Attachment D-7: Rebound and Uplift of the Stilling Basin, Deep Soil Mixing Design
|
|
- Rosa Foster
- 5 years ago
- Views:
Transcription
1 Attachment D-7: Rebound and Uplift of the Stilling Basin, Deep Soil Mixing Design Attachment D-7: Rebound and Uplift of the Stilling Basin, Deep Soil Mixing Design
2 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Appendix D, Attachment 7: FLAC Analysis of Diversion Inlet Structure Rebound Fargo Moorhead Metropolitan Area Flood Risk Management Project Diversion Inlet Structure Engineering and Design Phase Doc Version: Draft February 22, 2016 DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx
3 Fargo Moorhead Metropolitan Area Flood Risk Management Project This page is intentionally left blank Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx
4 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Appendix D, Attachment 7: FLAC Analysis of Diversion Inlet Structure Rebound Table of Contents 1. General Stratigraphy Soil Expansion Soil Parameters General Modified Cam Clay Parameters Shear Strength Parameters Free Field Unloading FLAC Modeling Procedure FLAC Modeling Results Unloading with Pile and Structure Present FLAC Modeling Procedure Pile Elements Pile-Soil Shear Coupling Springs FLAC Modeling Results Stilling Basin Location Shear Transfer in the Till Approach Apron Control Structure Mitigation of Stilling Basin Rebound FLAC Modeling Results Deep Soil Mixing Plan Conclusions References District Quality Control DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page i
5 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound TABLES Table 1 Summary of Mohr-Coulomb Parameters... 3 Table 2 Summary of Modified Cam-Clay Parameters... Error! Bookmark not defined. Table 3 Structural Parameters... Error! Bookmark not defined. Table 4 Comparison of Axial Load and Displacement for Varying ββ Values in the Till (Stilling Basin Location) Table 5 Comparison of Axial Load and Displacement for Varying ββ Values in the Till (Stilling Basin and Approach Apron Locations) Table 6 Mohr-Coulomb Parameters for Improved Soil FIGURES Figure 1 Plan View of Diversion Inlet Figure 2 Profile of Diversion Channel, Structure, and Connecting Channel Figure 3 Boring Log M Figure 4 Boring Log M Figure 5 Determination of Reference Specific Volume and Preconsolidation Pressure for the Argusville Fm Figure 6 Determination of Reference Specific Volume and Preconsolidation Pressure for the Brenna Fm Figure 7 Stratigraphy for FLAC modeling at the Diversion Inlet Figure 8 Effective Vertical Stress Contours for Insitu Conditions Figure 9 Effective Horizontal Stress Contours for Insitu Conditions Figure 10 Comparison of Hand Calculated Vertical and Horizontal Effective Stress Profiles to FLAC Figure 11 Effective Vertical Stress Contours after Unloading to Elevation 888 ft Figure 12 Effective Horizontal Stress Contours after Unloading to Elevation 888 ft Figure 13 Vertical Displacement Contours after Unloading to Elevation 888 ft Figure 14 Rebound Profile Comparison of FLAC to One Dimensional Expansion Spreadsheet Calculation Figure 15 Location of the Single Pile FLAC Model in the DIS Stilling Basin Figure 16 FLAC model in DIS Stilling Basin with Pile and Pile Cap (prior to unloading) DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page ii
6 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Figure 17 Effective Vertical Stress Contours, 250 psf Contour Interval, DIS Stilling Basin Figure 18 Effective Horizontal Stress Contours, 250 psf Contour Interval, DIS Stilling Basin Figure 19 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Stilling Basin Figure 20 Shear Strain Rate Contours, DIS Stilling Basin Figure 21 Vertical Displacement Contours, DIS Stilling Basin Figure 22 Axial Load in Pile, DIS Stilling Basin Figure 23 Shear Spring Forces, DIS Stilling Basin Figure 24 Pile Displacement, DIS Stilling Basin Figure 25 Location of the Single Pile FLAC Model in the DIS Approach Apron Figure 26 FLAC model in DIS Approach Apron with Pile and Pile Cap (after unloading) Figure 27 Effective Vertical Stress Contours, 250 psf Contour Interval, DIS Approach Apron Figure 28 Effective Horizontal Stress Contours, 250 psf Contour Interval, DIS Approach Apron Figure 29 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Approach Apron Figure 30 Shear Strain Rate Contours, DIS Approach Apron Figure 31 Vertical Displacement Contours, DIS Approach Apron Figure 32 Axial Load in Pile, DIS Approach Apron Figure 33 Shear Spring Force, DIS Approach Apron Figure 34 Pile Displacement, DIS Approach Apron Figure 35 Location of the Control Structure FLAC Model Cross-Section Figure 36 FLAC Model of DIS Control Structure (after unloading) Figure 37 Effective Vertical Stress Contours, DIS Control Structure (after unloading) Figure 38 Effective Horizontal Stress Contours, DIS Control Structure Figure 39 Vertical Displacement Contours, DIS Control Structure Figure 40 FLAC Model in DIS Stilling Basin with Pile, Pile Cap and DSM Treated Zones (after unloading) 55 Figure 41 Effective Vertical Stress Contours, 500 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Figure 42 Effective Horizontal Stress Contours, 500 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Figure 43 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Figure 44 Shear Strain Rate Contours, DIS Stilling Basin with DSM Treated Zones DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page iii
7 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Figure 45 Shear Stress Contours, 25 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Figure 46 Shear Stress Contours, 50 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Figure 47 Vertical Displacement Contours, DIS Stilling Basin with DSM Treated Zones Figure 48 Axial Load in Pile, DIS Stilling Basin with DSM Treated Zones Figure 49 Pile Displacement, DIS Stilling Basin with DSM Treated Zones Figure 50 Proposed DSM Panel Layout for DIS Stilling Basin DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page iv
8 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Executive Summary The Lake Agassiz clays in the Red River Valley are known for their poor engineering properties. These soils have low shear strength and high compressibility. When the soils are excavated to construct the diversion channel, the reverse of the consolidation process occurs. The excavation causes a large stress decrease in the foundation soils. In this case, the soil wants to expand and draw water into the void space creating negative pore water pressures. Over time the negative pore pressures dissipate and the void space in the soil increases. This process is referred to as expansion or commonly called rebound. For the Diversion Inlet Structure (DIS), estimates of the channel rebound range from 14 to 17 inches at the stilling basin location. This is the free-field rebound estimate without the structure and piles in place. In order to analyze the problem with the structure and piles in place, i.e. analyze the soil structure interaction, required advanced numerical modeling. The Corps used FLAC software to quantify the structural rebound of the appurtenant structures making up the DIS. A summary from the FLAC modeling is shown below. Summary of FLAC Results for the Diversion Inlet Vertical Displacement (inches) Feature/Location Free Field Structure and Piles in Place Stilling Basin 16 6 Control Structure Not Analyzed 0.5 Approach Apron 10 2 The predicted rebound of the pile founded stilling basin is high and creates differential movement problems between the stilling basin and control structure. As the Lake Agassiz clays above the till expand, shear is transferred to the piles. The expanding soil also exerts a pressure on the base of the stilling basin. As soil expansion occurs the piles are put into tension and act like anchors. Because the length of the pile driven into the till is relatively short, the anchor length is short, and the piles are in effect pulled out of the till as rebound occurs. The design team discussed options to mitigate the predicted stilling basin rebound. The construction schedule led to the use of deep soil mixing (DSM) to mitigate rebound of the stilling basin. DSM involves a binder (cement, lime, fly ash) added and mixed into the insitu soil by auger to improve the soil properties. In this case, the improvement would be to increase the stiffness of the Lake Agassiz clays, thereby reducing rebound during unloading. FLAC modeling indicates the DSM zones allow the loads from the pile being pulled out of the till to transfer into the relatively stiff DSM that spans between the till and the base of the structure. The FLAC simulations also indicate the structural rebound can be reduced to below 1 inch by using 4 ft. wide DSM panels in the stilling basin located midway between the H piles. For this reason, the use of DSM within the stilling basin footprint is recommended to help ensure that the structure performs well over time. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7
9 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Appendix D, Attachment 7: FLAC Analysis of Diversion Inlet Structure Rebound 1. General The Diversion Inlet Structure (DIS) is a pile-founded hydraulic structure that consists of the following major components: approach apron, control structure, and stilling basin. The approach apron and stilling basin are founded on vertical HP14x73 piles generally spaced between 8 and 10 ft. on center. The control structure includes the tainter gates, stepped spillway, mechanical platform, and vehicle service bridge. The control structure is founded on HP14x73 piles battered in both the upstream and downstream directions with vertical piles located under the piers. The DIS provides water control and grade change from the connecting channel into the diversion channel. Figure 1 and Figure 2 provide a plan and profile view of the Diversion Inlet Structure, the connecting channel, and the diversion channel. The purpose of this report is to estimate the structural rebound of the primary components of the DIS to allow the component structural joints to be properly designed and detailed for any anticipated differential movement. In order to accomplish this, the finite difference program Fast Lagrangian Analysis of Continua (FLAC) 7.0 by Itasca Consulting Group, Inc. was used to conduct numerical analyses of the soil structure interaction. In general, the report explains the methodology used in the various FLAC models, describes the conditions analyzed, discusses the model results and validations, and illustrates soil-structure response through a series of figures. 2. Stratigraphy The stratigraphy for the FLAC model is similar to what was used in the limit equilibrium slope stability analyses for determining unbalanced loads and documented in Appendix D: Geotechnical Engineering and Geology. The soil stratigraphy was based primarily on two borings located along the diversion centerline. Soil boring M (Figure 4) is located at the downstream end of the DIS stilling basin and boring M (Figure 3) is located near the center of the control structure. The details of the stratigraphy are as follows: Ground surface in the area averages El. 915 ft. and it was assumed the natural ground water table was approximately 10 feet below ground surface at El. 905 ft. The Sherack/Brenna contact ranges from El. 898 ft. to 889 ft. An elevation of 890 ft. was used which was the average between borings M and M. The Brenna/Argusville contact ranges from El. 869 ft. to 860 ft. An elevation of 863 ft. was used which is about the average contact elevation between borings M and M. The Argusville/Unit A Till contact ranges from El. 852 ft. to 845 ft. An elevation of 848 ft. was used which is the contact elevation from boring M. The Weathered Till/Intact Till contact was chosen as El. 840 ft, or 8 feet into the till. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 1
