APPENDIX C HYDROGEOLOGIC INVESTIGATION

Similar documents


Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG


REPORT OF FAULT SURFACE RUPTURE HAZARD EVALUATION PROPOSED WALDORF-ASTORIA LUXURY HOTEL AND CONFERENCE CENTER

APPENDIX C. Borehole Data

Log of Monitoring Well D58B

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 SURFACE ELEVATION



APPENDIX A. Borehole Logs Explanation of Terms and Symbols

Geotechnical Engineering Report

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Geotechnical Engineering Report

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

DRILL HOLE # BH-BGC13-FN-01

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

APPENDIX B: BORING LOGS

Appendix G GEOLOGICAL INVESTIGATION

Geotechnical Data Report

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

Geotechnical Data Report

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

Chapter 12 Subsurface Exploration

Geotechnical Data Report

WELL NUMBER 14-BW03 PAGE 1 OF 5

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

Geotechnical Engineering Report

3.0 SUMMARY OF FINDINGS

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

Technical Memorandum. Soil Borings

APPENDIX A GEOTECHNICAL REPORT

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Geotechnical Engineering Report

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

APPENDIX C SUBSURFACE EXPLORATIONS

Feet. SAND; clayey, fine grained; shells are common; rounded quartz grains. SHELLS; muddy; almost no sand, shells and fragments common

Geotechnical Engineering Report

GZA GeoEnvironmental, Inc.

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

Geotechnical Data Report

UAS Student Residence

ENGINEERING ASSOCIATES

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

Geotechnical Subsurface Exploration and Laboratory Testing Data Report

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

Preliminary Geotechnical and Environmental Report

71912 From: Dana Derrington Sent: Wednesday, May 31, :02 PM Central Standard Time TO:

Geotechnical Subsurface Exploration and Laboratory Testing Data Report

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

NAPLES MUNICIPAL AIRPORT

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW


Feet CLAY; silty, greenish gray and clayey fine sand; Color: 5Y 3/1

GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD

GEOTECHNICAL ENGINEERING REPORT HARPER VALLEY SANITARY LIFT STATION AND FORCEMAIN KIRTLAND, NEW MEXICO. Submitted To:

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

DYREGROV ROBINSON INC.

Dry Muliwai Sample Location Map

HDD PA-IN RD (W-N57 and W-N56)

Conventional Field Testing & Issues (SPT, CPT, DCPT, Geophysical methods)

Pierce County Department of Planning and Land Services Development Engineering Section

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

REPORT OF SUBSURFACE EXPLORATION

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

WARM SPRINGS GRADE SEPARATION AT I-15

GEOTECHNICAL ENGINEERING SERVICES REPORT

HDD PA-LA SR (S-K34, S-K35, PEM-K32)

Geotechnical Engineering Report

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION, LABORATORY TESTING AND GEOTECHNICAL ENGINEERING ANALYSES

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

GEOLOGIC SUBSURFACE CONDITIONS. October 31, 2017 Project No

Geotechnical Data Report

Geotechnical Investigation

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No.

AN EMPLOYEE OWNED COMPANY

Transcription:

Figure B-5.7

Figure B-5.8

Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation FIGURES C-1.1A THROUGH C-1.3D LOGS OF BORINGS (PE PHASE) December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

