Extended-Reach Wells

Size: px
Start display at page:

Download "Extended-Reach Wells"

Transcription

1 Bjarne Bennetzen Maersk Oil Qatar AS Doha, Qatar Extended-Reach Wells John Fuller Gatwick, England Erhan Isevcan Doha, Qatar Tony Krepp Richard Meehan Nelson Mohammed The Woodlands, Texas, USA In recent years, the oil and gas industry has been honing its ability to drill increasingly longer high-angle wells along increasingly convoluted well paths. The horizontal lengths of these extended-reach wells are today measured in kilometers and miles and link multiple isolated deposits with a single wellbore. Jean-Francois Poupeau Houston, Texas Kumud Sonowal Zakum Development Company Abu Dhabi, UAE Oilfield Review Autumn 21: 22, no. 3. Copyright 21 Schlumberger. For help in preparation of this article, thanks to Emma Jane Bloor and Mike Williams, Sugar Land, Texas. DrillMAP, PowerDrive X5 and PowerDrive Xceed are marks of Schlumberger. 4 Oilfield Review

2 Innovative technology is marked by its ability to break new ground. In the world of extendedreach drilling, that standard is literal. In 1997, BP set the pace when it drilled a horizontal section of more than 1 km [about 6 mi] in a well at its Wytch Farm field in England. 1 Since then, the industry has repeatedly extended that mark. As of this writing, the record horizontal length is more than 1.9 km [6.8 mi] and the record measured depth is 12.3 km [7.6 mi] in a well offshore Qatar. 2 As operators look to tap their own isolated reserves through extended-reach drilling (ERD), they may be tempted to simply replicate what has been done before. However, because seemingly small changes in ERD parameters may have significant impacts on completion options, it is essential that engineers plan each extended-reach well as a unique engineering-based project. For example, to facilitate installation of intelligent completions, it is important that the wellbore have a relatively large diameter and a smooth profile. Intelligent wells often include production strings with externally mounted instrumentation. That equipment may be damaged during installation if the annular space between the tubular and casing walls is too narrow or irregular. A less complex completion, on the other hand, may afford the operator the luxury of rotating the casing or applying high downward loads to force it through high angles and tight spots, thus eliminating the need for building extra annular space into the drilling program. Proper planning must include follow-through. In executing ERD plans, experienced drilling engineers often perform familiar-seeming operations in an unfamiliar manner. To ensure that all involved perform their tasks according to ERD guidelines, training in best practices is essential for personnel both in the field and in the office. Much of the progress in drilling longer horizontal reaches has been attributed to improved technology in two areas: more-responsive steering and more-accurate real-time measurement capabilities. This article, however, focuses on a third component of the industry s advance: the development of best practices and the importance of connecting lessons learned from engineering, technology, training, supervision and postjob analysis to drilling the next extended-reach well. 1. For more on Wytch Farm: Allen F, Tooms P, Conran G, Lesso B and Van de Slijke P: Extended-Reach Drilling: Breaking the 1-km Barrier, Oilfield Review 9, no. 4 (Winter 1997): Sonowal K, Bennetzen B, Wong P and Isevcan E: How Continuous Improvement Led to the Longest Horizontal Well in the World, paper SPE/IADC 11956, presented at the SPE/IADC Drilling Conference and Exhibition, Amsterdam, March 17 19, 29. Autumn 21 5

3 True vertical depth, ft True vertical depth, ft 5, 1, 15, 2, 25, 3, 35, Worldwide Extended-Reach Drilling 4, 5, 5, 1, 15, 1, 15, 2, 5, 1, 15, 2, 25, 3, 35, 4, Horizontal departure, ft > Extending reach. The ratio of horizontal departure to true vertical depth (HD/TVD) has increased steadily since the mid-197s (top). Traditionally a well whose HD/TVD ratio is 2. or greater is considered an extended-reach well. Deep wells with large horizontal departure are also classed here as extended-reach wells. By 21, operators had drilled numerous wells with ratios greater than 4. (bottom). The Al-Shaheen field BD-4A well set a record horizontal departure of 37,956 ft. Defining ERD Wells An ERD well is defined as having a horizontal departure/true vertical depth (HD/TVD) ratio of more than 2. (above). This ratio provides a crude indicator of well complexity: the higher the ratio, the more complex the well. But it is only a basic indicator of how difficult the well will be to drill and complete. Drilling to targets located at a significant horizontal distance from the surface location usually requires more than drilling vertically, turning a corner and drilling horizontally. Depending on such formation characteristics as temperature, pressure and rock properties, the drilling team determines weight on bit (WOB), drillstring rpm, mud weight and other parameters. All these are tempered by the planned trajectory 2, Horizontal departure, ft 25, 2. 3, Up to 1975 Up to 198 Up to 1985 Up to 199 Up to 1995 Up to 2 Up to 25 Up to 21 35, Low reach Medium reach Extended reach Ultraextended reach ERD well 4, of the well and the build and drop angles and azimuthal turns necessary to deliver it. This last has become a significant factor in extended-reach well planning in recent years as sophisticated steerable and LWD technology has allowed operators to use fewer, more-complex 3D well paths to optimize reservoir development. Extended-reach wells are also generally categorized as very long, or very shallow TVD (next page). Each has its own challenges. Very long, or ultraextended wells, can be difficult to drill and complete because they may encounter high torque and drag forces. Circulating pressures may be elevated to overcome frictional losses as the drilling fluid is pumped down the drillstring and back up the borehole-drillpipe annulus Shallow TVD wells are usually drilled in unconsolidated formations with relatively low fracture gradients. The resulting narrow fracture-gradient pore-pressure window becomes increasingly important as the wellbore extends horizontally and equivalent circulating densities (ECDs) continue to rise. 3 Also, when the distance from the rig to the targeted reservoir section is relatively short, shallow wells may have to be turned from the vertical at a sharp angle. The resulting trajectory can lead to torque and buckling problems on the drillpipe and on completion tubulars. 4 When an extended-reach well includes a deep TVD, it may also be limited by drillstring tension and high side forces that introduce casing and drillpipe wear concerns. Subsets of these basic well types include deepwater wells, 3D wells and those whose design is constrained by the limitations of the available rig. Extended-reach wells in deep water are uncommon because moving a floating rig over the target formation is usually a better solution than drilling horizontally. However, as production rates at fixed deepwater production platforms decline, the fields they serve may become candidates for extended-reach wells drilled to connect with outlying reservoirs. When a deepwater extended-reach well is a better option, low fracture gradients caused by water replacing thousands of feet of overburden exacerbate the need to closely manage ECD. Additionally, because of the long vertical section between the seafloor and the surface, more weight is hanging from the rig s traveling block, and pipe tension is significantly increased. This extra tension creates large side forces, which may lead to casing wear as the drillpipe is pulled up through build and drop angles during backreaming operations. 5 Deepwater operations also affect drilling fluid properties in a manner that can impact hole cleaning. As the mud travels from the surface, it is cooled significantly by the near-freezing water at the seafloor. It is then heated to formation temperatures at the bit before returning to seafloor temperatures at the base of the riser. This process may change the drilling mud rheology, affecting its carrying capacity or the ECD loads imposed on the wellbore. In extended-reach wells, mud weights must be carefully controlled. This is one more instance in which the margin of error is smaller in extended-reach wells than in vertical wells. Complex 3D wells have proliferated in recent years as the industry has developed and adopted increasingly sophisticated rotary steerable and 6 Oilfield Review

4 MWD tools. These wells are characterized by numerous significant azimuth changes designed to keep the wellbore in line with its targets. Rig-limited wells are those drilled from drilling units with inadequate hook load or pump capacity. 6 Many drilling engineers treat these wells as a distinct ERD category because the rig s shortcomings force them to use technology that would otherwise not be required. Planning Extended-reach wells are drilled for numerous reasons: to contact as much reservoir with the borehole as possible, to reach several widely distributed hydrocarbon deposits from a single location or to remove surface operations from environmentally sensitive areas. Driven by environmental concerns, one of the most successful ERD programs was carried out in the BP Wytch Farm field on the south coast of England. In 1993, the operator chose to access offshore oil deposits beneath Poole Harbour using high-angle, longreach wells drilled from closely spaced surface locations on land. The first well had a horizontal reach of 3.8 km [2.4 mi]. The project culminated in 1999 with a 1.9-km horizontal-reach well. At the time BP broke the 1-km mark, the company used teams that consisted of up to 1 people representing all the entities involved in the drilling effort. Before each well was started, assigned personnel were brought together for one- to two-day workshops. They were first told how company global objectives related to the goals, design, cost and commercial viability of the Wytch Farm well they were planning. Then, subsurface, drilling, directional, mud and completion engineers described the technical details and potential hazards of the well that was about to be spudded. 7 The teams then broke into smaller groups of five to eight people who reviewed and set target times for each phase of the well, such as drilling a section or running and cementing a casing string. Each of these phases was then divided into its smaller components. The small groups brought their conclusions to the assembled team and created an overall drilling plan from the various pieces. Throughout the drilling of the well, the team measured actual progress and targets against the plan and devoted time to discussing the root causes of any problems that had occurred. 8 Such meticulous planning and follow-through is ideal for complex and extended-reach wells, and experts often cite the BP approach as the reason for the Wytch Farm successes. The key to proper ERD plans is to make them detailed and specific to each well. It is also useful to create and maintain a team with representation from all relevant disciplines from the very beginning of the project until its completion. True vertical depth True vertical depth Kickoff point Build section 3. ECD is the effective density exerted by a circulating fluid against the formation. The ECD is calculated as: d + P/(.52D), where d is the mud weight in pounds per gallon (ppg). P is the pressure drop in the annulus between depth D and surface (psi), and D is the true vertical depth (feet). 4. Mims M and Krepp T: Drilling Design and Implementation for Extended Reach and Complex Wells, 3rd ed. Houston: K&M Technology Group, Backreaming operations pass a tool of a larger OD than the drill bit through a previously drilled-out section of the well to increase hole diameter. 1. Horizontal departure Tangent angle The time required to adequately plan an extended-reach well depends on numerous factors including well depth, length, complexity, rig availability, location and logistics. But many engineers consider a reasonable planning period to Complex S-Turn B&H Catenary Azimuth turns Horizontal departure > Basic extended-reach well types. Extended-reach wells fall into two categories: very shallow or very long wells (top, black lines). Each has its own set of challenges and neither has claim to higher HD/TVD ratios (dashed lines). Extended-reach well profiles can be classified as build and hold (B&H), catenary, S-turn or complex (bottom). The B&H profile is drilled at a constant angle once the tangent angle has been established from the kickoff point. B&H wells require minimal drilling and minimal directional control. The catenary profile is a variation of the B&H well path. It begins with a lower initial build rate (measured in degrees per 1 ft drilled) that accelerates as the wellbore angle increases. This design is often chosen to reduce torque problems. Catenary wells have longer overall length (MD) and higher tangent angles than B&H well profiles. The S-turn profile is characterized by a higherangle tangent section than the B&H well before dropping angle to a more vertical angle as it enters the target. This approach may reduce uncertainty when matching TVD and survey data. It may also reduce drilling time within abrasive target zones whose stability may be time dependent and when ECD management may be difficult. Complex well profiles, characterized by a third dimension, are created by adding one or more azimuth turns to high-angle wellbores. Although more difficult to execute than other profiles, complex well paths permit the operator to penetrate more targets with a single well The hook load is the total force pulling down on the rig s hook from which all drilling equipment including the kelly, rotary and drillstring is attached and from which all other well equipment is being lowered into, or pulled out of, the wellbore. 7. Meader T, Allen F and Riley G: To the Limit and Beyond The Secret of World-Class Extended-Reach Drilling Performance at Wytch Farm, paper IADC/SPE 5924, presented at the IADC/SPE Drilling Conference, New Orleans, February 23 25, Meader et al, reference Autumn 21 7

5 Offset Well Data Review (OWR) Introduction Scope of report Description of reviewed wells Learnings from OWR Field and Geology Field overview Formation tops Lithology Pore pressure Fracture gradient Temperature Well Designs Casing designs Design drivers Drilling Performance Time performance ROP Downtime Drilling Parameters Flow rates, rpm, practices used Drilling Fluids Mud systems Hole problems Directional Drilling BHA runs Directional drilling performance Bits Bit record Type comparison Torque and Drag Friction factors Drilling torque and drag Casing running Formation Evaluation Details Formation evaluation while drilling Wireline, coring Stuck tools, washouts, packoffs Cementing Slurry design Centralization Procedures used Hazards Losses, stuck pipe Well control Wellbore stability H 2 S, CO 2 Preliminary Well Design (PWD) Introduction and Summary Scope of report Summary overview Field and Geology Overview ERD well position in field Formation tops Lithology Target requirement Pore pressure Fracture pressure Temperature Well Design Overview Surface location Casing design Well path design Drilling fluids Friction factors Hole Sections (17 1 /2, 12 1 /4, 8 1 /2 in.) Key issues and priorities Directional strategy Drilling fluids Hydraulics Torque and drag (T&D) Power requirements T&D and hydraulic plots Casing (13 3 /8 in. and 9 5 /8 in.) and Liner Running procedures and equipment Cementing Cleanout and Completion Drag risk plots Rollers Buckling Equipment Specifications Topdrive Pumps Drawworks Drillpipe size Drilling tools Industry Benchmarking Relevant ERD wells comparison Rig capabilities comparison Time and Cost +/ 4% of time, cost of PWD be 6 to 12 months from the time of conception to commencement of drilling (below left). Risk management through the use of benchmarking, technology, training and development of a learning curve is behind any comprehensive planning of any drilling program. However, because some measures that are appropriate when drilling conventional wells may actually increase uncertainties in ERD operations, they present engineers with unique decisionmaking challenges. For example, larger-than-necessary hole sizes are often included in the upper section of vertical wells as a contingency plan to reduce drilling risk. Their inclusion allows operators to set an extra string of casing to deal with unexpected Detailed Well Design (DWD) Field and Geology Overview Key issues per hole section Reservoir schematics Pore pressure Fracture gradient Temperature graphs Well Design Overview Well path summary Casing summary Cementing summary Drilling fluids Bit and BHA summary Hole Sections (17 1 /2, 12 1 /4, 8 1 /2 in.) Key issues Overview of solutions Detailed procedure outline Special notes T&D charts Casing (13 3 /8 in. and 9 5 /8 in.) and Liner Key issues Overview of solutions Detailed procedure outline Special notes T&D charts Cleanout and Completion Key issues Overview of solutions Detailed procedure outline Special notes T&D charts Equipment Specifications Final equipment specifications Drillpipe size Drilling tools Time and Cost +/ 2% of time, cost of PWD > Extended-reach well planning. ERD programs require completion of major steps comprising many parts before a drilling program can be delivered to the field. The offset well data review (OWR) allows operators to identify key ERD well-design issues. A preliminary well design (PWD) is then generated to establish feasibility, risks, equipment requirements, contractor needs, scope of work and a cost estimate for the project. A detailed well design (DWD) is a refined PWD that includes final drillpipe, casing and rig specifications, tenders for contractors and an improved cost estimate. (Adapted from Mims and Krepp, reference 4.) pressures, fracture gradients or wellbore instability without reducing hole size across the productive interval. This contingency approach may be ill-advised, however, in extended-reach wells because of the effect it may have on hole-cleaning concerns such as stuck pipe. The more prudent decision may be to forgo the flexibility of larger tophole sizes to drill smaller-id wellbores that are easier to clean of cuttings and debris. Additionally, in certain formation types, directional control may be more difficult in large-diameter holes. A Stable Wellbore As in all drilling operations, selection of mud weight, pump rates and drilling fluids is driven by formation-fracture gradient, pore-pressure and friction-pressure losses along the borehole-drillpipe annulus. Wellbore instability, exacerbated when the limits imposed by these parameters are exceeded, is a primary cause of drilling failures in all well types. However, the way operators deal with the problem of borehole collapse or washout differs between conventional and ERD wells. In vertical or deviated wells, the fracture gradient of the rock typically increases with depth at a rate faster than that at which the friction-pressure losses increase. However, as an ERD well becomes essentially horizontal and depth does not change, the fracture gradient ceases to increase while ECDs continue to rise with hole length (below). Combating the effects of rising ECDs is typically a matter of reducing mud weight, flow rate or ROP. Therefore, the better choice is often to True vertical depth ECD Limit Density > ECD-limited TD. Friction pressure losses incurred as drilling fluid flows between the drillstring and wellbore are an element of ECD (red). In vertical wells, ECD increases at a slower rate than does fracture gradient (blue). However, in horizontal sections (green), the fracture gradient remains unchanged while ECD increases with wellbore length. At some point along the horizontal well path, assuming mud density, flow rate and rheology remain the same, ECD will exceed the fracture gradient, fluid loss will become unmanageable and drilling will have to be halted. 8 Oilfield Review

6 Wellbore Stability Forecast - Drillmap MUDWEIGHT WINDOW Drilling Risks Bed Parallel Breakouts Fracture Problems Risk summary Good Hole Cleaning at High ROP Breakout_Mw [WMUD] (g/cm3).6 Other ID R1 R2 Hole depth MD TVD R3 R R2 R5 R1 R4 R R6 R5 R6 R R8 R8 R R7 R Description Actions Kick_Mw [PPMW] (g/cm3).6 Mudloss_Mw [WMUD] (g/cm3) Mud losses into the formation may occur if ECD is > 1.65 sg Details: Consequences: Destabilization of fractures, losses, well control problems Contributing factor: If open, pre-existing natural fractures exist, High ECD exceeding mudloss gradient Minor breakout due to local shear failure of wellbore if MW is too low Details: Consequence: Excessive debris in borehole Contributing Factors: Mudweight below 1.2 sg, excessive swabbing, well orientation/build angle, low formation strength Avalanching of unstable cuttings and cavings beds between 45 and 7 degrees hole inclination Details: Consequence: Stuck pipe,pack-offs, erratic torque/drag, high ECD transients (hydraulic shock), packoff during trips, trouble running casing, loss of hole Contributing factors: Hole inclinations from 45-7deg, hole size (12 1/4 hole), enlarged hole or washouts, too low flowrates for hole size, poor hole cleaning practices Details: -Keep ECD below mudloss gradient, monitor fluid losses & time-lapse resistivity for invasion Details: -If mud invasion observed careful tripping through invaded zones Details: During trips limit disturbing identified damaged zones. Minimise pump cycling. Details: Maintain efficient hole cleaning, monitor DTOR, ECD, and cavings. Raise MW. Details: - Establish a safety circulation procedure if ECD spikes up - If pack-off symptoms occur, RIH below packed zone, work pipe down with torsion while trying to re-establish circulation - Jar down if necessary - After previous steps, RIH one or two stands and circ hole clean prior to futher tripping Details: - Use torque & drag charts to monitor deviation from trend - Track cuttings rate and compare to drilling /circulation operations - Maintain efficient hole cleaning and rotary throughout avalanche section in open or cased hole. - Use adequate rotary to lift cuttings from low side of hole. - Monitor ECD for signs of packing-off - ensure hole is circulated appropriately prior to connection or trip Formation of static cuttings bed above 65 degrees hole Details: See actions for Risk 3 Details: Consequences: Stuck pipe,pack-offs, erratic torque/drag, high ECD transients Details: See actions for Risk 3 (hydraulic shock), loss of hole Contributing factors: Hole inclinations above 65 deg, hole size (12 1/4 hole), hole washouts or enlarged, low flowrates for hole size, poor hole cleaning practices Drilling shocks, Stick & Slip, erratic torque and RPM Details: Adjust drilling parameters (WOB, RPM) Details: Contributing factors: Hard stringers, hole rugosity, y, unstable bit design Details: Run MWD tools with shock sensors, good Consequence: uence: Tool failure, drillstring failure communication with driller (twist-off), off), sidetrack Wellbore re degrades and forms enlarged areas of fter drilling (caverns, asymmetric breakout) Details: -If caverns noted on CDNI, avoid rotation hole after Details: while tripping through cavern sections s: Consequences: Stuck pipe,pack-offs, c torque/drag, high ECD transients erratic -See also actions as for Risk 3 aulic shock), packoff during trips, trouble (hydraulic ng casing, loss of hole running Details: - Monitor CDNI during reaming or ributing factors: Low mudweight, excessive Contributing back-reaming trips to determine if zones are bbing, well orientation, mechanical swabbing, forming urbance such as excessive back-reaming, hole -Track the presence of zones on Excel correlation disturbance n for too long (excessive NPT), open chart - Also actions as for Risk Breakouts akouts will occur if MW is less than 1.2 sg Details: tails: Consequence: See Risk 2 Details: See Risk 2 Contributing ntributing Factors: See Risk 2 Details: See Risk If open, pre-existing natural fractures exist, mud losses sses into the formation may occur if ECD is > Details: Keep ECD below mudloss gradient, sg monitor fluid losses & time-lapse resistivity fro Details: Consequences: See Risk 1 invasion Contributing factor: See Risk 1 Details: -If mud invasion observed careful tripping through invaded zones -Minimise swab and surge effects -Add fluid loss additives If conductive faults exist, mud losses into the formation may occur if ECD is > 1.65 sg Details: -Prepare LCM materials prior to drilling Details: Consequences: Destabilisation of fault expected Fault between mMD Contributing factor: High ECD exceeding mudloss ( mTVD) gradient -Keep ECD below mudloss gradient, losses & time-lapse resistivity f Details: -If mud invasion observe tthrough hrough invaded zones -Minimise swab and surge effects Mechanical Earth Model 2.6 Breakdown_Mw [WMUD] (g/cm3) sg line _S_GRv3 [GR_ARC] (gapi) 15 DEVI [DEVI] (deg) AZIM [AZIM] (deg) 2 2 Depth (m) MD Stratigraphy TVD 199 L M Rock_Strength [UCS] (kpa) 5 Friction_Angle [FANG] (deg) 5 Overburden [TZSP] (kpa) 5 Min_Hor_Stress [TXSP] (kpa) 5 Max_Hor_Stress [TYSP] (kpa) 5 Pore_Pressure [PPRS] (kpa) 5 H I_IV Cavern? V 1 VI_VII VIII 25 Cavern? 26 IX X 29 Details: -Prepare LCM materials prior to drilling expected Fault between mMD ( mTVD) -Keep ECD below mudloss gradient, monitor fluid losses & time-lapse resistivity for invasion F Fault Details: -If mud invasion observed careful tripping through invaded zones -Minimise swab and surge effects If conductive faults exist, mud losses into the Caver formation may occur if ECD is > 1.65 sg Details: Consequences: Destabilisation of fault Contributing factor: High ECD exceeding mudloss gradient XI XVIII XIX1_ XX XX XX2_? XX3 5 XX1_2 Severity Light Serious Major Catastrophic Probability Low Medium High breakdown kick breakout > Predicting wellbore stability. Results of predrilling wellbore studies are delivered in a DrillMAP format. Column 1 indicates those intervals through which certain risk factors, explained in Column 2, may be encountered. Column 2 also provides prevention and remedy suggestions for each risk factor (inset). The mud-weight window in Track 1 indicates mud weights that are insufficient at depth to prevent breakout (red) or a kick (turquoise). It also indicates expected consequence from mud weights that are too high, including mud loss (purple) and breakdown (blue). The driller needs to keep mud weight between these limits. Track 2 includes the gamma ray (green), planned deviation (pink) and azimuth (blue). Track 3 is the TVD/MD comparison based on the planned well trajectory and Track 4 indicates expected stratigraphy-change depths. Track 5 is the mechanical earth model (MEM) and includes unconfined compressive rock strength (UCS) (brown) and friction angle (FANG) (black). Both are inputs for the Mohr-Coulomb failure criterion used to describe a linear relationship between normal and shear (maximum and minimum) stresses at failure. Modeled overburden (brown), minimum horizontal stress (red), maximum horizontal stress (green) and pore pressure (blue) are included as part of the MEM. change the factors causing friction by increasing the flow area, which can be done by drilling a larger hole or by reducing drillpipe size. Neither is the perfect solution. An enlarged borehole may lead to problems associated with reduced ROP. A smaller drillpipe diameter may result in exceeding standpipe pressure or pump limits, or the drillstring may become too flexible and exacerbate stick/slip or steering problems. The larger flow area created by a smaller drillpipe or larger hole may also create hole-cleaning difficulties. Whatever the challenge, minimizing wellbore instability is a key to reaching ERD goals. The mud-weight window between collapse and mud loss is often narrow in high-angle wells; that limitation is exacerbated by the higher ECDs that characterize these wells. These conditions mean that it can be difficult to avoid wellbore instability. Drilling engineers need to know where deformation and collapse pose a risk so they can plan adequate stability management. Autumn 21 A wellbore stability study before drilling identifies zones likely to collapse, gives an estimate of the severity of the threat and recommends mud weights to manage instability. Additionally, the study identifies zones at risk for uncontrolled instability, which may require replanning. Depending on the prevailing stress state, collapse can occur on either side, the top or the bottom of the wellbore. The wellbore stability study recognizes the likely orientation of collapse, and with this information engineers can design moreeffective hole-cleaning procedures. Some types of instability, such as drilling along the shale bedding plane, can create uncontrollable collapse and are especially hazardous in ERD wells.9 Crossing faults is also common in ERD. Engineers estimate the stresses acting on these features so that their stability can be modeled. The study considers the interaction between drilling mud and shale to prevent or minimize the impact of pore pressure increases in the shale that can lead to time-dependent degradation of the wellbore. To avoid these and other problems, experts also use a geologic model during wellbore stability modeling. The results of the study are delivered through DrillMAP planning and management software. This tool provides a wellbore stability prediction for the specific well path, identifies the drilling hazards and recommends mud weights and operational procedures to minimize wellbore degradation (above).1 9. Tan CP, Rahman SS, Richards BG and Mody FK: Integrated Approach to Fluids Optimisation for Efficient Shale Instability Management, paper SPE 48875, presented at the International Oil and Gas Conference and Exhibition in China, Beijing, November 2 6, For more on drilling management software: Ali AHA, Brown T, Delgado R, Lee D, Plumb D, Smirnov N, Marsden R, Prado-Velarde E, Ramsey L, Spooner D, Stone T and Stouffer T: Watching Rocks Change Mechanical Earth Modeling, Oilfield Review 15, no. 2 (Summer 23):

7 Okha N Odoptu-More North pad RUSSIA Sakhalin Island Sakhalin Island N JAPAN South pad CHINA Yuzhno- Sakhalinsk km 1 2 mi INDONESIA > ERD in Sakhalin. Odoptu-More is a Miocene-age hydrocarbon accumulation lying off the northeast coast of Sakhalin Island, Russia. Most, if not all, of the field can be reached from land-based surface locations (yellow ovals) using extended-reach wells (black lines). The Odoptu-More field (inset) extends roughly 4 km [2.5 mi] east to west and 12 km [7.5 mi] north to south with producing intervals at roughly 1,5 to 1,7 m [4,9 to 5,6 ft] TVD. Odoptu-More is at the northern end of a group of fields that includes Chayvo, Piltun and Arkutun-Dagi. >Wellbore debris due to instability. A review of drilling records during an investigation into one Odoptu-More well indicated that most of the trouble time related to NPT was confined to relatively short depth ranges. As hole-cleaning problems worsened, cubic meters of surplus returns hard mudstone with a fine-grained structure and dimensions of up to 6 cm [2.4 in.] in diameter and 2 cm [.8 in.] in height such as the one shown here were recovered from these localized areas. The morphology of these returns did not point to a classical shear-failure mechanism generally associated with insufficient mud weight. Given their localized nature in the well and the ability to correlate these zones across part of the field, engineers theorize the likely failure mechanism is related to anisotropy within the rock itself. (Adapted from Mohammed et al, reference 11.) 1 Oilfield Review

8 Inclination and azimuth, degrees Survey tool enters cavern heading down and left Survey tool exits cavern heading up and right Drilling azimuth Ream azimuth 1 Ream azimuth 2 Drilling inclination Ream inclination 1 Ream inclination , 3,1 3,2 3,3 3,4 3,5 3,6 3,7 3,8 3,9 3,1 Depth along hole, m > Direct time-lapse evidence. In a key problem well, localized rugose zones, or caverns, could be inferred directly from inclination and azimuth anomalies seen in high-resolution, multiple-pass survey data in the 12 1 /4-in. wellbore. These continuous deviation and inclination (CDNI) data were acquired from MWD tools run through previously drilled sections of hole. Multiple passes of CDNI data are overlaid for the inflected curves and clearly track misalignments of the surveying tool excursions of up to 1.5 from the as-drilled axis of the borehole. (Adapted from Mohammed et al, reference 11.) Rosneft SMNG (Sakhalinmorneftegaz) was experiencing wellbore stability problems in extended-reach wells that accessed the northern part of the Odoptu-More structure off the coast of Sakhalin Island, Russia (previous page, top). The field has been drilled using extended-reach wells since In 23, the operator turned from drilling with positive displacement motors to using rotary steerable systems (RSSs). By 26, 21 extendedreach wells with HD/TVD ratios of up to 4.1 had been drilled and completed. The introduction of RSSs brought a substantial improvement in ROP. However, their use was accompanied by increased NPT stemming from hole-cleaning problems associated with backreaming through certain zones within the 12 1 /4-in. hole section. These problems were manifested as excessive torque and drag, ECD spikes, packoffs and stuck pipe. Using mechanical assistance such as backreaming in large-diameter holes is standard practice when pump- and flow-rate capabilities of the rig are limited. Not using backreaming under such conditions usually results in inefficient hole cleaning and subsequent difficulties running casing. However, in the case of Odoptu-More, these complications resulted from excessive amounts of nondrilled returns, consisting of hard mudstone debris, that were induced during backreaming operations (previous page, bottom). From analysis of multiple passes of real-time measurementwhile-backreaming data, the source of the debris was eventually traced to localized rugose zones within the wellbore (above). In response, the operator and Schlumberger engineers developed a depth-based mechanical earth model (MEM), specific to each well drilled. The team modified the casing program to more effectively isolate the key unstable zones. To complement these changes, the team also designed a customized risk-management strategy based on an understanding of the root causes of NPT in earlier wells. This strategy comprehensively addressed the formation of localized rugosity that resulted from tripping and backreaming operations. It has also proved effective in limiting the generation and associated spreading of debris from these zones. Engineers then used the DrillMAP planning and management tool to implement a strategy based on similar methods used in the North Sea, Gulf of Mexico and South America. This plan classifies measured depth-referenced drilling risks and details control and contingency measures against the backdrop of the MEM. A new version of this protocol and a new MEM are created for each well. In addition, the team added a real-time decision-support engineering function at the rig to implement the risk-management strategy. 11 As development continues on the Odoptu-More structure, continuous direction and inclination (CDNI) data are used to give early warning of cavities, and their precise location and condition are used to drive casing design. Push, Pull and Twist When planning an extended-reach well, engineers must also consider the physics of wellbore length. In vertical wells, torque, drag and buckling are essentially ignored and it is assumed the pipe is in the center of the wellbore. The loads created by these events can become so large that the pipe can no longer be rotated by the rig topdrive or moved up or down by the drawworks. The loads can also be sufficiently large that, should the pipe become stuck, efforts aimed at freeing it can cause it to part, forcing the operator to abandon the well, declare TD prematurely or drill a sidetrack well. 11. Mohammed N, Chernov M, Maňalac-Trǿn E and Kaydalov Y: Focused Risk-Management Brings a Step-Change Improvement in Drilling Performance at Sakhalin s Odoptu ERD Development, paper SPE 12818, presented at the SPE Russian Oil and Gas Technical Conference and Exhibition, Moscow, October 3 6, 26. Autumn 21 11

9 String tension and compression Axial drag Contact force Rotation Torque String tension and compression Rotation Torque Axial drag Rotation Contact force Weight of pipe String tension and compression > Torque and drag. Torque is a measure of resistance to rotation caused by friction between the casing or drillstring and the borehole wall. Drag is a measure of resistance to upward or downward movement. The amount of torque and drag seen on the tubular is a function of tension or compression and the area in contact with the borehole. When tubulars are properly centered in a vertical hole, contact with the wellbore wall is negligible and torque and drag are essentially zero (top left). During a build section, the drillpipe or casing experiences torque and drag to varying degrees because it is pressed against the top side of the borehole wall and in compression or tension (top center). In the tangential section of the hole, the tubulars are in full contact with the bottom side of the hole and in some compression or tension (top right). The amount of torque and drag created along this section of the well is primarily a function of casing weight. Buckling is caused when compressional forces resulting from drag fold the pipe against the wellbore wall in a sinusoidal configuration (bottom left). With time, if the loads continue to grow, the pipe will bend helically (bottom right), at which point downward movement is halted. In extended-reach wells, friction plays a more significant role than it does in vertical wells. This is because drillpipe and casing are forced against the sides of the extended-reach wellbore (above). The occurrence and magnitude of mechanical torque, such as bit and off-bottom frictional torque, and of drag are a function of several key factors: change drilling fluid. Mechanical torque is created when the drillstring encounters differential sticking or interacts with cuttings beds or unstable formations. 12 Making bit selection early in the well-planning process helps avoid bit torque, which is generated by the interaction of the bit and formation. Off-bottom torque, as the term implies, occurs when rotating the drillstring while it is raised above the bottom of the well. This eliminates the element of bit torque from the measurement. Drag is an axial force affected by the same factors as torque and occurs when the pipe is being moved up or down the wellbore. 12 Oilfield Review

10 Though all wells may experience differential sticking, extended-reach wells are particularly susceptible to the phenomenon, and recovering from it is more difficult than in conventional wells. The solution to wellbore instability at high angles is often higher mud weights that result in drilling overbalanced, which is the primary cause of stuck pipe. Also, compared with vertical wells, extended-reach wells typically leave longer sections of reservoir exposed for longer periods of time with the drillstring and BHA buried in cuttings on the low side of the hole. This may cause a packoff condition that results in stuck pipe. Because differential sticking can greatly increase overall friction, it may intensify minor torque, drag or buckling problems. Once differential sticking does occur in an extended-reach well, the driller s ability to get the pipe free is reduced by the high wellbore angle, which limits how much weight or tension may be transmitted to the BHA. Typically, in a conventional well, pipe may be considered permanently stuck when 667, N (15, lbf) of overpull fails to move it. In an extended-reach well, the inability to transmit weight or tension may drive that value to as low as 89, N (2, lbf). 13 The problem is made worse in the presence of high drag forces since it may be impossible to exert enough upward force to set and activate the drilling jars. 14 Because extended-reach wells are so susceptible to the effects of friction, planning engineers must simulate all major operations to ensure that each is feasible and that loads are within acceptable limits. This requires use of torque and drag modeling programs. Torque and drag models use a nondimensional friction factor that accounts for a number of elements impacting pipe movement, including: Pipe stiffness attempts to account for additional side forces on the pipe rather than a soft pipe model, which assumes the tubular con- - drillstring or casing to keep them located in the center of the hole. Hydraulic piston effects are caused by moving the pipe through fluids in the wellbore in a manner to create pressure surges. Key seats occur when the drillpipe wears a groove in one side of the hole in a build, drop or turn Depth, m 5 1, 1,5 2, 2,5 3, 3,5 4, 4,5 5, 5,5 6, 6,5 7, 7,5 8, 8, Slack-off surface tension, 1, lbf > Analyzing risk of drag. Minor variations in friction factors can have major impact on torque and drag in extended-reach wells. During the planning stage, it is essential that friction factors be analyzed for sensitivity to variations in mud weight, well path, hole profiles or drillstring configuration. This example is for a 9 5 /8-in. floated casing run in a well with an expected openhole friction factor of.5. The slack-off surface tension is equivalent to the expected reading on a weight gauge at the surface as the casing is being lowered into the well. The red curves represent several friction factors ranging from.3 to.7. In this case if the friction factor is only slightly greater than.5, the casing weight will become negative, which means that the combination of friction and the casing buoyancy in the wellbore fluids will be greater than the casing weight, preventing the casing from reaching bottom. Floated casing is a technique in which the drilling fluid is replaced by air in that part of the casing in the tangent section. This increases casing buoyancy, which reduces torque and drag by lessening the contact force between it and the borehole wall. While this eliminates the option to circulate, it may lighten the casing sufficiently for it to be rotated, which may counter the effects of torque and drag. section. The larger-diameter BHA cannot be pulled back through this groove and so becomes seated when operators attempt to move the drillstring up the hole. Small variations in friction factors can significantly impact torque and drag calculations. Changes to parameters such as mud weight, well path, casing point selection and drillstring or casing design may cause these variations during drilling. It is critical, therefore, that while planning an extended-reach well, a suitable range of friction factors be considered. Engineers use torque and drag risk analyses to determine possible outcomes when the friction factor varies (above). Cased hole section Differential sticking occurs when the drillstring cannot be moved (rotated or reciprocated) along the axis of the wellbore. Differential sticking typically occurs when high-contact forces caused by low reservoir pressures, high wellbore pressures, or both, are exerted over a sufficiently large area of the drillstring. The sticking force is a product of the differential pressure between the wellbore and the reservoir and the area that the differential pressure is acting upon. This means that a relatively low differential pressure applied over a large working area can be just as effective in sticking the pipe as can a high differential pressure applied over a small area. 13. Mims and Krepp, reference Drilling jars are mechanical devices used downhole to free stuck pipe by delivering an impact load to another downhole component. The driller sets and activates the drilling jars by slowly pulling up on the drillstring as the BHA remains stuck in place. Since the top of the drillstring is moving up, it is stretching and storing energy. When the jars reach their firing point, they allow one section of the jar to suddenly move axially relative to a second section and are pulled up rapidly in much the same way that one end of a stretched spring moves when released. This moving section slams into a steel shoulder, imparting an impact load. Autumn 21 13

11 Measured Off-Bottom Torque and Drilling Torque Measured depth, ft 5, 1, 15, 2, 25, 3, 35, Measured off-bottom torque Measured drilling torque Surface equipment limit, Eliminating the limiting factor. From a review of the Al-Shaheen field, MOQ concluded that the length of horizontal sections in the field was limited by the torque capacity of the drillpipe connections and ECD loads rather than topdrive or rig capability (top). To set its record length at the BD-4A well, the operator used 5-in. drillpipe with high-torque connections. At 23,6 ft, a section of 4-in. drillpipe was added above the BHA. Then, at 28, ft, the lubricant additive in the drilling mud was increased from 2% to 3%. As a result, drilling torque was reduced from a projected average (not shown) as high as 26, ft.lbf [35, N.m] to a measured average ranging from 14, to 21, ft.lbf [19, to 28, N.m]. Friction factors of.2 to.24 were reduced to.18 to.21. At the same time the increased flow area created by the section of smaller diameter drillpipe above the BHA reduced ECD from 15.2 to 14.3 lbm/galus [1,797 to 1,714 kg/m 3 ] (bottom). (Adapted from Sonowal et al, reference 2.) 4, 45, Off-bottom torque, 1, ft.lbf ECD Loads and Average Hole Size Measured depth, ft 5, 1, 15, 2, 25, 3, 35, 4, 8.5-in. openhole size 9.-in. openhole size 9.5-in. openhole size Measured mud weight MOQ calculated ECD 45 psi above pore pressure at heel Buckling may also become a significant challenge in drilling extended-reach wells. Buckling, a poorly understood phenomenon, is the result of cumulative drag that applies compressional forces on the drillstring or casing and causes the string to change its behavior. Buckling also occurs in BHAs but, especially since the advent of RSSs, the ability to manage it has improved. As with all ERD problems the potential for buckling must be considered during well planning. When selecting tubulars, planning turn and build rates and designing annular clearances in the lower sections of the hole, engineers must be particularly aware of the potential for buckling. Other proactive steps to help avoid buckling include maintaining a stiff drillstring while avoiding the addition of weight that can exacerbate torque and drag problems. Because pipe stiffness is a function of its radius, larger diameter drillpipe has been used in extended-reach wells to 45, ECD, lbm/galus 15. Sonowal et al, reference 2. Along-hole departure is the measured horizontal distance from surface to bottomhole if azimuth changes are removed and the wellbore unwound. 14 Oilfield Review

12 fight buckling. It is important, however, to consider the impact of the resulting frictional pressure losses on ECD. Other measures are available, including special downhole tools that reduce torque and drag forces or that better facilitate load transfer. A Model Solution The Al-Shaheen field, Block 5 offshore Qatar, has a history of poor productivity from vertical wells, and development using conventional wells would require a large number of platforms. Additionally, the field s hydrocarbon reserves are areally extensive. These factors make the field a particularly good prospect for an ERD strategy, but the operator, Maersk Oil Qatar AS (MOQ), had to first overcome torque and ECD problems that threatened to limit horizontal-reach lengths. MOQ targeted the Lower Cretaceous Kharaib B and Shuaiba carbonate formations and the Nahr Umr sandstone. The Kharaib B Formation is a laterally uniform carbonate layer about 8 ft [24 m] thick with a 25 ft [8 m] thick reservoir target. The Shuaiba Formation includes lateral facies changes and permeability contrasts. It is about 2 ft [6 m] thick with a reservoir target about 2 ft [6 m] thick. The Nahr Umr Formation is a 2-ft sand sequence with reservoir targets made up of permeable sands with a thickness of 5 ft [1.5 m] or less. In 1994, the operator drilled a recordbreaking 1.9-mi [3.1-km] horizontal section using positive displacement motors and adjustable gauge stabilizers. By adopting new technology as it became available, the company improved on that achievement. In May 28, MOQ completed a record horizontal reach of 6.8 mi [1.9 km], with a measured depth of 7.6 mi [12.3 km] and, at the time, the world s longest along-hole departure of 37,956 ft or 7.2 mi [11.6 km]. 15 The original measured depth of the well was to be 5.5 mi [8.8 km] but the operator chose to extend that to appraise the eastern flank and increase the exposure of the reservoir using a single wellbore. However, torque and drag modeling indicated loads at the new TD would exceed the topdrive and the drillstring capabilities. At the same time, ECDs would be unacceptably high using the existing 5-in. drillpipe and traditional mud properties. Modeling indicated that these ECDs and torque loads could be brought to acceptable levels using a tapered 4- by 5-in. drillstring. The model also determined that a tapered string would result in higher pump pressure and reduced flow rate at TD and that the length of the 4-in. section was the limiting factor in balancing the conflict. The final design reconciling torque and drag, hydraulics and ECD models included 7, ft [2,133 m] of 4-in. drillpipe and 15, ft [4,572 m] of 5-in. drillpipe with high-torque connections added to the top of the drillstring (previous page). The 8 1 /2-in. section of the well was drilled in two runs. The first used a PowerDrive X5 pushthe-bit RSS to reach 33,877 ft [1,326 m] with drilling torque monitoring that indicated a friction factor of between.18 and.21. During that first run, lubricant additive levels were increased from 2% to 3% to reduce torque and the severity of stick/slip and thus reduce vibration, allowing the driller to maintain ROP without damaging the BHA. Drilling torque peaked at the topdrive limit of 36, to 39, ft.lbf [49, to 53, N.m]. The operator then picked up 4-in. drillpipe to reduce torque and ECD loads. The second run using a 4- by 5-in. tapered drillstring immediately resulted in sufficient torque and ECD improvements to allow drilling to a final TD of 4,32 ft [12,29 m] MD. This included a 35 azimuth turn. Additionally a PowerDrive Xceed point-the-bit RSS was used because it requires a smaller pressure drop across the tool than the push-the-bit design. A larger bit-nozzle flow area was also included in the calculus to improve pump pressure and flow rate at the bit. The operator was able to achieve this record length by placing emphasis on ECD management and taking steps to control friction-factor increases during the planning phase of the well. Simulations indicated that if ECD-induced lostcirculation rates remained acceptable, the well could have been drilled to about 44, ft [13,4 m], at which point it would have reached the torque limit of the topdrive. Drilling Ahead Originally, constructing long horizontal wells was an economic decision either more pay zone exposed for the cost of one wellbore or numerous formations tapped for the cost of a single surface location. By acting as extremely deep-penetrating, large-diameter perforation tunnels, horizontal wells are also an answer to the challenge of achieving economic flow rates from tight, thin formations. But as the industry has learned to drill wells beyond the limits once imposed by torque, drag, ECD and rig capacities, ERD has become attractive for reasons other than economic ones. As was demonstrated at the Wytch Farm field in England, long horizontal wells also offer environmentally acceptable alternatives. The formations targeted by those wells lie beneath the ecologically sensitive Poole Harbour. By placing surface locations on land some distance from the shoreline and drilling far beneath the harbor floor, the waterway and its immediate surroundings remained isolated from operator activity. This drilling choice allowed the area to remain visually appealing and reduced the threat of ecological contamination. Today the world finds itself in something of a dilemma. People have become keenly aware of the fragility of the Earth s environment at the same time that globalization has raised the standard of living for millions. But that prosperity has come at the cost of creating an insatiable demand for hydrocarbon-base fuels, which requires more drilling. Applying ERD practices to access more deposits while drilling fewer wells from fewer surface locations is one measure the upstream industry is using to help reconcile these competing realities. RvF Autumn 21 15

Fluids, Hole Cleaning and Tripping Optimization

Fluids, Hole Cleaning and Tripping Optimization Fluids, Hole Cleaning and Tripping Optimization Overview Hole cleaning in highly deviated wells is probably one of the most misunderstood concepts. Primarily, relying on Plastic Viscosity and Yield Point

More information

Cornish Institute of Engineers Conference th October 2013

Cornish Institute of Engineers Conference th October 2013 Wellbore Stability and Real Time Drilling Optimisation: Delivered Worldwide from Cornwall Sarah Marks Cornish Institute of Engineers Conference 2013 11 th October 2013 GeoScience Limited, Falmouth Business

More information

Hydraulics and wellbore cleaning

Hydraulics and wellbore cleaning Hydraulics and wellbore cleaning 01 Hydraulics & wellbore cleaning Introduction 1.0 Drilling fluid essentials 1.1 Objectives The objectives of this section are to; 1. Present the key aspects of hydraulics

More information

Heterogeneity Type Porosity. Connected Conductive Spot. Fracture Connected. Conductive Spot. Isolated Conductive Spot. Matrix.

Heterogeneity Type Porosity. Connected Conductive Spot. Fracture Connected. Conductive Spot. Isolated Conductive Spot. Matrix. Porosity Histogram Porosity Contribution 1.3.3.3 Connected 9.8 ohm.m U R D 9 18 7. 5.25 4.38 3.5 2.63 1.75 48 Heterogeneity Distribution Image Orientation, L U 27 36.4.3 X,X72.5 Depth, ft.3 1 Isolated.3

More information

Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia

Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia Petroleum and Mineral Resources 97 Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia S. Smith & V. Rasouli Department of Petroleum Engineering, Curtin University, Australia

More information

Optimizing Drilling Performance by Wellbore Stability and Pore-Pressure Evaluation in Deepwater Exploration T. Klimentos, Schlumberger

Optimizing Drilling Performance by Wellbore Stability and Pore-Pressure Evaluation in Deepwater Exploration T. Klimentos, Schlumberger IPTC 10933 Optimizing Drilling Performance by Wellbore Stability and Pore-Pressure Evaluation in Deepwater Exploration T. Klimentos, Schlumberger Copyright 2005, International Petroleum Technology Conference

More information

MicroScope. Resistivity- and imagingwhile-drilling

MicroScope. Resistivity- and imagingwhile-drilling MicroScope Resistivity- and imagingwhile-drilling service MicroScope Magnify your reservoir Multidepth laterolog resistivity Multidepth borehole images Mud resistivity Azimuthal gamma ray Bit resistivity

More information

1 General introduction

1 General introduction 1 General introduction 1.1 Oil well drilling system Oil and other hydrocarbons are the primary source of global energy. However, the exploration of these hydrocarbons presents a myriad of challenges resulting

More information

Drilling Challenges Related to Geopressure Compartmentalization Selim S. Shaker, Geopressure Analysis Services (G.A.S.)

Drilling Challenges Related to Geopressure Compartmentalization Selim S. Shaker, Geopressure Analysis Services (G.A.S.) AADE-05-NTCE-11 Drilling Challenges Related to Geopressure Compartmentalization Selim S. Shaker, Geopressure Analysis Services (G.A.S.) This paper was prepared for presentation at the AADE 2005 National

More information

Drillworks. DecisionSpace Geomechanics DATA SHEET

Drillworks. DecisionSpace Geomechanics DATA SHEET DATA SHEET Drillworks overview DecisionSpace Geomechanics Key features Pre-drill, real-time, and post-drill analyses are all easily performed in one application using the latest data from across the field

More information

Analyses of Field Measured Data With Rheology and Hydraulics Models

Analyses of Field Measured Data With Rheology and Hydraulics Models International Journal of Fluids Engineering. ISSN 0974-3138 Volume 8, Number 1 (2016), pp. 1-12 International Research Publication House http://www.irphouse.com Analyses of Field Measured Data With Rheology

More information

J.V. Herwanger* (Ikon Science), A. Bottrill (Ikon Science) & P. Popov (Ikon Science)

J.V. Herwanger* (Ikon Science), A. Bottrill (Ikon Science) & P. Popov (Ikon Science) 29829. One 4D geomechanical model and its many applications J.V. Herwanger* (Ikon Science), A. Bottrill (Ikon Science) & P. Popov (Ikon Science) Main objectives (i) Field case study demonstrating application

More information

Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer

Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer TM Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer Artificial Intelligence 2 Artificial Intelligence 3 3 Artificial Intelligence 4 Artificial Intelligence

More information

Predicting the path ahead

Predicting the path ahead Predicting the path ahead Horizontal drilling has become a routine procedure in many parts of the world and is particularly popular in the Middle East. Despite increasing familiarity with the techniques,

More information

Introduction to Oil&Gas Well Drilling

Introduction to Oil&Gas Well Drilling Introduction to Oil&Gas Well Drilling Drilling Introduction to Oil&Gas Well Drilling The term drilling indicates the whole complex of operations necessary to construct wells of circular section applying

More information

Multi-target wells: a new concept to improve well economics

Multi-target wells: a new concept to improve well economics Multi-target wells: a new concept to improve well economics OMV AG, Vienna, Austria ABSTRACT: The Vienna Basin is a sedimentary basin more than 10 km in thickness and composed of more than a dozen hydrocarbon

More information

X,800. X,850 ft. X,900 ft. X,950 ft. X,000 ft. GeoSphere. Reservoir Mapping-While-Drilling Service

X,800. X,850 ft. X,900 ft. X,950 ft. X,000 ft. GeoSphere. Reservoir Mapping-While-Drilling Service X,800 X,850 ft X,900 ft X,950 ft X,000 ft GeoSphere Reservoir Mapping-While-Drilling Service Discover reservoir mapping-while-drilling...... and reveal subsurface beddings and fluid contacts at the reservoir

More information

geovision Resistivity imaging for productive drilling

geovision Resistivity imaging for productive drilling geovision Resistivity imaging for productive drilling geovision Resistivity imaging while drilling helps position wells in the best place in the reservoir in less time. Real-time resistivity measurements

More information

Optimum Mud Overbalance and ROP Limits for Managing Wellbore Stability in Horizontal Wells in a Carbonate Gas Reservoir

Optimum Mud Overbalance and ROP Limits for Managing Wellbore Stability in Horizontal Wells in a Carbonate Gas Reservoir Optimum Mud Overbalance and ROP Limits for Managing Wellbore Stability in Horizontal Wells in a Carbonate Gas Reservoir Authors: Khaqan Khan and Dr. Hamoud A. Al-Anazi ABSTRACT Saudi Aramco has been drilling

More information

Introduction to Formation Evaluation Abiodun Matthew Amao

Introduction to Formation Evaluation Abiodun Matthew Amao Introduction to Formation Evaluation By Abiodun Matthew Amao Monday, September 09, 2013 Well Logging PGE 492 1 Lecture Outline What is formation evaluation? Why do we evaluate formation? What do we evaluate?

More information

Downhole Navigation for Oil & Gas Drilling

Downhole Navigation for Oil & Gas Drilling Downhole Navigation for Oil & Gas Drilling Martin E. Poitzsch Research Director, Sensor Physics Schlumberger-Doll Research, Cambridge, MA A Division of Schlumberger Ltd. Outline Importance of Accurate

More information

STICK-SLIP WHIRL INTERACTION IN DRILLSTRING DYNAMICS

STICK-SLIP WHIRL INTERACTION IN DRILLSTRING DYNAMICS STICK-SLIP WHIRL INTERACTION IN DRILLSTRING DYNAMICS R. I. Leine, D. H. van Campen Department of Mechanical Engineering, Eindhoven University of Technology, P. O. Box 513, 5600 MB Eindhoven, The Netherlands

More information

Can Geomechanics Improve Your Drilling and Completions?

Can Geomechanics Improve Your Drilling and Completions? Can Geomechanics Improve Your Drilling and Completions? Spoiler Alert Yes. CSPG Operations Geology Division March 15, 2018 Presented by Amy Fox, Ph.D., P.Geo. Introduction Montney AFE vs. Actual Drilling

More information

Directional Drilling. History

Directional Drilling. History Directional Drilling Directional drilling is the science of deviating a well bore along a planned course to a subsurface target whose location is a given lateral distance and direction from the vertical.

More information

MULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute

MULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute MULTIPLE CHOICE QUESTIONS ON OIL, GAS, AND PETROCHEMICALS The Energy and Resources Institute Preface Petroleum as everyone knows consists of hydrocarbons of various molecular weights and other organic

More information

Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING FLUIDS**

Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING FLUIDS** AGH DRILLING, OIL, GAS Vol. 34 No. 1 2017 http://dx.doi.org/10.7494/drill.2017.34.1.169 Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING

More information

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals

More information

Comprehensive Wellbore Stability Analysis Utilizing Quantitative Risk Assessment

Comprehensive Wellbore Stability Analysis Utilizing Quantitative Risk Assessment Comprehensive Wellbore Stability Analysis Utilizing Quantitative Risk Assessment Daniel Moos 1 Pavel Peska 1 Thomas Finkbeiner 1 Mark Zoback 2 1 GeoMechanics International, Palo Alto, CA 94303 2 Stanford

More information

ractical Geomechanics for Unconventional Resources

ractical Geomechanics for Unconventional Resources P ractical Geomechanics for Unconventional Resources 24-26 October 2012, Calgary, Canada Practical Geomechanics for Unconventional Resources Nowadays, unconventional resources have been brought into the

More information

Introduction to Oil and Gas Production

Introduction to Oil and Gas Production Introduction to Oil and Gas Production Steven Marzuola ATA Energy Conference May 4-6, 2007 Houston Texas Introduction Dope, Joints, Tripping Strippers Casing, Tubing, Liner API - American Petroleum Institute

More information

Geohazards have a direct impact on the drilling and

Geohazards have a direct impact on the drilling and SPECIAL Geohazards SECTION: G e o h a z a r d s A new, fully integrated method for seismic geohazard prediction ahead of the bit while drilling CENGIZ ESMERSOY, ARTURO RAMIREZ, SHARON TEEBENNY, YANGJUN

More information

ractical Geomechanics for Oil & Gas Industry

ractical Geomechanics for Oil & Gas Industry P ractical Geomechanics for Oil & Gas Industry Practical Geomechanics for Oil and Gas Industry The integrity of the wellbore plays an important role in petroleum operations including drilling, completion

More information

Realtime Geopressure and Wellbore Stability Monitoring while Drilling. Eamonn Doyle VP Real-time Operations

Realtime Geopressure and Wellbore Stability Monitoring while Drilling. Eamonn Doyle VP Real-time Operations Realtime Geopressure and Wellbore Stability Monitoring while Drilling Eamonn Doyle VP Real-time Operations 1 2 Main points 1. Why bother with PPwD? Isn t the prognosis good enough? 2. Can it be justified?

More information

Practical Application of Directional Drilling at Takigami Geothermal Field

Practical Application of Directional Drilling at Takigami Geothermal Field Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005 Practical Application of Directional Drilling at Takigami Geothermal Field Hisashi Jotaki 1 and Keisuke Ushijima 2 1 Idemitsu

More information

Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment

Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment AADE-07-NTCE-71 Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment Essam Adly, Schlumberger Copyright 2007, AADE This paper was prepared for presentation

More information

AADE 01-NC-HO-43. result in uncertainties in predictions of the collapse and fracture pressures.

AADE 01-NC-HO-43. result in uncertainties in predictions of the collapse and fracture pressures. AADE 01-NC-HO-43 Wellbore Stability in Deep Water Handling Geomechanical Uncertainty Daniel Moos, Ph.D., Sr. VP Technology Development, GeoMechanics International, Inc. Copyright 2001 AADE National Drilling

More information

Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it?

Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it? P E T R O L E U M E N G I N E E R I N G D E P A R T M E N T Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it? Dr. Will Fleckenstein, PE Colorado School of Mines 1 Who is involved

More information

Prediction of Collapse in a Casing and Tubing: with Case Study of Iran.

Prediction of Collapse in a Casing and Tubing: with Case Study of Iran. Australian Journal of Basic and Applied Sciences, 5(11): 831-840, 011 ISSN 1991-8178 Prediction of Collapse in a Casing and Tubing: with Case Study of Iran. 1 A.Asadi, N.Parhizgar, 3 E.Momeni 1 Department

More information

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania Authors: John Lavelle, Amin Yaghoobi About Suplac Oil Field Discovered 1958 Oil Density 960 kg/m3 (16 API) Viscosity 2300

More information

Engineering in Support of Transformative Science

Engineering in Support of Transformative Science Engineering in Support of Transformative Science Scientific Ocean Drilling of Mid-Ocean Ridge and Ridge-Flank Setting Workshop August 27, 2009 Austin, Texas Greg Myers IODP-MI Outline o Main engineering

More information

Section 19.1: Forces Within Earth Section 19.2: Seismic Waves and Earth s Interior Section 19.3: Measuring and Locating.

Section 19.1: Forces Within Earth Section 19.2: Seismic Waves and Earth s Interior Section 19.3: Measuring and Locating. CH Earthquakes Section 19.1: Forces Within Earth Section 19.2: Seismic Waves and Earth s Interior Section 19.3: Measuring and Locating Earthquakes Section 19.4: Earthquakes and Society Section 19.1 Forces

More information

Implementing and Monitoring a Geomechanical Model for Wellbore Stability in an Area of High Geological Complexity

Implementing and Monitoring a Geomechanical Model for Wellbore Stability in an Area of High Geological Complexity AADE-10-DF-HO-15 Implementing and Monitoring a Geomechanical Model for Wellbore Stability in an Area of High Geological Complexity J. G. Vargas, Halliburton; J. Mateus, Halliburton; A. Jaramillo, Halliburton;

More information

Ensuring integrity of shale gas wells in Europe

Ensuring integrity of shale gas wells in Europe M4Shale Gas Final Conference, Krakow, Poland 19.10.2017 Ensuring integrity of shale gas wells in Europe M. Torsæter, K. Gawel, J. Todorovic, A. Stroisz, R. Skorpa and A. Lavrov SINTEF Petroleum Research,

More information

Corporate Houston, TX... (713)

Corporate Houston, TX... (713) Allied Wireline Services and Horizontal Wireline Services are proud to announce that we are now one company, dedicated to providing you the highest value wireline services and built on the commitment to

More information

SKM DRILLING ENGINEERING. Chapter 4 - Drilling Problems

SKM DRILLING ENGINEERING. Chapter 4 - Drilling Problems SKM 3413 - DRILLING ENGINEERING Chapter 4 - Drilling Problems Assoc. Prof. Abdul Razak Ismail Petroleum Engineering Dept. Faculty of Petroleum & Renewable Energy Eng. Universiti Teknologi Malaysia 2 Contents

More information

Instructional Objectives

Instructional Objectives GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives

More information

Rotary Drilling Rotary Drilling Bits

Rotary Drilling Rotary Drilling Bits GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives

More information

RHELIANT PLUS Superior performance, thermal stability and cost savings from the next generation flat rheology invert emulsion system for deepwater

RHELIANT PLUS Superior performance, thermal stability and cost savings from the next generation flat rheology invert emulsion system for deepwater RHELIANT PLUS Superior performance, thermal stability and cost savings from the next generation flat rheology invert emulsion system for deepwater drilling RHELIANT PLUS: Innovation for faster drilling

More information

DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS. *V. Rasouli, B.

DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS. *V. Rasouli, B. DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS *V. Rasouli, B. Evans Department of Petroleum Engineering, Curtin University ARRC Building,

More information

Multi-skill software for Planning, Following-Up and Post Analysis of wells.

Multi-skill software for Planning, Following-Up and Post Analysis of wells. Multi-skill software for Planning, Following-Up and Post Analysis of wells. Calculation and presentation of the Well Plan Recalculate and update the prognosis during drilling including geology information.

More information

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G IODP Expedition 341S: SCIMPI and 858G ReCORK Week 1 Report (19 27 May 2013) Operations Victoria Port Call and Transit to Hole 858G IODP SCIMPI and 858G ReCORK Expedition (341S) officially began when the

More information

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals

More information

New downhole technologies helped develop horizontal thin sand

New downhole technologies helped develop horizontal thin sand Reprinted from: June 2005 issue, pgs 25-33. Used with permission. DRILLING AND COMPLETION TECHNOLOGY SPECIAL FOCUS New downhole technologies helped develop horizontal thin sand Completion of Well Ewan-YH

More information

A Field Case Example of Wellbore Strengthening Design and Verification Process

A Field Case Example of Wellbore Strengthening Design and Verification Process AADE-11-NTCE-26 A Field Case Example of Wellbore Strengthening Design and Verification Process Mario Bouguetta, Quanxin Guo, and J.D. Moffitt, M-I SWACO Copyright 2011, AADE This paper was prepared for

More information

TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT. Abstract:

TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT. Abstract: 29 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 29NTCE-5-4 srotary ssteerable TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT HAMMAD ZAFAR, NINO SUAREZ, RAYMOND

More information

3 Mathematical modeling of the torsional dynamics of a drill string

3 Mathematical modeling of the torsional dynamics of a drill string 3 Mathematical modeling of the torsional dynamics of a drill string 3.1 Introduction Many works about torsional vibrations on drilling systems [1, 12, 18, 24, 41] have been published using different numerical

More information

Petrophysical Data and Open Hole Logging Operations Basics COPYRIGHT. Introduction to Petrophysical Data and Open Hole Logging Operations Basics

Petrophysical Data and Open Hole Logging Operations Basics COPYRIGHT. Introduction to Petrophysical Data and Open Hole Logging Operations Basics Learning Objectives Petrophysical Data and Open Hole Logging Operations Basics Introduction to Petrophysical Data and Open Hole Logging Operations Basics By the end of this lesson, you will be able to:

More information

Pressure Regimes in Deep Water Areas: Cost and Exploration Significance Richard Swarbrick and Colleagues Ikon GeoPressure, Durham, England

Pressure Regimes in Deep Water Areas: Cost and Exploration Significance Richard Swarbrick and Colleagues Ikon GeoPressure, Durham, England Pressure Regimes in Deep Water Areas: Cost and Exploration Significance Richard Swarbrick and Colleagues Ikon GeoPressure, Durham, England FINDING PETROLEUM 26 th September 2012 OUTLINE of PRESENTATION

More information

Sand Control Rock Failure

Sand Control Rock Failure Sand Control Rock Failure Why? A bit of Mechanics on rock failure How? Some choices that depend on the rock What is moving? Sand grains? Fines? 3/14/2009 1 Young s Modulus, E Young s Modulus is a material

More information

MASTER S THESIS. Study program/ Specialization: Spring semester, Petroleum Engineering/Drilling Technology. Open access.

MASTER S THESIS. Study program/ Specialization: Spring semester, Petroleum Engineering/Drilling Technology. Open access. Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering/Drilling Technology Spring semester, 2014 Open access Writer: Dishni Altamirov (Writer s signature)

More information

6. THE BOREHOLE ENVIRONMENT. 6.1 Introduction. 6.2 Overburden Pressures

6. THE BOREHOLE ENVIRONMENT. 6.1 Introduction. 6.2 Overburden Pressures 6. THE BOREHOLE ENVIRONMENT 6.1 Introduction Wireline logging has a single clearly defined purpose: to give accurate and representative data on the physical properties of the rock formations and fluids

More information

Drilling Engineering Design and Application of Well Fengshen-x601

Drilling Engineering Design and Application of Well Fengshen-x601 Advances in Petroleum Exploration and Development Vol. 8, No. 1, 2014, pp. 85-89 DOI:10.3968/5609 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Drilling Engineering Design

More information

AADE-06-DF-HO-15. A. Arbizu, P Reid and H Santos, Impact Solutions Group

AADE-06-DF-HO-15. A. Arbizu, P Reid and H Santos, Impact Solutions Group AADE-06-DF-HO-15 Field Results of Ultra-low Invasion Drilling Fluids Demonstrate Reduced Wellbore Instability, Reduced Mud Losses, Wellbore Strengthening and Improved Well Productivity A. Arbizu, P Reid

More information

Microseismicity applications in hydraulic fracturing monitoring

Microseismicity applications in hydraulic fracturing monitoring Available online atwww.scholarsresearchlibrary.com Archives of Applied Science Research, 2016, 8 (4):13-19 (http://scholarsresearchlibrary.com/archive.html) ISSN 0975-508X CODEN (USA) AASRC9 Microseismicity

More information

Critical Borehole Orientations Rock Mechanics Aspects

Critical Borehole Orientations Rock Mechanics Aspects Critical Borehole Orientations Rock Mechanics Aspects By R. BRAUN* Abstract This article discusses rock mechanics aspects of the relationship between borehole stability and borehole orientation. Two kinds

More information

Coupling Axial Vibration With Hook Load/Bit Force And The Effect Of Shock Absorber

Coupling Axial Vibration With Hook Load/Bit Force And The Effect Of Shock Absorber International Journal of Engineering Research and Technology. ISSN 0974-3154 Volume 10, Number 1 (017), pp. 61-69 International Research Publication House http://www.irphouse.com Coupling Axial Vibration

More information

MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to:

MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to: LEARNING OBJECTIVES MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS Coring Operations Basics By the end of this lesson, you will be able to: Understand why cores are justified and who needs core data

More information

Subsurface Geology and Resource Exploration

Subsurface Geology and Resource Exploration LAB 11. Subsurface Geology and Resource Exploration Locating earth resources such as aluminum, copper, gold and gemstones has been an important job for geologists for a long time. This lab deals with the

More information

Exploration, Drilling & Production

Exploration, Drilling & Production Nontechnical Guide to PETMOLEUM Geology, Exploration, Drilling & Production Third Edition Norman J. Hyne, Ph.D. Contents Preface *i Introduction 1 The Nature of Gas and Oil 1 Petroleum 1 The Chemistry

More information

Seismic Guided Drilling: Near Real Time 3D Updating of Subsurface Images and Pore Pressure Model

Seismic Guided Drilling: Near Real Time 3D Updating of Subsurface Images and Pore Pressure Model IPTC 16575 Seismic Guided Drilling: Near Real Time 3D Updating of Subsurface Images and Pore Pressure Model Chuck Peng, John Dai and Sherman Yang, Schlumberger WesternGeco Copyright 2013, International

More information

Stuck Pipe Prevention

Stuck Pipe Prevention SUGAR LAND LEARNING CENTER Stuck Pipe Prevention SELF - LEARNING COURSE USEFUL PRE-REQUISITES A Primer of Oilwell Drilling Sugar Land Learning Center Introduction to self-learning: Self-learning enables

More information

Identified a possible new offset location where the customer is currently exploring drill options.

Identified a possible new offset location where the customer is currently exploring drill options. GroundMetrics was hired to conduct a Full-Field Resistivity Survey for an oil and gas producer that needed to make crucial decisions to drive profitability at the location. The results saved them hundreds

More information

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Master of Science in Petroleum Technology, Drilling Specialization Spring semester, 2013 Restricted Access Writer: Anders

More information

Drilling a geothermal well into a deep sedimentary geothermal reservoir conclusions from case study Gross Schoenebeck

Drilling a geothermal well into a deep sedimentary geothermal reservoir conclusions from case study Gross Schoenebeck Drilling a geothermal well into a deep sedimentary geothermal reservoir conclusions from case study Gross Schoenebeck Wulf Brandt & Geothermics Group GeoForschungsZentrum Potsdam In situ Geothermal Laboratory

More information

An Open Air Museum. Success breeds Success. Depth Imaging; Microseismics; Dip analysis. The King of Giant Fields WESTERN NEWFOUNDLAND:

An Open Air Museum. Success breeds Success. Depth Imaging; Microseismics; Dip analysis. The King of Giant Fields WESTERN NEWFOUNDLAND: VOL. 7, NO. 4 2010 GEOSCIENCE & TECHNOLOGY EXPLAINED GEO EXPRO VOL. 7, NO. 4 2010 Success breeds Success geoexpro.com Country Profile: Senegal Ocean Bottom Node Seismic WESTERN NEWFOUNDLAND: An Open Air

More information

Estimation of Pore Pressure from Well logs: A theoretical analysis and Case Study from an Offshore Basin, North Sea

Estimation of Pore Pressure from Well logs: A theoretical analysis and Case Study from an Offshore Basin, North Sea P-217 Estimation of Pore Pressure from Well logs: A theoretical analysis and Case Study from an Offshore Basin, North Sea Pritam Bera Final Year, M.Sc.Tech. (Applied Geophysics) Summary This paper concerns

More information

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW)

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW) APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW) Operator: Pursuant to section 8 and 9 of the Petroleum and Natural Gas Act (R.S.N.L. 1990, c. P-10) and in compliance with section 29 of the Petroleum Drilling

More information

DRILLING IN MENENGAI FIELD SUCCESS AND CHALLENGES

DRILLING IN MENENGAI FIELD SUCCESS AND CHALLENGES Presented at Short Course VIII on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Oct. 31 Nov. 22, 2013. GEOTHERMAL TRAINING PROGRAMME

More information

Advances in Geosteering

Advances in Geosteering Advances in Geosteering SMART4D While Drilling Geosteering Marcellus Case Study Joint Presentation: Feb 27 th 2014, Houston, TX Rocky Mottahedeh, P.Geol. P.Eng. EOW Report University_31_18_2H Advances

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

AADE 2009NTCE DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM

AADE 2009NTCE DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-14-06 DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM AUTHOR(S) & AFFILIATIONS: SONNY BRYAN, JOE COX,

More information

Exploring and Drilling for Oil and Gas. Prepared by Tom Sheeran

Exploring and Drilling for Oil and Gas. Prepared by Tom Sheeran Exploring and Drilling for Oil and Gas What are Oil and Gas? Oil and Gas are substances found within the earth s crust. They are thought to come from decomposed plant and animal matter. Scientists believe

More information

Investigation of Drill Bit Heave Response to Drill Rig Heave Excitation

Investigation of Drill Bit Heave Response to Drill Rig Heave Excitation Investigation of Drill Bit Heave Response to Drill Rig Heave Excitation Liqing Huang, Galin V. Tahchiev and Yusong Cao MARINTEK USA Inc 263 Augusta Drive, Suite 2, Houston, Texas, 7757, USA ABSTRACT Managing

More information

(Refer Slide Time: 02:18)

(Refer Slide Time: 02:18) Geology and Soil Mechanics Prof. P. Ghosh Department of Civil Engineering Indian Institute of Technology Kanpur Lecture 40 Shear Strength of Soil - C Keywords: Shear strength of soil, direct shear test,

More information

Unconventional Natural Gas A Brief Review for Instituto Petroquimica Argentina

Unconventional Natural Gas A Brief Review for Instituto Petroquimica Argentina October 5, 2010 Unconventional Natural Gas A Brief Review for Instituto Petroquimica Argentina William L. Tittle Principal and Director of Strategy Americas and Asia Raul Arias Alvarez Senior Consultant

More information

Case History of First Liner Drilling Application in Romania

Case History of First Liner Drilling Application in Romania Case History of First Liner Drilling Application in Romania Ali Qureshi Well Delivery Team Leader-Team-5 OMV Petrom S.A. Bucharest, 28 th April 2016 Agenda Introduction Background (well design, prognosis

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Session 3 Understanding Earthquakes and Earthquake Hazards Lecturer: Dr. Patrick Asamoah Sakyi Department of Earth Science, UG Contact Information:

More information

MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE

MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE 6 JOURNEES SCIENTIFIQUES ET TECHNIQUES Hôtel Hilton, 20 to 22 june 2004, Algiers, Algeria MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE FOSTER, L. AIDOO, A. TOURQUI,

More information

Apply Rock Mechanics in Reservoir Characterization Msc Julio W. Poquioma

Apply Rock Mechanics in Reservoir Characterization Msc Julio W. Poquioma Apply Rock Mechanics in Reservoir Characterization Msc Julio W. Poquioma Chief Reservoir Engineer PetroSA Mobil: +27 79 492.02.52 Email julio.poquioma@petrosa.co.za Aberdeen, April 18 20 / 2012 Content

More information

HELICAL BUCKLING OF DRILL-STRINGS

HELICAL BUCKLING OF DRILL-STRINGS HELICAL BUCKLING OF DRILL-STRINGS Marcin Kapitaniak 1,, Vahid Vaziri 1,, and Marian Wiercigroch 1 1 Centre for Applied Dynamics Research, School of Engineering, University of Aberdeen, Aberdeen, AB24 3UE,

More information

Stress Calibration from Drilling Data

Stress Calibration from Drilling Data Stress Calibration from Drilling Data Possibilities and Limitations Stefan Wessling, Anne Bartetzko, Thomas Dahl October 6 th 2011 FKPE Workshop Hannover Overview Introduction wellbore stability model

More information

AADE 02 DFWM-HO-14. Low Shear Rate Rheology: Clarifying Muddied Waters Terry Hemphill, Baroid product service line, Halliburton.

AADE 02 DFWM-HO-14. Low Shear Rate Rheology: Clarifying Muddied Waters Terry Hemphill, Baroid product service line, Halliburton. AADE 2 DFWM-HO-14 Low Shear Rate Rheology: Clarifying Muddied Waters Terry Hemphill, Baroid product service line, Halliburton Copyright 22 AADE Technical Conference This paper was prepared for presentation

More information

AADE-03-NTCE-19. The key to this increasingly complex and costly process is Survey Management.

AADE-03-NTCE-19. The key to this increasingly complex and costly process is Survey Management. AADE-03-NTCE-19 Survey Management Provides A Safer Drilling Environment With Reduced Drilling Costs Roger Miller, Mike Terpening, Greg Conran, Schlumberger Copyright 2003 AADE Technical Conference This

More information

True 3D measurements for enhanced reservoir quantification. Rt Scanner

True 3D measurements for enhanced reservoir quantification. Rt Scanner True 3D measurements for enhanced reservoir quantification Rt Scanner Rt Scanner measurements in three dimensions at multiple depths of investigation (DOIs) quantify even low-resistivity laminated pay

More information

A fresh look at Wellbore Stability Analysis to Sustainable Development of Natural Resources: Issues and Opportunities

A fresh look at Wellbore Stability Analysis to Sustainable Development of Natural Resources: Issues and Opportunities A fresh look at Wellbore Stability Analysis to Sustainable Development of Natural Resources: Issues and Opportunities Dr.Parag Diwan, Dr.B.P.Pandey, Dharmendra Kumar Gupta*, Suresh Ayyappan Department

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Geomechanical controls on fault and fracture distribution with application to structural permeability and hydraulic stimulation

Geomechanical controls on fault and fracture distribution with application to structural permeability and hydraulic stimulation CSPG Luncheon Calgary February 5 th 2015 Geomechanical controls on fault and fracture distribution with application to structural permeability and hydraulic stimulation Scott Mildren - Ikon Science Australian

More information

Optimizing Hole Cleaning Using Low Viscosity Drilling Fluid

Optimizing Hole Cleaning Using Low Viscosity Drilling Fluid Advances in Petroleum Exploration and Development Vol. 14, No. 1, 2017, pp. 55-61 DOI:10.3968/9658 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Optimizing Hole Cleaning

More information

Forces in Earth s Crust

Forces in Earth s Crust Name Date Class Earthquakes Section Summary Forces in Earth s Crust Guide for Reading How does stress in the crust change Earth s surface? Where are faults usually found, and why do they form? What land

More information

BAUER MeBo Sea Bed Drill Rig

BAUER MeBo Sea Bed Drill Rig BAUER MeBo Sea Bed Drill Rig Spotlights BAUER Maritime Experiences 1993 Diamond deposit exploration with a BC cutter in water depth of 160 m (South Africa) Atlantic Ocean 2005 Drilling inside of a monopile

More information