1 1 USACE DAM RISK ASSESSMENT PROGRAM OVERVIEW AND HOW ENGINEERING GEOLOGY CONTRIBUTES TO THE LEVEL OF CONFIDENCE AND RESULTS Todd N. Loar, PG, CEG Senior Geological Engineer Risk Management Center Lakewood, CO 14 September 2017 Association of Engineering Geologists Colorado Springs, CO September, 2017 File Name Hurricane Katrina, inundation map
2 USACE INVENTORY OVERVIEW Dams: 710 structures (at 556 different flood management projects) Levees: 15,000 mi of federally authorized levees (USACE and other stakeholders) Navigation Systems
3 USACE INVENTORY OVERVIEW
4 RISK MANAGEMENT CENTER (RMC) RMC Offices IWR Offices RA Team: Part of USACE HQ (Institute for Water Resources, IWR). Lead risk management for centrally-located dam/levee safety program: Program management Risk analysis and assessments Review and support Establish project prioritization, plan studies, and modification activities Data management / compilation Develop technical competency (training) Risk Cadre District Team Multi-disciplinary Team: Civil, geotech, geologic, H&H, structural, mechanical, economists, environmental
5 RISK MANAGEMENT CENTER (RMC)
6 We live in a world filled with risk and its in our nature to continually evaluate our actions, environment & decisions relative to the potential consequences and/or benefits.
7 RISK AND RISK ASSESSMENTS Probability of Failure Incremental Risk= Probability Consequences of the Loading Given the Loading Given Failure X X Failure Likelihood (loading & system response) Includes statistical & subjective probability Consequence Level The risk assessment process attempts to answer the following questions: Consequences include: life, economic, and environment and other non-monetary impacts. Life safety is paramount.
8 TOLERABLE RISK GUIDELINES (TRG S) Risks that society is willing to live with so as to secure certain benefits. Risks society does not regard as negligible. Decisions are risk INFORMED: Emphasis is on the decision, NOT the number or the model Numbers are NOT decisions Risks that society is confident are being properly managed by the owner. Risks that the owner keeps under review and reduces still further as practicable.
9 LEVELS OF A RISK ASSESSMENT 1. Periodic Assessments (PA) and Semi- Quantitative Risk Assessment (SQRA) 2. Issue Evaluation Studies (IES) 3. Dam Safety Modification Study (DSMS) 4. Post-Implementation Evaluation (PIE) Each Level involves an increasing amount of data compilation, review, evaluation, site characterization, and engineering analysis
10 Geologic Contributions to Risk Assessment - Loading Seismic Loading: Probability Probability of Failure Consequences of the Loading Given the Loading Given Failure Deterministic & probabilistic earthquake loadings for dam stability analyses Potential for and geometry of surface fault rupture % Contribution to Hazard Incremental Risk= Crustal Faults Deep Intraslab Source Cascadia Megathrust 9,950 yr
11 Geologic Contributions to Risk Assessment - Loading Incremental Risk= Hydrologic Loading: Probability Probability of Failure Consequences of the Loading Given the Loading Given Failure Constrain hydro-loading using long-term flood records: Geomorphic indicators and investigations of paleoflood stage Geomorphic indicators of stage non-exceedance (upper bound) Age-dating to define frequency of extreme loading House et al. (2002) AGU Paleoflood Paleo-flood point
12 Geologic Contributions to Risk Assessments Failure / Consequences Probability of Failure Incremental Risk= Probability Consequences of the Loading Given the Loading Given Failure Consequence analysis for various loading, breach & non-breach scenarios are developed by the MMC This is where engineering geology contributes the most to the RA Process
13 DAM FAILURES IN THE 20TH CENTURY Fontenelle St. Francis Bayless Quail Creek ~1/3 of all dams failed by overtopping ~1/3 failed by seepage and piping through the dam or into the foundation ~1/3 failed due to foundation and miscellaneous causes ~55% of all concrete dam failures attributed to foundation issues (ICOLD, 1995) Approx. 70% of failures can be attributed to geologic and/or geotechnical issues
14 Example Geological PFM: Description Loading -> Flaw exists > Initiation > Continuation > Progression > Intervention > Breach
15 Example Geological PFM: Description Loading -> Flaw exists > Initiation > Continuation > Progression > Intervention > Breach
16 Example Geological PFM: Event Tree Breach Unsuccessful Intervention Progression: Clogging 6 Continuation Initiation Flaw: Ineffective Treatment Flaw: Open Rock Discontinuities 1) Reservoir Loading 4 3 Probability that the surface treatment / 2 grouting in the core Probability that rock trench fails to cut off the seepage path defects exist & are 1 open/continuous enough to transport embankment materials Probability that gradients and velocity are sufficient to initiate scour? Probability an unfiltered exit exists downstream? Probability that intervention is unsuccessful? Probability that the embankment materials are unable 5 to self-heal or clog the failure paths and a stope forms? Geologic / Geotech / Hydrogeologic Uncertainties: Open/continuous network of discontinuities downstream of core/curtain within the SS/LS unit allowing embankment material to migrate/erode Evaluate foundation treatment and effectiveness. Obtain information to understand the gradients across the core trench and between the core material and downstream rock Potential Targets for Field Studies (mapping, drilling, testing, instrumentation) Probability the stope enlarges to collapse 7 the crest of the dam leading to breach by overtopping?
