CONCEPT UTILITY LETTER PROMENADE AT CASTLE ROCK PD (LOTS 2, 3-A AND 4, CASLTE PINES COMMERCIAL FILING 12 & UNPLATTED LAND IN NORTHWEST CASTLE ROCK)

Size: px
Start display at page:

Download "CONCEPT UTILITY LETTER PROMENADE AT CASTLE ROCK PD (LOTS 2, 3-A AND 4, CASLTE PINES COMMERCIAL FILING 12 & UNPLATTED LAND IN NORTHWEST CASTLE ROCK)"

Transcription

1 ONET UTILITY LETTER FOR ROMENADE AT ASTLE ROK D (LOTS 2, 3-A AND 4, ASLTE INES OMMERIAL FILING & UNLATTED LAND IN NORTHWEST ASTLE ROK) October 24, 2014 Revised: December 10, 2014 OWNER/DEVELOER: romenade astle Rock, LL 5750 DT arkway, Suite 210 Greenwood Village, O BY: Bowman VISION LAND 603 ark oint Drive, Suite 100 Golden, O ROJET NO: TOWN ROJET NO: D

2 romenade at astle Rock D oncept Utility Letter age 2 of ENGINEER S STATEMENT: The enclosed utility report, and exhibits, were prepared by me or under my direct supervision and is correct to the best of my knowledge and belief. Said utility report has been prepared in accordance with applicable Town of astle Rock criteria and is in conformance with the master plan of utilities for the affected area. I accept responsibility for any liability caused by negligent acts, errors or omissions on my part in preparing this report. Lincoln J. Thomas.E. #42350 For and on Behalf of Bowman Vision Land

3 romenade at astle Rock D oncept Utility Letter age 3 of TABLE OF ONTENTS: roject Location and Description:... 4 Site Location:... 4 Description of roperty and Land Use:... 4 Water System:... 5 Existing Water System:... 5 roposed Water System:... 6 Wastewater System:... 6 Existing Wastewater System:... 6 roposed Wastewater System:... 6 References:... 8 Appendix A: Reference Materials... 9 Appendix B: Vicinity Map Appendix : lanned Development lan Appendix D: Utility Maps...

4 romenade at astle Rock D oncept Utility Letter age 4 of roject Location and Description: Site Location: The romenade at astle Rock D (Lots 2 and 4, astle ines ommercial Filing, Lot 3-A astle ines ommercial Filing 1 st Amendment and unplatted land) is a 160 acre commercial development in the northwest corner of the Town of astle Rock near the intersection of Atrium Way and Factory Shops Boulevard. The site is contained within portions of Section 22 and Section 27, Township 7 South, Range 67 West, of the 6 th.m., see Vicinity Map in Appendix B. The site is bordered on the north by astle ines Village subdivision and North Meadows extension currently under construction, on the east by The Outlets at astle Rock and Interstate 25, on the south by The Outlets at astle Rock and Lowe s, and on the west by The ines at astle Rock Apartments, existing developed parcels in Filing and State Highway 85. Description of roperty and Land Use: The 160 acre Site is planned for a maximum of 360 multi-family units, 240 hotel rooms, approximately 820,069 sf of retail/offices, 198,294 sf of restaurants, and 4.43 acres of irrigated open space. It is estimated that the development will require 2,218 SFEs of water use and 2,221 SFEs of wastewater flow. SFE flows and demands are calculated by using the table in each of the Town Water System and Wastewater ollection System riteria Manuals, see below, and are tabulated in Appendix A. This project will be developed in phases as the market will allow. The anticipated phasing for romenade at astle Rock will be in the following order: lanning Area 1, lanning Area 7, lanning Area 4, lanning Area 5, lanning Area 6, lanning Area 2, and lanning Area 3. The developer and Town of astle Rock will determine the level of infrastructure improvements required to serve any given phase at the time of the Site Development lan (SD) for that hase. Dust mitigation measures and erosion control measures will be implemented during the grading process in accordance with the Town standards. The order of phasing may be modified as the market dictates. Water Wastewater Land Use Typical ADD (gpd) Typical SFEs Typical ADF (gpd) Typical SFEs Retail / Offices 0.2 /sf /sf 0.1 /sf /sf Restaurants 3.0 sf /sf 1.5 /sf /sf Multi-Family Residential 260 /dwelling unit 0.65 /dwelling unit 130 /dwelling unit 0.65 /dwelling unit Hotel / Motel 75 /room 0.19 /room 75 /room /room Irrigated Land 3,750 /irrigated acre 9.38 /irrigated acre N/A N/A Easements will be provided around water mains and sanitary sewer mains that are outside of public right-of-ways in accordance with Town standards regarding location and size, and will be dedicated with new subdivision plats that will be submitted along with the construction

