1 Old Channel of the Comal River Bank Stabilization Draft Prepared for: City of New Braunfels Prepared by: REESE AND NICHOLS, INC Jollyville Rd, Bldg 4, Suite 100 Austin, Texas NEB13133

2 Old Channel of the Comal River Bank Stabilization Prepared for: City of New Braunfels DRAT THIS DOCUMENT IS RELEASED OR THE PURPOSE O INTERIM REVIEW UNDER THE AUTHORITY O M. LESLIE BOYD, P.E., TEXAS NO ON 06/11/2013. IT IS NOT TO BE USED OR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. Prepared by: REESE AND NICHOLS, INC. Texas Registered Engineering irm Jollyville Rd, Bldg 4, Suite 100 Austin, Texas NEB13133

3 TABLE O CONTENTS 1.0 INTRODUCTION Background PROJECT APPROACH Geomorphological Evaluation Riparian Vegetation Plan Bank Stabilization Evaluation STABILIZATION CONCEPT DEVELOPMENT Background Initial Stabilization Alternatives Selected Concepts RECOMMENDATIONS COST OPINIONS CONCLUSION Table of Illustrations Photo No. 1 Sediment Island and Overgrowth... 1 Photo No. 2 Leaning Tree at the Top Edge of Bank... 2 Photo No. 3 Invasive Elephant Ear Thicket... 2 Photo No. 4 Washed Bank above Sediment Island... 7 Photo No. 5 TRM Installation on Steep Bank...13 Photo No. 6 Tree Roots Clinging to Steep Bank...18 igure 1.1 Existing Conditions Map... 4 igure 3.1 Slope Reducing Alternative: Typical Section igure 3.2 Waler and Anchor System: Typical Section igure 3.3 Waler and Anchor System Conceptual Sketch Table of Tables Table 5.1: POPCC for TRM and Anchored Waler Stabilization Table 5.2: POPCC for Slope Reduction with TRM Stabilization Appendices Appendix A Geomorphologic Site Assessment Appendix B Riparian Vegetation Plan Appendix C Topographic Survey Appendix D Geotechnical Exploration Report Appendix E Conceptual Drawings of Proposed Stabilization Alternatives

4 1.0 INTRODUCTION This report addresses the study and evaluation of possible bank stabilization alternatives for the Old Channel reach of the Comal River in Landa Park, New Braunfels, Texas. The reach under study extends from the culverts on the east side of Landa Lake to the culverts beneath Golf Course Road near the golf clubhouse. This report is the third component of the reese and Nichols, Inc. (NI) assignments addressing this reach of the river. 1.1 BACKGROUND This reach of the Old Channel of the Comal is home to several endangered species, especially the fountain darter. Surface runoff and flooding have steepened the north bank of the river and resulted in the deposition of a sediment island (Photo No. 1). The sediment island reduced the available area for fountain darters and was removed in March Large trees are clinging precariously onto the top edge of the bank (Photo No. 2). Invasive species of plants and trees have invaded the reach and further reduced the preferred habitat of the darters (Photo No. 3). Photo No. 1 Sediment Island and Overgrowth

5 Photo No. 2 Leaning Tree at the Top Edge of Bank Photo No. 3 Invasive Elephant Ear Thicket

6 The City of New Braunfels in conjunction with the Edwards Aquifer Recovery Implementation Program (EARIP) have embarked upon conserving the endangered species habitat in Landa Park and have engaged a variety of consultants and contractors to provide services on numerous areas within the Landa Habitat Conservation Plan (HCP). The City has developed a plan for this specific reach of the Comal which includes modifying the culverts on the east side of Landa Lake (Halff Associates), removing the sediment island (D&M Construction), replanting native plants upon removal of the sediment island (Bio-West), and developing bank stabilization concepts along with riparian restoration for the reach (reese and Nichols, Inc). Henceforth, this report will present the reese and Nichols, Inc. work efforts on this reach of the Comal River. The project map is shown in igure 1.1 and depicts existing conditions at the site with notations.

