CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO)

Size: px
Start display at page:

Download "CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO)"

Transcription

1 CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO) GEOTECHNICAL REAL ESTATE DISCLOSURE REPORT MASTER REPORT FOR CITY OWNED LOTS 15205, 15209, 15213, 15217, 15221, 15225, DE PAUW STREET, PACIFIC PALISADES, CA W.O. E170213F GEO FILE # NOVEMBER 4, 2009

2 TABLE OF CONTENTS GEOTECHNICAL REAL ESTATE DISCLOSURE REPORT CITY PROPERTIES DE PAUW STREET 1.0 INTRODUCTION PURPOSE SCOPE OF REPORT GENERAL SITE LOCATION AND DESCRIPTION OF PROPERTIES HISTORY AND BACKGROUND PHYSIOGRAPHY POTRERO CANYON HISTORY REVIEW OF RELEVANT RAP RECORDS RELATING TO POTRERO CANYON GRADING IN THE AREA OF THE DE PAUW STREET PROPERTIES HISTORY OF DEVELOPMENT AND GEOTECHNICAL EXPLORATION OF DE PAUW STREET GEOLOGY GEOLOGIC SETTING EARTH UNITS GEOLOGIC STRUCTURE GROUNDWATER SEISMIC HAZARDS PROPERTY WALK-THROUGHS REAL ESTATE DISCLOSURES REQUIREMENTS FOR GEOTECHNICAL INVESTIGATIONS WITHIN CITY OWNED PROPERTIES LIMITATIONS REFERENCES Appendix A: Figures 1-20 Appendix B: De Pauw Street Photos 1-22

3 GEO File No W.O. E170213F Page 1 of INTRODUCTION The City of Los Angeles provides this report of geotechnical real estate disclosure in response to a request from the Department of General Services Asset Management Division. This geotechnical disclosure report is based in part on review of readily available geotechnical records and reported data from past geologic subsurface exploration and geologic mapping by others in the immediate vicinity of the seven City owned properties covered by this report, 15205, 15209, 15213, 15217, 15221, 15225, De Pauw Street, Los Angeles, CA also know as lots 5 through 10 and B respectively. 2.0 PURPOSE The purpose of this report is to provide geotechnical information compiled for the subject properties and to make the buyer aware of the overall geotechnical condition of the properties. This disclosure is not a guarantee of any kind nor does it take the place of a thorough geotechnical investigation or warranty the buyer may wish to obtain. This disclosure report is a summary of readily available geotechnical information concerning the subject properties for the purpose of disclosing such information for the real estate transaction. 3.0 SCOPE OF REPORT This report is based on document review, visual site observation, review of readily available documented subsurface investigations and past grading work on or adjacent to the properties. Tasks completed in the preparation of this report included: Review of readily available aerial photographs, past and current; Review of published geologic maps and reports of the site area contained within Geotechnical Engineering Division (GEO) files; Review of readily available relevant documents on file at the City of Los Angeles Department of Recreation and Parks (RAP); Review of geotechnical reports specific to the individual lots obtained from the City of Los Angeles Department of Building and Safety (LADBS) files; Site observation and reconnaissance of adjacent areas. This disclosure is based on what the City of Los Angeles is aware of and available to the City at the time of the preparation of this report. It is recommended that prospective purchaser(s) of the properties obtain consultation from a qualified California State licensed engineering geologist regarding potential geotechnical hazards that may affect the properties.

4 GEO File No W.O. E170213F Page 2 of GENERAL SITE LOCATION AND DESCRIPTION OF PROPERTIES The seven properties covered by this report are located on the northeastern side of De Pauw Street approximately 400 feet east of the intersection of Lombard Avenue and Earlham Street in the Pacific Palisades community of Los Angeles. All of the lots are currently vacant. The back of all the lots face northeast to southeast into the north central portion of Potrero Canyon, the bottom of which is 54 to 60 feet below street grade in the area. The lot dimensions for all the properties are approximately 50 feet wide at the street and wider on the canyon side, and 150 feet deep with an area exceeding 7,500 square feet. The lots are relatively flat for approximately 25 feet from the street then descend a roughly 2:1 (horizontal:vertical) slope to approximately 8 feet below street grade to a level pad for the remainder of the lot. The lower pad of the lots contains numerous small stockpiles of soil. Past the property line at the rear of the lots there is an approximately 2:1 (horizontal:vertical) slope that descends approximately 50 feet vertically towards the floor of Potrero Canyon. The western property line of the properties is setback approximately 20 feet from the street. The eastern property line of the properties is directly above or adjacent to an unpaved access road above the canyon. Past grading in the area of the lots consisted of placing fill to create a level pad in the 1920s tract development, and the construction of a buttress fill at the rear of the lots in the 1990s as a part of a slope reconstruction during canyon grading for park development. The existing conditions from an aerial view (as of 2006) of the lots along the relevant section of De Pauw Street with addresses, lot numbers, and topography are shown in Figure 1. More detailed descriptions of the individual City owned properties are included in Section 7.0 of this report. 5.0 HISTORY AND BACKGROUND 5.1 Physiography The properties rest on a relatively flat marine and non-marine terrace that was dissected by fluvial processes that formed Potrero Canyon downslope at the rear of the properties. Potrero Canyon is a southwest draining canyon which trends across the Pacific Palisades area immediately north of Pacific Coast Highway (PCH). In this area, PCH trends northwest. Immediately south of the highway is Will Rogers State Beach. The relatively flat marine terraces bounded by the steep cliffs or palisades above the canyon have been developed as residential areas. Backyards of the residential areas are open to the relatively steep canyon slopes or, in the case of much of Potrero Canyon, graded 2:1 slopes. Unlike the neighborhoods above, there are no housing developments or public streets in the bottom of Potrero Canyon. The canyon walls of Potrero Canyon became over steepened in the past due to undercutting by the preexisting blue line stream at the canyon bottom, which led to surficial failures and landslides in the canyon in recent geologic history. The major landslides within the canyon were numbered as part of a canyon wide geotechnical exploration in For the purposes of this report the numbering system has been retained and included as

5 GEO File No W.O. E170213F Page 3 of 31 Figure 2 for reference. As indicated on Figure 2, Slide 2 was a mapped landslide adjacent to the lots covered in this report. 5.2 Potrero Canyon History In 1922 development of the eastern Pacific Palisades started with installation of water lines and construction of roads (Moran et al, 1959). Road grading on the mesas above the canyon began in the early 1920 s (Buckley, 1987). Based on a review of available airphotos, the grading of the tract surrounding and including the properties was complete by The airphoto from 1929, Figure 3, shows approximately 10 houses on the west mesa above the rim of Potrero Canyon. The 1929 canyon itself appears in its natural state. In the area east of the properties, the airphoto shows what appears to be the remnant of a ravine with the upper portion of the ravine approximately 60 feet from the road. At the time, the canyon bottom was approximately 170 feet below the level of De Pauw Street. In 1939, sanitary sewers were installed on the bluff (Moran, et al, 1959). Moran et al, 1959, mentions slope stability problems in Potrero Canyon, citing that filling of the canyon had been considered by the City of Los Angeles and private interests in order to stabilize slopes and provide a recreation area. At that time, the City was interested in possibly using the canyon for a disposal area for solid refuse, street sweepings and excess soil. The west rim of Potrero Canyon became densely developed in the early 1950 s. During this time Slide 3 (refer to Figure 1) reactivated and reportedly damaged a residence on De Pauw Street (KBA, 1986). In 1959 an extensive geotechnical exploration of a wide area of Pacific Palisades was conducted by Moran, et al that studied the landslides of the area (Moran et al, 1959). The report studied the slides within Potrero Canyon with piezometers and slope indicators. The study determined that the slides were caused by the groundwater flow regime, weak earth materials, and over-steepening of the canyon walls by stream erosion. It was recommended that the canyon be filled with 40 feet of fill and a storm drain installed. The slides were recommended to be allowed to erode to point of selfstabilization. The canyon was purchased by the City of Los Angeles in the 1960 s with the intention to utilize the canyon as a southern extension of the existing Palisades Park (Buckley, 1987). The City then initiated several studies to determine best course of action to create useable parkland and improve the stability of the slopes within the canyon. In 1979, several pre-existing ancient landslides became active and threatened upslope residences (KBA, 1990); among them was Slide 2 which occurred downslope of the subject properties. Figure 4 shows Potrero Canyon in the area of Slide 2 from the air shortly after the slide damaged several homes. Slides 2 and 3 reactivated and created

6 GEO File No W.O. E170213F Page 4 of 31 an earth dam at the floor of the canyon. Subsequently, a small lake, shown in the photos in Figure 5 near Slides 2 and 3, formed that accelerated movement of the slides causing headward retreat of the slide scarps. This headward retreat endangered three residences on De Pauw Street (KBA, 1986). Grading to the present day configuration is described in the section below. 5.3 Review of Relevant RAP Records Relating to Potrero Canyon Grading in the area of the De Pauw Street Properties The following is a synopsis of information from relevant, readily available documents regarding the grading of Potrero Canyon in the area of the subject properties subsequent to the 1979 slides described above. A June 3, 1986 report by Kovacs-Byer and Associates Inc. (KBA) summarizes the results of a study done for the RAP that addressed stabilization of existing landslides in Potrero Canyon to develop a recreational area. Kovacs-Byer, under the direction of the RAP, was selected to oversee the landslide mitigation and filling of the canyon. During the course of researching the grading work within Potrero Canyon, GEO has located and reviewed several interim compaction reports, memorandums, and letters, however, no records of in-grading geologic mapping have been found. The canyon stabilization project was proposed to be conducted over several phases. The first phase primarily consisted of controlling the flow of groundwater by the installation of a storm drain and subdrain system in conjunction with horizontally drilled drains, or hydraugers. The canyon bottom was proposed to be filled to a depth of 75 feet with stabilization slopes constructed in the areas of sliding. The storm drain, subdrain, and planned fill detailed in the 1986 report have all been essentially completed in the area of the subject lots at this time. The 1986 exploration study conducted slope stability calculations that Byer concluded made it, reasonable to assume that the proposed canyon fill, remedial grading, and subsurface drainage system will provide engineered fill slopes on the west side of the Potrero Canyon with a factor of safety in excess of 1.5. Stabilization of the landslides will be achieved. (KBA, 1986). It was recommended that the upper 5 to 10 feet of the slide debris be removed during grading to limit future infiltration of water into the slide masses left in place. Based on consolidation testing of the slide debris samples, Byer concluded that the debris is, not subject to excessive consolidation. (KBA, 1986). Byer determined that, deeper removals will not be necessary due to the well consolidated nature of the slide debris. As part of the 1986 exploration study, KBA drilled five borings within and adjacent to Slide 2. The locations of the borings are shown here on the geologic map in Figure 6 and the relevant cross sections are shown as Figures 7 and 8. Three bucket auger borings were drilled, B-10, B-11, and B-13. Boring B-10, drilled on the south side of Slide 2, encountered slide debris to 35 feet below the existing ground surface and Pico Formation siltstone bedrock below the debris. Heavy seepage was noted at several

7 GEO File No W.O. E170213F Page 5 of 31 depths within the debris encountered in B-10 and was only surface logged due caving hazards. Seepage was also noted to emanating from the terrace bedrock contact within the scarp during the excavation of B-10. Boring B-11, drilled on the north side of Slide 2, encountered terrace deposits to 18 feet, slide debris to 50 feet below the existing ground surface and Modelo Formation interbedded siltstone and sandstone bedrock below the debris. A well defined clay gouge zone was noted from 48 to 50 feet below the existing ground surface. Boring B-13, drilled at the toe of Slide 2, encountered slide debris to 20 feet below the existing ground surface and Modelo Formation interbedded siltstone and sandstone bedrock below the debris. Groundwater was not encountered below the zone of sliding. Two hollow stem borings were drilled, B-15 and B-16. Boring B-15, drilled at the head of the slide on the south side, encountered alluvial terrace deposits to 15 feet, marine terrace deposits to 34 feet below the existing ground surface and Pico Formation siltstone bedrock underlying the terrace deposits. Boring B-16, drilled at the head of the slide on the south side, encountered alluvial terrace deposits to 12 feet, marine terrace deposits to 28 feet below the existing ground surface and Modelo Formation siltstone and sandstone bedrock underlying the terrace deposits. It was noted in the 1986 report, five homes adjacent to Slide 2 were either undermined or destroyed by the headward advance of the slide. KBA estimated that at the time of the investigation, the volume of the slide was approximately 18,000 cubic yards of ancient and recent debris. It was postulated that the geologic structure of the canyon had not directly influenced the location of the landslides, but that it had influenced the movement and occurrence of groundwater in the area. It was concluded that the groundwater flow regime, exerted a strong influence on the development of landsliding in the canyon. (KBA, 1986) The 1986 KBA report mentioned previous work by others that was done in the vicinity of the subject properties. A 1978 Ralph Stone & Company report regarding a slope failure at and De Pauw Street was reviewed by KBA, 1986, but was not encountered in the scope of this report (RSC, 1978). As indicated on Byer s geologic map in Figure 6, there are two additional borings adjacent to Slide 2, LS-1 and LS-3 that were advanced by Lockwood-Singh and Associates (LSA). Reports from LSA were not reviewed by KBA, 1986, nor were they encountered within the scope of this report. Kovacs-Byer and Associates, Inc. issued a progress report letter in January of 1990 which detailed the requirements of subdrains and hydraugers (horizontal drains) at the scarps of Slides 1, 2, 3, and 6 (KBA, 1990a). The subdrains were deemed necessary to dewater springs encountered at the existing 25 foot fill elevation and consisted of six inch perforated pipe placed in a three foot by three foot trench packed with ¾ inch gravel. The hydraugers were specified to be 100 feet long and placed 50 feet on center and were intended to drain groundwater from the terrace/bedrock contact. In an Engineering Geologic Memorandum issued in July of 1990 Kovacs-Byer and Associates, Inc. stated that during Phase I grading, the installation of the storm drain and main canyon drain, it was found that the side slopes of Potrero Canyon were

8 GEO File No W.O. E170213F Page 6 of 31 potentially unstable above the 75 foot line. It was then proposed to raise the canyon fill to 100 feet above the original flowline of Potrero Canyon and construct 2:1 (horizontal:vertical) slope buttresses from that elevation to the rim of the canyon. (KBA, 1990b.) In a Project Status report issued in July of 1990 Kovacs-Byer and Associates, Inc. stated that the canyon bottom subdrain had been installed in bedrock 10 to 20 feet below the flowline of the canyon (KBA, 1990c). It was also noted that the hydraugers were placed laterally into the slopes to a depth of 300 to 500 feet in the most active seep areas on the slopes of the canyon. Several bores were usually drilled in a fan pattern from one location and then connected into a manifold to form and an array of hydraugers that were then connected to the subdrain. Approximately two miles of hydraugers were placed within the whole of Potrero Canyon. Initial flow rates from the hydrauger bores were commonly 100 gallons per day apiece, though typically the rates declined rapidly. Unusual flow patterns were exhibited in Array G, which sustained a total flow rate of approximately 1,000 gallons per day, and Array E, where initial flow rates were on the order of 40,000 gallons per day. Array G is located below the southern portion of Slide 2. The schematic origin point locations of these installed arrays are shown in Figure 9. The only As Built map of the hydraugers located, shown as Figure 10, details a more precise location of the arrays (KBA, Unknown Date). A Grading Memorandum was issued by Kovacs-Byer and Associates, Inc., in July of 1991 which indicated that grading had progressed to the point, where the removal of the upper 10 feet of adjacent slide material should commence in the middle portion of Slide 2 (KBA, 1991a). These removals were directed to be performed under the observation of the project geologist to ensure that, sufficient material is removed and to ensure the grading in the vicinity of the landslide does not pose a threat to the stability of offsite properties. An As-Built Geologic Conditions report was issued by Kovacs-Byer and Associates, Inc., in September of 1991 which indicated that grading had progressed to the point where the wetter portion of the debris in the southern part Slide 2 was trimmed to a 2:1 gradient (KBA, 1991b). A Progress Report was issued by Kovacs-Byer and Associates, Inc., in November of 1991 which indicated that a gravel blanket drain had been continuously placed against the southern half of Slide 2. (KBA, 1991c) The report noted that the blanket drain placement was terminated at the then current location and that the slide material above the blanket drains was observed to be dry with the seepage in the area completely stopped. A Progress Report was issued by Kovacs-Byer and Associates, Inc., in May of 1992 which indicated that grading had placed fill in the toe area of Slide 2 (KBA, 1992). It was noted that this area had been trimmed and benched as part of the Phase I grading. It was also noted that the fill placement could continue at the north end of Slide 2 for another six feet to the point where, removal of the exposed slide material will be

9 GEO File No W.O. E170213F Page 7 of 31 required prior to continuing filling. The limits of fill at the time of this report are shown in Figure 11. The Byer Group in March of 1994 prepared a report regarding the slope stability of temporary cuts to Slides 2 and 3 in response to a Building and Safety request (BG, 1994a). At the time, the fill pad had progressed to the point where benching of Slide 2 had exposed soft earth materials not suitable for the support of additional fill. It was recommended that, the northern half of Landslide #2 be removed from the base of the scarp. It was noted that the upper portion of the slide in that area exposed undisturbed terrace material and bedrock of the Pico Formation. The southern half of Slide 2 was observed to consist of saturated slide material. In order to remove the saturated material it was proposed to trim the slope to 1:1 extending into the lot pad area above the landslide. A subdrain at the toe of the trim slope to be connected to the storm drain system was also recommended. Byer also included slope stability calculations in the report that show a factor of safety in excess of 1.25 for the temporary slopes. The mapped location of the proposed trims is shown in Figure 12. The cross section line, 2-2, is shown in Figure 13. A memorandum was issued by the Byer Group in June of 1994 as an update on the grading progress (BG, 1994b.) It was noted that the grading contractor was not allowed to fill against Slide 2 until remedial grading was performed. The remedial grading was to consist of removing the upper 5 to 10 feet of the slide and removing the talus that had accumulated against the slide scarp as well as the 1:1 trim mentioned earlier. The memorandum referenced a letter from LADBS (dated April 19, 1994) that required the construction of a soldier pile system adjacent to private property south of Slide 2. The memorandum stated that the Byer Group planned subsurface exploration of the proposed pile area. The Byer Group issued an addendum report on the new subsurface exploration in July of 1994 (BG, 1994c.) Boring S2-1 was drilled to a depth of 61 feet on the flat portion of De Pauw Street approximately 70 feet from the street. The boring encountered alluvial terrace from the surface to 17 feet below ground surface (bgs), followed by marine terrace deposits to 34½ feet bgs and massive siltstone bedrock of the Pico Formation to the final depth. The report stated that slope trimming and benching had reached the point, where the remaining portions of exposed landslide debris should be removed. Using samples obtained from boring S2-1, testing was conducted for stability analysis of the proposed trim slope. The analysis indicated that the trim slope would have a factor of safety of 1.5. Therefore, the Byer Group concluded that the trim slope was stable without the need for a soldier pile system. The Byer Group recommended that, for the southern slide section, the scarp area exposing terrace be trimmed back to 1½:1 and a 1:1 slope trim in bedrock. They determined that the northern portion of the Slide 2 was more stable and removal of talus and slide debris was recommended at the toe of the scarp. The northern portion of the slide was recommended to be removed to a depth of 10 feet to expose firm in place slide debris under observation of the geologist would who give approval prior to placement of fill. Subdrains were recommended at the toe of the trim slope and at the terrace bedrock contact and as necessary as determined by the geologist. The mapped location of the

10 GEO File No W.O. E170213F Page 8 of 31 proposed trims and boring S2-1 are shown in Figure 14. The cross section line, 4-4, is shown in Figure 15. Subsequent to this report, a Request for Modification was filed to delete the requirement for soldier piles which was granted. A geologic memorandum regarding Slide 2 was issued by the Byer Group in October of 1994 that detailed the current conditions and recommendations for the area (BG, 1994d). The memo stated that the unsuitable portions of the north half of Slide 2 had been removed and the area prepared for the placement of compacted fill. The bottom for this area was approved by John Byer on October 28, The southern half of Slide 2 had not been removed at that time as the grading permit was still pending. Another geologic memorandum regarding Slide 2 was issued by the Byer Group in December of 1994 that detailed the current conditions and recommendations for the area (BG, 1994e). The memo stated that the temporary slope could not be excavated, back beyond the slide plane, and a portion of the slope moved as a result. It was recommended that the, temporary slope be trimmed from the top to remove the remaining slide debris to provide a safe and stable work area. In early January of 1995 there was approximately one week of heavier than normal rainfall which caused damage in area in and around Potrero Canyon (BG, 1995a). No damage was noted at Slide 2, but the report mentioned that LADBS had approved plans for the removal of the remaining portions of Landslide 2. It was noted that the removal was to consist of a combination of a 1½:1 and 1:1 (horizontal:vertical) temporary slope. An Interim Compaction Report was filed in June of 1995 for a portion of the grading work in the area of Slide 2 (BG, 1995b). The report stated that the bottom at Slide 2, approximately 275 by 65 by 90 feet, was identified as firm slide debris by a geologist and approved on October 28, The bottom was noted to be included on the Compaction Map enclosed with the report; however no map was attached to the report available to GEO from the RAP records. In August of 1995 a City of Los Angeles review letter (CLA, 1995a) was issued regarding the 1995 Interim Compaction Report (BG, 1995b.) This letter withheld approval for the fill covered by the 1995 compaction report. The review of the BG report was to continue upon submittal of an addendum report including a cross section through Slide 2 and a map including the subdrains. A report from the BG responding to this letter was not encountered during a review of the RAP records. In August of 1995 a City of Los Angeles review letter (CLA, 1995b) was issued regarding the 1995 Interim Compaction Report (BG, 1995b.) This letter granted approval for the fill covered by the 1995 compaction report as a non-structural fill which was not to be used for support of structures. In a Plan Review and Update report from December of 1997 the Byer Group stated that Slide 2 remained in place and had yet to be excavated and buttressed (BG, 1997a). It was noted that grading permits for the repair of Slide had been obtained and that

11 GEO File No W.O. E170213F Page 9 of 31 Slide 2 would be removed to, firm stable material and replaced as certified compacted fill. It was further noted that, for slide #2 compacted fill will be placed directly on bedrock and terrace material. Additional subdrains were recommended for Slide 2 at the terrace bedrock contact. In late December of 1997 the Byer Group issued an Engineering Geologic Consultation report that detailed the current conditions and recommendations for the Slide 2 area (BG, 1997b). It was stated that Slide 2 area was still not ready for compacted fill and that temporary 1:1 cut from the rim of the canyon down to the base of the landslide had not been made. The base of the excavation should expose bedrock adjacent to Phase I certified compacted fill. Once again, a subdrain was recommended at the terrace bedrock contact which was noted to be 40 feet below the top of the canyon. A geologic memorandum regarding Slide 2 was issued by the Byer Group in June of 1998 that detailed the current conditions and recommendations for the area (BG, 1998a). Removal of the remaining portions of Slide 2 and the excavation of the temporary cut were being performed at the time of this report. It was noted that John Byer was requested to observe the removal of the debris. It was determined that the planned temporary cut would not remove all of the remaining debris. As a result of that determination, John Byer, the project geologist, directed the grading contractor to move the top of the cut west toward the street approximately 10 feet. The Byer Group requested that the temporary back cut be surveyed for future as-built reports. Portions of the Slide 2 temporary slope were seen to be failing due to springs emanating from the face of the cut well below the terrace-bedrock contact. Additional drains were recommended to be installed to convey this water to the storm drain system under the direction of John Byer. An Interim Compaction Report was filed in December of 1998 that covered the continuing grading work in the area of Slides 2 (BG, 1998b). The report stated that the, remaining portions of Slide 2 were excavated to firm bedrock with the bottom approved by the geologist, a subdrain installed, and compacted fill placed. A subdrain was installed at the base of the Slide 2 removal per the approved grading plan. It was noted that oversized rocks and concrete rubble were placed in windrows in the area of Slide 2. The windrows were reported to be three feet by three feet and spaced every 15 feet horizontally with fill placed around the material and sand jetted into the voids. The limits of fill adjacent to the northern and southern limits of Slide 2 covered by this report is shown in the compaction maps are included here as Figures 16 and 17. On January 22, 1999, a City of Los Angeles review letter (CLA, 1999) was issued regarding the 1998 Interim Compaction Report (BG, 1998b.) This letter granted approval for the fill covered by the 1998 compaction report as a primary structural fill. An Interim Compaction Report was filed in January of 2000 that covered the continuing grading work in the area of Slides 2 (BG, 2000). Slide 2 was still in the process of being buttressed at the time of this report. It was stated that, the contractor has reached Phase III finish grade at the portion of the canyon north of station with all the

12 GEO File No W.O. E170213F Page 10 of 31 stockpiled soils used as compacted fills. Station is the south to north referencing the storm drain within the central canyon fill and is located approximately midpoint within the lot at De Pauw Street, or the northern section of Slide 2. The BG reported that the fill placed was compacted to a minimum of 90 percent of the maximum dry density as determined by ASTM D1557. The maximum fill depth covered in the report was 60 feet at the Slide 2 buttress. The last density test of fill included in this report located in the area of Slide 2 was at elevation 218 msl, or approximately 42 feet below current grade. The limits of fill adjacent to the scarp of Slide 2 covered by this report is shown in the compaction map included here as Figure 18. It was noted that rocks and rubble were placed in windrows with the same procedures described in the 1998 compaction report. The BG indicated that the foundation design values, provided in the December 1998 report, were intended for the sound barrier walls and not residential structures on the rim of the canyon. The remaining grading details contained in the report conform to standard practice for compaction reports certifying artificial fill and the slope buttresses were, graded in accordance with the plans and permits approved by the City of Los Angeles Department of Building and Safety, Grading Section. The fill covered by this report was approved as primary structural fill by the City of Los Angeles on February 4, 2000 (CLA, 2000). The BG report noted that the lots along the rim of the canyon that had been stabilized by compacted fill and stabilization fills were expected to support future residential development. The Byer Group recommended that each lot be investigated, by an independent soil testing agency to provide project specific foundation recommendations. In light of any future development, the report stated that, a complete file of geotechnical reports for the project will be maintained at the office of The J. Byer Group for outside consultants to review. A geologic memorandum regarding Slide 2 and other issues was issued by the Byer Group in April of 2000 that detailed the current conditions and recommendations for the area (BG, 1994d). Slide 2 was noted as a area of concern at the time of the report. At the time of the report, the Slide 2 area consisted, of a 1:1 temporary backcut and a false fill slope approximately 15 feet away from the cut. Groundwater was noted to be flowing from the terrace deposits down the face of the cut and saturating the compacted fill along the toe of slope complicating grading. It was proposed by the contractor to reestablish the temporary drain on the slope and begin filling with the water diverted. Saturated soils were recommended to be removed to firm subgrade prior to continuing the fill operation. This memorandum is the last grading document within the available Recreation and Parks records that specifically references the areas in and around the subject properties on De Pauw Street. 5.4 History of Development and Geotechnical Exploration of De Pauw Street In this section, a brief synopsis of past geotechnical explorations and development on or adjacent to the City owned properties on De Pauw Street within the area of Slide 2 that were encountered within the scope of this report. To that end, a review of the LADBS

13 GEO File No W.O. E170213F Page 11 of 31 documents encountered for each property in this section of De Pauw Street will be presented from south to north. A bibliographic list of documents reviewed for each property is included in this section for ease of reference. The list of documents presented in this report may not represent all available records for the individual properties due in part to inconsistencies in City document filing procedures, changes in grading code document requirements, degradation of reproductions, etc. The review of documents was limited to those relevant to a geotechnical review, i.e., plumbing and electrical permits have not been obtained or reviewed for this report. This report does not evaluate conformance issues with building codes or whether proper permits were obtained for construction at the individual properties De Pauw Street City of Los Angeles (CLA), Application for the Erection of Frame Building Class D for De Pauw St., Permit No.: 1928LA13064, dated May 7, City of Los Angeles (CLA), Application to Alter, Repair or Demolish, for De Pauw St., Permit No.: 1957LA61789, dated January 14, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1957LA61789, dated January 14, The earliest record found for De Pauw Street is an application for a building permit in The application proposed constructing a single family, 2 story residence at the site. An application for a building permit to demolish the residence was filed in 1957 by the private property owner at the time. A second application for a building permit to demolish the residence was filed in 1958 that listed the City of Los Angeles as the owner De Pauw Street City of Los Angeles (CLA), Application to Erect a New Building, for De Pauw St., Permit No.: , dated April 18, City of Los Angeles (CLA), Application to Erect a New Building, for De Pauw St., Permit No.: , dated April 18, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1954WL10994, dated March 19, City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1954WL10994, dated April 10, 1955.

14 GEO File No W.O. E170213F Page 12 of 31 City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1954WL10994, dated April 19, City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1956WL19634, dated August 26, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1969WL75746, dated February 10, City of Los Angeles (CLA), Order to Comply, for De Pauw Street. Issued February 15, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1986LA51122, dated November 19, City of Los Angeles (CLA), Range File (various City records regarding demolition of property), for De Pauw St., dated December 10, The earliest record found for De Pauw Street is an application for a new construction building permit in The application proposed constructing a single family, single story residence at the site. An application for a building permit to construct a garage on the property was also filed in An application for a building permit to construct a den at the rear of the property was filed in The Certificate of Occupancy for the den was issued the next year. A Certificate of Occupancy for the addition of a carport was issued in An application for a building permit to demolish part of one wing and close in was filed in An Order to Comply to repair the property was issued in 1969 after a major slope failure at the rear of the property due to severe January-February rainstorms. According to City records, the title to the property was acquired by the City February of An application for a building permit to demolish the residence was filed in 1986 that listed the City of Los Angeles as the owner. City records indicate that the residence was demolished in August of De Pauw Street City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1950XX00446, dated May 9, City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1963WL47194, dated October 25, City of Los Angeles (CLA), Department of Building and Safety Grading Preinspection Report, for De Pauw St., dated June 26, 1968.

15 GEO File No W.O. E170213F Page 13 of 31 City of Los Angeles (CLA), Abate Order, for De Pauw Street. Dated April 21, City of Los Angeles (CLA), Notice of Building, Structure or Premises Classified as Either Hazardous, Substandard or a Nuisance, for De Pauw Street Dated May 21, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1986LA51123, dated November 19, City of Los Angeles (CLA), Termination of Notice of Building, Structure or Premises Classified as Either Hazardous, Substandard or a Nuisance, De Pauw St., Dated March 6, City of Los Angeles (CLA), Range File (various City records regarding demolition of property), for De Pauw St., dated March 6, A Certificate of Occupancy for a one story single family dwelling and garage was issued in A Certificate of Occupancy for the enclosing a portion of the existing porch and conversion to ¾ bath was issued in A grading pre-inspection report was filed in 1986 the City of Los Angeles Department of Building and Safety (LADBS) that stated that there was a recent slide at the rear of the property at the time and the existing dwelling and garage exhibited cracking. An Abate Order was issued in April of 1986 that noted the residence was vacant and vandalized and ordered that the residence be brought to a habitable condition. According to City records, the title to the property was acquired by the City February of A Notice of building, structure or premises classified as either hazardous, substandard or a nuisance was filed by the LADBS in May of 1986 with the Los Angeles County Recorder that required that the property be repaired or demolished. An application for a building permit to demolish the residence was filed in 1986 that listed the City of Los Angeles as the owner. A Termination of Notice of building, structure or premises classified as either hazardous, substandard or a nuisance was filed by the LADBS in March of 1987 with the Los Angeles County Recorder indicating that the earlier notice was no longer in force. City records indicate that the residence was demolished in December of De Pauw Street City of Los Angeles (CLA), Application to Erect a New Building, for De Pauw St., Permit No.: 1949WL01640, dated August 2, City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1949WL01640, dated December 14, 1949.

16 GEO File No W.O. E170213F Page 14 of 31 City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1958LA11002, dated August 22, City of Los Angeles (CLA), Geology/Soil Report Denial Letter for De Pauw St., Los Angeles Department of Building and Safety, Grading Division, dated March 20, Nigra, John O., 1974a. Project , Geological Engineering Investigation of Known Slide Area and Effect on Safe Occupancy at De Pauw St., being Lot 8, Block 19, Tract 9300, in the Pacific Palisades, City of Los Angeles, dated February 19, City of Los Angeles (CLA), Department of Building and Safety Grading Denial Letter, for De Pauw St., dated March 20, Nigra, John O., 1974b. Project (B), Supplementary Geological Report, De Paux St., Pacific Palisades, City of Los Angeles, (Lot 8, Tract 9300). Dated April 26, Merrill, John D., CPG., Engineering Geologic Report, Lot 8, Block 19, Tract 9300, De Pauw St, Pacific Palisades, California. Dated May 3, Advanced Foundation Engineering, Inc. (AFE), Soils Report for Lot 8, Block 19, Tract 9300, De Pauw St, dated May 8, City of Los Angeles (CLA), Department of Building and Safety Grading Approval Letter, for De Pauw St., dated May 30, County of Los Angeles (CoLA), Notice Regarding Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards of a Geological Nature, De Pauw Street, Pacific Palisades CA Filed on May 30, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1974WL00567, dated July 30, City of Los Angeles (CLA), Application for Grading, for De Pauw St., Permit No.: 1974WL00568, dated July 30, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1976WL09273, dated August 10, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1976WL09273, dated August 10, 1976.

17 GEO File No W.O. E170213F Page 15 of 31 City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1976WL09273, dated November 23, City of Los Angeles (CLA), Certificate of Substandard Property, for De Pauw St., Dated June 23, City of Los Angeles (CLA), Notice to Abate Damaged or Vandalized Buildings, for De Pauw Street. Dated June 29, City of Los Angeles (CLA), Notice of Building Classified as a Nuisance or Hazard to Life or Property, Demolition Abatement Proceedings, for De Pauw St., Dated July 11, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1985LA11787, dated May 10, City of Los Angeles (CLA), Termination of Notice of Building, Structure or Premises Classified as Either Hazardous, Substandard or a Nuisance, for De Pauw St., Dated August 7, The earliest record found for De Pauw Street is an application for a new construction building permit and Certificate of Occupancy issued in The application proposed constructing a single family, single story residence and garage at the site. An application for a building permit to extend the front of the garage approximately four (4) feet towards the street was filed in In February of 1974, a geologic engineering investigation was conducted on the property by John O. Nigra regarding the landslide at the rear of the lot and corrective measures (Nigra, 1974a). It was noted that the concrete slab and block wall in the rear yard of the property, resting on undisturbed clay soil and terrace gravel, had failed. A vertical drop off of feet was noted at the base of the exposed footings in this area. Indications of creep were seen in the slope below the southeast corner of the rear yard, but these features were not seen to be related to the landslide. Unlawfully placed drainage conduits were seen to be installed in the rear yards of neighboring properties to the north and south that, combined with poor drainage on the subject property, likely produce the recent sliding. It was noted that there was, no unfavorable dip components in the supporting rocks to warrant fear of bedding plane slides. Gradual pop-outs and vertical slabbing seem to be more the case, and only where concentrated water run-off saturates the underlying rocks. As part of the investigation a six (6) foot deep test was dug that showed terrace deposits at the location shown on the map included with the report, provided here as Figure 19. Vertical cracking of the foundation was observed extending into the footing only at the location of the test pit. It was determined by the consultant that the foundation distress was not caused by the landslide. Removal of the area of the structure and concrete slabs directly adjacent to

18 GEO File No W.O. E170213F Page 16 of 31 the landslide was recommended as well as correcting the drainage for the entire property as well as the neighbors. LADBS issued a letter in March of 1974 with-holding approval of the John O. Nigra February, 1974 report due to its lack of, a detailed soil engineering analysis of the proximal landslide mass, and insufficient corrective measures. A supplementary report was prepared on the property by John O. Nigra in April of 1974 (Nigra, 1974b). This report clarified that the building structures were, not damaged and that there were no signs of encroachment of the head scarp under the structure. The report restated the need for the recommended corrective measures to limit the potential for future damage to the property. John Merrill Engineering Geologists completed a geologic report on the property in May of The scarp at that time was noted to be about 22 feet high and within terrace deposits. The movement of the landslide was attributed to poor drainage and unusually heavy and prolonged rainfall. The terrace bedrock contact was noted at approximate elevation 236 and was seen to contain a zone of cobbles and boulders up to a foot in diameter. The bedrock was identified as the Monterey Formation with the bedding having a general west strike and a north dip of about 40 degrees. The report concluded that a slope trim at the rear of the property and drainage correction for the site and the neighboring properties would, restore the property. A Notice Regarding Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards of a Geological Nature was filed with the Los Angeles County Registrar-Recorder in May of Advanced Foundation Engineering, Inc. also completed an inspection of the site in May of As a part of the inspection the consultant focused on the soils of the east facing slope at the rear of the house and what was encountered in two test pits, one adjacent to the foundation on the south side of the house and the other at the northeast corner of the structure. The report noted a near vertical slope at the rear of the lot which was undercutting the slab at its northeast corner. The erosion was thought to be caused by faulty roof and surface drainage that concentrated runoff at the location. Some settlement was noted in the northeast corner of the foundation. The report recommended the removal of the hardscape and wall in the rear yard as well as the east end of the kitchen. Proper drainage towards the street was recommended for the entire property. Construction of a new foundation in the northeast and southern sections of the structure and a 1:1 slope trim at the rear of the lot was also recommended. With the recommended corrective measures taken, it was thought that the structure should have an estimated life of 15 to 20 years and the house would once again be considered safe for occupancy. An approval letter was issued in May of 1974 from LADBS granting permission to reoccupy the residence on the property. The approval was based on favorable reports prepared by AFE, dated May 8, 1974 and John Merrill dated May 3, The letter required that the recommendations of the consultants be followed. One of the

19 GEO File No W.O. E170213F Page 17 of 31 requirements of the approval letter was a sworn affidavit filed with the County Recorder stating that, the owner is fully aware that the site is in an area subject to slides or unstable soil. An application for a building permit to trim the slope at the rear of the property to 1:1 (horizontal:vertical) was filed in July of An application for a building permit to construct a deck at the rear of the property and to remove a portion of the kitchen was filed in An application for a building permit to remodel the kitchen and move a wall 2.5 feet into the garage was filed in 1976 with the Certificate of Occupancy issued in A Certificate of Substandard Property was filed by LADBS in June of 1981 with the Los Angeles County Recorder because of a landslide affecting the property. An Abate Order was issued in June of 1984 that noted the residence was damaged and that there was a slope failure and the rear foundation was gone and ordered that the residence be brought to a habitable condition or demolished. A Notice of Building Classified as a Nuisance or Hazard to Life or Property was filed by the LADBS in July of 1984 with the Los Angeles County Recorder that required that the property be repaired or demolished. An application for a building permit to demolish the residence was filed in 1985 that listed the City of Los Angeles as the owner. City records indicate that the residence was demolished in May of A Termination of Notice of building, structure or premises classified as either hazardous, substandard or a nuisance was filed by the LADBS in August of 1985 with the Los Angeles County Recorder indicating that the earlier notice was no longer in force De Pauw Street City of Los Angeles (CLA), Certificate of Occupancy for De Pauw St. Permit No.: 1949XX00127, dated May 12, City of Los Angeles (CLA), Order to Comply, for De Pauw Street. Issued May 1, City of Los Angeles (CLA), Certificate of Substandard Property, for De Pauw St., Dated August 25, City of Los Angeles (CLA), Notice to Abate Damaged or Vandalized Buildings, for De Pauw Street. Dated June 29, City of Los Angeles (CLA), Notice of Building Classified as a Nuisance or Hazard to Life or Property, Demolition Abatement Proceedings, for De Pauw St., Dated July 11, City of Los Angeles (CLA), Application to Alter, Repair, Demolish and for Certificate of Occupancy, for De Pauw St., Permit No.: 1985LA11786, dated May 10, 1985.

