability,

More information

Hazard Communication

Hazard Communication Hazard Communication For Company: Address: LC-1009 Rev. 06/16 Page 1 Hazard Communication Program Ref: OSHA 1910.1200 Approved by: Title: Ranking Official's Signature Date: Hazard Communication Coordinator

More information

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Operation Name: BN-National Community

More information

SNOW CONTROL OPERATIONS

SNOW CONTROL OPERATIONS SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow

More information

ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM

ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM 51-th session of the UN Committee on the Peaceful Uses of Outer Space (COPUOS) 1 Federal Space Agency of Russia continues consecutive activity in

More information

Dark Sky Initiative Draft Terms of Reference

Dark Sky Initiative Draft Terms of Reference Dark Sky Initiative Draft Terms of Reference July 2008 Table of Contents 1.0 Introduction 2 2.0 Initiative intent 2-3 3.0 Initiative goals 3 4.0 Legislation 3 5.0 Municipal Development Plan 3 6.0 Land

More information

FIAR & Enterprise Risk Management (ERM)

FIAR & Enterprise Risk Management (ERM) FIAR & Enterprise Risk Management (ERM) Update Brief to the SCESC October 24, 2017 1 BLUF -> Integration of FIAR Remediation Requirement: OSD Mgmt/Tracking Material Weaknesses (MW) Identified in Component

More information

Princeton Astrophysics Community Meeting

Princeton Astrophysics Community Meeting Princeton Astrophysics Community Meeting Michael Moore Program Executive Astrophysics Division Science Mission Directorate September 4, 2012 Timeline 2011 2012 10 January: Identification of hardware availability

More information

MS/Standard how to order

MS/Standard how to order /tandard how to order I--5015 and I-5015 ype (older ontacts) 102 18 W () 1 2 5 7 8 1. onnector ype designates ilitary tandard * designates service class and with proprietary special * designates service

More information

Carley Foundry Customer Specification Index -12/1/16

Carley Foundry Customer Specification Index -12/1/16 568 7007 3 40107 40108 57815 100067 107700 9-14-93 148887 04 148888 22 310012 360709 363174 1004487-U 1464202 2529316 2950810 2950814 3320700 7431393 8351300 8448263 "-" 7/20/2010 9921013 U 9949050 11577275

More information

Department Mission: Mandated Services: Department Overview:

Department Mission: Mandated Services: Department Overview: Department: Treasurer FY 2019 Proposed Budget Department Mission: Our mission is to provide financial stewardship for Klamath County by safeguarding financial resources while maximizing investment return

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

GIS for Integrated Pest Management. Christina Hailey. Abstract:

GIS for Integrated Pest Management. Christina Hailey. Abstract: GIS for Integrated Pest Management Christina Hailey Abstract: At its formation in 1965, Harris County Mosquito Control (Houston, Texas) (HCMC) was primarily involved in the prevention and control of mosquito-borne

More information

November 3, 2014 Eric P. Smith JWST Program Office

November 3, 2014 Eric P. Smith JWST Program Office November 3, 014 Eric P. Smith JWST Program Office 1 SINCE LAST CAA MEETING... Completed of 3 recommended GAO schedule risk analyses for this year. Mutually agreed to drop 3 rd. Will perform cost-risk study

More information

Adopted Budget Presented for Board Approval June 15, 2016

Adopted Budget Presented for Board Approval June 15, 2016 2016-2017 Adopted Presented for Board Approval June 15, 2016 Prepared by Candace Reines, Assistant Superintendent Business Services Christopher Rabing, Director of Fiscal Services FINANCIAL REPORTS School

More information

ZF Maschinenantriebe GmbH Industrial Drives. Planetary gearboxes Economy Series for Servomotors

ZF Maschinenantriebe GmbH Industrial Drives. Planetary gearboxes Economy Series for Servomotors ZF Maschinenantriebe GmbH Industrial rives Planetary gearboxes Economy Series for Servomotors 2 ZF-uoplan 2K Two-speed Gearboxes ZF-Ecolift Elevator Gearboxes ZF-Servoplan G ompact Gearbox ZF-Tiratron

More information