1 March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: Manatee County, Florida Tierra Project No Mr. Figueroa: Tierra, Inc. (Tierra) has completed geotechnical engineering services for the above referenced project. The results of our field exploration program and subsequent geotechnical recommendations are presented in this report. Tierra appreciates the opportunity to be of service to AECOM on this project. We look forward to working with you on future projects. If you have any questions or comments regarding this report, please contact Tierra at your earliest convenience. Respectfully Submitted, TIERRA, INC. Daniel R. Ruel, P.E. Kevin H. Scott, P.E. Geotechnical Engineer Senior Geotechnical Engineer Florida License No Florida License No Daniel R. Ruel, P.E. State of Florida Professional Engineer, FL. P.E. License No This Item has been electronically signed and sealed by Daniel R. Ruel, P.E. On September 7, 208 using S- authentication code. Printed copies of this document are not considered signed and sealed and the S- authentication code must be verified on any electronic copies 735 Temple Terrace Highway Tampa, FL Phone (83) Fax (83) Florida Certificate No. 6486

2 TABLE OF CONTENTS PROJECT DESCRIPTION... Project Information... Scope of Services... SITE AND SUBSURFACE CONDITIONS... 2 USGS Quadrangle Map... 2 USDA Soil Survey... 2 Subsurface Conditions... 3 Groundwater Information... 4 Pavement Cores... 4 EVALUATION AND RECOMMENDATIONS... 4 Site Preparation... 4 Anomalous Condition... 5 California Bearing Ratio Tests Flexible Pavement... 5 Pavement Considerations... 5 Future Improvement Area... 6 REPORT LIMITATIONS... 6 APPENDIX Boring Location Plan Soil Profiles CBR Results Pavement Section Data Sheet Photographs of Pavement Cores

3 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page of 6 Project Information PROJECT DESCRIPTION The project, as Tierra understands it, is to construct a new North Quad Roadway to connect with the existing Clyde Jones Road at the Sarasota Bradenton International Airport. Portions of the project will include milling and resurfacing portions of Clyde Jones Road as well as reconstruction in the area of the proposed tie-in. Scope of Services The objective of our study was to obtain information concerning subsurface conditions at the site in order to base engineering estimates and recommendations in each of the following areas:. General location and description of potentially deleterious materials discovered in the borings which may interfere with construction progress and pavement performance, including existing fills or surficial organics. 2. Measure pavement and base thicknesses through coring, at the locations requested. 3. Perform SPT borings along the footprint of the proposed North Quad Access Roadway and pavement cores along the existing Clyde Jones Road. 4. Measure groundwater levels. In order to meet the preceding objectives, we provided the following services:. Reviewed published soils and topographic information. This published information was obtained from the Bradenton, Florida Quadrangle Map published by the United States Geological Survey (USGS), as well as the Manatee County Soil Survey of Florida, published by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS). 2. Executed a program of subsurface exploration consisting of pavement cores, test borings, subsurface sampling, and field testing as follows: a. Proposed North Quad Roadway: Performed nine (9) Standard Penetration Test (SPT) borings to depths of 0 feet below the existing ground surface. One day prior to the SPT borings, the locations of the SPT borings were manually augered to estimate the Seasonal High Groundwater Table (SHGWT) as well as to obtain a 24-hour measurement of the groundwater level the following day. b. Existing Clyde Jones Road: Performed eight (8) hand auger borings to depths ranging from 4 to 5 feet below the top of the existing pavement surface. Pavement cores were performed at each boring location. c. Future Improvements: As requested, Tierra performed one () SPT boring to a depth of 5 feet below grade in a potential drainage improvement area.

4 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page 2 of 6 3. Visually classified the samples in the laboratory using the Unified Soil Classification System (USCS). Performed laboratory classification tests on selected samples to confirm the visual classifications. Identified soil conditions at each boring location. 4. Performed four (4) California Bearing Ratio (CBR) tests on selected samples collected within the project area. 5. Prepared this engineering report that summarizes the course of study pursued, the field and laboratory data generated, subsurface conditions encountered and our engineering recommendations in each of the pertinent topic areas. The scope of our services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic materials in the soil, bedrock, groundwater, or air, on or below or around this site. The scope of services did not include the determination of the potential for sinkhole development. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items or conditions are strictly for the information of our client. USGS Quadrangle Map SITE AND SUBSURFACE CONDITIONS Based on the Bradenton, Florida USGS Quadrangle Map, ground elevations at the project site range from approximately +5 to +20 feet, National Geodetic Vertical Datum of 929 (NGVD 29). USDA Soil Survey Based on a review of the Manatee County Soil Survey, there is one () primary soil mapping unit noted with the project footprint: EauGallie Fine Sand (Map Unit: 20). The general soil descriptions are presented in the following paragraphs and table, as described in the Soil Survey. EauGallie Fine Sand (Map Unit: 20) The EauGallie, non-hydric component makes up 70 percent of the map unit. Slopes are 0 to 2 percent. This component is on flatwoods on marine terraces on coastal plains. The parent material consists of sandy and loamy marine deposits. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is poorly drained. Water movement in the most restrictive layer is moderately low. Available water to a depth of 60 inches is low. Shrink-swell potential is low. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 2 inches during June, July, August, September, and October. Organic matter content in the surface horizon is about 5 percent. The EauGallie, hydric component makes up 5 percent of the map unit. Slopes are 0 to 2 percent. This component is on flats on marine terraces on coastal plains. The parent material consists of sandy and loamy marine deposits. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is poorly drained. Water movement in the most restrictive layer is moderately low. Available water to a depth of 60 inches is low. Shrink-swell potential is low. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 6 inches during June, July, August, September, and October. Organic matter content in the surface horizon is about 5 percent.

5 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page 3 of 6 USDA Map Symbol and Soil Name (20) EauGallie, non-hydric EauGallie, hydric Depth (in) USCS SUMMARY OF USDA SOIL SURVEY MANATEE COUNTY, FLORIDA Soil Classification AASHTO Permeability (in/hr) 0-5 SP, SP-SM A SP, SP-SM A SM, SP-SM A-2-4, A SC, SC-SM, SM A-2-4, A SM, SP-SM A-2-4, A SP, SP-SM A SP, SP-SM A SM, SP-SM A-2-4, A SC, SC-SM, SM A-2-4, A SM, SP-SM A-2-4, A ph Seasonal High Water Table Depth (feet) Months June-Oct June-Oct Subsurface Conditions The subsurface conditions were explored using a total of ten (0) SPT borings performed to depths ranging from 0 to 5 feet below the ground surface and eight (8) pavement cores with hand auger borings to depths ranging from 4 to 5 feet below the pavement surface. The borings were located in the field by representatives of Tierra using handheld global positioning system (GPS) units. The locations of the borings performed are presented on the Boring Location Plan in the Appendix and should be considered approximate. The hand auger borings were performed by manually twisting and advancing a bucket auger into the ground, typically in 6-inch increments. The SPT borings were performed with the use of a drill rig equipped with an automatic hammer, using mud-rotary drilling procedures. The soil sampling was performed in general accordance with the American Society for Testing and Materials (ASTM) Test Designation D-586. The initial 4 feet of the SPT borings were advanced by hand auger to verify subsurface utility clearances. SPT resistance N-values were then taken continuously to a depth of 0 feet and at intervals of 5 feet thereafter when applicable. As each soil type was encountered samples were collected and visually classified in the field. The samples were then transported to our laboratory for verification of the visual classification and testing. The soil conditions encountered in the borings performed at the project site are summarized in the following table: Stratum Number Soil Description Unified Soil Classification System Symbol Gray to Brown Sand to Sand with Silt, Often with Shell SP/SP-SM 2 Brown Silty Sand, Often with Shell SM P Pavement and Base Material --- () () USCS does not include nomenclature for Pavement and Base Material

6 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page 4 of 6 The subsurface soil stratification is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The Soil Profiles included in the Appendix should be reviewed for specific information at individual boring locations. These profiles include soil descriptions, stratifications and penetration resistances when applicable. The stratifications shown on the boring profiles represent the conditions only at the actual boring location. Variations did occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual. Groundwater Information At the time of our field activities, the groundwater table was encountered at depths ranging from 3½ to 8 feet below the ground surface at the locations of the SPT borings. At these locations, an auger hole was maintained open for 24 hours prior to groundwater measurement to allow the water table to stabilize within the borehole. At the locations of the pavement cores/auger borings along Clyde Jones Road, the groundwater was not encountered prior to boring termination. As a result, GNE (Groundwater Not Encountered) is shown adjacent to these soil profiles. Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences (i.e. existing swales, drainage ponds, underdrains and areas of covered soils, such as paved parking lots). Based upon the results of our borings, the SHGWT is estimated to occur at depths ranging from ½ to 3 feet below the existing ground surface. The SHGWT estimate at these specific boring locations are shown adjacent to the soil profiles in the Appendix. As previously noted, the locations of our borings were based on our hand-held GPS devices and should be considered approximate. If the SHGWT levels are critical to design, Tierra recommends the locations of our borings be survey located. Pavement Cores Tierra performed eight (8) pavement cores within the existing pavement along Clyde Jones Road. The detailed results of the pavement coring operations as well as photographic documentation are included in the Appendix. Tierra recommends that this information and the information presented on the Soil Profiles and Boring Location Plan sheets be reviewed by the design engineer. Site Preparation EVALUATION AND RECOMMENDATIONS Prior to construction, the location of any existing underground utilities within the construction area should be established. Material suitable for re-use may be stockpiled; however, any material stockpiled for re-use shall be tested for conformance to material specifications as indicated in the following sections of this report. Provisions should then be made to relocate any interfering utility lines within the construction area to appropriate locations and backfilling the resulting excavations with compacted structural fill. In this regard, it should be noted that if abandoned underground pipes are not properly removed or plugged, they might serve as conduits for subsurface erosion, which subsequently may result in excessive settlement.

7 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page 5 of 6 As a minimum, it is recommended that the clearing operations extend to the depth needed to remove material considered deleterious at least 5 feet beyond the proposed development area. Deleterious materials to be removed include existing pavement and base sections, roots, organics, tree stumps or other buried or surface debris. Anomalous Condition Upon the completion of core/boring B-4, the removed soils from the auger process were used to backfill the borehole. Once all the removed soils were utilized to backfill the open borehole, the auger hole was not filled to the existing grade. The auger hole was still open to a depth of approximately 3½ feet below the pavement surface and additional sand was required to backfill the borehole to the surface. It is Tierra s understanding that there are no know utilities at this location. The condition observed could be the result of multiple conditions. One possibility is an unknown/abandoned conduit. If critical to the project Tierra recommends additional geotechnical services be performed in this area. Tierra has coordinated with AECOM and it s our understanding the reconstruction of Clyde Jones Road is being extended to include the area of B-4. The contractor should be aware of this area and relay any unusual conditions to the engineer. California Bearing Ratio Tests Flexible Pavement Four (4) bulk samples were collected at the project site for CBR testing. The tests were performed using bulk samples obtained from within 2 feet of the existing ground surface at the locations of borings S-2, S-5, and at two on-site stockpiles, identified as CBR- and CBR-2. The results of the CBR tests are presented in the Appendix. Pavement Considerations Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The following sections represent minimum thicknesses representative of typical load and construction practices and as such periodic maintenance should be anticipated. All pavement materials and construction procedures should conform to project requirements. In general, following the completion of the recommended clearing and grading operations, subgrade preparation and fill placement, the compacted fill and natural sandy soils should be acceptable for construction and support of a flexible (limerock, crushed concrete, or shell base) type pavement section. Any fill utilized to elevate the cleared pavement areas to subgrade elevation should consist of reasonably clean (maximum 2% passing #200 sieve sizes) sands uniformly compacted to a minimum depth of 2 inches to a minimum density of 95% of the Modified Proctor maximum dry density. In flexible pavement areas we recommend 2 inches of Type B stabilized subgrade (LBR = 40%) below the base course. Traffic should not be allowed on the subgrade as the base is placed to avoid rutting. The subgrade should be checked for soundness and be true to line and grade prior to the placement of the base course.

8 Geotechnical Engineering Services Report AECOM Project Number: Tierra Project No Page 6 of 6 The choice of pavement base type will depend on final pavement grades. If a minimum separation of 8 inches between the bottom of the base and the seasonal high groundwater level is obtained, then a limerock, shell, or crushed concrete base can be utilized. A crushed concrete base should be utilized if the separation between final grade and the seasonal high groundwater is a minimum of 2 inches and less than 8 inches. Base material elevations should not be designed for saturated conditions. If the designer wishes to have base material closer than 2 inches to the SHGWT, then an underdrain system should be utilized that will maintain the 2 inches of separation. The SHGWT should be re-established relative to a known elevation prior to setting final grades. Limerock, shell and crushed concrete base material should meet Florida Department of Transportation (FDOT) requirements including compaction to a minimum density of 98% of the Modified Proctor maximum dry density and a minimum Limerock Bearing Ratio (LBR) of 00%. Crushed concrete should be graded in accordance with FDOT Standard Specifications. As a guideline for pavement design, we recommend that the base course be a minimum of 6 inches thick in parking areas and 8 inches thick in heavily traveled drives. Before paving, the base should be checked for soundness. Based on our experience, the asphaltic concrete structural course should consist of at least one and one-half (½) inches of Type S or SP asphaltic concrete material in areas of light duty traffic and at least two (2) inches of Type S or SP asphaltic concrete material in areas of heavy duty traffic. The asphaltic concrete should meet standard FDOT material requirements and placement procedures as outlined in the current FDOT Specifications. Future Improvement Area As requested, Tierra performed SPT boring (T-) at a location of a potential future drainage improvement area. The results of the soils encountered along with the measured groundwater table are presented on the Soil Profiles in the Appendix. REPORT LIMITATIONS The conclusions and recommendations contained in this report are opinions based on the site conditions and project layout described herein and further assume that the conditions observed in the exploratory borings are representative of the subsurface conditions throughout the site, i.e., the subsurface conditions elsewhere on the site are the same as those disclosed by the borings. If, during construction, subsurface conditions different from those encountered in the exploratory borings are observed or appear to be present beneath excavations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. If there is a substantial lapse in time between the submittal of this report and the start of work at the site, or if conditions or project layout are changed due to natural causes or construction operations at or adjacent to the site, we recommend that this report be reviewed to determine the applicability of conclusions and recommendations considering the changed conditions and time lapse. This report was prepared for the exclusive use of AECOM and their Clients for evaluating the design of the project as it relates to the geotechnical aspects discussed herein. It should be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unanticipated soil conditions may require that additional expense be made to attain a properly constructed project. Therefore, some contingency fund is recommended to accommodate such potential extra costs.

9 Appendix Boring Location Plan Soil Profiles CBR Results Pavement Section Data Sheet Photographs of Pavement Cores

10 D D C C B B A A Sarasota Bradenton International Airport 6000 Airport Circle Sarasota, Florida TIERRA 735 Temple Terrace Highway Tampa, Florida Phone: Fax: FL Cert. No.: NORTH QUAD DEVELOPMENT BORING LOCATION PLAN 5

11 D BOR # T- EASTING NORTHING 6674 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-0 EASTING NORTHING 624 DATE 2/2/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-02 EASTING NORTHING 602 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-03 EASTING NORTHING 5765 DATE 2/2/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-04 EASTING NORTHING 5522 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 D DEPTH IN FEET N N N N = 2 N DEPTH IN FEET C C BOR # S-05 EASTING NORTHING 5266 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-06 EASTING NORTHING 5026 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-07 EASTING NORTHING 5023 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-08 EASTING NORTHING 506 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 BOR # S-09 EASTING NORTHING 5779 DATE 2/23/208 DRILLER A. JACKSON MMER AUTOMATIC RIG D-25 B DEPTH IN FEET = 3 N = 5 N 7 N 22 5 N 5 3 N DEPTH IN FEET B A A Sarasota Bradenton International Airport 6000 Airport Circle Sarasota, Florida NORTH QUAD DEVELOPMENT TIERRA 735 Temple Terrace Highway Tampa, Florida Phone: Fax: FL Cert. No.: SOIL PROFILES () 2

12 D BOR # B- EASTING NORTHING 6232 DATE 2/22/208 BOR # B-2 EASTING NORTHING 6240 DATE 2/22/208 BOR # B-3 EASTING NORTHING 6232 DATE 2/22/208 BOR # B-4 EASTING NORTHING 6240 DATE 2/22/208 BOR # B-5 EASTING NORTHING 6245 DATE 2/22/208 D DEPTH IN FEET 0 5 GNE P -200 = 7 NMC = 8 LL = NP PI = NP -200 = 7 GNE P = 9 NMC = 5 LL = NP PI = NP GNE P 2 GNE P 2 GNE P 2 REFUSAL ON APPARENT ROCK 0 5 DEPTH IN FEET C BOR # B-6 EASTING NORTHING 6253 DATE 2/22/208 BOR # B-7 EASTING NORTHING 6258 DATE 2/22/208 BOR # B-8 EASTING NORTHING 6266 DATE 2/22/208 C DEPTH IN FEET 0 5 GNE P -200 = 7 NMC = 3 LL = NP PI = NP GNE P 2 REFUSAL DUE TO POTENTIAL UTILITY GNE P DEPTH IN FEET B B A A Sarasota Bradenton International Airport 6000 Airport Circle Sarasota, Florida NORTH QUAD DEVELOPMENT TIERRA 735 Temple Terrace Highway Tampa, Florida Phone: Fax: FL Cert. No.: SOIL PROFILES (2) 3

13 TIERRA INC. RESULTS OF CALIFORNIA BEARING RATIO TEST Tested For: Project: Sarasota Airport Quad Access Road Project No Date: 3/6/208 Report No. CBR at S-2 CBR & MOISTURE-DENSITY RELATIONSHIP 00 CBR Value 0 Dry Unit Weight (pcf) % 9% 0% % 2% 3% 4% 5% 6% 7% 8% 9% 20% Moisture Content CBR Value 26 Description: Maximum Density 07.4 pcf Brown Slightly Silty Sand Optimum Moisture.9 % Test Method: ASTM D-883 (5 lb Surcharge) Sample Location: Tested By: L. Heitman B-2 Sample Depth: % Pass No. 4 Sieve: 00.0% to 2 feet

14 TIERRA INC. RESULTS OF CALIFORNIA BEARING RATIO TEST Tested For: Project: Sarasota Airport Quad Access Road Project No Date: 3/4/208 Report No. CBR at S-5 CBR & MOISTURE-DENSITY RELATIONSHIP 00 CBR Value 0 Dry Unit Weight (pcf) % 9% 0% % 2% 3% 4% 5% 6% 7% 8% 9% 20% Moisture Content CBR Value 35 Description: Maximum Density 03.4 pcf Gray Fine Sand Optimum Moisture 3.3 % Test Method: ASTM D-883 (5 lb Surcharge) Sample Location: Tested By: L. Heitman B-5 Sample Depth: % Pass No. 4 Sieve: 00.0% to 2 feet

15 TIERRA INC. RESULTS OF CALIFORNIA BEARING RATIO TEST Tested For: Project: Sarasota Airport Quad Access Road Project No Date: 3/6/208 Report No. CBR- (Western Stockpile) CBR & MOISTURE-DENSITY RELATIONSHIP 00 CBR Value 0 Dry Unit Weight (pcf) % 9% 0% % 2% 3% 4% 5% 6% 7% 8% 9% 20% Moisture Content CBR Value 23 Description: Maximum Density 07.4 pcf Brownish Gray Fine Sand Optimum Moisture 2.3 % Test Method: ASTM D-883 (5 lb Surcharge) Sample Location: Tested By: L. Heitman Western Stockpile Sample Depth: % Pass No. 4 Sieve: 00.0% to 2 feet

16 TIERRA INC. RESULTS OF CALIFORNIA BEARING RATIO TEST Tested For: Project: Sarasota Airport Quad Access Road Project No Date: 3/6/208 Report No. CBR-2 (Eastern Stockpile) CBR & MOISTURE-DENSITY RELATIONSHIP 00 CBR Value 0 Dry Unit Weight (pcf) % 9% 0% % 2% 3% 4% 5% 6% 7% 8% 9% 20% Moisture Content CBR Value 7 Description: Maximum Density 07.4 pcf Dark Brown Fine Sand Optimum Moisture 2.2 % Test Method: ASTM D-883 (5 lb Surcharge) Sample Location: Tested By: L. Heitman Eastern Stockpile Sample Depth: % Pass No. 4 Sieve: 00.0% to 2 feet

17 PAVEMENT SECTION DATA SHEET Project Name: Cored By: TIERRA Tierra Project Number: Core No. State Plane Coordinates (FL West NAD 83) () Asphalt Thickness Easting Northing (in) Type Base Material Thickness (in) Subgrade Pavement Condition (2) Notes B Soil Cement with Shell 5.6 Refer to Soil Profiles Poor to Fair B Soil Cement with Shell 8.3 Refer to Soil Profiles Poor to Fair B Soil Cement with Shell 7.2 Refer to Soil Profiles Poor to Fair B Soil Cement with Shell 5.2 Refer to Soil Profiles Poor to Fair B Soil Cement with Shell 8.0 Refer to Soil Profiles Poor to Fair Cracked full depth B Soil Cement with Shell 6. Refer to Soil Profiles Poor to Fair Cracked full depth B Soil Cement with Shell 5.2 Refer to Soil Profiles Poor to Fair B Soil Cement with Shell 7.0 Refer to Soil Profiles Poor to Fair () Pavement core locations were estimated utilizing GPS coordinates obtained by Tierra, Inc. in the field and should be considered approximate (2) Pavement condition based on visual characterization at core location

18 Core Photographs of Pavement Cores

19 Core 2 Photographs of Pavement Cores

20 Core 3 Photographs of Pavement Cores

21 Core 4 Photographs of Pavement Cores

22 Core 5 Photographs of Pavement Cores

23 Core 6 Photographs of Pavement Cores

24 Core 7 Photographs of Pavement Cores

25 Core 8 Photographs of Pavement Cores

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

PRELIMINARY GEOTECHNICAL EXPLORATION Additional MeadWestvaco Ridgeville Property 331 acres Dorchester County, South Carolina S&ME Project No. 1131-09-259A Prepared For: BP Barber & Associates Post Office

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical Study

More information

SECTION AGGREGATE OR GRANULAR SUBBASE

SECTION AGGREGATE OR GRANULAR SUBBASE SECTION 02230 AGGREGATE OR GRANULAR SUBBASE PART 1 GENERAL 1.01 SECTION INCLUDES A. Aggregate or granular subbase as shown on the drawings. 1.02 RELATED SECTIONS A. Section 01400 Quality Requirements.

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Unbound Pavement Applications of Excess Foundry System Sands: Subbase/Base Material

Unbound Pavement Applications of Excess Foundry System Sands: Subbase/Base Material Unbound Pavement Applications of Excess Foundry System Sands: Subbase/Base Material Tuncer B. Edil University of Wisconsin-Madison Recycled Materials Resource Center RMRC Participant Job Description Which

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

Should you have any questions regarding this clarification, please contact the undersigned at or (925) October 8, 2015 Revised October 13, 2015 Contra Costa Community College District 500 Court Street Martinez, CA 94553 Attention: Ron Johnson Subject: Clarification of Grading Requirements Diablo Valley

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Report of Subsurface Exploration and Geotechnical Engineering Evaluation

Report of Subsurface Exploration and Geotechnical Engineering Evaluation Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Chatham County Jail Pittsboro, North Carolina F&R Project No. 66N-0097 Prepared For: CHATHAM COUNTY P.O. Box 1809 Pittsboro,

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

Sabal Trail Pipeline Project Evaluation of Karst Topography and Sinkhole Potential for Pipeline and Facilities

Sabal Trail Pipeline Project Evaluation of Karst Topography and Sinkhole Potential for Pipeline and Facilities November 11, 2014 Sabal Trail Pipeline Project Evaluation of Karst Topography and Sinkhole Potential for Pipeline and Facilities Gulf Interstate Engineering Attention: Mr. Denys Stavnychyi - Project Engineer

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

EXHIBIT H LOT 317 GRADING AND SITE PLAN

EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT I LOT 317 ELEVATIONS ridge height 4915'-6" GENERAL & KEYED NOTES ridge height 4905'-9" 3 7 4 A5.1 1 5 ridge height 4910'-6" 2 ridge height 4906'-3" 1 Provide

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Soil Map Polk County, Florida

Soil Map Polk County, Florida Soil Map Polk County, Florida 28 9' 21'' 28 8' 23'' 3113000 3113200 3113400 3113600 3113800 3114000 3114200 3114400 3114600 81 51' 19'' 81 51' 19'' 416000 416000 ± 416200 416200 68 416400 68 416400 7 13

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION SITE DESIGN EVALUATION FOR REHABILITATION OF PINE GROVE LAKE DAM

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION SITE DESIGN EVALUATION FOR REHABILITATION OF PINE GROVE LAKE DAM REPORT OF PRELIMINARY SUBSURFACE EXPLORATION SITE DESIGN EVALUATION FOR REHABILITATION OF PINE GROVE LAKE DAM VILLAGE OF SLOATSBURG, ROCKLAND COUNTY, NEW YORK SUBMITTED TO: ASSOCIATION OF PROPERTY OWNERS

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

APPENDIX A Geotechnical Report, dated December 2009 PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX A Geotechnical Report, dated December 2009 PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX A Geotechnical Report, dated December 29 PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER INVITATION TO BID ITB NO. 11-9136-1 ADVERTISED: November, 21 MANDATORY PRE-BID MEETING: November 29, 21

More information

F_._G_. _.E_._,_L_T_D_ ~-11'-~~L ~

F_._G_. _.E_._,_L_T_D_ ~-11'-~~L ~ : e 99o'3 (} rr WtR!'~ _;, F G E,_L_T_D_ ~11'~~L ~ Fewell Geotechhicai Engineering, Ltd 3 2825 Koapaka St Honolulu, Hawaii 96819 (88) 8362171 {/~ ' File No 328,1 October 29, 198 Mr Evan Cruthers c/o Media

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS

APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS USKH Juneau International Runway 8/26 Rehabilitation Prepared For: Prepared By: 11/27/2013 PND No. 132070.02 November 2013 TABLE OF CONTENTS Page No.

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA David Harro The G3 Group, 2509 Success Drive, Suite 1, Odessa, FL 33556, david.harro@geo3group.com

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Bruce and Lee Industrial Site Florence, South Carolina August 31, 2015 Terracon Project No. 73155060 Prepared by: Terracon Consultants, Inc. August 31, 2015

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection