1 IRRIGATION REHABILITATION PROGRAM 2014/2015 STATUS REPORT Prepared by Irrigation Secretariat Lethbridge, Alberta May 2016

2 ACKNOWLEDGEMENTS Gerald Ontkean of Alberta Agriculture and Forestry s Basin Water Management Section provided much of the information contained in this report as part of Mr. Ontkean s monitoring of the construction activities of the irrigation districts. LIST of ACRONYMS IRP Irrigation Rehabilitation Program Irrigation Capital Works MW Major Works PS Planning Studies 14/15 Period 2

3 ABSTRACT This annual Irrigation Rehabilitation Program (IRP) Status Report summarizes the expenditures and status of all IRP projects that were active during the construction period. The IRP began in 1969 and is a cost shared program between Alberta Agriculture and Forestry and Alberta s 13 irrigation districts. The IRP funding is provided to the districts according to an inter-district allocation formula. Since 1969 funding levels have varied between $600,000 and $33,400,000 per year. The 2014 funding allocations are shown in Table 1. The provincial/irrigation district cost share ratio has varied since 1969, starting at 86 province - 14 irrigation district, changing to in 1994/95 and to in 1995/96 and remains at that ratio today. Irrigation Rehabilitation Financing Agreements are prepared annually between the Minister and each irrigation district. s must be approved by Irrigation Council prior to any project costs being paid for with cost shared funds, and all eligible project expenditures must be documented by Progress Certificates. Circumstances may arise that require an irrigation district to change project priorities from time to time. As well, actual costs may differ from estimated costs because of various circumstances, i.e. poor working conditions due to weather, construction cost inflation, etc. Information contained in this report was gathered from random monitoring (field visits) of project construction sites, records from the Basin Water Management Section and the Irrigation Secretariat and information from irrigation district personnel. 3

4 AETNA IRRIGATION DISTRICT (AID) During this reporting period the AID expended $13,367 of IRP cost shared funds on two projects in the category. Expenditures involved fencing of a previously completed project and engineering and design work. AID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth Aetna Main Canal Phase 1 Lateral C15 Extension Phase 1 Engineering and Design N/A

5 BOW RIVER IRRIGATION DISTRICT (BRID) During this reporting period the BRID expended $3,534,556 of IRP cost shared funds on eight projects in the and PS categories. Expenditures involved installation of pipeline, instrumentation, cleanup of previously completed IRP projects, and engineering for upcoming projects. BRID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth 2227 PS *Irrigation Demand Model (IDM) Laterals C-8/C-8-3 (Hays Block) Lateral M1 (Hays Block) N/A N/A , Lateral C (West Block) N/A Lateral D-4 (West Block) Structure Automation & Flow Measurement (2013) Lateral C-7 (Hays Block) Lateral H-6-3, K-11-A, K-11-C,K-11-D, K-11-E (Vauxhall Block) , sites instrumented N/A N/A 5 5 NOTE: * indicates Special Funding provided towards this project. The funding was allocated to BRID in 2011/12 13,291 5

6 EASTERN IRRIGATION DISTRICT (EID) During this reporting period the EID expended $12,012,157 of IRP cost shared funds on six projects in the and PS categories. Expenditures involved cleanup of previously completed IRP projects, collection of samples for water quality analysis, installation of pipeline and engineering for upcoming projects. EID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth 2226 PS *Irrigation Water sites sampled Quality Assessment 2274 AH North Bantry N/A J West Bantry , North Branch , North Branch , Bow Slope N/A ,576 NOTE: * indicates Special Funding provided towards this project 6

7 LEAVITT IRRIGATION DISTRICT (LID) No funds were expended by the LID during this reporting period. 7

8 LETHBRIDGE NORTHERN IRRIGATION DISTRICT (LNID) During this reporting period the LNID expended $7,979,764 of cost shared funds on one project in the category. Expenditures were associated with the installation of pipeline. LNID IRP Summary Rehabilitation IRP Name Approved in 14/15 to July 31/15 Liners Pipe Earth 2202 Laterals H3/H ,283 8

9 MAGRATH IRRIGATION DISTRICT (MID) During this reporting period the MID expended $15,130 of cost shared funds on one project in the category. Expenditures were associated with the installation of plastic drain tile. MID IRP Summary Rehabilitation IRP Name Approved in 14/15 to July 31/15 Liners Pipe Earth 2104 High Line Seepage Control (Phase 2) m tile drain installed 9

10 MOUNTAIN VIEW IRRIGATION DISTRICT (MVID) During this reporting period the MVID expended $270,700 of cost shared funds on one project in the category. Expenditures were associated with the installation of pipeline. MVID IRP Summary Rehabilitation IRP Name Approved in 14/15 to July 31/15 Liners Pipe Earth 2295 Highway 800 Pipeline (continuation) ,982 10

11 RAYMOND IRRIGATION DISTRICT (RID) During this reporting period the RID expended $256,493 of IRP cost shared funds on three projects in the category. Expenditures included cleanup of previously completed IRP projects, the installation of pipeline and preliminary work on an upcoming project. RID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth Welling lateral 5 phase 2 Welling Lateral 5 Phase 3 Welling lateral 5 - phase N/A , N/A

12 ROSS CREEK IRRIGATION DISTRICT (RCID) No funds were expended by the RCID during this reporting period. 12

13 ST. MARY RIVER IRRIGATION DISTRICT (SMRID) During this reporting period the SMRID expended $4,886,896 of IRP cost shared funds on sixteen projects in the and PS categories. Expenditures included cleanup of previously completed IRP projects, installation of pipelines, gabion walls and screen cleaners and preliminary work on new projects. SMRID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth 1799 Bow Island Lateral Concrete 2117 West Medicine Hat N/A Lateral West Medicine Hat Lateral 2 (upstream) 2176 Yellow Lake Lateral N/A < South Grassy Main N/A Cameron Lateral N/A < PS Water Storage N/A Opportunities - Study 2251 Yellow Lake Lateral N/A < Coaldale Lateral , Aquatic Weed and Algae Control Structures West Medicine Hat Lateral 13A and 13D 2271 Chin Lateral 10 Canal Armouring and structure replacement 2273 PS NE reservoir dam safety review 2288 Bow Island Lateral 7 Pipeline 2289 Aquatic Weed and Algae Control Structures PS Dam Safety Review for Stafford, Grassy Lake, and Lateral 10 Reservoirs N/A N/A N/A N/A , N/A sites installed N/A ,220 13

14 TABER IRRIGATION DISTRICT (TID) During this reporting period the TID expended $1,283,163 of IRP cost shared funds on eleven projects in the category. Expenditures involved cleanup of previously completed IRP projects, installation of canal liner, plastic drain tile, gabion walls and screen cleaners and preliminary work on upcoming projects. TID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth 1988 Big Bend Main Canal Lateral E-3 Big Bend N/A <1 100 Pipeline 2266 North Fincastle East N/A <1 100 Canal d/s Reach 2267 Lateral 3 East m plastic drain tile Horsefly 2268 Lateral G Big Bend N/A <1 100 SW W Long Term Infrastructure Plan 2283 Aquatic Weed & Algae Control gabion walls and 2 automated mechanical screen cleaners Structures (2015) 2285 Overshot Control N/A Gate Taber Main Canal at Lateral Overshot Control N/A Gate East Horsefly Main Canal at Lateral Lateral 18 Taber N/A Aquatic Weed and Algae Control Structures (2016) N/A

15 UNITED IRRIGATION DISTRICT (UID) During this reporting period the UID expended $563,606 of IRP cost shared funds on four projects in the category. Expenditures involved cleanup of previously completed IRP projects and the installation of pipeline. UID IRP Summary Rehabilitation IRP Name Approved in 14/15 to July 31/15 Liners Pipe Earth 2158 Lateral D3 & D3a N/A < Lateral B , Lateral D N/A < Lateral E ,347 4,400 15

16 WESTERN IRRIGATION DISTRICT (WID) During this reporting period the WID expended $2,455,218 of IRP cost shared funds on five projects in the category. Expenditures involved cleanup of previously completed IRP projects, installation of pipeline and preliminary work on upcoming projects. WID IRP Summary IRP Name Approved in 14/15 to July 31/15 Rehabilitation Liners Pipe Earth Sublateral 74T4 & 84T4A (Cemetery Hill) Secondary A Canal Rg Rd. 231 to S. Cluny A Canal Sublateral 81F11 North Cluny Lateral 83H6 Standard Lateral 85N7, 85N8, 85N , N/A , , N/A ,377 16

17 TABLES 17

18 TABLES The following tables summarize the results of each district s activities for 2014/2015: Table 1: Table 2: Table 3: Table 4: Table 5: Irrigation Rehabilitation Program Funding o Lists the IRP grant funding received by each district and the district s contribution. Irrigation Rehabilitation Program o Lists the IRP projects having substantial construction in each district with statistical data for each project. Irrigation Rehabilitation Program Summary of Funding and Expenditures o Lists each district s Major Works (MW), Irrigation Capital Works () and Planning Study (PS) expenditures, total funding allocation, and total expenditures. The expenditures are calculated from each district s progress certificates submitted for the construction period. Irrigation Rehabilitation Program Summary of Existing Rehabilitated Lengths o Lists the length of the irrigation districts current distribution systems, rehabilitated lengths in each district to July 31, 2014, the length of rehabilitation within the 2014/2015 construction period, and the total length rehabilitated to July 31, Irrigation Rehabilitation Program Summary of Lengths and Type of Rehabilitation o Historical summary of total length and type of rehabilitation completed from 1969 to July 31,

19 Table 1. Irrigation Rehabilitation Program Funding The following table lists IRP grants received by each district and each district s contribution. Irrigation District Base Funding Provincial Grant Special Funding Base Funding District contribution Total Program Aetna $72,711 $0 $24,237 $96,948 Bow River $3,185,862 $0 $1,061,954 $4,247,816 Eastern $5,090,220 $265,000 $1,696,740 $7,051,960 Leavitt $84,518 $0 $28,173 $112,691 Lethbridge Northern $2,299,009 $0 $766,336 $3,065,345 Magrath $238,465 $0 $79,488 $317,953 Mountain View $78,843 $0 $26,281 $105,124 Raymond $567,546 $0 $189,182 $756,728 Ross Creek $18,248 $0 $6,083 $24,331 St Mary River $5,480,096 $0 $1,826,699 $7,306,795 Taber $1,127,534 $0 $375,845 $1,503,379 United $536,307 $0 $178,769 $715,076 Western $1,955,641 $0 $651,880 $2,607,521 TOTAL $20,735,000 $265,000 $6,911,667 $27,911,667 Note: Base Funding Grants are cost shared 75 Province/25 Irrigation District Base Funding Grants are based on the Inter-District Allocation Formula as follows: - 50 of the funds allocated on the basis of the number of irrigation acres in each district - 50 of the funds allocated on the basis of the infrastructure replacement cost of specified infrastructure in each district $265,000 Special Funding Grant to EID in support of Irrigation Water Quality Assessment 19

20 Table 2. Irrigation Rehabilitation Program - Rehabilitation District Name Approval In 14/15 Complete To July 31/15 Liners Pipe Earth (Length in metres) BRID 2236 Lateral M1 (Hays Block) , BRID 2264 Lateral D-4 (West Block) ,720 EID 2292 J West Bantry ,879 EID North Branch ,618 EID North Branch ,079 LNID 2202 Laterals H3/H ,283 MID 2104 High Line Canal Seepage Control m drain tile MVID 2295 Highway 800 Pipeline (continuation) ,982 RID 2280 Welling Lateral 5 Phase ,198 SMRID 1799 Bow Island Lateral 26 Concrete ,907 SMRID 2168 West Medicine Hat Lateral 2 (upstream) drain crossings SMRID 2253 Coaldale Lateral ,092 SMRID 2288 Bow Island Lateral 7 Pipeline ,221 Aquatic Weed and Algal Control Structures SMRID Sites installed TID 1988 Big Bend Main Canal UID 2160 Lateral B ,053 UID 2263 Lateral E ,347 WID 2108 Sublateral 74T4 & 84T4A (Cemetery Hill) ,138 WID 2278 A Canal Sublateral 81F ,203 WID 2279 North Cluny Lateral 83H , , TOT AL: 84,470 metres t 20

21 Table 3. Irrigation Rehabilitation Program Summary of Funding and Expenditures - District 2014 Total Funding Gov't & district 2014/15 MW Expenditures 2014/15 + PS Expenditures 2014/15 Total Expenditures AID $96,948 $0 $13,367 $13,367 BRID $4,247,816 $0 $3,534,556 $3,534,556 EID $7,051,960 $0 $12,012,157 $12,012,157 LID $112,691 $0 $0 $0 LNID $3,065,345 $0 $7,979,764 $7,979,764 MID $317,953 $0 $15,130 $15,130 MVID $105,124 $0 $270,700 $270,700 RID $756,728 $0 $256,493 $256,493 RCID $24,331 $0 $0 $0 SMRID $7,306,795 $0 $4,886,896 $4,886,896 TID $1,503,379 $0 $1,283,163 $1,283,163 UID $715,076 $0 $563,606 $563,606 WID $2,607,521 $0 $2,455,218 $2,455,218 Total $27,911,667 $0 $33,271,050 $33,271,050 NOTE: (1) The total expenditures do not equal the total program funding as construction may occur in a different year (or years) than the year the funds were allocated. (2) Special Funding is included (if any) in total funding. (3) Some districts accrue funds to construct a larger project in the future. (4) Expenditures are categorized as either: MW (Major Works) - includes storage reservoirs and dams or conveyance works and seepage control where the design capacity is 6 m 3 /s or greater, (Irrigation Capital Works) - all other irrigation district infrastructure, or PS (Planning Studies) - studies and digital or photographic imagery used in an irrigation district's overall rehabilitation planning. 21

22 Table 4. Irrigation Rehabilitation Program Summary of Rehabilitated Lengths to July 31, 2015 District Total District Systems (Km) Total Systems Rehabilitated To July 31, 2014 (Km) 2014/2015 Rehabilitation (Km) Total To July 31, 2015 (Km) Of Total District System Rehabilitation AID BRID EID 1, LID LNID MID MVID RID RCID SMRID 1, , , TID UID WID 1, Total 7, , , NOTES: (1) Lengths in AID, BRID, EID, LNID, SMRID, UID, & WID exclude Main Canals that were rehabilitated under Alberta Environment's Water Management Systems Improvement Program. (2) Total Systems Rehabilitated for EID does not include Bank Rebuilding s constructed from 1977 to (3) Total Systems Rehabilitated for WID does not include "Tree Removal" s. (4) Totals do not include drainage works. (5) Totals do not include works rehabilitated by a district using its own funds. (6) Total length differs from Table 4 (Totals) due to recurrent rehabilitation. (7) Total Systems Rehabilitated under the IRP to July 31, 2014, and Total District Systems are based on the Basin Water Management Branch current 2015 IIMS database. 22

23 Table 5. Irrigation Rehabilitation Program Summary of Length and Type of Rehabilitation 1969 to July 31, 2015 CONCRETE LINING (km) MEMBRANE LINERS (km) PIPELINES (km) EARTH CANALS (km) TOTALS (km) OPEN DRAINS (km) 69/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / Total , , , of Total NOTES: (1) Open drains designate earth drains used to channel irrigation spill water: lengths do not include deep interceptors, toe drains, tile drains or tile grid systems. (2) Drains are not included in Total. (3) Total length differs from Table 5 due to recurrent rehabilitation. 23

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Mountain Snow Conditions and Water Supply Forecasts for Alberta

Mountain Snow Conditions and Water Supply Forecasts for Alberta Mountain Snow Conditions and Water Supply Forecasts for Alberta October 2001 Alberta Environment publishes the "Mountain Snow Conditions and Water Supply Forecasts for Alberta" monthly, usually from February

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Project Delivery Team Meeting. December 14, Trusted Partners Delivering Value Today for a Better Tomorrow

Project Delivery Team Meeting. December 14, Trusted Partners Delivering Value Today for a Better Tomorrow LOXAHATCHEE RIVER WATERSHED RESTORATION PROJECT Project Delivery Team Meeting December 14, 2016 One of the Last Old Growth Cypress Floodplains in the SE Florida Federally designated as a National Wild

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

ISSUES AND APPROACHES TO COUPLING GIS TO AN IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS ABSTRACT

ISSUES AND APPROACHES TO COUPLING GIS TO AN IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS ABSTRACT ISSUES AND APPROACHES TO COUPLING GIS TO AN IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS Yanbo Huang 1, Milton Henry 2, David Flahive 3, Guy Fipps 4 ABSTRACT Geographic Information Systems (GIS)

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway

More information

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

Tule Subbasin: Sustainable Groundwater Management Act (SGMA) August 24, 2016 David De Groot, Professional Engineer 4Creeks, Inc.

Tule Subbasin: Sustainable Groundwater Management Act (SGMA) August 24, 2016 David De Groot, Professional Engineer 4Creeks, Inc. Tule Subbasin: Sustainable Groundwater Management Act (SGMA) August 24, 2016 David De Groot, Professional Engineer 4Creeks, Inc. Overview 1 SUSTAINABLE GROUNDWATER MANAGEMENT ACT 2 TECHNICAL OVERVIEW OF

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE

PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE Engineers and Geologists PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUI-WAIRAU ZONE Report prepared for: Environment

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure Engineering Vulnerability

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

Moisture Situation Update November 6, 2016

Moisture Situation Update November 6, 2016 Synopsis October 2016, was unseasonably cool and wet across most of the province. This was particularly true for lands north of the Yellowhead Highway, as well as many other areas, west of Highway 2, stretching

More information

January 17, 2008 File:

January 17, 2008 File: January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

Government GIS and its Application for Decision Support

Government GIS and its Application for Decision Support Government GIS and its Application for Decision Support Zhang Qingpu (Chinese Academy of Surveying and Mapping, Email: zhangqp@casm.ac.cn) Abstract: Application of GIS in government agencies is called

More information

January 12, 2006 File:

January 12, 2006 File: January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL

More information

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA.

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA. Page 1 of 20 Hydrologic Forecast Centre Manitoba Infrastructure Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA February 28, 2019 Overview The February Outlook Report prepared by the Hydrologic

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION Aregai Tecle Professor of Hydrology Northern Arizona University Flagstaff, AZ Acknowledgement Many thanks to my research team mates and Elisabeth

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

Natural hazards in Glenorchy Summary Report May 2010

Natural hazards in Glenorchy Summary Report May 2010 Natural hazards in Glenorchy Summary Report May 2010 Contents Glenorchy s hazardscape Environment setting Flood hazard Earthquakes and seismic hazards Hazards Mass movement Summary Glossary Introduction

More information

Roger Andy Gaines, Research Civil Engineer, PhD, P.E.

Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Research Civil Engineer/Regional Technical Specialist Memphis District August 24, 2010 Objectives Where we have been (recap of situation and what s

More information

Nipigon River Landslide, Ontario, Canada

Nipigon River Landslide, Ontario, Canada Nipigon River Landslide, Ontario, Canada A. Abdelaziz, S. Besner, R. Boger, B. Fu, J. Deng, and A. Farina Presenter: Jian Deng, Ph.D, P.Eng Centre of Excellence for Sustainable Mining and Exploration,

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

STATUS OF PROJECTS IN EXECUTION FY10 SOPE SOUTH ASIA REGION. Sri Lanka. Public Disclosure Authorized. Public Disclosure Authorized

STATUS OF PROJECTS IN EXECUTION FY10 SOPE SOUTH ASIA REGION. Sri Lanka. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STATUS OF PROJECTS IN EXECUTION FY10 SOPE Sri Lanka Operations Policy and Country Services

More information

METEOROLOGICAL SERVICE DELIVERY Mozambique Model

METEOROLOGICAL SERVICE DELIVERY Mozambique Model METEOROLOGICAL SERVICE DELIVERY Mozambique Model MOZAMBIQUE INSTITUTE OF METEOROLOGY (INAM) João Atanasio Manhique National Deputy Director atanasio_m@inam.gov.mz http://www.inam.gov.mz Workshop: Achieving

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

Appendix A Flood Damages in 2013

Appendix A Flood Damages in 2013 Appendix A Flood Damages in 2013 RPT2-2014-07-09-App_A_Highwood_River_Flood_Damage_In_2013.Docx Table of Contents page Sign-Off 1. Flood Damage in 2013... 1 1.1 Background... 1 1.2 Town of High River...

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

CHAPTER 3: DATA ACQUISITION AND ANALYSIS. The research methodology is an important aspect of research to make a study results

CHAPTER 3: DATA ACQUISITION AND ANALYSIS. The research methodology is an important aspect of research to make a study results CHAPTER 3: DATA ACQUISITION AND ANALYSIS 3.1 Introduction The research methodology is an important aspect of research to make a study results are good and reliable. Research methodology also provides guidance

More information

Sedimentation in the Nile River

Sedimentation in the Nile River Advanced Training Workshop on Reservoir Sedimentation Sedimentation in the Nile River Prof. Dr. Abdalla Abdelsalam Ahmed 10-16 Oct. 2007, IRTCES, Beijing, China CWR,Sudan 1 Water is essential for mankind

More information

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30

More information

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology On the World Wide Web at http://www.hydroweb.com VOLUME 16 2008 MATHEMATICAL MODELING

More information

Bathymetric Survey and Sediment Hydroacoustic Study of Canyon Lake. Michael Anderson UC Riverside

Bathymetric Survey and Sediment Hydroacoustic Study of Canyon Lake. Michael Anderson UC Riverside Bathymetric Survey and Sediment Hydroacoustic Study of Canyon Lake Michael Anderson UC Riverside Introduction Canyon Lake was constructed in 1928 as the Railroad Canyon Reservoir as a result of the impoundment

More information

THE STUDY OF NUMBERS AND INTENSITY OF TROPICAL CYCLONE MOVING TOWARD THE UPPER PART OF THAILAND

THE STUDY OF NUMBERS AND INTENSITY OF TROPICAL CYCLONE MOVING TOWARD THE UPPER PART OF THAILAND THE STUDY OF NUMBERS AND INTENSITY OF TROPICAL CYCLONE MOVING TOWARD THE UPPER PART OF THAILAND Aphantree Yuttaphan 1, Sombat Chuenchooklin 2 and Somchai Baimoung 3 ABSTRACT The upper part of Thailand

More information

NSW MINING Health, Safety, Environment & Community

NSW MINING Health, Safety, Environment & Community NSW MINING Health, Safety, Environment & Community Developing Natural Landform in Mine Overburden Rehabilitation Tasman Willis Land Management Officer Mangoola Open Cut - Glencore Developing Natural Landform

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION 013 GEOGRAPHY (For School Candidates Only) Time: 3 Hours Tuesday, 8 th October 2009 p.m. Instructions

More information

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable Public Disclosure Authorized First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable Ecosystems AFRICA Western Africa Water Global Practice IBRD/IDA Investment Project

More information

Implementation Status & Results China CN Integrated Economic Development of Small Towns (P118597)

Implementation Status & Results China CN Integrated Economic Development of Small Towns (P118597) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China CN Integrated Economic Development of Small

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Zambia Environment & Natural Resources Global Practice Recipient Executed Activities Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 27-Dec-2017 ISR30903

More information

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018 Page 1 of 17 Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018 Overview The February Outlook Report prepared by the Hydrologic

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *6838706465* GEOGRAPHY 0460/22 Paper 2 May/June 2016 Candidates answer on the Question Paper. Additional

More information

Illinois State Water Survey Division

Illinois State Water Survey Division Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989

More information

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Abstract The Waterbury Dam was completed in October 1938 as a method of flood control in the Winooski Valley. The construction began in April1935

More information

6.4 Sensitivity Tests

6.4 Sensitivity Tests 6.4 Sensitivity Tests 6.4.1 Sensitivity of Floodplain Inundation to Width of Dry Culvert The preliminary design for the Expressway based on consideration of possible future climate effects to 2090 assumed

More information

Evaluation/Monitoring Report No. 259

Evaluation/Monitoring Report No. 259 SITE 100M EAST OF 16 LEARMORE ROAD CASTLEGORE CASTLEDERG COUNTY TYRONE LICENCE NO.: AE/13/36E NAOMI CARVER 1 Site Specific Information Site Name: 100m east of 16 Learmore Road, Castlederg, Co. Tyrone Townland:

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

Water Supply Conditions and Outlook October 1, 2018

Water Supply Conditions and Outlook October 1, 2018 Water Supply Conditions and Outlook October 1, 2018 Flow Forecasting & Operations Planning Water Security Agency Overview Water supply conditions across Saskatchewan remain near normal, with most reservoirs

More information

Weather Modification Activities in the Colorado River Basin. Mohammed Mahmoud

Weather Modification Activities in the Colorado River Basin. Mohammed Mahmoud Weather Modification Activities in the Colorado River Basin Mohammed Mahmoud Historical Information Authorized by 1968 Basin Project Act Substantially completed in 1993 Responsible for repaying reimbursable

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Operation Name: BN-National Community

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018 Page 1 of 21 Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018 Overview The March Outlook Report prepared by the Hydrologic Forecast

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

ISSUES AND APPROACHES TO COUPLING GIS TO IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS

ISSUES AND APPROACHES TO COUPLING GIS TO IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS ISSUES AND APPROACHES TO COUPLING GIS TO IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS Yanbo Huang 1 Milton Henry 2 David Flahive 3 Guy Fipps 4 ABSTRACT There are several possible approaches

More information

A BRIEF HISTORY OF EVALUATIONS PERFORMED ON THE OPERATIONAL KINGS RIVER WINTER OROGRAPHIC CLOUD SEEDING PROGRAM. Don A. Griffith and David P.