10 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound The elevation of the H-pile toe was set at El. 836 ft., which is the approximate elevation where the till stiffness substantially increases based on SPT blow counts. Please note that all elevations are reported in North American Vertical Datum of 1988 (NAVD 88). 3. Soil Expansion The Lake Agassiz clays in the Red River Valley are known for their poor engineering properties. These soils have low shear strength and high compressibility. When embankments are constructed on these saturated clays, primary consolidation settlement represents the majority of the compression that takes place. The familiar theoretical model of this process is the pore water in the clay s void space becomes pressurized in response to an embankment load. Stated in terms of stress, the total vertical stress change equals the pore pressure change in response to instantaneous loading. Because these clay deposits are thick and contain very low permeabilities, it can take many years for the excess pore pressures to dissipate. As the water is squeezed out of the soil voids over time the soil compresses producing consolidation settlement. When these same soils are excavated to construct the diversion channel, the reverse of the consolidation process occurs. The excavation causes a large stress decrease in the foundation soils. In this case, the soil wants to expand and draw water into the void space creating negative pore water pressures. The negative pore pressure equalization is again controlled by the soil permeability making the response time dependent. Eventually all the negative pore pressures dissipate, returning to an equilibrium condition, and the void space in the soil increases. This process is referred to as primary expansion. The upward displacement of the soil is commonly referred to as rebound. The FLAC modeling completed for this report attempts to correctly capture the decrease in effective vertical stress and associated increase in the void space of the soil due to the removal of overburden associated with the channel excavation. The modeling conservatively neglects expansion that would occur during excavation or prior to placement of the piles and structure construction. The stress response in the FLAC model was not coupled to the groundwater response. 4. Soil Parameters 4.1. General The constitutive model parameters for the foundation soils used in the FLAC analyses are summarized in Table 1 and Error! Reference source not found.. Mohr Coulomb parameters were used for the Sherack Formation, as well as the weathered and intact till. The selection of these parameters was consistent with prior numerical modeling conducted for the pile supported T-wall at the Diversion Inlet location. The reader is referred to Appendix D, Attachment 6: FLAC Analysis of Floodwall, Design Documentation Report, Inlet Diversion for additional discussion of the selection of the shear strength parameters and shear and bulk modulus values. The shear strength and modulus values used here are all effective stress parameters. The unit weights used if the FLAC model were the same as what is used in the Diversion Channel modeling. The unit weights were converted to a density using a gravity of 32.2 ft/s 2. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 2
11 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Table 1 Summary of Mohr-Coulomb Parameters Unit Density, Cohesion, Bulk Modulus, Shear Modulus, Soil Weight, ρ φ' c' Insitu K' G Formation γ (pcf) (slugs/ft 3 ) (deg) (psf) K o (psf) (psf) Sherack E E+05 Weathered Till E E+06 Intact Till E E Modified Cam Clay Parameters Instead of trying to calibrate Mohr-Coulomb parameters to approximate the anticipated rebound due to excavation of the diversion channel, the decision was made to use the Modified Cam Clay (MCC) constitutive model for the Brenna and Argusville Formations. The Brenna and Argusville represent the Lake Agassiz clays with the lowest shear strength and highest degree of compressibility. Triaxial shear strength and consolidation testing in these formations were used to develop the MCC parameters. Preconsolidation Reference Density, Poisson's Pressure, Specific Soil ρ Insitu Ratio, p c0 Volume Lambda, Kappa, Mu, Formation (slugs/ft 3 ) K o ν (psf) v λ λ κ Μ Brenna Argusville Note: The reference specific volume corresponds to a reference mean pressure, p 1 of 1 psf. The parameter lambda, λλ, is the slope of the normal compression line (NCL) plotted on the natural logarithm of mean effective stress, p (x-axis) versus specific volume (y-axis). While lambda represents the change in specific volume during isotropic compression, it is commonly estimated from consolidation testing. Lambda is approximately the compression index, Cc, divided by the ln 10. The parameter kappa represents the slope of the unload-reload line (URL) plotted in ln p versus specific volume space. Kappa, κκ, can also be approximated by dividing the swell index, Cs, by the ln 10. The third paramter necessary to define changes in specific volume due to changes in mean effective stress is an anchor point or a reference specific volume at a reference mean effective stress. The reference value of mean effective stress is normally taken as one, a unit value of stress. For this report, isotropically consolidated undrained triaxial tests with pore pressure measurements were used to determine a point on the NCL. To select this point triaxial compression specimen results were selected where the effective DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 3
12 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound confining stress was judged to be above the preconsolidation stress meaning the effective confining stress represented the mean effective stress and the void ratio after consolidation determined the specific volume for a point on the NCL. Projecting these values back to a p value of 1 psf at a slope of lambda gives an estimate of the reference specific volume. Figure 5 and Figure 6 show the determination of the reference specific volume from triaxial testing for the Argusville and Brenna formations respectively. The lambda and kappa values that were used in the FLAC modeling were increased 10 to 20% above the swell index values from consolidation testing to achieve a better calibration to the one dimensional hand calculation. The rebound computations in FLAC were found to be sensitive to the selection of Kappa and the reference specific volume. Slightly decreasing the reference specific volume increased the rebound in FLAC. Changes to Kappa were directly proportional to the rebound determined in FLAC. The parameter, Μ, is slope of the critical state line (CSL). For triaxial compression testing, Μ, is determined from: Μ = (6ssssssss )/(3 ssssssss ). The preconsolidation pressure used in the MCC model can be determined by estimating the preconsolidation pressure from consolidation testing and assuming this is the maximum effective vertical stress. The maximum effective horizontal stress can then be determined from an estimate of the at rest earth pressure coefficient. From these values the maximum mean effective stress and maximum deviatoric stress can be estimated. The preconsolidation stress pp cc0 used in the MCC model can be calculated as: qq 2 = MM 2 [pp(pp cc0 pp)] where p=maximum mean effective stress and q is the maximum deviatoric stress The determination of the preconsolidation stress is illustrated in the Theory and Background FLAC manual under Modified Cam-Clay constitutive model. Rebound computations in FLAC were found to be insensitive to the selection of the preconsolidation pressure. The calculation of the preconsolidation pressure, pp cc0 is shown in Figure 5 and Figure Shear Strength Parameters The effective and total stress shear strength parameters are not directly discussed in this report. The reader is referred to Sections 3.2 and 3.3 of Appendix D, Attachment 6: FLAC Analysis of Floodwall of the Design Documentation Report of the Inlet Diversion. 5. Free Field Unloading 5.1. FLAC Modeling Procedure A number of different FLAC models were constructed and analyzed for this report, but all followed the same general approach. The steps for the free field (without structural elements present) FLAC models are outlined as follows: 1. Generate the FLAC grid for the cross section. The grid represents a two dimensional cross-section (plane-strain conditions) and represents the foundation soils for a flat ground geostatic calculation with ground surface elevation at 915 ft. Based on previous numerical modeling, the behavior in the diversion channel is dominated by the vertical displacement (rebound) that occurs upon excavation. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 4
13 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound As a result, simple column models of soil were constructed with the soil zones sized 1ft. horizontally by 1 ft. vertically. The bottom of the grid was set at el. 815 ft. and the top of the grid at el. 915 ft. producing 100 zones vertically. The width of the grid was set at either 8 or 10 zones. The reason for the selected width was to take advantage of symmetry in the pile layout when piles were added to the analysis. The grid and material groups (stratigraphy) are shown on Figure Initialize total stresses and pore pressures. Because the MCC constitutive model was used for the Brenna and Argusville soils, a beginning mean effective stress state is required. A convenient way to establish this in FLAC is to initialize total vertical stress, total horizontal stresses, and pore pressures in each zone of the grid. Pore pressures were initialized assuming a hydrostatic condition with the groundwater elevation at 905 ft. The total vertical stress, Syy, is set to the cumulative value of depth times the soil density. The initialized value of Sxx was set equal to Ko times the effective vertical stress plus the pore water pressure (Sxx=Ko(Esyy)+u). The at rest earth pressure coefficient was determined in accordance with the following equation: KK OO = (1 ssssssφφ ) OOOOOO ssssss The total horizontal stresses, Sxx and Szz (out-of-plane stress), were set to equal to each other. Initializing stresses and pore pressures occurs outside of the solve command allowing the user to check stress states before setting material properties and solving with gravity turned on. Checks between the spreadsheet used to estimates stresses and pore pressures and the initialized stresses and pore pressures in FLAC indicated good agreement. 3. Establish material property values and boundary conditions. The FLAC analyses are based on the Mohr-Coulomb constitutive model (elastic-perfectly plastic soil behavior) in the Sherack and till materials (Table 1) and Modified Cam-Clay constitutive model in the Brenna and Argusville (Error! Reference source not found.). All the FLAC analyses completed for this report used drained modulus values and drained shear strengths for the foundation soils. Boundary conditions for the sides of the model are fixed in the x direction and the bottom of the model fixed in the x and y directions. 4. Perform a gravity turn on analysis. While not necessary at this point, the model was solved with gravity turned on to compare the effective vertical and horizontal stresses from FLAC with those determined by hand (Figure 10). The Insitu vertical and horizontal effective stresses are presented in Figure 8 and Figure 9 respectively. Good agreement is evident between the hand calculated stresses and those resulting from FLAC after solving. 5. Incrementally lower the groundwater level. The water level is lowered in the model in two foot intervals by initializing pore pressures to the new hydrostatic condition (two feet lower) and the model solved. The adjust total stress command was issued to properly compute effective stress values due to the simulated instantaneous changes in the pore pressures. The pore pressures in the model were dropped from a starting groundwater elevation of 905 ft. to a final elevation of 887 ft. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 5