17 Example Geological PFM: Characterizing the Uncertainty at Each PFM Node MORE LIKELY / LESS LIKELY FACTORS Geomechanical mapping, drilling angled borings, packer testing, down-hole televiewer survey, additional piezometers might improve our confidence and reduce uncertainty with this node of the PFM High confidence we are unlikely to revise our estimate with more information. Moderate confidence we are unsure about the potential to change the estimate with more information Low confidence likely to revise estimate with more information.
18 SUCCESSFUL ENG. GEO. IN RIDM Has experience / background in dam & levee design and construction Basic understanding of geotechnical, civil, hydrologic, and structural engineering disciplines Knowledge of different PFM s and how geologic conditions influence the PMF mechanics. Understands probability estimates/analysis for various nodes in the event tree. Familiar with past precedents, incidents, and failure case histories. Ability to sort, query, analyze, compile, and portray different types of geologic/geotechnical spatial data and create plots, figures and drawings that communicate the spatial geological conditions related to the PFM s. Must know what data is IMPORTANT and NECESSARY to evaluate foundations and solve engineering problems related to the PFM.
19 SUCCESSFUL ENG. GEO. IN RIDM Reviews, understands, summarizes, & prioritizes existing data prior to the RA Understands what the instrumentation data is telling the RA team in the context of the geology and PFM s (data tabulation is not interpretation) Thinks about PFM s and uses all geologic tools to most accurately reflect the subsurface and make realistic estimate of depositional environments, spatial extents and infer the most realistic behavior given the PFM Creates detailed plans and section drawings to display, summarize, and communicate material properties and instrumentation data Has genuine enthusiasm to solve specific technical geologic problems (be a problem-solving detective).
20 LESSONS LEARNED PFMA is starting point for RA Training of facilitators, technical team members, and participants is essential Engineering geologists are fully capable to lead / facilitate risk assessment teams Select realistic engineering properties and ranges (avoid conservatism in RA) PFM must be well developed and presented to characterize the failure modes and answer specific questions associated with the event tree nodes There is no clear line between geotechnical engineering and engineering geology Archived data or previous findings must be identified early as it can significantly alter the risk estimates Reports and geologic evaluation must be focused on the PFM and point to specific evidence supporting & justifying the conclusions and interpretations
21 Life Safety is Paramount Protecting People, Not Infrastructure
FRED BURR DAM FEASIBILITY STUDY
FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.
More informationTAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES
TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65
More informationOVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND
OVERVIEW OF ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND 255 255 255 237 237 237 0 0 0 217 217 217 LEVEES 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 110 135 120 Requirements and Processes
More informationWHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?
WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.
More informationCalibration of Seepage and Stability Models for analysis of Dams and Levees. Francke C Walberg Consulting Geotechnical Engineer, AECOM
Calibration of Seepage and Stability Models for analysis of Dams and Levees Francke C Walberg Consulting Geotechnical Engineer, AECOM Focus Use of models for; Evaluation of existing dams and levees Rehabilitation
More informationRisk Evaluation. Todd Shipman PhD, Alberta Geological Survey/Alberta Energy Regulator November 17 th,2017 Induced Seismicity Workshop, Yellowknife NWT
Risk Evaluation Todd Shipman PhD, Alberta Geological Survey/Alberta Energy Regulator November 17 th,2017 Induced Seismicity Workshop, Yellowknife NWT Risk Management Approach to Induced Seismicity Establishing
More informationModeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu
Modeling Great Britain s Flood Defenses AIRCurrents Editor s note: AIR launched its Inland Flood Model for Great Britain in December 2008. The hazard module captures the physical processes of rainfall-runoff
More informationQualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam
Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam Todd N. Loar, CEG Senior Geological Engineer USACE Risk Management Center AAARRR!!!... Peck, Peck, Terzaghi, Goodman,
More informationThe first steps in the hydropower project cycle:
The first steps in the hydropower project cycle: Initial investigations and feasibility studies 12 September 2013 Bruce Taylor Introduction Objectives of early stage studies Tools and methods Case study
More informationAmistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border
Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING
More informationNatural Hazards Large and Small
Specialty Seminar on Engineering of Geo-Hazards ASCE Met Section Geotechnical Group and Geo-Institute of ASCE 16 May 2007 Natural Hazards Large and Small Evaluation and Mitigation Edward Kavazanjian, Jr.,
More informationRisk Analysis HOW DID WE GET HERE AND WHERE ARE WE GOING? Steven G. Vick
Risk Analysis HOW DID WE GET HERE AND WHERE ARE WE GOING? Steven G. Vick Basic precepts 1. The purpose of risk analysis is to improve dam safety diagnostic improved understanding of dam and its vulnerabilities
More informationTreatment of Epistemic Uncertainty in PSHA Results
Treatment of Epistemic Uncertainty in PSHA Results Norm Abrahamson University of California, Berkeley Pacific Gas & Electric PSHA Workshop, Lenzburg, Switzerland, Sep 7, 2017 Haz(GM > z)= Nscenarios i=1
More informationDetermination of River Water Level Exceedance Frequency Curves
Swiss Federal Nuclear Safety Inspectorate ENSI Determination of River Water Level Exceedance Frequency Curves G. M. Schoen, R. C. Hausherr, A. Ramezanian PSA 2017 International Topical Meeting on Probabilistic
More informationEngineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer
Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical
More informationBRIEFING MEMO ON RESERVOIR TRIGGERED SEISMICITY (RTS)
BRIEFING MEMO ON RESERVOIR TRIGGERED SEISMICITY (RTS) 1. General. The issue of reservoir-triggered seismicity (RTS) has been controversial, and hotly debated, for many decades. There has been general recognition
More informationPracticing Geology in a Digital World
Practicing Geology in a Digital World Timothy I. Mote PhD, CEG, GISP Senior Engineering Geologist/GIS Analyst Geomatrix Consultants Berkeley EPS Alumni Student Forum 1/23/07 Geomatrix Office Locations:
More informationIAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6
IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and
More informationSLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE
More informationAssociation of Environmental & Engineering Geologists (AEG) To join AEG: Student membership is Free! Ask about our scholarships.
Association of Environmental & Engineering Geologists (AEG) To join AEG: www.aegweb.org/join Student membership is Free! Ask about our scholarships. What is the Association of Environmental & Engineering
More informationGuidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon
Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon
More informationInterpretive Map Series 24
Oregon Department of Geology and Mineral Industries Interpretive Map Series 24 Geologic Hazards, and Hazard Maps, and Future Damage Estimates for Six Counties in the Mid/Southern Willamette Valley Including
More informationHURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN
HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN March 2014Revised March 2015 UNITED STATES ARMY CORPS OF ENGINEERS
More informationProgrammatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces
Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces 23 rd International Petroleum Environmental Conference New Orleans, Louisiana November 8-10, 2016 Introduction
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-ET Engineer Manual 1110-2-6050 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 EM 1110-2-6050 30 June 1999 Engineering and Design RESPONSE SPECTRA AND SEISMIC ANALYSIS
More informationEmergency Action Plan (EAP) Tata Pond Dam
For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification
More informationLandslide Hazard Assessment Methodologies in Romania
A Scientific Network for Earthquake, Landslide and Flood Hazard Prevention SciNet NatHazPrev Landslide Hazard Assessment Methodologies in Romania In the literature the terms of susceptibility and landslide
More informationPit Slope Optimization Based on Hydrogeologic Inputs
Pit Slope Optimization Based on Hydrogeologic Inputs G. Evin, F. Henriquez, V. Ugorets SRK Consulting (U.S.), Inc., Lakewood, Colorado, USA ABSTRACT With the variability of commodity prices and the constant
More informationPractical aspects of dam break analysis
Practical aspects of dam break analysis Louis C Hattingh Hattingh Anderson Associates CC Dam break analysis It is a model You need to understand what you model & have an idea of the answers that you expect
More informationCNSC Review of the Long-Term Safety Case for a Deep Geologic Repository
CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository T. Son Nguyen Geoscience Specialist Brugg, Switzerland May 13, 2016 e-doc 4972224 nuclearsafety.gc.ca Content Ontario Power Generation
More informationPhase II Report: Project Definition Options. Dam Safety
OSHPC BARKI TOJIK Phase II Report: Project Definition Options Dam Safety Part 1: Basic data & Dam Design DAM Safety 2 Geology / Geotechnics...: Tectonics / Seismicity : DAM Design - Dam Location - Type
More informationGeotechnical Earthquake Engineering
Geotechnical Earthquake Engineering by Dr. Deepankar Choudhury Humboldt Fellow, JSPS Fellow, BOYSCAST Fellow Professor Department of Civil Engineering IIT Bombay, Powai, Mumbai 400 076, India. Email: dc@civil.iitb.ac.in
More informationSLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY
More informationTailings Dam Classification and Breach Analyses, Perspectives from the Canadian Dam Association
Tailings Dam Classification and Breach Analyses, Perspectives from the Canadian Dam Association May 10, 2017 Amec Foster Wheeler 2017. Tailings Dam Classification and Breach Analyses, Perspectives from
More informationGeotechnical Models and Data Confidence in Mining Geotechnical Design
Geotechnical Models and Data Confidence in Mining Geotechnical Design Michael Dunn Principal Consultant (Geotechnical Engineering) Overview Geotechnical models Geotechnical model and design Data reliability
More informationRisk Treatment. Todd Shipman PhD, Alberta Geological Survey/Alberta Energy Regulator November 17 th,2017 Induced Seismicity Workshop, Yellowknife NWT
Risk Treatment Todd Shipman PhD, Alberta Geological Survey/Alberta Energy Regulator November 17 th,2017 Induced Seismicity Workshop, Yellowknife NWT Risk Management Approach to Induced Seismicity Establishing
More informationSeismic Issues for California's Nuclear Power Plants. Norman Abrahamson University of California, Berkeley
Seismic Issues for California's Nuclear Power Plants Norman Abrahamson University of California, Berkeley From UCERF 2 Seismic Setting for California s Nuclear Power Plants Major Offshore Strike-Slip Faults
More informationA Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1
A Simple Procedure for Estimating Loss of Life from Dam Failure Wayne J. Graham, P.E. 1 INTRODUCTION Evaluating the consequences resulting from a dam failure is an important and integral part of any dam
More informationPractical reliability approach to urban slope stability
University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 2011 Practical reliability approach to urban slope stability R. Chowdhury
More informationFRIENDS OF THE EEL RIVER
FRIENDS OF THE EEL RIVER Working for the recovery of our Wild & Scenic River, its fisheries and communities. Frank Blackett, Regional Engineer Office of Energy Projects Division of Dam Safety and Inspections
More informationKNOWLEDGE NOTE 5-1. Risk Assessment and Hazard Mapping. CLUSTER 5: Hazard and Risk Information and Decision Making. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KNOWLEDGE NOTE 5-1 CLUSTER 5: Hazard and Risk Information and Decision Making Risk Assessment
More informationEvaluation of Mineral Resource risk at a high grade underground gold mine
Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015 Project Background Beaconsfield Gold Mine, Tasmania
More informationSINKHOLES WHERE AND WHY THEY FORM
SINKHOLES WHERE AND WHY THEY FORM In the wake of the sinkhole that developed beneath a Florida man s bedroom, tragically killing the man as he was sucked into the earth, many people are searching for information.
More informationImportant Concepts. Earthquake hazards can be categorized as:
Lecture 1 Page 1 Important Concepts Monday, August 17, 2009 1:05 PM Earthquake Engineering is a branch of Civil Engineering that requires expertise in geology, seismology, civil engineering and risk assessment.
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationSummary of Available Datasets that are Relevant to Flood Risk Characterization
Inter-Agency Characterization Workshop February 25-27, 2014 USACE Institute for Water Resources, Alexandria, VA, IWR Classroom Summary of Available Datasets that are Relevant to Characterization National
More informationTHE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015
THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage
More informationDam Safety Aspects of Reservoir-Triggered Seismicity
Dam Safety Aspects of Reservoir-Triggered Seismicity Dr. Martin Wieland Chairman, Committee on Seismic Aspects of Dam Design, International Commission on Large Dams (ICOLD) Poyry Energy Ltd., Zurich, Switzerland
More informationCertification Process for North Indio East Side Dike in the Coachella Valley
Certification Process for North Indio East Side Dike in the Coachella Valley September 7, 2016 Brady McDaniel (Northwest Hydraulic Consultants) Contributors Andrey Shvidchenko, Brent Wolfe and Jimmy Pan
More informationDowntown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk
Prepared for: The Municipality of Anchorage Planning Department and the Geotechnical Advisory Commission Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared
More informationGeoscientific Instrumentation in River Valley Projects
J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon
More informationIs It Safe to Frack Beneath Lake Lewisville?
Is It Safe to Frack Beneath Lake Lewisville? Jerry Bartz, 2016 Data in this presentation are provisional and subject to revision and released on the condition that the author shall not be held liable for
More informationGUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING
GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO J x PUBLISHING S Contents Preface and acknowledgments xiii 1 Fundamentals of slope design 1 Peter Stacey 1.1 Introduction
More informationCHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH
CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH 5.1 Overview Plaquemines Parish is the area where the last portion of the Mississippi River flows out into the Gulf of Mexico (see Figures
More informationWashington State K 12 Facilities Pre-Disaster Mitigation Program Final Mitigation Plan
Washington State K 12 Facilities Pre-Disaster Mitigation Program Final Mitigation Plan ESD Meeting, January 2015 Office of Superintendent of Public Instruction School Facilities & Organization 1 Mitigating
More informationA METHODOLOGY FOR ASSESSING EARTHQUAKE-INDUCED LANDSLIDE RISK. Agency for the Environmental Protection, ITALY (
A METHODOLOGY FOR ASSESSING EARTHQUAKE-INDUCED LANDSLIDE RISK Roberto W. Romeo 1, Randall W. Jibson 2 & Antonio Pugliese 3 1 University of Urbino, ITALY (e-mail: rwromeo@uniurb.it) 2 U.S. Geological Survey
More informationRapid Hazard Assessment of Heavy Rainfall Triggered Landslide Dams A Review
Rapid Hazard Assessment of Heavy Rainfall Triggered Landslide Dams A Review Focus on the developed technologies in Taiwan J. J. Dong Graduate Institute of Applied Geology, National Central University,
More informationICOLD Bulletin 164 on internal erosion of dams, dikes and levees and their foundations
ICOLD Bulletin 164 on internal erosion of dams, dikes and levees and their foundations Rodney Bridle UK Member, ICOLD Technical Committee on Embankment Dams rodney.bridle@damsafety.co.uk Workshop on seepage-induced
More informationSAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3
ABSTRACT SAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3 The paper presents Seismic Hazard Analysis (SHA) of Sondur dam situated in Chhattisgarh
More informationAttachment 3: Fragility Curve Determinations DRAFT
Attachment 3: Fragility Curve Determinations DRAFT CELRC-TS-DG 4 October 2017 MEMORANDUM FOR PM-PL SUBJECT: Fragility Curve Determination for McCook Levee North and South of 47 th Street Introduction 1.
More informationGEOL 1121 Earth Processes and Environments
GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,
More informationIMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL
IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL Conor Watkins Missouri University of Science and Technology
More informationTeton Dam Failure A Review of the Technical Factors Contributing to the Failure
Teton Dam Failure A Review of the Technical Factors Contributing to the Failure Outline of Presentation Location, Background and Project Statistics Technical Causes of Failure to be Discussed Geology
More informationBy Chris Mikes and David Fleck Digital Terrain Analysis GEOG 593. Overview
Earthquake and Infrastructure Damage Analysis in Multnomah and Clackamas Counties: The Application of LiDAR In The Development of an Emergency Response Plan By Chris Mikes and David Fleck Digital Terrain
More informationSusitna-Watana Hydroelectric Project (FERC No ) Site-Specific Seismic Hazard Study Study Plan Section 16.6
(FERC No. 14241) Site-Specific Seismic Hazard Study Study Plan Section 16.6 Initial Study Report Part A: Sections 1-6, 8-9 Prepared for Prepared by MWH / Fugro June 2014 TABLE OF CONTENTS 1. Introduction...
More informationGEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1
GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding
More informationDam Break Analysis Using HEC-RAS and HEC-GeoRAS A Case Study of Ajwa Reservoir
Journal of Water Resources and Ocean Science 2016; 5(6): 108-113 http://www.sciencepublishinggroup.com/j/wros doi: 10.11648/j.wros.20160506.15 ISSN: 2328-7969 (Print); ISSN: 2328-7993 (Online) Case Report
More informationEARTHQUAKE CLUSTERS, SMALL EARTHQUAKES
EARTHQUAKE CLUSTERS, SMALL EARTHQUAKES AND THEIR TREATMENT FOR HAZARD ESTIMATION Gary Gibson and Amy Brown RMIT University, Melbourne Seismology Research Centre, Bundoora AUTHORS Gary Gibson wrote his
More informationFloods Lecture #21 20
Floods 20 Lecture #21 What Is a Flood? Def: high discharge event along a river! Due to heavy rain or snow-melt During a flood, a river:! Erodes channel o Deeper & wider! Overflows channel o Deposits sediment
More informationPequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT
Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and
More information10. GEOTECHNICAL EXPLORATION PROGRAM
Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in
More informationThe Quail Creek Dike Failure
The Quail Creek Dike Failure (Lessons Not Learned) AEG Shlemon Specialty Conference Dam Foundation Failures and Incidents Denver, CO May 2013 Douglas D. Boyer, PE, CEG US Army Corps of Engineers Risk Management
More informationGeotechnical issues in seismic assessments: When do I need a geotechnical specialist?
Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? B.H. Rama & S.J. Palmer Tonkin & Taylor Ltd (T+T), Wellington, New Zealand. 2016 NZSEE Conference ABSTRACT: The Canterbury
More informationRole of the Geotechnical Consultant in Design Build Projects a General Contractors Geotechnical Engineer s Perspective
Role of the Geotechnical Consultant in Design Build Projects a General Contractors Geotechnical Engineer s Perspective Steven R. Saye Kiewit Engineering Group, Inc. Design Build Geotechnical Goal All parties
More informationPRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE
PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE Engineers and Geologists PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUI-WAIRAU ZONE Report prepared for: Environment
More informationProbabilistic design of levee and floodwall heights for the Hurricane Protection System in the New Orleans area
Probabilistic design of levee and floodwall heights for the Hurricane Protection System in the New Orleans area Mathijs van Ledden (Haskoning Inc.), Pat Lynett (Texas A&M), Don Resio (ERDC) and Nancy Powell
More informationCascadia megathrust earthquakes: reducing risk through science, engineering, and planning
Cascadia megathrust earthquakes: reducing risk through science, engineering, and planning NSF Hazards SEES EAR-1331412 Urban Science and Engineering Workshop 21 July 2014 Everything to do with M9 Cascadia
More informationWashington, D.C. Laura Benneyworth AMEC, Nashville, TN February 2009
Turning Data Into Information at Wolf Creek Dam ESRI s Federal User s Conference, Washington, D.C. Laura Benneyworth AMEC, Nashville, TN February 2009 Wolf Creek Dam Acknowledgments USACE, Nashville District
More informationReport on the Damage Survey Caused by Hurricane Katrina (Tentative Report)
Report on the Damage Survey Caused by Hurricane Katrina (Tentative Report) November 1, 2005 Coastal Disaster Prevention Technology Survey Team 1. Introduction Hurricane Katrina struck the United States
More informationThe Final Phase of San Clemente Dam Removal and Stream Restoration
The Final Phase of San Clemente Dam Removal and Stream Restoration Godwin, W., Waeber, J., Wade, D, and McGowan, W Annual Meeting, Association of Environmental & Engineering Geologists Kona, Hawaii September
More informationHEC Support of the CMEP Program. Mark Jensen
HEC Support of the CMEP Program Mark Jensen CMEP Civil/Military Emergency Preparedness Program that coordinates training of emergency operation centers in former Soviet block states and encourages a transition
More informationResults of the Sava River Model
Results of the Sava River Model Jamie G. James, P.E. Nashville District September 2010 US Army Corps of Engineers BUILDING STRONG Discussion Outline Study Goals Model Limitations HEC-RAS Model Results
More informationSeismic Analysis of Siri Dam Using Pseudo-Static Approach
Seismic Analysis of Siri Dam Using Pseudo-Static Approach Shabbir Ahmed Osmani 1, Md. Jahir Bin Alam 2 1 Department of Civil Engineering, Leading University, Bangladesh 2 Department of Civil and Environmental
More informationCoastal Hazards System: Interpretation and Application
Lessons Learned and Best Practices: Resilience of Coastal Infrastructure Hato Rey, PR March 8-9, 2017 Coastal Hazards System: Interpretation and Application Victor M. Gonzalez, P.E. Team: PI: Jeffrey A.
