1 SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) Sl. 1 2 Description of Work Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary Substation at Khuntlipalli Supply,Erection & Commissioning of 11 KV Link Line for Khuntlipalli Primary Substation Total Quoted value of Package - B (Khuntlipalli) Quoted Value (in Rs.) Supply Installation Total SERVICE CHARGES EXTRA IF ANY APPLICABLE in Words : Name of the Bidder : Signature : Seal :
2 Sl. SCHEDULE OF QUANTITY Supply Errection Total of Part-A (i) 33Kv Incoming Supply, installation with foundation & painting as per approved drawing - 1 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 No Supply, installation with foundation as per approved drawing & painting - RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6 No of flange 7.7 mm, (9.56 Kg Supply, installation with painting - Bracing Angle (50 x 50 x 6 mm (4.5 Kg Installation of 232 Sqmm AAAC for BUS arrangement Km Supply, installation with civil works for foundation of - 33Kv Isolator with earth switch Set Supply, installation with civil works for foundation of - 33Kv Isolator without earth switch Set Supply, installation of - 33Kv LA No Supply, installation of - Disc Insulator (B & S) 70 KN sutable for 232 sq mm AAAC No Supply, installation of - B&S Hard ware fittings Set Installation & Commissioning of - 33Kv VCB with CT & Control Relay Panel Set 2 (Excluding Foundation) (ii) 33Kv Bus 12 Supply, installation with foundation & painting as per approved drawing - No 8 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure ( Supply, installation with painting - MS Channel (100 x 50 x 6 mm) thickness of flange 7.7 mm, (9.56 Kg Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5 kg Supply, installation of Disc Insulator (B & S) No
3 Sl. Supply Errection Total of 16 Supply, installation of B&S Hard ware fittings No Installation & Commissioning of 33Kv VCB with CT & Control Relay Panel Set 2 (Excluding Foundation) 18 Installation & Commissioning of 33 Kv PT (single phase) No 3 19 Installation & Commissioning of of 33/11 KV, 3.15MVA Power Transformer No 2 (Excluding Foundation) (iii) Mounting of 33Kv Post Insulator Supply, installation with foundation & painting as per approved drawing - 20 RSJ 150 mm X 150 mm X 6.0 mtr long required for Pole Structure (34.6 No of flange 7.7 mm, (9.56 Kg Supply, installation with painting Bracing Angle (50x50x6 mm) (4.5 Kg Supply, installation 33Kv Post Insulator No (iv) Mounting of 11Kv Post Insulators Supply, installation with foundation & painting as per approved drawing 24 RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6 No of flange 7.7 mm, (9.56 Kg Supply, installation with painting - Bracing Angle (50x50x6)mm (4.5 Kg Supply, installation 11Kv Post insulators No (v) 11 KV Bus with Feeder bay 4 Nos Supply, installation with foundation & painting as per approved drawing - 28 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 No of flange 7.7 mm, (9.56 Kg Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5 Kg Supply, installation of Disc Insulator (B & S) No
4 Sl. Supply Errection Total of 32 Supply, installation of B&S Hard ware fittings No Supply, installation with civil works for foundation of 11Kv AB Switch 630 A (for Transformer Bay) Set Supply, installation with civil works for foundation of 11Kv AB Switch 400 A (For outgoing Feeder Bay) Set Supply, installation with civil works for foundation of 11Kv HG fuse Set Installation & Commissioning of 11Kv VCB (630 A) complete set with CT & Set 6 Control Relay Panel (Excluding Foundation) 37 Installation & Commissioning of 11 KV PT (single phase) No 6 38 Installation & Commissioning of 11 KV LA No (vi) 33/0.4 KV Station Transformer Supply, installation with foundation & painting as per approved drawing - 39 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 No of flange 7.7 mm, (9.56 Kg Supply, installation with painting - Bracing Angle (50x50x6 mm (4.5 Kg Supply, installation with civil works for foundation of 33 KV AB Switch set Installation and Commissioning of 33/0.4 KV,100 KVA Station Transformer No 1 with cable box 44 Supply, installation with civil works for foundation of 33 Kv HG Fuse set Supply, installation with civil works for foundation of 33 KV LA No (vii) Other Items 46 Supply, installation with civil works - Earthing Electrode with chamber No Supply, installation with civil works - GI flat 90X6 mm size under ground for mat Kg Supply, installation -GI flat 50X6 mm size for riser Kg Supply, installation - GI flat 25X6 mm size for riser kg Supply, installation - 8 swg GI wire kg Supply & Fixing of Earth bond No
5 PPLICABLE PPLICABLE Sl. Supply Errection Total of 52 Supply, installation with fabrication - Lightning Mast (spike ) with base plate to be mounted on RSJ pole Supply, installation & commissioning - Battery with Charger 2V X 12nos 53 including wooden stand plantee type battery of Exide Make & suitable charger cum DCDB of Caldyne Make. 53 Supply, installation & commissioning - ACDB (indoor) as per specification & approved drawing 54 Supply, installation & commissioning - SDB (out door) as per specification & approved drawing Supply, installation with civil works for foundation of poles - 1x400 Watt 55 HPSV outdoor Light fittings (Make PHILIPS / CGL) along with Tubular Poles of 10 mtr height (410 SP 48) with Junction box as per IS 2713 / No set No No No Supply, Laying with civil works C X 185 sq mm LT, PVC, Al, Armoured cable in the cable trench, cable termination at both ends should be done by providing suitable lugs, cable glands pvc tape, ampere tapes etc Mtr Supply, Laying of following size control cable & Termination. This includes Fixing of cable rack by full welding with two emboded GI flat, placing of 57 cable trays with supply of required jointing sleeve and GI bolt nuts, etc., laying of cable over the cable tray by providing cable markers cable glands at both end with terminations by providing ferruls, cable lugs (ring type) with dressing a 3 C x 2.5 sq mm PVC, Cu, Armoured control cable Mtr b 4C X 2.5 sq mm PVC, Cu, Armoured control cable Mtr c 10 C X 2.5 sq mm PVC, Cu, Armoured control cable Mtr d 2C X 4 sq mm LT, PVC, Al, Armoured cable for switchyard Lighting Mtr Supply and placement of following Safety & Measuring Equipments a Earth Tester No 1 b 2.5 KV Insulation Meggar No 1 c Fire Extinguisher No 4 d Fire Bucket & stand No 4 e Shock Treatment Chart No 2 f 33kv Hand Gloves Pair 4 4
6 NOT AP NOT AP Sl. Supply Errection Total of g H T Rubber Mat Mtr 10 h Digital Clamp on Meter Pair 1 i T & P Box No 1 j Emergency Light No 2 k First Aid Box with Medicine Set 1 TOTAL of Part-A Part-B 1 Contour Survey Sq.mtr 2000 Not applicable 2 Cutting & Levelling Cum UR Not applicable 3 Boundary Wall including gate pillar with supply of all required materials of approved quality to complete the job RM 160 Not applicable Steel gate for Boundary wall as per specification and approved drawing 4 including supply of all required materials of approved quality kg 250 Not applicable Construction of control room including PHD works, Electrical works, inside cable trench, overhead water tank etc., complete in all respect excluding bore well, but including supply of all required materials of approved quality to complete the work Sq mtr 108 Not applicable Deep Bore well with casing pipe, flexible pipe with 1.5 HP sub merged pump connecting cable complete in all respect including supply of all set 1 Not applicable required materials of approved quality Metal Spreading of 33/11Kv S/S including sand spreading as per specification including supply of all required materials of approved quality Sq mtr 200 Not applicable Foundation for Power Transformer with RRG massonary with guide rail as per specification and approved drawing including supply of all required materials of approved quality. Foundation for 33 KV VCB with CT & CR Pannel as per specification and approved drawing including supply of all required materials of approved quality. Foundation for 11 KV VCB with CT & CR Pannel as per specification and approved drawing including supply of all required materials of approved quality. No 2 Not applicable No 4 Not applicable No 6 Not applicable 5
7 Sl. 11 Supply Errection Total of Switch yard cable trench with cover as per specification and approved drawing including supply of all required materials of approved quality a) 300 mm width Mtr 10 Not applicable b) 600 mm width Mtr 20 Not applicable 12 Approach road as per specification and approved drawing including supply of all required materials of approved quality Mtr 30 Not applicable 13 EXTRA ITEMS (IF REQUIRED AS PER SITE CONDITION) including supply of all required materials of approved quality a Excavation in all type of soil Cum 1 Not applicable b PCC 1:3:6 including scafolding Cum 1 Not applicable c PCC 1:2:4 including scafolding Cum 1 Not applicable d RCC 1:2:4 including scafolding excluding supply of steel Cum 1 Not applicable e Reinforced steel Kg 1 Not applicable f Brick work 230 mm (full brick) Cum 1 Not applicable g Brick work 125 mm (Halfl brick) Cum 1 Not applicable h RRGH Masonary Cum 1 Not applicable TOTAL of Part-B Not applicable Grand Total (Part A + Part B) 0.00 SERVICE CHARGES EXTRA IF ANY APPLICABLE in Words : Name of the Bidder : Signature : Seal : Note : (i) Bidders can enter figures only in the cells highlighted in "Brown" colour. (ii) In case of Part - B, no separate rate is required to be quoted against the supply of civil construction materials. All such rates should be included in 6
8 SUPPLY, ERECTION & COMMISSIONING OF 11KV Line for 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE -B ) 1) Construction of 11KV line with 8 Mtr 200Kg,PSC Pole with 100 Sq.mm AAAC (Conductor supplied by ) Kms As per REC Standard a) One DP Cut point per Km. b) 5 stay sets per Km c) All poles will be earthed by earthing coil d) Padding Concreting will be done for all poles e) Concreting will be done for all stay sets f) Pipe earthing to be provided for all DP g) Anti climbing device for all poles Danger plate/number plate for all poles 2) Construction of Additional DP as per REC Standard Rate per Km SERVICE CHARGES EXTRA IF ANY APPLICABLE in Words : Name of the Bidder : Signature : Seal : Note : (i) Bidders can enter figures only in the cells highlighted in "Brown" colour.