LA METRO PB-TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 305 300 295 Westwood/ UCLA Station 290 285 280 275 270 DEPTH (ft) 5 10 15 20 25 30 35 40 "N" VALUE STD.PEN.TEST 19 8 8 OVA (ppm)** MOISTURE CONTENT (% of dry wt.) 15.3 11.0 12.4 20.5 25.3 16.9 DRY DENSITY (pcf) 109-119 - 98 102 MTA Westside Subway Extension Los Angeles, California BLOW COUNT* (blows/ft) push 8 3 6 PERCENT PASSING No. 200 SIEVE 40 17 48 70 SAMPLE LOC. DOWNHOLE TESTS PMT DRILLING COMPANY/DRILLING EQUIPMENT C & L Drilling / Mayhew 1000 DRILLING METHOD Rotary Wash DATES DRILLED 5/27/2011 and 5/28/2011 CL SC SM SM CL CL SM SC 3½-inch thick Asphaltic Concrete over 2-inch thick Base Course QUATERNARY YOUNGER ALLUVIUM [Qal] GRAVELLY LEAN CLAY - moist, brown, trace roots CLAYEY SAND with GRAVEL - very loose, moist, brown, fine-grained, trace fine to coarse gravel SILTY SAND with GRAVEL - medium dense, moist, brown, fine to coarse-grained, gravel (up to ½ inch in size) SILTY SAND - loose, moist, brown, fine-grained, trace coarse gravel LEAN CLAY with GRAVEL - medium stiff, moist, brown, trace fine sand, coarse gravel LEAN CLAY with SAND - soft, moist, brown, fine sand, trace coarse gravel Becomes medium stiff BOREHOLE LOCATION Sta 811+70, Rt 25 feet HOLE DIAMETER 4-7/8 inches BORING NO. OB-105 GROUND EL. 308 feet GROUND-WATER READINGS Two monitoring wells installed on 5/28/2011; ground-water level measured at a depth of 47 feet on 7/1/2011. See last page of this boring for details. (CONTINUED ON FOLLOWING FIGURE) QUATERNARY OLDER ALLUVIUM [Qalo] SILTY SAND - loose, moist, brown, fine sand, trace coarse gravel CLAYEY SAND - medium dense, moist, brown, fine to coarse-grained, trace fine to coarse gravel Field Tech: MH Prepared/Date: YN 8/22/2011 Checked/Date: LT/HP/PE 9/13/11 LOG OF BORING Project No.: 4953-10-1561 Figure: C-1.1a

LA METRO PB-TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 265 260 255 Westwood/ UCLA Station 250 245 240 235 230 DEPTH (ft) 45 50 55 60 65 70 75 80 "N" VALUE STD.PEN.TEST 23 27 40 54 OVA (ppm)** MOISTURE CONTENT (% of dry wt.) 19.4 17.1 11.4 10.3 23.2 15.1 26.4 19.1 DRY DENSITY (pcf) - 98-118 - 117-108 MTA Westside Subway Extension Los Angeles, California BLOW COUNT* (blows/ft) 9 20 21 30 PERCENT PASSING No. 200 SIEVE 13 84 SAMPLE LOC. DOWNHOLE TESTS PMT DRILLING COMPANY/DRILLING EQUIPMENT C & L Drilling / Mayhew 1000 DRILLING METHOD Rotary Wash DATES DRILLED 5/27/2011 and 5/28/2011 SM SW- SM SM CL CL CL CL BOREHOLE LOCATION Sta 811+70, Rt 25 feet HOLE DIAMETER 4-7/8 inches SILTY SAND - loose, moist, brown, fine to medium-grained WELL GRADED SAND with SILT - medium dense, moist, brown, fine to medium-grained, trace fine to coarse gravel SILTY SAND with GRAVEL - medium dense, moist, brown, fine-grained LEAN CLAY - hard, moist, brown SANDY LEAN CLAY - very stiff, moist, brown, fine sand LEAN CLAY with SAND - hard, moist, brown SAN PEDRO FORMATION [Qsp] LEAN CLAY with SAND - hard, moist, brown BORING NO. OB-105 (Continued) GROUND EL. 308 feet GROUND-WATER READINGS Two monitoring wells installed on 5/28/2011; ground-water level measured at a depth of 47 feet on 7/1/2011. See last page of this boring for details. (CONTINUED ON FOLLOWING FIGURE) Field Tech: MH Prepared/Date: YN 8/22/2011 Checked/Date: LT/HP/PE 9/13/11 LOG OF BORING Project No.: 4953-10-1561 Figure: C-1.1b