7 IGURE acing upstream - Banks are laid back, sparsely vegetated with few locations of minor undercut banks. 8. acing left bank - Vegetation is providing toe protection. 10. acing left bank - Overland sheet flow from the golf course flows down the bank eroding the soil, exposing roots, and forming rills and gullies. 12. acing left bank - Steep, near vertical bank with large void spaces in the bank profile. Banks are undercut and channel bed is covered in about 8 inches of sediment with vegetation growing on top. ILE NAME: Ex 3 Channel Assessment- ANSI D.mxd COORDINATE SYSTEM: NAD 1983 StatePlane Texas Central IPS 4203 eet SCALE: 500 DRATER: JJC DATE: May, 2013 Observed Water Level Bank Erosion Surface low from Golf Course 0 4. acing upstream - Minor undercut toe along both banks near the beginning of a riffle-pool sequence. Minor undercut banks with exposed roots make good aquatic habitat Jollyville Rd. Bldg. 4, Suite 100 Austin, Texas Phone - (512) acing downstream - Main outfall from the lake to the stream. Rock riprap lined for bed and bank protection. NI NO. : NEB13133 City of New Braunfels Ba n k 100 Right "Old Channel" of the Comal Bank Stabilization Left Ban k Areas of Interest N 11. acing downstream - Mass wasting on left bank has led to tree fall. 9. acing left bank - Steep, bare ground, gully erosion, and approximately 2-ft undercut bank. eet 7. On left bank - Vegetative ground cover can help stabilize banks. Deer may prevent or slow the establishment of ground cover. 5. acing left bank - Overland sheet flow from the golf course On left bank - Seepage spring 1. acing upstream - The toe of the slope was undercut, exposing roots.

8 2.0 PROJECT APPROACH NI developed a three stage approach to evaluate this reach of the river: Perform geomorphological evaluation Perform riparian vegetation plan Perform bank stabilization evaluations Each of these will be discussed in brief details below. 2.1 GEOMORPHOLOGICAL EVALUATION The geomorphological evaluation was performed to provide information on the erosive forces acting upon the reach and to observe the stability of the existing channel and banks. The existing river model was obtained from Halff Associates and modified as necessary to provide a model for use in the geomorphological assessment. The assessment evaluated the shear stresses acting upon the stream bottom and banks. Incipient motion evaluations and bend scour characteristics were also evaluated. This information was then utilized to establish which areas in the reach could be stabilized with planting and other non-mechanical stabilization methods. The geomorphological evaluation was performed first in order to delineate the limits where mechanical stabilization was deemed appropriate. Recommendations were set forth in the Geomorphic Site Assessment which is included herein as Appendix A. igure 3.8 therein, indicates the areas where shade tolerant planting, toe coir rolls, berms, and mechanical stabilization are recommended. Cost opinions will be presented herein in subsequent sections. 2.2 RIPARIAN VEGETATION PLAN The riparian restoration plan was developed on the concept of identifying all invasive plants and determining acceptable replacement plantings of native origin. The riparian restoration plan included the entire reach. It identified several invasive plants, primarily elephant ears and canes that should be removed. The riparian restoration plan is included herein as Appendix B. It was prepared subsequent to the geomorphological assessment in order to benefit from the zone delineations of the geomorphological assessment. Cost opinions will be presented herein in subsequent sections.

9 2.3 BANK STABILIZATION EVALUATION The bank stabilization evaluation of alternatives was developed following the geomorphological assessment and the riparian vegetation plan. Initial work included establishing sub-contracts to perform survey work and geotechnical investigations on the reach under study. The Schultz Group of New Braunfels performed the topographical survey for the project. Their survey was utilized in all three segments of work in this project. The topographic maps are included in Appendix C. Brierley Associates performed the geotechnical investigation of the site from their Austin office. Six borings were completed for the project. our holes were on the north bank near the golf course and two holes were on the south bank in the flat area adjacent to the sediment island. The geotechnical report is also included herein as Appendix D. The results of both reports will be discussed in more detail in subsequent sections.

10 3.0 STABILIZATION CONCEPT DEVELOPMENT 3.1 BACKGROUND In initial meetings with the City of New Braunfels (CONB) representatives noted that they were interested in stabilizing the bank, but they wanted the solution to be attractive. CONB representatives ruled out the use of gabions and sheet piling. NI agrees that the high visibility of this project warrants an attractive solution. When geotechnical borings were selected for the site and the drill rig was ready to mobilize, there were some anxious moments before authorizing the drilling to proceed. CONB expressed the high archaeologically importance of this site. Review of archaeological mapping indicated the entire study area has a high probability of cultural resource deposits. The drilling was allowed to proceed only due to the minute surface area being affected. The sediment island which had formed at the bend in this reach was the result of sediment deposition either from sediment transport or bank erosion from surface runoff. Initial observance by the geomorphological team indicates that it is most likely caused primarily by surface erosion. Proof of this is visible in the washed portion of the bank above the sediment island (Photo No. 4). Photo No. 4 Washed Bank above Sediment Island

11 Cross sections taken from the topographical mapping indicate that the top of bank is approximately twenty (20) feet above the normal water surface in the reach near the sediment island and downstream therefrom. The edge of bank offset horizontally from the water s edge is typically fifteen (15) to twenty (20) feet. The steepness of the slope severely hampers the options available to correct the bank without encroaching onto the nearby golf course. The geotechnical results indicate alluvial clays in the upper segments of the bank and they are underlain by gravelly clays and clays having both gravel and cobbles in their matrix. The interface between the clays and gravelly clays was found to be near elevation 617 on the four (4) borings on the north bank. The interface occurred near elevation 611 on the two (2) borings on the south. All of the above background information pieces served to direct the NI team in development of stabilization alternatives and will be discussed below as various stabilization alternatives are discussed. 3.2 INITIAL STABILIZATION ALTERNATIVES The portion of bank requiring mechanical bank stabilization is approximately three hundred (300) feet in length. It stretches from approximate station (just upstream of the sediment island) to station (near the south end of golf clubhouse). There are numerous methodologies available for stabilizing earthen streambanks. Some of the most common include: Concrete retaining walls Steel sheetpile walls Crib walls Mechanically stabilized earth slopes (MSE) Rock gabions Soil nail walls Turf mat reinforced slopes Tie-back walls Rock riprap slope paving Concrete slope paving Grassed slopes Concrete secant pile wall

12 The following considerations were considered most significant in selecting a proposed bank stabilization method. Minimal excavation due to archaeological concerns Appearance Resistance to erosion Cost MSE walls were initially a top contender for stabilization. However, MSE walls require approximately 70 percent of their height as a minimum base width. This would result in very wide cuts into the existing bank and MSE was thus dismissed. The concerns were archaeological as well as space constraints and near vertical cuts approaching 20 feet in height. Additionally, the golf clubhouse is situated at the edge of the top of bank, which prevents extensive excavation of the slope in this area. The next favored contender was soil nail walls. They can be constructed from the top down and can be artistically treated to resemble stones, rock layers or any other number of pleasant looking architectural features. The preferred height was approximately 10 feet for the soil nail wall, but stability issues were identified at the toe of the wall due to the gravelly material below the toe. Additionally, there is no bank to cut into at the location where the wall was desired. Thus, all soil nailed walls would have to be formed and backfilled for their entire height. This configuration limits the incremental benefits gained from the soil nail walls over other alternatives. Another benefit of the soil nail walls was their ability to produce a tree well around some of the edge hanging trees. The soil nail solution is not considered further at this time, but could be resurrected if interest in tree wells prevails. Crib walls are often found in bank stabilization, but they require approximately the same excavation as MSE walls for stability. Concrete retaining walls would also fall into the excessive excavation category because their typical base to height ratio is also around 70%. Concrete secant piles and concrete slope paving were considered to be as poor in appearance as gabions and steel sheetpile walls, which were explicitly ruled out on grounds of appearance by CONB. These four (4) were summarily abandoned from consideration. Grassed slopes and rock rip rap slope paving were dismissed from consideration due to the steep bank being almost 1H:1V.

13 We are left with turf mat reinforced slopes and tie back walls. These two concepts are further developed in the following section. 3.3 SELECTED CONCEPTS We believe that turf reinforcing mats (TRM) represent a reasonable bank stabilization method for the slopes in our study reach. They are resistant to velocities beyond those indicated in the hydraulic models. We would expect good service from TRM especially when protected from excessive overland flows by constructing a diversion berm at the top of slope as discussed in the geomorphologic assessment. There are essentially two different types of material to be protected on the banks, i.e., clays and gravelly clays. The geotechnical report indicates that the gravelly clays are stable at slopes just slightly above 2H:1V and the clays are stable at slopes up to 1H:1V. A majority of the existing slopes in our 300 feet length to be mechanically stabilized exceed these maximums. Where this occurs, we can either excavate back to a lesser slope or mechanically anchor the bank with a system of tie back anchors and walers. Excavating back to a lesser slope is indicated in igure 3.1. One drawback with this solution is that, due to the extensive excavation, there exists a high possibility of unearthing archaeological remnants. This could represent a significant cost and delay in the project. urther, review of the cross sections in Appendix E associated with this alternative indicates that significant encroachment onto the golf course can occur. Also, any trees within the excavation would be lost. These are significant shortcomings for this solution. The system of TRM with tie back anchors and walers is indicated in igure 3.2. This solution would essentially dress the slope to its present configuration and add anchors and walers as indicated to provide stabilization to the already steep slopes. The addition of anchors with walers will significantly increase the project cost, but would not require extensive excavation. This stabilization system will give the sloped bank a terraced appearance, and the walers can be made to look like a natural feature (e.g. limestone outcrop, old rock wall, etc.). It is possible that the final solution to stabilization would be one where the appropriate method was field selected on the basis of existing slope conditions. A conceptual sketch of the waler and anchor system is presented in igure 3.3. A TRM installation on a steep bank (without anchors and walers) is shown in Photo No. 5 for visualization purposes. TRM can be cut and molded around trees, so the reach s existing trees can be incorporated into the final visual appearance of the rehabilitation of the bank. Appendix E shows conceptual layouts and sections for each of the two options discussed herein.

14 igure 3.1 Slope Reducing Alternative: Typical Section igure 3.2 Waler and Anchor System: Typical Section

15 igure 3.3 Waler and Anchor System Conceptual Sketch

16 Photo No. 5 TRM Installation on Steep Bank

17 4.0 RECOMMENDATIONS Based upon the assessments performed for this project, we respectfully recommend the following: Geomorphological (Ref. igure 3.8, Appendix A) 1. Provide shade tolerant plants along the north bank (left) from the Landa culverts to approximately 400 feet downstream. 2. Provide a grassed earthen diversion berm beginning near the north end of the golf clubhouse and extending for approximately 500 feet upstream along the top edge of the north bank. 3. Provide core roil toe protection for approximately 125 feet downstream of Landa culverts on both the left and right bank. 4. Remove invasive plants along the north (left) toe from the end of the core roils to the start of the bank stabilization. Replant native species along this toe. 5. Remove invasive plants along the right toe from the end of the core roils to the culverts at Golf Course Road. Replant native species along this toe. Riparian Vegetation (Ref. Appendix B) 1. Remove invasive plants from Herbs 1 through 13 as indicated on Attachment 1 of Riparian Vegetation Plan. 2. Replant native vegetation in Herbs 1 through 13 in accordance with Section 3.2 of Riparian Vegetation Plan, page 7 and 8. Bank Stabilization 1. Stabilize the existing bank on the north side of the river from the south end of the golf clubhouse to approximately 300 feet upstream. 2. Minimize excavation of existing slopes by clearing existing slopes to present grade. 3. Stabilize cleared slopes with TRM and provide three rows of anchored walers as indicated on igure Trim TRM to fit around all trees chosen to remain.

18 5.0 COST OPINIONS We have prepared preliminary opinions of probable construction cost (POPCC) for the recommendations set forth in Section 4.0. In addition, a POPCC has been prepared for bank stabilization for TRM reinforcement of slopes as shown in igure 3.1. Table 5.1 presents the POPPC for the TRM/anchor/waler bank stabilization applied to the existing slopes. Table 5.2 presents the POPCC for the TRM reinforcement on trimmed back slopes for cost comparison. Table 5.1 City of New Braunfels Old Channel of the Comal Landa Park Preliminary Opinion of Probable Construction Cost Bank Rehabilitation - Waler and Anchor Slope Dressing ESTIMATOR GSH CHECKED BY MLB ACCOUNT NO. NEB13133 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 1 Mobilization 1 LS $ 20,000 $ 20,000 2 Site preparation and maintenance 1 LS $ 10,000 $ 10,000 3 Permanent turf reinforcement mat 2,250 SY $ 8 $ 18, " ground anchors 150 EA $ 400 $ 60,000 5 Cast-in-place concrete walers 1,000 L $ 35 $ 35,000 6 Coir rolls 250 L $ 24 $ 6,000 7 Toe plantings 1,500 L $ 24 $ 36,000 8 Shade tolerant plants 1 LS $ 5,000 $ 5,000 9 Remove invasive plants and replant native vegetation 9,000 S $ 3 $ 27, Earthen diversion berm 1 LS $ 4,000 $ 4,000 SUBTOTAL: $ 221,000 PROJECT SUBTOTAL: $ 221,000 CONTINGENCY: 30% $ 66,000 PRELIMINARY OPINION O PROBABLE CONTRUCTION COST $ 287,000 THIS DOCUMENT IS RELEASED OR PURPOSE O INTERIM REVIEW. IT IS NOT TO BE USED OR CONSTRUCTION OR BIDDING PURPOSES.

19 Table 5.2 City of New Braunfels Old Channel of the Comal Landa Park Preliminary Opinion of Probable Construction Cost Bank Rehabilitation - Slope Reduction ESTIMATOR GSH CHECKED BY MLB ACCOUNT NO. NEB13133 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 1 Mobilization 1 LS $ 13,000 $ 13,000 2 Site preparation and maintenance 1 LS $ 6,000 $ 6,000 3 Permenant turf reinforcement mat 2,500 SY $ 8 $ 20,000 4 Excavation 1,200 CY $ 20 $ 24,000 5 Coir rolls 250 L $ 24 $ 6,000 6 Toe plantings 1,500 L $ 24 $ 36,000 7 Shade tolerant plants 1 LS $ 5,000 $ 5,000 8 Invasive plant removal 9,000 S $ 3 $ 27,000 9 Earthen diversion berm 1 LS $ 4,000 $ 4,000 SUBTOTAL: $ 141,000 PROJECT SUBTOTAL: $ 141,000 CONTINGENCY: 30% $ 42,000 PRELIMINARY OPINION O PROBABLE CONTRUCTION COST $ 183,000 THIS DOCUMENT IS RELEASED OR PURPOSE O INTERIM REVIEW. IT IS NOT TO BE USED OR CONSTRUCTION OR BIDDING PURPOSES.

20 6.0 CONCLUSION During our site assessments, our staff visited with local residents familiar with this study reach of the Comal River. Residents indicated that for more than 20 years they have not noted any significant changes in the banks in this area and that the trees on the edge of the north bank have successfully survived. In the outset of this project, we had hoped to build tree wells around selected trees. We have since concluded that the trees are taking changes in stride and developing a root system which keeps them well founded (Photo No. 6). The geomorphological assessment indicated that the majority of this reach can be stabilized with natural means of construction such as shade tolerant plants, core roils, and native plants to reinforce the toes. The riparian site assessment identified 13 different areas affected by invasive species and recommends their removal and replacement with native plants. The bank stabilization is recommended to be primarily of TRM. The TRM will reinforce the slopes against velocities far greater than any indicated in our analyses. The area in a large flood is more a backwater effect than a raging river. We have endeavored to select stabilization methods which will minimize excavation and similarly reduce the likelihood of encountering artifacts which could severely impact the project schedule and cost. The POPCC for the recommended stabilization, i.e. TRM with anchors and walers is $287,000 (Table 5.1). The POPCC for the stabilization without anchors and walers is $183,000 (Table 5.2). We recognize this is a significant difference. However, the lower cost alternative will encroach into the golf course and require the removal almost all of the trees on the upper bank. In our opinion the TRM with anchors and walers represents the better stabilization alternative. We are of the opinion that these recommended improvements will preserve and protect this reach of the Comal River for many years. It will require that a continual maintenance effort be extended to keep invasive plants from recurring and once again spoiling the fountain darter habitat.

21 Photo No. 6 Tree Roots Clinging to Steep Bank

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Assessment. Assessment

Assessment. Assessment 2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

Long Valley Meadow Restoration Project

Long Valley Meadow Restoration Project Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

Flood and Stream Restoration

Flood and Stream Restoration 2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011 APPENDIX A REACH DECRIPTIONS Basin 615, South Fork of Quantico Creek - Project Reach Descriptions Reach Name: 615-A Coordinates (NAD 83, Virginia State Plane North): 11796510.57, 6893938.95 to 11801555.79,

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Best Management Practices for Coldwater Fisheries Enhancement and Restoration Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

Appendix F Channel Grade Control Structures

Appendix F Channel Grade Control Structures Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water. Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

Garner State Park Pavilion Preservation Study

Garner State Park Pavilion Preservation Study D4 Garner State Park Pavilion Preservation Study Presented by Andy Johnston, PE, CPESC, CFM Halff Associates, Inc. Austin Mark Winford, RA, LEED AP Texas Parks and Wildlife Department, Austin Location

More information

Degradation Concerns related to Bridge Structures in Alberta

Degradation Concerns related to Bridge Structures in Alberta Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to

More information

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized? Jerald S. Fifield, Ph.D. CISEC HydroDynamics Incorporated Parker, CO 303-841-0377 Aren t they the same thing? What Is Sediment? Soil particles deposited or suspended in water or air The process of depositing

More information

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Overview of fluvial and geotechnical processes for TMDL assessment

Overview of fluvial and geotechnical processes for TMDL assessment Overview of fluvial and geotechnical processes for TMDL assessment Christian F Lenhart, Assistant Prof, MSU Research Assoc., U of M Biosystems Engineering Fluvial processes in a glaciated landscape Martin

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

Rosgen Classification Unnamed Creek South of Dunka Road

Rosgen Classification Unnamed Creek South of Dunka Road Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA Vegetation effects on river hydraulics Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA jjdevries@ford-consulting.com SAC05 D2P31 RM 99.0L VIEW UPSTREAM AT UPSTREAM END DWR

More information

Fluvial Driven Alluvial Fans

Fluvial Driven Alluvial Fans Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics

More information

Do you think sediment transport is a concern?

Do you think sediment transport is a concern? STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,

More information

Appendix G. Riverbank Stabilization Techniques

Appendix G. Riverbank Stabilization Techniques Appendix G Riverbank Stabilization Techniques APPENDIX G RIVERBANK STABILIZATION TECHNIQUES Under Remedial Alternatives Housatonic River Rest of River October 12, 2010 Prepared for: General Electric Pittsfield,

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders .7 Reconnecting remnant meanders River Little Ouse Location - Thetford, Norfolk TL87082 Date of construction - 994 Length 900m Cost 5,000 Maximum extent of flooding during winter floods BTO boundary Small

More information

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill 1 When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill Robin McKillop 1, Dan McParland 1 & Cassie Scobie 2 TRIECA conference March 22-23, 2017 1 Palmer Environmental

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Habitat Assessment. Peggy Compton UW-Extension Water Action Volunteers Program Coordinator

Habitat Assessment. Peggy Compton UW-Extension Water Action Volunteers Program Coordinator Habitat Assessment Peggy Compton UW-Extension Water Action Volunteers Program Coordinator Adapted from a presentation by Jean Unmuth, Water Quality Biologist, WI DNR dnr.wi.gov www.uwex.edu erc.cals.wisc.edu

More information

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy. 1 2 Function... Sevier River... to successfully carry sediment and water from the watershed....dissipate energy. 3 ALLUVIAL FEATURES 4 CHANNEL DIMENSION The purpose of a stream is to carry water and sediment

More information

Dolores River Watershed Study

Dolores River Watershed Study CHAPTER 4: RIVER AND FLOODPLAIN ISSUES The Dolores River falls into a category of streams in Colorado that share some unique characteristics. Like some other mountain streams in the state, it has a steep

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study 2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

USE OF GEOPHYSICAL SURVEYS FOR FILL CHARACTERIZATION AND QUANTITY ESTIMATION AT BROWNFIELD SITES A CASE HISTORY. Abstract

USE OF GEOPHYSICAL SURVEYS FOR FILL CHARACTERIZATION AND QUANTITY ESTIMATION AT BROWNFIELD SITES A CASE HISTORY. Abstract USE OF GEOPHYSICAL SURVEYS FOR FILL CHARACTERIZATION AND QUANTITY ESTIMATION AT BROWNFIELD SITES A CASE HISTORY John A. Mundell, Mundell & Associates, Inc., Indianapolis, IN Gregory B. Byer, Mundell &

More information

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

C. STUDENT FIELD DATA SHEETS

C. STUDENT FIELD DATA SHEETS C. STUDENT FIELD DATA SHEETS Student Name Date Time Stream Location Parameter to find Your Group s Results Units trial trial average Transparency cm Water Temperature Air Temperature Weather N sunny N

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

Vetiver System for Stream Bank Stabilisation. Paul Truong

Vetiver System for Stream Bank Stabilisation. Paul Truong Vetiver System for Stream Bank Stabilisation (With special references to the river and canal bank stabilisation in Australia and Vietnam) Paul Truong Director, The Vetiver Network International, Veticon

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

6.11 Naas River Management Unit

6.11 Naas River Management Unit 6.11 Naas River Management Unit 6.11.1 Site 41 Issue: Bed and bank erosion Location: E 0685848 N 6058358 Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing

More information

Upper Mississippi River Basin Environmental Management Program Workshop

Upper Mississippi River Basin Environmental Management Program Workshop Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering

More information

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer ONE ROCK DAM ORD A low grade control structure built with a single layer of rock on the bed of the channel. ORDs stabilize the bed of the channel by slowing the flow of water, increasing roughness, recruiting

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island Re-inventing Government Creek -- Lessons from a successful salmon stream and estuary relocation on Gravina Island Jon Houghton, Ph.D. and Derek Ormerod, M.S., P.E. - Pentec Environmental/Hart Crowser,

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

Hydraulics of bendway weirs

Hydraulics of bendway weirs River Basin Management IV 389 Hydraulics of bendway weirs C. Thornton 1, S. Abt 1, D. Baird 2 & R. Padilla 3 1 Colorado State University, Fort Collins, CO, USA 2 U.S. Bureau of Reclamation, Denver, CO,

More information

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted Version: 8/25/14 Meadow Name Date : / / MM DD YYYY GPS Location:. N. W GPS Datum (e.g., WGS 84, NAD 27) Elevation (ft) Slope ( ) County Watershed (HUC8) Landowner USGS Quad Name Observers: 7.5 or 15 (circle

More information

Landscape Function Analysis

Landscape Function Analysis Landscape Function Analysis Ephemeral Drainage-line Assessments (EDA): Indicators of Stability Ephemeral drainage-lines are present in almost all landscapes such as those observed on a hillslope in a watershed

More information

PolyMet NorthMet Project

PolyMet NorthMet Project RS 26 Draft-01 December 8, 2005 RS26 Partridge River Level 1 Rosgen Geomorphic Survey Rosgen Classification Partridge River from Headwaters to Colby Lake Prepared for PolyMet NorthMet Project December

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

Case Study 2: Twenty-mile Creek Rock Fords

Case Study 2: Twenty-mile Creek Rock Fords Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek

More information

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO Prepared For Trout Unlimited 300 North Main Street, Hailey, Idaho, 83333 Prepared By P. O. Box 8578, 140 E. Broadway, Suite 23,

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 Prepared by: Northern Geotechnical Engineering, Inc. d.b.a. Terra

More information

AN ARCHAEOLOGICAL SURVEY FOR THE DCP MIDSTREAM THREE RIVERS PLANT TO CGP 51 PROJECT IN LIVE OAK COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE DCP MIDSTREAM THREE RIVERS PLANT TO CGP 51 PROJECT IN LIVE OAK COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE DCP MIDSTREAM THREE RIVERS PLANT TO CGP 51 PROJECT IN LIVE OAK COUNTY, TEXAS By William E. Moore Brazos Valley Research Associates Contract Report Number 251 2011 AN ARCHAEOLOGICAL

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Rock Sizing for Bank Stabilisation

Rock Sizing for Bank Stabilisation Rock Sizing for Bank Stabilisation WATERWAY MANAGEMENT PRACTICES Photo 1 Lower bank rock stabilisation with voids filled with small rocks Photo 2 Rock stabilisation with plants introduced at time of rock

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

Woodstock, Route 26 Stream Relocation Project

Woodstock, Route 26 Stream Relocation Project MAINE DEPARTMENT OF TRANSPORTATION 2006 POST - CONSTRUCTION MONITORING REPORT: Woodstock, Route 26 Stream Relocation Project Year 1 of 5 Compensation for the Woodstock, Route 26 Highway Reconstruction

More information

Chapter 3 Erosion in the Las Vegas Wash

Chapter 3 Erosion in the Las Vegas Wash Chapter 3 Erosion in the Las Vegas Wash Introduction As described in Chapter 1, the Las Vegas Wash (Wash) has experienced considerable change as a result of development of the Las Vegas Valley (Valley).

More information

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 % Stream Stability Assessment & BEHI Surveys Joe Rathbun MDEQ Water Resources Division rathbunj@michigan.gov 517--373 517 373--8868 Stability Stream can transport its water and sediment inputs without changing

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information