1 ISSUE 1: The Western North Carolina Drainage Area Requirement Issue Several inquiries and discussions in regard to the determination of the 6-acre drainage area requirement as the upstream limit have been initiated for the Streambed Mapping Project. The 6-acre requirement was established as part of Delivery Order 30 for promoting data consistency, completeness and cost effectiveness. Background Implementation Plan Creation The Streambed Mapping Project for Western North Carolina Counties is the result of a technical report entitled, Implementation Plan to Improve the Digital Representation and Mapping of Surface Waters in North Carolina. The report was created in the fall of 2004 in response to Senate Bill 1152, which mandated that a plan be created to improve the mapping of streams and surface waters in the State of North Carolina. Previously it was established that the current stream maps used by government agencies and the private sector were often outdated, inaccurate, and incomplete, which in turn added large expenses to current projects. In order to develop an effective implementation plan, the Geographic Information Coordinating Council (GICC) tasked the Statewide Mapping Advisory Committee (SMAC) with the creation of the Stream Mapping Working Group (SMWG). The SMWG was comprised of federal, state and local agencies. Through a series of meetings with the SMWG, user requirements, mapping specifications and implementation options for the plan were established. This collaborative effort led to the identification of needs for a new statewide digital stream file that could be effectively used and maintained by federal, state and local government agencies as well as the public. The full implementation plan can be found on the North Carolina Stream Mapping Project website ( Technical Documents). The plan was adopted by the Geographic Information Coordinating Council on January 5, 2005 and was presented to the Environmental Review Commission on January 13, The plan was received favorably by both groups. The GICC approved the implementation plan on January 5, Streambed Mapping Project Origination and Basis of Drainage Area Requirement The General Assembly appropriated funds to begin streambed mapping within Senate Bill 7, Hurricane Recovery Act of Senate Bill 7 allocates mapping funds for the 19 counties in Western North Carolina that were declared disaster areas in the Hurricane Recovery Act. The consensus of the SMWG regarding the upstream limits of the stream reaches for the new dataset has been used as a basis for mapping the streambeds for the Streambed Mapping Project. In order to clarify the term streambed, the term streamlines and water bodies shall be used in its place in this document. The SMWG recommended using a 6-acre drainage area as the upstream limit for mapping the streamlines and water bodies. A drainage area standard is necessary to provide data consistency and completeness for the streambed mapping product. First Revision Date: 7/14/2006 Page 1

2 Methods Method 1 6-Acre Drainage Area Standard The goal for streambed mapping is to maximize data consistency, stream representation and map accuracy in the most cost effective manner. It has previously been determined by the SMWG that the 6-acre drainage area will meet the majority of the project s requirements. Figure 1 displays drainage areas in acres and the miles of stream that would be mapped at those specific drainage area requirements. The information is based on calculations for the entire State of North Carolina. Figure 1 indicates that as the drainage area threshold decreases, the linear miles of stream mapped increases. The project cost also increases as the number of mapped streams increases. Figure 1: Drainage Area versus Stream Miles Mapped for the State of North Carolina The 6-acre drainage area requirement also helps to alleviate another need identified by the Stream Mapping Working Group. This is the need for data completeness and consistency. It is important that data collection and attribution remain consistent throughout the 19 identified counties. The current 1:24,000 scale USGS quadrangles contain inconsistencies in data density between them. Figure 2 below shows an area of Watauga County where the Sherwood quadrangle contains a denser stream network than the surrounding quadrangles. First Revision Date: 7/14/2006 Page 2

3 Figure 2: Consistency Differences in Current USGS 1:24,000-Scale Quadrangles Method 2 Stream Origin Standard The North Carolina Department of Transportation (NCDOT), the North Carolina Division of Water Quality (NCDWQ) and other agency programs related to permitting activities for the State have additional business requirements that are outside the scope of the Streambed Mapping Project. While data consistency and completeness are required, there is an additional need for accurate upstream limits that represent the total length of the first order stream. The starting point, or origin, of the intermittent and perennial stream is essential to planning, permitting and implementation of mitigation and buffer rules within the Division of Water Quality. NCDOT and NCDWQ initiated a project in early 2004 to map and model intermittent and perennial stream origins. The data collected and derived from the NCDOT/NCDWQ effort can be indexed with the final Streambed Mapping Dataset ( # 005). Data Analysis Stream Origins in 3 Areas of NC Three field-derived stream mapping datasets were used to analyze the effectiveness of the 6- acre drainage area standard. These datasets included Greensboro, NC which is located in the Piedmont; Hendersonville, NC, an urban area in the mountains; and White Mountain (Lenoir, NC), a rural mountain site. Stream identification and origins were determined in the field using First Revision Date: 7/14/2006 Page 3

4 the DWQ methodology described in the Stream Identification Manual version 3.1. This methodology was originally developed by DWQ and NCSU along with other agency and private industry personnel, and was implemented as a state policy in Each dataset was spatially analyzed using Geographic Information Systems (GIS) to determine the contributing drainage area to each stream origin. Drainage area data was then compared to a 6-acre threshold to assess the number of origins captured in a 6-acre drainage area. The comparisons of the stream origins to the 6-acre drainage area standard are included in Table 1 below. Table 1: Field Mapped Stream Origin Data Watershed Approximate Land Area (Acres) Number of Intermittent Origins Number of Perennial Origins Total Number of Origins Number of Origins Covered by 6 Acres Greensboro 25, White Mountain Hendersonville* 13, *Flow duration of origins was not determined The Greensboro data showed that 368 origin points (82%) were collected using 6-acres as the upstream drainage limit. Data obtained from Hendersonville indicated that only 30 of 119 (25%) stream origins were missed, or the 6-acre threshold captured 75% of all stream origins. The analysis from White Mountain revealed that 10 of 41 origins (25%) were not captured in the 6 acre stream limit. Data Analysis Stream Origins in White Mountain Additional analysis was performed on the White Mountain data to assess the miles of stream collected by digitizing to the stream origin point. This analysis was done by extending the 6- acre stream shapefile to the stream origin points or in some cases deleting the extra linework so that it stops at the stream origin points. The miles of stream were then calculated for both instances and compared to the original 6-acre streamlines. The results of this analysis are shown in Figure 3 and Table 2 below. In the White Mountain area, the longest distance from a 6 acre stream to a stream origin was 485 ft. Using 485 ft. as the maximum distance needed to intersect a stream origin, it can then be determined that a maximum of 17,453 feet of streams would need to be added to the White Mountain line work to match the stream origins. When this is calculated out across the entire project area, it would add approximately 24,508 miles on top of the existing 55,697 miles of stream in the current project area. First Revision Date: 7/14/2006 Page 4

5 Figure 3: White Mountain Sample of Color Coded Streams Analysis Table 2: White Mountain Stream Origin Analysis Stream Description Color Correlation with Figure 3 Length in Feet Streams Added to Origin Point RED Lines 4,286 Streams not Associated with Origin Point YELLOW Line Length 3,079 Streams Removed to Origin Point GREEN Line Length 3,168 Additional Linework Subtracted from Clipped Line Work Total 6 Acre Stream Coverage In Addition to Origin Points RED Length - GREEN Length 1,118 YELLOW + GREEN - RED 1,961 The results from Table 2 indicate that an additional 1,961 feet of streams were delineated at the 6 acre level than what would have been delineated using the origin points. An important First Revision Date: 7/14/2006 Page 5

6 note is that most of the additional streams collected at the 6 acre level are streams that only flow during heavy rains. Data Analysis Stream Origins in Greensboro A separate analysis was also performed using the City of Greensboro s stream study data. This data was used to assess the percent of field-determined stream origins captured within a 6-acre drainage area as compared to other drainage area limits. The results of this analysis are shown in Table 2 below. Table 3: Stream Origin Capture Greensboro, NC The data indicates as the drainage area for mapping the headwaters of streams decreases, the number of breakpoints captured increases. At a 20-acre drainage area requirement, 53% of the intermittent / perennial breakpoints are captured, and at a 6-acre drainage requirement the percentage of breakpoints captured increases to 95%. The results displayed in Table 3 indicate that using a drainage area requirement for mapping the headwaters of streams will capture intermittent as well as perennial streams. Given the relative low percentage of missed streams illustrated by these datasets, the recognition that DWQ stream origin breaks can be indexed to the final map product and the essential need for cost effectiveness and mapping consistency, the 6-acre drainage area standard for generating the Streambed Mapping Dataset is the most feasible. Recommendations Mapping the streamlines and water bodies to the 6-acre requirement is the recommended solution for the 19 counties in Western North Carolina. This solution provides a uniform product throughout the Streambed Mapping Project study areas. As the project moves to other regions of the state, this drainage area requirement may change according to changes in topography and regulations. Concerns regarding the 6-acre drainage area threshold for streams by DWQ and DOT staff centered on the need for accurately represented stream length. All participating agencies in the SMWG recognize the stream length need, but also balance that need with mapping consistency and cost across the state. Mapping all the origins of the state within the time frame allotted for First Revision Date: 7/14/2006 Page 6

7 the Streambed Mapping Project would cost in excess of 0.5 billion dollars. Since a DWQ project is currently underway to map origins across the state, this data can easily be integrated into the Streambed Mapping Project as it becomes available. The business and technical procedure will be determined as part of the Data Maintenance Plan. Issue paper #005 addresses these needs and procedures. For this reason, the 6-acre standard should not be revised at this late date. Discussion Summary Date Discussed: December 7 th, 2005 Discussion Participants: Scott Edelman, Melani Harrell, Terri McLean, Joe Sewash, Silvia Terziotti, Periann Russell Summary of Discussion The 6-acre drainage area requirement was established by the Stream Mapping Working Group (SMWG) in the fall of 2004, and will be used as the upstream mapping limits for the Streambed Mapping Project in Western North Carolina. This drainage area requirement will need to be revisited when the project moves to other regions of the state. It was noted that the SMWG also cited a need for data consistency across the state. Suggestions from the discussion on items to incorporate in the issue paper included: How agencies use the digital streamline and water body data Agencies that were involved in the creation of the Implementation Plan to Improve the Mapping and Digital Representation of Surface Waters in North Carolina How consensus from the SMWG was derived Who approved the Implementation Plan Other agencies that may be performing similar projects During the Advisory Committee Meeting held on July 14, 2006, the additions and revisions to the issue paper were reviewed. A section entitled Data Analysis Stream Origins in 3 Areas of NC was added to the issue paper by NCDWQ. This analysis utilized three field-derived stream mapping datasets to analyze the effectiveness of the 6-acre drainage area standard. Watershed Concepts also added a section to the issue paper called Data Analysis Stream Origins in White Mountain. White Mountain data was assessed to determine the miles of stream collected by digitizing to the stream origin point versus digitizing to the 6-acre upstream limit. Final Guidelines The final guidelines for this issue paper are to use the recommendations provided in Method 1. This method utilizes the 6 acre drainage area standard for the upstream limit of streamlines collected for the Streambed Mapping Project. First Revision Date: 7/14/2006 Page 7

Development of Improved Stream Mapping for NC

Development of Improved Stream Mapping for NC Development of Improved Stream Mapping for NC Presentation for Soil Science Society of North Carolina NC Division of Water Quality January 21, 2009 What are stream maps used for? Riparian buffer rules

More information

Flood Hazard Zone Modeling for Regulation Development

Flood Hazard Zone Modeling for Regulation Development Flood Hazard Zone Modeling for Regulation Development By Greg Lang and Jared Erickson Pierce County GIS June 2003 Abstract The desire to blend current digital information with government permitting procedures,

More information

MISSOURI LiDAR Stakeholders Meeting

MISSOURI LiDAR Stakeholders Meeting MISSOURI LiDAR Stakeholders Meeting East-West Gateway June 18, 2010 Tim Haithcoat Missouri GIO Enhanced Elevation Data What s different about it? Business requirements are changing.fast New data collection

More information

Summary Description Municipality of Anchorage. Anchorage Coastal Resource Atlas Project

Summary Description Municipality of Anchorage. Anchorage Coastal Resource Atlas Project Summary Description Municipality of Anchorage Anchorage Coastal Resource Atlas Project By: Thede Tobish, MOA Planner; and Charlie Barnwell, MOA GIS Manager Introduction Local governments often struggle

More information

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA O. Gerald Uba Metro, Portland, Oregon OVERVIEW The extent to which we understand "below ground"

More information

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions The Use of Geographic Information Systems (GIS) by Local Governments Giving municipal decision-makers the power to make better decisions Case Study: Examples of GIS Usage by Local Governments in North

More information

Issue 44: Phase II & III H&H Issues Date: 07/03/2006 Page 1

Issue 44: Phase II & III H&H Issues Date: 07/03/2006 Page 1 Background Phase I of the NCFMP studies have primarily focused on the coastal plain and sandhills physiographic regions in of the State. Phase II and III study areas will focus on the piedmont, foothills,

More information

State Geographic Information Consolidation Implementation Plan

State Geographic Information Consolidation Implementation Plan State Geographic Information Consolidation Implementation Plan As Directed by Session Law 2008-0107 Section 6.13 Prepared By: State Chief Information Officer Geographic Information Coordinating Council

More information

Report from the Geographic Information Coordinating Council

Report from the Geographic Information Coordinating Council Report from the Geographic Information Coordinating Council Presented by: Dr. Lee Mandell, Chair North Carolina Geographic Information Coordinating Council What is GIS? Geography plays a role in nearly

More information

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 INTRODUCTION Emergency Action Plans (EAPs) are critical to reducing the risks

More information

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona Item Type Reports (Electronic) Authors Deveney, Matthew R. Publisher The University of Arizona. Rights Copyright is held

More information

Down East RPO. Strategic Prioritization Office of Transportation Local Input Point Assignment Methodology. Introduction

Down East RPO. Strategic Prioritization Office of Transportation Local Input Point Assignment Methodology. Introduction Down East RPO Introduction Strategic Prioritization Office of Transportation Local Input Point Assignment Methodology The Down East Rural Planning Organization (DERPO) is required by state law to develop

More information

COGCC Interim Policy for APDs. Tutorial December 2008

COGCC Interim Policy for APDs. Tutorial December 2008 COGCC Interim Policy for APDs Tutorial December 2008 Purpose of Interim Policy and Interim Policy Period The Interim Policy was requested by the Commission to gather data on the number of permits filed

More information

Satellite Imagery: A Crucial Resource in Stormwater Billing

Satellite Imagery: A Crucial Resource in Stormwater Billing Satellite Imagery: A Crucial Resource in Stormwater Billing May 10, 2007 Carl Stearns Engineering Technician Department of Public Works Stormwater Services Division Sean McKnight GIS Coordinator Department

More information

Introducing Iowa StreamStats Version 4, a Redesign of the USGS Application for Estimating Streamflow Stats

Introducing Iowa StreamStats Version 4, a Redesign of the USGS Application for Estimating Streamflow Stats Introducing Iowa StreamStats Version 4, a Redesign of the USGS Application for Estimating Streamflow Stats Presented at the 2016 Iowa Water Conference Ames, IA March 24, 2016 by David Eash U.S. Geological

More information

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Introduction Abstract: The use of ArcMap to calculate soil areas for storm water

More information

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner Texas A&M University Zachry Department of Civil Engineering CVEN 658 Civil Engineering Applications of GIS Instructor: Dr. Francisco Olivera A GIS-based Approach to Watershed Analysis in Texas Author:

More information

Statewide Topographic Mapping Program

Statewide Topographic Mapping Program Statewide Topographic Mapping Program February 28, 2018 www.dotd.la.gov Outline Purpose of the Statewide Topographic Mapping Program History Breakdown of R.S. 48:36 - Topographic Mapping Statewide Topographic

More information

MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL

MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL Report No. K-TRAN: KU-03-1 FINAL REPORT MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL C. Bryan Young The University of Kansas Lawrence, Kansas JULY 2006 K-TRAN A COOPERATIVE TRANSPORTATION

More information

Leveraging LiDAR for Statewide NHD Hydrography Projects. Susan Phelps, CFM, GISP

Leveraging LiDAR for Statewide NHD Hydrography Projects. Susan Phelps, CFM, GISP Leveraging LiDAR for Statewide NHD Hydrography Projects Susan Phelps, CFM, GISP Mon, July 11 th, 2016 National Hydrography Dataset (NHD) Background Why Local-Res NHD? Drivers Include: Availability of accurate

More information

NAVAJO NATION PROFILE

NAVAJO NATION PROFILE NAVAJO NATION PROFILE Largest land based area and federally recognized tribe in the United States Over 27,000 square miles (or 17.2 million acres with a population of over 300,000 people. Covers Arizona,

More information

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville 2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville Prepared for: Town of Cary Town of Apex Town of Morrisville RTP South/Wake County Submitted to: North

More information

Document Title. Estimating the Value of Partner Contributions to Flood Mapping Projects. Blue Book

Document Title. Estimating the Value of Partner Contributions to Flood Mapping Projects. Blue Book Document Title Estimating the Value of Partner Contributions to Flood Mapping Projects Blue Book Version 1.1 November 2006 Table of Contents 1. Background...1 2. Purpose...1 3. Overview of Approach...2

More information

Base Level Engineering FEMA Region 6

Base Level Engineering FEMA Region 6 Base Level Engineering Over the past five years, has been evaluating its investment approach and data preparation work flow to establish an efficient and effective change in operation, generating an approach

More information

LRS Task Force June 13, REVISION HISTORY

LRS Task Force June 13, REVISION HISTORY North Carolina Department of Transportation Geographic Information Systems (GIS) Unit LINEAR REFERENCING SYSTEM (LRS) PROJECT DEFINITION Version 1.0 REVISION HISTORY Date Document Manager Revision Purpose

More information

State GIS Officer/GIS Data

State GIS Officer/GIS Data State GIS Officer/GIS Data This Act creates the position of state Geographic Information Systems (GIS) officer. The Act: requires the state GIS officer to adopt or veto the GIS data standards and a statewide

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Right of Way Mapping TxDOT Internal Audit Division Objective To determine the efficiency and effectiveness of district mapping procedures. Opinion Based on the audit scope areas reviewed,

More information

DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017

DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017 DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017 1 ABOUT DOGAMI AGENCY MISSION, VISION & GOALS 2 Lidar image of a stream network along the Umpqua

More information

USGS Data Initiatives for Elevation, Streams and Topo Maps

USGS Data Initiatives for Elevation, Streams and Topo Maps USGS Data Initiatives for Elevation, Streams and Topo Maps Gary Merrill, USGS Geospatial Liaison for Carolinas Silvia Terziotti, USGS Assoc. Geospatial Liaison for North Carolina, Water Communities of

More information

U.S. Geological Survey Agency Briefing for MAPPS Mark L. DeMulder Director, National Geospatial Program. March 12, 2013

U.S. Geological Survey Agency Briefing for MAPPS Mark L. DeMulder Director, National Geospatial Program. March 12, 2013 + U.S. Geological Survey Agency Briefing for MAPPS Mark L. DeMulder Director, National Geospatial Program March 12, 2013 + 3D Elevation Program (3DEP) National Leadership The National Enhanced Elevation

More information

Large Scale Mapping Policy for the Province of Nova Scotia

Large Scale Mapping Policy for the Province of Nova Scotia Large Scale Mapping Policy for the Province of Nova Scotia December, 2005 Version 1.0 TABLE OF CONTENTS PAGE BACKGROUND...3 POLICY...5 Policy 1.0 Large Scale Mapping Program...5 Policy 2.0 Service Offering...5

More information

2018/1 The integration of statistical and geospatial information. The Regional Committee of UN-GGIM: Americas:

2018/1 The integration of statistical and geospatial information. The Regional Committee of UN-GGIM: Americas: The following are the conclusions and recommendations of the Regional Committee of the United Nations on Global Geospatial Information Management for the Americas, during its Fifth Session, Thursday 8

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

Remote Sensing and Geospatial Application for Wetlands Mapping, Assessment, and Mitigation

Remote Sensing and Geospatial Application for Wetlands Mapping, Assessment, and Mitigation Remote Sensing and Geospatial Application for Wetlands Mapping, Assessment, and Mitigation Hydrology Soils MSU Seminar Series Remote Sensing and Geospatial Applications September 4, 2002 Vegetation NEPA

More information

Association of State Floodplain Managers, Inc.

Association of State Floodplain Managers, Inc. Association of State Floodplain Managers, Inc. 2809 Fish Hatchery Road, Suite 204, Madison, WI 53713 Phone: 608-274-0123 Fax: 608-274-0696 Email: asfpm@floods.org Website: www.floods.org Need for Updating

More information

Center for Geographic Information and Analysis Tim Johnson Darrin Smith Ben Shelton. Greensboro, NC January 22, 2015

Center for Geographic Information and Analysis Tim Johnson Darrin Smith Ben Shelton. Greensboro, NC January 22, 2015 Northern Piedmont and Mountains Orthoimagery 2014 Center for Geographic Information and Analysis Tim Johnson Darrin Smith Ben Shelton Greensboro, NC January 22, 2015 Today 1. Introductions 2. Program/Project

More information

Oregon APA Legal Issues Workshop December 7, Tricia Sears, DLCD With information from Bill Burns, DOGAMI

Oregon APA Legal Issues Workshop December 7, Tricia Sears, DLCD With information from Bill Burns, DOGAMI Oregon APA Legal Issues Workshop December 7, 2018 Tricia Sears, DLCD With information from Bill Burns, DOGAMI How this Topic Arrived WE FREQUENTLY HEAR CONCERNS ABOUT LIABILITY AND TAKINGS. Current federal

More information

Section 2. Indiana Geographic Information Council: Strategic Plan

Section 2. Indiana Geographic Information Council: Strategic Plan Section 2. Indiana Geographic Information Council: Strategic Plan Introduction A geographic information system (GIS) is an automated tool that allows the collection, modification, storage, analysis, and

More information

BROADBAND DEMAND AGGREGATION: PLANNING BROADBAND IN RURAL NORTHERN CALIFORNIA

BROADBAND DEMAND AGGREGATION: PLANNING BROADBAND IN RURAL NORTHERN CALIFORNIA BROADBAND DEMAND AGGREGATION: PLANNING BROADBAND IN RURAL NORTHERN CALIFORNIA Steven J. Steinberg, Ph.D a,b, *, Rebecca Degagne a, M.S., Michael Gough a a Institute for Spatial Analysis, Humboldt State

More information

ACCURACY ASSESSMENTS FOR HEADWATER STREAM MAPS IN WESTERN NORTH CAROLINA

ACCURACY ASSESSMENTS FOR HEADWATER STREAM MAPS IN WESTERN NORTH CAROLINA ACCURACY ASSESSMENTS FOR HEADWATER STREAM MAPS IN WESTERN NORTH CAROLINA Amanda Marie Johnson Department of Forestry and Environmental Resources North Carolina State University May 2013 Dr. Ted Shear Dr.

More information

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303)

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303) Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts Protecting Groundwater Sources from Flood Borne Contamination Ben Binder (303) 860-0600 Digital Design Group, Inc. The Problem Houston

More information

CHAPTER 7 PRODUCT USE AND AVAILABILITY

CHAPTER 7 PRODUCT USE AND AVAILABILITY CHAPTER 7 PRODUCT USE AND AVAILABILITY Julie Prior-Magee Photo from SWReGAP Training Site Image Library Recommended Citation Prior-Magee, J.S. 2007. Product use and availability. Chapter 7 in J.S. Prior-Magee,

More information

Watershed Delineation

Watershed Delineation Watershed Delineation Jessica L. Watkins, University of Georgia 2 April 2009 Updated by KC Love February 25, 2011 PURPOSE For this project, I delineated watersheds for the Coweeta synoptic sampling area

More information

NC DWQ Stormwater Permitting Interactive Map

NC DWQ Stormwater Permitting Interactive Map P a g e 1 NC DWQ Stormwater Permitting Interactive Map Using This Map This interactive map viewer uses Google Fusion Tables to show North Carolina permitting information in a Google Maps Interface. Finding

More information

4. GIS Implementation of the TxDOT Hydrology Extensions

4. GIS Implementation of the TxDOT Hydrology Extensions 4. GIS Implementation of the TxDOT Hydrology Extensions A Geographic Information System (GIS) is a computer-assisted system for the capture, storage, retrieval, analysis and display of spatial data. It

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 This section of the Draft Environmental Impact Report (DEIR) evaluated potential impacts to mineral resources from implementation of the General Plan. 5.11.1 Environmental Setting Minerals are defined

More information

Nomination Form. Clearinghouse. New York State Office for Technology. Address: State Capitol-ESP, PO Box

Nomination Form. Clearinghouse. New York State Office for Technology. Address: State Capitol-ESP, PO Box NASIRE 2001 RECOGNITION AWARDS Recognizing Outstanding Achievement in the Field of Innovative Use of Technology Nomination Form Title of Nomination: Manager/Job Title: Agency: NYS Geographic Information

More information

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION SALARY RANGE INITIATION $43,277 SIX MONTHS $45,367 POSITION GRADE PAT VI The Evansville-Vanderburgh County Area Plan

More information

2010 Census Data Release and Current Geographic Programs. Michaellyn Garcia Geographer Seattle Regional Census Center

2010 Census Data Release and Current Geographic Programs. Michaellyn Garcia Geographer Seattle Regional Census Center 2010 Census Data Release and Current Geographic Programs Michaellyn Garcia Geographer Seattle Regional Census Center 2010 Center of Population Located approximately 2.7 miles northeast of Plato, Missouri

More information

Appendix I Feasibility Study for Vernal Pool and Swale Complex Mapping

Appendix I Feasibility Study for Vernal Pool and Swale Complex Mapping Feasibility Study for Vernal Pool and Swale Complex Mapping This page intentionally left blank. 0 0 0 FEASIBILITY STUDY BY GIC AND SAIC FOR MAPPING VERNAL SWALE COMPLEX AND VERNAL POOLS AND THE RESOLUTION

More information

If you aren t familiar with Geographical Information Systems (GIS), you. GIS, when combined with a database that stores response information,

If you aren t familiar with Geographical Information Systems (GIS), you. GIS, when combined with a database that stores response information, Geographical Information Systems in EMS By William E. Ott If you aren t familiar with Geographical Information Systems (GIS), you should take a look at what GIS can offer you as an EMS manager. GIS, when

More information

Indiana GIS Local Resolution NHD Applications. Indiana State GIS Conference

Indiana GIS Local Resolution NHD Applications. Indiana State GIS Conference Indiana GIS Local Resolution NHD Applications Indiana State GIS Conference May 7, 2013 Agenda Topics I. Indiana s National Hydrography y Data II. Accessing NHD Data III. Demonstrations Using Local NHD

More information

Nebraska. Large Area Mapping Initiative. The Nebraska. Introduction. Nebraska Department of Natural Resources

Nebraska. Large Area Mapping Initiative. The Nebraska. Introduction. Nebraska Department of Natural Resources Nebraska Department of Natural Resources Introduction The Nebraska The Nebraska Department of Natural Resources (NDNR) has developed a process for using a geographic information system (GIS) to map Approximate

More information

Summary of Available Datasets that are Relevant to Flood Risk Characterization

Summary of Available Datasets that are Relevant to Flood Risk Characterization Inter-Agency Characterization Workshop February 25-27, 2014 USACE Institute for Water Resources, Alexandria, VA, IWR Classroom Summary of Available Datasets that are Relevant to Characterization National

More information

OREGON POPULATION FORECAST PROGRAM

OREGON POPULATION FORECAST PROGRAM OREGON POPULATION FORECAST PROGRAM PROGRAM OVERVIEW BACKGROUND Beginning in 1973 with the passage of Senate Bill (SB) 100, Oregon s growth management system has relied on population forecasts as the primary

More information

Huron Creek Watershed 2005 Land Use Map

Huron Creek Watershed 2005 Land Use Map Huron Creek Watershed 2005 Land Use Map Created By: Linda Kersten, 12/20/06 Created For: MTU Introduction to GIS Class (FW 5550) The Huron Creek Watershed Advisory Committee Michigan Technological University,

More information

9. GEOLOGY, SOILS, AND MINERALS

9. GEOLOGY, SOILS, AND MINERALS June 28, 2018 Page 9-1 9. GEOLOGY, SOILS, AND MINERALS This EIR chapter describes the existing geological, soil, and mineral conditions in the planning area. The chapter includes the regulatory framework

More information

An Internet-Based Integrated Resource Management System (IRMS)

An Internet-Based Integrated Resource Management System (IRMS) An Internet-Based Integrated Resource Management System (IRMS) Third Quarter Report, Year II 4/1/2000 6/30/2000 Prepared for Missouri Department of Natural Resources Missouri Department of Conservation

More information

Quality Assurance Project Plan (QAPP) - Vegetation Survey of Huron Creek Houghton, MI

Quality Assurance Project Plan (QAPP) - Vegetation Survey of Huron Creek Houghton, MI Quality Assurance Project Plan (QAPP) - Vegetation Survey of Huron Creek Houghton, MI Prepared By: Linda D. Kersten, Dr. Alex S. Mayer Michigan Technological University, Center for Water & Society Prepared

More information

Mapping Headwater Streams. Intermittent and Perennial Headwater Stream Model Development and Spatial Application

Mapping Headwater Streams. Intermittent and Perennial Headwater Stream Model Development and Spatial Application Mapping Headwater Streams: Intermittent and Perennial Headwater Stream Model Development and Spatial Application North Carolina Division of Water Quality Final Report for Federal Highway Administration

More information

Megan Durden, North Carolina State Archives Butch Lazorchak, Library of Congress Mark Myers, Kentucky State Archives Best Practices Exchange, Helena,

Megan Durden, North Carolina State Archives Butch Lazorchak, Library of Congress Mark Myers, Kentucky State Archives Best Practices Exchange, Helena, GIS are from Mars, Archivists are from Venus: Linking State Government Geospatial Professionals and their Cultural l Heritage Counterparts Megan Durden, North Carolina State Archives Butch Lazorchak, Library

More information

Presented by: Bryan Bloch GIS Specialist DNREC Division of Watershed Stewardship

Presented by: Bryan Bloch GIS Specialist DNREC Division of Watershed Stewardship Presented by: Bryan Bloch GIS Specialist DNREC Division of Watershed Stewardship Bryan Hall, AICP Sussex County Circuit Rider Planner, Office of State Planning Coordination, OMB November 19, 2012 UD Sustainable

More information

Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood

More information

Center for Geographic Information and Analysis Darrin Smith Ben Shelton. Morganton, NC January 29, 2015

Center for Geographic Information and Analysis Darrin Smith Ben Shelton. Morganton, NC January 29, 2015 Northern Piedmont and Mountains Orthoimagery 2014 Center for Geographic Information and Analysis Darrin Smith Ben Shelton Morganton, NC January 29, 2015 Today 1. Introductions 2. Program/Project overview

More information

Appropriation Directions for 2007

Appropriation Directions for 2007 INSPIRE in Sweden An Important Part of the National Geodata Strategy Monica Lagerqvist Nilsson Appropriation Directions for 2007 A commission to investigate the necessity to adjust the Swedish legislation

More information

John Laznik 273 Delaplane Ave Newark, DE (302)

John Laznik 273 Delaplane Ave Newark, DE (302) Office Address: John Laznik 273 Delaplane Ave Newark, DE 19711 (302) 831-0479 Center for Applied Demography and Survey Research College of Human Services, Education and Public Policy University of Delaware

More information

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION Gaurav Savant (gaurav@engr.msstate.edu) Research Assistant, Department of Civil Engineering, Lei Wang (lw4@ra.msstate.edu) Research

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies POLICY: FI/PL/03 Issued on August 5, 2012 Fee Policy for GEF Partner Agencies Summary: The proposed Agency fee structure in this paper is the decision of the GEF Council from its meeting of June 2012.

More information

Minimum Standards for Wetland Delineations

Minimum Standards for Wetland Delineations Minimum Standards for Wetland Delineations Jason Gipson Chief, Utah/Nevada Regulatory Branch Sacramento District Regulatory Program Workshop 16 Mar 2016 US Army Corps of Engineers Delineation Report Minimum

More information

5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN

5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN 5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN To provide a strong foundation for mitigation strategies considered in Sections 6 and 9, County considered a full range of natural hazards that could impact

More information

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries StreamStats: Delivering Streamflow Information to the Public By Kernell Ries U.S. Department of the Interior U.S. Geological Survey MD-DE-DC District 410-238-4317 kries@usgs.gov StreamStats Web Application

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

GEOVEKST A Norwegian Program for Cost Sharing in Production, Updating and Administration of Geographic Data

GEOVEKST A Norwegian Program for Cost Sharing in Production, Updating and Administration of Geographic Data GEOVEKST A Norwegian Program for Cost Sharing in Production, Updating and Administration of Dr. Anne Kirsten S. HØSTMARK, Norway Key words: Mapping in large scale, formal co-operation, cost sharing, standarised

More information

A Comparison of Manual and Computer-Assisted Drainage Delineation Methods for Hydrologic-Unit Map Development

A Comparison of Manual and Computer-Assisted Drainage Delineation Methods for Hydrologic-Unit Map Development This paper was peer-reviewed for scientific content. Pages 1118-1127. In: D.E. Stott, R.H. Mohtar and G.C. Steinhardt (eds). 2001. Sustaining the Global Farm. Selected papers from the 10th International

More information

To: Ross Martin, Lisa Stapleton From: Brad Lind Subject: Joint Funding Agreement with USGS for 2012 Imagery Date: March 14, 2012.

To: Ross Martin, Lisa Stapleton From: Brad Lind Subject: Joint Funding Agreement with USGS for 2012 Imagery Date: March 14, 2012. To: Ross Martin, Lisa Stapleton From: Brad Lind Subject: Joint Funding Agreement with USGS for 2012 Imagery Date: March 14, 2012 Attached are two copies of the Joint Funding Agreement (JFA) between SanGIS

More information

Dunn County Snow Removal Policy

Dunn County Snow Removal Policy Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern

More information

Hydrology and Watershed Analysis

Hydrology and Watershed Analysis Hydrology and Watershed Analysis Manual By: Elyse Maurer Reference Map Figure 1. This map provides context to the area of Washington State that is being focused on. The red outline indicates the boundary

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

A Comprehensive Inventory of the Number of Modified Stream Channels in the State of Minnesota. Data, Information and Knowledge Management.

A Comprehensive Inventory of the Number of Modified Stream Channels in the State of Minnesota. Data, Information and Knowledge Management. A Comprehensive Inventory of the Number of Modified Stream Channels in the State of Minnesota Data, Information and Knowledge Management Glenn Skuta Environmental Analysis and Outcomes Division Minnesota

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Albuquerque City-wide Zoning Remapping

Albuquerque City-wide Zoning Remapping Albuquerque City-wide Zoning Remapping Michelle Gricius, City of Albuquerque Planning Department Albuquerque Geographic Information System (AGIS) Division City of Albuquerque Annexation History Albuquerque

More information

Using ArcGIS for Hydrology and Watershed Analysis:

Using ArcGIS for Hydrology and Watershed Analysis: Using ArcGIS 10.2.2 for Hydrology and Watershed Analysis: A guide for running hydrologic analysis using elevation and a suite of ArcGIS tools Anna Nakae Feb. 10, 2015 Introduction Hydrology and watershed

More information

Case study: Nairobi City County CBD and its Environs. Presenter: Peter Patrick Kioko. Supervisor: Mr. B.M. Okumu

Case study: Nairobi City County CBD and its Environs. Presenter: Peter Patrick Kioko. Supervisor: Mr. B.M. Okumu Case study: Nairobi City County CBD and its Environs Presenter: Peter Patrick Kioko Supervisor: Mr. B.M. Okumu OUTLINE Introduction Problem Statement Objectives Area of study Application of GIS Methodology

More information

Ministry of Health and Long-Term Care Geographic Information System (GIS) Strategy An Overview of the Strategy Implementation Plan November 2009

Ministry of Health and Long-Term Care Geographic Information System (GIS) Strategy An Overview of the Strategy Implementation Plan November 2009 Ministry of Health and Long-Term Care Geographic Information System (GIS) Strategy An Overview of the Strategy Implementation Plan November 2009 John Hill, Health Analytics Branch Health System Information

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 18 July 2016 Original: English Committee of Experts on Global Geospatial Information Management Sixth session New York, 3-5 August 2016 Item 2

More information

www.ct.gov/opm/cdplan Role of the Locational Guide Map State agencies shall not provide funding for certain growth-related projects unless such projects are located within a priority funding area LGM shall

More information

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement The scope of work that follows incorporates and covers

More information

Baldwin County, Alabama

Baldwin County, Alabama 2015 Baldwin County, Alabama Multi-Hazard Mitigation Plan I. Comprehensive Plan A multi-jurisdiction plan City of Bay Minette City of Daphne Town of Elberta City of Fairhope City of Foley City of Gulf

More information

Floodplain Mapping & Flood Warning Applications in North Carolina

Floodplain Mapping & Flood Warning Applications in North Carolina Floodplain Mapping & Flood Warning Applications in North Carolina Marc Stanard, IT Project Manager Ken Ashe, Assistant Director David Herlong, Flood Warning Program Manager NC Crime Control & Public Safety

More information

Delineation of Watersheds

Delineation of Watersheds Delineation of Watersheds Adirondack Park, New York by Introduction Problem Watershed boundaries are increasingly being used in land and water management, separating the direction of water flow such that

More information

Natural and Human Influences on Flood Zones in Wake County. Georgia Ditmore

Natural and Human Influences on Flood Zones in Wake County. Georgia Ditmore Natural and Human Influences on Flood Zones in Wake County Georgia Ditmore Prepared for GEOG 591 December 5, 2014 2 Table of Contents Introduction.3 Objectives...5 Methods...6 Conclusion.11 References

More information

Use of administrative registers for strengthening the geostatistical framework of the Census of Agriculture in Mexico

Use of administrative registers for strengthening the geostatistical framework of the Census of Agriculture in Mexico Use of administrative registers for strengthening the geostatistical framework of the Census of Agriculture in Mexico Susana Pérez INEGI, Dirección de Censos y Encuestas Agropecuarias. Avenida José María

More information

2016 NC Coastal Local Governments Annual Meeting

2016 NC Coastal Local Governments Annual Meeting 6 NC Coastal Local Governments Annual Meeting NCFMP Coastal Map Maintenance Flood Study Updates and Changes April, 6 Tom Langan, PE, CFM Engineering Supervisor NCEM-Risk Management - Floodplain Mapping

More information

GISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland. G. E. Moglen 1

GISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland. G. E. Moglen 1 GISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland G. E. Moglen 1 1 Department of Civil and Environmental Engineering, University of Maryland, College Park, MD 20742; PH (301) 405-1964;

More information

MAUI. Introduction - Maui ISLAND OF MAUI

MAUI. Introduction - Maui ISLAND OF MAUI ISLAND OF MAUI MAUI Located about 30 miles NNW of the Island of Hawaiÿi, Maui is the second youngest island in the Hawaiian Chain and roughly one-fifth the size (729 square miles) of the Big Island. It

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management US Army Corps of Engineers Missouri River Navigator s Meeting February 12, 2014 Bill Doan, P.E. Missouri River Basin Water Management US Army Corps of Engineers BUILDING

More information

Census and USGS: Bringing Improved TIGER to The National Map. Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS

Census and USGS: Bringing Improved TIGER to The National Map. Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS Census and USGS: Bringing Improved TIGER to The National Map Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS USGS and the Census Bureau Since 1880 there has been a close working relationship

More information

5.11 MINERAL RESOURCES

5.11 MINERAL RESOURCES 5.11 This section of the Draft PEIR evaluates the potential impacts to mineral resources in the Plan Area from implementation of the Clovis General Plan and Development Code Update (proposed project).

More information

Introduction. Project Summary In 2014 multiple local Otsego county agencies, Otsego County Soil and Water

Introduction. Project Summary In 2014 multiple local Otsego county agencies, Otsego County Soil and Water Introduction Project Summary In 2014 multiple local Otsego county agencies, Otsego County Soil and Water Conservation District (SWCD), the Otsego County Planning Department (OPD), and the Otsego County

More information