LA METRO PB-TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 225 220 215 210 205 200 195 190 DEPTH (ft) 85 90 95 100 105 110 115 120 "N" VALUE STD.PEN.TEST 45 60 32 94 OVA (ppm)** MOISTURE CONTENT (% of dry wt.) 25.8 27.5 17.8 23.4 34.4 21.3 19.8 18.5 DRY DENSITY (pcf) - 92-99 - - - 113 MTA Westside Subway Extension Los Angeles, California BLOW COUNT* (blows/ft) 20 18 24 32 PERCENT PASSING No. 200 SIEVE 73 37 14 SAMPLE LOC. DOWNHOLE TESTS DRILLING COMPANY/DRILLING EQUIPMENT C & L Drilling / Mayhew 1000 DRILLING METHOD Rotary Wash DATES DRILLED 5/27/2011 and 5/28/2011 SC CL SM SW Becomes stiff CLAYEY SAND - very dense, moist, brown, fine to medium-grained SANDY CLAY - very stiff, moist, brown, fine sand Becomes hard BOREHOLE LOCATION Sta 811+70, Rt 25 feet HOLE DIAMETER 4-7/8 inches SILTY SAND - medium dense, wet, greenish-gray, fine-grained (Disturbed sample recovered) Becomes very dense, yellowish brown Becomes dense, reddish brown BORING NO. OB-105 (Continued) GROUND EL. 308 feet GROUND-WATER READINGS Two monitoring wells installed on 5/28/2011; ground-water level measured at a depth of 47 feet on 7/1/2011. See last page of this boring for details. (CONTINUED ON FOLLOWING FIGURE) Field Tech: MH Prepared/Date: YN 8/22/2011 Checked/Date: LT/HP/PE 9/13/11 LOG OF BORING Project No.: 4953-10-1561 Figure: C-1.1c

LA METRO PB-TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 185 180 175 170 165 160 155 150 DEPTH (ft) 125 130 135 140 145 150 155 160 "N" VALUE STD.PEN.TEST 50/5" OVA (ppm)** MOISTURE CONTENT (% of dry wt.) DRY DENSITY (pcf) 12.2 - MTA Westside Subway Extension Los Angeles, California BLOW COUNT* (blows/ft) PERCENT PASSING No. 200 SIEVE SAMPLE LOC. DOWNHOLE TESTS DRILLING COMPANY/DRILLING EQUIPMENT C & L Drilling / Mayhew 1000 DRILLING METHOD BOREHOLE LOCATION Rotary Wash Sta 811+70, Rt 25 feet DATES DRILLED HOLE DIAMETER 5/27/2011 and 5/28/2011 4-7/8 inches WELL GRADED SAND with GRAVEL - very dense, wet, yellow brown END OF BORING AT 121 FEET NOTES: Hand augered upper 5 feet to avoid damage to utilities. Two monitoring wells installed in the borehole on 5/28/2011; Groundwater level measured in the deeper well at a depth of 47 feet below the ground surface on 7/1/2011. Shallower well was dry. Borehole grouted with cement bentonite slurry and patched with asphalt concrete. "N" Value Standard Penetration Test: Number of blows required to drive the SPT sampler 18 inches using a 140 pound automatic hammer falling 30 inches. *Number of blows required to drive the Crandall Sampler 12 inches using a 380 pound hammer falling 18 inches. **Photo Ionization Detector used for OVA readings. PMT - Pressuremeter test BORING NO. OB-105 (Continued) GROUND EL. 308 feet GROUND-WATER READINGS Two monitoring wells installed on 5/28/2011; ground-water level measured at a depth of 47 feet on 7/1/2011. See last page of this boring for details. Field Tech: MH Prepared/Date: YN 8/22/2011 Checked/Date: LT/HP/PE 9/13/11 LOG OF BORING Project No.: 4953-10-1561 Figure: C-1.1d

B2SOIL_MACTEC_REV1 (ELEVATION) P:\MACTEC\MTA WESTSIDE EXTENSION\BORING LOGS\GINT DB & TEMPLATE\LIBRARY MACTEC FEB11.GLB C:\DOCUMENTS AND SETTINGS\KPARKER\DESKTOP\MTA WESTSIDE-MORENO.GPJ 6/29/11 THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) DEPTH (ft) 5 10 15 20 25 30 35 40 45 "N" VALUE STD.PEN.TEST MOISTURE (% of dry wt.) MTA Westside Extension Los Angeles, California DRY DENSITY (pcf) BLOW COUNT* (blows/ft) 12 16 SAMPLE LOC. DATE DRILLED: EQUIPMENT USED: HOLE DIAMETER (in.): ELEVATION: ** ML SP ML- CL SP ML- CL ML (CONTINUED ON FOLLOWING FIGURE) BORING OB-106 June 3, 2011 CME-75 - Hollow Stem Auger 8-in 0.3 feet of asphalt SILT (ml) - dark brown, moist, some clay, no odor FILL SILTY GRAVELY SAND (sp) - dark brown, moist, gravel up to 2-inches in diameter Refusal at 6 feet, moved boring 4 feet to the southwest NATIVE CLAYEY SILT (ml-cl) - dark brown, moist SILT (ml) - dark olive brown, moist, trace of clay GRAVELY SAND (sp) - brown, shale fragments up to 1-inch in diameter CLAYEY SILT (ml-cl) - dark olive brown, medium stiff, very moist See S-114 for complete lithology from 21 to 40 feet SANDY SILT (ml) - dark brown, very stiff, slightly moist, fine sand LOG OF BORING Project: 4953-10-1561 Field Tech: PK Prepared By: KP Checked By: Figure C-1.2a

