1 Memorandum o: From: Greg Johnson P.E. Mike Morgan P.E. Date: February Subject: Ashville Park Stormwater Management System Scenarios with Village Introduction his memo presents analysis performed for the Ashville Park Subdivision stormwater management system supplementing the evaluations documented in Draft Ashville Park Stormwater Management System Flood Mitigation Plan (referred to as the previous study in this report). he technical methodology for this analysis is the same as was used in the previous study. For the analysis presented in this memo DM Smith evaluated five scenarios described below that include future Village in combination with various stormwater management system improvements. Each scenario was analyzed using the 10-year and 100-year design storms as documented in the previous study. Attachment 1 provides schematics for each scenario. he existing condition model described in the previous study was used as a starting model for the analyses documented in this memo. Scenario 1 his scenario builds on the existing condition model as described in the previous study. It includes a fully developed Ashville Park Village (as presented in the developer s proposed lot configuration) and primary stormwater system elements. Additionally this scenario includes the following modifications from the developer s conceptual plans (see schematic in Attachment 1): hannel connecting BMP 10 and 15 that is approximately 900 linear feet (lf) with a 4-footwide bottom at elevation 1 foot orth American Vertical Datum of 1988 (AVD 88). he side slopes range from: H:1V from approximately 8 feet AVD 88 to 4 feet AVD 88; 4H:1V from feet AVD 88 to 1 foot AVD 88 and 6H:1V safety shelf from feet AVD 88 to 4 feet AVD 88. his channel geometry is subsequently be referred in this memo as the developer proposed channel. Memorandum_Additional Svcs_Feb201 JG.docx

2 Ashville Park Stormwater Management System Analysis Support February Page 2 BMP 10A located south of Ashville Park Boulevard and directly connected to BMP 10 (modeled as two separated storage units: BMP 10A-1 and BMP 10-A-2 which are connected with a 1050-lf channel proposed by the developer). BMP 16 proposed in future Village. Pipes shown in the developer s conceptual plans for Village which connect BMP 16 to BMP 6 (see previous study build out conditions model for additional details). BMP 1 proposed in future Village E (though a built out Village E is not modeled). 400 linear feet of 60-inch diameter pipe and 55 lf of channel connecting BMP 1 to BMP 10A-2. For this analysis the model hydrology and subcatchment delineation for proposed Village is considered the same as the build out model presented in the previous study. For all the other locations existing condition subcatchments are used to represent the model areas with a few edits to account for the portions inside the developer-proposed BMP ponds and ditch berms. Subcatchment delineation has been revised in the vicinity of BMPs 10A and 1 with a small berm around each so that precipitation received by each pond runs off directly to the pond (storage) node. Since the areas surrounding these BMPs are not anticipated to be regraded runoff will behave as it does in the existing condition. he hydrologic parameters (impervious area width and slope) are set based on engineering judgment and developer conceptual plans. he normal water surface sets the impervious area percentage within the BMP subbasins but with the steep bank slope and low infiltration the model will not be highly sensitive to impervious percentage area in these new subbasins. he hydraulic elements of Scenario 1 match the hydraulic elements in the build out condition model described in the previous study. he difference between Scenario 1 and the build out model is that built out Villages D and E are not included in the development only their hydraulic elements. Scenario 2 his scenario includes all the elements in Scenario 1 in addition to expansion of BMP 6 and construction of BMP 2A. he expansion of BMP 6 adds approximately acres of storage at a normal pool elevation of 2 feet AVD 88. he BMP is expected to be dredged at the northern edge expanding west toward ilshire Village. BMP 2A is located west of anier Village east of Princess Anne oad and south of Ashville Park Boulevard. his BMP is estimated to provide 2 acres of additional storage at a normal water surface elevation of 2 feet AVD 88. In this scenario the BMP is modeled as offline storage to the ditch extending between the Princess Anne oad culvert and the ditch draining to existing BMP 2. Flow Memorandum_Additional Svcs_Feb201 JG.docx

3 Ashville Park Stormwater Management System Analysis Support February Page is diverted to the BMP using a weir structure and a short ditch that outfalls to the BMP. Since the ditch is at a higher elevation than the normal water surface elevation in BMP 2 the normal water surface elevation in BMP 2A would be regulated by water table elevations. In the previous study BMP 2A was connected to the anier Village primary stormwater management system and therefore regulated as the rest of the system. It is beyond the scope of this analysis to determine the operating normal water surface of this BMP since a groundwater model would likely be necessary. For this scenario an initial elevation of.1 ft AVD 88 was used to match existing nearby lake levels. Scenario his scenario includes all elements of Scenario 1 as well as a 1-cfs pump station and gated control structure between BMP 14 and Flanagan s ane. his flood control pump station was set to operate throughout the design storm simulation and may be used to draw down the upstream ponds from the normal water surface elevation of 2 feet AVD 88 to a level of 1 foot AVD 88 prior to the storm. his draw down is not simulated in the model; however model nodes upstream of the pump have initial depths set at 1 foot AVD 88. he gated control structure is used to maintain water levels in the subdivision under normal conditions. For the design storm simulation the structure may only operate when the stage in BMP 14 is greater than the stage in the Flanagan s ane ditch at which point the pump station flows increase. Scenario 4 his scenario includes all the elements in Scenario 2 with the addition of the 1 cfs pump station and gated control structure as described in Scenario. he initial depth in BMP 2A is set to an elevation of feet AVD 88 since the pump station drawdown cannot directly affect this BMP under this configuration. It is unknown how the groundwater will respond to 24 to 48 hours of drawdown in the nearby lakes. Scenario 5 his scenario includes all the elements in Scenario 4 with the removal of BMP 1 and the associated hydraulic elements connecting it to BMP 10A (as described in Scenario 1). he subcatchment delineation has been revised to direct the runoff that flowed to BMP 1 in the previous four scenarios to the existing node ASH_88 (similar to existing condition models described in the previous study). Analysis esults An overview of the results for each scenario are provided in the sections below. he tables included in Attachment 2 provide detailed model results. able 1-1 provides critical elevation peak stage delta from the critical elevation and duration for existing conditions and the five scenarios evaluated. he five locations included in the table provide representative results for flood durations expected in the ilshire and anier Villages. ables 2-2 and -1 in Attachment 2 provide a comprehensive listing of peak stages and the difference between existing conditions and each scenario throughout the hydraulic model. Memorandum_Additional Svcs_Feb201 JG.docx

4 Ashville Park Stormwater Management System Analysis Support February Page 4 Scenarios 1 and 2 For Scenario 1 there are very slight increases in peak stage in some nodes over the existing condition. he increases are minimal and generally within the range of 0.01 to 0.02 ft. Flood durations above road flowline during the 10-year storm are slightly lower for Scenario 1 as compared to the existing condition but flood durations above road crown are similar to the existing condition for the 100-year storm. Analysis of Scenario 2 shows a reduction in peak stage increases in many nodes as compared to Scenario 1; however there remain a few spots at 0.01 ft increase. For the 10-year storm the flood durations above the road flowlines continue to shorten in Scenario 2 but for the 100-year storm flood durations increase for at least one of the locations. his could be attributed to the bottleneck being downstream of the additional storage included in this scenario. he 100-year storm takes over 24 hours to drain. As storage is increased between the ilshire and anier Villages and the outfall there is more volume to drain out of the subdivision outfall before the neighborhoods can eventually drain. Scenarios and 4 Both these scenarios significantly reduce peak flood stages in ilshire and anier Villages. However both scenarios also increase stages as compared to the existing condition offsite in ditches along Flanagan s ane and Sandbridge oad. Generally these increased stages are maintained within the ditch banks; however the increase does encroach onto Sandbridge oad at its intersection with ew Bridge oad. he durations of flooding above road flowline for the 10- year storm and the road crown for the 100-year storm are significantly reduced in this alternative. he 10-year flood durations have been reduced from half a day to 1 day in the existing condition to less than an hour at some intersections for both the scenarios. For the 100-year storm the flood durations are reduced from over 6 hours to under 20 hours. Scenario 5 his scenario provides results similar to Scenario 4 with the exception of longer flood durations above road crown for the 100-year storm. he results suggest BMP 1 is not critical to the Scenario 4 result. he removal of BMP 1 provides a result between the expected result from Scenario and the additional storage from BMP 2A and expansion of BMP 6 in Scenario 4. cc:.j. Bodnar ity of Virginia Beach Shanda Davenport ity of Virginia Beach Memorandum_Additional Svcs_Feb201 JG.docx