14 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound in the location of the diversion structure stilling basin. Lowering the groundwater creates an increase in effective stresses creating downward vertical displacements in the model. 6. Incrementally excavate the foundation soil. With the water table dropped to the level of the excavation, velocities and displacements in the model are reinitialized to zero. Then zones are removed (nulled) in two foot vertical increments and then solved to equilibrium. The process is repeated until reaching the final excavation elevation (888 ft. at the stilling basin and 899 ft. at the approach apron location). In the case of the stilling basin location or upstream limit of the diversion channel, the excavation proceeds to the top of the Brenna formation removing all of the Sherack. The effective vertical and horizontal stress contours after unloading to el. 888 ft. are presented in Figure 11 and Figure 12 respectively FLAC Modeling Results Figure 13 presents the vertical displacement contours after unloading the model to el. 888 ft. The computed vertical displacement at the grid point at el. 888 ft. was approximately 1.29 ft. (15.5 in.) compared to 1.37 ft. (16.5 in.) from a one dimensional hand calculation. The vertical displacement from FLAC at the grid point at el. 888 ft. includes a small amount of expansion in the till, ft. (0.15 in.), while the hand calculation assumes the till does not rebound at all. The agreement between FLAC and the hand calculation is considered good. Figure 14 presents the rebound profile from FLAC compared to the one dimensional expansion calculation. The expansion in the FLAC model takes place in the Brenna and Argusville represented by the MCC constitutive model. While this constitutive model offered better calibration to anticipated rebound than the Mohr-Coulomb model, it should be noted that small changes to certain, interrelated parameters affects the rebound in FLAC. These parameters include Kappa, the reference specific volume, and Poisson s ratio. Relatively small decreases in the reference specific volume increased the computed rebound, while small increases in either Kappa or Poisson s ratio increased vertical displacement in FLAC. 6. Unloading with Pile and Structure Present 6.1. FLAC Modeling Procedure The same general procedure used for the free field unloading FLAC model was used simulate the loads and displacements expected to occur in the piles and pile cap of the stilling basin. Because the problem is dominated by excavation that produces significant reduction in vertical stress and subsequent expansion of the saturated fine-grained foundation soils, the stilling basin FLAC model was simplified to represent the center pile in the stilling basin pile layout with vertical boundaries set midway between the adjacent pile locations in the stilling basin. Figure 15 shows the location of the FLAC model in the stilling basin. Note that the pile spacing is 10 ft. in the direction of flow or the out-of-plane spacing in the FLAC model. The parameters used for the pile and concrete zones in FLAC are summarized in Error! Reference source not found.. The concrete was modelled as solid zones with linear elastic properties. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 6
15 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Moment Young s of Unit Material Modulus, E Poisson's Inertia Area Perimeter Weight Density, (psi) Ratio, ν (in 4 ) (in 2 ) (in) (pcf) (slugs/ft 3 ) Concrete 3,122, HP14x ,000, Notes: 1. When spacing is specified in the STRUCT property command in FLAC, the actual pile properties are input. The structural properties are then scaled automatically by dividing the actual properties input by the pile spacing. Upon completion of calculations, the actual forces in the pile are reported in the FLAC output. 2. Modulus of concrete estimated by 57,000(fc 0.5 ) where fc is the compressive strength of concrete and was conservatively assumed to be 3000 psi. 3. The moment of inertia listed is for the "strong direction". Since bending of the piles was not evaluated this was not considered an important consideration. Steps one and two outlined above for the free field unloading model are the same for this model. At step three, the material parameters are established for the foundation soils and the concrete cap and pile elements are also added to the model at this stage. The pile cap is added by changing the soil zones from elevation 888 ft. to 883 ft. to zones with linear elastic concrete properties. The pile is added to the FLAC model and attached to the grid by shear coupling spring within the zones represented by soil. The pile elements were extended two feet into the concrete zones and the pile nodes were fixed to the grid nodes within the concrete. Although a departure from the actual construction sequence, wishing the structure and pile in place was considered a reasonable simplification in the modeling procedure. After the model is solved to equilibrium, compressive stresses and downward displacements develop in the concrete zones and the pile elements due to the stress changes from the introduction of the concrete zones and pile. The stresses and displacements that develop are relatively small. The stresses and displacements increase further as the groundwater is progressively lowered in the model. Prior to incrementally unloading the soil above the pile cap, the displacement and velocities in the zones and piles elements are initialized to zero in order to capture the structural rebound from the stress change due only to the soil unloading. Because the piles in the stilling basin are vertical and expected displacements primarily vertical, piles were connected to the FLAC grid by shear coupling springs and no normal coupling springs. The forces in the shear coupling springs are dependent on the spring displacement, spring stiffness and spring strength. Displacement in the shear springs reverse as the unloading above the pile cap progresses, creating positive skin friction around the pile (the pile moves upward more than the surrounding soil). Note that the pile is much stiffer than the soil and the pile and soil displacement are equal at the pile head location, meaning the pile displaces upward more than the soils at lower elevation. The larger upward movement of the pile relative to the soil creates positive forces in the shear springs. During the DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 7
16 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound unloading of the overburden soils, the relative shear spring displacements become large enough for the springs to yield and the full shear resistance of the pile in tension is realized Pile Elements All the FLAC models assumed the same pile toe elevation of 836 ft. The pile elements were installed in one foot segments with the structural nodes spaced vertically each foot. Each one foot pile segment located within the soil zones are assigned geometric and mechanical properties. The geometric properties include the pile area, moment of inertia, and spacing. These properties are consistent along the entire pile length. The mechanical properties include the coupling spring parameters that will vary for each pile segment. The bottom shear coupling spring was not given any additional strength or altered spring stiffness to account for end bearing since the only interest was in the behavior of the pile due to the soil rebound. Two, one foot pile segments were located within the concrete zones and were fixed to the grid, meaning the structural nodes were linked or rigidly connected to the associated FLAC grid points 6.3. Pile-Soil Shear Coupling Springs Shear coupling springs connect the pile elements to the soil mesh and represent the axial shear transfer occurring between the pile and soil commonly termed skin friction. In FLAC, the soil-pile shear coupling springs are represented by a bi-linear model with a linear spring and a limiting shear force (elastic-plastic behavior). FLAC requires three input parameters for the shear coupling springs: cs_sstiff, cs_scoh, and cs_sfric. In the FLAC models, cs_sfric, the frictional component of the shear spring strength, was set to zero, and the limiting shear force was established by cs_scoh. The parameter cs_scoh is set to the longterm or drained shear strength between the soil-pile interface times the contact area. The long-term unit skin friction value ff ss in the foundation clays was established according to the equation: ff ss = KKσσ vv tan δδ Where KK = a lateral earth pressure coefficient σσ vv = effective overburden pressure δδ= friction angle between the soil and pile The limiting value of the shear force that develops in the shear coupling spring was set according to: cs_scoh = QQ ss = ff ss AA ss ff ss = long-term unit skin friction acting along the pile shaft AA ss = surface area of the pile shaft in contact with the soil The determination of cs_sstiff and cs_scoh is described in the following section. The parameter cs_sstiff defines the stiffness of the shear spring. The effective overburden pressure,σσ vv, used in the computation of the long-term unit skin friction was simply taken as the effective vertical stress computed from a geostatic calculation. In the case of the diversion channel excavation, this calculation was based on the accumulation of vertical stress from a unit depth times the effective unit weight of soil determined from the final excavated elevation. The effective vertical stress around the pile is expected to decrease over DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 8
17 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound time as expansion occurs. Use of the final effective vertical stress in computing the long-term skin friction was considered conservative and consistent with conventional pile capacity determination. To mobilize the full pile shaft resistance requires only a very small relative movement between the soil and the pile. For the FLAC analyses completed for this report, it was assumed the limiting shear force cs_scoh was reached in a relative axial displacement between the pile/soil of 0.25 inches. The stiffness of the shear spring cs_sstiff was then set according to: cs_sstiff = cccc_ssssssh 0.25 iiiiiiheeee 6.4. FLAC Modeling Results Stilling Basin Location Figure 16 presents the FLAC model in the DIS stilling basin with the pile and pile cap prior to unloading. Upon completion of the overburden unloading, tensile stresses develop in the pile cap concrete around the head of the pile and a reduction in effective vertical stress is evident where the pile is pulled from the till due to the expanding Lake Agassiz clays. Figure 17 and Figure 18 show the effective vertical and horizontal stress contours after unloading is complete. The reductions in effective vertical stress contours due to the pile uplift are shown more clearly in Figure 19 where the contour interval is more closely spaced and the groups defining the model stratigraphy are displayed. The vertical stress reduction is evident around the pile toe at el. 836 ft. and a larger reduction is present near el. 848 at the Argusville weathered till contact. Figure 20 shows the shear strain rate contours, while Figure 21 displays the vertical displacement contours. In the case of Figure 20, no discernible pattern to the shear strain rate is evident. The V-shaped contours in Figure 21 result from the pile displacing upward more than the surrounding soil. Since the entire length of the pile displaces upward by nearly the same amount, the displacement contours are more V-shaped at lower elevations where soil displacements are relatively small. At higher elevations the relative displacement between pile and soil are closer, producing flatter contours. The pile displaces upward from the drag exerted by the expanding Brenna and Argusville formations and the Brenna pushing against the bottom of the concrete base. The axial load in the pile builds from the pile toe to the pile head (Figure 22) as the shear coupling springs displace and ultimately yield due to a larger upward movement of the pile in comparison to the soil. The shear spring forces are shown in Figure 23. In the case of the DIS stilling basin location, the pile head displaces upward 0.5 ft. (6 in.). The full pile displacement profile is shown in Figure 24. The pile lengthens slightly under the tensile loading, approximately 0.08 in. As the pile is pulled upward through the till, which experiences only a very small upward displacement, those pile springs experience greater relative displacement than those located along higher elevations of the pile. The pile springs located in the till are also able to mobilize larger values of unit skin friction compared to those located further up the pile. This produces axial load that builds much faster in the till. Nearly 44% of the ultimate shaft resistance of the pile is mobilized in the 12 ft. length of pile in the till. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 9
18 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Shear Transfer in the Till The shear transfer between soil-pile in the weathered and intact till is an important consideration. The unit skin friction is determined fromff ss = KKσσ vv tan δδ, where KK tan δδ is often replaced by the coefficient ββ giving the familiarff ss = ββσσ vv. In soft clays ββ normally varies between 0.2 and 0.4. In the Lake Agassiz clays, a ββ value of 0.3 was used to determine the unit skin friction value. Initially the same ββ value was applied to both till formations. As a check, the ββvalue in the till was increased from 0.3 to 0.4. This change increases the available shear transfer of the pile to the surrounding till. A comparison from the FLAC results is shown in Table 2. Clearly the available shear transfer between pile-till is an important consideration given the effect on the structural rebound and the load transferred into the pile cap. Table 2 Comparison of Axial Load and Displacement for Varying ββ Values in the Till (Stilling Basin Location) ββ Value in the Till Axial Load at Pile Head following Unloading (kips) Axial Displacement at Pile Head following Unloading (inches) A higher unit skin friction value in the till translates to less pile displacement and more tensile load in the pile. The till serves as an anchoring material and the length of embedded pile as the anchoring length. Additional numerical modeling indicated increasing the length of the pile by further embedment into the till effectively reduced the upward displacement at the pile head, while increasing the tensile loads in the pile. While embedding the pile further into the till is a simple change in a numerical model, as a practical consideration, H piles cannot be driven very far into a soil with SPT blow counts of 100 or more Approach Apron A FLAC model representative of the DIS approach apron was also analyzed. The model was setup in the same manner as the stilling basin model with a single pile spaced 10 ft. on center in the upstream direction and model side boundaries set at the line of symmetry between piles 5 ft. either side of the pile (Figure 25). The primary difference between the approach apron and stilling basin model is the pile cap is located at a higher elevation 899 ft. compared to 888 ft. in the stilling basin. This means 11 ft. less overburden removal and a pile that s also 11 ft. longer since the assumed pile toe el. of 836 ft. did not change. The approach apron slab in the FLAC model was 3 ft. thick compared to 5 ft. in the stilling basin. The FLAC model after removal of the overburden is shown in Figure 26. Due to the higher invert elevation at the approach apron, the effective overburden pressure is greater at this location resulting in higher unit skin friction values so the pile shear coupling spring parameters were set accordingly. Figure 27 and Figure 28 show the effective vertical and horizontal stress contours after unloading is complete. Reductions in effective vertical stress are again evident around the pile toe at el. 836 ft. and near el. 848 at the Argusville weathered till contact. Figure 29 shows the reduction in effective vertical stress as line contours at a 50 psf contour interval overlaid on the material groups. Figure 30 displays DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 10
19 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound the shear strain rate contours. This figure clearly shows the shear transfer from the pile to the surrounding soil as the pile is pulled from the weathered till. Figure 31 shows the vertical displacement contours with the pile displacing upward more than the surrounding soil. The axial load in the pile builds from the pile toe to the pile head (Figure 32) with a maximum tension force at the pile head of kips. The shear spring forces are shown in Figure 33. The shear spring forces are larger at the approach apron location than the stilling basin (Figure 23) due to the higher available unit skin friction. The pile displacement profile is shown in Figure 34. The pile head displacement was ft. (2.4 in.). A summary of the pile head displacements and axial loads is provided in Table 3 for both the stilling basin and approach apron models, as well as the two different beta values used to estimate the unit skin friction in the till. Table 3 Comparison of Axial Load and Displacement for Varying ββ Values in the Till (Stilling Basin and Approach Apron Locations) Model Location ββ Value in the Till Axial Load at Pile Head following Unloading (kips) Axial Displacement at Pile Head following Unloading (inches) Stilling Basin Stilling Basin Approach Apron Approach Apron Control Structure A two dimensional FLAC model of the control structure slab was also analyzed. The cross-section (Figure 35) was located at an abutment pier location and assumed vertical piles for the entire section. Note that the pile layout beneath the control structure generally includes vertical piles under the piers and rows of batter piles aligned either upstream or downstream that alternate direction every row or two between the piers. A two dimensional plane strain model of the control structure slab taken perpendicular to the direction of flow was considered a conservative assumption. The additional conservatism of not including the center vertical pile under the pier location to match the batter pile layout was considered reasonable. Figure 36 shows the FLAC model section including the grid, material groups, pile locations, and boundary conditions. The cross-section includes 10 piles, five located under the stepped spillway and five located under the upstream half of the horizontal slab. The piles were fixed to the FLAC grid for the two foot embedment into the concrete slab. The slab thickness was 6 ft. at the upstream model limit and 7 ft. at the downstream model limit. The modeling steps for the control structure were the same as the stilling basin and approach apron models that included a single pile and pile cap. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 11
20 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound Results are shown in Figure 37 through Figure 39. Figure 37 shows the effective vertical stress contours following unloading. The stresses around the pile heads become negative and an effective stress increase occurs under the stepped spillway in response to the water level being lowered to at or just below the concrete slab surface. Figure 38 displays the effective horizontal stress contours. Tensile stresses are evident in the upper surface of the stepped spillway and in the upstream bottom half of the slab. Figure 39 shows the vertical displacement contours. The overall vertical displacement is quite small for the control structure. After unloading, the FLAC model produced 0.04 ft. (0.5 in.) at the upper, upstream corner of the slab and ft. (0.56 in.) at the upper, downstream corner of the slab. The vertical displacement contours exhibit the same pattern as the single pile models due to the pile moving upward more than the surrounding soil. This is apparent in Figure 39 if an individual pile is isolated midway between the adjacent piles. The reasons for the smaller structural rebound are attributed to the number and spacing of the piles, the thickness of the slab, and most importantly that about twothirds of the structure is subject to a smaller stress change due to excavation proceeding to a higher elevation at 899 ft. instead of the lower elevation of the stilling basin. 7. Mitigation of Stilling Basin Rebound In the case of the DIS stilling basin, the FLAC modeling revealed 4 to 6 inches of structural rebound depending on the assumptions made regarding shear transfer between the till and pile. This magnitude of rebound for a pile founded structure was considered unreasonable. Given that the predicted rebound for the control structure was a half inch or less, the predicted differential displacement between the control structure and stilling basin would be significant. Concerns surrounding the performance of the control structure/stilling basin joint and the desire to avoid future structural repairs associated with the predicted differential movement, lead to the decision to mitigate the differential rebound problem during design instead of facing future repairs. Project schedule constraints lead to a mitigation measure that the team believed could be incorporated into the plans and specifications without significant redesign from the other engineering disciplines. The mitigation measure investigated to minimize structural rebound within the footprint of the stilling basin was soil modification through the use of deep soil mixing (DSM) in the form of DSM columns or panels placed between the existing stilling basin pile layout. DSM involves the addition of a binder (cement, lime, or fly ash) injected into the soil at a controlled rate through an auger or series of augers. The augers mix the binder with the insitu soil. The type and amount of binder added to the soil, construction methods, and cure time control the improvement of the soil strength and stiffness FLAC Modeling Results The use of DSM in the stilling basin location was investigated by adding improved soil zones to the single pile FLAC model discussed earlier (Figure 40). The improved soil zones extended from the base of the concrete down to the top of the weathered till, a distance of 35 ft. in the numerical model. The zones in this model are 1 ft. square. As a starting point, a 2 zone width of the Brenna and Argusville formations were treated at the vertical boundary along each side of the model. Because this model took advantage of a line of symmetry located midway between adjacent piles, the width of the improved soil between DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 12
21 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound adjacent piles is 4 ft. The DSM improved soil was assumed to have a negligible density change after mixing and the density was set equal to the Argusville formation. The modulus of the DSM treated soil was conservatively estimated at 2.16e6 psf which turns out to be slightly stiffer than the foundation till. Table 4 provides a summary of the density, shear strength, and stiffness parameters used for soils improved by DSM. The DSM zones were modeled as a Mohr-Coulomb material. Table 4 Mohr-Coulomb Parameters for Improved Soil Material Young s Modulus, E Poisson's Friction Angle Cohesion Unit Weight Density, (psf) Ratio, ν (deg.) (psf) (pcf) (slugs/ft3) Improved Soil 2,160, Notes: 1. Modulus estimated from 150 times an assumed unconfined compressive strength, q u, for the treated soil of 100 psi [E = 150*(100psi) = 15,000 psi = 2.16e6 psf]. Reference FHWA Design Manual: Deep Mixing for Embankment and Foundation Support, Publication No. FHWA-HRT , October Cohesion estimated as c = q u/2 = 100 psi/2 = 50 psi = 7200 psf. An interface was added to the FLAC model that included the DSM zones. The interface was located between the bottom of the concrete slab and the top of the foundation soils to allow for the possibility of slip/separation between the soil/dsm zones and the concrete zones in the model. The interface was unglued (slip/separation allowed) with a shear and normal stiffness set to 1x10 9 psf and the tensile bond strength set to zero. Slip occurred where the pile crossed the interface. The remainder of the interface length did not slip and registered compressive normal stresses. Figure 41 and Figure 42 show the effective vertical and horizontal stress contours respectively after removal of the overburden. Figure 41 illustrates the vertical stress change that occurs at the till/dsm contact as shear is transferred from the pile to the till and into the DSM zones. This is shown in more detail in Figure 43 at a closer contour interval and with the material groups displayed in the background. The DSM zones in the model provide a bridge between the stiff foundation till and the concrete slab. The closely spaced vertical stress contours result from the stiffness change between the Lake Agassiz clays and the DSM improved soils. The vertical stress change due to removal of the overburden occurs across the vertical boundary between the softer Brenna and Argusville clays and the stiffer improved soils. The shear occurring between the pile-soil-dsm improved soils is perhaps best illustrated through the shear strain rate contours in Figure 44 and the shear stress contours in Figure 45. A zoomed in view from el. 830 to 860 ft. showing the shear stress contours and pile overlaid on the material groups is presented in Figure 46. The pile is pulled upward relative to the foundation till and lower portion of the Argusville formation. Shear transfer occurs from the pile to the surrounding soils. The presence of the stiffer DSM improved soil zones provides a material that is only expanding a small amount due to the overburden removal and allows shear transfer to occur into the base of the DSM panel. Figure 47 shows the vertical displacement contours for the soil, improved soil, and concrete zones with the pile overlaid. Vertical DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 13
22 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound displacement within the DSM treated locations is uniform across the width of those zones. The inclusion of the DSM zones in the FLAC model in a 4 ft. panel width reduced the structural rebound from 6 inches to 0.8 inches. The axial load profile in the pile is included in Figure 48. The inclusion of the soil improvement reduced the tensile axial load in the pile by about 10 kips from 67.4 kips to 57.6 kips. Figure 49 shows the pile displacement profile. The numerical simulation in FLAC shows that inclusion of a 4 ft. wide DSM panel located midway between piles effectively reduces the structural rebound to a tolerable level and eliminates differential movement concerns between the stilling basin and control structure Deep Soil Mixing Plan The proposed DSM panel layout for the stilling basin is provided in Figure 50. In general, 4 ft. wide DSM panels are proposed midway between the HP 14x73s that range in spacing between 7 and 9 ft. The DSM panels are aligned parallel with the direction of flow. A narrower 2 ft. panel is proposed along the outer edge of the stilling basin slab due to the tighter pile spacing under the stilling basin wall. The majority of the DSM panel were stopped short of the joint between the stilling basin and control structure to avoid interference with the last pile row of the control structure where numerous piles are battered in a downstream direction. The 4 ft. wide DSM panels ended at the last downstream pile row of the stilling basin to avoid a conflict with the sheet pile cutoff that will be aligned perpendicular to the direction of flow between the last pile row and downstream edge of the slab. The planned construction sequence for the DIS would have deep soil mixing occurring after excavation of the stilling basin location to final grade and prior to driving the H piles. The DSM panels would extend from ground surface to the top of the till estimated at elevation 848 ft. Spoil generated from DSM operations would be disposed of in the outer third of the excavated material berm (EMB). The specifications will require the stilling basin slab or contractor working platform to be in direct contact with the top of the DSM panels upon completion of construction. 8. Conclusions It was established early in the design of the FMM Diversion Channel that excavation of 30 ft. of overburden would create a reduction in effective vertical stress on the order of 2200 psf and result in 1.5 ft. of expansion in the Lake Agassiz clays at the channel invert. Estimating structural rebound of the DIS components required use of the FLAC software to analyze the soil-structure interaction that would take place. FLAC analyses revealed 4 to 6 inches of predicted structural rebound of the stilling basin due to the overburden removal. This predicted displacement lead to concerns about long-term repair costs of the joint between the control structure and stilling basin and the decision by the design team to mitigate by reducing the structural rebound of the stilling basin. The construction schedule did not allow adequate time to wait for rebound to occur after channel excavation or to redesign the stilling basin foundation and concrete slab. Numerical simulations revealed improving the stiffness properties of the Brenna and Argusville formations in a 4 ft. width between midway piles reduced the structural rebound to below 1 inch. Deep soil mixing panels located between piles and aligned parallel to the flow direction effectively reduced the structural rebound of the stilling basin, did not require redesign of the pile foundation or stilling basin slab, and met the construction schedule. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 14
23 Fargo Moorhead Metropolitan Area Flood Risk Management Project Draft Design Documentation Report Inlet Diversion Appendix D, Attachment 7: FLAC Analysis of DIS Rebound 9. References Reese, Lymon C., et al. Computer Program APile Plus Version 4.0 Technical Manual. Austin, Texas Terzaghi, K., Peck, R. B., & Mesri, G. (1996). Soil Mechanics in Engineering Practice. New York: John Wiley & Sons, Inc. U.S. Army Corps of Engineers. EM , Design of Pile Foundations. Washington DC. January 15, U.S. Army Corps of Engineers, St. Paul District. General Report: Geotechnical Design and Geology of the Fargo Moorhead Metropolitan Area Flood Risk Management Project North Dakota Diversion Alignment. St. Paul, MN. May 13, U.S. Army Corps of Engineers, St. Paul District. Appendix D, Attachment 6: FLAC Analysis of Floodwall, Fargo Moorhead Metropolitan Area Flood Risk Management Project, Draft Design Documentation Report. January 26, 2016 (Doc. Version). U.S. Army Corps of Engineers, St. Paul District. Appendix D, Attachment 1: Settlement Calculations, Fargo Moorhead Metropolitan Area Flood Risk Management Project, 90% Design Documentation Report. July U.S. Department of Transportation, Federal Highway Administration. Publication No. FHWA_HRT , Federal Highway Administration Design Manual: Deep Mixing for Embankment and Foundation Support. Washington DC. October Wood, D. M. (1990). Soil Behavior and Critical State Soil Mechanics. New York: Cambridge University Press. 10. District Quality Control A district quality control (DQC) review of this report and the associated FLAC files was completed by the undersigned. The review included checks of the model inputs, the procedures followed to set up the model states, and the overall validity of the modeling and reported results. DDR_FMM_DIS_App_D_Attach_7_FLAC_Analysis_draft.docx Appendix D, Attachment 7: Page 15
24 Figure 1 Plan View of Diversion Inlet Apppendix D, Attachment 7: Page 16
25 Figure 2 Profile of Diversion Channel, Structure, and Connecting Channel Apppendix D, Attachment 7: Page 17
26 Figure 3 Boring Log M Apppendix D, Attachment 7: Page 18
27 Figure 4 Boring Log M Apppendix D, Attachment 7: Page 19
28 CIU Triaxial Test Results Argusville Formation Consolidation Void Ratio Reference Soil Boring Sample Depth Pressure after Initial Specific Formation No. No. (ft) (tsf) Consolidation Void Ratio Volume Argusville MU MU MU MU MU MU MU MU MU MU MU MU Average (all) pc' sigmav max Ko sigmah max pmax qmax M pc Figure 5 Determination of Reference Specific Volume and Preconsolidation Pressure for the Argusville Fm. Apppendix D, Attachment 7: Page 20
29 CIU Triaxial Test Results Brenna Formation Consolidation Void Ratio Reference Soil Boring Sample Depth Pressure after Initial Specific Formation No. No. (ft) (tsf) Consolidation Void Ratio Volume Brenna MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU MU Average (all) pc' sigmav max Ko sigmah max pmax qmax M pc Figure 6 Determination of Reference Specific Volume and Preconsolidation Pressure for the Brenna Fm. Apppendix D, Attachment 7: Page 21
30 JOB TITLE :. FLAC (Version 7.00) LEGEND 31-Jan-16 16:26 step E+01 <x< 5.500E E+02 <y< 9.200E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna Sherack Grid plot 0 2E 1 Boundary plot 0 2E 1 Fixed Gridpoints -direction B Both directions. Diversion Inlet Location Figure 7 Stratigraphy for FLAC modeling at the Diversion Inlet B BBBBBBBB (*10^1) (*10^2) Apppendix D, Attachment 7: Page 22
31 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND 1-Feb-16 15:28 step E+01 <x< 5.500E E+02 <y< 9.200E+02 Effec. SYY-Stress Contours -5.00E E E E E E+00 Contour interval= 1.00E+03 Extrap. by averaging Pile plot Diversion Inlet Location (*10^1) Figure 8 Effective Vertical Stress Contours for Insitu Conditions Apppendix D, Attachment 7: Page 23
32 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND 1-Feb-16 15:27 step E+01 <x< 5.500E E+02 <y< 9.200E+02 Effec. S-Stress Contours -5.00E E E E E E Contour interval= 1.00E+03 Extrap. by averaging Diversion Inlet Location (*10^1) Figure 9 Effective Horizontal Stress Contours for Insitu Conditions Apppendix D, Attachment 7: Page 24
33 Elevation (NAVD 88) Esyy (spreadsheet) Esxx (spreadsheet) Esyy (FLAC after solve) Esxx (FLAC after solve) Effective Stress (psf) Figure 10 Comparison of Hand Calculated Vertical and Horizontal Effective Stress Profiles to FLAC Apppendix D, Attachment 7: Page 25
34 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 1-Feb-16 15:30 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Effec. SYY-Stress Contours -3.50E E E E E E E E+00 Contour interval= 5.00E+02 Extrap. by averaging Pile plot Diversion Inlet Location (*10^1) Figure 11 Effective Vertical Stress Contours after Unloading to Elevation 888 ft. Apppendix D, Attachment 7: Page 26
35 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 1-Feb-16 15:31 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Effec. S-Stress Contours -4.00E E E E E+00 Contour interval= 1.00E+03 Extrap. by averaging Diversion Inlet Location (*10^1) Figure 12 Effective Horizontal Stress Contours after Unloading to Elevation 888 ft. Apppendix D, Attachment 7: Page 27
36 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 1-Feb-16 15:33 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Y-displacement contours 0.00E E E E E E E+00 Contour interval= 1.00E Diversion Inlet Location (*10^1) Figure 13 Vertical Displacement Contours after Unloading to Elevation 888 ft. Apppendix D, Attachment 7: Page 28
37 Figure 14 Rebound Profile Comparison of FLAC to One Dimensional Expansion Spreadsheet Calculation Apppendix D, Attachment 7: Page 29
38 Figure 15 Location of the Single Pile FLAC Model in the DIS Stilling Basin Apppendix D, Attachment 7: Page 30
39 JOB TITLE :. FLAC (Version 7.00) LEGEND 2-Feb-16 15:38 step E+01 <x< 5.500E E+02 <y< 9.200E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna User:Concrete Sherack Grid plot 0 2E 1 Boundary plot 0 2E 1 Fixed Gridpoints -direction B Both directions interface id#'s Diversion Inlet Stilling Basin Location Figure 16 FLAC model in DIS Stilling Basin with Pile and Pile Cap (prior to unloading) B BBBBBBBB (*10^1) 1 (*10^2) Apppendix D, Attachment 7: Page 31
40 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 4-Feb-16 17:43 step E+01 <x< 4.500E E+02 <y< 8.900E+02 Effec. SYY-Stress Contours -3.75E E E E E E E E E+02 Contour interval= 2.50E+02 Extrap. by averaging Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 17 Effective Vertical Stress Contours, 250 psf Contour Interval, DIS Stilling Basin Apppendix D, Attachment 7: Page 32
41 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 4-Feb-16 17:43 step E+01 <x< 4.500E E+02 <y< 8.900E+02 Effec. S-Stress Contours -5.00E E E E E E E E E+03 Contour interval= 2.50E+02 Extrap. by averaging Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 18 Effective Horizontal Stress Contours, 250 psf Contour Interval, DIS Stilling Basin Apppendix D, Attachment 7: Page 33
42 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 4-Feb-16 17:40 step E+01 <x< 4.500E E+02 <y< 8.900E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna User:Concrete Effec. SYY-Stress Contours Contour interval= 5.00E+01 Minimum: -3.95E+03 Maximum: 5.50E+02 Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 19 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Stilling Basin Apppendix D, Attachment 7: Page 34
43 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 4-Feb-16 17:39 step E+01 <x< 4.500E E+02 <y< 8.900E+02 Max. shear strain-rate 0.00E E E E E E E E E-08 Contour interval= 5.00E-09 Extrap. by averaging Grid plot 0 2E 1 Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 20 Shear Strain Rate Contours, DIS Stilling Basin Apppendix D, Attachment 7: Page 35
44 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 4-Feb-16 17:41 step E+01 <x< 4.500E E+02 <y< 8.900E+02 Y-displacement contours 0.00E E E E E E-01 Contour interval= 5.00E-02 Grid plot 0 2E Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 21 Vertical Displacement Contours, DIS Stilling Basin Apppendix D, Attachment 7: Page 36
45 Figure 22 Axial Load in Pile, DIS Stilling Basin Apppendix D, Attachment 7: Page 37
46 Figure 23 Shear Spring Forces, DIS Stilling Basin Apppendix D, Attachment 7: Page 38
47 Figure 24 Pile Displacement, DIS Stilling Basin Apppendix D, Attachment 7: Page 39
48 Figure 25 Location of the Single Pile FLAC Model in the DIS Approach Apron Apppendix D, Attachment 7: Page 40
49 Figure 26 FLAC model in DIS Approach Apron with Pile and Pile Cap (after unloading) FLAC (Version 7.00) LEGEND 4-Feb-16 16:49 step E+01 <x< 4.500E E+02 <y< 9.000E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna Sherack User:Concrete Grid plot 0 2E 1 Boundary plot 0 2E 1 Fixed Gridpoints B BBBBBBBBBB -direction B Both directions Pile plot (*10^2) (*10^1) JOB TITLE :. Diversion Inlet Approach Apron Apppendix D, Attachment 7: Page 41
50 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 7-Feb-16 11:41 step E+01 <x< 4.500E E+02 <y< 9.000E+02 Effec. SYY-Stress Contours -4.50E E E E E E E E E E+03 Contour interval= 2.50E+02 Extrap. by averaging Pile plot Diversion Inlet Approach Apron (*10^1) Figure 27 Effective Vertical Stress Contours, 250 psf Contour Interval, DIS Approach Apron Apppendix D, Attachment 7: Page 42
51 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 7-Feb-16 11:43 step E+01 <x< 4.500E E+02 <y< 9.000E+02 Effec. S-Stress Contours -5.50E E E E E E E E E+02 Contour interval= 2.50E+02 Extrap. by averaging Pile plot Diversion Inlet Approach Apron (*10^1) Figure 28 Effective Horizontal Stress Contours, 250 psf Contour Interval, DIS Approach Apron Apppendix D, Attachment 7: Page 43
52 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 7-Feb-16 11:45 step E+01 <x< 4.500E E+02 <y< 9.000E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna Sherack User:Concrete Effec. SYY-Stress Contours Contour interval= 5.00E+01 Minimum: -4.70E+03 Maximum: 2.55E+03 Pile plot Diversion Inlet Approach Apron (*10^1) Figure 29 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Approach Apron Apppendix D, Attachment 7: Page 44
53 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 7-Feb-16 13:49 step E+01 <x< 4.500E E+02 <y< 9.000E+02 Max. shear strain-rate 0.00E E E E E E E-08 Contour interval= 2.50E-09 Extrap. by averaging Grid plot 0 2E 1 Pile plot Diversion Inlet Approach Apron (*10^1) Figure 30 Shear Strain Rate Contours, DIS Approach Apron Apppendix D, Attachment 7: Page 45
54 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 7-Feb-16 14:14 step E+01 <x< 4.500E E+02 <y< 9.000E+02 Y-displacement contours 0.00E E E E E-01 Contour interval= 5.00E-02 Grid plot 0 2E 1 Pile plot Diversion Inlet Approach Apron (*10^1) Figure 31 Vertical Displacement Contours, DIS Approach Apron Apppendix D, Attachment 7: Page 46
55 Figure 32 Axial Load in Pile, DIS Approach Apron Apppendix D, Attachment 7: Page 47
56 Figure 33 Shear Spring Force, DIS Approach Apron Apppendix D, Attachment 7: Page 48
57 Figure 34 Pile Displacement, DIS Approach Apron Apppendix D, Attachment 7: Page 49
58 Figure 35 Location of the Control Structure FLAC Model Cross-Section Apppendix D, Attachment 7: Page 50
59 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND 8-Feb-16 17:15 step E+01 <x< 5.000E E+02 <y< 9.150E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' Argusville Brenna User:Concrete Sherack Grid plot 0 2E 1 Boundary plot 0 2E 1 Marked Gridpoints Fixed Gridpoints -direction B Both directions Pile plot Diversion Inlet Control Structure B BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (*10^1) Figure 36 FLAC Model of DIS Control Structure (after unloading) Apppendix D, Attachment 7: Page 51
60 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND Feb-16 9:49 step E+01 <x< 5.000E E+02 <y< 9.150E+02 Boundary plot 0 2E 1 Effec. SYY-Stress Contours -4.00E E E E E E E+03 Contour interval= 1.00E+03 Extrap. by averaging Pile plot Marked Gridpoints Water Table Diversion Inlet Control Structure (*10^1) Figure 37 Effective Vertical Stress Contours, DIS Control Structure (after unloading) Apppendix D, Attachment 7: Page 52
61 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND 8-Feb-16 17:30 step E+01 <x< 5.000E E+02 <y< 9.150E+02 Boundary plot 0 2E 1 Effec. S-Stress Contours -6.00E E E E E E E E E+03 Contour interval= 1.00E+03 Extrap. by averaging Pile plot Marked Gridpoints Diversion Inlet Control Structure (*10^1) Figure 38 Effective Horizontal Stress Contours, DIS Control Structure Apppendix D, Attachment 7: Page 53
62 JOB TITLE :. (*10^2) FLAC (Version 7.00) LEGEND Feb-16 17:33 step E+01 <x< 5.000E E+02 <y< 9.150E+02 Y-displacement contours 0.00E E E E E E E E E E-02 Contour interval= 5.00E-03 Pile plot Marked Gridpoints Diversion Inlet Control Structure (*10^1) Figure 39 Vertical Displacement Contours, DIS Control Structure Apppendix D, Attachment 7: Page 54
63 JOB TITLE :. FLAC (Version 7.00) LEGEND 11-Feb-16 11:45 step E+01 <x< 4.000E E+02 <y< 8.900E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' User:DSM User:Concrete Argusville Brenna Grid plot 0 2E 1 Boundary plot 0 2E 1 Fixed Gridpoints -direction B Both directions interface id#'s Diversion Inlet Stilling Basin 1 B BBBBBBBB (*10^1) (*10^2) Figure 40 FLAC Model in DIS Stilling Basin with Pile, Pile Cap and DSM Treated Zones (after unloading) Apppendix D, Attachment 7: Page 55
64 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 11-Feb-16 11:52 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Effec. SYY-Stress Contours -4.00E E E E E E E E E+00 Contour interval= 5.00E+02 Extrap. by averaging Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 41 Effective Vertical Stress Contours, 500 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 56
65 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 11-Feb-16 12:23 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Effec. S-Stress Contours -5.00E E E E E E E E E+03 Contour interval= 5.00E+02 Extrap. by averaging Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 42 Effective Horizontal Stress Contours, 500 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 57
66 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 11-Feb-16 12:28 step E+01 <x< 1.500E E+02 <y< 8.600E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' User:DSM Argusville Effec. SYY-Stress Contours Contour interval= 1.00E+02 Minimum: -3.50E+03 Maximum: -9.00E+02 Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 43 Effective Vertical Stress Contours, 50 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 58
67 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 11-Feb-16 12:33 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Max. shear strain-rate 0.00E E E E E E E E-09 Contour interval= 1.00E-09 Extrap. by averaging Grid plot 0 2E Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 44 Shear Strain Rate Contours, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 59
68 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 12-Feb-16 11:18 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Y-stress contours 0.00E E E E E E E E+02 Contour interval= 2.50E+01 Extrap. by averaging Pile Plot Pile Locations Diversion Inlet Control Structure (*10^1) Figure 45 Shear Stress Contours, 25 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 60
69 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 11-Feb-16 15:48 step E+01 <x< 1.500E E+02 <y< 8.600E+02 User-defined Groups 'User:Intact Till' 'User:Weathered Till' User:DSM Argusville Y-stress contours Contour interval= 5.00E+01 Minimum: 0.00E+00 Maximum: 3.50E+02 Pile plot Diversion Inlet Stilling Basin (*10^1) Figure 46 Shear Stress Contours, 50 psf Contour Interval, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 61
70 JOB TITLE :. FLAC (Version 7.00) (*10^2) LEGEND 12-Feb-16 11:27 step E+01 <x< 4.000E E+02 <y< 8.900E+02 Y-displacement contours 0.00E E E E E E E-02 Contour interval= 1.00E-02 Pile plot Diversion Inlet Control Structure (*10^1) Figure 47 Vertical Displacement Contours, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 62
71 Figure 48 Axial Load in Pile, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 63
72 Figure 49 Pile Displacement, DIS Stilling Basin with DSM Treated Zones Apppendix D, Attachment 7: Page 64
73 Figure 50 Proposed DSM Panel Layout for DIS Stilling Basin Apppendix D, Attachment 7: Page 65
Cubzac-les-Ponts Experimental Embankments on Soft Clay
Cubzac-les-Ponts Experimental Embankments on Soft Clay 1 Introduction In the 197 s, a series of test embankments were constructed on soft clay at Cubzac-les-Ponts in France. These full-scale field tests
More informationModified Cam-clay triaxial test simulations
1 Introduction Modified Cam-clay triaxial test simulations This example simulates a series of triaxial tests which can be used to verify that Modified Cam-Clay constitutive model is functioning properly.
More informationTIME-DEPENDENT BEHAVIOR OF PILE UNDER LATERAL LOAD USING THE BOUNDING SURFACE MODEL
TIME-DEPENDENT BEHAVIOR OF PILE UNDER LATERAL LOAD USING THE BOUNDING SURFACE MODEL Qassun S. Mohammed Shafiqu and Maarib M. Ahmed Al-Sammaraey Department of Civil Engineering, Nahrain University, Iraq
More informationHyperbolic Soil Bearing Capacity
1 Introduction Hyperbolic Soil Bearing Capacity This example involves analyzing the bearing capacity of a round footing. The example is useful for illustrating several SIGMA/W features and procedures,
More informationEarth Pressure Theory
Lateral Earth Pressure Page 1 Earth Pressure Theory Examples of Retaining Walls Lateral Earth Pressure Page 2 At-Rest, Active and Passive Earth Pressure Wednesday, August 17, 2011 12:45 PM At-rest condition
More informationAdvanced model for soft soils. Modified Cam-Clay (MCC)
Advanced model for soft soils. Modified Cam-Clay (MCC) c ZACE Services Ltd August 2011 1 / 62 2 / 62 MCC: Yield surface F (σ,p c ) = q 2 + M 2 c r 2 (θ) p (p p c ) = 0 Compression meridian Θ = +π/6 -σ
More informationVerification of the Hyperbolic Soil Model by Triaxial Test Simulations
1 Introduction Verification of the Hyperbolic Soil Model by Triaxial Test Simulations This example simulates a series of triaxial tests that can be used to verify that the Hyperbolic constitutive model
More informationDeep Foundations 2. Load Capacity of a Single Pile
Deep Foundations 2 Load Capacity of a Single Pile All calculations of pile capacity are approximate because it is almost impossible to account for the variability of soil types and the differences in the
More informationClass Principles of Foundation Engineering CEE430/530
Class Principles of Foundation Engineering CEE430/530 1-1 General Information Lecturer: Scott A. Barnhill, P.E. Lecture Time: Thursday, 7:10 pm to 9:50 pm Classroom: Kaufmann, Room 224 Office Hour: I have
More information(Refer Slide Time: 02:18)
Geology and Soil Mechanics Prof. P. Ghosh Department of Civil Engineering Indian Institute of Technology Kanpur Lecture 40 Shear Strength of Soil - C Keywords: Shear strength of soil, direct shear test,
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationAxially Loaded Piles
Axially Loaded Piles 1 t- Curve Method using Finite Element Analysis The stress-strain relationship for an axially loaded pile can be described through three loading mechanisms: axial deformation in the
More informationLesson 25. Static Pile Load Testing, O-cell, and Statnamic. Reference Manual Chapter 18
Lesson 25 Static Pile Load Testing, O-cell, and Statnamic Reference Manual Chapter 18 STATIC LOAD TESTING Most accurate method to determine static pile capacity Perform at design or construction stage
More informationNumerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading
Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading Jorge Castillo, Yong-Beom Lee Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting Inc., USA ABSTRACT
More informationFLAC3D analysis on soil moving through piles
University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 211 FLAC3D analysis on soil moving through piles E H. Ghee Griffith University
More informationUPDATED 04 JUN 12. Memorandum
Memorandum To: From: Chris Behling Shung Chiu Kent Hokens Mike Navin Neil Schwanz Mike McGuire George Filz Date: December 26, 2010 Subject: Interim Guidance, Revised "LPILE Method" to Calculate Bending
More informationEffect of embedment depth and stress anisotropy on expansion and contraction of cylindrical cavities
Effect of embedment depth and stress anisotropy on expansion and contraction of cylindrical cavities Hany El Naggar, Ph.D., P. Eng. and M. Hesham El Naggar, Ph.D., P. Eng. Department of Civil Engineering
More informationSOIL MODELS: SAFETY FACTORS AND SETTLEMENTS
PERIODICA POLYTECHNICA SER. CIV. ENG. VOL. 48, NO. 1 2, PP. 53 63 (2004) SOIL MODELS: SAFETY FACTORS AND SETTLEMENTS Gabriella VARGA and Zoltán CZAP Geotechnical Department Budapest University of Technology
More information1 Introduction. Abstract
Abstract This paper presents a three-dimensional numerical model for analysing via finite element method (FEM) the mechanized tunneling in urban areas. The numerical model is meant to represent the typical
More informationLandslide FE Stability Analysis
Landslide FE Stability Analysis L. Kellezi Dept. of Geotechnical Engineering, GEO-Danish Geotechnical Institute, Denmark S. Allkja Altea & Geostudio 2000, Albania P. B. Hansen Dept. of Geotechnical Engineering,
More informationFinite Element Investigation of the Interaction between a Pile and a Soft Soil focussing on Negative Skin Friction
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Finite Element Investigation of the Interaction between a Pile and a Soft Soil
More informationChapter (12) Instructor : Dr. Jehad Hamad
Chapter (12) Instructor : Dr. Jehad Hamad 2017-2016 Chapter Outlines Shear strength in soils Direct shear test Unconfined Compression Test Tri-axial Test Shear Strength The strength of a material is the
More informationAppendix D2: Geotechnical Engineering
Project and Reach 5 Appendix D2: Geotechnical Engineering and Geology Appendix D2: Geotechnical Engineering and Geology Fargo Moorhead Metropolitan Area Project Reach 5 Engineering and Design Phase P2#370365
More information13 Dewatered Construction of a Braced Excavation
Dewatered Construction of a Braced Excavation 13-1 13 Dewatered Construction of a Braced Excavation 13.1 Problem Statement A braced excavation is constructed in saturated ground. The excavation is dewatered
More informationFinite Element Solutions for Geotechnical Engineering
Release Notes Release Date: July, 2015 Product Ver.: GTSNX 2015 (v2.1) Integrated Solver Optimized for the next generation 64-bit platform Finite Element Solutions for Geotechnical Engineering Enhancements
More informationAPPENDIX I. Deformation Analysis of the Left Abutment
APPENDIX I Deformation Analysis of the Left Abutment August 25, 2016 Appendix I Deformation Analysis of the Left Abutment TABLE OF CONTENTS I1 INTRODUCTION... 1 I2 MODEL DEVELOPMENT... 2 I2.1 General...
More informationGeotechnical Properties of Soil
Geotechnical Properties of Soil 1 Soil Texture Particle size, shape and size distribution Coarse-textured (Gravel, Sand) Fine-textured (Silt, Clay) Visibility by the naked eye (0.05 mm is the approximate
More informationSoft Ground Coupled Consolidation
1 Introduction Soft Ground Coupled Consolidation This example is about constructing an embankment in delayed stages on a soft foundation so that some of the excess pore-pressure is allowed to dissipate
More informationNumerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation
Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Yong-Beom Lee, Jorge Castillo Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting
More informationPLAXIS 3D FOUNDATION Validation Manual. version 1.5
PLAXIS 3D FOUNDATION Validation Manual version 1.5 TABLE OF CONTENTS TABLE OF CONTENTS 1 Introduction...1-1 2 Soil model problems with known theoretical solutions...2-1 2.1 Bi-axial test with linear elastic
More informationTheory of Shear Strength
MAJ 1013 ADVANCED SOIL MECHANICS Theory of Shear Strength Prepared by, Dr. Hetty 1 Strength of different materials Steel Concrete Soil Tensile strength Compressive strength Shear strength Complex behavior
More informationSHEAR STRENGTH OF SOIL
Soil Failure Criteria SHEAR STRENGTH OF SOIL Knowledge about the shear strength of soil important for the analysis of: Bearing capacity of foundations, Slope stability, Lateral pressure on retaining structures,
More informationExample Application 12. Embankment Loading on a Cam-Clay Foundation
Example Application 12 Embankment Loading on a Cam-Clay Foundation 1 Foundation Soil Properties 2 Modeling Procedure Step 1 Create the foundation model grid, set boundary conditions, assign material model
More information1 Slope Stability for a Cohesive and Frictional Soil
Slope Stability for a Cohesive and Frictional Soil 1-1 1 Slope Stability for a Cohesive and Frictional Soil 1.1 Problem Statement A common problem encountered in engineering soil mechanics is the stability
More information4 Undrained Cylindrical Cavity Expansion in a Cam-Clay Medium
Undrained Cylindrical Cavity Expansion in a Cam-Clay Medium 4-1 4 Undrained Cylindrical Cavity Expansion in a Cam-Clay Medium 4.1 Problem Statement The stress and pore pressure changes due to the expansion
More information2D Liquefaction Analysis for Bridge Abutment
D Liquefaction Analysis for Bridge Abutment Tutorial by Angel Francisco Martinez Integrated Solver Optimized for the next generation 64-bit platform Finite Element Solutions for Geotechnical Engineering
More information8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses.
8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses. 8.2. Some soils show a peak shear strength. Why and what type(s)
More information16 Rainfall on a Slope
Rainfall on a Slope 16-1 16 Rainfall on a Slope 16.1 Problem Statement In this example, the stability of a generic slope is analyzed for two successive rainfall events of increasing intensity and decreasing
More informationChapter (11) Pile Foundations
Chapter (11) Introduction Piles are structural members that are made of steel, concrete, or timber. They are used to build pile foundations (classified as deep foundations) which cost more than shallow
More informationBENCHMARK LINEAR FINITE ELEMENT ANALYSIS OF LATERALLY LOADED SINGLE PILE USING OPENSEES & COMPARISON WITH ANALYTICAL SOLUTION
BENCHMARK LINEAR FINITE ELEMENT ANALYSIS OF LATERALLY LOADED SINGLE PILE USING OPENSEES & COMPARISON WITH ANALYTICAL SOLUTION Ahmed Elgamal and Jinchi Lu October 07 Introduction In this study: I) The response
More informationA Pile Pull Out Test
1 Introduction A Pile Pull Out Test This example simulates pulling a pile out of the ground. It is not a realistic field case, but numerically the simulation makes it possible to verify the behavior of
More informationPILE-SUPPORTED RAFT FOUNDATION SYSTEM
PILE-SUPPORTED RAFT FOUNDATION SYSTEM Emre Biringen, Bechtel Power Corporation, Frederick, Maryland, USA Mohab Sabry, Bechtel Power Corporation, Frederick, Maryland, USA Over the past decades, there has
More informationCHAPTER 8 ANALYSES OF THE LATERAL LOAD TESTS AT THE ROUTE 351 BRIDGE
CHAPTER ANALYSES OF THE LATERAL LOAD TESTS AT THE ROUTE 351 BRIDGE.1 INTRODUCTION An important objective of this research is to determine whether accurate analyses of the lateral load-deflection behavior
More informationCHAPTER 6 FINITE ELEMENT MODEL OF A SOIL-BENTONITE CUTOFF WALL
CHAPTER 6 FINITE ELEMENT MODEL OF A SOIL-BENTONITE CUTOFF WALL 6.1 Introduction A finite element model of a soil-bentonite cutoff wall was developed for this research. The model simulates all stages of
More informationNumerical Modeling in Geotechnical Engineering October 17,
1 Numerical Modeling in Geotechnical Engineering October 17, 18 2014 PRESENTED BY: Siavash Zamiran Ph.D. Student, Research and Teaching Assistant, Department of Civil Engineering, Southern Illinois University
More informationGEO-SLOPE International Ltd, Calgary, Alberta, Canada Wick Drain
1 Introduction Wick Drain This example is about modeling the behavior of a wick drain. The primary purpose here is to illustrate how interface elements can conveniently be used to include the effects of
More informationComputers and Geotechnics
Computers and Geotechnics xxx (29) xxx xxx Contents lists available at ScienceDirect Computers and Geotechnics journal homepage: www.elsevier.com/locate/compgeo Simulation of the progressive failure of
More informationSettlement and Bearing Capacity of a Strip Footing. Nonlinear Analyses
Settlement and Bearing Capacity of a Strip Footing Nonlinear Analyses Outline 1 Description 2 Nonlinear Drained Analysis 2.1 Overview 2.2 Properties 2.3 Loads 2.4 Analysis Commands 2.5 Results 3 Nonlinear
More informationINTI COLLEGE MALAYSIA
EGC373 (F) / Page 1 of 5 INTI COLLEGE MALAYSIA UK DEGREE TRANSFER PROGRAMME INTI ADELAIDE TRANSFER PROGRAMME EGC 373: FOUNDATION ENGINEERING FINAL EXAMINATION : AUGUST 00 SESSION This paper consists of
More informationFINITE ELEMENT ANALYSIS OF ARKANSAS TEST SERIES PILE #2 USING OPENSEES (WITH LPILE COMPARISON)
FINITE ELEMENT ANALYSIS OF ARKANSAS TEST SERIES PILE #2 USING OPENSEES (WITH LPILE COMPARISON) Ahmed Elgamal and Jinchi Lu October 07 Introduction In this study, we conduct a finite element simulation
More informationCompression and swelling. Mechanisms of compression. Mechanisms Common cases Isotropic One-dimensional Wet and dry states
Compression and swelling Mechanisms Common cases Isotropic One-dimensional Wet and dry states The relationship between volume change and effective stress is called compression and swelling. (Consolidation
More informationSOIL MECHANICS: palgrave. Principles and Practice. Graham Barnes. macmiiian THIRD EDITION
SOIL MECHANICS: Principles and Practice THIRD EDITION Graham Barnes palgrave macmiiian 'running Contents Preface xii Fine soil 19 List of symbols xiv Mass structure 21 Note on units xix Degree of weathering
More information1.5 STRESS-PATH METHOD OF SETTLEMENT CALCULATION 1.5 STRESS-PATH METHOD OF SETTLEMENT CALCULATION
Module 6 Lecture 40 Evaluation of Soil Settlement - 6 Topics 1.5 STRESS-PATH METHOD OF SETTLEMENT CALCULATION 1.5.1 Definition of Stress Path 1.5. Stress and Strain Path for Consolidated Undrained Undrained
More informationTable of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials
Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials 1.3 Scope of This Book 1.4 Historical Development of Geotechnical
More informationCavity Expansion Methods in Geomechanics
Cavity Expansion Methods in Geomechanics by Hai-Sui Yu School of Civil Engineering, University of Nottingham, U. K. KLUWER ACADEMIC PUBLISHERS DORDRECHT / BOSTON / LONDON TABLE OF CONTENTS Foreword Preface
More informationAPPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests
APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)
More information1.8 Unconfined Compression Test
1-49 1.8 Unconfined Compression Test - It gives a quick and simple measurement of the undrained strength of cohesive, undisturbed soil specimens. 1) Testing method i) Trimming a sample. Length-diameter
More informationShear strength. Common cases of shearing In practice, the state of stress in the ground will be complex. Common cases of shearing Strength
Shear strength Common cases of shearing Strength Near any geotechnical construction (e.g. slopes, excavations, tunnels and foundations) there will be both mean and normal stresses and shear stresses. The
More informationINTRODUCTION TO STATIC ANALYSIS PDPI 2013
INTRODUCTION TO STATIC ANALYSIS PDPI 2013 What is Pile Capacity? When we load a pile until IT Fails what is IT Strength Considerations Two Failure Modes 1. Pile structural failure controlled by allowable
More informationINCREASE IN PILE CAPACITY WITH TIME IN MISSOURI RIVER ALLUVIUM
INCREASE IN PILE CAPACITY WITH TIME IN MISSOURI RIVER ALLUVIUM Paul J. Axtell Jacob W. Owen Scott D. Vollink U.S. Army Corps of Engineers U.S. Army Corps of Engineers U.S. Army Corps of Engineers Kansas
More informationNumerical modelling of tension piles
Numerical modelling of tension piles S. van Baars Ministry of Public Works, Utrecht, Netherlands W.J. van Niekerk Ballast Nedam Engineering, Amstelveen, Netherlands Keywords: tension piles, shaft friction,
More informationCHAPTER 8 CALCULATION THEORY
CHAPTER 8 CALCULATION THEORY. Volume 2 CHAPTER 8 CALCULATION THEORY Detailed in this chapter: the theories behind the program the equations and methods that are use to perform the analyses. CONTENTS CHAPTER
More informationIntroduction to Soil Mechanics
Introduction to Soil Mechanics Sela Sode and Colin Jones WILEY Blackwell Contents Preface Dedication and Acknowledgments List of Symbols Soil Structure 1.1 Volume relationships 1.1.1 Voids ratio (e) 1.1.2
More informationA Constitutive Framework for the Numerical Analysis of Organic Soils and Directionally Dependent Materials
Dublin, October 2010 A Constitutive Framework for the Numerical Analysis of Organic Soils and Directionally Dependent Materials FracMan Technology Group Dr Mark Cottrell Presentation Outline Some Physical
More informationTheory of Shear Strength
SKAA 1713 SOIL MECHANICS Theory of Shear Strength Prepared by, Dr. Hetty 1 SOIL STRENGTH DEFINITION Shear strength of a soil is the maximum internal resistance to applied shearing forces The maximum or
More informationSHEAR STRENGTH OF SOIL
SHEAR STRENGTH OF SOIL Necessity of studying Shear Strength of soils : Soil failure usually occurs in the form of shearing along internal surface within the soil. Shear Strength: Thus, structural strength
More informationNonlinear Time-Dependent Soil Behavior due to Construction of Buried Structures
Journal of Earth Sciences and Geotechnical Engineering, vol. 4, no. 1, 214, 71-88 ISSN: 172-4 (print), 172- (online) Scienpress Ltd, 214 Nonlinear Time-Dependent Soil Behavior due to Construction of Buried
More informationPractical methodology for inclusion of uplift and pore pressures in analysis of concrete dams
Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Michael McKay 1 and Francisco Lopez 2 1 Dams Engineer, GHD Pty 2 Principal Dams/Structural Engineer, GHD Pty
More informationGuidelines on Foundation Loading and Deformation Due to Liquefaction Induced Lateral Spreading
Guidelines on Foundation Loading and Deformation Due to Liquefaction Induced Lateral Spreading February, 2011 1 INTRODUCTION Past earthquakes offer many examples of bridges that either collapsed or incurred
More informationWIND TUNNEL TESTING GEOTECHNICAL STUDY
WIND TUNNEL TESTING Wind tunnel testing was conducted by the Boundary Layer Wind Tunnel Laboratory (BLWTL) at the University of Western Ontario (UWO) to develop wind load time histories for the chimney.
More informationAdvanced numerical modelling methods of rock bolt performance in underground mines
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2010 Advanced numerical modelling methods of rock bolt performance in underground mines
More informationYOUR HW MUST BE STAPLED YOU MUST USE A PENCIL (no pens)
Spring 2008 CIVE 462 HOMEWORK #1 1. Print out the syllabus. Read it. Write the grade percentages in the first page of your notes. 2. Go back to your 301 notes, internet, etc. and find the engineering definition
More informationEntrance exam Master Course
- 1 - Guidelines for completion of test: On each page, fill in your name and your application code Each question has four answers while only one answer is correct. o Marked correct answer means 4 points
More informationEN Eurocode 7. Section 3 Geotechnical Data Section 6 Spread Foundations. Trevor L.L. Orr Trinity College Dublin Ireland.
EN 1997 1: Sections 3 and 6 Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1997-1 Eurocode 7 Section 3 Geotechnical Data Section 6 Spread Foundations Trevor L.L. Orr
More information1 Slope Stability for a Cohesive and Frictional Soil
Slope Stability for a Cohesive and Frictional Soil 1-1 1 Slope Stability for a Cohesive and Frictional Soil 1.1 Problem Statement A common problem encountered in engineering soil mechanics is the stability
More informationFinite Element analysis of Laterally Loaded Piles on Sloping Ground
Indian Geotechnical Journal, 41(3), 2011, 155-161 Technical Note Finite Element analysis of Laterally Loaded Piles on Sloping Ground K. Muthukkumaran 1 and N. Almas Begum 2 Key words Lateral load, finite
More informationCalculation of 1-D Consolidation Settlement
Calculation of 1-D Consolidation Settlement A general theory for consolidation, incorporating threedimensional flow is complicated and only applicable to a very limited range of problems in geotechnical
More informationTikrit University. College of Engineering Civil engineering Department CONSOILDATION. Soil Mechanics. 3 rd Class Lecture notes Up Copyrights 2016
Tikrit University CONSOILDATION College of Engineering Civil engineering Department Soil Mechanics 3 rd Class Lecture notes Up Copyrights 2016 Stresses at a point in a soil mass are divided into two main
More informationThe effect of stope inclination and wall rock roughness on backfill free face stability
The effect of stope inclination and wall rock roughness on backfill free face stability Dirige, A. P. E., McNearny, R. L., and Thompson, D. S. Montana Tech of the University of Montana, Butte, Montana,
More informationFinite Element Solutions for Geotechnical Engineering
Release Notes Release Date: January, 2016 Product Ver.: GTSNX 2016 (v1.1) Integrated Solver Optimized for the next generation 64-bit platform Finite Element Solutions for Geotechnical Engineering Enhancements
More informationR.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973
El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING
More informationCh 4a Stress, Strain and Shearing
Ch. 4a - Stress, Strain, Shearing Page 1 Ch 4a Stress, Strain and Shearing Reading Assignment Ch. 4a Lecture Notes Sections 4.1-4.3 (Salgado) Other Materials Handout 4 Homework Assignment 3 Problems 4-13,
More informationDynamic Analysis Contents - 1
Dynamic Analysis Contents - 1 TABLE OF CONTENTS 1 DYNAMIC ANALYSIS 1.1 Overview... 1-1 1.2 Relation to Equivalent-Linear Methods... 1-2 1.2.1 Characteristics of the Equivalent-Linear Method... 1-2 1.2.2
More informationDestructuration of soft clay during Shield TBM tunnelling and its consequences
Destructuration of soft clay during Shield TBM tunnelling and its consequences Hirokazu Akagi Abstract It is very important to prevent ground settlement associated with shield TBM tunnelling in soft ground
More informationADVANCED SOIL MECHANICS FINAL EXAM (TAKE HOME):DUE THURSDAY, DECEMBER 19, 6PM.
14.531 ADVANCED SOIL MECHANICS FINAL EXAM (TAKE HOME):DUE THURSDAY, DECEMBER 19, 2013 @ 6PM. Problem #1. Field load tests on strip footings yielded the test data provided below in Figure 1 and Table 1
More informationInterpretation of Pile Integrity Test (PIT) Results
Annual Transactions of IESL, pp. 78-84, 26 The Institution of Engineers, Sri Lanka Interpretation of Pile Integrity Test (PIT) Results H. S. Thilakasiri Abstract: A defect present in a pile will severely
More informationGapping effects on the lateral stiffness of piles in cohesive soil
Gapping effects on the lateral stiffness of piles in cohesive soil Satyawan Pranjoto Engineering Geology, Auckland, New Zealand. M. J. Pender Department of Civil and Environmental Engineering, University
More informationMonitoring of underground construction
Monitoring of underground construction Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8
More informationEngineeringmanuals. Part2
Engineeringmanuals Part2 Engineering manuals for GEO5 programs Part 2 Chapter 1-12, refer to Engineering Manual Part 1 Chapter 13. Pile Foundations Introduction... 2 Chapter 14. Analysis of vertical load-bearing
More informationCONSOLIDATION OF SOIL
Lecture-6 Soil consolidation Dr. Attaullah Shah 1 CONSOLIDATION OF SOIL When a soil mass is subjected to a compressive force there is a decrease in volume of soil mass. The reduction in volume of a saturated
More informationH.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)
DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09
More informationDYNAMIC RESPONSE APPROACH AND METHODOLOGY
DYNAMIC RESPONSE APPROACH AND METHODOLOGY Traditional seismic stability procedures vs coupled effective-stress approach. Traditional seismic stability procedures: Empirical and laboratory corrections and
More informationUSER S MANUAL 1D Seismic Site Response Analysis Example University of California: San Diego August 30, 2017
USER S MANUAL 1D Seismic Site Response Analysis Example http://www.soilquake.net/ucsdsoilmodels/ University of California: San Diego August 30, 2017 Table of Contents USER'S MANUAL TABLE OF CONTENTS Page
More information*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١
١ ******!" #$ % & '!( ) % * ") +,-./ % 01. 3 ( 4 56 7/4 ) 8%9 % : 7 ;14 < 8%9 % : *7./ = ;-, >/'." Soil Permeability & Seepage ٢ Soil Permeability- Definition ٣ What is Permeability? Permeability is the
More informationD1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test.
(d) COMPRESSIBILITY AND CONSOLIDATION D1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test. (a) Plot the e - σ curve. (b)
More informationEvaluation of dynamic behavior of culverts and embankments through centrifuge model tests and a numerical analysis
Computer Methods and Recent Advances in Geomechanics Oka, Murakami, Uzuoka & Kimoto (Eds.) 2015 Taylor & Francis Group, London, ISBN 978-1-138-00148-0 Evaluation of dynamic behavior of culverts and embankments
More informationTABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK
TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLE LIST OF FIGURES LIST OF SYMBOLS LIST OF APENDICES i ii iii iv v
More informationSOIL SHEAR STRENGTH. Prepared by: Dr. Hetty Muhammad Azril Fauziah Kassim Norafida
SOIL SHEAR STRENGTH Prepared by: Dr. Hetty Muhammad Azril Fauziah Kassim Norafida What is shear strength Shear strength of a soil is the maximum internal resistance to applied shearing forces Why it is
More informationLaboratory Testing Total & Effective Stress Analysis
SKAA 1713 SOIL MECHANICS Laboratory Testing Total & Effective Stress Analysis Prepared by: Dr. Hetty Mohr Coulomb failure criterion with Mohr circle of stress 2 ' 2 ' ' ' 3 ' 1 ' 3 ' 1 Cot Sin c ' ' 2
More informationInfluences of material dilatancy and pore water pressure on stability factor of shallow tunnels
Influences of material dilatancy and pore water pressure on stability factor of shallow tunnels YANG Xiao-li( ), HUANG Fu( ) School of Civil and Architectural Engineering, Central South University, Changsha
More information