1 May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number: 4-00-R-Rev0 Distribution: copies - Urban Systems Ltd. copies - Golder Associates Ltd.

2 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION Table of Contents.0 INTRODUCTION....0 SCOPE OF WORK SITE DESCRIPTION AND BACKGROUND SUB-SURFACE INVESTIGATION Laboratory Testing SUBSURFACE CONDITIONS Asphalt Pavement Soils Groundwater....0 COMMENTS AND RECOMMENDATIONS CLOSURE... 6 TABLES (IN TEXT) Table : Observed Asphalt Pavement Thickness... 3 TABLES (ATTACHED) Table : Douglas Street Bus Lane Geotechnical Profile FIGURES Figure : Key Plan Figure : Borehole Locations APPENDICES APPENDIX A Important Information and Limitations of This Report APPENDIX B Record of Boreholes APPENDIX C Laboratory Test Results May, 0 Report No R-Rev0 i

3 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION.0 INTRODUCTION Golder Associates Ltd. (Golder) is pleased to provide Urban Systems Ltd.(USL) with this report documenting the factual results and recommendations of a geotechnical investigation carried out for a proposed bus lane alongside the existing northbound lane of Douglas Street, from Tolmie Avenue to the Switch Bridge of the Galloping Goose Trail in Victoria BC (the Site). The investigation was carried out according to the scope of work in our proposal dated March 3, 0. This report addresses the geotechnical investigation, a separate report will be provided for the Environmental Site Assessment requirements of the project. If required, additional bio-environmental services such as archaeological services can be provided by Golder. This report shall be read in conjunction with Important Information and Limitations of This Report which is included following the text as Appendix A. The reader s attention is specifically drawn to this information for the proper use and interpretation of this report..0 SCOPE OF WORK From the information provided via , Golder understands that the BC Ministry of Transportation and Infrastructure (MoTI) is proposing to widen Douglas Street between Alpha Street and Harriet Road to develop a northbound bus lane. The section of interest is approximately 00 m in length (See Figure - Location Plan). USL retained Golder to carry out the following tasks: investigate the ground conditions adjacent to the east side of Douglas Street; confirm the thickness of the existing pavement structure of Douglas Street; and prepare a summary report and provide pavement design recommendations for the proposed bus lane. 3.0 SITE DESCRIPTION AND BACKGROUND Douglas Street is a four lane urban street; it is classified as Highway Trans Canada Highway. The section that is the topic of this report has eight intersections and cross streets. Average annual daily traffic is approximately 0,000 vehicles in each direction. Published geological mapping of the site indicates that the ground conditions consist of thick Victoria Clay comprising to m of brown facies clay overlying greater than 3 m of soft grey clay. Between Cloverdale Street and Audley Street and between Saanich Road and Culduthel Road, the ground has been mapped as shallow brown Victoria Clay (less than m thick) overlying bedrock. Monahan,P.A. and Levson,V.M., Quaternary Geological Map of Greater Victoria, Geoscience Map 000-, Geological Survey Branch, Ministry of Energy and Mines, 000- May, 0 Report No R-Rev0

4 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION Visually, the condition of the existing pavement appears to be good with minor cracking and minor distortion. However a detailed pavement condition rating was not performed. The location of the proposed bus lane is primarily over the existing sidewalk, bus pullouts or right turn lanes. 4.0 SUB-SURFACE INVESTIGATION The geotechnical subsurface investigation along Douglas St. was carried out on April 0 and 3, 0. Eight boreholes were advanced through the road surface and subsurface using a hollow stem truck mounted auger drillrig, supplied and operated by Drillwell Ltd. based out of Duncan BC. The approximate borehole locations are shown in Figure : Borehole Location Plan. The borehole investigation was conducted to assess the asphalt and subsurface soil conditions and obtain disturbed soil samples. The boreholes were advanced to between.83 and 3.0 m below ground surface (bgs). The Record of Borehole summary logs are provided in Appendix B. The drilling investigations were conducted under the full-time supervision of a member of Golder s geotechnical staff, who visually examined and logged the subsurface conditions encountered and collected soil samples for review and laboratory testing. The subsurface soil stratigraphy was visually inspected and logged based cuttings from the auger flights and split spoon samples collected during Standard Penetration Testing (SPT). SPT methods were also used to assess in-situ relative density and consistency of the soils. SPT testing was conducted using a 63. kg automatic hammer dropped 760 mm. A 0 mm wide open sampler was driven 600 mm (4 in) and the SPT blow N value was determined based on the blow count between 0 and 40 mm of driving. Disturbed samples collected from the sampler were transported to Golder s geotechnical testing laboratory in Victoria B.C. for laboratory index testing. Upon completion the boreholes were backfilled with soil cuttings and nominally compacted with the available equipment, the asphalt surface was patched using a cold-patch asphalt mix. 4. Laboratory Testing Samples from the boreholes were submitted to Golder s materials testing laboratory in Victoria for index testing. Based on the soil conditions encountered during the investigation the following testing was carried out: 8 - Water contents (ASTM D499); 3 - Atterberg Limits (ASTM D438-0); and 3 - Grain Size Analysis (ASTM D4-63). Water content and Atterberg limits and grain size distributions are provided on the Record of Borehole logs provided in Appendix B. Detailed results of laboratory testing are provided in Appendix C. May, 0 Report No R-Rev0

