GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

Size: px
Start display at page:

Download "GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC"

Transcription

1 GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M August 2017

2 TABLE OF CONTENTS EXECUTIVE SUMMARY...i 1.0 INTRODUCTION LOCATION AND DESCRIPTION PROPOSED DEVELOPMENT FIELD INVESTIGATION Soil, Bedrock and Seismic Conditions Lab Test Results Terrain Conditions Groundwater Conditions DISCUSSION AND RECOMMENDATIONS - CONSTRUCTION Geotechnical Assessment Safe Building Areas Site Preparation Shallow Footings Drainage Structural Fill Concrete Slab-On-Grade Concrete Type QUALITY ASSURANCE CLOSURE REVIEW OF EXISTING INFORMATION... 8 APPENDICES Appendix I Appendix II Appendix III Appendix IV Figures Photos Borehole Logs Lab Test Reports File: 17m49r

3 EXECUTIVE SUMMARY This report provides the findings and recommendations of a geotechnical site investigation completed on seven selected lots (Lots 202, 204, 205, 206, 208, 210, and 213) in an existing subdivision on the Akisqnuk First Nation (AFN) in Windermere, BC. The purpose of the investigation was to determine soil, terrain and groundwater conditions on these sites and provide geotechnical recommendations regarding safe building areas, as well as building construction. The investigation identified areas on these lots that are conditionally safe for the placement of single-family residences. Building construction in these areas may be supported by conventional shallow footings; however, only shallow basements (i.e., footing bottoms no deeper than 1.2 m from the existing ground surface) are permissible. Deeper basements are possible on Lots 206 and 208, where the daylighting of foundation drains is possible due to sloping ground to the west. During building construction, quality assurance reviews should be conducted by a geotechnical engineer (or designate). Reviews should be conducted of the subgrade surface, placement and compaction of fills, backfill, and footing drainage systems. Construction of full basements requires engineering approval. File: 17m49r i

4 1.0 INTRODUCTION This report provides the findings and recommendations of a geotechnical site investigation completed on seven selected lots in an existing subdivision on the Akisqnuk First Nation (AFN) in Windermere, BC. The assessment was completed by (Groundtech) at the request of Adrian Bergles, Lands Manager for AFN. The purpose of the investigation was to determine soil, terrain and groundwater conditions of seven lots and provide geotechnical recommendations regarding safe building areas, as well as building construction. 2.0 LOCATION AND DESCRIPTION The subdivision is located on Subdivision Road (Figure 1), within the AFN near Windermere, BC. The subdivision is located west of Highway 95 on very gentle west-facing terrain. In terms of a topographic setting, the property is located on the east side of the Rocky Mountain Trench and approximately 830 m east of Lake Windermere. Photos of the site are found in Appendix II. There is a gravel road that provides access to 14 residential lots, seven of which are developed with residences. 3.0 PROPOSED DEVELOPMENT The seven undeveloped lots (202, 204, 205, 206, 208, 210, and 213) are being considered for the placement of houses. It is assumed the structures will be supported on conventional shallow footings with a lower level concrete slab-on-grade. Vehicle access will be via driveways from Subdivision Road. 4.0 FIELD INVESTIGATION Ms. Isabel Ferreira, E.I.T., of Groundtech, completed the field investigation on June 13 and 14, The site investigation was conducted with a visual assessment of the subject lots and adjacent areas. Using a wheeled drill rig, seven boreholes (B1 through B7) were drilled to a depth of 8.08 m, to investigate soil and groundwater conditions. The approximate borehole locations are shown on Figure 2. The soils encountered in the boreholes were visually classified and the associated stratigraphy was logged. Soil strength (Undrained shear strength - S u ) was assessed by the use of a Torvane or Pocket Penetrometer (PP) on semi-disturbed fine-grained samples (i.e., split spoon samples). Standard Penetration Testing (SPT) was also completed in the boreholes to assess in situ density/consistency of the soils. Note, SPT testing in gravelly or cobbly soils overestimate soil density due to rock effect. SPT blow counts are noted in the text as SPT followed by the blows/0.305 m (e.g., SPT 7). Split spoon sampling was completed at selected depths. Representative disturbed grab samples of selected materials were collected for future reference and/or laboratory testing. The borehole logs are found in Appendix III. The boreholes were completed with piezometers to allow for follow-up groundwater measurements. 4.1 Soil, Bedrock and Seismic Conditions Soil mapping indicates the project area is in an area mantled by glaciolacustrine sediments. The soils encountered during the field investigation are consistent with the mapping. File: 17m49r 1

5 B1 was drilled on the northwest side of Lot 213, to a depth of 8.08 m. The soil stratigraphy consisted of a top layer of loose, dry silt and sand to a depth of 0.91 m, underlain to a depth of 3.96 m by dense to very dense (SPT 42-63), dry gravel and sand with some silt. Compact (SPT 18), wet, gravelly sand with a trace of silt was found between depths of 3.96 m and 6.1 m. Deeper soil horizons consisted of very loose (SPT 3), wet sand with traces of gravel and silt, underlain at a depth of 7.62 m by loose (SPT 6), wet sand with a trace of silt. B2 was drilled on the southeast side of Lot 204. The soil stratigraphy consisted of a topsoil layer of loose, dry sand with some silt to a depth of 0.91 m, underlain by dense, dry sand with some gravel and some silt to a depth of 1.52 m. Dense to compact (SPT 30-22), dry, gravelly sand with a trace of silt was encountered between depths of 1.52 m and 3.35 m. The middle horizon consisted of loose (SPT 6-9), wet sand and silt with a trace of clay to a depth of 7.62 m. The lowermost layer was comprised of loose (SPT 7), wet silt and sand with a trace of clay to a final depth of 8.08 m. B3 was drilled on the north section of Lot 208, to a depth of 8.08 m. The soil stratigraphy consisted of a top layer of loose, moist silt with a trace of clay to a depth of 1.22 m, underlain by compact, moist, silty sand with some gravel and a trace of clay to a depth of 1.52 m. Middle horizons consisted of dense (SPT 45), moist, sandy, silty gravel between depths of 1.52 m and 2.29 m. Compact (SPT 14), dry sand with a trace of silt to loose (SPT 9) wet sand with some silt were encountered between depths of 2.29 m and 6.1 m. The lowermost horizon consisted of compact (SPT 12-11), wet sand with some silt. B4 was drilled on Lot 210, on the southwest portion of the lot. The soil stratigraphy consisted of a top layer of compact, dry silt with a trace of clay to a depth of 1.22 m, underlain by compact (SPT 18), dry, gravelly, silty sand between the depths of 1.22 m and 2.13 m. The middle horizon, between depths of 2.13 m and 4.27 m, is comprised of loose (SPT 8), moist sand with a trace of silt. The lowermost layer consisted of loose to compact (SPT 7-12), wet sand with some silt. The final depth of B4 was 8.08 m. B5 was completed on the east portion of Lot 202, to a depth of 8.08 m. The soil stratigraphy consisted of loose (SPT 6), dry sand with a trace of silt to a depth of 2.29 m, underlain by compact (SPT 16), dry sand with traces of silt and gravel between depths of 2.29 m and 3.66 m. Middle horizons consisted of compact (SPT 23), dry sand with some gravel and a trace of silt to a depth of 5.18 m. The lowermost horizons consisted of loose (SPT 7), wet sand with a trace of silt, underlain by compact (SPT 16), wet sand with some gravel a trace of silt. B6 was drilled on Lot 206, on the east side close to the main road. The soil stratigraphy consisted a thin topsoil layer of loose, moist silt with a trace of clay, underlain by loose, moist sand and gravel with a trace of silt to a depth of 1.22 m. Compact, moist sand and gravel with a trace of silt was encountered from the depths of 1.22 m to 1.52 m, underlain by compact (SPT 20), moist, sandy gravel with some silt to a depth of 2.29 m. The middle horizons consisted of compact (SPT 12), wet, gravelly sand with a trace of silt to loose (SPT 10), wet silt with some sand to a depth of 5.33 m. The lowermost horizon extended from depths of 5.33 m to 8.08 m and consisted of loose (SPT 8), wet sand and gravel with a trace of silt. B7 was drilled on the southeast portion of Lot 205, to a depth of 8.08 m. The upper soil stratigraphy consisted of a layer of loose, dry sand with a trace of silt, underlain by compact (SPT 20), dry, sandy, silty gravel to a depth of 1.83 m. Compact, moist sand and gravel with a trace of silt was encountered from depths of 1.83 m to 2.44 m. The middle horizons consisted of dense (SPT 39), wet sand with traces of gravel and clay to compact, wet sand and silt with a trace of gravel to a depth of 5.33 m. The lowermost layer consisted of loose (SPT 6-10), wet, silty sand. No bedrock was encountered during drilling; bedrock is expected to be at significant depth and should not affect construction. File: 17m49r 2

6 The soils at the site are considered to be Class E (soft) soils, in terms of the Site Classification for Seismic Site Response as per Table 6.1A in the Canadian Foundation Engineering Manual (4 th Edition). 4.2 Lab Test Results Washed gradation tests (ASTM C136 and C117) were completed on six soil samples to determine gradational characteristics. Moisture content tests were also completed on the samples. The test results are summarized in Table 1. Table 1 Sample Cobble Gravel Sand Silt Moisture (%) (%) (%) (%) Content (%) Description B1/S Gravel and sand, some silt (GM) B2/S Sand and silt (NP ML) B3/S Sandy, silty gravel (GM) B4/S Gravelly, silty sand (SM) B6/S Sandy gravel, some silt (GM) B7/S Sandy, silty gravel (GM) The above samples have significant silt content, indicating moderate to high frost action potential. None of the samples tested are suitable for re-use as structural fill. The lab test results are found in Appendix IV. 4.3 Terrain Conditions In general, the subdivision area has very gentle slopes, descending to the west with local vertical relief in the order of 1 m to 2 m. Terrain is slightly steeper on the west edge of Lots 206, 207 and 208, where the terrain forms the gentle headwall slopes of a draw. The steepest terrain was found on the southwest side of Lot 208 where slope angles approach 20. Areas containing seepage and/or wet soil areas were identified on portions of Lots 206, 208 and 213 These are interpreted to be springs and/or areas where groundwater daylights near the crest of steeper slopes. No signs of slope instability were observed on or near the site. 4.4 Groundwater Conditions Table 2 - Depth to Groundwater (June 20, 2017) Piezometer Depth to Groundwater (m) B1 4.0 B2 3.0 B3 4.2 B B B6 2.1 B The groundwater levels observed and detailed in Table 2 may not be peak levels. It is possible groundwater levels could rise to 1 m to 2 m from the ground surface, especially near B2, B6 and B7. Groundwater levels will present seasonal trends with increasing to peak levels in the spring or earlier summer; increasing trends are in response to snowmelt. Following peak levels, declining trends typically occur that extend through the remaining summer, fall and winter periods. Short-term increases can occur in response to rainfall events. File: 17m49r 3

7 5.0 DISCUSSION AND RECOMMENDATIONS - CONSTRUCTION 5.1 Geotechnical Assessment Geotechnical recommendations regarding safe building areas, as well as building construction are provided in the following report sections. Construction of residences on lots 202, 204, 205, 206, 208, 210 and 213 in areas considered safe is considered conditionally acceptable. Areas considered not safe contain weak soil and/or surface water, springs, seepage and wet soil areas. These areas are discussed further in Section 5.2 of the report. Where ground conditions are considered suitable (i.e. Safe Building Areas), buildings may be constructed with conventional strip and pad footings. Half basements (i.e., underside of the footing no deeper than 1.2 m) are permissible. Due to the potential for high groundwater, homes with full basements are not recommend unless the basement can be effectively drained downslope. Deeper basements are possible on Lots 206 and 208 where the daylighting of foundation drains is possible due to sloping ground to the west. Construction of full basements requires approval by a geotechnical engineer. 5.2 Safe Building Areas Some of the area considered for construction of residences is not considered suitable due to poor ground conditions and/or steep slopes. Building of residences in certain areas are not recommended due to the presence of weak soils and/or surface water in the form of seepage or streams. Poor soil bearing and/or challenges with respect to managing surface or groundwater are anticipated in these areas. As such, construction of residences supported on conventional shallow footings is not recommended in these areas. Certain areas were not considered suitable due to steep terrain/slope stability. To supplement the field assessment of terrain stability, a desktop study of stability of steep slopes was carried out to help delineate unsuitable building areas. It is engineering practise to require terrain considered for residential development have at least a threshold acceptance Factor of Safety (FOS) of 1.5 (static) and 1.0 (seismic) against landslides. In geotechnical engineering practise, the degree of stability of a site is measured by the FOS parameter, where the FOS is the ratio of the resisting forces to the driving forces for a given slope profile and failure surface. A FOS of close to one or less than one would represent an unstable slope. FOSs at increasing values above one lend increasing confidence in the stability of the slope. Seismic analysis was not completed for this site as static FOSs typically govern. For the desktop study, the infinite slope solution was used as an aid to define safe building areas. The infinite slope solution equation is as follows: FOS = (ć + (γ - (Dw/D)γw)Dcos 2 βtanφ )/γdsinβcosφ Where: ć = effective cohesion Φ = effective friction angle γ = moist unit weight β = slope angle γw = unit weight of water D = soil depth Dw = saturated soil depth For a dry site and assuming ć = 0 the equation simplifies to: FOS = tanφ /tanβ File: 17m49r 4

8 The soil types on the sites are variable, and include mixtures of sand and gravel and mixtures of silt and sand. Φ values for these materials typically range from 28 to in excess of 40. A Φ value of 35 and Dw/D ratio of 0.5 was selected for use in the analysis and is considered conservative. Analysis using this equation indicates a slope angle of 20 (i.e., 36 %), provides a FOS in excess of 1.5. This value, as well engineering judgement, was used as a guide in the field to identify safe building area boundaries. The safe building areas are shown on a Figure 3. Construction beyond these areas is possible, but would require special measures, further geotechnical investigation, and engineering design. 5.3 Site Preparation Subgrades should be prepared by removing any disturbed, loosened or water softened soils. Any organics should be removed from the subgrade. Any standing water within the building sites should be removed prior to site preparation. The surface of the subgrade should be trimmed smooth with the clean-up bucket of an excavator. The subgrade soils are expected to be native sand and gravel soils in some areas; as such, the subgrade surface will likely be loosened by the excavation process. This being the case, a 1000 lb vibratory plate tamper should be used to compact the subgrade prior to the placement of footings, slab-on-grade drainage layers, structural fills, etc. A minimum of four passes with the tamper should be completed. Following site preparation, heavy machinery should be restricted from prepared areas to not disturb and weaken subgrade soils. 5.4 Shallow Footings It is assumed the footing subgrades will be prepared in native sand and gravel soils. Maximum allowable soil bearing capacities of 100 kpa Serviceability Limit States (SLS) and 450 kpa Ultimate Limit States (ULS), un-factored, may be used for footing design. ULS (factored resistance) is based on shear strength and SLS is based on an acceptable total and differential settlement values, which in this case was selected as 25 mm and 19 mm, respectively. Minimum footing sizes for the residence should be consistent with the local building code. Given the soil characteristics, exterior wall footings should be founded at a minimum depth of 1.2 m below final site grade for protection from frost penetration. Similarly, footings in unheated areas should be founded at a minimum depth of 2.1 m below final site grade. If these depths cannot be achieved, the footings should be suitably insulated. 5.5 Drainage It is possible silty soils may be encountered at footing depths, such soils are prone to weakening if wetted. As such, a footing drain system should be placed at the toe of the exterior footing. The drain should consist of a rigid 100 mm diameter perforated PVC pipe covered with clean (i.e., < 5 % passing the U.S. No. 200 sieve), 50 mm minus drain rock. The pipe and drain rock system should be enveloped by nonwoven geotextile (i.e., Nilex 4551 or approved equivalent). The drain should outfall to a rock pit consisting of a 1 m wide x 1 m long x 1 m deep (i.e., below underside of footings) excavation, filled with drain rock. The drain rock fill should be separated from underlying, adjacent and overlying soils by geotextile, as described above. The rock pit should be placed west of and no closer than 10 m from the building. File: 17m49r 5

9 Where full basements are permissible, a granular 0.6 m thick (minimum) drainage layer should be placed against the exterior of basement foundation walls and consist of moderately compacted, clean (i.e., < 5 % passing the U.S. No. 200 sieve), 75 mm minus sand and gravel. To promote drainage of surface waters away from the exterior of the foundation walls, the surface of any foundation backfill should be capped with a 0.3 m minimum thickness of low permeability soil (silt/clay) and the final ground surface adjacent to the foundation walls should be sloped away from the building at a minimum grade of 1 % to 2 %. 5.6 Structural Fill Structural fill should consist of clean (i.e., < 5 % passing the U.S. No. 200 sieve), well-graded, 75 mm minus sand and gravel (pit run) or crush and should be thoroughly compacted in maximum 150 mm thick lifts. To achieve suitable compaction, a minimum of eight passes per lift with a 1000 lb vibratory plate tamper or 10,000 lb roller should be completed. Depending on the natural moisture content of the material, the addition of water may be required to achieve suitable compaction. Should this be the case, water should be applied to the fill during the spreading of lifts, prior to compaction. Compaction testing (i.e., with a nuclear densometer) should be conducted on structural fills that are thicker than 1 m. The minimum compaction should be 100 % of the material s Standard Proctor Maximum Dry Density. If the surface of the backfill on an exterior foundation wall is to support structures sensitive to settlement, such as sidewalks, driveways or parking areas, the backfill should consist of compacted structural fill, as described above. The onsite sand and gravel soils are likely suitable for re-use as structural fill but should be approved by Groundtech prior to use. 5.7 Concrete Slab-On-Grade Floor slabs-on-grade should be underlain by a granular drainage layer consisting of at least 150 mm of clean (i.e., < 5 % passing the U.S. No. 200 sieve), 19 mm minus crush or clean, 50 mm minus sand and gravel and should be thoroughly compacted using a vibrating plate tamper, as described above. To inhibit the upward migration of moisture, slabs should be separated from the underlying drainage layer by 0.15 mm (6 mil) thick polyethylene sheeting vapour barrier. Adjacent sheets of vapour barrier should overlap a minimum of 0.6 m. 5.8 Concrete Type Type 10 Normal Portland concrete is recommended, as the soils in the area typically do not have any significant soluble sulphate content. 6.0 QUALITY ASSURANCE Quality assurance reviews should be conducted by a geotechnical engineer (or designate) at intervals during construction of the structures. Reviews should be conducted of the subgrade surface, placement and compaction of fills, and footing drainage systems. If building schedules are required, these inspections are mandatory. File: 17m49r 6

10 7.0 CLOSURE This report has been prepared for the exclusive use of Akisqnuk First Nation for this project. This report is based on subsurface information obtained during the site investigation, which was conducted with accepted geotechnical engineering principles and practices. It should be noted that natural soil and groundwater conditions can be variable. No other warranty, expressed or implied, is made. Groundtech should be contacted if subsurface conditions encountered during construction differ from those anticipated and/or interpreted from the site investigation. Individual recommendations presented in this report should not be used out of context with the entire report. Interpretation of any part of this report should be made in consultation with Groundtech. Any use or reliance of this report by a third party is the responsibility of said party and Groundtech accepts no responsibility for any damages suffered by said party as a result of decisions made or actions taken based on this report. If there are any questions or concerns regarding the foregoing information, please call Douglas Clapp, P.Eng., at (250) Respectfully submitted, Douglas A. Clapp, P. Eng. DAC/dac September 30, 2017 File: 17m49r 7

11 8.0 REVIEW OF EXISTING INFORMATION The following information was reviewed as part of the investigation: 1. Soil Resources of the Lardeau Map Area (82K), RAB Bulletin 15, Report No. 27, British Columbia Soil Survey; BC Ministry of the Environment, Resource Analysis Branch; Geological Hazards and Geology of the South Columbia River Valley; Ministry of Highways and Public Works (Highways), Geotechnical and Materials Branch; March 1978, File: 17m49r 8

12 APPENDIX I Figures

13 Figure 1 Site Location Map Project: Geotechnical Site Investigation Site Location Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49fg

14 Figure 2 Site Plan Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Legend: Approximate location of boreholes: Lots of Interest: 202, 204, 205, 206, 208, 210 and 213 Scale: NTS File: 17m49fg

15 Figure 3 Safe Building Areas Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Legend: Safe Building Areas: Unsafe Building Areas: Lots of Interest: 202, 204, 205, 206, 208, 210 and 213 Scale: NTS File: 17m49fg

16 APPENDIX II Photos

17 Photo 1 South View of Subdivision Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

18 Photo 2 South View of Subdivision Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

19 Photo 3 East View of Subdivision Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

20 Photo 4 Typical Site Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

21 Photo 5 Typical Site Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

22 Photo 6 Typical Site Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

23 Photo 7 Typical Wet Area Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

24 Photo 8 Typical Wet Area Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

25 Photo 9 Typical Wet Area Project: Geotechnical Site Investigation Akisqnuk First Nation Subdivision Selected Lots Kootenay No. 3 Road Windermere, BC Scale: NTS File: 17m49ph

26 APPENDIX III Borehole Logs

27 Project No: 17m49 Project: Seven Lot Subdivsion Client: Akisqnuk First Nation Location: Lot 213 Bore Hole: B1 Date: June 13, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface light brown, loose, dry silt and sand light brown, dense to very dense, dry gravel and sand, some silt S1 S S light brown, compact, wet, gravelly sand, trace silt 3.96 S4 S m 06/20/17 switch to hollow stem light brown, very loose to loose, wet sand, trace gravel and silt 6.10 S light brown, loose, wet sand, trace silt End of Bore Hole Excavated By: Chilako Drilling Equipment: 6" Solid Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

28 Project No: 17m49 Project: Seven Lot Subdivsion Client: Akisqnuk First Nation Location: Lot 204 Bore Hole: B2 Date: June 13, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface light brown, loose, dry sand, some silt light brown, dense, dry sand, some gravel and silt S1 S2 30 light brown, compact, dry, gravelly sand, trace silt 3.00 S m 06/20/ S4 6 light brown, loose, wet sand and silt, trace clay 6.00 S light brown, loose, wet silt and sand, trace clay End of Bore Hole S Excavated By: Chilako Drilling Equipment: 6" Hollow Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

29 Project No: 17m49 Project: Seven Lot Subdivision Client: Akisqnuk First Nation Location: Lot 208 Bore Hole: B3 Date: June 13, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface 0.00 light brown, loose, moist silt, trace clay light brown, compact, moist, silty sand, some gravel, trace clay light brown, dense, moist, sandy, silty gravel S1 S2 S light brown, compact, dry sand, trace silt S light brown, loose, wet sand, some silt 4.57 S m 06/20/ S light brown, compact, wet sand, some silt 8.00 End of Bore Hole 8.08 S Excavated By: Chilako Drilling Equipment: 6" Hollow Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

30 Project No: 17m49 Project: Seven Lot Subdivision Client: Akisqnuk First Nation Location: Lot 210 Bore Hole: B4 Date: June 13, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface 0.00 light brown, compact, dry silt, trace clay light brown, compact, dry, gravelly, silty sand S light brown, loose, moist sand, trace silt S m 06/20/ S light brown, loose to compact, wet sand, some silt S End of Bore Hole 8.08 S Excavated By: Chilako Drilling Equipment: 6" Hollow Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

31 Project No: 17m49 Project: Seven Lot Subdivision Client: Akisqnuk First Nation Location: Lot 202 Bore Hole: B5 Date: June 13, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface light brown, loose, dry sand, trace silt S1 S light brown, compact, dry sand, trace silt and gravel S light brown-grey, compact, dry sand, some gravel, trace silt m 06/20/ light brown, loose, wet sand, trace silt S light brown, compact, wet sand, some gravel, trace silt 7.92 S End of Bore Hole Excavated By: Chilako Drilling Equipment: 6" Hollow Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

32 Project No: 17m49 Project: Seven Lot Subdivision Client: Akisqnuk First Nation Location: Lot 206 Bore Hole: B6 Date: June 14, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface tan, loose, moist silt, trace clay light brown, loose, moist sand and gravel, trace silt light brown, compact, moist sand and gravel, trace silt light brown, compact, moist, sandy gravel, some silt S1 S m 06/20/ light brown, compact, wet, gravelly sand, trace silt S light brown, loose, wet silt, some sand S S light brown, loose, wet sand and gravel, trace silt S End of Bore Hole Excavated By: Chilako Drilling Equipment: 6" Solid Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

33 Project No: 17m49 Project: Seven Lot Subdivision Client: Akisqnuk First Nation Location: Lot 205 Bore Hole: B7 Date: June 14, 2017 Engineer: Douglas A. Clapp Depth (m) Symbol (USCS) Description Elev./Depth (m) Number Type Uncorrected SPT Blowcounts Blows/.3m % Fines < mm Moisture Content Piezometer Remarks 0.00 Ground Surface light brown, loose, dry sand, trace silt light brown, compact, dry, sandy, silty gravel light brown, compact, moist sand and gravel, trace silt light brown, dense, wet sand, trace gravel and clay S1 S2 S m 06/20/ light brown, compact, wet sand and silt, trace gravel S S light brown, loose, wet, silty sand S End of Bore Hole 8.08 S Excavated By: Chilako Drilling Equipment: 6" Solid Stem Logged By: IF Box 688 Fernie, B.C., V0B 1M0 Datum: Sheet: 1 of 1

34 APPENDIX IV Lab Test Reports

35 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17353 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: GRAVEL and SAND, some silt/clay Sample Date: - Sample ID: B1 S1 grab 5' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm 41.1 % Sand : < 4.75mm and > 0.075mm 39.2 % Silt/Clay : < 0.075mm 19.8 % % p a s s i n g Particle Size (mm) Moisture Content: 2.3% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

36 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17352 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: SAND and SILT/CLAY Sample Date: - Sample ID: B2 S5 SS 20-22' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A 37.5 #N/A 19.0 #N/A 12.5 #N/A 9.5 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm % Sand : < 4.75mm and > 0.075mm 41.7 % Silt/Clay : < 0.075mm 58.3 % % p a s s i n g Particle Size (mm) Moisture Content: 25.4% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

37 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17348 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: Sandy, silty/clayey GRAVEL Sample Date: - Sample ID: B3 S3 grab 5-7' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm 42.0 % Sand : < 4.75mm and > 0.075mm 34.1 % Silt/Clay : < 0.075mm 23.9 % % p a s s i n g Particle Size (mm) Moisture Content: 5.8% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

38 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17351 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: Gravelly, silty/clayey SAND Sample Date: - Sample ID: B4 S1 SS 5-7' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm 26.3 % Sand : < 4.75mm and > 0.075mm 48.3 % Silt/Clay : < 0.075mm 25.4 % % p a s s i n g Particle Size (mm) Moisture Content: 5.8% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

39 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17349 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: Sandy GRAVEL, some silt/clay Sample Date: - Sample ID: B6 S1 SS 5-7.5' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm 48.7 % Sand : < 4.75mm and > 0.075mm 34.2 % Silt/Clay : < 0.075mm 17.1 % % p a s s i n g Particle Size (mm) Moisture Content: 8.2% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

40 PARTICLE SIZE ANALYSIS Project No: AR Lab ID: S17350 Project: Groundtech General Client: Groundtech Engineering Ltd Client Project: Akisqnuk Sub Attn: Doug Clapp Date Received: CC: - June 16, 2017 Sample Description: Sandy, silty/clayey GRAVEL Sample Date: - Sample ID: B7 S2 SS 5-7' Sample Time: - Sample Source: Geotechnical Investigation Sampled By: Client Specification: NA Sieve Analysis 100 % PASSING VS PARTICLE SIZE Sieve Size (mm) % Passing Specification limits #N/A 75.0 #N/A Summary Cobble : >75mm % Gravel : < 75mm and > 4.75mm 48.9 % Sand : < 4.75mm and > 0.075mm 30.0 % Silt/Clay : < 0.075mm 21.1 % % p a s s i n g Particle Size (mm) Moisture Content: 7.9% Comments: Tested in accordance with ASTM C136 Sieve Analysis of Fine and Coarse Aggregates /C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing Report Date: June 26, 2017 Reviewed By: Bryan Morrison, BSc.

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate. Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to:

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to: AMEC Earth & Environmental Limited 610 Richard Road, Prince George, BC Canada V2K 4L3 Tel +1 (250) 564-3243 Fax +1 (250) 562-7045 www.amec.com GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

SI Planning & Laboratory Testing for Hill-Site Development

SI Planning & Laboratory Testing for Hill-Site Development SI Planning & Laboratory Testing for Hill-Site Development 21 April 2009 IEM Penang Ir. Tan Yean Chin G&P Geotechnics Sdn Bhd Cameron Highlands, 1961 Genting Highland Tower 1993 Bukit Antarabangsa, 1999

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Warmate Tamunonengiyeofori Geostrat International Services Limited, Rivers State, Nigeria www.geostratinternational.com info@geostratinternational.com,

More information

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay 19 Module 5: Lecture -1 on Stability of Slopes Contents Stability analysis of a slope and finding critical slip surface; Sudden Draw down condition, effective stress and total stress analysis; Seismic

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS The City of Winnipeg Appendix A - Part 2 Bid Opportunity No. 210-2014 Addendum #1 Page 1 of 1 Template Version: C420131129 - RW APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS Quality Engineering

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report APPENDICES Appendix A City Standard Details Appendix B Engineering Geology Report APPENDIX A CITY STANDARDS DETAILS APPENDIX B ENGINEERING GEOLOGY REPORT ENGINEERING GEOLOGY REPORT WATER

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

DRAFT GEOTECHNICAL INVESTIGATION REPORT

DRAFT GEOTECHNICAL INVESTIGATION REPORT DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland 151-03483-00 Date: July 2015 WSP Canada Inc. 500 Greber

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer > i evernment OF BRITISH COLUMBIA a TO...?&.?...A 2....KO.?'!!&... Sr. *logical Engineer... Grou,,water. Section Hydrology Division Wat.er... In~.~s.tiga.ti.On.s..Branck.... 5 u BJECT...C;.roun.dw.ater...Snve

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information