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO)

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO) CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO) GEOTECHNICAL REAL ESTATE DISCLOSURE REPORT FOR CITY OWNED LOTS 15329 AND 15333 DE PAUW STREET,

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports UNITED WALNUT TAXPAYERS PRELIMINARY REVIEW OF NEGATIVE GEOTECHNICAL AND GEOLOGICAL ASPECTS OF CONSTRUCTING EARTHFILL PAD FOR A SOLAR FARM ON THE WEST PARCEL - DRAFT 1. Introduction A licensed Engineering

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report Gary Lee Moore, P.E., City Engineer Vince Jones, P.E., Deputy City Engineer WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report White Point Landslide Geotechnical Investigation

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

EXHIBIT H LOT 317 GRADING AND SITE PLAN

EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT I LOT 317 ELEVATIONS ridge height 4915'-6" GENERAL & KEYED NOTES ridge height 4905'-9" 3 7 4 A5.1 1 5 ridge height 4910'-6" 2 ridge height 4906'-3" 1 Provide

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY

More information

265 Dalewood Way alteration permit #2016/02/17/9761 June 30, 2016 Appeal #16-109 Deck at Rear due to conflict with Slope Protection Act A. Executive Summary: We are in receipt of the Notification of Structural

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought #20 - Landslides: Mitigation and Case Histories Web Exercise #3 (Volcanoes) Due Wednesday There is a 2-point penalty for every day the assignment is late. Exam 1 Scores Scores and exam key are posted Vaiont

More information

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California Data Report for White Point Landslide Boring B-12 W.O. E1907483 Task Order Solicitation 11-087 San Pedro District Los Angeles, California Submitted To: Mr. Christopher F. Johnson, P.E., G.E. City of Los

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. 9 GEOLOGY AND SOILS INTRODUCTION This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. This chapter utilizes information from the following reports prepared

More information

HILLSIDE DEVELOPMENT APPLICATION CHECKLIST C (Proposal to create lots as of 9/12/2007)

HILLSIDE DEVELOPMENT APPLICATION CHECKLIST C (Proposal to create lots as of 9/12/2007) HILLSIDE DEVELOPMENT APPLICATION CHECKLIST C (Proposal to create lots as of 9/12/2007) Applicability for lands to be partitioned and/or divided, without ultimate building construction proposed. Submittal

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES 3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES This section summarizes the principal geotechnical conditions that occur in the project area. The potential impact that each condition

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the Proposed Project. The Geotechnical Engineering Investigation (the

More information

Landslide Mitigation (BYUI)

Landslide Mitigation (BYUI) Landslide Mitigation (BYUI) The general principle behind landslide mitigation is stabilization. Slopes that are too steep are shallowed or strengthened. Loose rocks can be bolted or cemented into place.

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

A Homeowner s Guide to Landslides for Washington and Oregon

A Homeowner s Guide to Landslides for Washington and Oregon Protect Your Home and Property 1 A Homeowner s Guide to Landslides for Washington and Oregon Washington Geological Survey and Oregon Department of Geology and Mineral Industries LANDSLIDES ARE ONE OF THE

More information

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Table 5- Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Transformer Pads (9 pads: PAD 9) Evaluate if PCBs presently exist in soils adjacent to, and/or beneath the transformer

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction CHAPTER 9 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Case History: La Conchita Landslide La Conchita: small coastal community 80 km (50 mi) northwest of Los Angeles Landslide occurred on January 10, 2005

More information

4.5 GEOLOGY AND SOILS

4.5 GEOLOGY AND SOILS 4.5 GEOLOGY AND SOILS This section addresses the project site geology and soils and analyzes potential changes that would result from development of the Wye Specific Plan project. 4.5.1 Environmental Setting

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS

COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS June 23, 2016 G5056 TO: SUBJECT: Sam Herzberg Senior Planner SAN MATEO COUNTY PARKS DEPARTMENT 455 County Center, 4 th Floor Redwood

More information

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 Prepared by: Northern Geotechnical Engineering, Inc. d.b.a. Terra

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SEISMIC HAZARDS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SEISMIC HAZARDS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SEISMIC HAZARDS 1. ENVIRONMENTAL SETTING The following analysis of geology and seismic hazards for the Middle School Project is based on the Report of Geotechnical

More information

September 7, 2017 (Revised November 1, 2017)

September 7, 2017 (Revised November 1, 2017) September 7, 2017 (Revised November 1, 2017) Project No. 10113.002 Environmental Advisors 2400 East Katella Avenue, Suite 800 Anaheim, California 92806 Attention: Subject: Mr. Greg McCafferty Response

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

Appendix E. Geotechnical Report

Appendix E. Geotechnical Report Appendix E Geotechnical Report MR. ADAM O NEILL GLASSELL PARK, LLC 1035 SOUTH GRAND AVENUE, 3 RD FLOOR LOS ANGELES, CALIFORNIA 90015 PRELIMINARY GEOTECHNICAL ENGINEERING AND ENGINEERING GEOLOGY INVESTIGATION

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED IN THE MATTER of the Housing Accords and Special Housing Areas Act 2013 ("HASHAA") AND IN THE MATTER of Proposed Qualifying Development Application ("QD2") for 125 Murphys Road, Flat Bush BETWEEN Murphys

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE Policy No: DSP-OO3 Release Date: January 1, 2014 Effective Date: January 1, 2014 Revision Date: March 1, 2018 TITLE: The City Policy for Site Specific

More information

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards. GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS A. GOALS: To protect life and property from natural disasters and hazards. B. POLICIES: 1. Floodplains shall be maintained as natural drainage-ways.

More information

August 31, 2006 Embankment Failure Debris Flow at the Cascades Development Haywood County, North Carolina. Introduction. Findings

August 31, 2006 Embankment Failure Debris Flow at the Cascades Development Haywood County, North Carolina. Introduction. Findings August 31, 2006 Embankment Failure Debris Flow at the Cascades Development Haywood County, North Carolina Introduction North Carolina Geological Survey (NCGS) staff members visited the site of the August

More information

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter

More information

Rock Fall Study Warm Springs Village Warm Springs Avenue Boise, Idaho

Rock Fall Study Warm Springs Village Warm Springs Avenue Boise, Idaho Rock Fall Study Warm Springs Village Warm Springs Avenue Boise, Idaho Prepared For: Mr. Bill Clark Warm Springs Enterprises, LLC 420 Main Street, Suite 204 Boise, Idaho 83702 Prepared By: STRATA, A Professional

More information

EROSION HAZARD OF MINNESOTA'S LAKE SUPERIOR SHORELINE. Carol A. Johnston Principal Investigator

EROSION HAZARD OF MINNESOTA'S LAKE SUPERIOR SHORELINE. Carol A. Johnston Principal Investigator EROSION HAZARD OF MINNESOTA'S LAKE SUPERIOR SHORELINE Carol A. Johnston Principal Investigator Maps prepared by: James Salés, John Bonde, Tim Aunan, and Richard Raby Minnesota Sea Grant Research Bulletin

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309 PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER GP-4a LEGAL DESCRIPTION LSD 12-10-78-4-W6M SITE NAME Burnt River Bridge - West Approach Slide HIGHWAY & KM Hwy 49:06

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS Except where otherwise noted, the following Section is based on the Preliminary Geotechnical Investigation, Proposed Medical Office Buildings and Mixed-Use

More information

Geology, Soils, and Seismicity

Geology, Soils, and Seismicity Section 3.8 Geology, Soils, and Seismicity Introduction This section generally evaluates the effects of the alternatives analyzed in this Supplemental DEIS with regard to geology, soils and seismicity.

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles. CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA 5.1. Introduction Ukay Perdana area is a developing community with continuous building activities and road construction. There are thus only left

More information

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Landslide and other ground failures posting substantial damage and loss of life In U.S., average 25 50 deaths; damage more than $3.5 billion

More information

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for:

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for: braun Braun Consulting Engineers ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO Prepared for: STANLEY MINES ADENTURE PARK 3375 W. POWERS CIRCLE LITTLETON, COLORADO

More information

Learning Objectives. Your goals for studying this chapter are: Understand where landslides occur. Understand the warning signs of landslides.

Learning Objectives. Your goals for studying this chapter are: Understand where landslides occur. Understand the warning signs of landslides. Learning Objectives Landslides are common problems across the country and in many parts of the world. Next to flooding, they are the most likely natural hazard you may have to deal with in your lifetime.

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared for: The Municipality of Anchorage Planning Department and the Geotechnical Advisory Commission Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following analysis is based on the Geotechnical Investigation Report, Proposed Mid-Rise Multi- Family Residential Development Project Wetherly

More information

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

Should you have any questions regarding this clarification, please contact the undersigned at or (925) October 8, 2015 Revised October 13, 2015 Contra Costa Community College District 500 Court Street Martinez, CA 94553 Attention: Ron Johnson Subject: Clarification of Grading Requirements Diablo Valley

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Final EIS The Kenai Peninsula is predisposed

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS The following section is a summary of the preliminary geotechnical consultation conducted for the Proposed Project. The Report of Geotechnical Engineering

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

4.5 GEOLOGY, SOILS AND SEISMICITY

4.5 GEOLOGY, SOILS AND SEISMICITY 4.5 This section summarizes information on geology, soils and seismic hazards, and mineral resources in the Truckee area, as well as potential area-wide geologic hazards and regional seismic characteristics

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West

More information

Setting MOUNTAIN HOUSE NEIGHBORHOODS I AND J INITIAL STUDY 5. ENVIRONMENTAL CHECKLIST 6. GEOLOGY AND SOILS. Issue

Setting MOUNTAIN HOUSE NEIGHBORHOODS I AND J INITIAL STUDY 5. ENVIRONMENTAL CHECKLIST 6. GEOLOGY AND SOILS. Issue Issue Less Than Significant or No Impact Potential Significant Impact Adequately Addressed in MEIR MEIR Required Additional Review: No Significant Impact Less Than Significant Impact Due to Mitigation

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS The following discussion is based upon information contained in the Hollywood Redevelopment Plan Amendment EIR and a letter prepared by Geotechnologies,

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

September 11, Project No Mount San Antonio College Facilities Building North Grand Avenue Walnut, California 91789

September 11, Project No Mount San Antonio College Facilities Building North Grand Avenue Walnut, California 91789 September 11, 2017 Project No. 11672.001 Mount San Antonio College Facilities Building 46 1110 North Grand Avenue Walnut, California 91789 Attention: Subject: Mr. Gary Gidcumb, Architect, LEED AP Geotechnical

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is based upon the City of El Segundo General Plan and General Plan EIR and addresses the following geologic issues: soil erosion,

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information

KRIS wsbssm. IBHiiilll

KRIS wsbssm. IBHiiilll KRIS wsbssm IBHiiilll Digitized by the Internet Archive in 2012 with funding from University of Illinois Urbana-Champaign http://archive.org/details/engineeringaspec34ekbl STATE OF ILLINOIS HENRY HORNER,

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

Consists of cliff face (free-face) and talus slope or upper convex slope, a straight slope and a lower concave slope

Consists of cliff face (free-face) and talus slope or upper convex slope, a straight slope and a lower concave slope 1 2 3 4 5 6 7 8 Introduction to Environmental Geology, 5e Chapter 10 Slope Processes, Landslides, and Subsidence Mass wasting: summary in haiku form Mass wasting: downhill quickly like an avalanche, or

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

9. GEOLOGY, SOILS, AND MINERALS

9. GEOLOGY, SOILS, AND MINERALS June 28, 2018 Page 9-1 9. GEOLOGY, SOILS, AND MINERALS This EIR chapter describes the existing geological, soil, and mineral conditions in the planning area. The chapter includes the regulatory framework

More information

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007 KANSAS GEOLOGICAL SURVEY Open File Report 2007-22 LAND SUBSIDENCE KIOWA COUNTY, KANSAS Prepared by Michael T. Dealy L.G., Manager, Wichita Operations SITE LOCATION The site was approximately four miles

More information

Brea Olinda Unified School District

Brea Olinda Unified School District Brea Olinda Unified School District Updated May 2, 2011 Olinda School Frequently Asked Questions 1. Will the new school will be breaking ground this Fall? YES! BOUSD held the Groundbreaking Ceremony on

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Roadmap to Stability

Roadmap to Stability Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to

More information

MEMORANDUM. REVISED Options for Landslide Regulations: Setbacks and Slope Height

MEMORANDUM. REVISED Options for Landslide Regulations: Setbacks and Slope Height Snohomish County Council Office MS #609 3000 Rockefeller Avenue Everett, WA 98201 (425) 388-3494 MEMORANDUM DATE: May 2, 2014 TO: FROM: RE: Councilmembers Will Hall, Council Staff REVISED Options for Landslide

More information

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007 Photo E003 0+000 Viewing looking upslope at Site 4 from highway. Conditions unchanged from 2006. Photo E018 0+000 Localized erosion within road fill on upslope side of highway. Photo E022 0+250 Looking

More information

Guidelines for Geotechnical Reports City of Santa Monica Building and Safety

Guidelines for Geotechnical Reports City of Santa Monica Building and Safety Guidelines for Geotechnical Reports Building and Safety Version 1.6 TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Purpose... 1 1.2 The Review Process... 1 1.3 Definition of Roles... 2 1.4 Applicable Codes...

More information