5 romenade at astle Rock D oncept Utility Letter age 5 of documents for each planning area. The Site is currently comprised of undeveloped land that has been previously graded in areas, contains native grasses, bare ground, and contains no irrigation canals or ditches, water wells, or on-site wastewater treatment facilities. There is a regulatory floodplain that encumbers a small portion of the site near the intersection of Factory Shops Boulevard and Atrium Drive; this area will be developed and a LOMR is currently being submitted. Topography on the site slopes from east to west with an elevation change of approximately 165 feet. Water System: Existing Water System: urrently on Site there are multiple existing water mains to connect to for the proposed development: - Factory Shops Boulevard (from New Memphis ourt to Atrium Drive) - astlegate Drive West (from astlegate Drive North to Atrium Drive) - Atrium Way (from State Highway 85 to Atrium Drive) - Atrium Drive (from ircular North ROW from Factory Shops Boulevard to astlegate Drive West) - V New Beale Street (from State Highway 85 to roundabout in New Beale Street) - astlegate Drive North (from State Highway 85 to asltegate Drive West) - 8 New Abbey Lane - 16 East of Highway 85 between Atrium Way and New Beale Street See Appendix D for Town provided utility maps. No known bottlenecks or shortcomings are anticipated for water distribution as the site lies entirely on the lower end of the yellow pressure zone and has adequate pressure. This Site lies entirely in the Yellow pressure zone and will rely on storage tank T A/B for water supply which is located near the intersection of Meadows arkway and oachline Road and has a capacity of 10 MG. Elevation on the site varies from 6,220 feet to 6,065 feet, which results in anticipated static water pressures of between 4 psi and 49 psi. The maximum anticipated pressure is calculated by subtracting the minimum site ground elevation from the maximum HGL and multiplying by psi/ft, while the minimum anticipated pressure is calculated by subtracting the maximum site ground elevation from the minimum HGL. Max Ground Elevation Served (ft) Min Ground Elevation Served (ft) Yellow ressure Zone: Max HGL (ft) Min HGL (ft) Max. ressure (psi) Min. ressure (psi)

6 romenade at astle Rock D oncept Utility Letter age 6 of roposed Water System: roposed development anticipates the removal of a portion of the existing water system and addition of multiple water mains within the site. The existing water mains in Factory Shops Boulevard, astlegate Drive West and Atrium Way will be extended and tied together into a 4-way cross at the proposed intersection, the fourth leg of the cross will run under the proposed Atrium Way extension up to its intersection with North Meadows, then down North Meadows to its intersection with astlegate Drive North. er Town of astle Rock Water Standards, loops will be provided in each lanning Area and around building groups to supply adequate domestic and fire pressures, and fire hydrant coverage. Any future development of the existing water infrastructure needed to serve this site is the responsibility of the Developer. There are no proposed supply facilities required to adequately serve the development. See Appendix A for water demand calculations. Wastewater System: Existing Wastewater System: urrently there are multiple sanitary mains that run near and within the site: - 54 & 27 V Along east side of State Highway 85-8 V New Abbey Lane Outfall to 27 along State Highway 85-3 x 8 V Stubs in astlegate Drive West from the existing astlegate Apartments (astle ines ommercial Filing 2, 6 and 8). - 8 V Along the north side of the Outlets at astle Rock - 10 V New Beale Street The 8 V in New Abbey Lane takes flows from the existing developed lots in Filing (rimrose School and hristian Brothers Automotive), while the 8 V mains that end at astlegate Drive West take contribution flows from the existing astlegate Apartments. roposed Wastewater System: roposed development anticipates a main extension within Atrium Way from State Highway 85 to the north end of the development to serve the majority of the site (lanning Areas 1-4). lanning Area 5 will be serviced by connecting to the existing 8 main in New Abbey Lane. lanning Area 6 will be serviced by connecting into the 27 main along State Highway 85, or connect to the sewer main in Atrium Way. lanning Area 7 will tie into the sanitary stubs that exist in astegate Drive West and then outfall through astlegate Apartments and into the 27 main along State Highway 85. Any future development of the existing wastewater infrastructure needed to serve this site is the responsibility of the Developer. There are no proposed wastewater facilities that are anticipated for this development. See Appendix A for wastewater demand calculations.

7 romenade at astle Rock D oncept Utility Letter age 7 of There are 5 Design oints in the site that analyze in depth the adequacy of existing and proposed sanitary pipes. Design oints 1 and 2 analyze the flows from the proposed lanning Area 7. Design oint 3 is at the existing connection of the Filing sanitary to the Interceptor along State Highway 85, and is taken at the critical slope at the connection. It currently takes flows from rimrose School and hristian Brothers Automotive, and will take flows from lanning Area 5. Design oint 4 will be a new connection at the intersection of Atrium Way and State Highway 85, and will convey flows from lanning Areas 1-4, and 6. Design oint 5 is at the lower extent of the site and receives flows from the entire site and flows from further upstream. Analysis of Design oints can be found in Appendix A in a routing table, and correspond to the Design oints in Appendix. These show that the existing and proposed pipes on site will be able to convey lows through the site. ritical oints are used to verify that existing pipes on site can convey existing and proposed flows. There are 2 ritical oints in the existing astlegate Apartments at critical slopes downstream of proposed lanning Area 7 and the existing astlegate Apartments. ritical slopes were determined by as-built drawings in Appendix A. ritical oint 1 passes flows from half of lanning Area 7 (180 units) and flows from 1/4 of the astlegate Apartments (188 units). Whereas ritical oint 2 also passes flows from half of lanning Area 7 (180 units) and flows from 1/2 of the existing astlegate Apartments (375 units). Analysis of ritical oints can be found in Appendix A, and correspond to the ritical oints in Appendix. Design oint 3 was estimated in the 1 st Amendment to the Final Water and Sanitary Sewer System Study for astle ines ommercial D from March 2007 (D Utility Report) to convey cfs, however, in this report it conveys 0.45 cfs. While this is larger than the planned value, it is still lower than the pipe capacity of 1.01 cfs, which results in the pipe being 44% of maximum capacity. Also, in the D Utility Report, Design oint 5 was estimated to have a capacity of.45 cfs and at full buildout was estimated to convey 7.87 cfs. In this report, the full buildout flow is 6.41 cfs, and the pipe max capacity is 8.68 cfs, which results in the pipe being 74% of maximum capacity. Overall, the sanitary flows from the site will convey through the proposed and existing pipes.

8 romenade at astle Rock D oncept Utility Letter age 8 of References: 1. Town of astle Rock Water System Design riteria Manual September Town of astle Rock Wastewater ollection System Design riteria Manual September Water and Sanitary Sewer System Study for astle ines ommercial D November st Amendment to the Final Water and Sanitary Sewer System Study for astle ines ommercial D March nd Amendment to the Final Water and Sanitary Sewer System Study, astle ines ommercial D December 2006 (rimrose School) 6. Final Utility Report for Lot 3-B, astle ines ommercial Filing, 1 st Amendment April 2013 (hristian Brothers Automotive) 7. International Fire ode 2009

9 Appendix A: Reference Materials romenade at astle Rock D oncept Utility Letter age 9 of

10 hapter 4. Water System Design riteria associated with the Town s oncept, reliminary, and Final Development ackages are documented in hapter 3 of these riteria Design Demands The tabulation below provides the Average Daily Demand (ADD) rates that shall be applied to compute the demands associated with the various types of land use within the development. Demands shall be computed for intermediate and full build-out phases of the development, and shall be assigned to the appropriate design points within the model to accurately reflect the geographical distribution of land use throughout the site. Land Use Typical ADD/Unit Typical SFEs/Unit Single Family Residential and Duplexes 400 gpd/dwelling unit 1.00/dwelling unit Multi-Family Residential (Townhomes and ondos) 260 gpd/dwelling unit 0.65/dwelling unit Retail/Offices 0.2 gpd/sf /SF Hotels/Motels 75 gpd/room 0.19/room Restaurants 3.0 gpd/sf /SF ar Washes 5,000 gpd/facility.5/facility Industrial / Other ommercial 1,200 gpd/acre 3.0/acre Institutional 800 gpd/acre 2.0/acre Rates for Typical Douglas ounty School Sizes: Elementary (10 ac, 675 students) 3,375 gpd/school 8.44/school Middle (25 ac, 850 students) 8,500 gpd/school 21.25/school High (50 ac, 1,700 students) 17,000 gpd/school 42.50/school Rates for Alternate School Sizes: Elementary Domestic 5 gpd/student 0.013/student Middle Domestic 10 gpd/student 0.025/student High Domestic 10 gpd/student 0.025/student Elementary Schools Irrigation 3,000 gpd/total acreage 7.5/total acreage Middle Schools Irrigation 5,250 gpd/total acreage 13.1/total acreage High Schools Irrigation 4,400 gpd/total acreage 11.0/total acreage hurches 600 gpd/church 1.5/church Irrigated Land (Sports Fields and School Sites Excluded) 3,750 gpd/ irrigated acre 9.38/acre Town of astle Rock Water System Design riteria Manual September

11 hapter 4. Wastewater ollection System Design riteria Wastewater System Average Daily Flow (ADF) Land Use Typical ADF/Unit Typical SFEs/Unit Single Family Residential and Duplexes 200 gpd/dwelling unit 1.00/dwelling unit Multi-Family Residential (Townhomes and ondos) 130 gpd/dwelling unit 0.65/dwelling unit Retail/Offices 0.1 gpd/sf /SF Hotels/Motels 75 gpd/room 0.375/room Restaurants 1.5 gpd/sf /SF ar Washes 5,000 gpd/acre 25.0/acre Industrial/Other ommercial 600 gpd/acre 3.0/acre Institutional 400 gpd/acre 2.0/acre hurches 300 gpd/church 1.5/church Irrigated Land 0 gpd/acre 0.0/acre Rates for Typical Douglas ounty School Sizes: Elementary (10 ac, 675 students) 3,375 gpd/school 16.88/school Middle (25 ac, 850 students) 8,500 gpd/school 42.50/school High (50 ac, 1700 students) 17,000 gpd/school 85.00/school Rates for Alternate School Sizes: Elementary 5 gpd/student 0.025/student Middle 10 gpd/student 0.050/student High 10 gpd/student 0.050/student The demands noted in the table above represent the winter time or dry weather Average Daily Flow (ADF) with no allowance for infiltration and inflow (I/I). I/I shall be accounted for in accordance with the eak Design Flow computation discussed in the sections to follow. Regarding design flows for schools, planned school sizes shall be confirmed with the Douglas ounty School District and documented in the Utility Report. The tabulated rates shown above shall be applied as appropriate, depending on the information provided by the School District. Reasonable engineering judgment shall be used in determining the estimated ADF for commercial, industrial and institutional sites. Individual evaluation and justification shall be provided when the proposed use is not specifically represented in the table above, or when the proposed flows will be inconsistent with the tabulated values. Justification of all non-residential flows shall be addressed in the Utility Report. Town of astle Rock Wastewater ollection System Design riteria Manual September

12 lanning Area romenade at astle Rock - lanning Areas Water Demand Area (ac) Retail / Office (sf) Restaurant (sf) Multi-Family Residential (du) Hotel / Motel (Room) Irr. Land (ac) SFE Open Space by A 1& Total:

13 romenade at astle Rock - lanning Areas 1-7- Sanitary Demand Multi-Family lanning Area Area (ac) Retail/ Office (sf) Restaurant (sf) Residential (du) Hotel/Motel (Room) ADF (gpd) F DF (gpd) SFE Total:

