- / CHART NO. 4 I L L I N O I S CONTACT WORK BOATS - M/V GORDON STEVENS AP for O l m sted / Loc k 53 S A I L I N G L I N E

Size: px
Start display at page:

Download "- / CHART NO. 4 I L L I N O I S CONTACT WORK BOATS - M/V GORDON STEVENS AP for O l m sted / Loc k 53 S A I L I N G L I N E"

Transcription

1 89 7' W 37 10' N 37 10' N 89 6' W FEDERAL MOORING CELLS TOP ELEV WITH BUOYS ON TOP (CELLS WILL GO UNDER WATER WITH A CAIRO GAGE 49.1 ) 37 11' N 89 5' W 37 8' N for O l m sted Loc k 53 OL MS TE D PUBLIC ACCESS - MV GORDON STEVENS ' W MATCH LINE CHART AMERICA POINT H O D G E S B A Y O U CRE E K 968 HUMPHREY'S CREEK Project Depth Shown at Low Water Conditions Olmsted Upper Gage = 2. 0' 967 Olmsted Lower Gage = 10.1 ' Lock 53 Lower Gage = 8.0 ' FIX ED W EI R CE L LS A ND B OAT A B UTME NT FINISHED TOP ELEV ( A BU TME NT AND C EL LS W IL L GO UNDE R WATE R WITH AN OLMSTED UPPER GAGE 24.5 ) O L M S T E D L O C K & D A M C O N S T R U C T I O N S I T E - - MATCH LINE CHART 5 # # - RESTRICTED 89 3' W 37 7' N 89 5' W NOTE: IMPROVED CHANNEL AT MOUND CITY BAR IS DREDGED TO PROVIDE 9 ' PROJECT DEPTH AT AN EXPECTED MINIMUM STA GE OF 7. 5' ON CA IRO GAGE A ND 7. 3' ON LOWER GAGE AT DAM ' N 89 4' W 37 9' N 89 3' W S C A L E : 1 " = ' R E V I S E D : J U LY CHART NO. 4 Feet

2 595' Existing Fixed Weir 368' exist. Sheet Pile Cutoff Wall 227' Exist. Fixed Weir Cells 227' Navigable Pass Left Boat Abutment Future 1400' Navigation Pass 80' ILLINOIS Top of Bank. EL Top of Left Boat Abutment. EL Navigation Pass Concrete Elev Top Wicket Lifting Eye Elev Tainter Gate Sill, El Elev Top of Lock wall, El Fixed Weir ZERO OF GAGE Upper Gage Zero = Lower Gage Zero = OLMSTED ELEVATION LOOKING DOWNSTREAM ( LOCK SIZE 1200' x 110' ) ( LOCK SIZE 1200' x 110' ) Top of Concrete Sil, El (Top Gate Stops Elev ) ILLINOIS OHIO RIVER KENTUCKY Ladder Check Post

3 - Full Time Locking Water Below Elev Olmsted Upper Gage Below 27.0' Lock 53 Upper Gage Below 32.9' RESTRICTED ELEV MV GORDON STEVENS NO PASSING B ET W E E N to (ONEWAY TR AFF IC) w o u l d b e R e m o v e d i f C o n d i t i o n s A l l o w f o r O p e n R i v e r P a s s a g e FIXED WEIR CELLS AND BOATABU TMENT FINISHED TOP ELEV (ABU TMENTAND CELLS WILLGO U NDER WATER WITH AN OLMSTED U PPER GAGE 24.5) ,000 Feet CHART NO. 4D - Facing Page

4 FEDERAL MOORIN G CEL L S (CEL L S WIL L GO U N DER WAT ER WIT H A CAIRO GAGE 49.1) for O l m sted Loc k 53 - MV GORDON STEVENS p OL MST ED PU BL IC ACCESS FEDERAL MOORIN G CEL L S (CEL L S WIL L GO U N DER WAT ER WIT H AN OL MST ED U PPER GAGE OF41) HIGH WATER MOORING SIT E NO PASSING B ET W E E N to (ONEWAY TR AFF IC) G 1 G 2 G 3 C O N S T R U C T I O N S I T E 1300'Pa s s - R 1 G 4 R 2 R 3 G 5 EL EV.280 G 6 R 4 W i l l B e R e m o v e d a s N o L o n g e r N e e d e d 963 FIXED WEIR CEL L S AN D BOAT ABU T MEN T FIN ISHED T OP EL EV (ABU T MEN T AN D CEL L S WIL L GO U N DER WAT ER WIT H AN OL MST ED U PPER GAGE 24.5) No Construction Due to High Water Water Elevation above BU OY SL OCAT ION S: G1= N W G2= N W G3= N W G4= N W G5= N W G6= N W R1= N W R2= N W R3= N W R4= N W Olmsted Upper Gage Above 16.0' Lock 53 Upper Gage Above 21.9' N OT E:IMPROV ED CHAN N EL AT MOU N D CIT Y BAR IS DREDGED T O PROV IDE 9'PROJECT DEPT H AT AN EXPECT ED MIN IMU M ST AGE OF7.5'ON CAIRO GAGE AN D 7.3'ON L OWER GAGE AT DAM 53. CHART NO. SCAL E: 1"= 2000' 4F - REV ISED:JU L Y 2018 Fe e t

5 FEDERALMOORIN G CELLS TOP ELEV.320.0W ITH BUOYS ON TOP (CELLS W ILLGO UN DER W ATER W ITH ACAIRO GAGE 49.1) for O l m sted Loc k 53 - MV GORDON STEVENS p OLMSTED P UBLIC ACCESS FEDERALMOORIN G CELLS TOP ELEV.320.0W ITH BUOYS ON TOP (CELLS W ILLGO UN DER W ATER W ITH AN OLMSTED UP P ER GAGE OF41) RESTRICTED 963 HIGH WATER MOORING SIT E ELEV.280 RESTRICTED Full Time Locking Water Below Elev. 296 FIX ED W EIR CELLS AN D BOATABUTMEN T FIN ISHED TOP ELEV (ABUTMEN TAN D CELLS W ILLGO UN DER W ATER W ITH AN OLMSTED UP P ER GAGE 24.5) NO PASSING B ET W E E N to (ONEWAY TR AFF IC) Olmsted Upper Gage Below 27.0' Lock 53 Upper Gage Below 32.9' N OTE:IMP ROV ED CHAN N ELATMOUN D CITY BAR IS DREDGED TO P ROV IDE 9'P ROJECTDEP TH ATAN EX P ECTED MIN IMUM STAGE OF7.5'ON CAIRO GAGE AN D 7.3'ON LOW ER GAGE ATDAM 53. CHART NO. SCALE: 1"= 2000' 4G - REV ISED:JULY 2018 Feet

6 FEDERAL MOORIN G CEL L S (CEL L S WIL L GO U N DER WAT ER WIT H A CAIRO GAGE 49.1) OL MST ED PU BL IC ACCESS p FEDERAL MOORIN G CEL L S (CEL L S WIL L GO U N DER WAT ER WIT H AN OL MST ED U PPER GAGE OF41) - RESTRICTED - EL EV RESTRICTED FIXED WEIR CEL L S AN D BOAT ABU T MEN T -FIN ISHED T OP EL EV (ABU T MEN T AN D CEL L S WIL L GO U N DER WAT ER WIT H AN OL MST ED U PPER GAGE 24.5AS SHOWN ON L OCK CROSS-SECT ION ) N OT E:IMPROV ED CHAN N EL AT MOU N D CIT Y BAR IS DREDGED T O PROV IDE 9'PROJECT DEPT H AT AN EXPECT ED MIN IMU M ST AGE OF7.5'ON CAIRO GAGE AN D 7.3'ON L OWER GAGE AT DAM 53. CHART NO. SCAL E: 1"= 2000' 4H - Finished REV ISED:JU L Y 2018 Fe e t

A L A BA M A L A W R E V IE W

A L A BA M A L A W R E V IE W A L A BA M A L A W R E V IE W Volume 52 Fall 2000 Number 1 B E F O R E D I S A B I L I T Y C I V I L R I G HT S : C I V I L W A R P E N S I O N S A N D TH E P O L I T I C S O F D I S A B I L I T Y I N

More information

OH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9

OH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9 OH BOY! O h Boy!, was or igin a lly cr eat ed in F r en ch an d was a m a jor s u cc ess on t h e Fr en ch st a ge f or young au di enc es. It h a s b een s een by ap pr ox i ma t ely 175,000 sp ect at

More information

176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s

176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s A g la di ou s F. L. 462 E l ec tr on ic D ev el op me nt A i ng er A.W.S. 371 C. A. M. A l ex an de r 236 A d mi ni st ra ti on R. H. (M rs ) A n dr ew s P. V. 326 O p ti ca l Tr an sm is si on A p ps

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-15-12 Numerical Sedimentation Study of Shoaling on the Ohio River near Mound City, Illinois David Abraham, PhD., P.E., Nate Clifton, and Barry Vessels August 2015 Coastal and Hydraulics Laboratory

More information

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D Lesson eight What are characteristics of chemical reactions? Science Constructing Explanations, Engaging in Argument and Obtaining, Evaluating, and Communicating Information ENGLISH LANGUAGE ARTS Reading

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

State Water Survey Division SURFACE WATER SECTION

State Water Survey Division SURFACE WATER SECTION State Water Survey Division SURFACE WATER SECTION AT THE UNIVERSITY OF ILLINOIS Illinois Department of Energy and Natural Resources SWS Miscellaneous Publication 88 SEDIMENTATION OF POOL 19 ON THE MISSISSIPPI

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 14 Choose the best answer to the following Multiple Choice Questions. 1. If your vessel must pass through a draw

More information

P a g e 5 1 of R e p o r t P B 4 / 0 9

P a g e 5 1 of R e p o r t P B 4 / 0 9 P a g e 5 1 of R e p o r t P B 4 / 0 9 J A R T a l s o c o n c l u d e d t h a t a l t h o u g h t h e i n t e n t o f N e l s o n s r e h a b i l i t a t i o n p l a n i s t o e n h a n c e c o n n e

More information

CFD Modeling for Structure Designs in Environmental Impacts Mitigation

CFD Modeling for Structure Designs in Environmental Impacts Mitigation CFD Modeling for Structure Designs in Environmental Impacts Mitigation June 05 Navid Nekouee, Hugo Rodriguez and Steven Davie Environmental Impact Mitigation Design Savannah Harbor Expansion Project (SHEP)

More information

2012 USACE Drought Actions

2012 USACE Drought Actions 2012 USACE Drought Actions for Inland Waterway Users Board 68 Jim Walker Navigation Branch Chief 19 December 2012 US US Army Corps of of Engineers US Drought Monitor 1 2 3 4 6 5 Impacts: 1. The area in

More information

T h e C S E T I P r o j e c t

T h e C S E T I P r o j e c t T h e P r o j e c t T H E P R O J E C T T A B L E O F C O N T E N T S A r t i c l e P a g e C o m p r e h e n s i v e A s s es s m e n t o f t h e U F O / E T I P h e n o m e n o n M a y 1 9 9 1 1 E T

More information

River Ice Modelling. Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada

River Ice Modelling. Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada River Ice Modelling Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada Submitted to F.E. Hicks, PhD, PEng, FCSCE Professor, Dept. of Civil and Environmental Engineering University of Alberta

More information

A Rich History. AB OVE T H E F O L D: C O N S T R U C T E D by Dwight B. Heard between 1919 and HUMAN SPIDER ON TH E RADIO FI LM DE B UT

A Rich History. AB OVE T H E F O L D: C O N S T R U C T E D by Dwight B. Heard between 1919 and HUMAN SPIDER ON TH E RADIO FI LM DE B UT S PAC E AVA I L A B LE F O R LE AS E! 1 1 2 N. C E N T R A L AV E N U E, P H O E N I X, A R I Z O N A AB OVE T H E F O L D: N E W F U T UR E. O L D S O U L. I n t h e h e a r t o f D o w n t o w n Ph o

More information

M E T R O P O L IT A N A R E A S, U N ITED S T A T E S A N D R E G IO N A L S U M M A R IE S,

M E T R O P O L IT A N A R E A S, U N ITED S T A T E S A N D R E G IO N A L S U M M A R IE S, M E T R O P O L IT A N A R E A, U N ITED T A T E A N D R E G IO N A L U M M A R IE, 1 9 6 9-7 0 Bulletin 1660-92 U.. DEPARTMENT OF LABOR BUREAU OF LABOR TATITIC B U R E A U O F L A B O R T A T I T IC R

More information

= m. 30 m. The angle that the tangent at B makes with the x axis is f = tan-1

= m. 30 m. The angle that the tangent at B makes with the x axis is f = tan-1 1 11. When the roller coaster is at B, it has a speed of 5 m>s, which is increasing at at = 3 m>s. Determine the magnitude of the acceleration of the roller coaster at this instant and the direction angle

More information

A PHYSICAL MODEL STUDY OF SCOURING EFFECTS ON UPSTREAM/DOWNSTREAM OF THE BRIDGE

A PHYSICAL MODEL STUDY OF SCOURING EFFECTS ON UPSTREAM/DOWNSTREAM OF THE BRIDGE A PHYSICA MODE STUDY OF SCOURING EFFECTS ON UPSTREAM/DOWNSTREAM OF THE BRIDGE JIHN-SUNG AI Hydrotec Researc Institute, National Taiwan University Taipei, 1617, Taiwan HO-CHENG IEN National Center for Hig-Performance

More information

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D Lesson seven What is a chemical reaction? Science Constructing Explanations, Engaging in Argument and Obtaining, Evaluating, and Communicating Information ENGLISH LANGUAGE ARTS Reading Informational Text,

More information

THIS PAGE DECLASSIFIED IAW E

THIS PAGE DECLASSIFIED IAW E THS PAGE DECLASSFED AW E0 2958 BL K THS PAGE DECLASSFED AW E0 2958 THS PAGE DECLASSFED AW E0 2958 B L K THS PAGE DECLASSFED AW E0 2958 THS PAGE DECLASSFED AW EO 2958 THS PAGE DECLASSFED AW EO 2958 THS

More information

SOLUTION. ill Principle of Impulse and Momentum: Referring to Fig. b, 75(0) + 75(9.81)(3) - T(3) = 75vA. vb = T (1) From Fig.