5 AAHME 1

6 FU Ü Y OS AY egend BE AU X E BU E Y Planned Storage AY Planned Ditch Parcel MI K H AM PIO Flood ocation (Attachment 2: able 1-1 &1-2) Proposed Improvements I EI " 8 2 ID GE D Pump Station ontrol Structure Stormwater Pipe Dredge Existing Ditch Ditch BMP Addition or Expansion Village 5 15 D PI ES D PEPPEI D E SA QUIY AY MOEIO D PESO D " 14 AS HV I EP A K B VD 10A 11 EAMA Existing eir D GADO OOP AG A S SD FA ainier Village 1 6 HAIG BIGHOOD 5 O U 4 2 AY MA 1 16 EMEIA D ASH VI E PA K B SADB ID GE D AMAIO UB AO ilshire Village 4 KEO KI D BY HE K KI AY Existing Stormwater Pipe PS O AES SEAB OAD ri d g Ash vi lle B US Fish and ildlife Property e r eek 1 D Elbow Farms Property E 1 in = 00 ft Feet B DG I E D Ashville Park Scenario 1 ity of Virginia Beach February 201

7 Ü egend BE AU X E BU BMP 6 Expansion: approx. footprint at normal pool elv. E Existing Stormwater Pipe Y Planned Storage AY Planned Ditch Parcel MI K H AM PIO Flood ocation (Attachment 2: able 1-1 &1-2) Proposed Improvements I PS EI " 8 2 ID GE D ontrol Structure Stormwater Pipe Dredge Existing Ditch Ditch BMP Addition or Expansion 5 PESO D PI ES D PEPPEI D E SA QUIY AY AY MA SADB ID 10 1 " 14 AS HV I EP A K B VD 10A 11 EAMA Existing eir 12 9 AG A S 15 D 18 ' 'Φ D GADO OOP ainier Village 1 6 SD 5 FA MOEIO D " ASH VI E PA K B HAIG BIGHOOD 16 EMEIA D O U 4 2 GE D AMAIO 1 Gated ontrol Structure Village ilshire Village 4 KEO KI D UB AO BY HE K KI Pump Station SEAB OAD D ri d g Ash vi lle B US Fish and ildlife Property e r eek 1 BMP 2A: approx. footprint at normal pool elv. Elbow Farms Property E 1 in = 00 ft Feet B DG I E D Ashville Park Scenario 2 ity of Virginia Beach February 201

8 FU E X Ü BE A BU E U Y AY egend Existing Stormwater Pipe Y Planned Storage AY Planned Ditch Parcel M IK Flood ocation (Attachment 2: able 1-1 &1-2) Proposed Improvements PS EI D 16 6 B VD 1 cfs Pump Station 15 D PESO D 9 QUIY AY ainier Village PEPPEI D AS HV I EP A K B VD 10A PS " Gated ontrol Structure EAMA 1 Ash vi lle B 1 AYMA e r eek 5 ri d g 5 AG A S K B FA SD ASHV IE PA GADO OOP Ditch GE D EMEIA D HAIG MOEIO D O U KE OK I K 4 2 AMAIO UB AO BEEIA D 1 Dredge Existing Ditch Village 4 ilshire Village SADB ID D BY HE I SHI ADEA I Stormwater Pipe E A MA AMAI O ontrol Structure BMP Addition or Expansion I EP A K GE D AS HV ID 8 US Fish and ildlife Property PIES S AE D KI I O 2 " Pump Station Elbow Farms Property E 1 in = 00 ft Feet B DG I E D Ashville Park Scenario ity of Virginia Beach February 201

9 Ü egend BE AU X E BU E Planned Storage AY MI K H AM PIO PS " 8 Pump Station ontrol Structure Stormwater Pipe Dredge Existing Ditch Ditch BMP Addition or Expansion SADB ID 6 15 D PESO D PI ES D 1 PEPPEI D E SA QUIY AY ainier Village AY MA AG A S cfs Pump Station 10 1 PS " 14 AS HV I EP A K B VD 10A EAMA 5 5 SD GADO OOP MOEIO D " FA D ASH VI E PA K B HAIG BIGHOOD 16 EMEIA D O U 4 2 GE D AMAIO 1 Gated ontrol Structure Village ilshire Village 4 KEO KI D UB AO BY HE K GE D Flood ocation (Attachment 2: able 1-1 &1-2) Proposed Improvements I 2 ID Planned Ditch Parcel BMP 6 Expansion: approx. footprint at normal pool elv. KI Y EI Existing Stormwater Pipe 11 Gated ontrol Structure D lle B BMP 2A: approx. footprint at normal pool elv. Ash vi SEAB OAD ri d g US Fish and ildlife Property e r eek 1 Elbow Farms Property E 1 in = 00 ft Feet B DG I E D Ashville Park Scenario 4 ity of Virginia Beach February 201