M.P.P.K.V.V.CO.LTD., INDORE STOCK POSITION OF GENERAL MATERIAL LYING IN AREA STORES AS ON
M.P.P.K.V.V.CO.LTD., INDORE STOCK POSITION OF GENERAL MATERIAL LYING IN AREA STORES AS ON 15.3.2016 No. NAME OF MATERIALS UNITINDOREBARWAHADHAR UJJAIN RATLAM MANDSAUR TOTAL 7 CONDUCTOR i AAAC-02 SQUIRREL
More informationWEEKLY STATUS OF MATERIAL AS ON IN RESPECT ELECTRIC CENTRAL STORES DIVISION JAMMU.
S.No. Description of material Unit Opening balance as on 4-3.2017 Receipt during the week Issue during the week Closing Bal. as on 11/03/2017 1 2 3 4 5 6 7 8 1 Conductor ACSR Squirrel ( 20mm 2 ) Km. 0.000
More informationVX25 Enclosure System. Technical documentation PE conductor connection, current carrying capacity
VX Enclosure System Technical documentation PE conductor connection, current carrying capacity Enclosure system VX Contents Contents. General remarks. Introduction. Notes on the design of the earthing
More informationSECTION 2 BIDDING DATA
SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,
More informationSECTION 2 BIDDING DATA
SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,
More informationVKES. Contents. Page 2 No 213, 13th Main RBI Layout JP Nagar 7th Phase, Bangalore Vidyuth Kanti Engineering Services
Contents What is earthing... 4 Why do we do earthing... 4 What is the Scope of this guideline... 4 How to protect a person in a substation against electrical shock... 4 What happens during a fault... 4
More informationWeekly Status of Key material as on in respect of Electric Central Store Division, Jammu
Weekly Sttus of Key mteril s on 14.12.2013 in respect of Electric Centrl Store Division, Jmmu S.No. Prticulrs Unit Blnce s on 07.12.2013 Receipts during the week Issues during the week Ground blnce s on
More informationBASIC RATE In Figures To be entered by the Bidder in Rs. P. GST Amount in INR. Excise Duty Amount in INR. Rs. P. Rs. P
Validate Print Help Item Wise BoQ 15 Tender Inviting Authority: SECTION HEAD PURCHASE Name of Work: Design, Engineering, Supply, Erection, testing and commissioning of Ductable Precision Air Conditioning
More informationTHE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE
July 04 THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE In this third part. we want to speak about how important is the correct sizing of the
More informationN. 1 ELECTRIC ARC FURNACE SECOND HAND 50 TONS. TAPPING CAPACITY
N. 1 ELECTRIC ARC FURNACE SECOND HAND 50 TONS. TAPPING CAPACITY contact : Agency specialized in EAF-EBT furnaces supply for steel EAF Electric Arc Furnaces, LF Ladle Furnaces, ladle treatment stations,
More informationSPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM
INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION January 2017 SPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM I. SCOPE This
More informationFlexitest Switch Assemblies Type FT-19R and FT-19RX Supersedes DB March 2008
Flexitest Switch Assemblies Type FT-19R and FT-19RX Supersedes DB41-078 March 2008 FT-19R and FT-19RX FT-19R 3RU with Individual Clear Covers APPLICATION FEATURES The type FT-19R (standard length) and
More informationBETA Protecting. Low-Voltage Fuse Systems. LV HRC fuse links. 3/36 Siemens ET B1 2008
LV HRC fuse links Overview LV HRC fuses are used for installation systems in non-residential, commercial and industrial buildings as well as in switchboards of power supply companies. They therefore protect
More informationSECTION 1 - WHAT IS A BTU METER? BTU's = Flow x ΔT Any ISTEC BTU Meter System consists of the following main components:
SECTION 1 - WHAT IS A BTU METER? ISTEC BTU Meters measure energy usage by multiplying flow rate and temperature difference. As the water (or other liquid) passes through these lines, the multi-wing turbine
More informationSingle Phase Motors Technical Datasheets
Single Phase Motors Technical Datasheets EN A dynamic, strong and ambitious Group: Orange1 Holding is an international renown Group, one of the most important European manufacturers of single-phase and
More informationBlocks and Holders POWR-BLOKS. Connectors. Ampere Ratings. Ordering Information. Applications. Specifications. Distribution/Splicer Blocks and Covers
Connectors Box lug connectors are designed for use with a single, solid or class B or C stranded conductor. Use of more than one conductor per connector opening or use of extra-flexible, fine stranded
More informationE X - C O N T R O L U N I T S A N D C O N T R O L S T A T I O N S