SOLUTION. ill Principle of Impulse and Momentum: Referring to Fig. b, 75(0) + 75(9.81)(3) - T(3) = 75vA. vb = T (1) From Fig. 15 30. The crate B and cylinder A have a mass of 200 kg and 75 kg, respectively. If the system is released from rest, determine the speed of the crate and cylinder when t = 3 s. Neglect the mass of the

More information

PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005

PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005 PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005 Hurricane Katrina Hurricane Katrina swept across southern Florida and lost momentum, then gained speed and water, showing the second lowest barometric

More information

Hydraulic Evaluation of Discharge Over Rock Closing Dams on the Upper Mississippi River

Hydraulic Evaluation of Discharge Over Rock Closing Dams on the Upper Mississippi River ydraulic Evaluation of Discarge Over Rock Closing Dams on te Upper Mississippi River Jon endrickson, P.E. Senior ydraulic Engineer, St Paul District Introduction Prototype data was used for calibrating

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

Software Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode

Software Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode Unit 2 : Software Process O b j ec t i ve This unit introduces software systems engineering through a discussion of software processes and their principal characteristics. In order to achieve the desireable

More information

http://water.usgs.gov/waterwatch/ Stream Flow Measurement: Velocity-Area method Stream discharge = Q = U * A Q = volumetric flow rate in [L 3 T -1 ] U= average stream velocity [L 2 T -1 ] A = cross sectional

More information

Analysis of the Effects of Bendway Weir Construction on Channel Cross Sectional Geometry

Analysis of the Effects of Bendway Weir Construction on Channel Cross Sectional Geometry Mississippi River Miles 275.2 1.7 Analysis of the Effects of Bendway Weir Construction on Channel Cross Sectional Geometry By Timothy Lauth David Gordon, P.E. Katherine Clancey Adam Rockwell Brad Krischel

More information

Stop 1: Marmot Dam Stop 1: Marmot Dam

Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.

More information

C o r p o r a t e l i f e i n A n c i e n t I n d i a e x p r e s s e d i t s e l f

C o r p o r a t e l i f e i n A n c i e n t I n d i a e x p r e s s e d i t s e l f C H A P T E R I G E N E S I S A N D GROWTH OF G U IL D S C o r p o r a t e l i f e i n A n c i e n t I n d i a e x p r e s s e d i t s e l f i n a v a r i e t y o f f o r m s - s o c i a l, r e l i g i

More information

SRS. z39 Front Side Airbag Squib Circuit LH Y B Y. Center Airbag Sensor Assembly D2+ 2 A Y G Y R. Spiral Cable. Driver Side Squib 2nd Step Circuit

SRS. z39 Front Side Airbag Squib Circuit LH Y B Y. Center Airbag Sensor Assembly D2+ 2 A Y G Y R. Spiral Cable. Driver Side Squib 2nd Step Circuit K Front retensioner LH L Front retensioner H z Front Side Airbag Squib Circuit LH z0 Front Side Airbag Squib Circuit H L+ L + Kz Kz Lz Lz L+ L C + C C SFL+ SFL SF+ C SF E(A), K(), L(C) Center Airbag Sensor

More information

Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez

Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez American Association of Port Authorities Facilities Engineering Conference October 20-22, 2015 Waterfront

More information

EFFECT OF BAFFLE BLOCKS ON THE PERFORMANCE OF RADIAL HYDRAULIC JUMP

EFFECT OF BAFFLE BLOCKS ON THE PERFORMANCE OF RADIAL HYDRAULIC JUMP Fourth International Water Technology Conference IWTC 99, Alexandria, Egypt 255 EFFECT OF BAFFLE BLOCKS ON THE PERFORMANCE OF RADIAL HYDRAULIC JUMP O. S. Rageh Irrigation & Hydraulics Dept., Faculty of

More information

Radioactive Decay and Half Life Simulation 2/17 Integrated Science 2 Redwood High School Name: Period:

Radioactive Decay and Half Life Simulation 2/17 Integrated Science 2 Redwood High School Name: Period: Radioactive Decay and Half Life Simulation 2/17 Integrated Science 2 Redwood High School Name: Period: Background I t was not until the end of the 1800 s that scientists found a method for determining

More information

MATH 310 TEST Measure April Answers

MATH 310 TEST Measure April Answers MATH 310 TEST Measure April 25 2007 Answers 1. Use t he draw ing below to illust rat e the relat ionship betw een cubic yards and cubic f eet. 2. Show the dimensional analysis for the conversion of 2 cubic

More information

GEOL 1121 Earth Processes and Environments

GEOL 1121 Earth Processes and Environments GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

Fall / Winter Multi - Media Campaign

Fall / Winter Multi - Media Campaign Fall / Winter Multi - Media Campaign Bi g H or n R a di o N et w or k 1 B U B B A S B A R- B- Q U E R E ST A U R A N T 10% O F F B R E A K F A S T C o u p o n vali d M o n.- Fri. 7-11 a m Excl u des a

