SECTION 2 BIDDING DATA

Size: px
Start display at page:

Download "SECTION 2 BIDDING DATA"

Transcription

1 SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict, the provisions herein shall prevail over those in the Instructions to Bidders. Clause 1.1 INSTRUCTIONS TO BIDDERS CLAUSE REFERENCE THE EMPLOYER IS: State Electricity Distribution Company Ltd. (MSEDCL) represented by the: Chief Engineer, MSEDCL ADM. Bldg. Rastapeth Pune Phone: (020) / Fax: (020) Clause 1.1 & 1.2 BRIEF DESCRIPTION OF THE WORKS IS AS FOLLOWS: The Works to be executed under this Contract will include the design, test, supply, transport, construction, erection, testing and commissioning of transmission lines, distribution lines, service connections, power transformers of varying capacities, distribution transformers of varying capacities, testing, pre-commissioning and commissioning of sub-stations and other allied works, including a five year guarantee (defects liability) period, for implementation of MSEDCL s Infrastructure Plan (Infra Plan) on a single point responsibility, divisible contract, Turnkey basis as defined in the bidding documents, under the Contract as described in the table below: Bid Number Particulars of Work Estimated Cost (Rs. Crores) Amount of Bid Security ( CE/ Zone - Pune/ Circle Pune (R)/ InfraPlan/ T-1 Sub transmission and distribution works in the Pune (R) Circle under in the State of Rs crores Rs crores For the Bidders information, Annexure 1 to this Section 2 provides a brief description of the scope of all the work proposed to be taken up in, of which this Contract will form a part. Clause 1.3 PERIOD OF COMPLETION: The Works shall be completed in its entirety within 24 (twenty four) months from the Start Date, which shall be the date of issue of the Notice to Proceed or such other Start Date as may be specified in the Notice to Proceed. WORKS GUARANTEE (DEFECTS LIABILITY) PERIOD: The Works, Plant and Equipment supplied under the Contract shall be guaranteed against defects in materials, workmanship and manufacturer s defects for a period of 60 (sixty) months after completion and acceptance by the Employer. Clause 2.1 FINANCING AGENCY: The Financing Agency for the Contract is the Rural Electrification Corporation (REC), New Delhi. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7

2 Clause 10.1 Clause 17.1 Clause 18.1 Requests for clarification of the bidding documents should be addressed to the Chief Engineer, at the address provided under the preceding Clause 1.1. BID VALIDITY: Bids shall remain valid for a period of: 90 (ninety) days after the date of opening of the bid. BID SECURITY: A Bid Security in the amount specified under the preceding Clause 1.1 & 1.2 shall be provided as a part of the bid, which shall remain valid for a period of: 28 (twenty eight) days beyond the validity of the bid. Clause 18.2 Clause 20.1 BID SECURITY: The Bid Security shall be issued in favor of the: Superintending Engineer (O&M), Pune (R) Circle, MSEDCL PRE-BID MEETING: A pre-bid meeting shall be held at the following date, time, and location: 11:00 hours on 09 November 2006 at the office of the: Chief Engineer, MSEDCL ADM. Bldg. Rastapeth Pune Clause 22.3 Clause 23.1 Clause 24.1 SEALING AND MARKING OF BIDS: (a) Bids shall be submitted at the Office of the: Chief Engineer, MSEDCL, ADM. Bldg. Rastapeth, Pune (b) Envelopes shall bear the following markings: Turnkey Contract For Undertaking Works under Infrastructure Plan for Pune (R) Circle under Bid Reference No: CE/ Zone - Pune/ Circle Pune (R)/ InfraPlan/ T-1 Do not Open Before: 16:00 hrs. on 21 November 2006 DEAD LINE FOR SUBMISSION OF BIDS: Bids shall be submitted at the address stipulated in Clause 22.3 above, not later than: 14:00 hours on 21 November LATE BIDS: Any bid received by the Employer after the prescribed deadline for submission of bids will be rejected and returned unopened to the bidder. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 2 OF 7

3 Clause 26.1 OPENING OF TECHNICAL PROPOSALS: Technical Proposals shall be opened in the presence of bidders representatives who chose to attend at: 16:00 hours on the date and at the location specified in Clause 23.1 above. Price Proposals will remain unopened and held in the custody of the Employer until the time of opening of the Price Proposals. Clause 32.1 Clause 44.1 OPENING OF PRICE PROPOSALS: Price Proposals shall be opened in the presence of the technically responsive bidders who have been invited to attend the opening and who chose to attend at the location specified in Clause 22.3 above at: 11:00 hours on 04 December 2006, or at such other time as may be notified to the responsive bidders. PERFORMANCE SECURITY: Within 14 (fourteen) days of the date of issue of the Letter of Acceptance, the successful bidder shall furnish a Performance Security in the amount of 10% (ten percent) of the Contract Price, or in such other amount as the Employer may determine in accordance with the provisions of Clause 38.8 if the bid of the successful bidder is found to be seriously unbalanced or substantially below the Employer s estimate of the cost of the works to be performed under the contract. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 3 OF 7

4 Annexure 1 INDICATIVE SCOPE OF WORKS TO BE UNDERTAKEN ON TURNKEY BASIS INFRASTRUCTURE PLAN: PUNE ZONE PARTICULARS UNIT CAPITAL WORKS 33/11 KV S/Stn (a) Nos. Nos (b) MVA MVA Augmentation ( Total ) Nos (a) 3.15 MVA to 5 MVA Nos (b) 5 MVA to 10 MVA Nos MVA added through MVA augmentation Additional Power Transformer Nos (Total ) (a) 3.15 MVA Nos (b) 5 MVA Nos (c) 10 MVA Nos MVA added through additional MVA power T/F 22/11 KV S/Stn (a) Nos. Nos (b) MVA MVA Total Capacity addition( ) MVA Switching Stations (Total ) Nos (a) 22 KV Nos (b) 11 KV Nos Bay (Total ) Nos (a) 33 KV Nos (b) 22 KV Nos (c) 11 KV Nos KV Line ( Total ) km (a) Overhead km (b) Underground km KV Line ( Total ) km (a) Overhead km (b) Underground km KV Line ( Total ) km (a) Overhead km (b) Underground km H.T.Line added (8+9+17c+17d) km /0.4 KV DTC (Total) Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 4 OF 7

5 PARTICULARS UNIT MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 5 OF 7 Capacity Added MVA /0.4 KV DTC Augmentation (a) Nos. Nos (b) MVA Added MVA /0.4 KV DTC (Total) Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos KVA Nos Capacity Added MVA /0.4 KV DTC Augmentation (a) Nos. Nos (b) MVA Added MVA Total DTC capacity addition ( a+17b) MVA L.T. Line 3 Ph. ( Total ) km (a) Overhead km (b) Underground km L.T. Line 1 Ph. ( Total ) km (a) Overhead km (b) Underground km L.T.Line added km Service Connections (a) Domestic & Commercial Nos (b) L.T.Agricultural Nos (c) L.T.Industrial Nos (d) Others Nos Total Nos HVDS (a) 25 KVA DTC Nos (b) 16 KVA DTC Nos (c) 22 KV Line km (d) 11 KV Line km Capacitors (a) Station type Nos (b) Online (0.6 MVAR) Nos (c ) LTLMS Nos SCADA Call Center Other Than Above* TOTAL CAPITAL WORKS (A) RENOVATION & MODERNISATION WORKS Reconductoring of 33 KV Line Km Reconductoring of 22 KV Line Km Reconductoring of 11 KV Line Km Reconductoring of L.T. Line Km Conversion of Overhead to Underground (a) 33 KV line Km (b) 22 KV line Km

6 PARTICULARS UNIT (c) 11 KV line Km (d) L.T. line Km Replacement of Cables (a) 70 sqmm Km (b) 95 sqmm Km (c)120 sqmm Km (d) 150 sqmm Km (e) 185 sqmm Km (f) 240 sqmm Km (g) 300 sqmm Km (h) 400 sqmm Km /11 KV S/Stn Revamping (a) R&M ( Indoor to Outdoor) Nos (b) Transformers Nos (c) CTs (i) 33 KV Nos (ii) 22 KV Nos (iii) 11 KV Nos (d) PTs (i) 33 KV Nos (ii) 22 KV Nos (iii) 11 KV Nos (e) Circuit Breakers (i) 33 KV Nos (ii) 22 KV Nos (iii) 11 KV Nos (f) Isolators Nos (g) Ligtning Arrester Nos (h) Control Panels Nos (i) Battery Nos (j) Battery Charger Set Nos (k) Capacitors Nos (l) Reearthing Nos DTC Metering Nos DTC Maintenence (a) Re-earthing Nos (b) Replacement of Distribution Nos Boxes (c) Replacement of LT Cables Km Replacement of poles (a) H.T. poles Nos (b) L.T. poles Nos Replacement of Meters (a) 1 Phase Nos (b) 3 phase Nos (c) CT operated meter Nos Feeder Pillar (a) 22 KV Feeder Pillar Nos (b) 11 KV Feeder Pillar Nos (c) LT Feeder Pillar 4 Way Nos (d) LT Feeder Pillar 6 Way Nos (e) Mini Feeder Pillar Nos Ring Main Unit Nos Providing Guardings Nos MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 6 OF 7

7 PARTICULARS UNIT Crimping of jumpers at cut points Nos T&P Ls Civil Works Ls Other than above * Total Material cost for R & M WORKS (SubTotal A) I) Direct Charges a) Labour charges on material 10% b) Transport on material 5% c) Insurance on material 1% d) Service Tax (on a, b, c) 12.24% e) Contingencies on material 3% f) Tools & Plants on material 1.50% g) Contractor supervision on 10% material h) Contractor financing on 3% material SubTotal B i) Contractor profit on SubTotal B 5% SubTotal C j) Escalation on material 5% SubTotal D k) H.O. supervision on SubTotal 10% D SubTotal E l) Interest during construction 2.50% period on total Total R&M works (B) Grand Total(A+B) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 7 OF 7

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B )

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) Sl. 1 2 Description of Work Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Zone, Nagpur Case No.

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Zone, Nagpur Case No. Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Zone, Nagpur Case No. CGRF(NZ)/168/2016 Applicant : Shri Ganesh G.Kalvade At.Po.Shekapur Tq.Hinganghat Dist.Wardha.

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting

More information

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006)

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006) SUBPART 217.1--MULTIYEAR CONTRACTING (Revised December 19, 2006) 217.103 Definitions. As used in this subpart-- Advance procurement means an exception to the full funding policy that allows acquisition

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid

Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid J. McCall, J. Yuan, D. Folts, N. Henderson, American Superconductor D. Knoll, Southwire M. Gouge, R. Duckworth, J.

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501 REISSUED 10/09/2017 SECTION 001116 ADVERTISEMENT FOR BIDS 1. Sealed bids will be received by Ottumwa Community School District for construction of the following: Ottumwa Schafer Stadium 8-Lane Track Bids

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety.

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. CONTRACT DESCRIPTION Materials must conform to PennDOT specifications. The provisions of Act 226-1968,

More information

WEEKLY STATUS OF MATERIAL AS ON IN RESPECT ELECTRIC CENTRAL STORES DIVISION JAMMU.

WEEKLY STATUS OF MATERIAL AS ON IN RESPECT ELECTRIC CENTRAL STORES DIVISION JAMMU. S.No. Description of material Unit Opening balance as on 4-3.2017 Receipt during the week Issue during the week Closing Bal. as on 11/03/2017 1 2 3 4 5 6 7 8 1 Conductor ACSR Squirrel ( 20mm 2 ) Km. 0.000

More information

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels To: Prime Estimating & Software Services, LLC 4248 Kensington High Street Naples, Florida, U.S.A. 3405 Att: Doug Baxter Phone: (239) 213-1237 Fax: (239) 213-1237 Project: Mock Metalwork Project Address:

More information

REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND

REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND SUDAN REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND Date: August 8 th 2010 REFERENCE:RFQ/KRT/GF/10/049 Dear Sir / Madam: You are kindly requested to submit your quotation

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal YORK REGION DISTRICT SCHOOL BOARD Procedure #NP464.0, Snow/Ice Clearance and Removal Application The Snow/Ice Clearance and Removal procedure addresses the practices to be followed with regards to the

More information

Request for Empanelment

Request for Empanelment Request for Empanelment (Empanelment is method/procedure/way to seek technical & financial or financial quotation from eligible firm/organization/academic institute to short list eligible contender for

More information

Acknowledgment of Aramco Asia. Supplier Code of Conduct

Acknowledgment of Aramco Asia. Supplier Code of Conduct Acknowledgment of Aramco Asia Supplier Code of Conduct (Applicable to Vendors, Manufacturers, and Contractors) Aramco Asia is committed to the highest ethical and legal standards in the conduct of its

More information

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services JOB SITES: GreenTrees of Huntley 11417 E. Main Street Huntley, IL 60142 SilverTrees Apartments 5901 Milwaukee Street Richmond,

More information

M.P.P.K.V.V.CO.LTD., INDORE STOCK POSITION OF GENERAL MATERIAL LYING IN AREA STORES AS ON

M.P.P.K.V.V.CO.LTD., INDORE STOCK POSITION OF GENERAL MATERIAL LYING IN AREA STORES AS ON M.P.P.K.V.V.CO.LTD., INDORE STOCK POSITION OF GENERAL MATERIAL LYING IN AREA STORES AS ON 15.3.2016 No. NAME OF MATERIALS UNITINDOREBARWAHADHAR UJJAIN RATLAM MANDSAUR TOTAL 7 CONDUCTOR i AAAC-02 SQUIRREL

More information

City of Grand Island Tuesday, October 13, 2015 Council Session

City of Grand Island Tuesday, October 13, 2015 Council Session City of Grand Island Tuesday, October 13, 2015 Council Session Item G-8 #2015-276 - Approving Bid Award for Snow Removal Services 2015/2016 for the Streets Division of the Public Works Department Staff

More information

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety.

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. DESCRIPTION This contract covers the needs for the lab testing of coal used by Commonwealth facilities.

More information

Purchase of Two (2) Snow Plows and Two (2) Plow Sub-frames.

Purchase of Two (2) Snow Plows and Two (2) Plow Sub-frames. INVITATION TO BID Notice is hereby given that sealed bids will be received at the City Clerk's Office, City Hall, 435 Ryman Street, Missoula, MT 59802 until 2:00 p.m., Tuesday, June 25 th, 2013 and will

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal Request for Tenders Community Development, Parks & Recreation Facility Snow Removal Community Development, Parks & Recreation Yorkton, Saskatchewan Closing Date: Friday October 5, 2018 at 4:00 p.m. The

More information

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan (Text in italic font is meant for instruction to staff and should be deleted in

More information

NLCIL RESERVES THE RIGHT TO CONDUCT REVERSE AUCTION ON ITEM WISE SITE COST BASIS AFTER PRICE BID OPENING SUBJECT TO

NLCIL RESERVES THE RIGHT TO CONDUCT REVERSE AUCTION ON ITEM WISE SITE COST BASIS AFTER PRICE BID OPENING SUBJECT TO NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA. IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF

THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA. IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF File # 16-487 THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF ANDREW CHARLES MCLANE (139600) AND ANDREW MCLANE

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid

Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid J. Yuan, J. Maguire, D. Folts, N. Henderson, American Superconductor D. Knoll, Southwire M. Gouge,

More information

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT: RESOLUTION 2017-08 A RESOLUTION OF THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT APPROVING PROPOSED BUDGET(S) FOR FISCAL YEAR 2017/2018 AND SETTING A PUBLIC HEARING THEREON

More information

Jawaharlal Nehru National Solar Mission

Jawaharlal Nehru National Solar Mission Jawaharlal Nehru National Solar Mission National Solar Mission-Phase-I Journey so far NTPC Vidyut Vyapar Nigam Ltd. 1 11/5/2012 Background India is located in the equatorial sun belt of the earth, thereby

More information

Procurement. International Competitive Bidding;

Procurement. International Competitive Bidding; Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. for the proposed project will be carried out in accordance with: World Bank s "Guidelines:

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 Statement of Receipts and Disbursements/Cash Flow for the year 2017-18 Head/Item Actuals up to COPPY % Variation

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2015-16 Head/Item Actuals up to

More information

Tender for T E C H N I C A L BID. LAST DATE: On or before on 2pm SUBMITTED TO:

Tender for T E C H N I C A L BID. LAST DATE: On or before on 2pm SUBMITTED TO: Tender for INTERIOR FURNISHING, ELECTRICAL, AIR CONDITION, CCTV, DATA CABLING AND PA SYSTEM WORKS FOR THE ERNAKULAM DISTRICT CO-OPERATIVE BANK LTD. BRANCH AT PATTIMATTOM T E C H N I C A L BID LAST DATE:

More information

CASE No. 33 of In the matter of Determination of Generic Tariff for Renewable Energy for FY

CASE No. 33 of In the matter of Determination of Generic Tariff for Renewable Energy for FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@merc.gov.in Website:

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2015-16 Head/Item Actuals up to

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY

More information

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800) Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 Statement of Receipts and Disbursements/Cash Flow for the year 2017-18 Head/Item Actuals up to COPPY % Variation

More information

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY

More information

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety.

Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. Overview for Contract Prior to utilizing a contract, the user should read the contract in it's entirety. DESCRIPTION Contract is used to provide elliptical and round cement concrete pipe and their respective

More information

DEMAND FORECASTING PROTOCOL

DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 443 DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 444 DEMAND FORECASTING PROTOCOL Table of Contents DFP 1 OBJECTIVES,

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project I. General Plan Mozambique: P125120 - Greater Maputo Water Supply Expansion Project 1. Bank s approval Date of the procurement Plan 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

REGULATORY INFORMATION REPORT FOR THE QUARTER : 4th

REGULATORY INFORMATION REPORT FOR THE QUARTER : 4th REGULATORY INFORMATION REPORT FOR THE QUARTER : 4th 2007-08 PREPARED BY : "UGVCL,Mehsana" SUBMITTED TO : GUJARAT ELECTRICITY REGULATORY COMMISSION DATE : Jan-08 To March-08 Page 1 C:\Documents and Settings\UB

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

CAPEX, Consumer Metering and OPEX under RUPL and SUPL for FY 13-14

CAPEX, Consumer Metering and OPEX under RUPL and SUPL for FY 13-14 CAPEX work feeer meter installe in s. in s. CAPEX, Consumer an OPEX uner RUPL an SUPL for FY 13-14 meter installe in s. (100 kva & above) in s. AB Cable Erection for replaceme nt Capacitor Bank as Customer

More information

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT 1 TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT RFQ for Geotechnical Investigations and Foundation Recommendations TCML/MS/RFQ1/2017 October 2017

More information

PARTICIPATING ORGANISATIONS CIRCULAR

PARTICIPATING ORGANISATIONS CIRCULAR PARTICIPATING ORGANISATIONS CIRCULAR Date : 24 November 2011 R/R No. : 10 of 2011 DIRECTIVES ON SUBMISSION BY PARTICIPATING ORGANISATIONS OF PERIODIC REPORTS BY ELECTRONIC TRANSMISSION TO BURSA MALAYSIA

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

Government of Maharashtra Forest Department O/o Deputy Conservator of Forests, Pandharkawada Division, Pandharkawada

Government of Maharashtra Forest Department O/o Deputy Conservator of Forests, Pandharkawada Division, Pandharkawada Government of Maharashtra Forest Department O/o Deputy Conservator of Forests, Pandharkawada Division, Pandharkawada Notice for appointment of GIS Specialist Applications are invited for appointment of

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND 2017 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND 001... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 V. DEBT SERVICE FUND...

More information

Procurement Plan for ETLP (P156590)

Procurement Plan for ETLP (P156590) I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered

More information

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

GUIDELINES FOR FILMING IN TOMBALL, TEXAS GUIDELINES FOR FILMING IN TOMBALL, TEXAS I. PURPOSE The following guidelines are intended to protect the personal and property rights of our Tomball, Texas residents and businesses. The City Manager reserves

More information

@Copyright 2016 SKAPS Industries.

@Copyright 2016 SKAPS Industries. SKAPS INDUSTRIES 571 Industrial Pkwy, Commerce, GA 30529 Phone: (706) 336 7000 Fax: (706) 336 7007 E Mail: contact@skaps.com SKAPS GEOCOMPOSITE DROP IN SPECIFICATIONS @Copyright 2016 SKAPS Industries www.skaps.com

More information

Consultants: firms Consultants: individuals

Consultants: firms Consultants: individuals Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all

More information

University of Minnesota. Capital Appropriations Expenditure Report. January 2016

University of Minnesota. Capital Appropriations Expenditure Report. January 2016 Capital Appropriations Expenditure Report January 2016 1 Appropriation Status Year Full Allocation % Spent or Encumbered Under Contract % Spent, Encumbered or Otherwise Obligated to Complete a Project

More information

MACRO-PRUDENTIAL RULES AND REGULATION (2015): DISCLOSURE REQUIREMENTS ANNEXURE I: FORMAT FOR ANNUAL DISCLOSURES DRUK PNB BANK LTD.

MACRO-PRUDENTIAL RULES AND REGULATION (2015): DISCLOSURE REQUIREMENTS ANNEXURE I: FORMAT FOR ANNUAL DISCLOSURES DRUK PNB BANK LTD. MACRO-PRUDENTIAL RULES AND REGULATION (2015): DISCLOSURE REQUIREMENTS ANNEXURE I: FORMAT FOR ANNUAL DISCLOSURES DRUK PNB BANK LTD. For the Year ended December 31, 2016 Item 1: Tier I Capital and its Sub-components

More information

SUPERINTENDENCY OF BANKS ADMINISTRATION DIVISION PROCUREMENT DEPARTMENT

SUPERINTENDENCY OF BANKS ADMINISTRATION DIVISION PROCUREMENT DEPARTMENT Prepared by: Ricardo Meneses Reviewed by: Juan Barceló SUPERINTENDENCY OF BANKS ADMINISTRATION DIVISION DEPARTMENT TRANSPARENCY REPORT FEBRUARY 2017 TRANSPARENCY REPORT JANUARY 2017 Superintendency of

More information

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DE 05-142 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for License to Construct and Maintain Electric Lines Over and Across the Public Waters of the Nashua River in the City of Nashua, New Hampshire

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 V. DEBT SERVICE FUNDS... 6

More information

Working with Rumaila's Supply Chain

Working with Rumaila's Supply Chain Working with Rumaila's Supply Chain 2 3 With a heritage of over half a century of continued oil and gas production, Rumaila's vast resources makes it comparable with the very largest producing fields in

More information

Procurement Plan. I. General

Procurement Plan. I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan [Original: July 2013]:

More information

DEPARTMENT SUMMARY DEPT. NO. : 71

DEPARTMENT SUMMARY DEPT. NO. : 71 DEPARTMENT SUMMARY DEPT. NO. : 71 PURPOSE: The Division is responsible for implementing the Capital Improvement projects for the rehabilitation of the City's infrastructure. To achieve this goals, the

More information

Institute for Plasma Research (An Autonomous Institute of Dept. of Atomic Energy) Bhat, Gandhinagar

Institute for Plasma Research (An Autonomous Institute of Dept. of Atomic Energy) Bhat, Gandhinagar (An Autonomous Institute of Dept. of Atomic Energy) ITEM DESCRIPTION TERMS & CONDITIONS SST-1 Network Up-gradation which include Supply of fiber optic based ethernet networking components, installation,

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

NOVALYNX CORPORATION MODEL 110-WS-16BP BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL

NOVALYNX CORPORATION MODEL 110-WS-16BP BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL NOVALYNX CORPORATION MODEL 110-WS-16BP BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL REVISION DATE: OCT 2005 Receiving and Unpacking Carefully unpack all components and compare to the packing list. Notify

More information

AM01 - System Offices. Purchase Order

AM01 - System Offices. Purchase Order Page 1 of 5 AM01 - System ffices Purchase rder P.. Date: 10/5/2016 Purchase rder Number AM01-17-P034061 SHW THIS NUMBER N ALL PACKAGES, INVICES AND SHIPPING PAPERS. V E N D R Vendor Number: 00000842 FACILITY

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS GRANDE CACHE REGIONAL DINOSAUR TRACKS FOUNDATION REQUEST FOR PROPOSALS Grande Cache Regional Dinosaur Tracks Feasibility Study Box 300 Grande Cache, AB. T0E 0Y0 INTRODUCTION AND SUMMARY The ( Foundation

More information

STATE OF NORTH CAROLINA D DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION C March 8, 1995

STATE OF NORTH CAROLINA D DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION C March 8, 1995 STATE OF NORTH CAROLINA 6810-1D DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION SUPERSEDING 6810-1C March 8, 1995 SPECIFICATION FOR CHEMICALS (This specification is released

More information

Studies on hyper scaling dielectric loss of grading capacitors of 500kv breakers

Studies on hyper scaling dielectric loss of grading capacitors of 500kv breakers Studies on hyper scaling dielectric loss of grading capacitors of 500kv breakers Abstract: To solve the problem of hyper scaling dielectric loss of grading capacitors for 500 kv high voltage substation

More information

FY ANNUAL FINANCIAL REPORT

FY ANNUAL FINANCIAL REPORT Charter Schools FY 2015-2016 ANNUAL FINANCIAL REPORT Page 1 TOTAL CHARTER FEDERAL ACCOUNT ALL SCHOOLS PROJECTS NO. FUNDS FUND CHS FUND 142 FUND CONDENSED BALANCE SHEET - ALL FUNDS ASSETS 11120 Cash on

More information

RFP # Attachment 5 Revised Proposal Evaluation Form Attachment 5 PROPOSAL EVALUATION FORM All proposals will be reviewed for responsiven

RFP # Attachment 5 Revised Proposal Evaluation Form Attachment 5 PROPOSAL EVALUATION FORM All proposals will be reviewed for responsiven RFP #2016-2000-3362 Attachment 5 Revised Proposal Evaluation Form Attachment 5 PROPOSAL EVALUATION FORM All proposals will be reviewed for responsiveness and then evaluated using the criteria set out herein.

More information

SPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM

SPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION January 2017 SPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM I. SCOPE This

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

INCOME BEFORE CONTRIBUTIONS 32,373 Net Operating Gain/(Loss) (97,940) 70, ,619 32,373 Net Total Gain/(Loss) (97,940) 71, ,306

INCOME BEFORE CONTRIBUTIONS 32,373 Net Operating Gain/(Loss) (97,940) 70, ,619 32,373 Net Total Gain/(Loss) (97,940) 71, ,306 Goodwill Industries, Inc. Comparative Income Statement Feb16 Year to Date Variance/ Variance Variance Variance/ Last Year from Budget Actual INCOME Actual from Budget Last Year (5,847) (6,678) 1,471,935

More information

CEDAR CREST MUTUAL DOMESTIC WATER CONSUMERS & SEWAGE WORKS ASSOCIATION. December 31, 2016

CEDAR CREST MUTUAL DOMESTIC WATER CONSUMERS & SEWAGE WORKS ASSOCIATION. December 31, 2016 CEDAR CREST MUTUAL DOMESTIC WATER CONSUMERS Table of Contents Page Official Roster i Independent Accountants Report on Applying Agreed Upon Procedures 1 Schedule of Revenues and Expenditures Budget and

More information

AM23 - Texas A&M University Health Science Purchase Order

AM23 - Texas A&M University Health Science Purchase Order Page 1 of 7 AM23 - Texas A&M University Health Science Purchase Order P.O. Date: 9/22/2016 Purchase Order Number AM23-17-P033061 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D

More information

GENERATOR INTERCONNECTION APPLICATION

GENERATOR INTERCONNECTION APPLICATION GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Electric Utility Contact Information Great Lakes Energy

More information

Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile

Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile USAEE - IAEE Houston - Texas 17-19 September 2007 Ricardo Raineri rraineri@ing.puc.cl / www.ricardoraineri.com

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4 IV. GENERAL FUND 001 DESCRIPTIONS... 6 V. DEBT SERVICE FUNDS... 9

More information

THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE

THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN PANEL BOARDS ADDRESSED TO HAZARDOUS AREAS - PART THREE July 04 THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE In this third part. we want to speak about how important is the correct sizing of the

More information

Woods of Perth Limited (in Administration) Court of Session Case No. PB584 of 2010

Woods of Perth Limited (in Administration) Court of Session Case No. PB584 of 2010 Woods of Perth Limited (in Administration) Court of Session Case No. PB584 of 2010 Joint Administrators progress report for the six month period from 21 April 2011 to 20 October 2011 and final progress

More information

GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE

GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE 21 November 2017 GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE HIGHLIGHTS RC drilling at Danaya and Yando completed. RC drilling at Danaya intersects very wide (>117m) spodumene bearing pegmatite zone.

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

Annexure-E PROJECT PROPOSAL FOR DAIRY MARKETING OUTLET/ DAIRY PARLOUR UNDER DAIRY ENTREPRENEURSHIP DEVELOPMENT SCHEME (DEDS)

Annexure-E PROJECT PROPOSAL FOR DAIRY MARKETING OUTLET/ DAIRY PARLOUR UNDER DAIRY ENTREPRENEURSHIP DEVELOPMENT SCHEME (DEDS) Annexure-E PROJECT PROPOSAL FOR DAIRY MARKETING OUTLET/ DAIRY PARLOUR UNDER DAIRY ENTREPRENEURSHIP DEVELOPMENT SCHEME (DEDS) 2017-18 1. INTRODUCTION 1.1 India is endowed with a largest livestock population

More information

REQUEST FOR PROPOSALS FOR DIGITAL ORTHOPHOTOGRAPHY PROJECT

REQUEST FOR PROPOSALS FOR DIGITAL ORTHOPHOTOGRAPHY PROJECT REQUEST FOR PROPOSALS FOR DIGITAL ORTHOPHOTOGRAPHY PROJECT The purpose of this Request for Proposals (RFP) is to solicit responses from qualified professionals for the production and supply of ortho rectified

More information

PROJECT MANUAL BISHOP OPERATIONS YARD SHADE CANOPY INSTALLATION PROJECT

PROJECT MANUAL BISHOP OPERATIONS YARD SHADE CANOPY INSTALLATION PROJECT PROJECT MANUAL BISHOP OPERATIONS YARD SHADE CANOPY INSTALLATION PROJECT BISHOP, INYO COUNTY, CALIFORNIA CONTRACTING AGENCY: EASTERN SIERRA TRANSIT AUTHORITY (ESTA) DATE October 19, 2018 Bishop Operations

More information

KETCHUM ARTS COMMISSION INTERACTIVE ART CALL FOR ARTISTS Request for Qualifications

KETCHUM ARTS COMMISSION INTERACTIVE ART CALL FOR ARTISTS Request for Qualifications KETCHUM ARTS COMMISSION INTERACTIVE ART CALL FOR ARTISTS Request for Qualifications I N T R O D U C T I O N The City of Ketchum, Idaho, invites professional artists, architects or designers to apply for

More information

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller 1 16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots David Mueller 2 Transmission System Harmonics Studies In the US, the closure of older coal fired plants is a driver

More information

BASIC RATE In Figures To be entered by the Bidder in Rs. P. GST Amount in INR. Excise Duty Amount in INR. Rs. P. Rs. P

BASIC RATE In Figures To be entered by the Bidder in Rs. P. GST Amount in INR. Excise Duty Amount in INR. Rs. P. Rs. P Validate Print Help Item Wise BoQ 15 Tender Inviting Authority: SECTION HEAD PURCHASE Name of Work: Design, Engineering, Supply, Erection, testing and commissioning of Ductable Precision Air Conditioning

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Delay Attribution Board. Guidance No. DAB-28

Delay Attribution Board. Guidance No. DAB-28 Delay Attribution Board Guidance No. DAB-28 1. Introduction 1.1. The Delay Attribution Board (the Board) received a request for guidance in connection with the Attribution of TRUST incident 253013 2B07

More information

Status and Future Direction of HTS Power Application in KEPCO

Status and Future Direction of HTS Power Application in KEPCO Oct.26-28, 2011, Thailand PL-18 CIGRE-AORC 2011 www.cigre-aorc.com Status and Future Direction of HTS Power Application in KEPCO K. W. Jeong, B. S. Moon, S. K. Park Grid Planning Office, KEPCO Korea SUMMARY

More information

Wheeling Tariffs FY to FY and. Retail Supply Tariffs

Wheeling Tariffs FY to FY and. Retail Supply Tariffs Wheeling Tariffs FY2009-10 to FY2013-14 and Retail Supply Tariffs FY2009-10 Order 20 th March 2009 Andhra Pradesh Electricity Regulatory Commission Singareni Bhavan, Red Hills, Lakdi-Ka-Pool, Hyderabad

More information