A BRIEF HISTORY OF EVALUATIONS PERFORMED ON THE OPERATIONAL KINGS RIVER WINTER OROGRAPHIC CLOUD SEEDING PROGRAM. Don A. Griffith and David P. AUGUST 2014 GRIFFITH ET AL. 29 A BRIEF HISTORY OF EVALUATIONS PERFORMED ON THE OPERATIONAL KINGS RIVER WINTER OROGRAPHIC CLOUD SEEDING PROGRAM Don A. Griffith and David P. Yorty North American Weather

More information

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014. SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,

More information

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY, UTAH SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,

More information

7.3 Sediment Delivery Analysis

7.3 Sediment Delivery Analysis 7.3 Sediment Delivery Analysis In order to evaluate potential changes in sedimentation patterns that could occur due to impacts from the FCP and LPP alignments, sediment assessment models were constructed

More information

Evaluation of the two stage ditch as a best management practice. A. Hodaj, L.C. Bowling, C. Raj, I. Chaubey

Evaluation of the two stage ditch as a best management practice. A. Hodaj, L.C. Bowling, C. Raj, I. Chaubey Evaluation of the two stage ditch as a best management practice A. Hodaj, L.C. Bowling, C. Raj, I. Chaubey Two-stage ditch: Stage 1 : main channel Stage 2 : flood plain bench Traditional ditch Twostage

More information

Hunter Water S170 Register

Hunter Water S170 Register SHI No.: 3630118 Location Name: No address Description: is an open canal cut into the surrounding pasture land with earthen embankments at the sides. It connects to the Williams River through concrete

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015 Public Disclosure Authorized The World Bank REPORT NO.: RES33110 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized LK WATER SUPPLY AND

More information

Pirai river (Bolivia)

Pirai river (Bolivia) Pirai river (Bolivia) Confluent of the Amazon river which average discharge is only 6 m3/s, but with peak discharge over 5000 m3/s, a challenge for river basin management and for flood control HYDROEUROPE

More information

Manitoba s Elevation (LiDAR) & Imagery Datasets. Acquisition Plans & Opportunities for Collaboration

Manitoba s Elevation (LiDAR) & Imagery Datasets. Acquisition Plans & Opportunities for Collaboration Manitoba s Elevation (LiDAR) & Imagery Datasets Acquisition Plans & Opportunities for Collaboration Manitoba Planning Conference May 2017 Presentation Outline Manitoba s Elevation (LiDAR) and Imagery Datasets

More information

The relationship between drainage density and soil erosion rate: a study of five watersheds in Ardebil Province, Iran

The relationship between drainage density and soil erosion rate: a study of five watersheds in Ardebil Province, Iran River Basin Management VIII 129 The relationship between drainage density and soil erosion rate: a study of five watersheds in Ardebil Province, Iran A. Moeini 1, N. K. Zarandi 1, E. Pazira 1 & Y. Badiollahi

More information

The World Bank Dam Operational Improvement and Safety (P096532)

The World Bank Dam Operational Improvement and Safety (P096532) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Water Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 17-Jun-2017 ISR27994 Implementing Agencies: Republic

More information

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 03-Mar-2017 ISR26764 Implementing Agencies: Public

More information

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017 Title: Number: Program Name: Provincial Wetlands and Water Boundaries Section Effective Date: September 1, 2017 This document was updated on: August 25, 2017 The Provincial Wetlands and Water Boundaries

More information

Implementation Status & Results Report Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813)

Implementation Status & Results Report Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 21-Jun-2018 ISR32317 Implementing

More information

Gossan s Industrial Mineral Opportunities in Manitoba

Gossan s Industrial Mineral Opportunities in Manitoba Gossan s Industrial Mineral Opportunities in Manitoba Presentation to: Gossan Resources Limited James Bamburak, M.Sc., P.Geo. July 2003 Manitoba Industry, Trade and Mines Industrial Mineral Opportunities

More information

The subject paper is being submitted for approval for publication in the annual volume entitled Geological Survey Research.

The subject paper is being submitted for approval for publication in the annual volume entitled Geological Survey Research. Water Resources Division 345 Middlefield Road Menlo Park, California January 12, 1965 Memorandum To: Mr. Frank E. Clark, Chief, General Hydrology Branch Thru: Area Hydrologist PCA From: Valmore C. LaMarche

More information

Poverty Mapping, Policy Making and Operations

Poverty Mapping, Policy Making and Operations Poverty Mapping, Policy Making and Operations Some Applications from Kenya (DECDG) Using Poverty Maps to Design Better Policies and Interventions Washington DC May 11, 2006 Outline Poverty Mapping process

More information

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY.

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. By Er. S. Muthu Parvatha Vardhini, Asst. Executive Engineer, (Designs) Water Resources

More information

Monmouthshire County Council Review of Landslips within the County December February 2014

Monmouthshire County Council Review of Landslips within the County December February 2014 Monmouthshire County Council Review of Landslips within the County December 2013- February 2014 Introduction The County of Monmouthshire suffered a period of extreme weather between December 2013 and February

More information

Surviving the Big One: Understanding and Preparing for a Major Earthquake in Western Oregon

Surviving the Big One: Understanding and Preparing for a Major Earthquake in Western Oregon Surviving the Big One: Understanding and Preparing for a Major Earthquake in Western Oregon May 21, 2013 City of Salem Salem Public Library Althea Rizzo, Geological Hazards Program Coordinator Oregon Emergency

More information

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer > i evernment OF BRITISH COLUMBIA a TO...?&.?...A 2....KO.?'!!&... Sr. *logical Engineer... Grou,,water. Section Hydrology Division Wat.er... In~.~s.tiga.ti.On.s..Branck.... 5 u BJECT...C;.roun.dw.ater...Snve

More information

Thinking Outside the Box (Culvert) Making difficult decisions for Fish Passage. Dave Stewart Oregon Department of Fish and Wildlife

Thinking Outside the Box (Culvert) Making difficult decisions for Fish Passage. Dave Stewart Oregon Department of Fish and Wildlife Thinking Outside the Box (Culvert) Making difficult decisions for Fish Passage Dave Stewart Oregon Department of Fish and Wildlife Overview Fish Passage History Fast Version Where are we at Now Approval

More information

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Third National Urban Water Sector Reform Project (P123513) Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,

More information

Summary of the 2017 Spring Flood

Summary of the 2017 Spring Flood Ottawa River Regulation Planning Board Commission de planification de la régularisation de la rivière des Outaouais The main cause of the exceptional 2017 spring flooding can be described easily in just

More information

Oregon Water Conditions Report May 1, 2017

Oregon Water Conditions Report May 1, 2017 Oregon Water Conditions Report May 1, 2017 Mountain snowpack in the higher elevations has continued to increase over the last two weeks. Statewide, most low and mid elevation snow has melted so the basin

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Environmental Assessment of Ogoniland Site Specific Fact Sheets OKULUEBU OGALE

Environmental Assessment of Ogoniland Site Specific Fact Sheets OKULUEBU OGALE Environmental Assessment of Ogoniland Site Specific Fact Sheets OKULUEBU OGALE This fact sheet is part of a series prepared as part of the Environmental Assessment of Ogoniland by the United Nations Environment

More information

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Little Swan Lake Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Agenda Little Swan Lake Dam Inspection Theoretical Little Swan Lake Siltation Rate Calculations

More information

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Oslo Symposium, August 1992). IAHS Publ. no. 210, 1992. 269 Monitoring of suspended sediment concentration in discharge

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *1391603277* GEOGRAPHY 0460/23 Paper 2 May/June 2015 Candidates answer on the Question Paper. Additional

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir

More information

DST MODEL SUPPORT SPATIAL DATA AND WATER RIGHTS INFORMATION. Tim Minor, Desert Research Institute

DST MODEL SUPPORT SPATIAL DATA AND WATER RIGHTS INFORMATION. Tim Minor, Desert Research Institute DST MODEL SUPPORT SPATIAL DATA AND WATER RIGHTS INFORMATION Tim Minor, Desert Research Institute THIS PAGE INTENTIONALLY LEFT BLANK ii TABLE OF CONTENTS LIST OF FIGURES... iii INTRODUCTION... 1 PHASE III

More information

-Assessment of current water conditions. - Precipitation Forecast. - Recommendations for Drought Monitor

-Assessment of current water conditions. - Precipitation Forecast. - Recommendations for Drought Monitor June 1, 2010 -Assessment of current water conditions - Precipitation Forecast - Recommendations for Drought Monitor Snotel WYTD Precipitation as Percentage of Average Upper Colorado Headwaters 88% of

More information

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar Conceptual Model of Stream Flow Processes for the Russian River Watershed Chris Farrar Several features of creeks affect the interactions between surface and groundwater. This conceptual model uses the

More information

Stanislaus County Water Advisory Committee. May 30, 2018

Stanislaus County Water Advisory Committee. May 30, 2018 Stanislaus County Water Advisory Committee May 30, 2018 2018 Hydrologic Conditions and Water Supply Outlook 2018 Water Allocations WEST Federal 45% State 35% CCID 100% EAST SSJID 100% OID

More information

2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure

2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure 2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure 1/30/2017 Page 1 of 22 Hydrologic Forecast Centre Manitoba Infrastructure and Transportation

More information