More information

Cayuga Lake Model. 2-D Hydrodynamic Model. TAC Meeting Wednesday, January 15, 2014 Cornell University, Ithaca, NY. Upstate Freshwater Institute

Cayuga Lake Model. 2-D Hydrodynamic Model. TAC Meeting Wednesday, January 15, 2014 Cornell University, Ithaca, NY. Upstate Freshwater Institute Cayuga Lake Model 2-D Hydrodynamic Model Upstate Freshwater Institute TAC Meeting Wednesday, January 15, 2014 Cornell University, Ithaca, NY 1/15/2014 Upstate Freshwater Institute 1 Two-Dimensional Model

More information

Lagunitas Creek Stewardship Plan. Marin Municipal Water District

Lagunitas Creek Stewardship Plan. Marin Municipal Water District Lagunitas Stewardship Plan Marin Municipal Water District Final June 2011 FIGURES Lagunitas Stewardship Plan Final June 2011 Legend Tomales Bay Highway 1 Major Roads Public Lands Marin Municipal Water

More information

Syllable Division- Nonsense Words Closed. Directions: Underline the vowels. Then divide and label the syllables. 1. l a b n e t 8.

Syllable Division- Nonsense Words Closed. Directions: Underline the vowels. Then divide and label the syllables. 1. l a b n e t 8. Syllable Division- Nonsense Words Closed 1. l a b n e t 8. b o n f i l 2. p e n c a g 9. d a n s i l 3. m a p k i f 1 0. f o n f a c h 4. s e p g a t 1 1. u n g o b 5. m i s t e f 1 2. s t a g m i t 6.

More information

Provider Satisfaction

Provider Satisfaction Prider Satisfaction Prider Satisfaction [1] NOTE: if you nd to navigate away from this page, please click the "Save Draft" page at the bottom (visible to ONLY logged in users). Otherwise, your rpons will

More information

Fr anchi s ee appl i cat i on for m

Fr anchi s ee appl i cat i on for m Other Fr anchi s ee appl i cat i on for m Kindly fill in all the applicable information in the spaces provided and submit to us before the stipulated deadline. The information you provide will be held

More information

minceymarble.com 4321 Browns Bridge Road, Gainesville, GA Ph: Fx:

minceymarble.com 4321 Browns Bridge Road, Gainesville, GA Ph: Fx: minceymarble.com 4321 Browns Bridge Road, Gainesville, GA 30504 Ph: 800.533.1806 Fx: 770.531.0935 For Stan ar Sho er S Di i ion 1 13 De cription : lti iece Seale S r ace anel S te a e : 3x S a Serie :

More information

Dangote Flour Mills Plc

Dangote Flour Mills Plc SUMMARY OF OFFER Opening Date 6 th September 27 Closing Date 27 th September 27 Shares on Offer 1.25bn Ord. Shares of 5k each Offer Price Offer Size Market Cap (Post Offer) Minimum Offer N15. per share

More information

Downloaded from

Downloaded from HEIGHTS AND DISTANCES 1. If te angle of elevation of cloud from a point meters aove a lake is and te angle of depression of its reflection in te lake is cloud is., prove tat te eigt of te Ans : If te angle

More information

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY Solichin 1 Abstract: A serious erosion problem takes place in Cipamingkis River in west Java, Indonesia. As

More information

3 2 - x is correct. Since 32 is the total games played, and x is her number of wins, the losses must be 32 take away x.

3 2 - x is correct. Since 32 is the total games played, and x is her number of wins, the losses must be 32 take away x. Coordinate Algebra (CCGPS) EOCT Quiz Answer Key Algebra - (MCC9 12.A.SSE.1 ) Interpret Expressions, (MCC9 12.A.SSE.1b) Complicated Expressions, (MCC9 12.A.CED.1 ) Create Equations, (MCC9 12.A.CED.2) Graph

More information

Calculus I, Fall Solutions to Review Problems II

Calculus I, Fall Solutions to Review Problems II Calculus I, Fall 202 - Solutions to Review Problems II. Find te following limits. tan a. lim 0. sin 2 b. lim 0 sin 3. tan( + π/4) c. lim 0. cos 2 d. lim 0. a. From tan = sin, we ave cos tan = sin cos =

More information

Riverine Modeling Proof of Concept

Riverine Modeling Proof of Concept Technical Team Meeting Riverine Modeling Proof of Concept Version 2 HEC-RAS Open-water Flow Routing Model April 15-17, 2014 Prepared by R2 Resource Consultants, Brailey Hydrologic, Geovera, Tetra Tech,

More information

Form and content. Iowa Research Online. University of Iowa. Ann A Rahim Khan University of Iowa. Theses and Dissertations

Form and content. Iowa Research Online. University of Iowa. Ann A Rahim Khan University of Iowa. Theses and Dissertations University of Iowa Iowa Research Online Theses and Dissertations 1979 Form and content Ann A Rahim Khan University of Iowa Posted with permission of the author. This thesis is available at Iowa Research