5 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION 4. SUBSURFACE CONDITIONS The encountered subsurface conditions provide information on the existing pavement structure along the proposed bus lane. The existing pavement structure was observed to vary between boreholes and has been grouped and discussed based on location. For ease of discussion the subsurface conditions encountered under the northbound lane of Douglas Street have been grouped and interpreted as the following materials, in order of increasing depth: Asphalt pavement; overlying base course: sand and gravel; overlying sub grade: sandy silty clay; overlying cobbles and coarse gravel; overlying silty clay or sand and gravel; overlying bedrock. General descriptions of the materials encountered based on locations is provided in the sections below. Detailed descriptions and borehole logs are provided in Appendix B Record of Boreholes. 4.. Asphalt Pavement Asphalt Pavement was encountered at surface at all eight borehole locations. The asphalt pavement ranged in thickness from 0 to 300 mm but was typically 00 mm in thickness. The observed asphalt pavement thickness is provided in the table below: Table : Observed Asphalt Pavement Thickness Borehole General Location Observed Asphalt Thickness BH-0 North of Tolmie Avenue 0 mm BH-0 North of Cloverdale Avenue 00 mm BH-03 North of Audley Street 00 mm BH-04 South of Saanich Road 0 mm BH-0 North of Saanich Road 0 mm BH-06 Opposite Culduthel Road 00 mm BH-07 South of Carey Road 00 mm BH-08 North of Switch Bridge 300 mm May, 0 Report No R-Rev0 3

6 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION 4.. Soils Alpha Street to Audley Street Boreholes BH-0 and BH-0 were located between Alpha Street and Audley Street. In this section the asphalt pavement was underlain by approximately 0. m of sand and gravel fill (base course). Particle size distributions of a sample collected from this material had the following gradation: 6% gravel, 30% sand and % fines. The base course was underlain by inferred native material comprised of to.3 m thickness of firm to stiff silty clay overlying sand and gravel or silty sand trace gravel encountered to the maximum depth of investigation, 3.0 m bgs. A strong hydrocarbon odour was noted at to. m depth at BH-0 and a slight hydrocarbon odour was noted in the silty clay unit in BH-0. Audley Street to Saanich Road Boreholes BH-03 and BH-04 were located between Audley Street and Saanich Road. In this section the asphalt pavement was underlain by 0. to 0.3 m of sand and gravel fill (base course). Particle size distributions of a sample collected from this material had the following gradations: 67.0% gravel, 3.8% sand and 9.% fines. The base course was underlain by firm to stiff sandy silty clay ranging from 0. to 0.6 m in thickness. Underlying the clayey silty sand, cobbles and coarse gravel, having a thickness ranging between 0. to. m was encountered. These materials were underlain by firm silty clay or hard clayey silty sand, inferred to be in situ native material. These soils were encountered to the maximum depth of investigation, 3.0 m bgs. Saanich Road to Harriet Road Boreholes BH-0, BH-06, BH-07 and BH-08 were located between Saanich Road and Harriet Road. In this section the asphalt pavement was underlain by sand and gravel fill (base course) ranging in thickness from 0. to 0.8 m. Particle size distributions of a sample collected from this material had the following gradations: 49% gravel, 46% sand and % fines. In boreholes BH-0, BH-07 and BH-08 the base course was underlain by silty clay, sandy clay and cobbles which was in turn underlain by clay or sand. These soils are inferred to be in situ native material and were encountered to the maximum depth of investigation, 3.0 m bgs. In borehole BH-06 underlying the sand and gravel base course was a lower layer of asphalt pavement. The lower asphalt layer was 0.0 m thick. The asphalt was underlain by sand and gravel having a thickness of approximately 0.6 m. It is inferred that this layer is fill and is underlain by sandy silty clay to a depth of.7 m bgs. At.7 m bgs bedrock was reached and the borehole was terminated (this was inferred by the drill refusal). May, 0 Report No R-Rev0 4

7 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION 4.3 Groundwater Groundwater was not encountered during the subsurface investigation. However, based on Golder s experience in similar ground conditions in the Victoria area, it is inferred that groundwater levels could rise to near the top of the clay, especially after periods of sustained wet weather (i.e., winter months), given the poor drainage properties of these soils..0 COMMENTS AND RECOMMENDATIONS In summary, the existing roadway structure generally consists of asphalt pavement varying in thickness from 0 to 300 mm but generally 00 mm, 00 mm of base course/ sub-base granular aggregate, overlying a subgrade that is typically firm to stiff silty clay. This structure appears to be providing an acceptable roadway structure for the present traffic conditions. The anticipated traffic loading for the proposed bus lane is not known at this time. When details of the bus traffic volumes are available a specific roadway design can be carried out. In the interim, for preliminary design, the MoTI typical pavement design for high volume roads is recommended. This interim structure consists of: 00 mm of asphalt pavement, 300 mm of crushed base course (0 mm of mm maximum particle size over 0 mm of 7 mm maximum particle size) and 300 mm of select granular sub-base. No unusual or problematic ground conditions for construction were encountered. Existing sidewalk materials and surface organic soils must be removed prior to placement of the new roadway structure. MoTI Standard Specifications for Highway Construction must be followed for all aspects of construction. May, 0 Report No R-Rev0

8

9 //0 Table : Douglas Street Bus Lane Geotechnical Profile 4 Location Depth m bgs North of Switch Bridge BH-08 Unit Thickness South of Carey Rd. BH-07 Opposite Culduthel Rd. Unit BH-06 Thickness 0. asphalt pavement sand and gravel North of Saanich Rd. Unit BH-0 Thickness 0. asphalt pavement gravelly sand Unit Thickness South of Saanich Rd. BH-04 North of Audley St. Unit BH-03 Thickness 0.0 asphalt pavement sand and gravel Unit Thickness North of Cloverdale Av. BH-0 North of Tolmie Av. Unit BH-0 Thickness 0. asphalt pavement sand and gravel 0. asphalt pavement 0.3 asphalt pavement 0. asphalt pavement 0. asphalt pavement 0. sand and gravel sand and sand and gravel gravel sand and 0.6 firm sandy 0.46 gravel silty clay 0. stiff sandy 0.6 silty clay 0.6 firm silty clay firm silty clay 0.46 firm silty clay asphalt 0.0 cobbles and 0.46 firm silty clay.98 pavement coarse gravel 0.9 gravelly sand coarse gravel 0.6 firm sandy silty 0.6 stiff firm clay.9 and cobbles clay Unit Thickness 0... stiff silty clay. cobbles and. to clay coarse gravel.3 firm sandy.37.4 silty clay. very stiff sandy 0.38 silty clay.6 firm silty clay 0.94 loose silty sand bedrock.0 EOH: very stiff clay firm silty clay 0.6 to clay.6.7 stiff sandy 0.46 stiff silty clay 0.46 hard clayey 0.46 clayey silt to silty sand.8 clayey silty sand loose sand and gravel 3.0 stiff silty sand 0. EOH: 3.0 EOH: 3.0 EOH: 3.0 EOH: 3.0 EOH: 3.0 EOH: 3.0 EOH: 3.0 \\golder.gds\gal\burnaby\final\0\3 Proj\4 USL_Douglas St Bus Lane_Victoria\4-00-R-Rev0-MAY_\ Table Summary of stratigraphy dl.xlsx [Sheet] Golder Associates Page of

10 INSET MAP - NOT TO SCALE Nanaimo VANCOUVER ISLAND Duncan Sidney Port Renfrew Sooke Victoria ENLARGED AREA IF THIS MEASUREMENT ES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A REFERENCE :0,000,000,000 METRES CLIENT PROJECT URBAN SYSTEMS LTD. UGLAS STREET PROPOSED BUS LANE VICTORIA, BC CONSULTANT YYYY-MM-DD DESIGNED D. LISTER PREPARED A. WOOD REVIEWED D. LISTER APPROVED M. KELLY mm 0 DEPARTMENT OF NATURAL RESOURCES. ALL RIGHTS RESERVED. PROJECTION: TRANSVERSE MERCATOR, DATUM: NAD83, COORDINATE SYSTEM: UTM ZONE 0. TITLE KEY PLAN PROJECT NO. PHASE REV FIGURE 0 Path: \\golder.gds\gal\victoria\cad-gis\client\urban_systems\victoria_douglas_street\99_projects\4_douglas_st_bus_lane\0_production\ File Name: dwg PROJECT LOCATION

11 Path: \\golder.gds\gal\victoria\cad-gis\client\urban_systems\victoria_douglas_street\99_projects\4_douglas_st_bus_lane\0_production\ File Name: dwg LEGEND BOREHOLE LOCATION REFERENCE IMAGE OBTAINED FROM GOOGLE EARTH PRO. USED UNDER LICENSE. IMAGERY DATE: NOVEMBER 9, 04. GOOGLE EARTH IMAGE IS NOT TO SCALE. CLIENT URBAN SYSTEMS LTD. CONSULTANT YYYY-MM-DD DESIGNED PREPARED REVIEWED APPROVED D. LISTER J. FARAH D. LISTER M. KELLY PROJECT UGLAS STREET PROPOSED BUS LANE VICTORIA, BC TITLE BOREHOLE LOCATION PLAN PROJECT NO. 4 0 :3,000 (APPROX.) PHASE METRES REV. 0 FIGURE IF THIS MEASUREMENT ES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B 0 mm

12 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION APPENDIX A Important Information and Limitations of This Report May, 0 Report No R-Rev0

13 LIMITATIONS AND USE OF THIS REPORT LIMITATIONS AND USE OF THIS REPORT Standard of Care: Golder Associates Ltd. (Golder) has prepared this report in a manner consistent with that level of care and skill ordinarily exercised by members of the engineering and science professions currently practicing under similar conditions in the jurisdiction in which the services are provided, subject to the time limits and physical constraints applicable to this report. No other warranty, expressed or implied is made. Basis and Use of the Report: This report has been prepared for the specific site, design objective, development and purpose described to Golder by the Client. The factual data, interpretations and recommendations pertain to a specific project as described in this report and are not applicable to any other project or site location. Any change of site conditions, purpose, development plans or if the project is not initiated within eighteen months of the date of the report may alter the validity of the report. Golder can not be responsible for use of this report, or portions thereof, unless Golder is requested to review and, if necessary, revise the report. The information, recommendations and opinions expressed in this report are for the sole benefit of the Client. No other party may use or rely on this report or any portion thereof without Golder s express written consent. If the report was prepared to be included for a specific permit application process, then upon the reasonable request of the client, Golder may authorize in writing the use of this report by the regulatory agency as an Approved User for the specific and identified purpose of the applicable permit review process. Any other use of this report by others is prohibited and is without responsibility to Golder. The report, all plans, data, drawings and other documents as well as all electronic media prepared by Golder are considered its professional work product and shall remain the copyright property of Golder, who authorizes only the Client and Approved Users to make copies of the report, but only in such quantities as are reasonably necessary for the use of the report by those parties. The Client and Approved Users may not give, lend, sell, or otherwise make available the report or any portion thereof to any other party without the express written permission of Golder. The Client acknowledges that electronic media is susceptible to unauthorized modification, deterioration and incompatibility and therefore the Client can not rely upon the electronic media versions of Golder s report or other work products. The report is of a summary nature and is not intended to stand alone without reference to the instructions given to Golder by the Client, communications between Golder and the Client, and to any other reports prepared by Golder for the Client relative to the specific site described in the report. In order to properly understand the suggestions, recommendations and opinions expressed in this report, reference must be made to the whole of the report. Golder can not be responsible for use of portions of the report without reference to the entire report. Unless otherwise stated, the suggestions, recommendations and opinions given in this report are intended only for the guidance of the Client in the design of the specific project. The extent and detail of investigations, including the number of test holes, necessary to determine all of the relevant conditions which may affect construction costs would normally be greater than has been carried out for design purposes. Contractors bidding on, or undertaking the work, should rely on their own investigations, as well as their own interpretations of the factual data presented in the report, as to how subsurface conditions may affect their work, including but not limited to proposed construction techniques, schedule, safety and equipment capabilities. /3

14 LIMITATIONS AND USE OF THIS REPORT LIMITATIONS AND USE OF THIS REPORT (CON T) Soil, Rock and Groundwater Conditions: Classification and identification of soils, rocks, and geologic units have been based on commonly accepted methods employed in the practice of geotechnical engineering and related disciplines. Classification and identification of the type and condition of these materials or units involves judgment, and boundaries between different soil, rock or geologic types or units may be transitional rather than abrupt. Accordingly, Golder does not warrant or guarantee the exactness of the descriptions. Special risks occur whenever engineering or related disciplines are applied to identify subsurface conditions and even a comprehensive investigation, sampling and testing program may fail to detect all or certain subsurface conditions. The environmental, geologic, geotechnical, geochemical and hydrogeologic conditions that Golder interprets to exist between and beyond sampling points may differ from those that actually exist. In addition to soil variability, fill of variable physical and chemical composition can be present over portions of the site or on adjacent properties. The professional services retained for this project include only the geotechnical aspects of the subsurface conditions at the site, unless otherwise specifically stated and identified in the report. The presence or implication(s) of possible surface and/or subsurface contamination resulting from previous activities or uses of the site and/or resulting from the introduction onto the site of materials from off-site sources are outside the terms of reference for this project and have not been investigated or addressed. Soil and groundwater conditions shown in the factual data and described in the report are the observed conditions at the time of their determination or measurement. Unless otherwise noted, those conditions form the basis of the recommendations in the report. Groundwater conditions may vary between and beyond reported locations and can be affected by annual, seasonal and meteorological conditions. The condition of the soil, rock and groundwater may be significantly altered by construction activities (traffic, excavation, groundwater level lowering, pile driving, blasting, etc.) on the site or on adjacent sites. Excavation may expose the soils to changes due to wetting, drying or frost. Unless otherwise indicated the soil must be protected from these changes during construction. Sample Disposal: Golder will dispose of all uncontaminated soil and/or rock samples 90 days following issue of this report or, upon written request of the Client, will store uncontaminated samples and materials at the Client s expense. In the event that actual contaminated soils, fills or groundwater are encountered or are inferred to be present, all contaminated samples shall remain the property and responsibility of the Client for proper disposal. Follow-Up and Construction Services: All details of the design were not known at the time of submission of Golder s report. Golder should be retained to review the final design, project plans and documents prior to construction, to confirm that they are consistent with the intent of Golder s report. During construction, Golder should be retained to perform sufficient and timely observations of encountered conditions to confirm and document that the subsurface conditions do not materially differ from those interpreted conditions considered in the preparation of Golder s report and to confirm and document that construction activities do not adversely affect the suggestions, recommendations and opinions contained in Golder s report. Adequate field review, observation and testing during construction are necessary for Golder to be able to provide letters of assurance, in accordance with the requirements of many regulatory authorities. In cases where this recommendation is not followed, Golder s responsibility is limited to interpreting accurately the information encountered at the borehole locations, at the time of their initial determination or measurement during the preparation of the Report. /3

15 LIMITATIONS AND USE OF THIS REPORT LIMITATIONS AND USE OF THIS REPORT (CON T) Changed Conditions and Drainage: Where conditions encountered at the site differ significantly from those anticipated in this report, either due to natural variability of subsurface conditions or construction activities, it is a condition of this report that Golder be notified of any changes and be provided with an opportunity to review or revise the recommendations within this report. Recognition of changed soil and rock conditions requires experience and it is recommended that Golder be employed to visit the site with sufficient frequency to detect if conditions have changed significantly. Drainage of subsurface water is commonly required either for temporary or permanent installations for the project. Improper design or construction of drainage or dewatering can have serious consequences. Golder takes no responsibility for the effects of drainage unless specifically involved in the detailed design and construction monitoring of the system. 3/3

16 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION APPENDIX B Record of Boreholes May, 0 Report No R-Rev0

17 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~36609 E: ~4749 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION FILL - (SP/GP) SAND and GRAVEL, trace to some fines; grey-brown; non-cohesive, moist, compact. STRATA PLOT ELEV. DEPTH 0.00 RECORD OF BOREHOLE: BH-0 NUMBER 0. GS DRILLING DATE: April 0, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s (CI) SILTY CLAY, some sand; brown; cohesive, w>pl, firm (CL) SILTY CLAY, trace sand; grey-brown; cohesive, w>pl, firm Truck Mounted Auger Drill WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION 73 4 Hollow Stem Auger - black soil with strong hydrocarbon odour from.0 to. m depth (SP/GP) SAND and GRAVEL, some fines; grey, strong hydrocarbon odour; non-cohesive, wet, loose End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

18 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~36637 E: ~47376 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION FILL - (GP) Sandy GRAVEL, some fines; grey-brown; non-cohesive, moist, compact. STRATA PLOT ELEV. DEPTH RECORD OF BOREHOLE: BH-0 NUMBER GS DRILLING DATE: April 0, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m (CI-CH) SILTY CLAY to CLAY, trace sand; brown; cohesive, w>pl, firm (CH) CLAY; brown, slight hydrocarbon odour; cohesive, w>pl, firm Truck Mounted Auger Drill SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION 9 Hollow Stem Auger (SC/SM) SILTY SAND, trace gravel; brown-grey; cohesive, w>pl, stiff. End of Borehole National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

19 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~3667 E: ~4730 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION FILL - (SP/GP) SAND and GRAVEL, some fines; brown-grey; non-cohesive, moist, compact. STRATA PLOT ELEV. DEPTH RECORD OF BOREHOLE: BH-03 NUMBER GS DRILLING DATE: April 0, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s (CL) Sandy SILTY CLAY, trace to some gravel; brown-grey; cohesive, w>pl, stiff Inferred layer of COBBLES and GRAVEL, coarse Truck Mounted Auger Drill WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION 0 33 Hollow Stem Auger (SM) CLAYEY SILTY SAND, some gravel; grey, TILL-LIKE; cohesive, w>pl, hard End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

20 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~36664 E: ~4766 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD SOIL PROFILE DESCRIPTION Ground Surface ASPHALT, pavement. FILL - (SP/GP) SAND and GRAVEL, trace to some fines; brown; non-cohesive, moist, compact. (CI-CL) sandy SILTY CLAY; grey-brown; cohesive, w~pl, firm. STRATA PLOT ELEV. DEPTH GS 0.30 RECORD OF BOREHOLE: BH-04 NUMBER 0 4 DRILLING DATE: April 3, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION Inferred COBBLES and coarse GRAVEL 0.76 Truck Mounted Auger Drill Hollow Stem Auger (CI-CL) SILTY CLAY, trace fine sand; grey; cohesive, w>pl, firm (CL) SILTY CLAY, trace sand; grey-brown; cohesive, w>pl, stiff to very stiff End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

21 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~3667 E: ~4730 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION STRATA PLOT ELEV. DEPTH 0.00 RECORD OF BOREHOLE: BH-0 NUMBER DRILLING DATE: April 3, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m FILL - (SP) gravelly SAND, some fines; brown; non-cohesive, moist, compact. 0. GS (CL-CI) SILTY CLAY, trace sand; brown; cohesive, w>pl, firm to stiff. 0.6 (CI-CH) SILTY CLAY to CLAY, trace sand; brown; cohesive, w>pl, stiff to very stiff Truck Mounted Auger Drill SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION 83 Hollow Stem Auger (CH) CLAY, trace fine sand; brown; cohesive; w>pl, very stiff End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

22 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~36683 E: ~4796 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION FILL - (SP/GP) SAND and GRAVEL, trace fines; brown; non-cohesive, moist, dense. STRATA PLOT ELEV. DEPTH 0.00 RECORD OF BOREHOLE: BH-06 NUMBER 0.0 GS DRILLING DATE: April 3, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION 3 7 Truck Mounted Auger Drill Hollow Stem Auger ASPHALT, pavement. (SP) gravelly SAND, some fines; brown; non-cohesive, moist, compact (CL) sandy SILTY CLAY, trace gravel; brown-grey, TILL; cohesive, w~pl, very stiff..37 Inferred BEDROCK. End of Borehole > National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

23 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~ E: ~474 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION FILL - (GP) SAND and GRAVEL, trace to some fines; grey-brown; non-cohesive, moist, compact to dense. STRATA PLOT ELEV. DEPTH 0.00 RECORD OF BOREHOLE: BH-07 NUMBER 0.0 GS DRILLING DATE: April 3, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION (CL) sandy SILTY CLAY; grey-brown, with pockets of organics; cohesive, w>pl, firm Truck Mounted Auger Drill Hollow Stem Auger (SM) SILTY SAND; with pockets of organics; non-cohesive, moist, loose (ML-SM) sandy CLAYEY SILT to CLAYEY SILTY SAND; grey; cohesive, w>pl, stiff End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

24 PROJECT No.: 4 / 000 CLIENT: Urban Systems Ltd. PROJECT: Douglas Street - Geotechnical investigation LOCATION: Victoria, BC N: ~36698 E: ~47040 NAD83 UTM Zone: 0 Note: Northing and Easting Coordinates have been determined by GPS in the field and are approximate only. DEPTH SCALE METRES 0 DRILLING RIG DRILLING METHOD Ground Surface ASPHALT, pavement. SOIL PROFILE DESCRIPTION STRATA PLOT ELEV. DEPTH 0.00 RECORD OF BOREHOLE: BH-08 NUMBER DRILLING DATE: April 3, 0 INCLINATION: -90 SAMPLES DYNAMIC PENETRATION RESISTANCE, BLOWS/0.3m TYPE RECOVERY % BLOWS/0.3m SHEAR STRENGTH nat V. Q - Cu, kpa rem V. U - Pocket Pen HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl NP - Non-Plastic SHEET OF DATUM: Ground Surface ADDITIONAL LAB. TESTING PIEZOMETER, STANDPIPE OR THERMISTOR INSTALLATION FILL - (SP/GP) SAND and GRAVEL, some fines; grey; non-cohesive, moist, dense GS 3 63 Inferred coarse GRAVEL and COBBLES Truck Mounted Auger Drill Hollow Stem Auger (CI) SILTY CLAY, trace sand; brown; w>pl, firm (CI-CH) SILTY CLAY to CLAY, trace fine sand; grey; w>pl, firm End of Borehole. 3.0 National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:BC_BOREHOLE (AUTO) jfarah // 4 DEPTH SCALE : SOIL CLASSIFICATION SYSTEM: GACS LOGGED: J. Plican CHECKED: D. Lister

25 UGLAS STREET BUS LANE GEOTECHNICAL INVESTIGATION APPENDIX C Laboratory Test Results May, 0 Report No R-Rev0

26 Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Percent Finer by Mass Size of Opening (inches) / 3/4 3/ SUMMARY OF PARTICLE SIZE DISTRIBUTION U.S. Sieve Size (meshes / inch) Hydrometer USCS Particle Size Scale Legend Depth Interval : 0. to 0.30 Sieve Size (USS) (mm) " 3/4" /" 3/8" #4 US MESH #0 US MESH #0 US MESH #40 US MESH #60 US MESH #00 US MESH #00 US MESH Reference(s) ASTM C36 Sample Location: BH-0 Sample No.: Lab Schedule No.: Particle Size (mm) Percent Passing Particle Size (mm) BOULDER COBBLE Coarse GRAVEL Fine Coarse Medium SAND Fine FINES (Silt, Clay) National IM Server:GINT_GAL_NATIONALIM Unique Project ID:799 Output Form:_LAB_PARTICLE SIZE (W/ GRADATIONS) dmackie 4// JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

27 Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Percent Finer by Mass Size of Opening (inches) / 3/4 3/ SUMMARY OF PARTICLE SIZE DISTRIBUTION U.S. Sieve Size (meshes / inch) Hydrometer USCS Particle Size Scale Legend Depth Interval : 0.9 to. Sieve Size (USS) (mm) /" " 3/4" /" 3/8" #4 US MESH #0 US MESH #0 US MESH #40 US MESH #60 US MESH #00 US MESH #00 US MESH Reference(s) ASTM C36 Sample Location: BH-03 Sample No.: 3 Lab Schedule No.: Particle Size (mm) Percent Passing Particle Size (mm) BOULDER COBBLE Coarse GRAVEL Fine Coarse Medium SAND Fine FINES (Silt, Clay) National IM Server:GINT_GAL_NATIONALIM Unique Project ID:799 Output Form:_LAB_PARTICLE SIZE (W/ GRADATIONS) dmackie 4// JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

28 Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Percent Finer by Mass Size of Opening (inches) / 3/4 3/ SUMMARY OF PARTICLE SIZE DISTRIBUTION U.S. Sieve Size (meshes / inch) Hydrometer USCS Particle Size Scale Legend Depth Interval : 0.0 to 0. Sieve Size (USS) (mm) /" " 3/4" /" 3/8" #4 US MESH #0 US MESH #0 US MESH #40 US MESH #60 US MESH #00 US MESH #00 US MESH Reference(s) ASTM C36 Sample Location: BH-07 Sample No.: Lab Schedule No.: Particle Size (mm) Percent Passing Particle Size (mm) BOULDER COBBLE Coarse GRAVEL Fine Coarse Medium SAND Fine FINES (Silt, Clay) National IM Server:GINT_GAL_NATIONALIM Unique Project ID:799 Output Form:_LAB_PARTICLE SIZE (W/ GRADATIONS) dmackie 4// JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

29 LIQUID LIMIT, PLASTIC LIMIT AND PLASTICITY INDEX OF SOILS Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Other Remarks: N/A Reference(s) Borehole ID: BH-0 Sample No.: 3 ASTM D Depth Interval : 0.6 to 0.76 Lab Schedule No.: Test Method: A-Multi Point Preparation Method: Wet 80 PLASTICITY CHART CLAY (CH) Plasticity Index SILTY CLAY (CL) SILTY CLAY (CI) CLAYEY SILT (MH) ORGANIC SILT (OH) National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:_LAB_ATTERBERG CASAGRANDE (SINGLE) dmackie 4// Sym. 0 Sample Location Sample / Specimen Number NP - NON-PLASTIC RESULT ND - NOT DETERMINED A-Line 0 SILTY CLAY-CLAYEY SILT (CL-ML) CLAYEY SILT (ML) ORGANIC SILT (OL) 0 SILT (ML) Liquid Limit Depth Bottom Percent Passing #40 Sieve (%) Liquid Limit Plastic Limit Plasticity Index Natural Water Content (%) Liquidity Index BH ND JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

30 LIQUID LIMIT, PLASTIC LIMIT AND PLASTICITY INDEX OF SOILS Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Other Remarks: N/A Reference(s) Borehole ID: BH-03 Sample No.: ASTM D Depth Interval : 0.76 to 0.9 Lab Schedule No.: Test Method: A-Multi Point Preparation Method: Wet 80 PLASTICITY CHART CLAY (CH) Plasticity Index SILTY CLAY (CL) SILTY CLAY (CI) CLAYEY SILT (MH) ORGANIC SILT (OH) National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:_LAB_ATTERBERG CASAGRANDE (SINGLE) dmackie 4// Sym. 0 Sample Location Sample / Specimen Number NP - NON-PLASTIC RESULT ND - NOT DETERMINED A-Line 0 SILTY CLAY-CLAYEY SILT (CL-ML) CLAYEY SILT (ML) ORGANIC SILT (OL) 0 SILT (ML) Liquid Limit Depth Bottom Percent Passing #40 Sieve (%) Liquid Limit Plastic Limit Plasticity Index Natural Water Content (%) Liquidity Index BH ND JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

31 LIQUID LIMIT, PLASTIC LIMIT AND PLASTICITY INDEX OF SOILS Client: Urban Systems Ltd. Project: Douglas Street - Geotechnical investigation Location: Victoria, BC Project No.: 4 Phase: 000 Other Remarks: N/A Reference(s) Borehole ID: BH-07 Sample No.: 3 ASTM D Depth Interval : 0.9 to. Lab Schedule No.: Test Method: A-Multi Point Preparation Method: Wet 80 PLASTICITY CHART CLAY (CH) Plasticity Index SILTY CLAY (CL) SILTY CLAY (CI) CLAYEY SILT (MH) ORGANIC SILT (OH) National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:_LAB_ATTERBERG CASAGRANDE (SINGLE) dmackie 4// Sym. 0 Sample Location Sample / Specimen Number NP - NON-PLASTIC RESULT ND - NOT DETERMINED A-Line 0 SILTY CLAY-CLAYEY SILT (CL-ML) CLAYEY SILT (ML) ORGANIC SILT (OL) 0 SILT (ML) Liquid Limit Depth Bottom Percent Passing #40 Sieve (%) Liquid Limit Plastic Limit Plasticity Index Natural Water Content (%) Liquidity Index BH ND JP/AA 4//0 DGM 4//0 Tech Date Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

32 Sheet of Reference(s) WATER CONTENT DETERMINATION ASTM D 6 Client: Project: Location: Urban Systems Ltd. Douglas Street - Geotechnical investigation Victoria, BC Project No.: 4 Phase: 000 Lab Schedule No.: Sample Location Sample No. Specimen No. Depth Interval Depth Bottom Water Content (%) BH BH BH BH BH BH BH BH National IM Server:GINT_GAL_NATIONALIM Unique Project ID: Output Form:_LAB_WATER CONTENT (REPORT) dmackie 4// Checked Date Golder Associates Ltd. 379 Carey Road Victoria, British Columbia, Canada V8Z 6T8 Tel: (0) Fax: (0) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

33 Golder Associates Ltd. nd floor, 379 Carey Road Victoria, British Columbia, V8Z 6T8 Canada T: + (0)

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

Attachment B. Grain Size Distribution Curves

Attachment B. Grain Size Distribution Curves Attachment B Grain Size Distribution Curves AREVA Resources Canada Inc. Kiggavik Project EIS December 11 Attachment B Technical Appendix 6A Surficial Geology and Terrain Client: Areva Project:

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

LIONS GATE SECONDARY WWTP SEWER CONVEYANCE

LIONS GATE SECONDARY WWTP SEWER CONVEYANCE LIONS GATE SECONDARY WWTP SEWER CONVEYANCE APPENDIX C Laboratory Testing June 11, 2015 Report No. 1406018-012-R-Rev0 FIGURE 1 - SAND: SUMMARY OF PARTICLE SIZE DISTRIBUTION Project: 24 0 Lions Gate WWTP

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2 PAVEMENT REPORT GEOTECHNICAL INVESTIGATION FOR THE REHABILITATION OF LOUIS HEBERT STREET, VAUDREUIL STREET, MARQUELLE STREET AND LASALLE STREET, ROCKLAND, ONTARIO Submitted to: Lee Jablonski, P.Eng. J.L.

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS The City of Winnipeg Appendix A - Part 2 Bid Opportunity No. 210-2014 Addendum #1 Page 1 of 1 Template Version: C420131129 - RW APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS Quality Engineering

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION Site Plan Application Pace Redevelopment Stouffville, Ontario Submitted to: Mr. Terry Chapman Pace Savings & Credit Union Limited 8111 Jane Street, Unit

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to:

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate. Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

Tikrit University College of Engineering Civil engineering Department

Tikrit University College of Engineering Civil engineering Department Tikrit University SOIL CLASSIFICATION College of Engineering Civil engineering Department Soil Mechanics 3 rd Class Lecture notes Up Copyrights 2016 Classification of soil is the separation of soil into

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

Appendix F Laboratory test results

Appendix F Laboratory test results Appendix F Laboratory test results SOIL AND ROCK SAMPLE ANALYSIS LABORATORY TEST REPORT To: Bord Gais Copy: Orla Smyth (kkidd@bge.ie) From: Stephen Watson Laboratory Manager Causeway Geotech Ltd Tel: +44(0)2827666640

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

Geotechnical Report for Derwent Way Transfer Station, New Westminster, BC

Geotechnical Report for Derwent Way Transfer Station, New Westminster, BC July 19, 2016 Westerra Enterprises Inc. #109-32885 Mission Way Mission, BC, V2V 6E4 ISSUED FOR USE FILE: ENG.VGEO3082-01 Attention: Subject: Mr. Myles Hargrove Geotechnical Report for Derwent Way Transfer

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information