10 Ü egend BE AU X E BU E Planned Storage AY MI K H AM PIO PS " 8 Stormwater Pipe Dredge Existing Ditch Ditch BMP Addition or Expansion SADB ID PI ES D 1 PEPPEI D E SA QUIY AY ainier Village AY MA 10 1 PS " 14 AS HV I EP A K B VD 11 10A Gated ontrol Structure EAMA US Fish and ildlife Property Ash vi lle B BMP 2A: approx. footprint at normal pool elv. e r eek 15 D AG A S GADO OOP 1 cfs Pump Station SD 5 5 FA MOEIO D " PESO D ASH VI E PA K B HAIG D 16 EMEIA D O U 4 2 GE D AMAIO Village BIGHOOD Gated ontrol Structure K 4 ri d g ilshire Village 1 D ontrol Structure KEO KI D UB AO BY HE SEAB OAD Pump Station GE D Flood ocation (Attachment 2: able 1-1 &1-2) Proposed Improvements I 2 ID Planned Ditch Parcel BMP 6 Expansion: approx. footprint at normal pool elv. KI Y EI Existing Stormwater Pipe Elbow Farms Property E 1 in = 00 ft Feet B DG I E D Ashville Park Scenario 5 ity of Virginia Beach February 201

11 AAHME 2

12 able 1-1 Selected Flood s for the 100-year design storm ritical Elevations Exsiting (ft AVD) ocation Model ode rown rown (100-yr) (ft AVD) (1) Quincy ay & Pepperlin Dr * (2) Kittridge Dr oop () hanning n & Grandon oop A * * * (4) ilshire Dr & Blythe Dr * * * (5) BMP BMP_5 5.5** * * * * he stage has not receeded below the critical elevation by the end of the simulation ** owest Indicator Elevation Upstream BMP (ft AVD) Scenario 1 rown (ft AVD) Scenario 2 rown (ft AVD) Scenario rown (ft AVD) Scenario 4 rown (ft AVD) Scenario 5 rown able 1-2 Selected Flood s for the 10-year design storm ocation Model ode Flow ine (10- yr) (1) Quincy ay & Pepperlin Dr (2) Kittridge Dr oop () hanning n & Grandon oop A (4) ilshire Dr & Blythe Dr (5) BMP BMP_5 5.0** ** owest Indicator Elevation Upstream BMP ritical Elevations (ft AVD) (ft AVD) Existing Flow ine (ft AVD) Scenario 1 Flow ine (ft AVD) Scenario 2 Scenario Scenario 4 Flow ine (ft AVD) Flow ine (ft AVD) Flow ine (ft AVD) Scenario 5 Flow ine

13 able 2-1 Summary of Scenario Simulation esults ocation Model ode ritical Elevations (ft AVD) (ft AVD) Flowline Scenario 1 (ft AVD) rown (ft AVD) Flowline Scenario 2 Scenario Scenario 4 Scenario 5 (ft AVD) rown Flowline (10-yr) rown (100-yr) Quincy ay & Pepperlin Dr Kittridge Dr oop hanning n & Grandon oop A ilshire Dr & Blythe Dr ubao Dr & Aldea ir amarillo ane orthwest oop erramar n east of Pepperlin Blythe Dr & Aldea ir ubao Dr west of BMP est Quincy y & Grandon oop 0910-A East Quincy y & Grandon oop erramar n & Pepperlin Dr Grandon oop & Pepperlin Dr 0910-A18B Bencia Dr east of Keokirk n est hanning n B Montecito Dr 0910-A14B est Grandon oop d A Brighwood Dr & Ashville Park Bvld 0910-A ubao Dr north of Kittridge Dr Brighwood Dr & Grandon oop 0910-A4A Ashville Park Blvd & ubao Dr 0910-A Ashville Park Blvd south of BMP amarillo n east of Keokirk n amarillo ane ortheast oop (ft AVD) Flowline (ft AVD) rown (ft AVD) Flowline (ft AVD) rown (ft AVD) Flowline (ft AVD) rown

14 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) (ft AVD) Scenario onditions Scenario 4 onditions Scenario 5 onditions A ASH_ A OF B J J J J os S9_A_18_S J J D (ft AVD) (ft AVD) (ft AVD) (ft AVD) (ft AVD)

15 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) Scenario 4 onditions (ft AVD) Scenario onditions (ft AVD) (ft AVD) (ft AVD) (ft AVD) Scenario 5 onditions D F01A A A A A A A A A A A A A ASH_ A ASH_ D (ft AVD)

16 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) Scenario 4 onditions (ft AVD) Scenario onditions (ft AVD) (ft AVD) (ft AVD) (ft AVD) Scenario 5 onditions A A A A11A (ft AVD)

17 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) Scenario 4 onditions (ft AVD) Scenario onditions (ft AVD) (ft AVD) (ft AVD) (ft AVD) Scenario 5 onditions I_ A E E A18B A A A10A A1A A A A A A08A A0D (ft AVD)

18 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) Scenario 4 onditions (ft AVD) Scenario onditions (ft AVD) (ft AVD) (ft AVD) (ft AVD) Scenario 5 onditions E A14B A15B A1B A06A A A12B A A05A A A A4A E A0A E A A A E E A B02A B0A BMP2_ BMP2_ BMP2_ E A B A BMP1_ BMP1_ (ft AVD)

19 able -1 Model esults Existing onditions Model ode (ft AVD) (ft AVD) Scenario 1 onditions (ft AVD) (ft AVD) Scenario 2 onditions (ft AVD) Scenario 4 onditions (ft AVD) Scenario onditions (ft AVD) (ft AVD) (ft AVD) (ft AVD) Scenario 5 onditions BMP1_ BMP1_ E E E E BMP BMP BMP D0A E E BMP4_ BMP4_ BMP4_ D02B BMP_ BMP_ BMP_ BMP_ BMP_ (ft AVD)

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

WELCOME Lake Wabukayne OPEN HOUSE

WELCOME Lake Wabukayne OPEN HOUSE WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive

More information

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT 154 A HYDROLOGC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY N QUEENS, NY Monica Tsang-Rakovan, Kevin J. Phillips, Khalid Bajwa, John Ferrelli, Fanning, Phillips and Molnar Fanning,

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Monitoring Considerations and Costs

Monitoring Considerations and Costs Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.

More information

Evaluation and Incorporation of USACE HEC-RAS Model of Chicago Waterway System into the Development of the North Branch DWP

Evaluation and Incorporation of USACE HEC-RAS Model of Chicago Waterway System into the Development of the North Branch DWP M E M O R A N D U M Evaluation and Incorporation of USACE HEC-RAS Model of Chicago Waterway System into the Development of the North Branch DWP TO: FROM: Joseph Spradling, PE, HDR Steven Vassos, PE, FluidClarity

More information

Phillips Ditch Drainage Study

Phillips Ditch Drainage Study Phillips Ditch Drainage Study By: David L. McCormick, PE, D. WRE McCormick Engineering, LLC For: St. Joseph County, Indiana Revision Date: March 29, 2017 Table of Contents 1. INTRODUCTION... 1 1.1. Review

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Between 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage

Between 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage Ocean Park Alternative Drainage Route Analysis February, 2012 November 11 14, 2009 Between 6 am to 4 pm the next day approximately 7.5 inches fell Chesapeake Bay Bridge Tunnel NOAA Tide Gage Hurricane

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

D. MATHEMATICAL MODEL AND SIMULATION

D. MATHEMATICAL MODEL AND SIMULATION D. MATHEMATICAL MODEL AND SIMULATION D - i TABLE OF CONTENTS D.1 Objective of Model Development... D - 1 D.2 Selection of Software... D - 1 D.3 General Steps of Simulation by MOUSE... D - 1 D.4 Cases of

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

Section 3.0 Existing Systems Hydrology and Hydraulics

Section 3.0 Existing Systems Hydrology and Hydraulics Section 3.0 Existing Systems Hydrology and Hydraulics This chapter summarizes the results and methodology of MACTEC s evaluation of the existing drainage systems and lakes for the City of Maitland, Florida.

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

JUNE 2004 Flood hydrology of the Waiwhetu Stream

JUNE 2004 Flood hydrology of the Waiwhetu Stream JUNE 2004 Flood hydrology of the Waiwhetu Stream Laura Watts Resource Investigations Contents 1. Introduction 1 2. Catchment description 2 3. Data availability and quality 3 3.1 Rainfall data 3 3.2 Water

More information

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for: HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

Windsor Woods Stormwater Management System Flood Mitigation Plan

Windsor Woods Stormwater Management System Flood Mitigation Plan CITY OF VIRGINIA BEACH Windsor Woods Stormwater Management System Flood Mitigation Plan FINAL APRIL 5, 2018 k Lake Windsor Outlet Culvert Lake Windsor Windsor Woods Canal Table of Contents Executive Summary

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

Hydrology and Hydraulics Design Report. Background Summary

Hydrology and Hydraulics Design Report. Background Summary To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

6/9/2014. Software Overview. System Overview

6/9/2014. Software Overview. System Overview Future Rainfall 6/9/2014 Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, CFM, PMP TFMA Spring 2014 Conference Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low =

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE 255 237 237 237 217 217 217 200 200 200 0 163 131 Bridging the Gap163Conference 255 0 132 255 0 163 122 The Dana on Mission Bay San Diego, CA January 28,

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

Appendix C Surface Water and Groundwater Interaction Memorandum

Appendix C Surface Water and Groundwater Interaction Memorandum Texas Custodial Trust 2301 West Paisano Drive El Paso, Texas 79922 Appendix C Surface Water and Groundwater Interaction Memorandum 6835001 Malcolm Pirnie, Inc. 410 N. 44 th Street, Suite 1000 Phoenix,

More information

Working with Natural Stream Systems

Working with Natural Stream Systems Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Appendix 15 Computational Methodology

Appendix 15 Computational Methodology Appendix 15 Computational Methodology Introduction This Appendix describes the process used by the risk team to determine the final loss exceedence values in the risk analysis. The process involved the

More information

August 2006 El Paso. Policy Factors

August 2006 El Paso. Policy Factors August 2006 El Paso Flooding: Technical and Policy Factors John Walton University of Texas at El Paso El Paso, Texas UTEP History Deficiencies in El Paso Arroyo drainage systems were multitudinous and

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries StreamStats: Delivering Streamflow Information to the Public By Kernell Ries U.S. Department of the Interior U.S. Geological Survey MD-DE-DC District 410-238-4317 kries@usgs.gov StreamStats Web Application

More information

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain?

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain? Dealing with Zone A Flood Zones Topics of Discussion Overview of Zone A Floodplains Permitting Development in Zone A Floodplains Estimating Flood Elevations in Zone A Flood Insurance Implications Letters

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

University of the Virgin Islands Conceptual Stormwater Management Plan Coral Bay Watershed Final Letter Report (May 2005)

University of the Virgin Islands Conceptual Stormwater Management Plan Coral Bay Watershed Final Letter Report (May 2005) Final Letter Report (May 2005) Background The Coral Bay watershed, shown in Figure 1, is located in the southeastern portion of the island of St. John, U.S. Virgin Islands (USVI) and consists of approximately

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 December 16, 2015 Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 RE: Response to SWFWMD Supplemental Information Request Dear Mr.

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1

More information

Climate Adaptation Challenges for Boston s Water and Sewer Systems

Climate Adaptation Challenges for Boston s Water and Sewer Systems National Association of Flood & Stormwater Management Agencies Climate Adaptation Challenges for Boston s Water and Sewer Systems John P Sullivan P.E. October 15,2014 Boston 1630 Boston 1630-2012 Boston

More information

Pennypack Creek Watershed Act 167 Study

Pennypack Creek Watershed Act 167 Study Pennypack Creek Watershed Act 167 Study Progress Report December 17, 2009 Jeffrey Featherstone jeffrey.featherstone@temple.edu Mahbubur Meenar meenar@temple.edu Rick Fromuth richard.fromuth@temple.edu

More information

Preliminary BMP Calculations

Preliminary BMP Calculations Preliminary BMP Calculations 1 Preliminary BMP Calculations 2 Ohio Department of Transportation 1 Preliminary BMP Calculations 3 Draw drainage basin boundary perpendicular to contours Look for conveyance

More information

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS New England East-West Solution (NEEWS) Greater Springfield Reliability

More information

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR Black & Veatch Holding Company 2017. All rights reserved. 2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING Master Plan Addendum B&V PROJECT NO. 195982 PREPARED FOR Union County 7 MARCH 2018 Table of

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014. SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,

More information

Las Colonias Subdivision September 2010 Flood Study

Las Colonias Subdivision September 2010 Flood Study Las Colonias Subdivision September 2010 Flood Study Curtis Beitel, P.E., CFM Scott Muchard, P.E. Project Engineer William Badini, CFM Senior Meteorologist Location Map Background Los Colonias Subdivision

More information

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY, UTAH SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...