More information

Lesson Ten. What role does energy play in chemical reactions? Grade 8. Science. 90 minutes ENGLISH LANGUAGE ARTS

Lesson Ten. What role does energy play in chemical reactions? Grade 8. Science. 90 minutes ENGLISH LANGUAGE ARTS Lesson Ten What role does energy play in chemical reactions? Science Asking Questions, Developing Models, Investigating, Analyzing Data and Obtaining, Evaluating, and Communicating Information ENGLISH

More information

I zm ir I nstiute of Technology CS Lecture Notes are based on the CS 101 notes at the University of I llinois at Urbana-Cham paign

I zm ir I nstiute of Technology CS Lecture Notes are based on the CS 101 notes at the University of I llinois at Urbana-Cham paign I zm ir I nstiute of Technology CS - 1 0 2 Lecture 1 Lecture Notes are based on the CS 101 notes at the University of I llinois at Urbana-Cham paign I zm ir I nstiute of Technology W hat w ill I learn

More information

You can see w h at gold is u sed f or dow n below : )

You can see w h at gold is u sed f or dow n below : ) d l o G U A You can see w h at gold is u sed f or dow n below : ) Bu t f ir st look at ou r in t r odu ct ion Gold is t h e at om u sed in m an y t h in gs lik e jew elr y it is also u sed w it h elect

More information

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? Bruce Rhoads Department of Geography University of Illinois at Urbana-Champaign

More information

H STO RY OF TH E SA NT

H STO RY OF TH E SA NT O RY OF E N G L R R VER ritten for the entennial of th e Foundin g of t lair oun t y on ay 8 82 Y EEL N E JEN K RP O N! R ENJ F ] jun E 3 1 92! Ph in t ed b y h e t l a i r R ep u b l i c a n O 4 1922

More information

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY M. Jovanović 1, R. Kapor, B. Zindović University of Belgrade Faculty of Civil Engineering E-mail:

More information

K E L LY T H O M P S O N

K E L LY T H O M P S O N K E L LY T H O M P S O N S E A O LO G Y C R E ATO R, F O U N D E R, A N D PA R T N E R K e l l y T h o m p s o n i s t h e c r e a t o r, f o u n d e r, a n d p a r t n e r o f S e a o l o g y, a n e x

More information

Lake Winnebago Regulation Meeting

Lake Winnebago Regulation Meeting Lake Winnebago Regulation Meeting USACE Detroit District October 9, 2014 US Army Corps of Engineers Agenda Basin Overview Major Stakeholders Maintenance a and Repair Work Weather Conditions 2013-20142014

More information

Do you think sediment transport is a concern?

Do you think sediment transport is a concern? STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,

More information

MATHEMATICS: PAPER II. 2. Write your examination number in the space provided in your Answer Book.

MATHEMATICS: PAPER II. 2. Write your examination number in the space provided in your Answer Book. NATIONAL SENIOR CERTIFICATE EXAMINATION NOVEMBER 009 MATHEMATICS: PAPER II Time: 3 hours 150 marks PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY 1. This question paper consists of 0 pages, and a green

More information

c. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f

c. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f Essential Skills Chapter f ( x + h) f ( x ). Simplifying the difference quotient Section. h f ( x + h) f ( x ) Example: For f ( x) = 4x 4 x, find and simplify completely. h Answer: 4 8x 4 h. Finding the

More information

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States Glenn Colusa Irrigation District completed a Sacramento River project

More information

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.

More information

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis

More information

Flooding in Manayunk Neighborhood of Philadelphia

Flooding in Manayunk Neighborhood of Philadelphia Flooding in Manayunk Neighborhood of Philadelphia Samuel Brodfuehrer GIS in Water Resources December 8, 2017 Introduction... 3 Philadelphia Overview... 3 Manayunk Overview... 4 Project Objective... 6 Methods

More information

Upper Mississippi River Basin Environmental Management Program Workshop

Upper Mississippi River Basin Environmental Management Program Workshop Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering

More information

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL UGE UGE UGE UGE UGE UGE UGE N SCALE: " = 4 6 ' 445 CHALLENGER RD., SUITE () 799-6 () 799-8 (FA) SCALE: JOB # NOTED - P RIP-RAP CEME SILOS DOLPHIN RD. FAILED WALL SECTION NORTH WAREHOUSE BULKHEAD WALL NCP4

More information

Snork Synthesis Lab Lab Directions

Snork Synthesis Lab Lab Directions Snork Synthesis Lab Lab Directions This activity, modified from the original at The Biology Corner, will help you practice your understanding of protein synthesis. Submit your lab answers according to

More information

Chemistry 3411 MWF 9:00AM Spring Physical Chemistry I - Exam #2, Version A (Dated: February 27, 2009)

Chemistry 3411 MWF 9:00AM Spring Physical Chemistry I - Exam #2, Version A (Dated: February 27, 2009) Chemistry 3411 MWF 9:00AM Spring 2009 Physical Chemistry I - Exam #2, Version A (Dated: February 27, 2009) 1 Name: GT-ID: NOTE: Partial Credit will be awarded! However, full credit will be awarded only

More information

Beechwood Music Department Staff

Beechwood Music Department Staff Beechwood Music Department Staff MRS SARAH KERSHAW - HEAD OF MUSIC S a ra h K e rs h a w t r a i n e d a t t h e R oy a l We ls h C o l le g e of M u s i c a n d D ra m a w h e re s h e ob t a i n e d

More information

Rock Sizing for Multi-Pipe & Culvert Outlets

Rock Sizing for Multi-Pipe & Culvert Outlets Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

Executive Committee and Officers ( )

Executive Committee and Officers ( ) Gifted and Talented International V o l u m e 2 4, N u m b e r 2, D e c e m b e r, 2 0 0 9. G i f t e d a n d T a l e n t e d I n t e r n a t i o n a2 l 4 ( 2), D e c e m b e r, 2 0 0 9. 1 T h e W o r

More information

Table of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea

Table of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea G Blended L ea r ni ng P r o g r a m R eg i o na l C a p a c i t y D ev elo p m ent i n E -L ea r ni ng H R K C r o s s o r d e r u c a t i o n a n d v e l o p m e n t C o p e r a t i o n 3 0 6 0 7 0 5

More information

INTRODUCTION AND MATHMATICAL Concepts. 1. Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram

INTRODUCTION AND MATHMATICAL Concepts. 1. Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram chapter INTRODUCTION AND MATHMATICAL Concepts Section 1.2 Units Section 1.3 The Role of Units in Problem Solving 1. Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram (b) slug

More information

MaxDepth Aquatics, Inc.

MaxDepth Aquatics, Inc. MaxDepth Aquatics, Inc. Bathymetry of Mirror Pond From Newport Bridge to Galveston Bridge Prepared for the City of Bend By Joseph Eilers & Benn Eilers MaxDepth Aquatics, Inc. Bend, OR June 2005 INTRODUCTION

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

Instruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A

Instruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A Instruction Sheet COOL SERIES DUCT COOL C UL R US LISTED H NK O you or urc s g t e D C t oroug y e ore s g / as e OL P ea e rea g product PR D C FE RES - Re ove r fro e c sed rea t m a o se e x o duct

More information

Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram

Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram chapter INTRODUCTION AND MATHEMATICAL CONCEPTS Section 1. Units Section 1.3 The Role of Units in Problem Solving 1. Which one of the following is an SI base unit? (a) gram (c) newton (e) kilogram (b) slug

More information

Enclosure 27. Memorandum for Record Gulf Sturgeon Spawning Habitat Survey and Mapping October 2002

Enclosure 27. Memorandum for Record Gulf Sturgeon Spawning Habitat Survey and Mapping October 2002 Enclosure 27 Memorandum for Record Gulf Sturgeon Spawning Habitat Survey and Mapping 23-23 October 2002 CESAM-PD-EI 31 October 2002 MEMORANDUM FOR RECORD SUBJECT: Gulf Sturgeon Spawning Habitat on the

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

LAPWARE, LLC. Profit Island Chute is open to navigation and is a shortcut for single-barge

LAPWARE, LLC. Profit Island Chute is open to navigation and is a shortcut for single-barge 1 109 The following questions (1-10) are based on the Army Corps. of Engineers Mississippi River Maps (Cairo to the Gulf) and the Light List. 443 500 623 748 At 0630, on 15 March, you are upbound on the

More information

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE ROD INVENTORY FOR CERTIFICTION OF MILEGE Kay F outs Road Inventory Supervisor, IS H C ISHC ROD IN V E N T O R Y SECTIO N ND DT C O L L E C T IO N s provided in the Indiana Code, the Indiana State Highway

More information

CHANGES IN RIVER BED AROUND THE FUKAWA CONTRACTION AREA BY FLOODS AND CHANNEL IMPROVEMENT WORKS IN THE LOWER TONE RIVER

CHANGES IN RIVER BED AROUND THE FUKAWA CONTRACTION AREA BY FLOODS AND CHANNEL IMPROVEMENT WORKS IN THE LOWER TONE RIVER The 1 th Int. Conf. on Hydroscience and Engineering (ICHE-212), Nov. 4 Nov. 7, Orlando, USA 1 CHANGES IN RIVER BED AROUND THE FUKAWA CONTRACTION AREA BY FLOODS AND CHANNEL IMPROVEMENT WORKS IN THE LOWER

More information

Island Design. UMRS EMP Regional Workshop. Presentation for the

Island Design. UMRS EMP Regional Workshop. Presentation for the Island Design Presentation for the UMRS EMP Regional Workshop by Jon Hendrickson Hydraulic Engineer Regional Technical Specialist, Water Quality and Habitat Restoration August 17 19, 2005 Project Delivery

More information

Modelling the Impacts of Dam Rehabilitation on River Ice Jam: A Case Study on the Matane River, QC, Canada

Modelling the Impacts of Dam Rehabilitation on River Ice Jam: A Case Study on the Matane River, QC, Canada CGU HS Committee on River Ice Processes and the Environment 19 th Workshop on the Hydraulics of Ice Covered Rivers Whitehorse, Yukon, Canada, July 9-12, 2017. Modelling the Impacts of Dam Rehabilitation

More information

Emergency Action Plan (EAP) Tata Pond Dam

Emergency Action Plan (EAP) Tata Pond Dam For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification

More information

NOTES ON OPEN CHANNEL FLOW

NOTES ON OPEN CHANNEL FLOW NOTES ON OPEN CANNEL FLOW Prof. Marco Pilotti Facoltà di Ingegneria, Università degli Studi di Brescia Profili di moto permanente in un canale e in una serie di due canali - Boudine, 86 OPEN CANNEL FLOW:

More information

Tanjung Priok GFPPEP. Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta

Tanjung Priok GFPPEP. Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta prepared by Department of Civil and Environmental Engineering

More information

P a g e 3 6 of R e p o r t P B 4 / 0 9

P a g e 3 6 of R e p o r t P B 4 / 0 9 P a g e 3 6 of R e p o r t P B 4 / 0 9 p r o t e c t h um a n h e a l t h a n d p r o p e r t y fr om t h e d a n g e rs i n h e r e n t i n m i n i n g o p e r a t i o n s s u c h a s a q u a r r y. J

More information

Relative Velocities In Two Dimensions

Relative Velocities In Two Dimensions Relative Velocities In Two Dimensions The heading is the angle of the moving body the direction the object is pointing. The resultant velocity is typically the velocity of the object relative to the ground.

More information

Beaver Creek Corridor Design and Analysis. By: Alex Previte

Beaver Creek Corridor Design and Analysis. By: Alex Previte Beaver Creek Corridor Design and Analysis By: Alex Previte Overview Introduction Key concepts Model Development Design Accuracy Conclusion Refresh v = Beaver Creek Site = Wittenberg Introduction Low head

More information

Ashville Park Stormwater Management System Scenarios with Village C

Ashville Park Stormwater Management System Scenarios with Village C Memorandum o: From: Greg Johnson P.E. Mike Morgan P.E. Date: February 16 201 Subject: Ashville Park Stormwater Management System Scenarios with Village Introduction his memo presents analysis performed

More information

Regional Sediment Management

Regional Sediment Management Regional Sediment Management Linda S. Lillycrop Program Manager Coastal Engineer US Army Engineer Research and Development Center Coastal and Hydraulics Laboratory Q AVG Coastal Resilience: The Environmental,

More information

Me n d e l s P e a s Exer c i se 1 - Par t 1

Me n d e l s P e a s Exer c i se 1 - Par t 1 !! Me n d e l s P e a s Exer c i se 1 - Par t 1 TR UE - BR E E D I N G O R G A N I S M S Go a l In this exercise you will use StarGenetics, a genetics experiment simulator, to understand the concept of

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

MLSE in a single path channel. MLSE in a multipath channel. State model for a multipath channel. State model for a multipath channel

MLSE in a single path channel. MLSE in a multipath channel. State model for a multipath channel. State model for a multipath channel MLSE in a single path channel MLSE - Maximum Lielihood Sequence Estimation T he op timal detector is the one w hich selects from all p ossib le transmitted b it sequences the one w ith hig hest p rob ab

More information

Some Applications of trigonometry

Some Applications of trigonometry Some Applications of trigonometry 1. A flag of 3m fixed on the top of a building. The angle of elevation of the top of the flag observed from a point on the ground is 60º and the angle of depression of

More information

Bird s Point HSR MODEL River Miles HYDRAULIC SEDIMENT RESPONSE MODEL INVESTIGATION

Bird s Point HSR MODEL River Miles HYDRAULIC SEDIMENT RESPONSE MODEL INVESTIGATION Technical Report M61 Bird s Point HSR MODEL River Miles 5.8 0.0 HYDRAULIC SEDIMENT RESPONSE MODEL INVESTIGATION By Ashley N. Cox Adam M. Rockwell Jasen L. Brown, P.E. Robert D. Davinroy, P.E. Eddie J.

More information

Preparation of a Hydrodynamic model of. Detroit River- St. Clair River waterways. with Telemac-2D

Preparation of a Hydrodynamic model of. Detroit River- St. Clair River waterways. with Telemac-2D Preparation of a Hydrodynamic model of Detroit River- St. Clair River waterways with Telemac-2D Controlled Technical Report CHC-CTR-085 March 2009 CTR-CHC-085 NRC-CHC has prepared this report for the International

More information