B2SOIL_MACTEC_REV1 (ELEVATION) P:\MACTEC\MTA WESTSIDE EXTENSION\BORING LOGS\GINT DB & TEMPLATE\LIBRARY MACTEC FEB11.GLB C:\DOCUMENTS AND SETTINGS\KPARKER\DESKTOP\MTA WESTSIDE-MORENO.GPJ 6/29/11 THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) DEPTH (ft) 50 55 60 65 70 75 80 85 90 "N" VALUE STD.PEN.TEST MOISTURE (% of dry wt.) MTA Westside Extension Los Angeles, California DRY DENSITY (pcf) BLOW COUNT* (blows/ft) SAMPLE LOC. DATE DRILLED: EQUIPMENT USED: HOLE DIAMETER (in.): ELEVATION: ** BORING OB-106 (Continued) 26 ML SILT (ml) - (10YR, 4/3) brown, very stiff, moist, some clay, trace of fine sand, no odor, wet sluff at top of sampler NOTES: June 3, 2011 CME-75 - Hollow Stem Auger 8-in Total Depth = 69 feet bgs Hand augered to 5 feet bgs SPT samples taken at 20, 40, and 60 feet bgs Well Construction Details Bentonite cement grout to approximately 1.5 feet Medium bentonite chips to 41 feet 0.01-inch perforated screen from 48 to 68 feet Monterey #3 sand from 46 to 69 feet LOG OF BORING Project: 4953-10-1561 Field Tech: PK Prepared By: KP Checked By: Figure C-1.2b

METRO SOIL CORE MC 200 TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 305 300 295 290 285 280 275 270 DEPTH (ft) 5 10 15 20 25 30 35 40 BOX # 1 2 3 RUN # 1, 2 3 4 % RECOVERY 75 100 55 MOISTURE CONTENT (% of dry wt.) PERCENT PASSING No. 200 SIEVE 3.5 5.1 3.3 15.7 4.0 6.1 7 47 25 MTA Westside Subway Extension Los Angeles, California SAMPLE LOC. DRILLING COMPANY/DRILLING EQUIPMENT Boart Longyear / 600T Trusonic drill rig DRILLING METHOD Sonic Coring DATES DRILLED 5/27/11-5/29/11 GROUND-WATER READINGS Ground-water level not measured. ML SM SW- SM SC- SM SC- SM SM SM ML 2½ inch thick Asphalt Concrete QUATERNARY YOUNGER ALLUVIUM [Qal] SILT - moist, brown, trace sand and gravel Some clay 5-inch shale fragment Layer of Sandy Silt with Gravel (up to 2 inches in size) No core recovery from 6 to 9 feet SILTY SAND with GRAVEL - medium dense, dry to slightly moist, dark greenish gray (10Y 4/1), fine to coarse grained, fine to coarse gravel (up to 2 inches in size) Layers of Sandy Silt, moist, very dark grayish brown, fine to coarse sand, some fine to coarse gravel No core recovery from 14 to 15 feet WELL GRADED SAND with SILT and GRAVEL - dry to slightly moist, dark greenish gray (10Y 4/1), fine to coarse grained, fine to coarse gravel (up to 1½ inches in size) SILTY CLAYEY SAND - medium dense, moist, dark grayish brown (2.5Y 3/2), fine grained, some medium to coarse, some fine gravel (up to ¾ inch in size), trace cobble (up to 4 inches in size), alternating layers of Sandy Silt SILTY SAND with GRAVEL - medium dense, moist, dark greenish gray (10Y 3/1), fine to coarse grained, fine to coarse gravel (up to 1½ inches in size) Becomes yellowish-brown BOREHOLE LOCATION 813+20, Rt 25 feet HOLE DIAMETER 6 inches No core recovery from 28 to 31 feet BORING NO. P-103 GROUND EL. 309 feet QUATERNARY OLDER ALLUVIUM [Qalo] SILTY SAND with GRAVEL - medium dense, moist, dark greenish gray (10Y 3/1) Becomes brown (10YR 4/3) SANDY SILT - very stiff to hard, moist, brown, fine sand, some fine gravel (CONTINUED ON FOLLOWING FIGURE) LOG OF BORING Project No.: 4953-10-1561 Field Tech: RS/RH Prepared/Date: YN/WL 9/30/2011 Checked/Date: HP/PE 10/2/2011 Figure: C-1.3a

METRO SOIL CORE MC 200 TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 265 260 255 Tunnel 250 245 Tunnel 240 235 230 DEPTH (ft) 45 50 55 60 65 70 75 80 BOX # 4 5 6 7 RUN # 5 6 7 8 % RECOVERY 100 100 100 100 MOISTURE CONTENT (% of dry wt.) PERCENT PASSING No. 200 SIEVE 12.9 23.6 25.5 27.2 18.7 21.7 18.8 9.0 18.2 19.6 20.0 23.6 62 63 70 82 MTA Westside Subway Extension Los Angeles, California SAMPLE LOC. DRILLING COMPANY/DRILLING EQUIPMENT Boart Longyear / 600T Trusonic drill rig DRILLING METHOD Sonic Coring DATES DRILLED 5/27/11-5/29/11 GROUND-WATER READINGS Ground-water level not measured. ML CL ML CL CL- ML ML CL CH Alternating layers of Silty Sand, moist, brown, fine to coarse-grained, fine to coarse gravel SANDY LEAN CLAY - moist, brown, fine to medium sand, trace coarse, occasional fine gravel (up to 3/8 inch in size) Alternating Sandy Silt, trace fine to coarse gravel SILT with SAND - moist, brown, fine sand, trace fine gravel Becomes dark greenish gray with brown spots SANDY LEAN CLAY - medium stiff, moist, dark greenish gray, brown and varying colors, fine sand, some medium to coarse, trace fine gravel (up to 3/4 inch in size) SILTY CLAY with SAND - medium stiff, moist, brown and dark greenish gray, fine to coarse sand, trace gravel Fine to coarse gravel BOREHOLE LOCATION 813+20, Rt 25 feet HOLE DIAMETER 6 inches SANDY SILT with GRAVEL - stiff, moist, dark greenish gray, fine to coarse sand, fine to coarse gravel (up to 2 inches in size) LAKEWOOD FORMATION [Qlw] LEAN CLAY with SAND - medium stiff to stiff, moist, brown, fine sand, trace medium and coarse, occasional gravel (up to 3/8 inch in size) Becomes dark brown (10YR 3/3) BORING NO. P-103 (Continued) GROUND EL. 309 feet FAT CLAY - very stiff, moist, dark greenish gray with brown mottling, trace fine and medium sand, trace calcium carbonate nodules (CONTINUED ON FOLLOWING FIGURE) LOG OF BORING Project No.: 4953-10-1561 Field Tech: RS/RH Prepared/Date: YN/WL 9/30/2011 Checked/Date: HP/PE 10/2/2011 Figure: C-1.3b

METRO SOIL CORE MC 200 TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 225 220 215 210 205 200 195 190 DEPTH (ft) 85 90 95 100 105 110 115 120 BOX # 8 9 10 11 RUN # 9 10 11 12 % RECOVERY 100 100 100 100 MOISTURE CONTENT (% of dry wt.) PERCENT PASSING No. 200 SIEVE 24.5 28.1 18.1 28.2 24.5 23.2 24.8 22.9 19.5 21.0 20.3 20.5 92 95 92 MTA Westside Subway Extension Los Angeles, California SAMPLE LOC. DRILLING COMPANY/DRILLING EQUIPMENT Boart Longyear / 600T Trusonic drill rig DRILLING METHOD Sonic Coring DATES DRILLED 5/27/11-5/29/11 GROUND-WATER READINGS Ground-water level not measured. CH ML CH ML ML CH CL SP SW Trace fine gravel, abundant shell fragments, trace calcium carbonate nodules Occasional fine to medium gravel Occasional fine gravel HOLE DIAMETER 6 inches Some fine to coarse sand SANDY SILT - hard, moist, olive (5Y 5/4), trace fine gravel Alternating with layers of Silt and Clay, moist, olive gray to dark olive gray with brown mottling, trace fine sand Some shell fragments Some calcium carbonate nodules FAT CLAY - hard, moist, olive gray with some brown mottling, trace fine to coarse sand, occasional fine gravel SILT with SAND - hard, moist, olive gray with black and brown mottling, fine sand Some calcium carbonate nodules BOREHOLE LOCATION 813+20, Rt 25 feet BORING NO. P-103 (Continued) GROUND EL. 309 feet FAT CLAY - hard, moist, brown to grayish green, very few brown mottling, trace fine to coarse sand, trace fine gravel (up to 3/8 inch in size) No brown mottling, few calcium carbonate nodules SANDY LEAN CLAY with GRAVEL - stiff, moist, dark greenish gray, fine to coarse sand, fine to coarse gravel, some calcium carbonate nodules POORLY GRADED SAND - medium dense to dense, moist to wet, yellowish brown (10YR 5/6), trace fine black slate gravel (CONTINUED ON FOLLOWING FIGURE) LOG OF BORING Project No.: 4953-10-1561 Field Tech: RS/RH Prepared/Date: YN/WL 9/30/2011 Checked/Date: HP/PE 10/2/2011 Figure: C-1.3c

METRO SOIL CORE MC 200 TUNNEL ZONE S:\70131 GEOTECH\GINTW\LIBRARY MACTEC JUNE2011.GLB C:\DOCUMENTS AND SETTINGS\HPPONNABOYINA\DESKTOP\G1.GPJ 10/3/11 THIS RECORD IS AN INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. LATITUDE AND LONGITUDE OF BORING LOCATION SHOWN ON LOGS ARE APPROXIMATE. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. ELEVATION (ft) 185 180 175 170 165 160 155 150 DEPTH (ft) 125 130 135 140 145 150 155 160 BOX # RUN # % RECOVERY MOISTURE CONTENT (% of dry wt.) PERCENT PASSING No. 200 SIEVE MTA Westside Subway Extension Los Angeles, California SAMPLE LOC. DRILLING COMPANY/DRILLING EQUIPMENT Boart Longyear / 600T Trusonic drill rig DRILLING METHOD Sonic Coring DATES DRILLED 5/27/11-5/29/11 GROUND-WATER READINGS Ground-water level not measured. SM WELL GRADED SAND - medium dense, moist, yellowish brown to dark yellowish brown, fine to coarse grained, trace fine gravel SILTY SAND with GRAVEL - dense, moist, dark greenish gray, fine to coarse grained, fine to medium gravel END OF BORING AT 120 FEET NOTES: BOREHOLE LOCATION 813+20, Rt 25 feet HOLE DIAMETER 6 inches Consistency description on this log is based on pocket penetrometer test results and/or visual observation of soil samples. Hand augered upper 7 feet to avoid damage to utilities. Borehole grouted with cement-bentonite slurry and patched with asphalt concrete. BORING NO. P-103 (Continued) GROUND EL. 309 feet LOG OF BORING Project No.: 4953-10-1561 Field Tech: RS/RH Prepared/Date: YN/WL 9/30/2011 Checked/Date: HP/PE 10/2/2011 Figure: C-1.3d

Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation FIGURES C-2.1 THROUGH C-2.4 GROUNDWATER MONITORING WELL DIAGRAMS December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation FIGURES C-3.1 THROUGH C-3.84 NOTICE OF INTENT (NOI) December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

Figure C-3.1

Figure C-3.2

Figure C-3.3

Figure C-3.4

Figure C-3.5

Figure C-3.6

Figure C-3.7

Figure C-3.8

Figure C-3.9

Figure C-3.10

Figure C-3.11

Figure C-3.12

Figure C-3.13

Figure C-3.14

Figure C-3.15

Figure C-3.16

Figure C-3.17

Figure C-3.18

Figure C-3.19

Figure C-3.20

Figure C-3.21

Figure C-3.22

Figure C-3.23

Figure C-3.24

Figure C-3.25

Figure C-3.26

Figure C-3.27

Figure C-3.28