E X - C O N T R O L U N I T S A N D C O N T R O L S T A T I O N S EX- CONTROL UNITS AND CONTROL STATIONS EX- INSTALLATION SWITCH.. EX- CONTROL STATIONS INDIVIDUAL EX- CONTROL STATIONS.. 0 EX- CONTROL AND
More informationThree Core XLPE/LSF/SWA/LSF Power Cable
1 Three Core XLPE/LSF/SWA/LSF Power Cable./ kv Application LSF armoured power cable for use in fixed installations. Especially for use in areas where fire would create dense smoke and toxic fumes causing
More informationwww. ElectricalPartManuals. com Flexitest Switch Assemblies Type FT-19R and FT-19RX INTL APPLICATION
Effective: January 2004 Supersedes, dated June 1998 APPLICATION QUALITY FEATURES Descriptive Bulletin 41-078INTL Flexitest Switch Assemblies Type The type FT-19R (standard length) and FT-19RX (extended
More informationChapter-Content Page 14.0 Surface Mounted Boxes 14.1 Flush Mounted Boxes 14.2 Distribution Pillar
Outdoor Distribution Cabinets 14.0 Chapter-Content Page 14.0 Surface Mounted Boxes 2 14.1 Flush Mounted Boxes 9 14.2 Distribution Pillar 10 23 14 http://www.krone-gmbh.at - Page 1 14.0 Surface Mounted
More informationFLT5A FLT5A. abc. abc. Thermometer User Guide. Thermometer User Guide. Internet:
abc instruments international FLT5A Thermometer Land Instruments International Dronfield, S18 1DJ England Telephone: (1246) 417691 Facsimile: (1246) 41585 Email: infrared.sales@landinst.com Internet: www.landinst.com
More information08/072 PKZ2 Motor-Protective Circuit-Breakers Tripping Characteristics
0/07 PKZ Tripping Characteristics Moeller HPL0-00/00 S-PKZ high-capacity contact module, SEA-PKZ contact module Normal switching duty AC-/00V kw A Rated output of three-phase motors 0...0 Hz. 7..... 0.7
More informationQuestion Bank. Electric Energy, Power and Household Circuits
Electric Energy, Power and Household Circuits 1. (a) What do you understand by the term electric work? (b) State the SI unit of electric work and define it. (c) Name two bigger units of electric work.
More informationMAINTENANCE EVALUATION CHECKLIST HYDRAULIC ELEVATORS
Manufacturer: Model: Evaluation Performed By: INTRODUCTION: This checklist will enable the user to make an objective appraisal of the condition of the equipment. Given the variety and complexity of the
More informationRIMA OFFICIAL CATALOGUE CATALOGUE TP
RAIL BRAKES RIMA OFFICIAL CATALOGUE UE 1 / 1 4 FEBRUARY 2013 CATALOGUE TP UE 2 / 1 4 DescriPt Ption Utilization and functioning Rail brakes, suitable for medium forces from 20 to 300 kn (securing cranes
More information40 CD RANGE FLUSH-MOUNTING DISTRIBUTION BOARDS AND ENCLOSURES
DISTRIBUTION BOARDS FLUSH-MOUNTING DISTRIBUTION BOARDS GWTEST SOFTWARE (see page 322) Complementary system items Ordinary installation - protected flush mounting DISTRIBUTION / JUNCTION Protection devices...
More information7S SERIES. Relay module with forcibly guided contacts 6 A 7S S /0310 7S
Relay module with forcibly guided contacts.12 with 2 pole (1NO + 1 N).14 with 4 pole (2 NO + 2 N and 3 NO + 1 N).16 with 6 pole (4 NO + 2 N) For safety applications, with class A forcibly guided contact
More informationWires & Cables. Wires & Cables FEB 2018 LP : 05. A Ratna Ganga Group Company. Toll Free No. : WIRES & CABLES PRICE LIST CUM CATALOGUE
Terms: All Product are ISI marked Price are subject to change without prior notice. All applicable GST taxes will be charged extra. Any dispute if arises are subject to Delhi Jurisdiction only. As per
More informationUniversity of Moratuwa, Sri Lanka. EE3231: Design of Electrical Installation
University of Moratuwa, Sri Lanka B.Sc. Engineering Level 4 Semester 1 Examination EE3231: Design of Electrical Installation Time allowed: 2 Hours January 2010 Additional Material: Not required INSTRUCTIONS
More informationVarius SUMMARY OF MODELS OF HRC FUSE-LINKS
SUMMARY OF MODELS OF HRC FUSE-LINKS Type PNA000 PHNA000 PNA00 PHNA00 Rated current I n up to A up to 0 A up to A up to 0 A Rated voltage U n AC 00 V, 00 V 90 V 00 V 90 V DC 0 V 0 V 0 V 0 V Fuse-link size
More informationRETAIL PRICELIST Date: February 2017
RETAIL PRICELIST Date: February 2017 NOTE: All paver and stepping stone prices includes colour. All prices, dimensions, weight and additional information are subject to change without prior notice. Actual
More informationIMAGINE A SAFER ELECTRICAL SYSTEM. Wires & Cables. Wires & Cables NOV 2017 LP : 04. A Ratna Ganga Group Company. Toll Free No.
IMAGINE A SAFER ELECTRICAL SYSTEM Terms: All Product are ISI marked Price are subject to change without prior notice. All applicable GST taxes will be charged extra. Any dispute if arises are subject to
More informationInstruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution
Instruction 0001-22-2--00 Vacuum Circuit Breaker Operator Module Type 3AH 4.16kV to 38kV Power Transmission & Distribution Hazardous voltages and high-speed moving parts. Will cause death, serious injury
More informationParts List with Exploded Views
Parts List with Exploded Views Dual Fuel- Series Dual Fuel Range Top Parts List for Model DF Ref # Part # Description 0 Grate, Burner W/Rubber Pad 0 Burner Cap Assy, Sml 0 Burner Head 0 Venturi, Small
More informationGESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN Mitglied der Short-Circuit-Testing Liaison (STL) Test Report
Mitglied der Short-Circuit-Testing Liaison (STL) Test Report Report-No.: 9725Fr Copy-No.: 00 Contents: 16Sheets Equipment under Test: Manufacturer: Client: Metal-enclosed, single-pole metal-clad and SF
More informationFire Resistant Armoured Power Cable
Power and Wiring Cables Fire Resistant Armoured Power Cable 00/00V Application Armoured fire resistant cable for use in fixed wiring installations where it is necessary for the cable to retain circuit
More informationRecloser/Fuse Coordination Table Maximum Downline Fuse "200N" (Amps)
Recloser (Amps) Recloser/Fuse Coordination Table Maximum Downline Fuse "200N" (Amps) Bypass Fuse "200N" (Amps) 15 5 15 25 10 30 35 15 40 50 20 65 70 30 80 100 40 125 100 VERSA TECH 20 65 140 VERSA TECH
More informationNR ROTARY RING TABLE: FLEXIBLE IN EVERY RESPECT
NR FREELY PROGRAMMABLE ROTARY TABLES NR ROTARY RING TABLE All NR rings allow customer-specific drive motors to be connected NR ROTARY RING TABLE: FLEXIBLE IN EVERY RESPECT WHEN IT S GOT TO BE EXACT We
More informationSerie B2.1. Flanged ductile iron ball valve. made in. Application fields. Shut-off valves E U R O P E. 18
erie B. Flanged ductile iron ball valve BRanDOni made in E U R O P E Application fields WATER CONdITIONING GA EATING INdUTRY FIRE FIGTING www.brandoni.it erie B. eries B. valves are shut-off ball valves
More informationNYY-J/-o 34 NYCWY 36 NYCY 37 NAYY 38
NYY-J/-o 34 NYCWY 36 NYCY 37 NAYY 38 NYY-J/-O Energy and control cable acc. to DIN VDE 0276 and HD 603 Application Indoor and outdoor installation, laying in ducts and underground, for power stations,
More informationElectricity. Year 10 Science
Electricity Year 10 Science What is electricity? The collection or flow of electrons in the form of an electric charge What is static electricity? A stationary electrical charge that is built up on the
More informationRepair Parts List DUEL FUEL RANGE MODEL NUMBER SVD48600BC. When requesting service or ordering parts, always provide the following information:
Repair Parts List DUEL FUEL RANGE MODEL NUMBER SVD48600BC When requesting service or ordering parts, always provide the following information: - Product Type - Part Number - Model Number - Part Description
More information2D - STRIP ANCHOR LIFTING SYSTEM
2D - STRIP ANCHOR LIFTING SYSTEM WWW.TERWA.COM Terwa reserves the right to make changes to the documentation at any time Page 1 OVERVIEW LIFTING CLUTCHES AND TRANSPORT ANCHOR SA-B SA-ST SA-TTU UNIVERSAL
More informationInstallation guide 862 MIT / MIR
Installation guide 862 MIT / MIR in combination with: 864 MTT or 863 MRT or (dual) spot element November 2005 Part no. 4416.232_Rev3 Enraf BV PO Box 812 2600 AV Delft Netherlands Tel. : +31 15 2701 100
More informationL Aquila Earthquake, Abruzzo. Italy May. 06, 2009 M w =6.3 Lifeline Performance by Alex Tang 1, PE, F. ASCE, and Thomas R. Cooper 2, PE, M.
L Aquila Earthquake, Abruzzo. Italy May. 06, 2009 M w =6.3 Lifeline Performance by Alex Tang 1, PE, F. ASCE, and Thomas R. Cooper 2, PE, M. ASCE Executive Summary The overall performance of lifelines was
More informationLatest Status of High Temperature Superconducting Cable Projects
Latest Status of High Temperature Superconducting Cable Projects Y.Ashibe, H.Yumura, M.Watanabe, H.Takigawa, H.Ito, M.Ohya, T.Masuda and M.Hirose Sumitomo Electric Industries, Ltd.Osaka,554-0024 Japan
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More information1 Fig. 3.1 shows the variation of the magnetic flux linkage with time t for a small generator. magnetic. flux linkage / Wb-turns 1.
1 Fig. 3.1 shows the variation of the magnetic flux linkage with time t for a small generator. 2 magnetic 1 flux linkage / 0 10 2 Wb-turns 1 2 5 10 15 t / 10 3 s Fig. 3.1 The generator has a flat coil
More informationISOCON-6. 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER
ISOCON-6 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER Whilst every effort has been taken to ensure the accuracy of this document, we accept no responsibility for damage, injury, loss or expense resulting
More informationSnow Melting Design Guide: Outdoor Stairs (Pavers)
Snow Melting Design Guide: Outdoor Stairs (Pavers) What is Snow Melting? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind snow melting systems
More information1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur
1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-current carrying part) or some electrical part of the
More informationA new concept in stove fitting
Proud to be British A new concept in stove fitting Create the perfect fireplace for your stove The Stove Box has been designed to keep site work to a minimum, cutting this down from a 2 day job into less
More informationParts List, Wiring Diagrams
Parts List, Wiring Diagrams PAE180-300 SERIES PACKAGE AIR CONDITIONER UNITS TABLE OF CONTENTS PARTS LIST----------- 2-11 PARTS DRAWING----- 12-34 WIRING DIAGRAMS--- 35-48 Printed in U.S.A. 7/28/08 KEY
More informationResistivity and Temperature Coefficients (at 20 C)
Homework # 4 Resistivity and Temperature Coefficients (at 0 C) Substance Resistivity, Temperature ( m) Coefficient, (C ) - Conductors Silver.59 x 0-0.006 Copper.6 x 0-0.006 Aluminum.65 x 0-0.0049 Tungsten
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00
More informationAccelerators. Table Quadrupole magnet
Accelerators 2.6 Magnet System 2.6.1 Introduction According to the BEPCII double ring design scheme, a new storage ring will be added in the existing BEPC tunnel. The tasks of the magnet system can be
More informationTeSys enclosed starters 2
Characteristics, references TeSys enclosed starters D..L. starters for motor control 0. to. kw with -phase thermal overload relay with protected phases Characteristics () Conforming to standards IEC 0--,
More informationCOLGED. Toptech
COLGED SPARE PARTS CATALOGUE ERSATZTEILKATALOG CATALOGUE PIECES DETACHEES CATALOGO PARTI RICAMBIO CATALOGO DE PIEZAS DE RECAMBIO CATALOGO PECAS, DE REPOSICAO Toptech -. -09-0 R L 9 0 0 0 0 9 MOD T0 MOD
More informationKM-1600SWH KM-1600SRH KM-1600SWH3 KM-1600SRH3
NO. ISSUED: REVISED: 71193 OCT. 2, 2001 JAN. 27, 2003 HOSHIZAKI STACKABLE CRESCENT CUBER MODELS KM-1600SWH KM-1600SRH KM-1600SWH3 KM-1600SRH3 PARTS LIST KM-1600SWH L-0 June, 2001 M-0 Feb., 2002 M-1 Feb.,
More informationGrounding and Shielding
Grounding and Shielding Veljko Radeka, BNL Outline Primary guidelines The Liquid Argon Calorimeter system Prevention of EMI and isolation Safety grounds Interface with other subsystems Status of implementation
More informationPhysicsAndMathsTutor.com
Electricity May 02 1. The graphs show the variation with potential difference V of the current I for three circuit elements. PhysicsAndMathsTutor.com When the four lamps are connected as shown in diagram
More informationEXEMPLAR NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 3 ( ) (X-Paper) 09:00 12:00
NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 3 2008 (12041002) (X-Paper) 09:00 12:00 EXEMPLAR This question paper consists of 7 pages. EXEMPLAR -2- NC(V) TIME: 3 HOURS
More informationCat. Multi-Processors. Hydraulic Excavators. Multi-Processor/Hydraulic Excavator Compatibility. Features: Maximum Productivity.
Cat Multi-Processors Hydraulic Excavators Maximum Productivity Big challenges are reduced to small pieces, thanks to high cutting and crushing forces generated by the cross-mounted cylinder. High productivity
More informationCALEFFI. Modulating digital controller for heating and cooling. 161 series 01122/08 GB. replaces dp 01122/05
Modulating digital controller for heating and cooling series REGI ERED SI EN ISO 00:000 Cert. n FM UNI EN ISO 00:000 Cert. n 000 0/0 G replaces dp 0/0 Function The controller can be used with three-point
More information3D Drawing - CARIF 260 BSA
D Drawing - CARIF 0 BSA DRAWING CODE DRAWING NAME NUMBER ASS000 Basement ASS00 Vice Base ASS00 Vice A ASS00B Vice B ASS00 Frame A ASS00B Frame B ASS000 Frame Cylinder A ASS000B Frame Cylinder B ASS000
More informationISOCON-3 MAINS POWERED ISOLATING SIGNAL CONVERTER
ISOCON-3 MAINS POWERED ISOLATING SIGNAL CONVERTER CAUTION: This equipment is designed for connection to mains voltages and must be used in accordance with this guide. If it is not, the safety protection
More informationBOLT SIZE Rec.Torque Ft/Lbs. Max Torque Ft/Lbs
BOLT SIZE Rec.Torque Ft/Lbs Max Torque Ft/Lbs "-0 5 "- "- "- 5 "- "-0 () 7 (9) (5) 5 (0) 9 () 5 () 50 () 70 (95) 00 () 5 (70) 5 (70) 5 () Material Add Suffix to P/N P09 THRU P PIPE CLAMPS FOR RIGID STEEL
More informationType M4 - SON - SO - MS
9. REV. Type M - SON - SO - MS Aircaps Tank venting and water excluding aircaps. For installation on service tank air pipes. Inerted void spaces and ballast tanks In order to maintain inert gas pressure
More informationRevision checklist SP10. SP10 Electricity and Circuits. SP10a Electric circuits. SP10b Current and potential difference
Electricity and Circuits a Electric circuits Describe the basic structure of an atom (positions, relative masses and relative charges of protons, neutrons and electrons). Recognise the circuit symbols
More informationSpare parts list UC-S
Spare parts list UC-S Contents Water inlet and tank heating Water softener Water drain, Mediamat Cyclo Circulating pump Wash + rinse; bottom Wash + rinse; top Boiler Dosage Panelling Cover plate, electrical
More informationMOFLEX. Insulated copper flexibars
MOFLEX Insulated copper flexibars 2019 Insulated copper flexibars Moflex Insulated copper flexibars Moflex are manufactured out of highly flexible copper strips either in bare or tinned version. They are
More informationPHOS 15 LED PROJECTOR
PHOS 15 LED PROJECTOR SPECIFICATIONS Item:.. PHOS 15 Body:.... Aluminium Available Colours:... White / Black / Silver Weight:.... 1.9 kg On / Off Switch:..... Not Available Environmental Conditions:.....
More informationHydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid
Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid J. McCall, J. Yuan, D. Folts, N. Henderson, American Superconductor D. Knoll, Southwire M. Gouge, R. Duckworth, J.
More informationIts modular concept allows to build up a ball valve for any degree of automation and any kind of application
Type 2657...59 DN 10 up to 80 mm; Plastic; 2/2 way dvantages/benefits ntegrated pilot valves, position feed-back and limit switches available Customized system solutions with Burkert valves & sensors With
More informationBINOCULAR STEREOSCOPIC MICROSCOPE MBS-10. User Manual
BINOCULAR STEREOSCOPIC MICROSCOPE MBS-10 User Manual ATTENTION! Мicroscope design may differ somewhat from description in this manual. 2 1 - PURPOSE The MBS-10 microscope is intended for observing both
More informationDevelopment of a resistive model for overhead line poles
Journal of Physics: Conference Series Development of a resistive model for overhead line poles To cite this article: Z Kvasznicza and G Elmer 2011 J. Phys.: Conf. Ser. 268 012017 Related content - Nonlinear
More informationWE RE HERE TO HELP: 1 (844) LIGHTCLOUD
Welcome Controller LCCONTROL20/D10 WE RE HERE TO HELP: 1 (844) LIGHTCLOUD 1 (844) 544-4825 support@lightcloud.com Contents Lightcloud Controller NPT Nut O-ring Instruction Manual Wire Nuts x 4 x 2 Specifications
More informationSpare parts list UC-M, UC-L, UC-XL
Spare parts list Contents Water inlet and tank heating Water softener Water drain, Mediamat Cyclo Circulating pump Wash + rinse; bottom Wash + rinse; top Boiler Dosage Panelling Cover plate, electrical
More informationEX-EMERGENCY LIGHT FITTINGS
EX-EMERGENCY LIGHT FITTINGS nllk 0...N 1-36 W Plastic version for Zone 2 and Zone 21/22 The explosion-protected light fittings of the series nllk 0 N are conform to the requirements of the ATEX-Directive
More informationLimited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results
Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully
More informationCFC, HCFC free, GWP zero thermal insulation in the form of tubes, sheets, coils and self-adhesive tape, a Flexible Elastomeric Foam product complying
CFC, HCFC free, GWP zero thermal insulation in the form of tubes, sheets, coils and self-adhesive tape, a Flexible Elastomeric Foam product complying with the European standard EN. EUROBATEX is a closed
More informationWARRANTY AND ASSISTANCE
TM WeatherHawk WARRANTY AND ASSISTANCE This equipment is warranted by CAMPBELL SCIENTIFIC (CANADA) CORP. ( CSC ) to be free from defects in materials and workmanship under normal use and service for twelve
More informationH07RN-F. Flexible Cables and Cords 60 C 450/750 V. Application. Specifications
H0RN-F 0 C 0/0 V Application For mains supply or extension leads for portable or fixed equipment operating indoors or outdoors (domestic or industrial) under conditions of frequent handling trailing or
More informationST T indoor batten fluorescent light fitting. USE ADVANTAGES IP20
... indoor batten fluorescent light fitting. USE The light fitting is suitable for assembly and production shop floors, supermarkets, warehouses and hallways. The light fitting is suitable for composing
More information3VT4 Molded Case Circuit Breakers up to 1000 A
VT4 Molded Case Circuit Breakers up to 00 A Catalog Technical nformation VT4 Molded Case Circuit Breakers up to 00 A General data / - Overview Circuit breakers Switch disconnectors / - Selection and ordering
More informationMR medium rating busbar
technical information General features MR is fully compliant with S EN 0-, specifically, the rated current of the Zucchini busbar trunking systems is always rated at the average ambient temperature of
More informationSnow Melting Design Guide: Accessibility Ramps (Concrete and Pavers)
Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers) What is a Snow Melting System? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind
More informationFault Calculation Methods
ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the
More informationOperating Instructions for Digital Manometer. Model: MAN-SD
Operating Instructions for Digital Manometer Model: MAN-SD 1. Contents 1. Contents...2 2. Note...3 3. Instrument Inspection...3 4. Regulation Use...4 5. Operating Principle...4 6. Mechanical Connection...5
More information- Memorize the terms voltage, current, resistance, and power. - Know the equations Ohm s Law and the Electric Power formula
E: Know Circuit Vocabulary (Short Answer) Level 2 Prerequisites: Know Circuit Vocabulary (Short Answer); Recognize Insulators and Conductors Objectives: - Memorize the terms voltage, current, resistance,
More informationMineral-insulated thermocouples to DIN and EN
Data Sheet 90.1210 (90.1221) Page 1/7 s to DIN 43 710 and EN 60 584 for temperatures from -200 to +1200 C flexible sheath with shock-proof measuring insert protection tube diameter from 0.5mm fast response
More informationStatus and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid
Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid J. Yuan, J. Maguire, D. Folts, N. Henderson, American Superconductor D. Knoll, Southwire M. Gouge,
More informationMODEL: WB009GMFI19HLD (120V) Wall Mount DC Inverter Fan Coil Unit 9,000 BTUH
MODEL: WB009GMFI19HLD (120V) Wall Mount DC Inverter Fan Coil Unit 9,000 BTUH No. Part Name Quantity BOM code List Price Remark 1 Panel assembly 1 201132890609 2 Air filter 2 201132890704 5 Display box
More informationCompany Directive STANDARD TECHNIQUE: CA2V/4. Relating to Procedures for Making 11kV Cable Straight Joints
Serving the Midlands, South West and Wales Gwasanaethu Canolbarth a De Orllewin Lloegr a Chymru Company Directive STANDARD TECHNIQUE: CA2V/4 Relating to Procedures for Making 11kV Cable Straight Joints
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More informationCurrent and Voltage Transformer
Digital Electric& Electronics System KS C Current and Voltage Transformer PHSE CURRENT TRNSFORMER PROTECTION CURRENT TRNSFORMER SQURE TYPE CURRENT TRNSFOMER (.KV) ROUND TYPE CURRENT TRNSFORMER [.KV] WINDING
More informationSingle Core XLPE/LSF/AWA/LSF Power Cable
Single Core XLPE/LSF/AWA/LSF Power Cable 00/00V and 100/00V Application LSF insulated, armoured and sheathed, single core power cable for use in fixed installations. Especially for use in areas where fire
More informationFAZ tripping characteristics at 30 C: B, C, D to IEC/EN FAZ tripping characteristics at 30 C: R to IEC/EN
FAZ, AZ High-Capacity Tripping Characteristics Moeller HPL011-001/00 1/07 FAZ tripping characteristics at 0 C: B, C, D to IEC/EN 0 9 FAZ tripping characteristics at 0 C: R to IEC/EN 0 97 t [s] 700 00 100
More informationEPR Insulated, Heavy Duty HOFR Sheathed Flexible Cables
1 EPR Insulated, Heavy Duty HOFR Sheathed Flexible Cables 0 C 0/0 V *TQ Application For power/lighting services and mains supply or extension leads in situations requiring frequent handling, trailing and
More informationEx-Floodlight PXLED. (Ex-Zone 1, 2, 21 and 22)
Ex-Floodlight PXLED (Ex-Zone 1, 2, 21 and 22) Lighting under harsh conditions The new modular LED floodlight series PXLED is suited for nearly every kind of lighting task in hazardous areas, including