1 South Eastern CFRAM Study HA15 Hydraulics Report Inistioge Model DOCUMENT CONTROL SHEET Client Project Title Document Title Model Name OPW South Eastern CFRAM Study IBE0601Rp0015_HA15 Hydraulics Report Inistioge Rev. Status Modeller Reviewed by Approved By Office of Origin Issue Date D01 Draft L. Howe I. Bentley G. Glasgow Belfast/ Limerick D02 Draft L. Howe I. Bentley G. Glasgow Belfast/ Limerick F01 Draft Final L. Howe / R. Clements K. Smart G. Glasgow Belfast/ Limerick 07/03/ /06/ /02/2015 F02 Draft Final L. Howe / R. Clements K. Smart G. Glasgow Belfast/ Limerick 13/08/2015 IBE0601Rp0015 F02

2 Table of Reference Reports Report Issue Date Report Reference Relevant Section South Eastern CFRAM Study Flood Risk Review South Eastern CFRAM Study Inception Report UoM15 South Eastern CFRAM Study Hydrology Report UoM15 South Eastern CFRAM Study HA11-17 SC4 Survey Contract Report November 2011 July 2012 October 2013 January 2014 IBE0601 Rp0001_Flood Risk Review_F IBE0601Rp0008_HA 15 Inception Report_F02 IBE0601Rp0010_HA15_Hydrology Report_F01 IBE0601Rp0016_South Eastern CFRAMS Survey Contract Report_F Hydraulic Model Details inistioge General Hydraulic Model Information Hydraulic Model Schematisation Hydraulic Model Construction Sensitivity Analysis Hydraulic Model Calibration and Verification Hydraulic Model Assumptions, Limitations and Handover Notes IBE0601Rp0015 F02

3 4 HYDRAULIC MODEL DETAILS 4.10 INISTIOGE General Hydraulic Model Information (1) Introduction: The South Eastern CFRAM Study Flood Risk Review report (IBE0601 Rp0001_Flood Risk Review_F01) highlighted Inistioge as an AFA for fluvial and tidal flooding based on a review of historic flooding and the extents of flood risk determined during the PFRA. Model 9 represents the Inistioge AFAin south County Kilkenny, and encompasses the most downstream reach of the River Nore prior to joining the Barrow Nore Estuary Upper. The Inistioge AFA is affected by the River Nore and a small tributary of the Nore flowing from the west which is also included as a HPW within the model. The Nore catchment as a whole is predominantly rural. The total contributing area at the downstream limit of the model is 2,519km 2 i.e. the entire Nore catchment. 96% of this area enters Model 9 at the upstream limit (downstream output from Thomastown Model 7). TheCroum River is a modelled tributary which meets the Nore within Inistiogeand has a total contributing area of 4.5km 2. Downstream of the AFA, several small, steeply sloping tributaries enter the River Nore; the largest of which is the Clodiagh River (14km 2 ). As the model is tidally influenced, the downstream boundary of the model is a tidal hydrograph; further details of this are included in Section (5). One gauging station, Brownsbarn (15006 OPW), is located on the modelled reach at the upstream limit of the model. This gauge is an A2 classified station and there is high confidence in it.further information on the gauge is provided in Section A CFRAM rating review was undertaken for the gauge; see Section (4)(a) for a full review. A rainfall runoff model has not been constructed as there is already high confidence in the gauge.this station was used as a pivotal site to adjust the index flows for Model 9. However, in the case of smaller tributaries entering the Nore, a review of pivotal site options revealed that using Station pushed the resulting Q med values above the 68%ile upper limit. Therefore, as an alternative, the most suitable geographically close station was used (Station or as appropriate)for the smaller tributaries. A number of rivers have been identified as HPW within the Inistioge model, including Croum River, Inistioge Link River and a portion of the Nore River which passes through the AFA. These reaches have been modelled as 1D-2D using the MIKE software suite. Upstream and downstream of the AFA, the Nore River is designated as MPW and has been modelled as 1D. The model has been extended upstream by 800m to enable the rating review of the Brownsbarn (15006) gauging station. (2) Model Reference: HA15_INIS9 IBE0601Rp F02

4 (3) AFAs included in the model: INISTIOGE (4) Primary Watercourses / Water Bodies (including local names): Reach IDName NORE NORE ILIK COUM NORE A NORE B INISTIOGE LINK THE CROUM (5) Software Type (and version): (a) 1D Domain: MIKE 11 (2011) (b) 2D Domain: MIKE 21 - Rectangular Mesh (2011) (c) Other model elements: MIKE FLOOD (2011) Hydraulic Model Schematisation (1) Map of Model Extents: Figure and Figure illustrate the extent of the modelled catchment, river centreline, HEP locations and AFA extents. The Nore catchment contains two Upstream Limit HEP, one Downstream Limit HEP and six Tributary HEPs (one of which is modelled). Brownsbarn (15006) gauging station is located at the upstream extent of the model reach. A rating review is to be carried out for this gauge and so the model has been extended 800m upstream to allow for this. IBE0601Rp F02

5 Figure : Map of Model Extent IBE0601Rp F02

6 South Eastern CFRAM Study Figure : Map of Model Extents at the AFA IBE0601Rp F02

7 (2) x-y Coordinates of River (Upstream extent): River Name x y NORE NORE ILIK INISTIOGE LINK COUM THE CROUM (3) Total Modelled Watercourse Length: 19.8 (km) (4) 1D Domain only Watercourse Length: 13.0km (approx.) (5) 1D-2D Domain Watercourse Length: 6.8km (approx.) (6) 2D Domain Mesh Type / Resolution / Area: Rectangular / 5 metres /9.8 km 2 (7) 2D Domain Model Extent: Figure D Model Extent Figure shows the extent of the LiDAR data used in the 2D model. For details of the approach to modelling buildings in the 2D area, please refer to Section of this report. Figure shows the extent of the NDHM data used. The black line shows the river network and the red boundary represents the LiDAR extent (as shown in Figure ). A buffer zone was created between the two datasets which were smoothed together by interpolation. IBE0601Rp F02

8 NDHM Extent Figure shows an overview drawing of the model schematisation. Figure shows a detailed view of critical structures in the model. The overview design diagram covers the model extents, showing the surveyed cross-section locations, AFA boundary and river centreline. It also shows the area covered by the 2D model domain. The detailed areais provided where there is the most significant risk of flooding. These diagrams include the surveyed cross-section locations, AFA boundary and river centreline. They also show the location of the critical structures as discussed in Section (1) along with the location and extent of the links between the 1D and 2D models. IBE0601Rp F02

9 4.10.5Model Schematic Overview (A) IBE0601Rp F02

10 Model Schematic Critical Structures (8) Survey Information (a) Survey Folder Structure: First Level Folder Second Level Folder Third Level Folder CCS_S15_M09_15COUM_WP2_Finals_ Inistioge CCS Surveyor Name S15 South Eastern CFRAM Study Area, Hydrometric Area 15 M09 Model Number 9 15COUM River Reference? WP2 Work Package 2 (b) Survey Folder References: 15COUM Data Files 15COUM GIS 15COUM Photos Photos (Naming convention is in the format of Cross-Section ID and orientation - upstream, downstream, left bank or right bank) 15COUM00000_DS Reach ID Name File Ref. NORE NORE A CCS_S15_M09_15NORE_A_WP2_Finals_ NORE NORE B CCS_S15_M09_15NORE B_WP2_Finals_ ILIK INISTIOGE LINK CCS_S15_M09_15ILIK_WP2_Finals_ IBE0601Rp F02

11 COUM THE CROUM CCS_S15_M09_15COUM_WP2_Finals_ (9) Survey Issues: There are no known queries with the survey data provided Hydraulic Model Construction (1) 1D Structures (in-channel along modelled watercourses): See Appendix A.1 Number of Bridges and Culverts: 12 Number of Weirs: 0 The survey information recorded includes a photograph of each structure, which has been used to determine the Manning's n value. Further details are included in Chapter A discussion on the way structures have been modelled is included in Chapter Three critical structures have been identified in the model. These are afootbridge (15COUM00044D) (Figure ), a road access bridge (15COUM00042I) (Figure ), and a culvert near Hatchery Lane (15COUM00026D)(Figure ) over the Croum River. The capacity of these three structures is insufficient to convey flood flows during the modelled events (10%, 1% and 0.1% AEP). All three structures restrict flows causing flow to build up upstream. However, out-of-channel flow only occurs during the 0.1% AEP event; this is due to the high capacity of the Croum River channel. Figure : Footbridge over Croum River (15COUM00044D) IBE0601Rp F02

12 Figure : Road access bridge over Croum River (15COUM00042I) Figure : Culvert over Croum River near Hatchery Lane (15COUM00026D) The overtopping structure (weir) shown in Figure was not included in the model for the 15COUM00031D culvert due to the headwall being over 3 metres above the culvert soffit, and so overtopping of the structure would not occur. IBE0601Rp F02

13 Figure : Photograph (left) and survey data (right) of 15COUM00031D (2) 1D Structures in the 2D domain (beyond the modelled watercourses): Four arches were identified in the floodplain(see red ellipse below in Figure ) beneath the R700 road bridge(structure 15NORE01718D) across the Nore River at Brownsbarn town. The structures are included in the model as 2D structures. Figure : 15NORE01718D (R700 Road Bridge) (3) 2D Model structures: None (4) Defences:None Type Watercourse Bank Model Start Chainage (approx.) Model End Chainage (approx.) Informal - none IBE0601Rp F02

14 (5) Model Boundaries - Inflows: Full details of the flow estimates are provided in the Hydrology Report (IBE0601Rp0010_HA15 Hydrology Report_F02- Section 4.9and Appendix D).The boundary conditions implemented in the model are shown in Table Table : MIKE 11 Boundary Information A review of flows was carried out during the calibration process, and no changeswere made. Further details on how the modelled flows compare with estimated flows in included in Appendix A.3.Figure provides an example of the associated upstream hydrograph generated for the 0.1% AEP in the Nore River. IBE0601Rp F02

15 Figure : Upstream Inflow (0.1% AEP) (6) Model Boundaries Downstream Conditions: The downstream boundary condition is a tidal hydrograph extracted from the New Ross model (HA14 Model 14) at the confluence of the Nore River and Barrow River.Figure shows the tide hydrographs used for Model 9. Figure : Tide curve taken from New Ross(HA14 Model 14) (7) Model Roughness: (a) In-Bank (1D Domain) Minimum 'n' value: Maximum 'n' value: 0.05 (b) MPW Out-of-Bank (1D) Minimum 'n' value: 0.03 Maximum 'n' value: (c) MPW/HPW Out-of-Bank (2D) Minimum 'n' value: (Inverse of Manning's 'M') Maximum 'n' value: (Inverse of Manning's 'M') IBE0601Rp F02

16 Figure : Map of 2D Roughness (Manning's n) Figure illustrates the roughness values applied within the 2D domain of the model. Roughness in the 2D domain was applied based on land type areas defined in the CORINE Land Cover Map with representative roughness values associated with each of the land cover classes in the dataset. (d) Examples of In-Bank Roughness Coefficients The Croum River 15COUM00041J The Croum River 15COUM00066 IBE0601Rp F02

17 Figure : 15COUM00041JRoughness Manning s n = 0.04 Standard natural stream or river in stable condition, with some weeds and stones Inistioge Link River 15ILIK00026 Figure : 15COUM00066 Roughness Manning s n = 0.05 Standard natural stream or river in stable condition, with some weeds and large amount of stones Nore River 15NORE01403 Figure : 15ILIK00026 Roughness Manning s n = Standard natural stream or river in stable condition Figure NORE01403Roughness Manning s n = Standard natural stream or river in stable condition, Sensitivity Analysis Sensitivity analysis to be reported in Final Version of report (F02), as agreed with OPW. IBE0601Rp F02

18 Hydraulic Model Calibration and Verification (1) Key Historical Floods (fromibe0601rp0008_ha15 Inception Report_D02, unless otherwise specified): NOV 2009 A review of historical flood events indicated that flooding occurred in Thomastown and Inistioge on 19 th November However, details of the flood extents are not available. At Brownsbarn hydrometric station (15006), located between these two AFAs, the peak flow measured during this event was 396m 3 /s, which is close to the modelled peak flow of a 10% AEP fluvial event (coincides with 50% AEP tidal event)of m 3 /s. A review of the 10% AEP model results shows Inistioge town to experience flooding during this event, see Figures and and the flood maps. JAN 2008 A Review of the historical data indicated that a flood event occurred on 10 th January 2008 ATThomastown and Inistioge. At the Met Eireann weather station in Kilkenny, 33.6mm of heavy rain fell mainly during a 12 hour period on 9 th to 10 th January and caused the Nore to burst its banks. In Inistioge, the R700 was flooded. Flood gates saved several houses from flooding. In the case of one house, the gate was not put in place in time. The quay area was flooded to a depth of 300mm. At the Brownsbarn hydrometric station (15006), locatedbetween the Thomastown and Inistioge AFAs, the recorded peak flow was m 3 /s which is close to the modelled peak flow of a 10% AEP Fluvial event (coincides with 50% AEP tidal event)of m 3 /s. Model results show the R700 is inundated with floodwaters in Inistioge town during the 10% AEP fluvial (coincides with 50% AEP tidal) event. The quay area, adjacent to the R700 Inistioge road bridge, is also inundated with waters up to a depth of 950mm,see Figures and and the flood maps. NOV 2000 The historical review indicated that a flood event occurred in Ballyragget, Kilkenny, Thomastown, Inistioge, and Ballyhale in November The flooding was caused by heavy rainfall causing the River Nore to overflow. References to flooding in Thomastown, Inistioge and Ballyhale on this date were also found. The N9 at Ballyhale was closed. A peak flood level of 8.0mOD (Malin), and a corresponding peak flow of 376m 3 /s,were recorded at the Brownsbarn hydrometric station (15006). This flow is close to a modelled 10% AEP fluvial event (coincides with 50% tidal event) at the Brownsbarn Gauge, of415.97m 3 /s. IBE0601Rp F02

19 No further information was found on the damage caused to these towns. During the 10% AEP fluvial (coincides with 50% tidal) event, the peak flow at Brownsbarn gauge is m 3 /s. A review of the 10% AEP model results shows Inistioge town to experience flooding during this event, see Figures and and the flood maps. JAN 1996 Kilkenny, Callan, Thomastown and Inistiogeexperienced flooding on 6 th January 1996 following heavy rainfall.references to flooding in Inistioge, where the Green and GAA pitch were flooded, were found. At the Brownsbarn Hydrometric Station (between Thomastown and Inistioge) on 7 th January, the peak flood level reached 8.06mOD (Malin) with a corresponding peak flow of 388m 3 /s. At the Brownsbarn hydrometric station (15006),between thethomastown and Inistioge AFAs, the recorded peak flow was 388 m 3 /s which is close to the modelled peak flow of a 10% AEP fluvial event (coincides with 50% AEP tidal event) of m 3 /s. A review of the 10% AEP model results shows that the GAA pitch and green experience flooding up to depths of 1.8m during this event, see Figures and and the flood maps. DEC 1960 Review of the historical data indicated that flooding occurred in Kilkenny, Callan, Thomastown and Inistioge on 1 st December 1960 caused by heavy rainfall and snowmelt. In Inistioge, houses were flooded to a depth of 3 to 4 feet. At Brownsbarn Hydrometric Station (15006), between Thomastown and Inistioge, a peak flood level of 8.24mOD (Malin) was recorded.the peak recorded flow was 411 m 3 /s, which is close to the modelled peak flow of a 10% AEP fluvial event (coincides with 50% AEP tidal event) of m 3 /s. A review of the 10% AEP model results shows that houses off the R700, adjacent to The Square, experience flooding up to 1m (approx. 3-4 ft); see Figures and and the flood maps. All buildings were removed from the floodplain and so the exact depths in the houses cannot be calculated. MAR 1947 A major flood event was found to have occurred on 14 th March 1947 in Freshford, Kilkenny, Callan, Thomastown and Inistioge.In Inistioge, the lower part of the village was flooded to a depth of five feet. Ten houses were affected. No information on flows or levels was found. During the 10% AEP fluvial event (coincides with 50% tidalevent), peak flood depths of 1.5m (approx. 5 ft) are shown in the lower part of Inistioge near the Nore River. Over a dozen houses are shown to be affected during this event, see Figures IBE0601Rp F02

20 and and the flood maps. OCT 1763 A review of the historical data indicated that flooding occurred in Kilkenny, Thomastown and Inistioge on 2 nd October 1763 caused by 24 hours of incessant rain. It was reported that every bridge on the Nore was washed away except for one in Ballyragget and one in Inistioge, which was badly damaged (Kilkenny County Council Report, Jul 1985).This is the worst known flood in the history of the area. During all simulated fluvial events (10%, 1% and 0.1% AEP fluvial events coinciding with 50% tidal event), the two bridges on the model reach (the R700 road bridge at Brownsbarn and the R700 bridge at Inistioge town) are inundated with floodwaters suggesting damage to the original bridges is likely, see Figures and and the flood maps. No flow or level data is available for calibration. IBE0601Rp F02

21 R700 Bridge at Brownsbarn NORE RIVER Figure Modelled 10% AEP flood extent and depths (metres) at the R700 road bridge adjacent to Brownsbarn village. GAA PITCH The Square NORE RIVER R700 Figure Modelled 10% AEP flood extent and depths (metres) in Inistioge town; the R700 road is indicated with a red line. IBE0601Rp F02

22 Summary of Calibration There are a number of historic flood events to calibrate/validate the model to in the AFA. The model results are well validated at the 10% AEP return period. However, there is limited gauge data with relevant flood information (extents, depths) for the higher return periods, so calibration/validationis limited to lower flow (10% AEP) events. A rating review was carried out for the Brownsbarn gauging station (15006). Brownsbarn calibrates well with the recorded rating review and has therefore been used for calibration with historical events. A mass balance check has been carried out on the model to ensure that the total volume of water entering and leaving the model at the upstream and downstream boundaries balances with the quantity of water remaining in the domain at the end of the simulation. The mass error in the 1% AEP design run was found to be -0.3%, which is within acceptable limits (Section 3.11 of this report details acceptable limits). Model flows were validated against the estimated flows at HEP check points to ensure the model is well anchored to hydrological estimates. However, as the downstream extent of the model (HEP 15_1839_1) is a tidal boundary it is not possible to validate. A test model was run using the 0.1% AEP inflows and the downstream boundary set to a Q-h boundary. The modelled peak flow at HEP 15_1839_1 is within 5% of the estimated peak flow ( m 3 /s) at HEP 15_1839_1. As such, the model is considered well anchored to the hydrological estimates. There are no significant instabilities shown in the model results. Overall, the model is performing well and is supported by historic information. (2) Public Consultation Comments and Response: To be completed for final version of the report (F02). (3) Standard of Protection of Existing Formal Defences: Defence Reference Type Watercourse Bank Modelled Standard of Protection (AEP) None (4) Gauging Stations: (a) Brownsbarn (15006) Gauging station is located in County Kilkenny on the River Nore. Figure shows the location of the gauge. IBE0601Rp F02

23 Figure Brownsbarn (15006) Gauging Station Location This gauging station has an FSU rating of A2, suggesting that there is confidence in the rating up to approximately 1.3 times the Q med. For FSU, a Q med value of m 3 /s was extracted from records between 1972 and The OPW have assigned the rating standard at the Brownsbarn station a data quality code of 36 up to 1.37 m, and a data quality code of 56 from 1.37m up to 3.23 m above staff gauge zero. A rating review was carried out for this gauge. During calibration the model was adjusted to achievebest fit of the modelled rating to the highest flow spot gauging ( m 3 /s; stage m, 7.79 m OD Malin).During initial calibration of the model, a lack of agreement between the modelled rating and the OPW rating in the low flow Q-h range was found, regardless of the roughness values used. Only the upstream face cross-section of the bridge structure was surveyed and a review of the cross-sections downstream of the bridge suggests that there may be a high point in the channel at a location downstream of the bridge, which was not captured in the survey, and which controls the low stage Q-h relationship. To account for this, a cross-section was interpolated downstream of the bridge structure with the bed levels raised until agreement could be achieved with the low flow spot gaugings.this low flow control point was investigated and a cross-section was surveyed at the location,this cross-section is now included in the model in place of the interpolated section. A Manning s n value of on the cross-section at the gauge was required for the model to replicate the existing OPW spot gaugings. This is slightly lower than the usual value of 0.03 for a clean, straight channel with minimal vegetation on the banks. A review of survey photographs and aerial photographs of the river confirmed that this is an appropriate value for this reach. IBE0601Rp F02

24 A Manning s n value of 0.02 was applied to each of the arches comprising the bridge structure, and an inflow loss coefficient of 0.3 was applied to each arch. After applying these values, the model Q-h represented the existing OPW rating fairly well. The gauging station is located on a HPW reach, and as such the model has been constructed from surveyed cross-sections in the 1D channel of the model, and LiDARDTM representing the 2D floodplain. Flow is accurately represented both in-channel and within the floodplain. The model produced a stable rating curve up to m 3 /s (stage 3.43 m; 9.58 m OD Malin). The rating curve for the 1D-2D linked model is considered reliable up to m 3 /s (stage 3.43 m; 9.58 m OD Malin), which is an estimated 0.1% AEP flow. The results of the rating curve are shown in Figure The graph depicts the RPS modelled rating curve against the OPW rating curve. The graph shows that the model accurately represents the OPW rating curve based on the highest flow spot gaugings up to the highest spot gauging m 3 /s (stage 3.43; 7.2 m OD Malin). The model passes through the highest flow spot gauging and can be considered well calibrated to the spot gaugings Comparison of Existing OPW Rating Curve, RPS Rating Curve and Spot Gaugings (5) Other Information: None IBE0601Rp F02

25 Hydraulic Model Assumptions, Limitations and Handover Notes (1) Hydraulic Model Assumptions: a) The in-channel, structure and floodplain roughness coefficients, initially selected based on normal bounds, were reviewed using aerial photography and survey data during the calibration process. It is considered that the selected values are representative. (b) The time-to-peak of inflow hydrographs generated during the hydrological analysis have been reviewed during the calibration process. No changes were made to flows. (c) For design run simulations it has been assumed that all culverts and screens are free of debris and sediment. (d) No overtopping structure (weir) was included for the 15COUM00031D culvert as the headwall is over 3 metres above the culvert soffit (see photograph in Section (1). The 0.1% AEPevent flow does not reach this level, and as such it is assumed acceptable to exclude the overtopping structure from the model. e) It should be noted that observed flooding of rural roads and outlying properties may be represented less accurately than flooding within the AFA. The MPW was modelled using cross-section data only and the cross-sections did not contain enough data on the left and right banks. As water levels increased, the floodplain was not accurately represented as water was not able to spill as required. The majority of the cross-sections on the Nore River (from chainage m to m)were extended with the use of the NDHM to provide enough information on the floodplain and to allow water to spill as necessary. Background mapping from the NDHM wasapplied to the MPW which allowed for more accurate floodplain representation between the 1D cross sections. Specific areas where floodwaters were subject to glasswalling beyond the 1D cross sectionswere connected to the nearest cross-section to produce a more accurate mapping output. It should be noted that this method simply projects the water level from the associated cross-section onto the topography. This methodology is further discussed in Section 3; essentially it provides no attenuation for the MPW but provides improved mapping. This is reflected in the model check flows which are discussed in Appendix A.3. (2) Hydraulic Model Limitations and Parameters: Hydraulic Model Parameters: MIKE 11 Timestep (seconds) 1 Wave Approximation High Order Fully Dynamic Delta 0.85 MIKE 21 IBE0601Rp F02

26 Timestep (seconds) 1 Drying / Flooding depths (metres) 0.02 / 0.03 Eddy Viscosity (and type) 0.5 (Flux Based) MIKE FLOOD Link Exponential Smoothing Factor River Nore, Ch and : 0.8. (where non-default value used) Lateral Length Depth Tolerance (m) Default (where non-default value used) (3) Design Event Runs & Hydraulic Model Handover Notes: This model is influenced by both coastal and fluvial sources, as such a range of events were simulated with fluvial or tidal influences dominating flows. The 10%, 1% and 0.1% AEP fluvial events were simulated, all coinciding with the 50% AEP tidal event. The 10%, 0.5% and 0.1% AEP tidal events were also simulated, all coinciding with the 50% AEP fluvial event. There are three critical structures in the model, all located in the AFA along the Croum River; these are 15COUM00044D (Footbridge over River Croum), 15COUM00042I (Road Access bridge over River Croum) and 15COUM00026D (Culvert under Hatchery Lane), which restrict flows during all return periods (10%, 1% and 0.1% AEP). Out-of-bank flooding only occurs in the 0.1% AEP event, due to the large capacity of the Croum River, and affects approximately 10 properties. During the fluvial events in Inistioge town, the capacity of the Croum River is shown to be adequate for most return periods (10% and 1% AEP). A limited amount of out-of-channel flooding occurs during the 0.1% AEP event, flooding a small number of properties on Hatchery Lane and Mill Road. During the tidal events in Inistioge town, the capacity of the Croum River is shown to be adequate for all modelled return periods (10%, 0.5% and 0.1% AEP). Extensive out-of-channel flooding occurs from the Nore River and Inistioge Link stream during all modelled fluvial and tidal return periods along the entire AFA and HPW reach. A longitudinal section included in Appendix A.2 shows water levels in the AFA during the 1% AEP event.flooding occurs adjacent to the GAA grounds, across a section of the R700 road through Inistioge town, and at approximately six properties in the AFAduring all modelled fluvialand tidal return periods. This is due to lack of capacity in the Nore River during high flows. Upstream and downstream of the AFA,extensive flooding occurs due to lack of capacity in the Nore River. The majority of the land flooded is grassland with minimal flooding to properties. During all return periods (10%, 1% and 0.1% AEP fluvial; 10%, 0.5% and 0.1% AEP tidal), significantflooding originates from the Inistioge Link stream and the Nore River, extending 1km downstream from its confluence with the downstream extent of the Inistioge link channel. This flooding is between 2m and 3m deep, affecting grassland and agricultural land adjacent to the River Nore. IBE0601Rp F02

27 (4) Hydraulic Model Deliverables: Please see Appendix A.4 for a list of all model files provided with this report. (5) Quality Assurance: Model Constructed by: Model Reviewed by: Model Approved by: Laura Howe Stephen Patterson Malcolm Brian IBE0601Rp F02

28 APPENDIX A.1 MODELLED STRUCTURES IBE0601Rp F02

29 Structure Details Bridges & Culverts RIVER BRANCH CHAINAGE ID LENGTH (m) OPENING SHAPE HEIGHT (m) WIDTH (m) SPRING HEIGHT FROM INVERT (m) MANNING S n Culverts Inistioge Link ILIK00025E 1.48 CROSS-SECTION DB Inistioge Link ILIK00023D 3.4 CROSS-SECTION DB NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE NORE NORE01378D of 10 ARCHES LW-TABLE THE COUM COUM00044D 2.3 CROSS-SECTION DB THE COUM COUM00042I 5.6 2CIRUCLAR THE COUM COUM00035D 1.3 CROSS-SECTION DB THE COUM COUM00031D 18.7 ARCHES CROSS-SECTION DB THE COUM COUM00026D ARCHES CROSS-SECTION DB THE COUM COUM00023D CROSS-SECTION DB THE COUM COUM00014I 9.8 CROSS-SECTION DB THE COUM COUM00001D 0.72 ARCHES CROSS-SECTION DB NORE 51 GS Brownsbarn (15NORE01718D) of 4 ARCHES LW-TABLE NORE 51 GS Brownsbarn (15NORE01718D) of 4 ARCHES LW-TABLE NORE 51 GS Brownsbarn (15NORE01718D) of 4 ARCHES LW-TABLE NORE 51 GS Brownsbarn (15NORE01718D) of 4 ARCHES LW-TABLE IBE0601Rp F02

30 APPENDIX A.2 RIVER LONG SECTION PROFILES IBE0601Rp F02

31 River Nore 1% AEP Peak Water Levels IBE0601Rp F02

32 APPENDIX A.3 ESTIMATED PEAK FLOW AND MODEL FLOW COMPARISON IBE0601Rp F02

33 IBE0601 SE CFRAM STUDY PEAK WATER FLOWS RPS AFA Name INISTIOGE Model Code HA15_INIS9 Status DRAFT FINAL Date extracted from model 27/01/2015 Peak Water Flows (FLUVIAL) Check Flow Model Flow River Name &Chainage AEP (m 3 /s) (m 3 /s) Diff (%) THE COUM % _1996_1 1% % NORE % _1839_1 1% % Peak Water Flows (TIDAL) Check Flow Model Flow River Name &Chainage AEP (m 3 /s) (m 3 /s) Diff (%) THE COUM % _1996_1 1% % NORE % _1839_1 0.5% % The table above provides details of flow in the model at every HEP check point, modelled tributary and gauging station. These flows have been compared with the hydrology flow estimation and a percentage difference provided. The modelled peak flow at HEP 15_1996_1 (CoumCh ) is between 1,427% and 1,652% different when compared with the estimated peak flow in the fluvial events 10%, 1% and 0.1% AEP. IBE0601Rp F02

34 The modelled peak flow is between 94% and 534% different when compared with the estimated peak flows during the 10%, 0.5% and 0.1% AEP tidal events. During these simulated events (10%, 1% and 0.1% Fluvial; 10% 0.5% and 0.1% AEP Tidal) the River Nore has very high water levels which exceed channel capacity on the right bank, flowing overland and connecting with the Croum River (upstream of the HEP) resulting in significant increases in modelled peak flow. This overland flow is the reason for the higher than estimated peak flows. The River Nore downstream of HEP 15_2002_9 is heavily tidally influenced and therefore reliable flow estimation is not possible. As a result, the difference between modelled flow and estimated flow at the downstream HEP 15_1839_1 is large. However, this difference was not considered to be significant, especially as the mass balance calculations do not indicate significant gains or losses of flow from the model. IBE0601Rp F02

35 APPENDIX A.4 DELIVERABLE MODEL AND GIS FILES IBE0601Rp F02

36 MIKE FLOOD MIKE 21 MIKE 21 RESULTS HA15_INIS9_MF_DES_1_F_Q10 HA15_INIS9_M21_DES_1_F_Q10 HA15_INIS9_M11_DES_1_F_Q10 HA15_INIS9_MF_DES_1_F_Q100 HA15_INIS9_M21_DES_1_F_Q100 HA15_INIS9_M11_DES_1_F_Q100 HA15_INIS9_MF_DES_1_F_Q1000 HA15_INIS9_M21_DES_1_F_Q1000 HA15_INIS9_M11_DES_1_F_Q1000 HA15_INIS9_MF_DES_1_T_Q10 HA15_INIS9_M21_DES_1_T_Q10 HA15_INIS9_M11_DES_1_T_Q10 HA15_INIS9_MF_DES_1_T_Q200 HA15_INIS9_M21_DES_1_T_Q200 HA15_INIS9_M11_DES_1_T_Q200 HA15_INIS9_MF_DES_1_T_Q1000 HA15_INIS9_M21_DES_1_T_Q1000 HA15_INIS9_M11_DES_1_T_Q1000 MIKE 11 - SIM FILE & RESULTS FILE MIKE 11 - NETWORK FILE MIKE 11 - CROSS-SECTION FILE MIKE 11 - BOUNDARY FILE HA15_INIS9_M11_DES_1_F_Q10 HA15_INIS9_NWK_DES_1 HA15_INIS9_XNS_DES_1 HA15_INIS9_BND_DES_1_F_Q10 HA15_INIS9_M11_DES_1_F_Q100 HA15_INIS9_BND_DES_1_F_Q100 HA15_INIS9_M11_DES_1_F_Q1000 HA15_INIS9_BND_DES_1_F_Q1000 HA15_INIS9_M11_DES_1_T_Q10 HA15_INIS9_BND_DES_1_T_Q10 HA15_INIS9_M11_DES_1_T_Q200 HA15_INIS9_BND_DES_1_T_Q200 HA15_INIS9_M11_DES_1_T_Q1000 HA15_INIS9_BND_DES_1_T_Q1000 MIKE 11 - DFS0 FILE MIKE 11 - HD FILE & RESULTS FILE* HA15_INIS9_TS_Q2(140224)peaks moved HA15_INIS9_HD_DES_1_F_Q10 HA15_INIS9_TS_Q10(140224)peaks moved HA15_INIS9_HD_DES_1_F_Q100 HA15_INIS9_TS_Q100(140224)peaks moved HA15_INIS9_HD_DES_1_F_Q1000 HA15_INIS9_TS_Q1000(140224)peaks moved HA15_INIS9_HD_DES_1_T_Q10 HA15_INIS9_TS_Tide Curve HA15_INIS9_HD_DES_1_T_Q200 HA15_INIS9_HD_DES_1_T_Q1000 IBE0601Rp F02

37 GIS Deliverables - Hazard Flood Extent Files (Shapefiles) Flood Depth Files (Raster) Water Level and Flows (Shapefiles) Fluvial Fluvial Fluvial& Tidal O20EXFCD001C0 o20dpfcd001c0 O20NCCDC0 O20EXFCD010C0 o20dpfcd010c0 O20EXFCD100C0 o20dpfcd100c0 Tidal O20EXCCD001C0 O20EXCCD005C0 O20EXCCD100C0 Tidal o20dpccd001c0 o20dpccd005c0 o20dpccd100c0 Flood Zone Files (Shapefiles) Flood Velocity Files (Raster) Flood Defence Files (Shapefiles) To be issued with Final version of this report (F02) Defended Areas O20ZNA_MCDC0 NA O20ZNB_MCDC0 Defence Failure Extent NA IBE0601Rp F02

DOCUMENT CONTROL SHEET

DOCUMENT CONTROL SHEET NWNB CFRAM Study HA01 Hydraulics Report Rathmullan Model DOCUMENT CONTROL SHEET Client Project Title Document Title Model Name OPW NWNB CFRAM Study IBE0700Rp0011_HA01 Hydraulics Report Rathmullan Rev.

More information

North Western - Neagh Bann CFRAM Study

North Western - Neagh Bann CFRAM Study North Western - Neagh Bann CFRAM Study UoM 01 Hydraulics Report 4.7 Carndonagh IBE0700Rp0011 rpsgroup.com/ireland Photographs of flooding on cover provided by Rivers Agency rpsgroup.com/ireland NWNB CFRAM

More information

DOCUMENT CONTROL SHEET

DOCUMENT CONTROL SHEET HA14 Hydraulics Report DRAFT FINAL South Eastern CFRAM Study HA14 Hydraulics Report Portlaoise Model DOCUMENT CONTROL SHEET Client Project Title Document Title Model Name OPW South Eastern CFRAM Study

More information

North Western - Neagh Bann CFRAM Study

North Western - Neagh Bann CFRAM Study North Western - Neagh Bann CFRAM Study UoM 01 Hydraulics Report 4.19 Letterkenny IBE0700Rp0011 rpsgroup.com/ireland Photographs of flooding on cover provided by Rivers Agency rpsgroup.com/ireland North

More information

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model Opanuku Stream Benchmark Validation 1. Introduction The model accuracy benchmark published by the Flood Risk Management Committee of the IAHR in http://members.iahr.org/imis/communitymanagement/communitylayouts/flood_risk_manageme

More information

Introduction to Hydraulic Modelling

Introduction to Hydraulic Modelling Session 3 Introduction to Hydraulic Modelling Stephen Patterson Introduction to Hydraulic Modelling What is hydraulic modelling? What is a model and what are we modelling? Type of models and modelling

More information

Tidal flood outline (No changes proposed)

Tidal flood outline (No changes proposed) Tidal flood outline (No changes proposed) SWRBD CFRAM Study Flood Risk Review Site Inspection Report Name: Schull Hydrometric Area: 20 County: Cork Unique OPW ID: 200303 Site Type: CAR Source of Flooding:

More information

Tool 2.1.4: Inundation modelling of present day and future floods

Tool 2.1.4: Inundation modelling of present day and future floods Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 2.1.4: Inundation modelling of present day and future floods Authors M. Duncan 1 and G. Smart 1 Affiliation 1 NIWA,

More information

Karamea floodplain investigation

Karamea floodplain investigation Karamea floodplain investigation NIWA Client Report: CHC2010-107 October 2010 NIWA Project: ELF 10234/1 Karamea floodplain investigation Graeme Smart Jo Bind NIWA contact/corresponding author Graeme Smart

More information

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS ROMAN P., I. 1, OROS C., R. 2 ABSTRACT. A simple GIS method for obtaining flooded areas. This paper presents a method for obtaining flooded areas near to

More information

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk Location: Shannon International Airport Radar Station, Co. Clare Unique ID: 275485 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137684 Northing: 160636 River / Catchment

More information

IMPACTS OF SECONDARY FLOOD EMBANKMENTS ON THE WAIMAKARIRI FLOODPLAIN, NEW ZEALAND

IMPACTS OF SECONDARY FLOOD EMBANKMENTS ON THE WAIMAKARIRI FLOODPLAIN, NEW ZEALAND IMPACTS OF SECONDARY FLOOD EMBANKMENTS ON THE WAIMAKARIRI FLOODPLAIN, NEW ZEALAND Terry van Kalken (1), Tony Oliver (2), Ian Heslop (2), Tony Boyle (2) (1) DHI Water & Environment, e-centre, Oaklands Road,

More information

Appendix C MIKEFLOOD Model Predictions for 28 October 1998 Flood Event

Appendix C MIKEFLOOD Model Predictions for 28 October 1998 Flood Event Appendix C MIKEFLOOD Model Predictions for 28 October 1998 Flood Event Status Issue 2 Page 99 January 2013 The predictions of the MIKEFLOOD model were checked against anecdotal evidence of flood inundation

More information

6.4 Sensitivity Tests

6.4 Sensitivity Tests 6.4 Sensitivity Tests 6.4.1 Sensitivity of Floodplain Inundation to Width of Dry Culvert The preliminary design for the Expressway based on consideration of possible future climate effects to 2090 assumed

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Grant 0299-NEP: Water Resources Project Preparatory Facility

Grant 0299-NEP: Water Resources Project Preparatory Facility Document Produced under Grant Project Number: 45206 May 2016 Grant 0299-NEP: Water Resources Project Preparatory Facility Final Report Volume 3 East Rapti (1 of 9) Prepared by Pvt. Ltd. For Ministry of

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

County Clare Flood Forecasting System

County Clare Flood Forecasting System County Clare Flood Forecasting System Paul Moroney BE (Civil), C. Eng. M.I.E.I. M.C.I.Arb. Head of the Environment Section Clare County Council (The views expressed in this paper represent the professional

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

Flood Inundation Mapping

Flood Inundation Mapping KU GIS Day 2009 November 18, 2009 Flood Inundation Mapping Wendy L. Pearson NOAA s National Weather Service Central Region Headquarters Kansas City, Missouri Flood Inundation Mapping Objectives: Overview

More information

Lecture 14: Floods. Key Questions

Lecture 14: Floods. Key Questions Lecture 14: Floods Key Questions 1. What is an upstream flood? 2. What is a downstream flood? 3. What were the setup conditions that cause floods? 4. What is a 100-year flood? 5. How are 100-year flood

More information

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form JUNE, 1999 Name of Model: Two-Dimensional Alluvial River and Floodplain Model (MIKE21 CHD & CST)

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Waipatiki Catchment Flood Hazard Analysis. June 2008 AM 08/04 HBRC Plan Number 4029

Waipatiki Catchment Flood Hazard Analysis. June 2008 AM 08/04 HBRC Plan Number 4029 Waipatiki Catchment Flood Hazard Analysis June 2008 AM 08/04 HBRC Plan Number 4029 Asset Management Group Technical Report ISSN 1174 3085 Engineering Section Waipatiki Catchment: Flood Hazard Analysis

More information

GEOL 1121 Earth Processes and Environments

GEOL 1121 Earth Processes and Environments GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,

More information

JUNE 2004 Flood hydrology of the Waiwhetu Stream

JUNE 2004 Flood hydrology of the Waiwhetu Stream JUNE 2004 Flood hydrology of the Waiwhetu Stream Laura Watts Resource Investigations Contents 1. Introduction 1 2. Catchment description 2 3. Data availability and quality 3 3.1 Rainfall data 3 3.2 Water

More information

Report R08/23 ISBN Kilmore Street PO Box 345 Christchurch Phone (03) Fax (03)

Report R08/23 ISBN Kilmore Street PO Box 345 Christchurch Phone (03) Fax (03) Report R08/23 ISBN 978-1-86937-804-2 58 Kilmore Street PO Box 345 Christchurch Phone (03) 365 3828 Fax (03) 365 3194 75 Church Street PO Box 550 Timaru Phone (03) 688 9069 Fax (03) 688 9067 Website: www.ecan.govt.nz

More information

Floodplain Risk Management in Dungog after the April 2015 Super Storm. Presentation Outline

Floodplain Risk Management in Dungog after the April 2015 Super Storm. Presentation Outline Presentation Outline Floodplain Risk Management in after the April 2015 Super Storm Rohan Hudson, Royal HaskoningDHV FMA 2017 Preparing for the Next Great Flood 17th May 2017 Background and Flood Mechanisms

More information

FINAL STREAM. Prepared For: Discharge. Draft Stream. Level Hay Street, Subiaco WA Indiana Street. Golden, CO USA

FINAL STREAM. Prepared For: Discharge. Draft Stream. Level Hay Street, Subiaco WA Indiana Street. Golden, CO USA Draft Stream Discharge and Water Supply Estimates S F FINAL STREAM DISCHARGE AND WATER SUPPLYS ESTIMATES CITRONEN FJORD F DEVELOPMENT PROJECT Prepared For: Ironbark Zinc Limited Level 1 350 Hay Street,

More information

Technical Note: Hydrology of the Lukanga Swamp, Zambia

Technical Note: Hydrology of the Lukanga Swamp, Zambia Technical Note: Hydrology of the Lukanga Swamp, Zambia Matthew McCartney July 7 Description The Lukanga swamp is located approximately 5km west of the city of Kabwe, in the Central province of Zambia,

More information

Hydraulic Modelling for Real Time Flood Forecast Applications

Hydraulic Modelling for Real Time Flood Forecast Applications BHS/CIWEM SW Branch Meeting Hydraulic Modelling for Real Time Flood Forecast Applications Yiping Chen 20 June 2007 Introduction Hydraulic River Modelling: Washland (Floodplain) Modelling Techniques Integrated

More information

Use of GIS in Flood Risk Mapping Sun Yan Evans*, Neil Gunn**, Daniel Williams*

Use of GIS in Flood Risk Mapping Sun Yan Evans*, Neil Gunn**, Daniel Williams* Use of GIS in Flood Risk Mapping Sun Yan Evans*, Neil Gunn**, Daniel Williams* *Mott MacDonald, Demeter House, Station Road, Cambridge, England, CB1 2RS **Environment Agency, Orchard House Endeavour Park,

More information

Michael Cranston, Claire Harley, Lauren McLean, Amy Tavendale, Darroch Kaye, and Lisa Naysmith (Flood Forecasting and Warning section)

Michael Cranston, Claire Harley, Lauren McLean, Amy Tavendale, Darroch Kaye, and Lisa Naysmith (Flood Forecasting and Warning section) Firths of Forth and Tay Flood Warning System and the Storms of 2012-2014 Keming Hu Acknowledgements Michael Cranston, Claire Harley, Lauren McLean, Amy Tavendale, Darroch Kaye, and Lisa Naysmith (Flood

More information

Flood Map. National Dataset User Guide

Flood Map. National Dataset User Guide Flood Map National Dataset User Guide Version 1.1.5 20 th April 2006 Copyright Environment Agency 1 Contents 1.0 Record of amendment... 3 2.0 Introduction... 4 2.1 Description of the Flood Map datasets...4

More information

D. MATHEMATICAL MODEL AND SIMULATION

D. MATHEMATICAL MODEL AND SIMULATION D. MATHEMATICAL MODEL AND SIMULATION D - i TABLE OF CONTENTS D.1 Objective of Model Development... D - 1 D.2 Selection of Software... D - 1 D.3 General Steps of Simulation by MOUSE... D - 1 D.4 Cases of

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

Flooding in Dolgellau

Flooding in Dolgellau Flooding in Dolgellau Graham Hall MMath, PhD University of Wales, Bangor Background Flooding has historically been a cause for concern in Dolgellau. Following a serious flood in December 1964 when shops

More information

Flood Mapping Michael Durnin October 9 th

Flood Mapping Michael Durnin October 9 th Michael Durnin October 9 th 2014 Leading Surveyors Company Profile Est. 1983 Celebrating 30 Years in Business Six Offices in UK & Ireland Over 30 Specialised Survey Services ISO 9001:2008 Registered Over

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana Development of a Fluvial Erosion Hazard Mitigation Program for Indiana Indiana Watersheds Webinar Series October 12,2011 Robert Barr Center for Earth and Environmental Science Department of Earth Sciences

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303)

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303) Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts Protecting Groundwater Sources from Flood Borne Contamination Ben Binder (303) 860-0600 Digital Design Group, Inc. The Problem Houston

More information

Illinois State Water Survey Division

Illinois State Water Survey Division Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989

More information

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Floodplain modeling Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Scientific Staff: Dr Carmen Maftei, Professor, Civil Engineering Dept. Dr Konstantinos

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

Hydro-engineers.ch HEC-RAS ANALAYSIS. River: L Aïre Mesfin Tewolde. Hydro-engineers.ch 23 oct. 2017

Hydro-engineers.ch HEC-RAS ANALAYSIS. River: L Aïre Mesfin Tewolde. Hydro-engineers.ch 23 oct. 2017 Hydro-engineers.ch HEC-RAS ANALAYSIS River: L Aïre Mesfin Tewolde 17 Hydro-engineers.ch 23 oct. 2017 PREPARED BY MESFIN TEWOLDE [TEMPORARY MISSION] Hydro-engineers.ch HEC-RAS ANALYSIS [January- March 2014]

More information

Integrating Hydrologic and Storm Surge Models for Improved Flood Warning

Integrating Hydrologic and Storm Surge Models for Improved Flood Warning Integ Hydrologic and Storm Surge Models for Improved Flood Warning Leahy, C.P, Entel, M, Sooriyakumaran, S, and Warren, G Flood Warning Program Office, Bureau of Meteorology, Docklands, Victoria National

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Degradation Concerns related to Bridge Structures in Alberta

Degradation Concerns related to Bridge Structures in Alberta Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

Large-Scale National Grid Data. Source map scale - 1:1,250. Published Historical Map - Segment A13. Map Name(s) and Date(s)

Large-Scale National Grid Data. Source map scale - 1:1,250. Published Historical Map - Segment A13. Map Name(s) and Date(s) Large-Scale National Grid Data Published 1993 Source map scale - 1:1,250 'Large Scale National Grid Data' superseded SIM cards (Ordnance Survey's 'Survey of Information on Microfilm') in 1992, and continued

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey. Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey. Fuad Hajibayov *1, Basak Demires Ozkul 1, Fatih Terzi 1 1 Istanbul

More information

Flood modelling and impact of debris flow in the Madarsoo River, Iran

Flood modelling and impact of debris flow in the Madarsoo River, Iran Monitoring, Simulation, Prevention and Remediation of Dense and Debris Flows 69 Flood modelling and impact of debris flow in the Madarsoo River, Iran S. Tjerry 1, O. Z. Jessen 2, K. Morishita 3 & H. G.

More information

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS Probabilistic Evaluation of a Meandering Low-Flow Channel February 24 th, 2014 2014 UMSRS 1 2 acknowledgments Low- Flow Channel (LFC) overview Proposed Diversion Channel collects runoff from: The Rush

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Workshop: Build a Basic HEC-HMS Model from Scratch

Workshop: Build a Basic HEC-HMS Model from Scratch Workshop: Build a Basic HEC-HMS Model from Scratch This workshop is designed to help new users of HEC-HMS learn how to apply the software. Not all the capabilities in HEC-HMS are demonstrated in the workshop

More information

Association of State Floodplain Managers, Inc.

Association of State Floodplain Managers, Inc. Association of State Floodplain Managers, Inc. 2809 Fish Hatchery Road, Suite 204, Madison, WI 53713 Phone: 608-274-0123 Fax: 608-274-0696 Email: asfpm@floods.org Website: www.floods.org Need for Updating

More information

Flood hydrology of the Mangaroa River MARCH 2005

Flood hydrology of the Mangaroa River MARCH 2005 Flood hydrology of the Mangaroa River MARCH 2005 MARCH 2005 Flood hydrology of the Mangaroa River Laura Watts Contents Summary 1 1. Introduction 2 2. Catchment description 3 3. Data availability and quality

More information

Appendix 15 Computational Methodology

Appendix 15 Computational Methodology Appendix 15 Computational Methodology Introduction This Appendix describes the process used by the risk team to determine the final loss exceedence values in the risk analysis. The process involved the

More information

Stop 1: Marmot Dam Stop 1: Marmot Dam

Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.

More information

APPENDIX 3B OCCURRENCE OF SIGNIFICANT RIVER ALLUVIUM AQUIFERS IN THE PLATEAU REGION

APPENDIX 3B OCCURRENCE OF SIGNIFICANT RIVER ALLUVIUM AQUIFERS IN THE PLATEAU REGION Plateau Region Water Plan January 2011 APPENDIX 3B OCCURRENCE OF SIGNIFICANT RIVER ALLUVIUM AQUIFERS IN THE PLATEAU REGION Occurrence of Significant River Alluvium Aquifers in the Plateau Region Prepared

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

Tom Ballestero University of New Hampshire. 1 May 2013

Tom Ballestero University of New Hampshire. 1 May 2013 Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

Chelmsford Borough Council LDF: Level 1 SFRA

Chelmsford Borough Council LDF: Level 1 SFRA Chelmsford Borough Council LDF: Level 1 SFRA Urban Capacity Study Sites PPS25 Flood Zones 2007 Figure B20-1 Preliminary Core Strategy Assessment Flood Zone Potential Housing Potential Employment 1, 2 &

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

4.17 Spain. Catalonia

4.17 Spain. Catalonia 4.17 Spain Catalonia In Spain, inundation studies are the responsibility of the respective Hydrographic Confederations of each river basin (River Basin Authorities). The actual status of inundation studies

More information

Kaskaskia Morphology Study Headwaters to Lake Shelbyville

Kaskaskia Morphology Study Headwaters to Lake Shelbyville Kaskaskia Morphology Study Headwaters to Lake Shelbyville KWA Mini Summit 5 March 2012 1 Kaskaskia Morphology Study Headwaters to Lake Shelbyville Conducted by U.S. Army Corps of Engineers, St. Louis District

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Height Above Nearest Drainage in Houston THE UNIVERSITY OF TEXAS AT AUSTIN

Height Above Nearest Drainage in Houston THE UNIVERSITY OF TEXAS AT AUSTIN Height Above Nearest Drainage in Houston THE UNIVERSITY OF TEXAS AT AUSTIN Jeff Yuanhe Zheng GIS in Water Resources December 2 nd, 2016 Table of Contents 1.0 Introduction... 1 2.0 Project Objective...

More information

EA SOUTH WEST. Hillfarrance. Flood defence scheme

EA SOUTH WEST. Hillfarrance. Flood defence scheme EA SOUTH WEST Hillfarrance Flood defence scheme E n v ir o n m e n t A g e n c y Hillfarrance flood defence scheme The village of Hillfarrance - six kilometres west of Taunton, Somerset - lies on the floodplain

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan Sohaib Baig (doctoral student) 16 November 2017 Disaster Prevention Research Institute 1 Kyoto

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Report and recommendations relating to the Severe Flood Event in Selly Park South on 6th September 2008

Report and recommendations relating to the Severe Flood Event in Selly Park South on 6th September 2008 Report and recommendations relating to the Severe Flood Event in Selly Park South on 6th September 2008 Compiled for Selly Park South Neighbourhood Forum, Birmingham City Council and the Environment Agency

More information

MEMORANDUM. Situation. David Ford Consulting Engineers, Inc J Street, Suite 200 Sacramento, CA Ph Fx

MEMORANDUM. Situation. David Ford Consulting Engineers, Inc J Street, Suite 200 Sacramento, CA Ph Fx David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779 Fx. 916.447.8780 MEMORANDUM To: Brad Moore, PE, USACE From: Nathan Pingel, PE (Lic # CA 63242), and

More information

Micheál Mac Cárthaigh Dublin Regional Inspectorate Environmental Protection Agency Richview, Dublin 14 Tel: (01) Fax: (01)

Micheál Mac Cárthaigh Dublin Regional Inspectorate Environmental Protection Agency Richview, Dublin 14 Tel: (01) Fax: (01) A Preliminary Assessment of the Flooding which occurred on 24 October 2011 in Selected Catchments on the East Coast, based on data collected at the EPA-LA Hydrometric Stations Micheál Mac Cárthaigh Dublin

More information

1 INTRODUCTION AND MAJOR FINDINGS... 1

1 INTRODUCTION AND MAJOR FINDINGS... 1 Memorandum To: Lindsey Clark, Stillwater Valley Watershed Council Coordinator From: Chad Raisland, Pioneer Technical Services, Inc. and Karin Boyd, Applied Geomorphology, Inc. CC: Tanya Lester, Stillwater

More information

DISCUSSION PURPOSES ONLY C A L I F O R N I A S T A T E L A N D S C O M M I S S I O N

DISCUSSION PURPOSES ONLY C A L I F O R N I A S T A T E L A N D S C O M M I S S I O N C A L I F O R N I A S T A T E L A N D S C O M M I S S I O N SAN JOAQUIN RIVER REACH 2B OVERVIEW OF THE CALIFORNIA STATE LANDS COMMISSION ADMINISTRATIVE MAPS PRESENTATION Water Boundary Principles Best

More information

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water. Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS Studia Geotechnica et Mechanica, Vol. XXXIV, No. 2, 2012 DOI: 105277/sgm021206 APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS JOANNA MARKOWSKA Department of Environmental

More information

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS C Ryan 1, D Tetley 2, C Kinsey 3 1 & 2 Catchment Simulation Solutions, NSW 3 Co-ordinator Stormwater and Structural

More information

Technical Note: Hydrology of the Lake Chilwa wetland, Malawi

Technical Note: Hydrology of the Lake Chilwa wetland, Malawi Technical Note: Hydrology of the Lake Chilwa wetland, Malawi Matthew McCartney June 27 Description Lake Chilwa is located in the Southern region of Malawi on the country s eastern boarder with Mozambique

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information