More informationWP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE
WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION
More informationLimited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May
More informationSTABILITY ANALYSIS OF EARTH DAM SLOPES SUBJECTED TO EARTHQUAKE USING ERT RESULTS INTERPRETATION
STABILITY ANALYSIS OF EARTH DAM SLOPES SUBJECTED TO EARTHQUAKE USING ERT RESULTS INTERPRETATION Eko Andi Suryo Lecturer / Department of Civil Engineering, Faculty of Engineering / University of Brawijaya
More informationGeology, Soils, and Seismicity
Section 3.8 Geology, Soils, and Seismicity Introduction This section generally evaluates the effects of the alternatives analyzed in this Supplemental DEIS with regard to geology, soils and seismicity.
More informationMonte Carlo Simulations for Probabilistic Flood Hazard Assessment
Monte Carlo Simulations for Probabilistic Flood Hazard Assessment Jemie Dababneh, Ph.D., P.E., 1 and Mark Schwartz, P.E. 1 1 RIZZO Associates, Monroeville, Pennsylvania Presentation to PSA 2017 International
More information14 Geotechnical Hazards
Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction
More informationUniversity of Colorado, Dept. of Civil Engineering Boulder CO
EFFECT OF GEOLOGY ON UPLIFT AND DAM STABILITY B. Amadei, C. Dialer, C. chinnaswarny T. Illangasekare University of Colorado, Dept. of Civil Engineering Boulder CO 80309-0428 INTRODUCTION Geology and water
More informationPractical methodology for inclusion of uplift and pore pressures in analysis of concrete dams
Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Michael McKay 1 and Francisco Lopez 2 1 Dams Engineer, GHD Pty 2 Principal Dams/Structural Engineer, GHD Pty
More informationJ. Paul Guyer, P.E., R.A.
J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the design of buildings and related infrastructure.
More information2018 Geography Mock Examination
2018 Geography Mock Examination Your Geography mock examination will test your understanding of Paper 1 (Living with the physical environment) and Section B (Fieldwork) from Paper 2. Attached are the necessary
More informationTHE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection. gift from Hong Kong (China). Geotechnical Engineering Office.
THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection gift from Hong Kong (China). Geotechnical Engineering Office. Geotechnical Engineering Office, Civil Engineering Department The Government of
More informationPROBABILISTIC DESIGN METHOD OF LEVEE AND FLOODWALL HEIGHTS FOR THE HURRICANE PROTECTION SYSTEM IN THE NEW ORLEANS AREA
PROBABILISTIC DESIGN METHOD OF LEVEE AND FLOODWALL HEIGHTS FOR THE HURRICANE PROTECTION SYSTEM IN THE NEW ORLEANS AREA Mathijs van Ledden Haskoning Inc., 1 Galleria Blvd., Metairie, LA70001, United States,
More informationDevelopment of U. S. National Seismic Hazard Maps and Implementation in the International Building Code
Development of U. S. National Seismic Hazard Maps and Implementation in the International Building Code Mark D. Petersen (U.S. Geological Survey) http://earthquake.usgs.gov/hazmaps/ Seismic hazard analysis
More informationA.V. Watkins Dam Failure Incident November 2006 Forensic Investigations and Repair
A.V. Watkins Dam Failure Incident November 2006 Forensic Investigations and Repair Mark Bliss, P.E. Geotechnical Engineering Group 3 Shlemon Specialty Conference May 17, 2013 Purpose of This Presentation
More informationGIS as a tool in flood management
GIS for the United Nations and the International Community Conference Panel: GIS and Capacity - How Territorial Planning Benefits from Geospatial Information 3-5 April 2012 Geneva, Switzerland GIS as a
More informationRESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams
TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:
More information