14 Design oint Multi-Family Residential (Units) romenade at astle Rock - lanning Areas Sanitary ipes apacity Misc. Uses (gpd or units) ipe Size (in) ipe Max apacity (cfs) (75% of Full) Basin Retail / Restaurant Hotel ADF umulative umulative umulative ipe Full ipe Basin Description Office (sf) (sf) (Rooms) (gpd) ADF (gpd) F DF (gpd) DF (cfs) Slope Flow (cfs) 1 1/2 A % % 1 1/2 A % % 2 A rimrose School & hristian Bros 2 Auto % % 3 A A A A A % % 1 A A 5, School, Auto A 1,2,3, A astlegate Apartments* Upstream Flows** % % DF / Max ap ritical oint 1 2 ritical oint Retail / Restaurant Multi-Family Residential Hotel Misc. Uses (gpd or ADF umulative ipe ipe Full ipe ipe Max DF/ Max Description Office (sf) (sf) (Units) (Rooms) units) (gpd) ADF (gpd) F DF (gpd) DF (cfs) Size Slope Flow (cfs) apacity (cfs) ap 1/2 A 7 + 1/4 GA % % 1/2 A 7 + 1/2 GA % % Abbreviations and Notes: A lanning Area GA astlegate Apartments * In 1994, astlegate Apartments were estimated to contain 750 units, 3/4 of this development flows through this pipe **ADF Upstream Flows derived from 2007 D Utility Study and astle Rock eak Factor Equation

15

16

17

18

19

20

21

22

23

24 D-1 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 0.67 ft Diameter 0.67 ft Discharge 1.45 ft³/s Results Discharge 1.45 ft³/s Normal Depth 0.67 ft Flow Area 0.35 ft² Wetted erimeter 2.10 ft Hydraulic Radius 0.17 ft Top Width 0.00 ft ritical Depth 0.56 ft ercent Full % ritical Slope ft/ft Velocity 4.10 ft/s Velocity Head 0.26 ft Specific Energy 0.93 ft Froude Number 0.00 Maximum Discharge 1.56 ft³/s Discharge Full 1.45 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:21:31 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

25 D-1 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.67 ft ritical Depth 0.56 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:21:31 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

26 D-2 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 0.67 ft Diameter 0.67 ft Discharge 1.45 ft³/s Results Discharge 1.45 ft³/s Normal Depth 0.67 ft Flow Area 0.35 ft² Wetted erimeter 2.10 ft Hydraulic Radius 0.17 ft Top Width 0.00 ft ritical Depth 0.56 ft ercent Full % ritical Slope ft/ft Velocity 4.10 ft/s Velocity Head 0.26 ft Specific Energy 0.93 ft Froude Number 0.00 Maximum Discharge 1.56 ft³/s Discharge Full 1.45 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:21:58 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

27 D-2 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.67 ft ritical Depth 0.56 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:21:58 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

28 D-3 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 0.67 ft Diameter 0.67 ft Discharge 1.34 ft³/s Results Discharge 1.34 ft³/s Normal Depth 0.67 ft Flow Area 0.35 ft² Wetted erimeter 2.10 ft Hydraulic Radius 0.17 ft Top Width 0.00 ft ritical Depth 0.55 ft ercent Full % ritical Slope ft/ft Velocity 3.81 ft/s Velocity Head 0.23 ft Specific Energy 0.90 ft Froude Number 0.00 Maximum Discharge 1.44 ft³/s Discharge Full 1.34 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:22:48 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

29 D-3 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.67 ft ritical Depth 0.55 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:22:48 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

30 D-4 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 1.00 ft Diameter 1.00 ft Discharge 5.16 ft³/s Results Discharge 5.16 ft³/s Normal Depth 1.00 ft Flow Area 0.79 ft² Wetted erimeter 3.14 ft Hydraulic Radius 0.25 ft Top Width 0.00 ft ritical Depth 0.92 ft ercent Full % ritical Slope ft/ft Velocity 6.57 ft/s Velocity Head 0.67 ft Specific Energy 1.67 ft Froude Number 0.00 Maximum Discharge 5.55 ft³/s Discharge Full 5.16 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:24:23 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

31 D-4 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.00 ft ritical Depth 0.92 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:24:23 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

32 D-5 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 2.25 ft Diameter 2.25 ft Discharge ft³/s Results Discharge ft³/s Normal Depth 2.25 ft Flow Area 3.98 ft² Wetted erimeter 7.07 ft Hydraulic Radius 0.56 ft Top Width 0.00 ft ritical Depth 1.18 ft ercent Full % ritical Slope ft/ft Velocity 2.91 ft/s Velocity Head 0.13 ft Specific Energy 2.38 ft Froude Number 0.00 Maximum Discharge.45 ft³/s Discharge Full ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:24:43 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

33 D-5 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 2.25 ft ritical Depth 1.18 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:24:43 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

34 ritical-1 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 0.67 ft Diameter 0.67 ft Discharge 1.42 ft³/s Results Discharge 1.42 ft³/s Normal Depth 0.67 ft Flow Area 0.35 ft² Wetted erimeter 2.10 ft Hydraulic Radius 0.17 ft Top Width 0.00 ft ritical Depth 0.56 ft ercent Full % ritical Slope ft/ft Velocity 4.02 ft/s Velocity Head 0.25 ft Specific Energy 0.92 ft Froude Number 0.00 Maximum Discharge 1.53 ft³/s Discharge Full 1.42 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 3:44:11 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

35 ritical-1 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.67 ft ritical Depth 0.56 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 3:44:11 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

36 ritical-2 roject Description Friction Method Solve For Manning Formula Full Flow apacity Input Data Roughness oefficient hannel Slope ft/ft Normal Depth 0.67 ft Diameter 0.67 ft Discharge 0.83 ft³/s Results Discharge 0.83 ft³/s Normal Depth 0.67 ft Flow Area 0.35 ft² Wetted erimeter 2.10 ft Hydraulic Radius 0.17 ft Top Width 0.00 ft ritical Depth 0.43 ft ercent Full % ritical Slope ft/ft Velocity 2.36 ft/s Velocity Head 0.09 ft Specific Energy 0.76 ft Froude Number 0.00 Maximum Discharge 0.89 ft³/s Discharge Full 0.83 ft³/s Slope Full ft/ft Flow Type Subritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft rofile Description rofile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 10/23/2014 4:01:25 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 1 of 2

37 ritical-2 GVF Output Data Normal Depth Over Rise % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.67 ft ritical Depth 0.43 ft hannel Slope ft/ft ritical Slope ft/ft 10/23/2014 4:01:25 M Bentley Systems, Inc. Haestad Methods Solution Bentley enter FlowMaster V8i (SELETseries 1) [ ] 27 Siemons ompany Drive Suite 200 W Watertown, T USA age 2 of 2

38 romenade at astle Rock D oncept Utility Letter age 10 of Appendix B: Vicinity Map SITE

39 Appendix : lanned Development lan romenade at astle Rock D oncept Utility Letter age 11 of

40 ROMENADE AT ASTLE ROK D LAN AMENDMENT TO A ORTION OF THE ASTLE INES OMMERIAL D A ORTION OF SETIONS 22 AND 27 OF TOWNSHI 7 SOUTH, RANGE 67 WEST OF THE 6TH RINIAL MERIAN TOWN OF ASTLE ROK, OUNTY OF DOUGLAS, STATE OF OLORADO Galloway & ompany, Inc. All Rights Reserved NOT FOR ONSTRUTION # - - roject No: Drawn By: hecked By: Date: JJ/KS LT 10/9/14 ROMENDATE AT ASTLE ROK D LAN AMENDMENT TO A ORTION OF THE ASTLE INES OMMERIAL D Disk File: SHEET TITLE: UTILITY LAN 3 of 4

41 Appendix D: Utility Maps romenade at astle Rock D oncept Utility Letter age of

42 . " in " V I V " 27 SMH5391 FH2252 SMH5388 SMH5385 R " V I SMH5387 I 1 5 SMH R "i n. Sanitary Sewer SMH5400 StormwaterIonduit Fiber in " 8 30 Raw Water Distribution Main FH2247 µ Legend I 8 R 1 V 1 inch = 200 feet Disclaimer: The data presented has been compiled from various sources, each of which introduces varying degrees of inaccuracies or inconsistencies. Such discrepancies in data are inherent and in supplying this product the Town of astle Rock assumes no liability for it s use or accuracy. Questions or omments regarding the cartographic composition of this map including, but not limited to, errors, omissions, corrections, and/or updates, should be directed to the Utilities Department, Town of astle Rock, (720) opyright 20, Town of astle Rock Utilities Mapping. V V VIINITY MA SMH6225 FH2336 SMH5399 R " 2 30 FH3583 SMH5397 FH2250 V SMH6230 V V n. "i n. FH FH2337 FH2262 SMH "i V V n. in. SMH6226 V " 54 V SMH5396 " i R SMH " 48 SMH6016 SMH7203 SMH6229FH2339 FH2261 SMH5401 I SMH SMH V FH V R 1 I 42 V FH2346 V V " 10 SMH6910 FH V 0 3 "H D E FH2264 SMH6227 " 54 ". in " 10 V 18 V n. V SMH6017 B "i " 27 SMH6018 W NE S LE A E V V V in. " V 15 V 316 FH2344 SMH TR 6 16 " T EE " V 10 M 0" 15 FH2260 SMH5393 Un kn ow nr SMH6231 AL-8 Lateral V V " 27 SMH658 FH2259 SMH659 FH2265 FH2253 6" R R I IVE FH V 16 SMH5411 FH2258 SMH5386 R V V " I "i n. in. " V 18 FH R ATRIUM D I FH2295 FH2254 SMH5381 SMH5379 M SMH1843 in. 6" SMH5383 I AY HW IU ATR D in. I " V G HI 1 I n. D AY 2" i W SMH5384 n. D " 27 E AT ST R V i " 21"V in " SMH5377. SMH7438 SMH1844 SMH SMH7003 Water Distribution Main ASTLE ROK UTILITIES MA (INTERNAL USE ONLY)

43 V " 48 M I in. D FH3246. FH2297 V E I. D I in. D " I in. D M RIU AT " Y WA SMH5379 I SMH5386 R FH2345 FH2258 V I Legend MEADOWS A-11 WELL HOUSE V Sanitary Sewer SMH5385 Stormwater onduit. Fiber V in I 16 V " 27 " I 18 in. R-220 AT VE DRI M U RI 4" R-222 "i n. FH R-221 SMH5381 V FH2295 in. 6" SMH SMH5383 SMH5380 V AY HW " SMH5384 I V " G HI R V 27 E AT ST 48 I in. SMH5376 SMH5378 FH2256 SMH D in. E n. SMH7215 SMH5410 "HD Y LAN 6" V "i 24 ABBE 21"V SMH1844 " 8 NE W D in. FH2296 I SMH7436SMH7438 R 42" V FH2299 I E D 6"H DE 6 "H V SMH " 27 SMH6025 " M n. "i 36 E D 6"H DE 6 "H V V SMH6053 FH2298 I I " " 27 SMH1845 R 30 E in V D "H 15 n. "i 374. I E n. D 1 R 72 FH2300 i V " SMH6003 I HD " R 84" I I 27 in FH2330 SMH6235 I I. D 8 SMH6236 n. D D SMH6234. V 21 I I n. D FH2329 i n. "i in " 8 SMH6237 FH2331 I n. D 15 n. D I i i FH2327 in. V FH2332 SMH6233 n. "i I V SMH in. SMH6065 in. D 8 " V " 15 i 27 " in. V SMH " SMH6063 SMH6232 FH2328 in I in. FH2318 SMH6057 SMH6062 VIINITY MA 1 inch = 200 feet µ Disclaimer: The data presented has been compiled from various sources, each of which introduces varying degrees of inaccuracies or inconsistencies. Such discrepancies in data are inherent and in supplying this product the Town of astle Rock assumes no liability for it s use or accuracy. Questions or omments regarding the cartographic composition of this map including, but not limited to, errors, omissions, corrections, and/or updates, should be directed to the Utilities Department, Town of astle Rock, (720) opyright 20, Town of astle Rock Utilities Mapping. Raw Water Distribution Main R " Water Distribution Main 15 ASTLE ROK UTILITIES MA (INTERNAL USE ONLY)

44 FH n. i " V I SMH6232 FH2332 E AT ST ER INT i FH "i IVE R DR AT R ATRIUM DRIVE I " R FH I FH2258 V 1 inch = 200 feet µ SMH5411 " 15 R FH2253 6" R Legend Sanitary Sewer Stormwater onduit R 30" V V " SMH5386 R "i n. V I " in. D SMH5381 V 18 V 18 SMH5406. in. 6" SMH I 16 V 7" 72 I V SMH5379 FH2295 SMH5409 SMH5407SMH5408 FH VIINITY MA I SMH5380 M RIU AT in. D 1 H ET RE T YS VE R A SMH5384 " E. 36 SMH5376 FH2256 V 48 I n. D AY 2" i W R V "HD 21"V 48 SMH5378 SMH5377 I. D FH2255 E R Y LAN FH2296 I ABBE R 42" NE W IU M FH2299 in. " SMH6024 R V M 66 SMH5410 E D 6"H DE 6"H DE 6"H DE 6 " H D E 6"H DE 6"H DE 6 "H " n. "i 36 I FH FH2297 SMH6025 V. SMH FH2298 n. I E M 2 AY HW HIG D n "i " 48 R 84 "H 15 E AT ST ER INT E. HD " 2 AY HW HIG I I I. D n. D n. D 72 I n. D i i Disclaimer: The data presented has been compiled from various sources, each of which introduces varying degrees of inaccuracies or inconsistencies. Such discrepancies in data are inherent and in supplying this product the Town of astle Rock assumes no liability for it s use or accuracy. Questions or omments regarding the cartographic composition of this map including, but not limited to, errors, omissions, corrections, and/or updates, should be directed to the Utilities Department, Town of astle Rock, (720) opyright 20, Town of astle Rock Utilities Mapping. Fiber Raw Water Distribution Main R Main Water Distribution 24" ASTLE ROK UTILITIES MA (INTERNAL USE ONLY)

45 n. "i ER INT FH AY HW IG EH AT ST n. "i SMH FH " M SMH6250 i n. V SMH6060 IV DR FH2323 SMH6061 FH2302 W in. V E SMH6059 in. SMH i n. Y2 WA " TE GA LE. D FH23 I FH2325 V in ST A V FH2313 SMH6252 IGH EH AT ST R 4 ER INT 24 FH2303 FH2322 in. SMH6067 M " 48 SMH6055 V 8 " V 48 in. I I Stormwater onduit SMH6232 Fiber Raw Water Distribution Main Water Distribution Main 72 n. D 36 i n. V 8 FH2328 V I in I in Sanitary Sewer " VIINITY MA V in. n "i 30 Legend SMH6062 i V SMH6066 FH2319 FH2318 I FH2301 in. n. FH2333 FH2326 "i FH2317 i n. FH SMH6056 in I FH2321 FH2316 SMH6054 SMH FH inch = 200 feet µ Disclaimer: The data presented has been compiled from various sources, each of which introduces varying degrees of inaccuracies or inconsistencies. Such discrepancies in data are inherent and in supplying this product the Town of astle Rock assumes no liability for it s use or accuracy. Questions or omments regarding the cartographic composition of this map including, but not limited to, errors, omissions, corrections, and/or updates, should be directed to the Utilities Department, Town of astle Rock, (720) opyright 20, Town of astle Rock Utilities Mapping. ASTLE ROK UTILITIES MA (INTERNAL USE ONLY)

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

FINAL UTILITY REPORT Creekside Thornton, CO

FINAL UTILITY REPORT Creekside Thornton, CO FINAL UTILITY REPORT Creekside Thornton, CO March 4, 216 Revised: June 27, 216 JN: 1539 Prepared for: HW Sodbusters, LLC 2733 E. Parleys Way, Suite 3 Salt Lake City, UT 8419 P: 81.485.777 Prepared by:

More information

Sewer Area Study. TR No (FOR OUTLET POINTS 1 & 2) January 5, 2016 JN PC11775AS SEWER AREA STUDY APPROVED /08/2016

Sewer Area Study. TR No (FOR OUTLET POINTS 1 & 2) January 5, 2016 JN PC11775AS SEWER AREA STUDY APPROVED /08/2016 Sewer Area Study TR No 53138 (FOR OUTLET POINTS 1 & 2) January 5, 2016 JN 99610-01 PC11775AS SEWER AREA STUDY APPROVED APPROVED BY: RCE NO. DATE 70745 03/08/2016 CHECKED BY: DATE Imelda Ng 03/08/2016 COUNTY

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014. SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,

More information

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY, UTAH SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,

