TIGGE at ECMWF. David Richardson, Head, Meteorological Operations Section Slide 1. Slide 1

Size: px
Start display at page:

Download "TIGGE at ECMWF. David Richardson, Head, Meteorological Operations Section Slide 1. Slide 1"

Transcription

1 TIGGE at ECMWF David Richardson, Head, Meteorological Operations Section Slide 1 Slide 1

2 ECMWF TIGGE archive The TIGGE database now contains five years of global EPS data Holds more than 520 terabytes (2.6 billion fields). There are around 1300 registered users of the TIGGE data portal Slide 2 Slide 2

3 ECMWF TIGGE archive 80 Number of active users Series Slide 3 Slide 3

4 ECMWF TIGGE archive Retrieved Data volumes (GBytes) Delivered Slide 4 Slide 4

5 ECMWF TIGGE archive - changes BoM, KMA stopped providing EPS to TIGGE archive KMA now testing sending higher resolution EPS New data: JMA 00 UTC control step 0 (as analysis) CMA analysis (06, 18)?? problem with database for 1 week needed to ask centres to resend. All gaps filled. Thanks to all who did that Access new batch access to TIGGE archive (python, perl) next generation data portal under development Planned GEOWOW developments: timeseries for small number of fields TIGGE-LAM, netcdf Slide 5 Slide 5

6 GEOWOW (GEOSS interoperability for Weather, Ocean and Water) is an EU-funded FP7 project that will begin in September GEOWOW will propose and validate a multi-disciplinary, distributed architectural model federating Earth Observation and other Earth Science data holdings and put this model forward as the European contribution to the Global Earth Observation System of Systems (GEOSS) Slide 6Common Infrastructure. Slide 6

7 GEOWOW The GEO Capacity Building Strategy focuses on three elements: human, institutional and infrastructure. The Weather component of the GEOWOW project will address all three by improving the access to THORPEX Interactive Grand Global Ensemble (TIGGE) data and developing and demonstrating products using this data in collaboration with users in developing countries, including providing education and training. GEOWOW will significantly enhance the accessibility of the TIGGE archive at ECMWF for the wider user community, in particular the ability to efficiently access long time series of forecast data at user-specified locations. Slide 7 Slide 7

8 GEOWOW 3 years: September 2011 August 2014 Co-ordinated by ESA Total funding from EU: 7 M euros For weather: 1.1 M euros ECMWF Met Office Météo-France Karlsruhe Institute of Technology Slide 8 Slide 8

9 The operational forecast system High resolution deterministic forecast: twice per day 16 km 91-level, to 10 days ahead Ensemble forecast (EPS): twice daily 51 members, 32/65 km 62-level, to 15 days ahead extended to 32 days once a week (Monthly forecast) Ocean waves: twice daily Global: 10 days ahead at 28 km Limited Area Wave (LAW): 5 days ahead at 10 km Ensemble: 15 days ahead at 55 km Seasonal forecast: once a month 41-members, 125 km 62 levels, to 7 months ahead a sub-set ensemble of 11 members is run for 13 months every quarter Slide 9 Slide 9

10 The operational ECMWF EPS The operational version of the EPS includes 51 forecasts with resolution: T L 639L62 (~32km, 62 levels) from day 0 to 10, T L 319L62 (~64km, 62 levels) from day 10 to 15 (32 at 00UTC on Thursdays). Initial uncertainties are simulated by adding to the unperturbed analyses a combination of T42L62 singular vectors, computed to optimize total energy growth over a 48h time interval (OTI), and perturbations generated using the new ECMWF Ensemble Data Assimilation (EDA) system. Model uncertainties are simulated by adding stochastic perturbations to the tendencies due to parameterized physical processes (SPPT scheme) and using a stochastic backscatter (SPBS) scheme. The EPS is run twice a day, at 00 and 12 UTC; the 00 UTC run is fully coupled to the HOPE ocean model after day 10. Slide 10 NH SH TR Definition of the perturbed ICs Products

11 Summary of EPS changes Initial perturbations: 2009 : Combination of Singular Vectors (SVs) optimised in two 48-hour windows: [t0, t0+48h] and [t0-48h, t0] 2011 : Combination of EDA perturbations (diff. between 10 EDA analyses) and SVs optimised in the [t0, t0+48h] window with reduced (50%) amplitude Simulation of model uncertainty: 2009 : SPPT with 1 spatial scale, white-noise time variab. with 6-hour time scale 2011 : SPPT with 3 spatial and time scales, red-noise variability in time (Markov chain), plus stochastic backscatter (SPBS) Slide 11

12 Simulation of initial uncertainty using EDA Since 22 June 2010, differences between 6h perturbed forecasts from the ECMWF Ensemble Data Assimilation system have been combined with singular vectors to generate the EPS initial perturbations The ten T L 399L91 EDA perturbed analyses are generated by randomly perturbing the observations and the SST, and by running the forecast model with the SPPT stochastic scheme. The random perturbations are defined by sampling a normal distribution with the observation error standard deviation U850 background error standard deviation Randomization method (ope, left) EDA (cy36r4, right) Since 18 May 2011, the EDA has been used to specify the background errors of the day in the highresolution 4D-Var Slide 12

13 Simulation of model uncertainty: multiscale SPPT Since Oct 1998, the EPS has included a stochastic scheme designed to simulate random model errors due to parameterized physical processes (SPPT). 500 km 6 h 1000 km 3 d 2000 km 30 d Since Nov 2010, the scheme includes a multi-scale pattern generator to account for parameterization errors on multiple spatial and temporal scales. Slide 13 (from M Leutbecher)

14 Simulation of model uncertainty: SPBS Since Nov 2010, a stochastic backscatter scheme (SPBS) is also used in the EPS: Rationale: a fraction of the dissipated energy is backscattered upscale and acts as streamfunction forcing for the resolved-scale flow (Shutts & Palmer 2004, Shutts 2005, Berner et al 2009) Streamfunction forcing is given by: Streamfunction forcing Backscatter ratio Total dissipation rate Pattern generator Recent improvements/updates include: Revised convective dissipation calculation Revised dissipation rate smoothing Slide 14 Changed pressure dependency of vertical correlations Option to force only part of the spectrum [reduces computational cost and avoids problems detected with small scale forcing]

15 Recent operational changes June 2010 (cycle 36r2) includes Changes to EPS initial-time perturbations 9 November 2010 (cycle 36r4) includes New cloud scheme New surface analysis schemes are introduced for snow and soil moisture EPS: revised model uncertainty; retuned initial perturbation amplitudes 18 May 2011 (cycle 37r2) includes Data assimilation changes Technical change: model-level data in GRIB-2 format Slide 15 Slide 15

16 EPS probability skill, RPSS, T850, N hem ECMWF EPS verification temperature 850hPa Ranked probability skill score \HG 0.8\(12mMA = 12 months moving average) N Hem Extratrop (lat 20.0 to 90.0, lon to 180.0) 00UTC,12UTC,beginning 0.8 T+72 12hMA T+168 T+120 T+72 T hMA T hMA Slide Monthly score and 12-month running mean (bold) of Ranked Probability Skill Score for EPS forecasts of T850 at day 3 (blue), 5 (red) and 7 (black) for N hem Slide 16

17 EPS probability skill, RPSS, T850, Europe ECMWF EPS verification temperature 850hPa Ranked probability skill score \HG 0.8\(12mMA = 12 months moving average) Europe (lat 35.0 to 75.0, lon to 42.5) 00UTC,12UTC,beginning 0.9 T+72 12hMA T+168 T+120 T+72 T hMA T hMA Slide Monthly score and 12-month running mean (bold) of Ranked Probability Skill Score for EPS forecasts of T850 at day 3 (blue), 5 (red) and 7 (black) for Europe Slide 17

18 EPS skill T850 NH 850hPa temperature Continuous ranked probability skill score N Hem Extratrop (lat 20.0 to 90.0, lon to 180.0) Date: UTC to UTC CMC UKMO NCEP ECMWF oper_an ti enfo prod Mean method: fair Population: 180,180,180,180,180,180,180,180,180,180,179,179,179,179, Slide Forecast Day Slide 18

19 m/s EPS spread/skill 850 wind tropics Ensemble Mean 850hPa wind speed Tropics (lat to 20.0, lon to 180.0) Date: UTC to UTC oper_an od enfo 0001 Mean method: standard 3 spread djf2010 rmse djf2010 spread djf2011 rmse djf2011 spread djf2009 rmse djf Slide Forecast Day Slide 19

20 EPS skill 850 wind tropics 850hPa wind speed Continuous ranked probability skill score Tropics (lat to 20.0, lon to 180.0) Date: UTC to UTC oper_an od enfo 0001 Mean method: standard ,12utc ,12utc ,12utc ,12utc ,12utc Slide Forecast Day Slide 20

21 EPS probabilistic precipitation skill CRPSS for 24-h Precipitation, ExTrop, ECMWF, h Precip, to , ExTrop Lead time (days) CRPSS Year 0.00 ECMWF ( 0.178) JMA ( 0.066) UKMO ( 0.037) NCEP (-0.008) Lead time (days) Slide 21 Slide 21

22 Product Development New parameters from deterministic forecast Height of lowest cloud base Height of 0 C level New parameters from EPS L, M, H cloud cover Slide 22 Slide 22

23 New EPS clustering New clustering operational since 16 November Graphical products on the ECMWF website at: Cluster fields available via dissemination The disseminated products are based on the day 5-7 time range (time steps 120, 132, 144, 156 and 168) Old clusters will be switched off later this year Slide 23 Slide 23

24 New EPS clustering Tuesday 7 June UTC ECMWF EPS Cluster scenario hpa Geopotential Reference step t Domain 75/340/30/40 Cont. in cluster=2 Det. in cluster=2 forecast t+120 VT:Sunday 12 June UTC Cluster: 1(of 3), population: 22, repres. member: 21 forecast t+144 VT:Monday 13 June UTC Cluster: 1(of 3), population: 22, repres. member: 21 forecast t+168 VT:Tuesday 14 June UTC Cluster: 1(of 3), population: 22, repres. member: forecast t+120 VT:Sunday 12 June UTC Cluster: 2(of 3), population: 17, repres. member: 0 forecast t+144 VT:Monday 13 June UTC Cluster: 2(of 3), population: 17, repres. member: 0 forecast t+168 VT:Tuesday 14 June UTC Cluster: 2(of 3), population: 17, repres. member: forecast t+120 VT:Sunday 12 June UTC Cluster: 3(of 3), population: 12, repres. member: 4 forecast t+144 VT:Monday 13 June UTC Cluster: 3(of 3), population: 12, repres. member: 4 forecast t+168 VT:Tuesday 14 June UTC Cluster: 3(of 3), population: 12, repres. member: Slide Slide 24

25 Regime transitions metres n. of clusters DEC 2010 JAN 2011 FEB MAR APR MAY EPS forecast of large-scale weather regimes. Daily time series for November 2010 to April 2011 of the number of EPS clusters and observed climatological regimes (coloured Slide 25 circles). The climatological regime associated with each cluster is indicated by the colour of the bar: blue - positive NAO pattern, green - negative NAO, red blocking, violet - Atlantic ridge. The EPS clusters are computed over forecast days 5-7. Slide 25

26 Climatological regimes Slide 26 Slide 26

27 Tropical cyclones Tracking of tropical cyclones developing during forecast (medium-range and monthly products on web) Operational tracks deterministic up to 1 hour earlier Under test: replacement of operational tracker (will include tracks beyond 5 days) Slide 27 Slide 27

28 Tropical cyclones Typhoon Songda May UTC Probability that 04W will pass within 120km radius during the next 120 hours tracks: black=oper, green=ctrl, blue=eps numbers: observed positions at t+..h 120 E 140 E N 20 N N 10 N E 140 E 5 Operational tracker Slide 28 Slide 28

29 Tropical cyclones Date ECMWF Probability that 04W will pass within 120 km radius during the next 240 hours tracks: solid=oper; dot=ctrl > 90 % Probability (%) of Tropical Cyclone Intensity falling in each category TD[up to 16] TS [17-32] HR1[33-42] HR2 [43-48] HR3 [> 48 m/s] 50 N 40 N 30 N 20 N 100 E 120 E 140 E 160 E 50 N 40 N 30 N 20 N Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30 May m Wind Speed (m/s) 10 N 0 N 100 E 120 E 140 E 160 E List of ensemble members numbers forecast Tropical Cyclone Intensity category in colours: TD[up to 16] TS[17-32] HR1 [33-42] HR2 [43-48] HR3 [ >48 m/s] +024 h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct h : hr ct N 0 N Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30 May 2011 Mean Sea Level Pressure in Tropical Cyclone Centre (hpa) Slide 29 Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30 May 2011 Slide 29

30 0-24h 24-48h 48-72h 72-96h h h h Track plumes for the TC are plotted for the EPS members, T1279 and Control. Each colour represents 24h forecast interval (EPS) Slide 30 Slide 30

31 Product Development Extra-tropical cyclone products (web products) Surface weather parameters (new web plots) Extension of EFI Slide 31 Slide 31

32 eccharts new interactive web plots Slide 32 Slide 32

Introduction to TIGGE and GIFS. Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO

Introduction to TIGGE and GIFS. Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO Introduction to TIGGE and GIFS Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO GIFS-TIGGE/NCAR/NOAA Workshop on EPS developments, June 2012 TIGGE THORPEX Interactive Grand Global

More information

Probabilistic Weather Forecasting and the EPS at ECMWF

Probabilistic Weather Forecasting and the EPS at ECMWF Probabilistic Weather Forecasting and the EPS at ECMWF Renate Hagedorn European Centre for Medium-Range Weather Forecasts 30 January 2009: Ensemble Prediction at ECMWF 1/ 30 Questions What is an Ensemble

More information

The ECMWF Extended range forecasts

The ECMWF Extended range forecasts The ECMWF Extended range forecasts Laura.Ferranti@ecmwf.int ECMWF, Reading, U.K. Slide 1 TC January 2014 Slide 1 The operational forecasting system l High resolution forecast: twice per day 16 km 91-level,

More information

4.3.2 Configuration. 4.3 Ensemble Prediction System Introduction

4.3.2 Configuration. 4.3 Ensemble Prediction System Introduction 4.3 Ensemble Prediction System 4.3.1 Introduction JMA launched its operational ensemble prediction systems (EPSs) for one-month forecasting, one-week forecasting, and seasonal forecasting in March of 1996,

More information

ECMWF products to represent, quantify and communicate forecast uncertainty

ECMWF products to represent, quantify and communicate forecast uncertainty ECMWF products to represent, quantify and communicate forecast uncertainty Using ECMWF s Forecasts, 2015 David Richardson Head of Evaluation, Forecast Department David.Richardson@ecmwf.int ECMWF June 12,

More information

The benefits and developments in ensemble wind forecasting

The benefits and developments in ensemble wind forecasting The benefits and developments in ensemble wind forecasting Erik Andersson Slide 1 ECMWF European Centre for Medium-Range Weather Forecasts Slide 1 ECMWF s global forecasting system High resolution forecast

More information

GIFS-TIGGE working group Report to ICSC. Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO

GIFS-TIGGE working group Report to ICSC. Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO GIFS-TIGGE working group Report to ICSC Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO ICSC-11, Geneva, July 2013 GIFS-TIGGE report Working group membership

More information

Sub-seasonal predictions at ECMWF and links with international programmes

Sub-seasonal predictions at ECMWF and links with international programmes Sub-seasonal predictions at ECMWF and links with international programmes Frederic Vitart and Franco Molteni ECMWF, Reading, U.K. Using ECMWF forecasts, 4-6 June 2014 1 Outline Recent progress and plans

More information

Clustering Techniques and their applications at ECMWF

Clustering Techniques and their applications at ECMWF Clustering Techniques and their applications at ECMWF Laura Ferranti European Centre for Medium-Range Weather Forecasts Training Course NWP-PR: Clustering techniques and their applications at ECMWF 1/32

More information

Stochastic methods for representing atmospheric model uncertainties in ECMWF's IFS model

Stochastic methods for representing atmospheric model uncertainties in ECMWF's IFS model Stochastic methods for representing atmospheric model uncertainties in ECMWF's IFS model Sarah-Jane Lock Model Uncertainty, Research Department, ECMWF With thanks to Martin Leutbecher, Simon Lang, Pirkka

More information

GPC Exeter forecast for winter Crown copyright Met Office

GPC Exeter forecast for winter Crown copyright Met Office GPC Exeter forecast for winter 2015-2016 Global Seasonal Forecast System version 5 (GloSea5) ensemble prediction system the source for Met Office monthly and seasonal forecasts uses a coupled model (atmosphere

More information

How far in advance can we forecast cold/heat spells?

How far in advance can we forecast cold/heat spells? Sub-seasonal time scales: a user-oriented verification approach How far in advance can we forecast cold/heat spells? Laura Ferranti, L. Magnusson, F. Vitart, D. Richardson, M. Rodwell Danube, Feb 2012

More information

Sub-seasonal predictions at ECMWF and links with international programmes

Sub-seasonal predictions at ECMWF and links with international programmes Sub-seasonal predictions at ECMWF and links with international programmes Frederic Vitart and Franco Molteni ECMWF, Reading, U.K. 1 Outline 30 years ago: the start of ensemble, extended-range predictions

More information

TC/PR/RB Lecture 3 - Simulation of Random Model Errors

TC/PR/RB Lecture 3 - Simulation of Random Model Errors TC/PR/RB Lecture 3 - Simulation of Random Model Errors Roberto Buizza (buizza@ecmwf.int) European Centre for Medium-Range Weather Forecasts http://www.ecmwf.int Roberto Buizza (buizza@ecmwf.int) 1 ECMWF

More information

MJO prediction Intercomparison using the S2S Database Frédéric Vitart (ECMWF)

MJO prediction Intercomparison using the S2S Database Frédéric Vitart (ECMWF) MJO prediction Intercomparison using the S2S Database Frédéric Vitart (ECMWF) Slide 1 WGNE Meeting 29 April 2016 1 INDEX The S2S project and S2S Database MJO prediction in S2S models MJO teleconnections

More information

A review on recent progresses of THORPEX activities in JMA

A review on recent progresses of THORPEX activities in JMA 4th THORPEX workshop 31 Oct. 2012, Kunming, China A review on recent progresses of THORPEX activities in JMA Masaomi NAKAMURA Typhoon Research Department Meteorological Research Institute / JMA Contents

More information

Model error and seasonal forecasting

Model error and seasonal forecasting Model error and seasonal forecasting Antje Weisheimer European Centre for Medium-Range Weather Forecasts ECMWF, Reading, UK with thanks to Paco Doblas-Reyes and Tim Palmer Model error and model uncertainty

More information

Verification statistics and evaluations of ECMWF forecasts in

Verification statistics and evaluations of ECMWF forecasts in 635 Verification statistics and evaluations of ECMWF forecasts in 29-21 D.S. Richardson, J. Bidlot, L. Ferranti, A. Ghelli, T. Hewson, M. Janousek, F. Prates and F. Vitart Operations Department October

More information

TIGGE-LAM archive development in the frame of GEOWOW. Richard Mladek (ECMWF)

TIGGE-LAM archive development in the frame of GEOWOW. Richard Mladek (ECMWF) TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek (ECMWF) The group on Earth Observations (GEO) initiated the Global Earth Observation System of Systems (GEOSS) GEOWOW, short for GEOSS

More information

An extended re-forecast set for ECMWF system 4. in the context of EUROSIP

An extended re-forecast set for ECMWF system 4. in the context of EUROSIP An extended re-forecast set for ECMWF system 4 in the context of EUROSIP Tim Stockdale Acknowledgements: Magdalena Balmaseda, Susanna Corti, Laura Ferranti, Kristian Mogensen, Franco Molteni, Frederic

More information

Recent Developments of JMA Operational NWP Systems and WGNE Intercomparison of Tropical Cyclone Track Forecast

Recent Developments of JMA Operational NWP Systems and WGNE Intercomparison of Tropical Cyclone Track Forecast Recent Developments of JMA Operational NWP Systems and WGNE Intercomparison of Tropical Cyclone Track Forecast Chiashi Muroi Numerical Prediction Division Japan Meteorological Agency 1 CURRENT STATUS AND

More information

25 years of ensemble forecasting at ECMWF

25 years of ensemble forecasting at ECMWF from Newsletter Number 153 Autumn 2017 METEOROLOGY 25 years of ensemble forecasting at ECMWF 25 YEARS OF ENSEMBLE PREDICTION doi:10.21957/bv418o This article appeared in the Meteorology section of ECMWF

More information

Upgrade of JMA s Typhoon Ensemble Prediction System

Upgrade of JMA s Typhoon Ensemble Prediction System Upgrade of JMA s Typhoon Ensemble Prediction System Masayuki Kyouda Numerical Prediction Division, Japan Meteorological Agency and Masakazu Higaki Office of Marine Prediction, Japan Meteorological Agency

More information

Sub-seasonal to seasonal forecast Verification. Frédéric Vitart and Laura Ferranti. European Centre for Medium-Range Weather Forecasts

Sub-seasonal to seasonal forecast Verification. Frédéric Vitart and Laura Ferranti. European Centre for Medium-Range Weather Forecasts Sub-seasonal to seasonal forecast Verification Frédéric Vitart and Laura Ferranti European Centre for Medium-Range Weather Forecasts Slide 1 Verification Workshop Berlin 11 May 2017 INDEX 1. Context: S2S

More information

Fernando Prates. Evaluation Section. Slide 1

Fernando Prates. Evaluation Section. Slide 1 Fernando Prates Evaluation Section Slide 1 Objectives Ø Have a better understanding of the Tropical Cyclone Products generated at ECMWF Ø Learn the recent developments in the forecast system and its impact

More information

Current JMA ensemble-based tools for tropical cyclone forecasters

Current JMA ensemble-based tools for tropical cyclone forecasters Current JMA ensemble-based tools for tropical cyclone forecasters Hitoshi Yonehara(yonehara@met.kishou.go.jp) Yoichiro Ota JMA / Numerical Prediction Division Contents Introduction of JMA GSM and EPS NWP

More information

Have a better understanding of the Tropical Cyclone Products generated at ECMWF

Have a better understanding of the Tropical Cyclone Products generated at ECMWF Objectives Have a better understanding of the Tropical Cyclone Products generated at ECMWF Learn about the recent developments in the forecast system and its impact on the Tropical Cyclone forecast Learn

More information

Recent Developments in Climate Information Services at JMA. Koichi Kurihara Climate Prediction Division, Japan Meteorological Agency

Recent Developments in Climate Information Services at JMA. Koichi Kurihara Climate Prediction Division, Japan Meteorological Agency Recent Developments in Climate Information Services at JMA Koichi Kurihara Climate Prediction Division, Japan Meteorological Agency 1 Topics 1. Diagnosis of the Northern Hemispheric circulation in December

More information

Current status and future developments of the ECMWF Ensemble Prediction System

Current status and future developments of the ECMWF Ensemble Prediction System Current status and future developments of the ECMWF Ensemble Prediction System Roberto Buizza European Centre for Medium-Range Weather Forecasts EFAS WS, ECMWF, 29-30 Jan 2009 Roberto Buizza: Current status

More information

S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r

S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r C3S European Climatic Energy Mixes (ECEM) Webinar 18 th Oct 2017 Philip Bett, Met Office Hadley Centre S e a s

More information

How ECMWF has addressed requests from the data users

How ECMWF has addressed requests from the data users How ECMWF has addressed requests from the data users David Richardson Head of Evaluation Section, Forecast Department, ECMWF David.richardson@ecmwf.int ECMWF June 14, 2017 Overview Review the efforts made

More information

Precipitation verification. Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO

Precipitation verification. Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO Precipitation verification Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO Outline 1) Status of WGNE QPF intercomparisons 2) Overview of the use of recommended methods for the verification

More information

The new ECMWF seasonal forecast system (system 4)

The new ECMWF seasonal forecast system (system 4) The new ECMWF seasonal forecast system (system 4) Franco Molteni, Tim Stockdale, Magdalena Balmaseda, Roberto Buizza, Laura Ferranti, Linus Magnusson, Kristian Mogensen, Tim Palmer, Frederic Vitart Met.

More information

Seasonal forecast from System 4

Seasonal forecast from System 4 Seasonal forecast from System 4 European Centre for Medium-Range Weather Forecasts Outline Overview of System 4 System 4 forecasts for DJF 2015/2016 Plans for System 5 System 4 - Overview System 4 seasonal

More information

Application and verification of the ECMWF products Report 2007

Application and verification of the ECMWF products Report 2007 Application and verification of the ECMWF products Report 2007 National Meteorological Administration Romania 1. Summary of major highlights The medium range forecast activity within the National Meteorological

More information

Recent activities related to EPS (operational aspects)

Recent activities related to EPS (operational aspects) Recent activities related to EPS (operational aspects) Junichi Ishida and Carolyn Reynolds With contributions from WGE members 31th WGE Pretoria, South Africa, 26 29 April 2016 GLOBAL 2 Operational global

More information

ACCESS AGREPS Ensemble Prediction System

ACCESS AGREPS Ensemble Prediction System ACCESS AGREPS Ensemble Prediction System Michael Naughton CAWCR Earth System Modelling Model Data Fusion Workshop 10-12 May 2010 Motivation for Ensemble Prediction NWP forecasts greatly improved but are

More information

Medium-range Ensemble Forecasts at the Met Office

Medium-range Ensemble Forecasts at the Met Office Medium-range Ensemble Forecasts at the Met Office Christine Johnson, Richard Swinbank, Helen Titley and Simon Thompson ECMWF workshop on Ensembles Crown copyright 2007 Page 1 Medium-range ensembles at

More information

MSC, BMRC, KMA,CMA, CPTEC, SAWS

MSC, BMRC, KMA,CMA, CPTEC, SAWS Characteristics of the sub-seasonal and seasonal forecast systems operational and under development at ECMWF, JMA, UKMO, Météo France, NCEP, MSC, BMRC, KMA,CMA, CPTEC, SAWS and Hydrometeorological Centre

More information

Convective-scale NWP for Singapore

Convective-scale NWP for Singapore Convective-scale NWP for Singapore Hans Huang and the weather modelling and prediction section MSS, Singapore Dale Barker and the SINGV team Met Office, Exeter, UK ECMWF Symposium on Dynamical Meteorology

More information

Ensemble forecasting. David Richardson. Head of Evaluation, Forecast Department, ECMWF. ECMWF February 15, 2017

Ensemble forecasting. David Richardson. Head of Evaluation, Forecast Department, ECMWF. ECMWF February 15, 2017 Ensemble forecasting David Richardson Head of Evaluation, Forecast Department, ECMWF David.Richardson@ecmwf.int ECMWF February 15, 2017 Overview Introduction Why do forecast go wrong? Observations, model,

More information

Exploring and extending the limits of weather predictability? Antje Weisheimer

Exploring and extending the limits of weather predictability? Antje Weisheimer Exploring and extending the limits of weather predictability? Antje Weisheimer Arnt Eliassen s legacy for NWP ECMWF is an independent intergovernmental organisation supported by 34 states. ECMWF produces

More information

Activities of Numerical Weather Prediction for Typhoon forecast at Japan Meteorological Agency

Activities of Numerical Weather Prediction for Typhoon forecast at Japan Meteorological Agency Activities of Numerical Weather Prediction for Typhoon forecast at Japan Meteorological Agency Masayuki Nakagawa Numerical Prediction Division Japan Meteorological Agency ESCAP/WMO Typhoon Committee Forty-ninth

More information

Recent advances in Tropical Cyclone prediction using ensembles

Recent advances in Tropical Cyclone prediction using ensembles Recent advances in Tropical Cyclone prediction using ensembles Richard Swinbank, with thanks to Many colleagues in Met Office, GIFS-TIGGE WG & others HC-35 meeting, Curacao, April 2013 Recent advances

More information

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC DRIHMS_meeting Genova 14 October 2010 Tiziana Paccagnella ARPA-SIMC Ensemble Prediction Ensemble prediction is based on the knowledge of the chaotic behaviour of the atmosphere and on the awareness of

More information

Quarterly numerical weather prediction model performance summaries April to June 2010 and July to September 2010

Quarterly numerical weather prediction model performance summaries April to June 2010 and July to September 2010 Australian Meteorological and Oceanographic Journal 60 (2010) 301-305 Quarterly numerical weather prediction model performance summaries April to June 2010 and July to September 2010 Xiaoxi Wu and Chris

More information

The WWRP Polar Prediction Project

The WWRP Polar Prediction Project The Polar Prediction Project Trond Iversen Member of the Polar Prediction Project Steering Group Norwegian Meteorological Institute / ECMWF 11th meeting, THORPEX GIFS-TIGGE, WG; June 2013 1 Background

More information

Model error and parameter estimation

Model error and parameter estimation Model error and parameter estimation Chiara Piccolo and Mike Cullen ECMWF Annual Seminar, 11 September 2018 Summary The application of interest is atmospheric data assimilation focus on EDA; A good ensemble

More information

NOTES AND CORRESPONDENCE. On Ensemble Prediction Using Singular Vectors Started from Forecasts

NOTES AND CORRESPONDENCE. On Ensemble Prediction Using Singular Vectors Started from Forecasts 3038 M O N T H L Y W E A T H E R R E V I E W VOLUME 133 NOTES AND CORRESPONDENCE On Ensemble Prediction Using Singular Vectors Started from Forecasts MARTIN LEUTBECHER European Centre for Medium-Range

More information

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3)

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3) Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3) Roberto Buizza European Centre for Medium-Range Weather Forecasts (http://www.ecmwf.int/staff/roberto_buizza/) ECMWF Predictability

More information

Report of GIFS-TIGGE WG (Submitted by Richard Swinbank and Masayuki Kyouda)

Report of GIFS-TIGGE WG (Submitted by Richard Swinbank and Masayuki Kyouda) WORLD METEOROLOGICAL ORGANIZATION COMMISSION FOR ATMOSPHERIC SCIENCES INTERNATIONAL CORE STEERING COMMITTEE FOR THORPEX Eleventh Session WMO, Geneva (15-17 July 2013) CAS/ICSC-11/DOC2.3.5 (24 VI.2013)

More information

NW Pacific Tropical Cyclone Ensemble Forecast Project

NW Pacific Tropical Cyclone Ensemble Forecast Project NW Pacific Tropical Cyclone Ensemble Forecast Project a Joint Project of and TCP in WMO For ESAP/WMO Typhoon Committee Members and Forecasters/Researchers over the Globe Tetsuo NAKAZAWA WMO/ including

More information

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2)

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2) Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2) Roberto Buizza European Centre for Medium-Range Weather Forecasts (https://software.ecmwf.int/wiki/display/~ner/roberto+buizza) ECMWF

More information

Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble

Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble 559 Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble Roberto Buizza Research Department To appear in Mon. Wea.Rev. March

More information

Verification at JMA on Ensemble Prediction

Verification at JMA on Ensemble Prediction Verification at JMA on Ensemble Prediction - Part Ⅱ : Seasonal prediction - Yukiko Naruse, Hitoshi Sato Climate Prediction Division Japan Meteorological Agency 05/11/08 05/11/08 Training seminar on Forecasting

More information

The forecast skill horizon

The forecast skill horizon The forecast skill horizon Roberto Buizza, Martin Leutbecher, Franco Molteni, Alan Thorpe and Frederic Vitart European Centre for Medium-Range Weather Forecasts WWOSC 2014 (Montreal, Aug 2014) Roberto

More information

ECMWF Forecasting System Research and Development

ECMWF Forecasting System Research and Development ECMWF Forecasting System Research and Development Jean-Noël Thépaut ECMWF October 2012 Slide 1 and many colleagues from the Research Department Slide 1, ECMWF The ECMWF Integrated Forecasting System (IFS)

More information

Current Issues and Challenges in Ensemble Forecasting

Current Issues and Challenges in Ensemble Forecasting Current Issues and Challenges in Ensemble Forecasting Junichi Ishida (JMA) and Carolyn Reynolds (NRL) With contributions from WGNE members 31 th WGNE Pretoria, South Africa, 26 29 April 2016 Recent trends

More information

SPECIAL PROJECT PROGRESS REPORT

SPECIAL PROJECT PROGRESS REPORT SPECIAL PROJECT PROGRESS REPORT Progress Reports should be 2 to 10 pages in length, depending on importance of the project. All the following mandatory information needs to be provided. Reporting year

More information

eccharts Ensemble data and recent updates Cihan Sahin, Sylvie Lamy-Thepaut, Baudouin Raoult Web development team, ECMWF

eccharts Ensemble data and recent updates Cihan Sahin, Sylvie Lamy-Thepaut, Baudouin Raoult Web development team, ECMWF eccharts Ensemble data and recent updates Cihan Sahin, Sylvie Lamy-Thepaut, Baudouin Raoult Web development team, ECMWF cihan.sahin@ecmwf.int ECMWF June 8, 2015 Outline eccharts Ensemble data in eccharts

More information

Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system

Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system Andrea Montani, Chiara Marsigli and Tiziana Paccagnella ARPA-SIM Hydrometeorological service of Emilia-Romagna, Italy 11

More information

Experiments of clustering for central European area specially in extreme weather situations. István Ihász. Hungarian Meteorological Service

Experiments of clustering for central European area specially in extreme weather situations. István Ihász. Hungarian Meteorological Service Experiments of clustering for central European area specially in extreme weather situations István Ihász Hungarian Meteorological Service 1 1. ECMWF clustering 2. Clustering for central European area Forecasters

More information

Recent ECMWF Developments

Recent ECMWF Developments Recent ECMWF Developments Tim Hewson (with contributions from many ECMWF colleagues!) tim.hewson@ecmwf.int ECMWF November 2, 2017 Outline Last Year IFS upgrade highlights 43r1 and 43r3 Standard web Chart

More information

Probabilistic predictions of monsoon rainfall with the ECMWF Monthly and Seasonal Forecast Systems

Probabilistic predictions of monsoon rainfall with the ECMWF Monthly and Seasonal Forecast Systems Probabilistic predictions of monsoon rainfall with the ECMWF Monthly and Seasonal Forecast Systems Franco Molteni, Frederic Vitart, Tim Stockdale, Laura Ferranti, Magdalena Balmaseda European Centre for

More information

Application and verification of ECMWF products 2012

Application and verification of ECMWF products 2012 Application and verification of ECMWF products 2012 Met Eireann, Glasnevin Hill, Dublin 9, Ireland. J.Hamilton 1. Summary of major highlights The verification of ECMWF products has continued as in previous

More information

Diagnostics of the prediction and maintenance of Euro-Atlantic blocking

Diagnostics of the prediction and maintenance of Euro-Atlantic blocking Diagnostics of the prediction and maintenance of Euro-Atlantic blocking Mark Rodwell, Laura Ferranti, Linus Magnusson Workshop on Atmospheric Blocking 6-8 April 2016, University of Reading European Centre

More information

MOGREPS Met Office Global and Regional Ensemble Prediction System

MOGREPS Met Office Global and Regional Ensemble Prediction System MOGREPS Met Office Global and Regional Ensemble Prediction System Ken Mylne Ensemble Forecasting Manager Crown copyright 2007 Forecaster Training MOGREPS and Ensembles. Page 1 Outline Introduction to Ensemble

More information

Ensemble Prediction Systems

Ensemble Prediction Systems Ensemble Prediction Systems Eric Blake National Hurricane Center 7 March 2017 Acknowledgements to Michael Brennan 1 Question 1 What are some current advantages of using single-model ensembles? A. Estimates

More information

Recent Data Assimilation Activities at Environment Canada

Recent Data Assimilation Activities at Environment Canada Recent Data Assimilation Activities at Environment Canada Major upgrade to global and regional deterministic prediction systems (now in parallel run) Sea ice data assimilation Mark Buehner Data Assimilation

More information

Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System

Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System Francisco Doblas-Reyes Renate Hagedorn Tim Palmer European Centre for Medium-Range Weather Forecasts (ECMWF) Outline Introduction

More information

The TIGGE global, medium-range ensembles

The TIGGE global, medium-range ensembles 739 The TIGGE global, medium-range ensembles Roberto Buizza Research Department November 2014 Series: ECMWF Technical Memoranda A full list of ECMWF Publications can be found on our web site under: http://www.ecmwf.int/en/research/publications

More information

New initiatives for Severe Weather prediction at ECMWF

New initiatives for Severe Weather prediction at ECMWF New initiatives for Severe Weather prediction at ECMWF Tim Hewson, Ivan Tsonevsky, Fernando Prates, Richard Forbes ECMWF Slide 1 Layout 1. EFI-related developments: - Upgraded Model Climate (M-Climate)

More information

Clustering Forecast System for Southern Africa SWFDP. Stephanie Landman Susanna Hopsch RES-PST-SASAS2014-LAN

Clustering Forecast System for Southern Africa SWFDP. Stephanie Landman Susanna Hopsch RES-PST-SASAS2014-LAN Clustering Forecast System for Southern Africa SWFDP Stephanie Landman Susanna Hopsch Introduction The southern Africa SWFDP is reliant on objective forecast data for days 1 to 5 for issuing guidance maps.

More information

The Hungarian Meteorological Service has made

The Hungarian Meteorological Service has made ECMWF Newsletter No. 129 Autumn 11 Use of ECMWF s ensemble vertical profiles at the Hungarian Meteorological Service István Ihász, Dávid Tajti The Hungarian Meteorological Service has made extensive use

More information

Diagnostics of forecasts for polar regions

Diagnostics of forecasts for polar regions Diagnostics of forecasts for polar regions Linus Magnusson ECMWF, Shinfield Park, Reading RG2 9AX, United Kingdom linus.magnusson@ecmwf.int 1 Introduction European Centre for Medium-range Weather Forecasts

More information

Developing Operational MME Forecasts for Subseasonal Timescales

Developing Operational MME Forecasts for Subseasonal Timescales Developing Operational MME Forecasts for Subseasonal Timescales Dan C. Collins NOAA Climate Prediction Center (CPC) Acknowledgements: Stephen Baxter and Augustin Vintzileos (CPC and UMD) 1 Outline I. Operational

More information

ECMWF: Weather and Climate Dynamical Forecasts

ECMWF: Weather and Climate Dynamical Forecasts ECMWF: Weather and Climate Dynamical Forecasts Medium-Range (0-day) Partial coupling Extended + Monthly Fully coupled Seasonal Forecasts Fully coupled Atmospheric model Atmospheric model Wave model Wave

More information

Shaping future approaches to evaluating highimpact weather forecasts

Shaping future approaches to evaluating highimpact weather forecasts Shaping future approaches to evaluating highimpact weather forecasts David Richardson, and colleagues Head of Evaluation, Forecast Department European Centre for Medium-Range Weather Forecasts (ECMWF)

More information

István Ihász, Hungarian Meteorological Service, Budapest, Hungary

István Ihász, Hungarian Meteorological Service, Budapest, Hungary Experiences using VarEPS products at the Hungarian Meteorological Service István Ihász, Hungarian Meteorological Service, Budapest, Hungary 1 Introduction ECMWF 15 day Variable Resolution Ensemble Prediction

More information

Global climate predictions: forecast drift and bias adjustment issues

Global climate predictions: forecast drift and bias adjustment issues www.bsc.es Ispra, 23 May 2017 Global climate predictions: forecast drift and bias adjustment issues Francisco J. Doblas-Reyes BSC Earth Sciences Department and ICREA Many of the ideas in this presentation

More information

Ensemble of Data Assimilations methods for the initialization of EPS

Ensemble of Data Assimilations methods for the initialization of EPS Ensemble of Data Assimilations methods for the initialization of EPS Laure RAYNAUD Météo-France ECMWF Annual Seminar Reading, 12 September 2017 Introduction Estimating the uncertainty in the initial conditions

More information

ECMWF Medium-Range Forecast Graphical Products

ECMWF Medium-Range Forecast Graphical Products ECMWF Medium-Range Forecast Graphical Products Analysis Snow cover, ice cover, albedo, leaf area index, orography and sea depth Albedo Europe, Global, Central Europe, North West Europe, North East Europe,

More information

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances December 2015 January 2016 February 2016 Issued by: METEO-FRANCE Date:

More information

Towards the Seamless Prediction of Weather and Climate

Towards the Seamless Prediction of Weather and Climate Towards the Seamless Prediction of Weather and Climate T.N.Palmer, ECMWF. Bringing the insights and constraints of numerical weather prediction (NWP) into the climate-change arena. With acknowledgements

More information

World Weather Research Program: a ten years vision. PM Ruti, F Vitart, S Majumdar IWTC VIII Dec Jeju

World Weather Research Program: a ten years vision. PM Ruti, F Vitart, S Majumdar IWTC VIII Dec Jeju World Weather Research Program: a ten years vision PM Ruti, F Vitart, S Majumdar IWTC VIII Dec 014 - Jeju An overarching question Disaster risk reduction Climate services How should we move from weather

More information

Science Objectives contained in three categories

Science Objectives contained in three categories Summer THORPEX-Pacific Asian Regional Campaign/Tropical Cyclone Structure-08 Experiments and Collaborative Efforts Science Objectives contained in three categories Increase predictability of high-impact

More information

ECMWF product development

ECMWF product development ECMWF product development David Richardson Head of Evaluation Section, Forecast Department, ECMWF David.richardson@ecmwf.int ECMWF June 6, 2018 Outline Review the efforts made by ECMWF to address feedback

More information

Hydrologic Ensemble Prediction: Challenges and Opportunities

Hydrologic Ensemble Prediction: Challenges and Opportunities Hydrologic Ensemble Prediction: Challenges and Opportunities John Schaake (with lots of help from others including: Roberto Buizza, Martyn Clark, Peter Krahe, Tom Hamill, Robert Hartman, Chuck Howard,

More information

Latest thoughts on stochastic kinetic energy backscatter - good and bad

Latest thoughts on stochastic kinetic energy backscatter - good and bad Latest thoughts on stochastic kinetic energy backscatter - good and bad by Glenn Shutts DARC Reading University May 15 2013 Acknowledgments ECMWF for supporting this work Martin Leutbecher Martin Steinheimer

More information

Main characteristics and performance of COSMO LEPS

Main characteristics and performance of COSMO LEPS Main characteristics and performance of COSMO LEPS Andrea Montani, Chiara Marsigli, Tiziana Paccagnella ARPA Emilia Romagna, Idro Meteo Clima Service Montani Marsigli Paccagnella Stochastic forcing, Ensemble

More information

Portugal. Instituto de Meteorologia

Portugal. Instituto de Meteorologia WWW TECHNICAL PROGRESS REPORT ON THE GLOBAL DATA- PROCESSING AND FORECASTING SYSTEM (GDPFS), AND THE ANNUAL NUMERICAL WEATHER PREDICTION (NWP) PROGRESS REPORT FOR THE YEAR 2005 Portugal Instituto de Meteorologia

More information

Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions

Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions The Fourth THORPEX Asian Science Workshop Kunming, China 2 Nov 2012 (Fri) Munehiko Yamaguchi 1, Tetsuo Nakazawa 1,2

More information

North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project)

North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project) TIGGE Real-Time Tropical Cyclone Data for Regional Applications North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project) a WWRP Research Development Project

More information

Behind the Climate Prediction Center s Extended and Long Range Outlooks Mike Halpert, Deputy Director Climate Prediction Center / NCEP

Behind the Climate Prediction Center s Extended and Long Range Outlooks Mike Halpert, Deputy Director Climate Prediction Center / NCEP Behind the Climate Prediction Center s Extended and Long Range Outlooks Mike Halpert, Deputy Director Climate Prediction Center / NCEP September 2012 Outline Mission Extended Range Outlooks (6-10/8-14)

More information

Application and verification of ECMWF products 2016

Application and verification of ECMWF products 2016 Application and verification of ECMWF products 2016 Met Eireann, Glasnevin Hill, Dublin 9, Ireland. J.Hamilton 1. Summary of major highlights The verification of ECMWF products has continued as in previous

More information

The Canadian approach to ensemble prediction

The Canadian approach to ensemble prediction The Canadian approach to ensemble prediction ECMWF 2017 Annual seminar: Ensemble prediction : past, present and future. Pieter Houtekamer Montreal, Canada Overview. The Canadian approach. What are the

More information

Severe weather warnings at the Hungarian Meteorological Service: Developments and progress

Severe weather warnings at the Hungarian Meteorological Service: Developments and progress Severe weather warnings at the Hungarian Meteorological Service: Developments and progress István Ihász Hungarian Meteorological Service Edit Hágel Hungarian Meteorological Service Balázs Szintai Department

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR

More information

Application and verification of ECMWF products 2012

Application and verification of ECMWF products 2012 Application and verification of ECMWF products 2012 Instituto Português do Mar e da Atmosfera, I.P. (IPMA) 1. Summary of major highlights ECMWF products are used as the main source of data for operational

More information

Tokyo Climate Center s activities as RCC Tokyo

Tokyo Climate Center s activities as RCC Tokyo First WMO Workshop on Operational Climate Prediction Pune, India, 09-11 November 2015 Tokyo Climate Center s activities as RCC Tokyo Arata Endo Tokyo Climate Center Japan Meteorological Agency E-mail:

More information