Probabilistic Weather Forecasting and the EPS at ECMWF

Size: px
Start display at page:

Download "Probabilistic Weather Forecasting and the EPS at ECMWF"

Transcription

1 Probabilistic Weather Forecasting and the EPS at ECMWF Renate Hagedorn European Centre for Medium-Range Weather Forecasts 30 January 2009: Ensemble Prediction at ECMWF 1/ 30

2 Questions What is an Ensemble Prediction System (EPS)? multiple forecasts from slightly different initial conditions enables probabilistic forecasts Why do we need an EPS and probabilistic forecasts? to account for uncertainties in initial conditions and model error to support user specific decision-making processes How do we use probabilistic forecasts? products (stamp maps, probability maps, EFI, EPSgrams) important verification aspects 30 January 2009: Ensemble Prediction at ECMWF 2/ 30

3 Deterministic Forecasting Temperature Is this forecast correct? Initial Uncertainty Initial condition Forecast time Forecast Model Error 30 January 2009: Ensemble Prediction at ECMWF 3/ 30

4 Ensemble Forecasting Temperature Initial condition Forecast time Forecast Complete description of weather prediction in terms of a Probability Density Function (PDF) 30 January 2009: Ensemble Prediction at ECMWF 4/ 30

5 Flow dependence of forecast errors 26 th June th June 1994 ECMWF ensemble forecast - Air temperature Date: 26/06/1995 London Lat: 51.5 Long: 0 ECMWF ensemble forecast - Air temperature Date: 26/06/1994 London Lat: 51.5 Long: 0 Control Analysis Ensemble Control Analysis Ensemble UK UK Forecast day Forecast day If the forecasts are coherent (small spread) the atmosphere is in a more predictable state than if the forecasts diverge (large spread) 30 January 2009: Ensemble Prediction at ECMWF 5/ 30

6 Multi-Model Ensemble Forecasting model 1 verification climate system phase space t=t t=0 model 3 Model 2 model 2 30 January 2009: Ensemble Prediction at ECMWF 6/ 30

7 Multi-Model Ensemble Forecasting verification climate system phase space t=t t=0 multi-model ensemble 30 January 2009: Ensemble Prediction at ECMWF 7/ 30

8 THORPEX Interactive Grand Global Ensemble A key component of THORPEX (to accelerate the improvements in the 1-day to 2-week high-impact weather forecasts for the benefit of humanity) Enhance international collaboration on ensemble prediction for severe weather Develop theory and practice of multi-model ensembles Develop the concept of a Global Interactive Forecasting System (GIFS), responding dynamically to changing uncertainty TIGGE archive: Global operational ensemble forecasts from 10 centres: BMRC (Australia), CMA (China), CPTEC (Brazil), ECMWF (Europe), JMA (Japan), KMA (Korea), Météo-France (France), Met Office (UK), MSC (Canada), NCEP (USA) 30 January 2009: Ensemble Prediction at ECMWF 8/ 30

9 SM vs. MM results T-2m, 250 European stations (60 cases) Multi-Model ECMWF Met Office NCEP CRPSS Solid: no BC Lead time / days 30 January 2009: Ensemble Prediction at ECMWF 9/ 30

10 SM vs. MM results T-2m, 250 European stations (60 cases) Multi-Model ECMWF Met Office NCEP CRPSS Dotted: 30d-BC Solid: no BC Lead time / days 30 January 2009: Ensemble Prediction at ECMWF 10 / 30

11 SM vs. MM results T-2m, 250 European stations (60 cases) Multi-Model ECMWF Met Office NCEP CRPSS Dashed: REFC-NGR Dotted: 30d-BC Solid: no BC Lead time / days 30 January 2009: Ensemble Prediction at ECMWF 11 / 30

12 Goal of Ensemble Prediction Represent uncertainty of prediction Ensemble Spread should o capture truth (spread ~ RMS error) o indicate range of uncertainty Move from deterministic to probabilistic forecast 30 January 2009: Ensemble Prediction at ECMWF 12 / 30

13 Questions What is an Ensemble Prediction System (EPS)? multiple forecasts from slightly different initial conditions enables probabilistic forecasts Why do we need an EPS and probabilistic forecasts? to account for uncertainties in initial conditions and model error to support user specific decision-making processes How do we use probabilistic forecasts? products (stamp maps, probability maps, EFI, EPSgrams) important verification aspects 30 January 2009: Ensemble Prediction at ECMWF 13 / 30

14 Why Probabilities? Energy contract scenario: penalty for non-delivery: 100 (if ff>25m/s), buying in energy: 20 weather forecast: 30% probability for ff>25m/s what would you do? Test the system for 100 cases of forecasts predicting 30% probability for the event ff>25m/s to occur Note: statistically, 30 times the event should occur, 70 times not occur buy extra energy in these 100 cases -> 100 x 20 = 2000 do not buy extra energy in these 100 cases -> 30 x 100 = 3000 Buying in extra energy beforehand (spending 20 ) is beneficial when probability for ff>25m/s is greater 20% The higher/lower the cost loss ratio, the higher/lower probabilities are needed in order to benefit from action on forecast 30 January 2009: Ensemble Prediction at ECMWF 14 / 30

15 Defining the cost-loss ratio Defining the specific costs and losses associated to your application Can prove to be a non-trivial problem Should be done in consultation with economic experts Examples for research and applications in this area exist, e.g.: The Decisions and Governance theme investigates how the presence of risk and uncertainty influences the design of successful policies in the areas of environmental management and climate change. In Europe, the group has identified successful ways of involving citizens in the design of programmes to reduce flood risk, and is now applying these lessons to similar efforts in China and Japan 30 January 2009: Ensemble Prediction at ECMWF 15 / 30

16 Ensemble Prediction System 1 control run + 50 perturbed runs (T L 399 L62) added dimension of ensemble members f(x,y,z,t,e) How do we deal with added dimension when interpreting, verifying and diagnosing EPS output? Transition from deterministic (yes/no) to probabilistic 30 January 2009: Ensemble Prediction at ECMWF 16 / 30

17 EPS products: stamp maps AN , 06GMT 956 EPS Cont FC +66 h 979 Mean sea level pressure (5hPa) VT: 16 Oct 1987, 6 UTC TL399 ensemble, TL95 moist SVs with t_opt=24h - mem no. 1 of h - mem no. 2 of h - mem no. 3 of h - mem no. 4 of h - mem no. 5 of h - mem no. 6 of h - mem no. 7 of h - mem no. 8 of h - mem no. 9 of h - mem no. 10 of h mem no. 11 of h - mem no. 12 of h - mem no. 13 of h - mem no. 14 of h mem no. 15 of h - mem no. 16 of h - mem no. 17 of h - mem no. 18 of h - mem no. 19 of h mem no. 20 of h mem no. 21 of h - mem no. 22 of h - mem no. 23 of h - mem no. 24 of h - mem no. 25 of h - mem no. 26 of h - mem no. 27 of h - mem no. 28 of h - mem no. 29 of h - mem no. 30 of h mem no. 31 of h mem no. 32 of h - mem no. 33 of h - mem no. 34 of h - mem no. 35 of h - mem no. 36 of h - mem no. 37 of h mem no. 38 of h - mem no. 39 of h mem no. 40 of h mem no. 41 of h - mem no. 42 of h - mem no. 43 of h - mem no. 44 of h - mem no. 45 of h - mem no. 46 of h - mem no. 47 of h - mem no. 48 of h - mem no. 49 of h - mem no. 50 of h January 2009: Ensemble Prediction at ECMWF 17 / 30

18 5 Probability of 10m windspeed 15 m/s Wednesday 21 January UTC ECMWF Forecast probability t+084 VT: Saturday 24 January UTC Surface: 10 metre Wind speed of at least 15 m/s 60 W 40 W 20 W 0 20 E 40 E 60 E N N N N 5 60 W 40 W 20 W 0 20 E 40 E 60 E 30 January 2009: Ensemble Prediction at ECMWF 18 / 30

19 Extreme Forecast Index Wednesday 21 January UTC ECMWF Extreme forecast index t VT: Saturday 24 January UTC - Sunday 25 January UTC Surface: 10 metre speed index 60 W 40 W W 0 70 N 20 E 40 E E 60 E N N E N N W E N January 2009: Ensemble Prediction at ECMWF 19 / 30

20 EPS products: EPSgram EPS Meteogram Reading (48m) N 1.33 W Deterministic Forecast and EPS Distribution Wednesday 23 January UTC EPS Meteogram Reading (48m) N 1 W Extended Range Forecast based on EPS Distribution Wednesday 23 January UTC Total Cloud Cover (okta) 8 Daily mean of Total Cloud Cover (okta) Total Precipitation (mm/6h) m Wind Speed (m/s) m Temperature reduced to station height ( C) 115m (T799) 105m (T399) Total Precipitation (mm/24h) Daily distribution of 10m Wind Direction Daily mean of 10m Wind Speed (m/s) m min/max temperature (C) reduced to station height 90m (T255) % 25% 50% 75% 100% -3 Wed 23 Thu 24 Fri 25 Sat 26 Sun 27 Mon 28 Tue 29 Wed 30 Thu 31 Fri 1 max 90% January % median T799 OPS T399 CTRL 25% 10% min Magics Wed 23 Thu 24 Fri 25 Sat 26 Sun 27 Mon 28 Tue 29 Wed 30 Thu 31 Fri 1 Sat 2 Sun 3 Mon 4 Tue 5 Wed 6 max 90% 75% January 2008 February 2008 median 25% 10% min Magics January 2009: Ensemble Prediction at ECMWF 20 / 30

21 Assessing the quality of a forecast The forecast indicated 10% probability for rain It did rain on the day Was it a good forecast? Yes No I don t know Single probabilistic forecasts are never completely wrong or right (unless they give 0% or 100% probabilities) To evaluate a forecast system we need to look at a (large) number of forecast observation pairs 30 January 2009: Ensemble Prediction at ECMWF 21 / 30

22 Assessing the quality of a forecast system Characteristics of a forecast system: Consistency*: Do the observations statistically belong to the distributions of the forecast ensembles? (consistent degree of ensemble dispersion) Reliability: Can I trust the probabilities to mean what they say? Sharpness: How much do the forecasts differ from the climatological mean probabilities of the event? Resolution: How much do the forecasts differ from the climatological mean probabilities of the event, and the systems gets it right? Skill: Are the forecasts better than my reference system (chance, climatology, persistence, )? * Note that terms like consistency, reliability etc. are not always well defined in verification theory and can be used with different meanings in other contexts 30 January 2009: Ensemble Prediction at ECMWF 22 / 30

23 Rank Histogram Rank Histograms asses whether the ensemble spread is consistent with the assumption that the observations are statistically just another member of the forecast distribution Check whether observations are equally distributed amongst predicted ensemble Sort ensemble members in increasing order and determine where the observation lies with respect to the ensemble members Rank 1 case Rank 4 case Temperature -> Temperature -> 30 January 2009: Ensemble Prediction at ECMWF 23 / 30

24 Rank Histograms OBS is indistinguishable from any other ensemble member OBS is too often below the ensemble members (biased forecast) OBS is too often outside the ensemble spread A uniform rank histogram is a necessary but not sufficient criterion for determining that the ensemble is reliable (see also: T. Hamill, 2001, MWR) 30 January 2009: Ensemble Prediction at ECMWF 24 / 30

25 Reliability A forecast system is reliable if: statistically the predicted probabilities agree with the observed frequencies, i.e. taking all cases in which the event is predicted to occur with a probability of x%, that event should occur exactly in x% of these cases; not more and not less. A reliability diagram displays whether a forecast system is reliable (unbiased) or produces over-confident / underconfident probability forecasts A reliability diagram also gives information on the resolution (and sharpness) of a forecast system Forecast PDF Climatological PDF 30 January 2009: Ensemble Prediction at ECMWF 25 / 30

26 Reliability Diagram Take a sample of probabilistic forecasts: e.g. 30 days x 2200 GP = forecasts How often was event (T > 25) forecasted with X probability? FC Prob. # FC perfect FC OBS-Freq. real OBS-Freq % (100%) 7200 (90%) 90% ( 90%) 4000 (80%) 80% ( 80%) 3000 (66%) % ( 10%) 800 (15%) 25 0% ( 0%) 700 (10%) 30 January 2009: Ensemble Prediction at ECMWF 26 / 30

27 Reliability Diagram Take a sample of probabilistic forecasts: e.g. 30 days x 2200 GP = forecasts How often was event (T > 25) forecasted with X probability? 100 OBS-Frequency 0 0 FC-Probability 100 FC Prob. # FC perfect FC OBS-Freq. real OBS-Freq. 100% (100%) 7200 (90%) 90% ( 90%) 4000 (80%) 80% ( 80%) 3000 (66%) % ( 10%) 800 (15%) 0% ( 0%) 700 (10%) 30 January 2009: Ensemble Prediction at ECMWF 27 / 30

28 Reliability Diagram over-confident model perfect model 30 January 2009: Ensemble Prediction at ECMWF 28 / 30

29 Reliability Diagram under-confident model perfect model 30 January 2009: Ensemble Prediction at ECMWF 29 / 30

30 Questions What is an Ensemble Prediction System (EPS)? multiple forecasts from slightly different initial conditions enables probabilistic forecasts Why do we need an EPS and probabilistic forecasts? to account for uncertainties in initial conditions and model error to support user specific decision-making processes How do we use probabilistic forecasts? products (stamp maps, probability maps, EFI, EPSgrams) important verification aspects 30 January 2009: Ensemble Prediction at ECMWF 30 / 30

TIGGE at ECMWF. David Richardson, Head, Meteorological Operations Section Slide 1. Slide 1

TIGGE at ECMWF. David Richardson, Head, Meteorological Operations Section Slide 1. Slide 1 TIGGE at ECMWF David Richardson, Head, Meteorological Operations Section david.richardson@ecmwf.int Slide 1 Slide 1 ECMWF TIGGE archive The TIGGE database now contains five years of global EPS data Holds

More information

The benefits and developments in ensemble wind forecasting

The benefits and developments in ensemble wind forecasting The benefits and developments in ensemble wind forecasting Erik Andersson Slide 1 ECMWF European Centre for Medium-Range Weather Forecasts Slide 1 ECMWF s global forecasting system High resolution forecast

More information

Application and verification of the ECMWF products Report 2007

Application and verification of the ECMWF products Report 2007 Application and verification of the ECMWF products Report 2007 National Meteorological Administration Romania 1. Summary of major highlights The medium range forecast activity within the National Meteorological

More information

Recent advances in Tropical Cyclone prediction using ensembles

Recent advances in Tropical Cyclone prediction using ensembles Recent advances in Tropical Cyclone prediction using ensembles Richard Swinbank, with thanks to Many colleagues in Met Office, GIFS-TIGGE WG & others HC-35 meeting, Curacao, April 2013 Recent advances

More information

Mio Matsueda (University of Oxford) Tetsuo Nakazawa (WMO)

Mio Matsueda (University of Oxford) Tetsuo Nakazawa (WMO) GIFS-TIGGE WG 10@UKMO (12-14 June, 2013) Early warning products for extreme weather events using operational medium-range ensemble forecasts Mio Matsueda (University of Oxford) Tetsuo Nakazawa (WMO) with

More information

Ensemble Verification Metrics

Ensemble Verification Metrics Ensemble Verification Metrics Debbie Hudson (Bureau of Meteorology, Australia) ECMWF Annual Seminar 207 Acknowledgements: Beth Ebert Overview. Introduction 2. Attributes of forecast quality 3. Metrics:

More information

Introduction to TIGGE and GIFS. Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO

Introduction to TIGGE and GIFS. Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO Introduction to TIGGE and GIFS Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO GIFS-TIGGE/NCAR/NOAA Workshop on EPS developments, June 2012 TIGGE THORPEX Interactive Grand Global

More information

TC/PR/RB Lecture 3 - Simulation of Random Model Errors

TC/PR/RB Lecture 3 - Simulation of Random Model Errors TC/PR/RB Lecture 3 - Simulation of Random Model Errors Roberto Buizza (buizza@ecmwf.int) European Centre for Medium-Range Weather Forecasts http://www.ecmwf.int Roberto Buizza (buizza@ecmwf.int) 1 ECMWF

More information

Applications: forecaster perspective, training

Applications: forecaster perspective, training Applications: forecaster perspective, training Ken Mylne Met Office Also, Chair, WMO CBS Expert Team on Ensemble Prediction Thanks to: Anders Persson, Pierre Eckert, many others. Crown copyright 2004 Page

More information

Verification of Probability Forecasts

Verification of Probability Forecasts Verification of Probability Forecasts Beth Ebert Bureau of Meteorology Research Centre (BMRC) Melbourne, Australia 3rd International Verification Methods Workshop, 29 January 2 February 27 Topics Verification

More information

4.3.2 Configuration. 4.3 Ensemble Prediction System Introduction

4.3.2 Configuration. 4.3 Ensemble Prediction System Introduction 4.3 Ensemble Prediction System 4.3.1 Introduction JMA launched its operational ensemble prediction systems (EPSs) for one-month forecasting, one-week forecasting, and seasonal forecasting in March of 1996,

More information

Medium-range Ensemble Forecasts at the Met Office

Medium-range Ensemble Forecasts at the Met Office Medium-range Ensemble Forecasts at the Met Office Christine Johnson, Richard Swinbank, Helen Titley and Simon Thompson ECMWF workshop on Ensembles Crown copyright 2007 Page 1 Medium-range ensembles at

More information

Sub-seasonal predictions at ECMWF and links with international programmes

Sub-seasonal predictions at ECMWF and links with international programmes Sub-seasonal predictions at ECMWF and links with international programmes Frederic Vitart and Franco Molteni ECMWF, Reading, U.K. Using ECMWF forecasts, 4-6 June 2014 1 Outline Recent progress and plans

More information

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC DRIHMS_meeting Genova 14 October 2010 Tiziana Paccagnella ARPA-SIMC Ensemble Prediction Ensemble prediction is based on the knowledge of the chaotic behaviour of the atmosphere and on the awareness of

More information

An extended re-forecast set for ECMWF system 4. in the context of EUROSIP

An extended re-forecast set for ECMWF system 4. in the context of EUROSIP An extended re-forecast set for ECMWF system 4 in the context of EUROSIP Tim Stockdale Acknowledgements: Magdalena Balmaseda, Susanna Corti, Laura Ferranti, Kristian Mogensen, Franco Molteni, Frederic

More information

Recommendations on trajectory selection in flight planning based on weather uncertainty

Recommendations on trajectory selection in flight planning based on weather uncertainty Recommendations on trajectory selection in flight planning based on weather uncertainty Philippe Arbogast, Alan Hally, Jacob Cheung, Jaap Heijstek, Adri Marsman, Jean-Louis Brenguier Toulouse 6-10 Nov

More information

Precipitation verification. Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO

Precipitation verification. Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO Precipitation verification Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO Outline 1) Status of WGNE QPF intercomparisons 2) Overview of the use of recommended methods for the verification

More information

S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r

S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r C3S European Climatic Energy Mixes (ECEM) Webinar 18 th Oct 2017 Philip Bett, Met Office Hadley Centre S e a s

More information

Sub-seasonal predictions at ECMWF and links with international programmes

Sub-seasonal predictions at ECMWF and links with international programmes Sub-seasonal predictions at ECMWF and links with international programmes Frederic Vitart and Franco Molteni ECMWF, Reading, U.K. 1 Outline 30 years ago: the start of ensemble, extended-range predictions

More information

Operational use of ensemble hydrometeorological forecasts at EDF (french producer of energy)

Operational use of ensemble hydrometeorological forecasts at EDF (french producer of energy) Operational use of ensemble hydrometeorological forecasts at EDF (french producer of energy) M. Le Lay, P. Bernard, J. Gailhard, R. Garçon, T. Mathevet & EDF forecasters matthieu.le-lay@edf.fr SBRH Conference

More information

Forecasting Extreme Events

Forecasting Extreme Events Forecasting Extreme Events Ivan Tsonevsky, ivan.tsonevsky@ecmwf.int Slide 1 Outline Introduction How can we define what is extreme? - Model climate (M-climate); The Extreme Forecast Index (EFI) Use and

More information

A review on recent progresses of THORPEX activities in JMA

A review on recent progresses of THORPEX activities in JMA 4th THORPEX workshop 31 Oct. 2012, Kunming, China A review on recent progresses of THORPEX activities in JMA Masaomi NAKAMURA Typhoon Research Department Meteorological Research Institute / JMA Contents

More information

Extended-range/Monthly Predictions. WGSIP, Trieste

Extended-range/Monthly Predictions. WGSIP, Trieste Extended-range/Monthly Predictions WGSIP, Trieste 1 Sub-seasonal to Seasonal Prediction: Met Office, Exeter (1 to 3 December 2010) Purpose Review of the current capabilities in sub seasonal to seasonal

More information

Skilful seasonal predictions for the European Energy Industry

Skilful seasonal predictions for the European Energy Industry Skilful seasonal predictions for the European Energy Industry Hazel Thornton, Philip Bett, Robin Clark, Adam Scaife, Brian Hoskins, David Brayshaw WGSIP, 10/10/2017 Outline Energy industry and climate

More information

GIFS-TIGGE working group Report to ICSC. Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO

GIFS-TIGGE working group Report to ICSC. Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO GIFS-TIGGE working group Report to ICSC Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO ICSC-11, Geneva, July 2013 GIFS-TIGGE report Working group membership

More information

Renate Hagedorn 1, Roberto Buizza, Thomas M. Hamill 2, Martin Leutbecher and T.N. Palmer

Renate Hagedorn 1, Roberto Buizza, Thomas M. Hamill 2, Martin Leutbecher and T.N. Palmer 663 Comparing TIGGE multimodel forecasts with reforecast-calibrated ECMWF ensemble forecasts Renate Hagedorn 1, Roberto Buizza, Thomas M. Hamill 2, Martin Leutbecher and T.N. Palmer Research Department

More information

Exploring ensemble forecast calibration issues using reforecast data sets

Exploring ensemble forecast calibration issues using reforecast data sets NOAA Earth System Research Laboratory Exploring ensemble forecast calibration issues using reforecast data sets Tom Hamill and Jeff Whitaker NOAA Earth System Research Lab, Boulder, CO tom.hamill@noaa.gov

More information

WMO Lead Centre activities for global sub-seasonal MME prediction

WMO Lead Centre activities for global sub-seasonal MME prediction Workshop on sub-seasonal predictability, 2-5 November 2015, ECMWF WMO Lead Centre activities for global sub-seasonal MME prediction Suhee Park Korea Meteorological Administration Contents Introduction

More information

The Hungarian Meteorological Service has made

The Hungarian Meteorological Service has made ECMWF Newsletter No. 129 Autumn 11 Use of ECMWF s ensemble vertical profiles at the Hungarian Meteorological Service István Ihász, Dávid Tajti The Hungarian Meteorological Service has made extensive use

More information

MOGREPS Met Office Global and Regional Ensemble Prediction System

MOGREPS Met Office Global and Regional Ensemble Prediction System MOGREPS Met Office Global and Regional Ensemble Prediction System Ken Mylne Ensemble Forecasting Manager Crown copyright 2007 Forecaster Training MOGREPS and Ensembles. Page 1 Outline Introduction to Ensemble

More information

Probabilistic Weather Prediction

Probabilistic Weather Prediction Probabilistic Weather Prediction George C. Craig Meteorological Institute Ludwig-Maximilians-Universität, Munich and DLR Institute for Atmospheric Physics Oberpfaffenhofen Summary (Hagedorn 2009) Nothing

More information

ECMWF products to represent, quantify and communicate forecast uncertainty

ECMWF products to represent, quantify and communicate forecast uncertainty ECMWF products to represent, quantify and communicate forecast uncertainty Using ECMWF s Forecasts, 2015 David Richardson Head of Evaluation, Forecast Department David.Richardson@ecmwf.int ECMWF June 12,

More information

Hydrologic Ensemble Prediction: Challenges and Opportunities

Hydrologic Ensemble Prediction: Challenges and Opportunities Hydrologic Ensemble Prediction: Challenges and Opportunities John Schaake (with lots of help from others including: Roberto Buizza, Martyn Clark, Peter Krahe, Tom Hamill, Robert Hartman, Chuck Howard,

More information

Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble

Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble 559 Comparison of a 51-member low-resolution (T L 399L62) ensemble with a 6-member high-resolution (T L 799L91) lagged-forecast ensemble Roberto Buizza Research Department To appear in Mon. Wea.Rev. March

More information

Severe weather warnings at the Hungarian Meteorological Service: Developments and progress

Severe weather warnings at the Hungarian Meteorological Service: Developments and progress Severe weather warnings at the Hungarian Meteorological Service: Developments and progress István Ihász Hungarian Meteorological Service Edit Hágel Hungarian Meteorological Service Balázs Szintai Department

More information

Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system

Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system Five years of limited-area ensemble activities at ARPA-SIM: the COSMO-LEPS system Andrea Montani, Chiara Marsigli and Tiziana Paccagnella ARPA-SIM Hydrometeorological service of Emilia-Romagna, Italy 11

More information

The Impact of Horizontal Resolution and Ensemble Size on Probabilistic Forecasts of Precipitation by the ECMWF EPS

The Impact of Horizontal Resolution and Ensemble Size on Probabilistic Forecasts of Precipitation by the ECMWF EPS The Impact of Horizontal Resolution and Ensemble Size on Probabilistic Forecasts of Precipitation by the ECMWF EPS S. L. Mullen Univ. of Arizona R. Buizza ECMWF University of Wisconsin Predictability Workshop,

More information

Current JMA ensemble-based tools for tropical cyclone forecasters

Current JMA ensemble-based tools for tropical cyclone forecasters Current JMA ensemble-based tools for tropical cyclone forecasters Hitoshi Yonehara(yonehara@met.kishou.go.jp) Yoichiro Ota JMA / Numerical Prediction Division Contents Introduction of JMA GSM and EPS NWP

More information

Recent activities related to EPS (operational aspects)

Recent activities related to EPS (operational aspects) Recent activities related to EPS (operational aspects) Junichi Ishida and Carolyn Reynolds With contributions from WGE members 31th WGE Pretoria, South Africa, 26 29 April 2016 GLOBAL 2 Operational global

More information

Current status and future developments of the ECMWF Ensemble Prediction System

Current status and future developments of the ECMWF Ensemble Prediction System Current status and future developments of the ECMWF Ensemble Prediction System Roberto Buizza European Centre for Medium-Range Weather Forecasts EFAS WS, ECMWF, 29-30 Jan 2009 Roberto Buizza: Current status

More information

South Asian Climate Outlook Forum (SASCOF-6)

South Asian Climate Outlook Forum (SASCOF-6) Sixth Session of South Asian Climate Outlook Forum (SASCOF-6) Dhaka, Bangladesh, 19-22 April 2015 Consensus Statement Summary Below normal rainfall is most likely during the 2015 southwest monsoon season

More information

OCEAN WAVE FORECASTING AT E.C.M.W.F.

OCEAN WAVE FORECASTING AT E.C.M.W.F. OCEAN WAVE FORECASTING AT E.C.M.W.F. Jean-Raymond Bidlot Marine Prediction Section Predictability Division of the Research Department European Centre for Medium-range Weather Forecasts Slide 1 Ocean waves:

More information

Feature-specific verification of ensemble forecasts

Feature-specific verification of ensemble forecasts Feature-specific verification of ensemble forecasts www.cawcr.gov.au Beth Ebert CAWCR Weather & Environmental Prediction Group Uncertainty information in forecasting For high impact events, forecasters

More information

Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System

Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System Tropical Intra-Seasonal Oscillations in the DEMETER Multi-Model System Francisco Doblas-Reyes Renate Hagedorn Tim Palmer European Centre for Medium-Range Weather Forecasts (ECMWF) Outline Introduction

More information

Verification of ECMWF products at the Deutscher Wetterdienst (DWD)

Verification of ECMWF products at the Deutscher Wetterdienst (DWD) Verification of ECMWF products at the Deutscher Wetterdienst (DWD) DWD Martin Göber 1. Summary of major highlights The usage of a combined GME-MOS and ECMWF-MOS continues to lead to a further increase

More information

Current Issues and Challenges in Ensemble Forecasting

Current Issues and Challenges in Ensemble Forecasting Current Issues and Challenges in Ensemble Forecasting Junichi Ishida (JMA) and Carolyn Reynolds (NRL) With contributions from WGNE members 31 th WGNE Pretoria, South Africa, 26 29 April 2016 Recent trends

More information

Evaluating Forecast Quality

Evaluating Forecast Quality Evaluating Forecast Quality Simon J. Mason International Research Institute for Climate Prediction Questions How do we decide whether a forecast was correct? How do we decide whether a set of forecasts

More information

Analog Ensemble for Probabilis1c Weather Predic1ons

Analog Ensemble for Probabilis1c Weather Predic1ons Analog Ensemble for Probabilis1c Weather Predic1ons Luca Delle Monache, F. Anthony Eckel * Daran Rife, Badrinath Nagarajan, and Keith Searight Research ApplicaCons Laboratory, NCAR - - Boulder, CO * Office

More information

Developing Operational MME Forecasts for Subseasonal Timescales

Developing Operational MME Forecasts for Subseasonal Timescales Developing Operational MME Forecasts for Subseasonal Timescales Dan C. Collins NOAA Climate Prediction Center (CPC) Acknowledgements: Stephen Baxter and Augustin Vintzileos (CPC and UMD) 1 Outline I. Operational

More information

The ECMWF Extended range forecasts

The ECMWF Extended range forecasts The ECMWF Extended range forecasts Laura.Ferranti@ecmwf.int ECMWF, Reading, U.K. Slide 1 TC January 2014 Slide 1 The operational forecasting system l High resolution forecast: twice per day 16 km 91-level,

More information

Estimation of Forecat uncertainty with graphical products. Karyne Viard, Christian Viel, François Vinit, Jacques Richon, Nicole Girardot

Estimation of Forecat uncertainty with graphical products. Karyne Viard, Christian Viel, François Vinit, Jacques Richon, Nicole Girardot Estimation of Forecat uncertainty with graphical products Karyne Viard, Christian Viel, François Vinit, Jacques Richon, Nicole Girardot Using ECMWF Forecasts 8-10 june 2015 Outline Introduction Basic graphical

More information

Diagnosis of Ensemble Forecasting Systems

Diagnosis of Ensemble Forecasting Systems Diagnosis of Ensemble Forecasting Systems M. Leutbecher September 2009 M. Leutbecher Ensemble Forecasting Systems September 2009 1 / 57 Diagnosis of Ensemble Forecasting Systems M. Leutbecher September

More information

The WWRP Polar Prediction Project

The WWRP Polar Prediction Project The Polar Prediction Project Trond Iversen Member of the Polar Prediction Project Steering Group Norwegian Meteorological Institute / ECMWF 11th meeting, THORPEX GIFS-TIGGE, WG; June 2013 1 Background

More information

The new ECMWF seasonal forecast system (system 4)

The new ECMWF seasonal forecast system (system 4) The new ECMWF seasonal forecast system (system 4) Franco Molteni, Tim Stockdale, Magdalena Balmaseda, Roberto Buizza, Laura Ferranti, Linus Magnusson, Kristian Mogensen, Tim Palmer, Frederic Vitart Met.

More information

Application and verification of ECMWF products 2015

Application and verification of ECMWF products 2015 Application and verification of ECMWF products 2015 Hungarian Meteorological Service 1. Summary of major highlights The objective verification of ECMWF forecasts have been continued on all the time ranges

More information

Verification statistics and evaluations of ECMWF forecasts in

Verification statistics and evaluations of ECMWF forecasts in 635 Verification statistics and evaluations of ECMWF forecasts in 29-21 D.S. Richardson, J. Bidlot, L. Ferranti, A. Ghelli, T. Hewson, M. Janousek, F. Prates and F. Vitart Operations Department October

More information

Challenging weather forecasting projects at medium ranges and possibly at more extended ranges

Challenging weather forecasting projects at medium ranges and possibly at more extended ranges Challenging weather forecasting projects at medium ranges and possibly at more extended ranges Contribution of the Royal Meteorological Institute (BELGIUM) to the ECMWF Users meeting Reading June 2014

More information

Have a better understanding of the Tropical Cyclone Products generated at ECMWF

Have a better understanding of the Tropical Cyclone Products generated at ECMWF Objectives Have a better understanding of the Tropical Cyclone Products generated at ECMWF Learn about the recent developments in the forecast system and its impact on the Tropical Cyclone forecast Learn

More information

Ensembles, Uncertainty and Climate Projections. Chris Brierley (Room 117)

Ensembles, Uncertainty and Climate Projections. Chris Brierley (Room 117) Ensembles, Uncertainty and Climate Projections Chris Brierley (Room 117) Definitions Ensemble: group of model simulations Uncertainty: doubt and ambiguity about future conditions Climate Projection: modeled

More information

The UK National Severe Weather Warning Service - Guidance Unit Perspective

The UK National Severe Weather Warning Service - Guidance Unit Perspective The UK National Severe Weather Warning Service - Guidance Unit Perspective Dan Suri, Chief Operational Meteorologist ECMWF User Workshop June 2015 Contents Who are the Guidance Unit? The National Severe

More information

Calibrating forecasts of heavy precipitation in river catchments

Calibrating forecasts of heavy precipitation in river catchments from Newsletter Number 152 Summer 217 METEOROLOGY Calibrating forecasts of heavy precipitation in river catchments Hurricane Patricia off the coast of Mexico on 23 October 215 ( 215 EUMETSAT) doi:1.21957/cf1598

More information

Forecast Inconsistencies

Forecast Inconsistencies Forecast Inconsistencies How often do forecast jumps occur in the models? ( Service Ervin Zsoter (Hungarian Meteorological ( ECMWF ) In collaboration with Roberto Buizza & David Richardson Outline Introduction

More information

Application and verification of ECMWF products: 2010

Application and verification of ECMWF products: 2010 Application and verification of ECMWF products: 2010 Hellenic National Meteorological Service (HNMS) F. Gofa, D. Tzeferi and T. Charantonis 1. Summary of major highlights In order to determine the quality

More information

Asian THORPEX Implementation Plan

Asian THORPEX Implementation Plan Asian THORPEX Implementation Plan 1. Introduction This document is to describe the Implementation Plan of the Asian THORPEX, that the Asian THORPEX Regional Committee (ARC) approves. THORPEX was established

More information

MSC, BMRC, KMA,CMA, CPTEC, SAWS

MSC, BMRC, KMA,CMA, CPTEC, SAWS Characteristics of the sub-seasonal and seasonal forecast systems operational and under development at ECMWF, JMA, UKMO, Météo France, NCEP, MSC, BMRC, KMA,CMA, CPTEC, SAWS and Hydrometeorological Centre

More information

How far in advance can we forecast cold/heat spells?

How far in advance can we forecast cold/heat spells? Sub-seasonal time scales: a user-oriented verification approach How far in advance can we forecast cold/heat spells? Laura Ferranti, L. Magnusson, F. Vitart, D. Richardson, M. Rodwell Danube, Feb 2012

More information

Introduction to THORPEX and TIGGE

Introduction to THORPEX and TIGGE Introduction to THORPEX and TIGGE David Richardson Met Office, Exeter Thanks to: Mel Shapiro, Alan Thorpe, co-chairs THORPEX ISSC David Rogers and THORPEX Implementation Plan Expert Group Elena Manaenkova,

More information

Upgrade of JMA s Typhoon Ensemble Prediction System

Upgrade of JMA s Typhoon Ensemble Prediction System Upgrade of JMA s Typhoon Ensemble Prediction System Masayuki Kyouda Numerical Prediction Division, Japan Meteorological Agency and Masakazu Higaki Office of Marine Prediction, Japan Meteorological Agency

More information

How ECMWF has addressed requests from the data users

How ECMWF has addressed requests from the data users How ECMWF has addressed requests from the data users David Richardson Head of Evaluation Section, Forecast Department, ECMWF David.richardson@ecmwf.int ECMWF June 14, 2017 Overview Review the efforts made

More information

Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions

Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions Tropical cyclone track forecasts using JMA model with ECMWF and JMA initial conditions The Fourth THORPEX Asian Science Workshop Kunming, China 2 Nov 2012 (Fri) Munehiko Yamaguchi 1, Tetsuo Nakazawa 1,2

More information

Calibration of ECMWF forecasts

Calibration of ECMWF forecasts from Newsletter Number 142 Winter 214/15 METEOROLOGY Calibration of ECMWF forecasts Based on an image from mrgao/istock/thinkstock doi:1.21957/45t3o8fj This article appeared in the Meteorology section

More information

Will it rain? Predictability, risk assessment and the need for ensemble forecasts

Will it rain? Predictability, risk assessment and the need for ensemble forecasts Will it rain? Predictability, risk assessment and the need for ensemble forecasts David Richardson European Centre for Medium-Range Weather Forecasts Shinfield Park, Reading, RG2 9AX, UK Tel. +44 118 949

More information

North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project)

North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project) TIGGE Real-Time Tropical Cyclone Data for Regional Applications North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project) a WWRP Research Development Project

More information

VERFICATION OF OCEAN WAVE ENSEMBLE FORECAST AT NCEP 1. Degui Cao, H.S. Chen and Hendrik Tolman

VERFICATION OF OCEAN WAVE ENSEMBLE FORECAST AT NCEP 1. Degui Cao, H.S. Chen and Hendrik Tolman VERFICATION OF OCEAN WAVE ENSEMBLE FORECAST AT NCEP Degui Cao, H.S. Chen and Hendrik Tolman NOAA /National Centers for Environmental Prediction Environmental Modeling Center Marine Modeling and Analysis

More information

15 day VarEPS introduced at. 28 November 2006

15 day VarEPS introduced at. 28 November 2006 Comprehensive study of the calibrated EPS products István Ihász Hungarian Meteorological Service Thanks to Máté Mile Zoltán Üveges & Gergő Kiss Mihály Szűcs Topics 15 day VarEPS introduced at the ECMWF

More information

ACCESS AGREPS Ensemble Prediction System

ACCESS AGREPS Ensemble Prediction System ACCESS AGREPS Ensemble Prediction System Michael Naughton CAWCR Earth System Modelling Model Data Fusion Workshop 10-12 May 2010 Motivation for Ensemble Prediction NWP forecasts greatly improved but are

More information

Cómo contar la predicción probabilistica? Part II: From body language to percentages

Cómo contar la predicción probabilistica? Part II: From body language to percentages Cómo contar la predicción probabilistica? How to tell probabilities in weather forecasting? Part II: From body language to percentages 1 From 100% qualitative to 100% quantitative probability communication

More information

Shaping future approaches to evaluating highimpact weather forecasts

Shaping future approaches to evaluating highimpact weather forecasts Shaping future approaches to evaluating highimpact weather forecasts David Richardson, and colleagues Head of Evaluation, Forecast Department European Centre for Medium-Range Weather Forecasts (ECMWF)

More information

Application and verification of ECMWF products 2009

Application and verification of ECMWF products 2009 Application and verification of ECMWF products 2009 Hungarian Meteorological Service 1. Summary of major highlights The objective verification of ECMWF forecasts have been continued on all the time ranges

More information

Standardized Anomaly Model Output Statistics Over Complex Terrain.

Standardized Anomaly Model Output Statistics Over Complex Terrain. Standardized Anomaly Model Output Statistics Over Complex Terrain Reto.Stauffer@uibk.ac.at Outline statistical ensemble postprocessing introduction to SAMOS new snow amount forecasts in Tyrol sub-seasonal

More information

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3)

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3) Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L3) Roberto Buizza European Centre for Medium-Range Weather Forecasts (http://www.ecmwf.int/staff/roberto_buizza/) ECMWF Predictability

More information

EMC Probabilistic Forecast Verification for Sub-season Scales

EMC Probabilistic Forecast Verification for Sub-season Scales EMC Probabilistic Forecast Verification for Sub-season Scales Yuejian Zhu Environmental Modeling Center NCEP/NWS/NOAA Acknowledgement: Wei Li, Hong Guan and Eric Sinsky Present for the DTC Test Plan and

More information

A. Doerenbecher 1, M. Leutbecher 2, D. S. Richardson 3 & collaboration with G. N. Petersen 4

A. Doerenbecher 1, M. Leutbecher 2, D. S. Richardson 3 & collaboration with G. N. Petersen 4 slide 1 Comparison of observation targeting predictions during the (North) Atlantic TReC 2003 A. Doerenbecher 1, M. Leutbecher 2, D. S. Richardson 3 & collaboration with G. N. Petersen 4 1 Météo-France,

More information

Development and Application of Climate Prediction Technology to Limit Adverse Impact of Natural Disaster

Development and Application of Climate Prediction Technology to Limit Adverse Impact of Natural Disaster 2017/EPWG/SDMOF/016 Thematic Session 2.4 Development and Application of Climate Prediction Technology to Limit Adverse Impact of Natural Disaster Submitted by: APEC Climate Center 11 th Senior Disaster

More information

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2)

Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2) Approaches to ensemble prediction: the TIGGE ensembles (EC/TC/PR/RB-L2) Roberto Buizza European Centre for Medium-Range Weather Forecasts (https://software.ecmwf.int/wiki/display/~ner/roberto+buizza) ECMWF

More information

25 years of ensemble forecasting at ECMWF

25 years of ensemble forecasting at ECMWF from Newsletter Number 153 Autumn 2017 METEOROLOGY 25 years of ensemble forecasting at ECMWF 25 YEARS OF ENSEMBLE PREDICTION doi:10.21957/bv418o This article appeared in the Meteorology section of ECMWF

More information

Assessment of Ensemble Forecasts

Assessment of Ensemble Forecasts Assessment of Ensemble Forecasts S. L. Mullen Univ. of Arizona HEPEX Workshop, 7 March 2004 Talk Overview Ensemble Performance for Precipitation Global EPS and Mesoscale 12 km RSM Biases, Event Discrimination

More information

Predicting rainfall using ensemble forecasts

Predicting rainfall using ensemble forecasts Predicting rainfall using ensemble forecasts Nigel Roberts Met Office @ Reading MOGREPS-UK Convection-permitting 2.2 km ensemble now running routinely Embedded within MOGREPS-R ensemble members (18 km)

More information

Uncertainty in Operational Atmospheric Analyses. Rolf Langland Naval Research Laboratory Monterey, CA

Uncertainty in Operational Atmospheric Analyses. Rolf Langland Naval Research Laboratory Monterey, CA Uncertainty in Operational Atmospheric Analyses 1 Rolf Langland Naval Research Laboratory Monterey, CA Objectives 2 1. Quantify the uncertainty (differences) in current operational analyses of the atmosphere

More information

Fernando Prates. Evaluation Section. Slide 1

Fernando Prates. Evaluation Section. Slide 1 Fernando Prates Evaluation Section Slide 1 Objectives Ø Have a better understanding of the Tropical Cyclone Products generated at ECMWF Ø Learn the recent developments in the forecast system and its impact

More information

South Asian Climate Outlook Forum (SASCOF-8)

South Asian Climate Outlook Forum (SASCOF-8) Eighth Session of South Asian Climate Outlook Forum (SASCOF-8) Colombo, Sri Lanka, 25-26 April 2016 Consensus Statement Summary Above-normal rainfall is most likely during the 2016 southwest monsoon season

More information

Adaptation for global application of calibration and downscaling methods of medium range ensemble weather forecasts

Adaptation for global application of calibration and downscaling methods of medium range ensemble weather forecasts Adaptation for global application of calibration and downscaling methods of medium range ensemble weather forecasts Nathalie Voisin Hydrology Group Seminar UW 11/18/2009 Objective Develop a medium range

More information

ECMWF product development

ECMWF product development ECMWF product development David Richardson Head of Evaluation Section, Forecast Department, ECMWF David.richardson@ecmwf.int ECMWF June 6, 2018 Outline Review the efforts made by ECMWF to address feedback

More information

GPC Exeter forecast for winter Crown copyright Met Office

GPC Exeter forecast for winter Crown copyright Met Office GPC Exeter forecast for winter 2015-2016 Global Seasonal Forecast System version 5 (GloSea5) ensemble prediction system the source for Met Office monthly and seasonal forecasts uses a coupled model (atmosphere

More information

Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the EURAD-IM performances

Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the EURAD-IM performances ECMWF COPERNICUS REPORT Copernicus Atmosphere Monitoring Service Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the EURAD-IM performances March

More information

Probabilistic Evaluation of Prediction and Dynamics of Super Typhoon MEGI (2010)

Probabilistic Evaluation of Prediction and Dynamics of Super Typhoon MEGI (2010) Probabilistic Evaluation of Prediction and Dynamics of Super Typhoon MEGI (2010) 6 November 2012 Chuanhai Qian 1, Fuqing Zhang 2, Yihong Duan 1 1 China Meteorological Administration 2 Pennsylvania State

More information

South Asian Climate Outlook Forum (SASCOF-12)

South Asian Climate Outlook Forum (SASCOF-12) Twelfth Session of South Asian Climate Outlook Forum (SASCOF-12) Pune, India, 19-20 April 2018 Consensus Statement Summary Normal rainfall is most likely during the 2018 southwest monsoon season (June

More information

Predictability from a Forecast Provider s Perspective

Predictability from a Forecast Provider s Perspective Predictability from a Forecast Provider s Perspective Ken Mylne Met Office, Bracknell RG12 2SZ, UK. email: ken.mylne@metoffice.com 1. Introduction Predictability is not a new issue for forecasters or forecast

More information

NOTES AND CORRESPONDENCE. Improving Week-2 Forecasts with Multimodel Reforecast Ensembles

NOTES AND CORRESPONDENCE. Improving Week-2 Forecasts with Multimodel Reforecast Ensembles AUGUST 2006 N O T E S A N D C O R R E S P O N D E N C E 2279 NOTES AND CORRESPONDENCE Improving Week-2 Forecasts with Multimodel Reforecast Ensembles JEFFREY S. WHITAKER AND XUE WEI NOAA CIRES Climate

More information

Deutscher Wetterdienst

Deutscher Wetterdienst Deutscher Wetterdienst Limited-area ensembles: finer grids & shorter lead times Susanne Theis COSMO-DE-EPS project leader Deutscher Wetterdienst Thank You Neill Bowler et al. (UK Met Office) Andras Horányi

More information