More information

Water & Wastewater Facility Plan Update

Water & Wastewater Facility Plan Update ater & astewater Facility Plan Update South Kalispell Development Supplement to: ater Facility Plan Update, 2008 astewater Facility Plan Update, 2008 November, 2016 Table of Contents Chapter 1 - Basis

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR Black & Veatch Holding Company 2017. All rights reserved. 2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING Master Plan Addendum B&V PROJECT NO. 195982 PREPARED FOR Union County 7 MARCH 2018 Table of

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

Design Data 17. Partial Flow Conditions of Box Culverts

Design Data 17. Partial Flow Conditions of Box Culverts Design Data 17 Partial Flow Conditions of Box Culverts Sewers, both sanitary and storm, are designed to carry a peak flow based on anticipated land development. The hydraulic capacity of sewers or culverts

More information

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas. NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July

More information

WATER DISTRIBUTION NETWORKS

WATER DISTRIBUTION NETWORKS WATER DISTRIBUTION NETWORKS CE 370 1 Components of Water Supply System 2 1 Water Distribution System Water distribution systems are designed to adequately satisfy the water requirements for a combinations

More information

Jp2g Consultants Inc.

Jp2g Consultants Inc. Jp2g Consultants Inc. ENGINEERS PLANNERS PROJECT MANAGERS 1150 Morrison Drive, Suite 410 Ottawa, ON K2H 8S9 T 613-828-7800, F 613-828-2600, www.jp2g.com September 20, 2018 City of Ottawa Development Review

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA Location and Acreage Approximately 1,863 acres of land in San Patricio County, located in the ETJ northwest of the existing City Limits. Metes and

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Winning Farm of Winchester

Winning Farm of Winchester Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

Basic Hydraulics June 2007

Basic Hydraulics  June 2007 Basic Hydraulics www.concrete-pipe.org June 2007 2007 Overview Open Channel Flow Manning Equation Basic Culvert Design Sanitary Sewer Design Flow, Velocity Stormwater Sewer Design Flow, Velocity 2 Open

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

Request Applicant Owner Zoning Location Attachments Site and Surrounding Area Direction Surrounding Zoning Surrounding Land Use Access

Request Applicant Owner Zoning Location Attachments Site and Surrounding Area Direction Surrounding Zoning Surrounding Land Use Access Planning & Zoning Commissionn Planning & Development Department September, 0 Preliminary/Final Plat Westwood, Section, Phase Request Applicant Owner Zoning Location Attachments Subdivision of approximately.

More information

Critical Area Mapping Update Project St. Mary s County Town Hall April 8th, :30 p.m.

Critical Area Mapping Update Project St. Mary s County Town Hall April 8th, :30 p.m. Critical Area Mapping Update Project St. Mary s County Town Hall April 8th, 2019 6:30 p.m. Critical Area Commission for the Chesapeake and Atlantic Coastal Bays St. Mary s County What Is the Critical Area

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

October 16, Dear Mr. Hawkins:

October 16, Dear Mr. Hawkins: IBI GROUP 101 410 Albert Street Waterloo ON N2L 3V3 Canada tel 519 585 2255 fax 519 585 2269 October 16, 2017 Mr. Trevor Hawkins Manager of Applications and Implementation Integrated Planning and Public

More information

SHADOW STUDY REPORT REGARDING

SHADOW STUDY REPORT REGARDING SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley

More information

73-2 have been satisfied; and

73-2 have been satisfied; and RESOLUTION NO. R- 86-104 W'dEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in Chapter 163 and Chapter 125, Florida Statutes, is authorized and empowered

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

Planning & Zoning Commission

Planning & Zoning Commission Request Applicant Owner Zoning Location Attachments Subdivision of 50.03 acres of previously unplatted property to create one lot for the construction of a K-6 th Grade Education Village for Dickinson

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

COPPER RANCH SKETCH PLAN

COPPER RANCH SKETCH PLAN SHEET INDEX VICINITY MAP CONTACTS: THE TOWN OF ERIE LAND SUMMARY CHART TYPE AREA (AC.) % OF TOTAL AREA PARKS AND OPEN SPACE SUMMARY (RESIDENTIAL ONLY - 13.5 ACRES/216 UNITS) REQUIRED (ACRES) PROVIDED (ACRES)

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

King City URA 6D Concept Plan

King City URA 6D Concept Plan King City URA 6D Concept Plan King City s Evolution Among the fastest growing cities 2000 Census 1,949 2010 Census 3,111 60% increase 2016 Census estimate 3,817 23% increase Average annual rate 4.3% Surpassing

More information

FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT

FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT DEERFIELD BEACH FL 33441 ROXANNE REGISTER Vice President of Leasing & Sales RoxanneRegister@dkatz.com (561) 869-4346 HIGHLIGHTS Retail only

More information

Rockefeller Group Corporate Center Master Plan

Rockefeller Group Corporate Center Master Plan 9,698± AADT 46 wayside dr 97,033± AADT international Pkwy SITE Seminole Towne Center 88,790± AADT Colonial Town Park SITE SPECIFICATIONS is a 28-acre development site strategically located along International

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

NCEES FS Practice Exam

NCEES FS Practice Exam NCEES FS Practice Exam Terrametra Resources Lynn Patten 1. One corner of a 60-ft. 120-ft. lot, otherwise rectangular, is a curve with a radius of 20 ft. and a central angle of 90. The area (ft. 2 ) of

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

Estimating Sewage System Flows

Estimating Sewage System Flows 9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

MVP WMS, George Schorr

MVP WMS, George Schorr APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

Appendix C Surface Water and Groundwater Interaction Memorandum

Appendix C Surface Water and Groundwater Interaction Memorandum Texas Custodial Trust 2301 West Paisano Drive El Paso, Texas 79922 Appendix C Surface Water and Groundwater Interaction Memorandum 6835001 Malcolm Pirnie, Inc. 410 N. 44 th Street, Suite 1000 Phoenix,

