Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Size: px
Start display at page:

Download "Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants"

Transcription

1 SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando, Florida 8, Phone (7) 8-8 Bartow, Centennial Drive, Bartow, Florida 8, Phone (8) -88 Cocoa, N. Cocoa Blvd., Cocoa, Florida, Phone () - Fort Myers, 7 Bavaria Road, Fort Myers, Florida, Phone () 78- Miami, 8 W. 8 th Street, Hialeah, Florida, Phone () 8-8 Port St. Lucie, Concourse Place NW, Unit, Port St. Lucie, Florida 8, Phone (77) Sarasota, 78 Sarasota Center Blvd., Sarasota, Florida, Phone () - Tallahassee, 7 West Tharpe Street, Tallahassee, Florida, Phone (8) 7- Tampa, Coconut Palm Drive, Suite, Tampa, Florida, Phone (8) -8 West Palm Beach, N. FL Mango Rd., Ste., West Palm Bch., FL, Phone ()87-8 MEMBERS: A.S.F.E. American Concrete Institute American Society for Testing and Materials Florida Institute of Consulting Engineers

2 Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants AIM Engineering & Surveying, Inc. Lee Boulevard Lehigh Acres, FL 7 Ardaman Project No. -- -JUN- Attention: Mr. Lee Flynn, P.E. SUBJECT: Subsurface Soil Exploration Drainage Improvements to the Four Corners MSBU Hendry County, Florida Gentlemen: As requested by AIM Engineering & Surveying, Inc. and authorized by Hendry County, Ardaman & Associates, Inc. (Ardaman) has performed the subsurface soil exploration for the project known as Drainage Improvements to the Four Corner MSBU in Hendry County, Florida. This report documents the results of our subsurface field exploration and laboratory testing programs within the Four Corners MSBU study area. This report has been prepared in accordance with generally accepted geotechnical engineering practices for specific application to the study area indicated in this report. No other warranty, expressed or implied, is made. PROJECT DESCRIPTION AND LOCATION The project will include improvements to the existing conveyance ditch from the Four Corners south along the county line between Hendry and Lee to S.R. 78 a distance of approximately, feet. The ditch exists within a -foot swath of land abutting the Hendry/Lee County line. Improvements to the ditch will include widening and deepening as well as two new weir structures. This report summarizes the Subsurface Soil Exploration program for the ditch improvements. Information about the proposed weirs is not included. An aerial photograph of the ditch from S.R. 78 north to the Four Corners is presented as Figure. 7 Bavaria Road, Fort Myers, Florida Phone () 78- FAX () 78- Florida: Bartow, Fort Myers, Miami, Orlando, Port St. Lucie, Sarasota, Tallahassee, Tampa, West Palm Beach Louisiana: Alexandria, Baton Rouge, Monroe, New Orleans, Shreveport

3 Report of Subsurface Soil Exploration -JUN- Drainage Improvements to the Four Corners MSBU Project No.-- Hendry County, Florida Page No. SCOPE OF GEOTECHNICAL SERVICES The scope of geotechnical services for the Drainage Improvements to the Four Corners MSBU project was outlined in a proposal to AIM Engineering & Surveying, Inc. dated July,. The key tasks performed for this project are itemized below.. Conducted Standard Penetration Test (T) borings on approximately -foot centers adjacent to the existing drainage ditch to determine the nature of the subsurface soils and groundwater conditions.. Reviewed each soil sample obtained from the test borings in our laboratory for further identification and classification.. Prepared this report to document the results of our field exploration and laboratory testing programs. It is the intent of this report to present general information about subsurface soil and groundwater conditions in the project study area as disclosed by the test borings to the design engineers and to interested bidders on this project. FIELD EXPLORATION PROGRAM A total of T borings were performed. The borings were labeled T- through T-. The T borings were drilled to a depth of feet. The T borings were conducted using methods consistent with ASTM D 8-Standard Method for Penetration Test and Split-Barrel Sampling of Soil. The equipment and procedures used in the T borings are described in detail in the Appendix. The locations of the borings are shown on the attached Figure Boring Location Plan which is a copy of an aerial photo of the study area obtained from the Lee County Property Appraiser s website. The borings were not located horizontally or vertically by survey. GPS coordinates from a hand-held unit are recorded on each boring log. Note that borings T- through T- were accessed from the east side of the ditch in Hendry County through land that is mostly cattle pasture. However, north of boring T-, heavy vegetation precluded further drill rig access requiring the remaining borings T- through T- to be accessed through the orange grove on the west side of the ditch in Lee County. Ardaman & Associates, Inc.

4 Report of Subsurface Soil Exploration -JUN- Drainage Improvements to the Four Corners MSBU Project No.-- Hendry County, Florida Page No. LABORATORY TESTING PROGRAM Representative soil samples obtained during our field sampling operation were packaged and transferred to our office and, thereafter, examined by a geotechnical engineer to obtain more accurate descriptions of the existing soil strata. Laboratory testing was performed on selected samples as deemed necessary to aid in soil classification and to further define the engineering properties of the soils. The laboratory tests included Natural Moisture Content, Percent Finer than the U.S. No. Sieve (percent silt and clay) and Sieve Analysis. The test results are presented on the attached soil boring logs at the depths from which the samples were recovered. The results of sieve analysis are presented on Grain-Size Distribution Sheets included in the Appendix. The soil descriptions shown on the logs are based upon visual-manual procedures in accordance with local practice. Soil classification is in general accordance with the Unified Soil Classification System (ASTM D-87) and is also based on visual-manual procedures. SUBSURFACE SOIL/ROCK CHARACTERIZATION The general subsurface soil conditions encountered in the T borings are presented on the attached soil boring logs. Soil stratification is based on visual examination of recovered soil samples and interpretation of the field boring logs. The stratification lines represent the approximate boundaries between the soil types, the actual transitions may be gradual. Because of the large study area, only broad generalities may be stated about subsurface conditions. The reader is encouraged to review the boring logs to become familiar with soil and rock types anticipated in the project area. The following soil and rock strata were identified in the test borings. Ardaman & Associates, Inc.

5 Report of Subsurface Soil Exploration -JUN- Drainage Improvements to the Four Corners MSBU Project No.-- Hendry County, Florida Page No. Unified Soil Classification Soil/Rock Description Poorly Graded Sand () fine sand with variable gravel content Poorly Graded Sand with Silt (-SM) slightly silty fine sand with variable gravel content Silty Sand (SM) silty fine sand (typically calcareous) with variable gravel content Silty Clayey Sand (SC-SM) silty clayey fine sand Clayey Sand (SC) clayey fine sand Sandy Silt (ML) fine sandy silt (typically calcareous) Sandy Lean Clay (CL) sandy clay, medium plasticity N/A Soft Weathered Limestone N/A Hard Weathered Limestone Following are typical uses of the soil and rock strata as construction materials. Poorly Graded Sand () Poorly Graded Sand with Silt (-SM) These sands contain less than percent non-plastic silty and may contain up to percent gravel (shell and limerock). Therefore, they are considered Select and suitable for use as structural fill. They are also suitable for use as fill for roadway embankments and subgrades and as general landscaping fill and berms. Drainage or permeability characteristics of these materials are good. Sands excavated below the water table should be stockpiled to drain excess moisture. Ardaman & Associates, Inc.

6 Report of Subsurface Soil Exploration -JUN- Drainage Improvements to the Four Corners MSBU Project No.-- Hendry County, Florida Page No. Silty Sand (SM) Silty Clayey Sand (SC-SM) Clayey Sand (SC) These sands may contain up to percent non-plastic silty or clayey fines. These soils are generally not suitable for reuse as structural fill and as fill for embankments; however, with careful control of the moisture content required compaction may be achieved allowing use of these soil types in roadway embankments or berms. Sandy Silt (ML) Sandy Lean Clay (CL) These sandy silts and sandy clays are generally not suitable for reuse as structural fill due to their high fines content. However, they may be used as embankment fill for roadways if placed at depths of 8 inches or more below the base course and above the water level existing at the time of construction. These materials retain excess moisture and will be very difficult to dry and compact. Drainage or permeability characteristics of these materials are typically very poor because of excessive silty or clayey fines. Soft Weathered Limestone Hard Weathered Limestone Limestone rock is defined as hard if the Standard Penetration Test (T) N-Value is greater than blows for inches or less of penetration. Hard Weathered Limestone was encountered in 8 of the borings at varying depths within the profile. The hardness of the limestone rock will be variable in the project study area with the degree of cementation that occurred in its formation or the degree of weathering that occurred since. Soft Weathered Limestone occurs in the project study area also, which could also be described as a weakly cemented gravelly slightly silty fine sand soil. Boulder-size fragments should be anticipated within the Soft Weathered Limestone. Use of rock as a fill material may require further processing by crushing and sieving to reduce particle sizes to mostly sand and gravel-size. The soil and rock information submitted herein is based on the data obtained from the test borings Ardaman & Associates, Inc.

7 Report of Subsurface Soil Exploration Drainage Improvements to the Four Corners MSBU Hendry County, Florida -JUN- Project No.-- Page No. presented on the T boring logs included in this report. This report does not reflect any variations that may occur between the borings. The nature and extent of any variation may not become evident until construction. Groundwater levels ranged from about to 8 feet below the existing surface at the time of the field exploration program (/7 /). Please refer to the soil boring logs for the specific groundwater depths on the date of drilling. The groundwater depths shown on the boring logs represent the groundwater surface encountered on the date shown. Fluctuations in groundwater levels should be anticipated throughout the year due to seasonal variations in rainfall and other factors. CLOSURE While the borings are representative of subsurface conditions at their respective locations and for their respectivee vertical reaches, local variations characteristic of the subsurface materials of the region are anticipated and may be encountered. The boring logs and related information are based on the driller's logs and visual examination of selected sample in the laboratory. The delineation between soil types shown on the logs is approximate and the description represents our interpretation of subsurface conditions at the designated boring locations and on the particular date drilled. If you have any questions about this report, pleasee contact this office. Very truly yours, Ardaman & Associates, Inc. Florida Certificate of Authorization No. Gary A. Drew, P.E. Vice President/Branch Manager GAD/egs Distribution: Client hard copies + electronic pdf Ardaman & Associates, Inc.

8 ATTACHMENTS FIGURE BORING LOCATION PLAN T BORING LOGS T- THROUGH T- Ardaman & Associates, Inc.

9 T- T- T- T- T- T- T-7 T-8 T- T- T- T- T- T- T- T- T-7 T-8 T- T- T- T- T- T- T- T- T-7 T-8 T- T- T- T- FIGURE BORING LOCATION PLAN SOURCE: COPY OF AERIAL PHOTOGRAPH FROM THE LEE COUNTY PROPERTY APPRAISER S WEBSITE = T BORING LOCATION S W E N Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants HENDRY COUNTY COUNTY LINE DITCH IMPROVEMENTS NORTH OF S.R. 78 Drawn By: Checked By: Date: ES GD FEB File No. Approved By: Figure No. -- Gary Drew, P.E.

10 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft): 7.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand. - - SC-SM Silty Clayey Sand - Light brown silty clayey fine sand, trace of shell fragments. - - CL Sandy Lean Clay - Light gray sandy clay, medium plasticity SM Silty Sand - Very light brown calcareous silty fine sand, trace to some gravel (cemented sands and limerock). - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

11 STATION: N.88' OFFSET: WO8.7' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft): 7.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray to brown fine sand. Safety hammer used ' SC-SM SC-SM Silty Clayey Sand - Dark brown silty clayey fine sand. Silty Clayey Sand - Light gray silty clayey fine sand. - - CL Sandy Lean Clay - Light gray sandy clay, medium plasticity. - - SM Silty Sand - Very light brown calcareous silty fine sand, trace to some gravel (cemented sands and limerock). - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

12 STATION: N.78' OFFSET: WO8.7' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE Poorly Graded Sand - Gray fine sand. Safety hammer used ' SC -SM CL Clayey Sand - Dark brown clayey fine sand. Poorly Graded Sand with Silt - LIght brown slightly silty fine sand, trace to some gravel (shell fragments). Sandy Lean Clay - Light gray sandy clay, medium plasticity SM Silty Sand - Light gray calcareous silty fine sand, trace to some gravel (cemented sands and limerock) TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

13 STATION: N.87' OFFSET: WO8.7' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray to brown fine sand. Safety hammer used ' Poorly Graded Sand - Yellowish-brown fine sand, trace shell fragments ML Sandy Silt - Light gray sandy calcareous silt SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). - - CL Sandy Lean Clay - Light gray sandy clay, medium plasticity, trace shell fragments. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

14 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE SC-SM Poorly Graded Sand - Gray fine sand. Silty Clayey Sand - Brown silty clayey fine sand. Safety hammer used ' Poorly Graded Sand - Yellowish-brown fine sand, trace shell fragments SC-SM Silty Clayey Sand - Light gray silty clayey fine sand SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands) CL Sandy Lean Clay - Light gray sandy clay, medium plasticity. 8 SM Silty Sand - Very light gray calcareous silty fine sand, trace to some gravel (cemented sands and limerock). - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

15 STATION: N.' OFFSET: WO8.8' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 7-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 7-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray to Brown fine sand. Safety hammer used ' SC-SM Silty Clayey Sand - Yellowish-brown silty clayey fine sand. Poorly Graded Sand - Yellowish-brown fine sand, trace shell fragments. - - SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). - - CL Sandy Lean Clay - Light gray sandy clay, medium plasticity SM Silty Sand - Light gray calcareous silty fine sand, trace to some gravel (cemented sands and limerock) TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

16 STATION: N.' OFFSET: WO8.8' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/MILD T N-VALUE SM Poorly Graded Sand - Brown fine sand. Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace gravel (shell fragments). Safety hammer used ' SM Poorly Graded Sand with Silt - Light brown slightly silty fine sand, trace to some gravel (shell fragments). - - ML Poorly Graded Sand - Brown fine sand. Sandy Silt - Light gray sandy calcareous silt TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-7

17 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/MILD T N-VALUE - - -SM Poorly Graded Sand - Brown fine sand. Poorly Graded Sand with Silt - Brown slightly silty fine sand. Safety hammer used ' SM Poorly Graded Sand with Silt - Light brown slightly silty fine sand, trace to some gravel (shell fragments) SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands) ML Sandy Silt - Very light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-8

18 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - SC-SM Poorly Graded Sand - Brown fine sand. Silty Clayey Sand - Reddish-brown silty clayey fine sand. Safety hammer used ' Soft Weathered Limestone / " /" Hard Weathered Limestone. ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

19 STATION: N.78' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray fine sand. Safety hammer used ' Poorly Graded Sand - Yellowish-brown fine sand. - - SC Clayey Sand - Brown clayey fine sand CL Sandy Lean Clay - Brown sandy clay, medium plasticity. - - Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

20 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE Poorly Graded Sand - Gray fine sand. Safety hammer used ' Tree Stump SM Poorly Graded Sand - Very dark gray fine sand. Poorly Graded Sand with Silt - Brown slightly silty fine sand, trace to some gravel (shell fragments). /"- - /" Hard Weathered Limestone. Soft Weathered Limestone. - - ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

21 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray fine sand Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC-SM Silty Clayey Sand - Brown silty clayey fine sand. Soft Weathered Limestone ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

22 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: 8-FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: 8-FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE Poorly Graded Sand - Gray fine sand. Safety hammer used ' Poorly Graded Sand - Very dark gray fine sand Soft Weathered Limestone /"- /" Hard Weathered Limestone. ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

23 STATION: N.7' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 7.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/MILD T N-VALUE - - Poorly Graded Sand - Gray fine sand. Safety hammer used ' Poorly Graded Sand - Brown fine sand Poorly Graded Sand - Dark brown fine sand SM Poorly Graded Sand with Silt - Brown slightly silty fine sand Soft Weathered Limestone. ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

24 STATION: N.78' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/MILD T N-VALUE Poorly Graded Sand - Gray fine sand. Safety hammer used ' Poorly Graded Sand - Brown fine sand SC Clayey Sand - Brown clayey fine sand Soft Weathered Limestone SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands) TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

25 STATION: N.87' OFFSET: WO8. PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/MILD T N-VALUE - - Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC-SM Silty Clayey Sand - Brown silty clayey fine sand. Hard Weathered Limestone. /"- - /" - - SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). - - ML Sandy Silt - Light gray sandy calcareous silt TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

26 STATION: N.' OFFSET: WO8.8' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Dark brown fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand. Soft Weathered Limestone ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-7

27 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 7.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Gray fine sand, trace of gravel (limerock). Safety hammer used ' - - Poorly Graded Sand - Yellowish-brown fine sand SC -SM Clayey Sand - Brown clayey fine sand. Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace to some gravel (limerock and cemented sands). - - Soft Weathered Limestone Hard Weathered Limestone. SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands) TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-8

28 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC -SM Clayey Sand - Yellowish-brown clayey fine sand. Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace to some gravel (cemented sands and limerock) Soft Weathered Limestone ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

29 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/MILLS T N-VALUE - - Poorly Graded Sand - Gray fine sand. Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand Soft Weathered Limestone SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

30 STATION: N.8' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/WARM T N-VALUE Poorly Graded Sand - Gray fine sand. Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

31 STATION: N.' OFFSET: WO8.8' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/WARM T N-VALUE - - Poorly Graded Sand - Brown fine sand. Safety hammer used ' - - Poorly Graded Sand - Yellowish-brown fine sand. - - SC Clayey Sand - Brown very clayey fine sand SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands) /" /" Hard Weathered Limestone. Soft Weathered Limestone. ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

32 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 7.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/WARM T N-VALUE - - Poorly Graded Sand - Gray fine sand. Poorly Graded Sand - Yellowish-brown fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand Soft Weathered Limestone ML Sandy Silt - Light gray sandy calcareous silt. - - TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

33 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: PARTLY CLOUDY/HOT T N-VALUE - - Poorly Graded Sand - Brown fine sand. Safety hammer used ' SC Clayey Sand - Brown clayey fine sand SM Silty Sand with Gravel - Light gray calcareous silty fine sand and gravel (cemented sands). - - Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

34 STATION: N.' OFFSET: WO8.8' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): N.R. DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/SHOWERS T N-VALUE 7- - SC-SM Silty Clayey Sand - Yellowish-brown silty clayey fine sand. Safety hammer used ' - - Poorly Graded Sand - Dark brown fine sand. - - Poorly Graded Sand - Brown fine sand SC Clayey Sand - Yellowish-brown fine sand Soft Weathered Limestone Hard Weathered Limestone. /"- - /" TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

35 STATION: N.7' OFFSET: WO8.7' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): N.R. DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/SHOWERS T N-VALUE - - SC-SM Silty Clayey Sand - Yellowish-brown silty clayey fine sand, trace of gravel (limerock). Safety hammer used ' - 7- Poorly Graded Sand - Brown fine sand SM Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace to some gravel (limerock) SC-SM Silty Clayey Sand - Light brown slightly silty clayey fine sand. - - Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

36 STATION: OFFSET: PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 8' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/RAIN T N-VALUE - /"- /" SC-SM Silty Clayey Sand - Yellowish-brown silty clayey fine sand, trace fo some gravel (limerock). Safety hammer used ' - - Poorly Graded Sand - Brown fine sand SC Clayey Sand - Gray clayey fine sand Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-7

37 STATION: N.8' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 8' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/RAIN T N-VALUE - - -SM Poorly Graded Sand with Silt - Brown slightly silty fine sand, trace of gravel (limerock). Safety hammer used ' Poorly Graded Sand - Brown fine sand Soft Weathered Limestone Hard Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-8

38 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 7' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/SHOWERS T N-VALUE - - -SM Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace of gravel (limerock). Safety hammer used ' - - SC-SM Silty Clayey Sand - Very dark gray silty clayey fine sand SC Clayey Sand - Brown clayey fine sand Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

39 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 8.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/LIGHT SHOWERS T N-VALUE SM Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace of gravel (limerock). Safety hammer used ' - - Poorly Graded Sand - Brown fine sand. - - SC Clayey Sand - Yellowish-brown clayey fine sand Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

40 STATION: N.' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft): 8.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/LIGHT SHOWERS T N-VALUE SM Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand, trace of gravel (limerock). Safety hammer used ' - - Poorly Graded Sand - Grayish-brown fine sand SC-SM Silty Clayey Sand - Yellowish-brown silty clayey fine sand. - - Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

41 STATION: N.7' OFFSET: WO8.' PROJECT: HENDRY CO. CO. LINE DITCH IMP. DATE DRILLED: -FEB- START: FINISH: WATER TABLE DEPTH (ft):.' DATE: -FEB- DRILL CREW: WOOTEN/MILLS LOGGED BY: G. DREW DRILL MAKE & MODEL: CME- BIT: -7/8" DIA. TRICONE ROLLER DRILLING RODS: NW DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: OVERCAST/SHOWERS T N-VALUE SM Poorly Graded Sand with Silt - Yellowish-brown slightly silty fine sand. Safety hammer used ' - - Poorly Graded Sand - Light brown fine sand SC Clayey Sand - Brown clayey fine sand. - - Soft Weathered Limestone TERMINATED AT.' 8 PAGE OF REVIEWED BY: Gary A. Drew, P.E. FILE NO: -- BORING NO.: T-

42 APPENDIX GRAIN-SIZE ANALYSIS SHEETS SOIL BORING, SAMPLING AND TESTING METHODS PROJECT PROCEDURE - UNIFIED Ardaman & Associates, Inc.

43 U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS HYDROMETER FINER BY WEIGHT COARSER BY WEIGHT GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND COARSE FINE COARSE MEDIUM FINE SILT OR CLAY. Test Hole T-8 T- Sample No. Elev or Depth Symbol Sample Description Unified Class ' Soft Weathered Limestone.. ' Soft Weathered Limestone NM % - PI NP NP AIM Engineering & Surveying, Inc. Hendry Co., Co. Line Ditch Imp. Four Corners MSBU North of C.R. 78 ES GD FEB- GRADATION CURVES -- Gary A. Drew, P.E., Branch Manager

44 U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS HYDROMETER FINER BY WEIGHT COARSER BY WEIGHT GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND COARSE FINE COARSE MEDIUM FINE SILT OR CLAY. Test Hole T- T- Sample No. Elev or Depth Symbol Sample Description Unified Class 8' Soft Weathered Limestone. 8 8' Soft Weathered Limestone. NM % - PI NP NP AIM Engineering & Surveying, Inc. Hendry Co., Co. Line Ditch Imp. Four Corners MSBU North of C.R. 78 ES GD FEB- GRADATION CURVES -- Gary A. Drew, P.E., Branch Manager

45

46

47

48

49

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Tikrit University College of Engineering Civil engineering Department

Tikrit University College of Engineering Civil engineering Department Tikrit University SOIL CLASSIFICATION College of Engineering Civil engineering Department Soil Mechanics 3 rd Class Lecture notes Up Copyrights 2016 Classification of soil is the separation of soil into

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1 N 64650 N 64600 N 64550 N 64500 N 64450 N 64400 N 64350 N 64300 N 64250 N 64200 N 64150 N 64100 N 64050 N 64000 N 63950 N 63900 N 63850 N 63800 N 63750 N 63700 N 63650 N 63600 N 63550 N 63500 N 63450 N

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 4 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District ED FIELDING Commissioner, District ANNE SCOTT Commissioner, District 3 SARAH HEARD Commissioner,

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Geotechnical Engineering I CE 341

Geotechnical Engineering I CE 341 Geotechnical Engineering I CE 341 What do we learn in this course? Introduction to Geotechnical Engineering (1) Formation, Soil Composition, Type and Identification of Soils (2) Soil Structure and Fabric

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical Study

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Correlation of unified and AASHTO soil classification systems for soils classification

Correlation of unified and AASHTO soil classification systems for soils classification Journal of Earth Sciences and Geotechnical Engineering, vol. 8, no. 1, 2018, 39-50 ISSN: 1792-9040 (print version), 1792-9660 (online) Scienpress Ltd, 2018 Correlation of unified and AASHTO classification

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-10 Bridge Over Council Hollow Creek Ottawa County, Oklahoma Project No. STPY-255F (191) EC Job Piece No. 30308 (06) April 1, 2015 Terracon Project No. 04155008 Prepared

More information

February 16, 2015 File No Ms. Robin Yates TRC Engineers Inc N. Fresno Street, Suite 200 Fresno, California 93710

February 16, 2015 File No Ms. Robin Yates TRC Engineers Inc N. Fresno Street, Suite 200 Fresno, California 93710 February 16, 2015 File No. 20152738 Ms. Robin Yates TRC Engineers Inc. 6051 N. Fresno Street, Suite 200 Fresno, California 93710 SUBJECT: Geotechnical Design Memorandum Fresno BPMP Scour Countermeasure

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

SOIL FORMATION SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS. Soil Properties and Classification

SOIL FORMATION SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS. Soil Properties and Classification SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS Soil Properties and Classification Soil Formation Soil Types Particle Size Analysis and Grading Characteristics Consistency Indices Engineering classification

More information

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING. PLAN SUBGRADES Geotechnical Bulletin GB1

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING. PLAN SUBGRADES Geotechnical Bulletin GB1 OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING PLAN SUBGRADES Geotechnical Bulletin GB1 Instructions: Enter data in the shaded cells only. (Enter state route number, project description,county,

More information

Attachment B. Grain Size Distribution Curves

Attachment B. Grain Size Distribution Curves Attachment B Grain Size Distribution Curves AREVA Resources Canada Inc. Kiggavik Project EIS December 11 Attachment B Technical Appendix 6A Surficial Geology and Terrain Client: Areva Project:

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Veterans Parkway Bridge Approaches Investigation Savannah, Georgia July 20, 2015 Terracon Project No. ES155020 Prepared for: Chatham County Engineering Department Savannah, Georgia

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Assistant Chief-Bureau of Structures and Geotechnical Services

Assistant Chief-Bureau of Structures and Geotechnical Services MEMO DATE: 2/10//2016 Bureau of Structures and Geotechnical Services TO: John Jones, P.E. Assistant Chief-Bureau of Structures and Geotechnical Services ATTENTION: Mark Hurt, P.E. Senior Bridge Squad Leader

More information