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017 SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &

More information

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE DEPARTMENT OF DEVELOPMENT & PLANNING 825 Ohio Avenue - Lynn Haven, FL 32444 (850) 265-2961 - (850) 265-3478 APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE Deadline to submit is 30 days

More information

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr. May 22, 2008 Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR 72032 RE: Royal Oaks Vista Subdivision Site AFIN: 12-00272 NPDES Permit No.: ARR150472 Dear Mr. Tyler: On March 26, 2008, I performed

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

Information for File MVP RMM

Information for File MVP RMM Information for File MVP-2013-03320-RMM Applicant: City of St. Cloud Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101 E-Mail: Ryan.M.Malterud@usace.army.mil Phone:

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

VIKING INSPECTION PROPERTY 4921 U.S. Hwy. 85, Williston, ND 58801

VIKING INSPECTION PROPERTY 4921 U.S. Hwy. 85, Williston, ND 58801 SALE PRICE: $799,000 LOT SIZE: +/-2.49 Acres BUILDING SIZE: +/-3,800 SF DRIVE-IN DOORS 2 CEILING HEIGHT: 16' YEAR BUILT: 2007 ZONING: Commercial PROPERTY OVERVIEW Highly visible, hard-to-find small shop/office/apartment

More information

A G E N D A Planning Session April 5, :45 p.m.

A G E N D A Planning Session April 5, :45 p.m. ITY OF THORNTON ITY MANAGER S OFFIE A G E N D A Planning Session April 5, 2016 5:45 p.m. 1. ouncil Operational Tour ity Water Facilities* - Burlington Ditch Diversion from the South Platte River 6:00 (Franklin

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Lecture Note for Open Channel Hydraulics

Lecture Note for Open Channel Hydraulics Chapter -one Introduction to Open Channel Hydraulics 1.1 Definitions Simply stated, Open channel flow is a flow of liquid in a conduit with free space. Open channel flow is particularly applied to understand

More information

TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890

TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890 BRIAN SZEKELY TOWN PLANNER Winchester Board of Selectmen 71 Mt. Vernon St. Winchester, MA 01890 TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT 71 Mount Vernon Street Winchester, MA 01890 August 11,

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

Drainage Study for Civic Center Way

Drainage Study for Civic Center Way Drainage Study for 23401 Civic Center Way P.C.C.E. INC. CIVIL ENGINEERING AND DESIGN Drainage Study for 23401 Civic Center Way WHOLE FOODS AT THE PARK Prepared by: P.C.C.E. INC STEPHEN R. SMITH, P.E. 23801

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning TOWN OF SEVERANCE, COLORADO NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning NOTICE IS HEREBY GIVEN that the Public Hearing required by C.R.S. 31-12-108 before the Severance

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

Open Channel Flow I - The Manning Equation and Uniform Flow COURSE CONTENT

Open Channel Flow I - The Manning Equation and Uniform Flow COURSE CONTENT Open Channel Flow I - The Manning Equation and Uniform Flow Harlan H. Bengtson, PhD, P.E. COURSE CONTENT 1. Introduction Flow of a liquid may take place either as open channel flow or pressure flow. Pressure

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport Alliance Airport Subject property +/- 419 AC Pat McDowell +1 817 334 8106 pat.mcdowell@am.jll.com JLL 201 Main Street, Suite 1440 Fort Worth, TX

More information

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling. Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

APPENDIX I: Traffic Forecasting Model and Assumptions

APPENDIX I: Traffic Forecasting Model and Assumptions APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan.

More information

Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050

Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050 George Mason University Center for Regional Analysis Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 21 to 25 Prepared for the Fairfax County Department of Planning and Zoning Lisa

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. High Street TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: High Street Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction

More information

Proclaiming Certain Lands as Reservation for the Confederated Tribes of the

Proclaiming Certain Lands as Reservation for the Confederated Tribes of the This document is scheduled to be published in the Federal Register on 11/05/2018 and available online at https://federalregister.gov/d/2018-24174, and on govinfo.gov [4337-15] DEPARTMENT OF THE INTERIOR

More information

The University of Akron. William Troyer The Dr. Gary B. and Pamela S. Williams Honors College

The University of Akron. William Troyer The Dr. Gary B. and Pamela S. Williams Honors College The University of Akron IdeaExchange@UAkron Honors Research Projects The Dr. Gary B. and Pamela S. Williams Honors College Spring 2018 Applying Control Logic to the End of the Ohio Canal Interceptor Tunnel

More information

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag The ordinance shall be known as the Zoning Ordinance of Wetumpka, Alabama, and the map herein referred to as the Zoning Map of Wetumpka, Alabama. The map and all explanatory matter thereon are hereby adopted

More information

APPENDIX Q. Updated Storm Drain Demands

APPENDIX Q. Updated Storm Drain Demands APPENDIX Q Updated Storm Drain Demands Teclmical Memorandum July 21, 201 0 Page 1 of8 TECHNICAL MEMORANDUM Date: July 21,2010 To: From: TMNo.: Subject: Bob Shattuck, Lennar Communities Scott Hartstein,

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

Hydrology and Hydraulics Design Report. Background Summary

Hydrology and Hydraulics Design Report. Background Summary To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC-15-0005 I. GENERAL INFORMATION A. APPLICANT: City of Papillion 122 East Third St. Papillion, NE 68046 B. LEGAL DESCRIPTION: See

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject: