1 POWER SYSTEM OPERATION CORPORATION LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE DAILY OPERATION REPORT POWER SUPPLY POSITION IN SOUTHERN REGION FOR 03-AUG-2017 DATE OF REPORTING : 04-AUG-2017 AT 06:00HRS 1. REGIONAL AVAILABILITY AVAILABILITY ()* * Availabilty indicated above includes ISTS Loss. #Shortage is calculated at 50 Hz which is the sum of Load Shedding and Frequency Correction at 50 Hz. 2 A. STATE (ENERGY - MU) # The accuracy of shortage computation depends on timely load shedding details furnished in the web directly by constitutents 2 B. STATE () & ENERGY FORECAST 3. GENERATION : EVENING PEAK (19:00HRS) NIGHT OFF-PEAK (03:00HRS)* DAY ENERGY SHORTAGE ()# FREQUENCY (Hz) AVAILABILITY ()* SHORTAGE ()# FREQUENCY (Hz) SHORTAGE # STATE THERMAL HYDRO GAS/NAPTH A/ DIESEL WIND SOLAR OTHERS NET SCH (FROM GRID) DRAWAL (FROM GRID) AVAILABILI TY SHORTAGE # AP TELANGA NA KAR KERALA TN PONDY TOTAL STATE 19:00 HRS PEAK 03:00 HRS OFF-PEAK DAY PEAK DAY ENERGY SHORTAGE # SHORTAGE # TIME SHORTAGE# FORECAST DEVIATION FROM FORECAST (ACTUAL + LS - FORECAST) AP :00: TELANGANA :55: KAR : KER : TN : PONDY ISTS LOSS : STATION ANDHRA PRADESH INSTALLED CAPACITY() 19:00HRS 03:00HRS OFF- DAY PEAK HRS DAY ENERGY Vijayawada TPS (6x210+1x500) : Rayalaseema TPS (5x210) : Krishnapatnam TPP (2*800) : Hinduja (1*520) : Total Thermal Srisailam RB (7x110) Lower Sileru (4x115) : Upper Sileru (4x60) : Other Hydro Total Hydro Vijjeswaram Gas (2x33+1x34+1x x59.5) AVG : Reliance Energy Ltd.(1x140+1x80) Jegrupadu (2x45.8+1x48.9+1x75.5) : Spectrum (1x46.8+2x46.1+1x68.88) LANCO (2*115+1*125) Vemegiri 1x233+1x137) Jegrupadu Ext Konaseema (1x145+1x140+1x165) Gauthami (2x145+1x174) GMR(BRG) (1x237) Other Gas/Naptha/Diesel Total Gas/Naptha/Diesel Wind : Solar Others : Total AP Page 1 of 16
2 TELANGANA STATION Kothagundam TPS (4x60+4x120+2x250+1x500) INSTALLED CAPACITY() 19:00HRS 03:00HRS OFF- DAY PEAK HRS DAY ENERGY AVG : Kaktiya TPS (1x500+1x600) : Ramagundan B (1x62.5) : Singareni (2x600) : Total Thermal N'Sagar (1x110+7x100.8) Srisailam LB (Gen) (6x150) KARNATAKA KERALA Srisailam LB (Pump) Other Hydro Total Hydro Wind Solar Others : Total TG Raichur TPS (7x210+1x250) : Bellary TPS (2x500+1x700) : UPCL(IPP) (2x600) : Jindal (2x130+4x300) : YTPS (1x800) Total Thermal Sharavathi (10x103.5) : Nagjheri (1x135+5x150) : Varahi (4x115) : Other Hydro Total Hydro Yelehanka Diesel (6x21.32) Other Gas/Naptha/Diesel Total Gas/Naptha/Diesel Wind : Solar Others : Total KAR Iddukki (6x130) : Sabarigiri (1x60+4x55)) : Lower Periyar (3x60) : Other Hydro Total Hydro Kayamkulam (2x x126.38) Reliance Energy (3x40.5+1x35.5) Brahmapuram DPP (5x21.32)) Kozhikode DPP (8x16) Other Gas/Naptha/Diesel Total Gas/Naptha/Diesel Wind Solar Others Total KER Page 2 of 16
3 TAMILNADU Ennore TPS (2x60+3x110) North Chennai TPS (3x210) : Tutucorin TPS (5x210) : Mettur TPS (4x210+1x600) : Neyveli-I (IPP) (6x50+3x100) : ST-CMS (1x250) : NCTPS STAGE-II (2x600) : Other Thermal Total TN Thermal Kadamparai (G) (4x100) Kadamparai (P) Other Hydro Total TN Hydro Basin Bridge (4x30) Kovilkalappal (1x70+1x37.88) : Kuttalam (1x64+1x37) : Valattur(Stg 1&2) (2x60+1x35+1x32) : Samalpatty (7x15.1) P P Nallur (1x330.5) Madurai Power CL (1x106) GMR Vasavi (4x49) Other Gas/Naptha/Diesel : Total Gas/Naptha/Diesel Wind : Solar Others : Total TN STATION CENTRAL SECTOR (ISGS) INSTALLED CAPACITY() 19:00HRS 03:00HRS OFF- DAY PEAK HRS DAY ENERGY Ramagundam,NTPC (3x200+4x500) : Neyveli TPS II (7x210) : Neyveli TPS I (EXP) (2x210) : Madras APS (2x220) : Kaiga STGI (2x220) : Kaiga STG II (2x220) : Neyveli TPS II (EXP) (2x250) : Talcher II, NTPC (4x500) : Simhadri II, NTPC (2x500) : Kudankulam (2x1000) : NTPC Kudgi (2x800) Simhadri I, NTPC (2x500) : JOINT VENTURE Total ISGS Vallur (3x500) : NTPL (2x500) : Total JV IPP UNDER OPEN ACCESS LKPPL STG2 (1x233+1x133) LKPPL STG3 (1x x126.7) SIMHAPURI (2x150) MEENAKSHI (2x150) COSTAL ENERGEN (2x600) TPCIL (2x660) : IL&FS (2x600) SGPL (2x660) : Total IPP AVG Page 3 of 16
4 Total State Thermal Total ISGS Thermal Total Thermal Total Hydro *Total Gas/Naptha/Diesel Total Nuclear Total Wind Total Solar Total Others Inter-regional (Except Talcher II) Grand Total * Total Gas/ naptha/diesel includes pondy Karaikal Power Plant of A. INTER-REGIONAL EXCHANGES & HVDC - PHYSICAL FLOWS [IMPORT(+)/EXPORT(-)] ELEMENT 4 B. INTER-REGIONAL EXCHANGES - SCHEDULES, WHEELING, UI & TALCHER AC I/C 5. FREQUENCY PROFILE 19:00 HRS PEAK 03:00 HRS OFF- MAX INTER-CHANGE () IMPORT TIME EXPORT TIME ENERGY Bhadrawati B2B Gazuwaka B2B : Talcher-Kolar : Talcher Stage II I/C Raichur-Solapur I & II : Upper Sileru-Balimela CHIKODI-KOHLAPUR KUDUGI-KOHLAPUR : IKAKULAM-ANGUL NIZAMABAD-WARDHA ISGS Schedule Talcher Stage II to ER ISGS Bilaterals of constituents ER WR Power Exchange ER WR Wheeling through ER to WR to Diversion of power ER WR IR Schedule Net UI Inter-Regional ER to WR to ER to WR to Schedule (Total) % OF TIME RANGE <48.8 Hz <49.0 Hz <49.2 Hz <49.5 Hz <49.7 Hz <49.9 Hz 49.9 Hz To Hz Flow (Total) >50 Hz >50.05 Hz % Instantenous Maximum Instantenous Minimum Block Maximum Block Minimum Day Avg Frequency Variation Hz TIME Hz TIME Hz TIME Hz TIME Hz Index :03: :18: : : Std. Var. Page 4 of 16
5 6. SHORT TERM OPEN ACCESS TRANSACTION WHEELING BILATERAL NAME OF THE TRANSACTION ER END WR END NAME OF THE TRANSACTION MU PEAK () APPCC-BSPHCL(MANIKARAN)(154.5)(-ER) APPCC-TATADELHI(GMRETL)(49)(-WR) APPCC-PSEB(NVVN)(50)(-ER) APPCC-PSEB(ARPPCPL)(30.08)(-ER) ITCWIND-ITCLTDI3L(ITCLTDWIND)(2.53)(-) BMMCEMENT-SAGARCEM(SAGARCEMNT)(13.5)(-) ITCWIND-ITCPSPD(ITCLTDWIND)(8)(-) ITCWIND-ITCLTDBIAL(ITCLTDWIND)(2.32)(-) APTRANSCO TOTAL EXPORT SITAPURPOW-ZUARICEMEN(SITAPURLTD)(15.85)(-) MYHOMEIND-JAYAJOTHI(MYHOME)(12)(-) PENNACEM-PENNATALAR(PENNACPP)(6)(-) PENNACEM-PENNABOYYA(PENNACPP)(6.5)(-) MYHOMEIND-MYHOMEVGU(MYHOME)(7.84)(-) SGPLNLR-APPCC(GMRETL)(350.31)(-) DALCEMTN-DALCEMAP(MANIKARAN)(5.5)(-) DALCEMKAR-DALCEMAP(ARPPCPL)(6)(-) APTRANSCO TOTAL IMPORT SITAPURPOW-ZUARICEMEN(SITAPURLTD)(15.85)(-) MYHOMEIND-JAYAJOTHI(MYHOME)(12)(-) PENNACEM-PENNATALAR(PENNACPP)(6)(-) PENNACEM-PENNABOYYA(PENNACPP)(6.5)(-) MYHOMEIND-MYHOMEVGU(MYHOME)(7.84)(-) TGTRANSCO TOTAL EXPORT APNRL-U#1&2-TGPCC(PTC)(5.79)(ER-) Dikchu-TGPCC(PTC)(20.27)(ER-) JNSTPP-TGPCC(PTC)(13.69)(ER-) BMMCEMENT-SAGARCEM(SAGARCEMNT)(13.5)(-) ITCWIND-ITCPSPD(ITCLTDWIND)(8)(-) SGPLNLR-TSSPDCL(SGPLNLR)(440.72)(-) SGPLNLR-TSSPDCL(SGPLNLR)(288.75)(-) TGTRANSCO TOTAL IMPORT DALCEMKAR-DALCEMAP(ARPPCPL)(6)(-) KPTCL TOTAL EXPORT ITCWIND-ITCLTDI3L(ITCLTDWIND)(2.53)(-) ITCWIND-ITCLTDBIAL(ITCLTDWIND)(2.32)(-) KPTCL TOTAL IMPORT KSEB TOTAL EXPORT DBPOWER-KSEB(ARPPCPL)(50)(ER-) JITPL-KSEB(ARPPCPL)(57.58)(ER-) KSEB TOTAL IMPORT DALCEMTN-DALCEMAP(MANIKARAN)(5.5)(-) TNEB TOTAL EXPORT NSPCL-SAILSLM(SAILSSP)(13.5)(ER-) APLMUNDRA2-TNEB(ADANI)(22.46)(ER-) SGPLNLR-TANGEDCO(GMRETL)(419.39)(-) TNEB TOTAL IMPORT GOA TOTAL EXPORT GOA TOTAL IMPORT LKPPL TOTAL EXPORT OFF-PEAK () Page 5 of 16
6 7. VOLTAGE LEVEL AT CRITICAL SUB STATION SUBSTATION 8. MAJOR RESERVOIR PARTICULARS Note: The Reservoirs data are of previous day and Cumulative figures for the month is upto previous day 9. DETAILS OF OVER DRAWAL OVER A DAY WHEN FREQUENCY < 49.9 HZ 10. SIGNIFICANT EVENTS (IF ANY) : % OF TIME (Minute Wise) 400 KV (Hourly) 220 KV / 230 KV (Hourly) <380 KV <390 KV >420 KV >430 KV MAXIMUM MINIMUM MAXIMUM MINIMUM KV TIME KV TIME KV TIME KV TIME HYDERABAD GOOTY VIJAYWADA KOLAR BANGALORE HIRIYUR CHENNAI TRICHY TRIVENDRAM KAIGA KUDANKULAM RESERVOIR MDDL (Mts) DESIGNED PRESENT LAST YEAR LAST DAY MONTH FRL (Mts) Energy Level (Mts) Energy Level (Mts) Energy Inflow Usage Prog. Inflow JALAPUT ISAILAM N.SAGAR LINGANAMAKKI SUPA IDUKKI KAKKI NILAGIRIS Prog. Usage TOTAL CONSTITUENTS AP TG KARNATAKA KERALA TAMILNADU PONDY AVERAGE ( F<49.9) OD MU'S ( F<49.9) OD NO OF BLOCK( F<49.9) GENERATOR NLCII NLCEXPI RSTP SEPL LANCO MEPL AVERAGE ( F<49.9) Under Injection MU'S ( F<49.9) Under Injection NO OF BLOCK( F<49.9) SYSTEM CONSTRAINTS (IF ANY) : 12. WEATHER CONDITIONS: Page 6 of 16
SOUTHERN REGION POWER SECTOR PROFILE GOVERNMENT OF INDIA MINISTRY OF POWER PROJECT MONITORING CELL NIRMAN BHAVAN NEW DELHI
SOUTHERN REGION POWER SECTOR PROFILE GOVERNMENT OF INDIA MINISTRY OF POWER PROJECT MONITORING CELL NIRMAN BHAVAN NEW DELHI JANUARY 2007 SOUTHERN REGION POWER SECTOR PROFILE TABLE OF CONTENTS Sl. No. Contents
More informationPhone : ; FAX : ; web site:
Government of India Central Electricity Authority Southern Regional Power Committee 29, Race Course Cross Road BANGALORE - 560 009 Phone : 080-2228 2516 ; FAX : 080-2225 9343; e-mail: mssrpc@yahoo.com;
More informationNPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II
ANNEXURE ( Page 1 of 3) REVISED PERCENTAGE ALLOCATION ( FIRM+UNALLOCATED ) FROM ISGS OF SR w.e.f.26.02.2015 From 18:00 hrs to 22:00 hrs. NTPC NLC NTECL NPCIL ISGS Ramagundam Talcher Simhadri TPS-II @ TPS-
More informationय प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018
भ रत सरक र GOVERNMENT OF INDIA उज म लय MINISTRY OF POWER क य व त धकरण CENTRAL ELECTRICITY AUTHORITY द ण य व त स म त SOUTHERN REGIONAL POWER COMMITTEE य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT January
More informationAPPENDIX A 5 BUSSYSTEM DATA
5 BUSSYSTEM DATA APPENDIX A A. BUSDATA S.No P gen Q gen P load Q Load Voltage Shunt 1 90 0 0 0 1.06 0 2 120 0 40 10 1.0707 0 3 120 0 90 60. 1.068 0 4 0 0 80 20 1.0 0 5 0 0 120 0 1.0 0 B. LINE DATA S. No
More informationPhone : ; FAX : ; ; web site:
WEBSITE भ त स क क न द र य व द य त प र व क ण दवक षण क ष त र य व द य त सव वत 29, स क सस क र स ड ब गल - 560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race
More informationPhone : ; FAX : ; ; web site:
WEBSITE भ रत सरक र क न र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र - 560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29,
More informationSub: Regional Transmission Deviation Account for the month of December, Reg
FAX / POST भ रत सरक र Government of India क य व त धकरण Central Electricity Authority द ण य व त स म त Southern Regional Power Committee 29, र स क स स र ड 29, Race Course Cross Road ब गल र :-560 009 BANGALORE
More informationव षय: स श ध त क ष त र य प र शण ल ख
WEBSITE भ रत सरक र क न र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र :-560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29,
More informationSub: Regional Transmission Deviation Account for the month of February, Reg
FAX / POST भ रत सरक र Government of India क य व त धकरण Central Electricity Authority द ण य व त स म त Southern Regional Power Committee 29, र स क स स र ड 29, Race Course Cross Road ब गल र :-560 009 BANGALORE
More informationव षय: स श ध त क ष त र य प र शण ऱ ख
WEBSITE भ रत सरक र क न र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र :-560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29,
More informationPOWER SYSTEM STATISTICS
POWER SYSTEM STATISTICS 2015-16 KERALA STATE ELECTRICITY BOARD LIMITED Table No. LIST OF TABLES Title 1 Growth of Kerala Power System 1 2 Plan wise Achievements 2 3 Particulars of Generators 3 4 Installed
More informationFig in '000 tes on date Monthly Progressive
DESP RAJGHAT BADARPUR CCL Rail 0.00 163.60 BADARPUR (TO TALCHER STPS) CCL Rail 0.00 3.83 PANIPAT BCCL Rail 10.55 52.05 CCL Rail 0.00 7.54 NCL RGTPP (HISSAR) CCL Rail 3.76 125.32 MCL Rail 7.47 22.41 NCL
More informationMORNING MEGAWATT. MARKET MOVERS 7 October 2017 PRICE IEX DAM. Delivery: 7 October 2017 Last updated: 10:00 AM. Price (Rs/MWh) Power (MW)
MORNING MEGAWATT Delivery: 7 October 2017 Last updated: 10:00 AM MARKET MOVERS 7 October 2017 7000 Price West Bengal Buy Himachal Pradesh Sale 2500 5250 1875 Price (Rs/MWh) 3500 1250 1750 625 0 0 1700-1715
More informationCHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES
CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES REVIEW: Central Electricity Authority General Review 2006 CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES During the year 2004-05 gross electricity generation
More informationALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF
More informationPOWER HOUSE WISE DESPATCH Date September 17, Provisional Fig in '000 tes on date Monthly Progressive Sum of Daily
RAJGHAT S BADARPUR BADARPUR (TO TALCHER STPS) CCL Rail 3.82 76.44 PANIPAT B CCL Rail 0.00 40.49 NCL RGTPP (HISSAR) BCCL Rail 0.00 3.56 MCL Rail 0.00 28.81 NCL Rail 0.00 37.01 IGTPP (JHAJJAR)-APCPL CCL
More informationअध क षण अ भयन त (व )/ Superintending Engineer(C)
भ रत सरक र क न दर य व त पर धकरण द क षण क ष तर य व त स म त 29, र स क सर कर स र ड ब गल र :560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race Course Cross
More informationCategory-wise and Voltage-wise Actual Sales ( )
Voltage LT 11 33 132kV & Above HT Total CAT Category-wise and Voltage-wise Actual Sales (2008-09) APCPDCL 2008-09 ATP KNL MBNR NLG MDK RRN RRS HYN HYS HYC Total 1 Domestic 309.19 347.85 169.23 253.39 253.89
More informationSUMMARY STATEMENT Power projects yielding benefit during the XIth Plan
SUMMARY STATEMENT Power projects yielding benefit during the XIth Plan ---------------- -------------------- Sl. Hydro Nuclear Grand No. Coal Lignite
More informationALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF
More informationPower Engineering II. Fundamental terms and definitions
Fundamental terms and definitions Power engineering A scientific discipline that focuses on: Generation of electrical energy (EE) Transmission and distribution of EE Consumption of EE Power grid operation
More informationKARNATAKA STATE NATURAL DISASTER MONITORING CENTRE (An Autonomous Body, affiliated to Department of Revenue, Govt. of Karnataka)
balla WEATHER: KARNATAKA STATE NATURAL DISASTER MONITORING CENTRE (An Autonomous Body, affiliated to Department of Revenue, Govt. of Karnataka) DAILY REPORT DATED 29.08.2016 Weather in the State during
More informationALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF
More informationMonthly Progressive. Sum of Daily
RAJGHAT BADARPUR CCL Rail 3.76 129.09 BADARPUR (To Talc CCL Rail 0.00 0.00 PANIPAT BCCL Rail 7.07 137.10 CCL Rail 0.00 41.60 NCL WCL Rail 0.00 23.03 RGTPP (HISSAR) CCL Rail 0.00 79.49 NCL Rail 3.60 105.60
More informationALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF
More informationSUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018
SUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018 1. CAPACITY ADDITION (Generation and Transmission) (i) Thermal capacity 600 MW has been
More informationAgenda for Long Term Access NVVNL Solar Power Projects
Agenda for Long Term Access NVVNL Solar Power Projects NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) vide letter dated 04/11/2014 had applied for Long term Access (LTA) for transfer of 150MW power i.e. 100MW from
More informationALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF
More informationPROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA
PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,
More informationALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN
Sunday 22 April 2018 NIGHT Time of Issue: 2000 hours IST ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN Significant Weather Features The ongoing fairly widespread rainfall activity with isolated thunder
More informationShortage(-)/Surplus.. Requirement Freq (Hz) Demand Met Shortage 42, , , ,
Power Supply Position in Northern Region For 16-Feb-2019 POWER SYSTEM OPERATION CORPORATION LIMITED NORTHERN REGIONAL LOAD DESPATCH CENTRE DAILY OPERATION REPORT OF NORTHERN REGION Date of Reporting:17-Feb-2019
More informationShortage(-)/Surplus.. Requirement Freq (Hz) Demand Met Shortage 40, , , ,
Power Supply Position in Northern Region For 28-Oct-2018 POWER SYSTEM OPERATION CORPORATION LIMITED NORTHERN REGIONAL LOAD DESPATCH CENTRE DAILY OPERATION REPORT OF NORTHERN REGION Date of Reporting:29-Oct-2018
More informationShortage(-)/Surplus.. Requirement Freq (Hz) Demand Met Shortage 47, , , , ,
Power Supply Position in Northern Region For 30-Sep-2018 POWER SYSTEM OPERATION CORPORATION LIMITED NORTHERN REGIONAL LOAD DESPATCH CENTRE DAILY OPERATION REPORT OF NORTHERN REGION Date of Reporting:01-Oct-2018
More informationN. K. Manglik Director
N. K. Manglik Director Hydro-meteorological observations could be broadly defined as the scientific way for collection of flow data at a specific location along the river including selected meteorological
More informationWind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015
Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?
More informationALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN
Saturday 21 April 2018 MORNING Time of Issue: 0800 hours IST ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN Significant Weather Features Isolated thunder squalls and hailstorms are very likely over Sub
More informationInternational Studies about the Grid Integration of Wind Generation
International Studies about the Grid Integration of Wind Generation Dr.-Ing. Markus Pöller/DIgSILENT GmbH Internation Studies About Grid Integration of Wind Generation Grid Integration of Wind Generationin
More informationAgenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS
Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS 1. LTA pertaining to Kudgi STPS a. KSEB vide letter dated 25-09-2017 (ANNEXURE A) had stated that with installed capacity
More informationReplies to Additional Information
Replies to Additional Information 1. Actual Consumers Category wise sales for the months January to March, 2017. Reply : Enclosed in Annexure-I 2. Excel Format-7 (Total Revenue at Current Tariff and )
More informationCalifornia Independent System Operator (CAISO) Challenges and Solutions
California Independent System Operator (CAISO) Challenges and Solutions Presented by Brian Cummins Manager, Energy Management Systems - CAISO California ISO by the numbers 65,225 MW of power plant capacity
More informationGrid Integration and Technology Trends. State Load Despatch Centre, Gujarat
Grid Integration and Technology Trends State Load Despatch Centre, Gujarat 16 th June 2016 Way of presentation Wind Energy in Gujarat Power System Grid Integration Wind Generation Characteristics Impact
More informationSOLAR POWER FORECASTING BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS
BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS Detlev Heinemann, Elke Lorenz Energy Meteorology Group, Institute of Physics, Oldenburg University Workshop on Forecasting,
More informationALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN
Tuesday 08 May 2018 MID DAY Time of Issue: 1345 hours IST ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN Significant Weather Features Under the influence of the present Western Disturbance over Jammu
More informationW E E K L Y MONSOON INSIGHT
W E E K L Y MONSOON INSIGHT 08 th July 2016 Indian Monsoon Dynamics Recent Weather Development India received 35% surplus rainfall in the week ended 6 July with all regions recording above-normal rainfall
More informationSystems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018
Systems Operations PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future Astana, September, 26 2018 7/6/2018 Economics of Grid Integration of Variable Power FOOTER GOES HERE 2 Net Load = Load Wind Production
More informationCharges for Deviation (Paise/kWh) applicable for: 19 December 2018
Annexure-I Annexure-II Average Frequency of the time block (Hz) र ट र य भ र प र षण क द र, ब -9 (प रथम तल), क त ब इ ट ट य शनल ए रय, कटव रय सर य, नई द ल -110016 Date of Issue: Charges for Deviation (Paise/kWh)
More informationBringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT
Bringing Renewables to the Grid John Dumas Director Wholesale Market Operations ERCOT 2011 Summer Seminar August 2, 2011 Quick Overview of ERCOT The ERCOT Market covers ~85% of Texas overall power usage
More informationSALTSEEDING FROM AIRCRAFT OVER LINGANAMAKKI CATCHMENT, SOUTH INDIA
SALTSEEDING FROM AIRCRAFT OVER LINGANAMAKKI CATCHMENT, SOUTH INDIA A.S. Ramachandra Murty, A. Mary Selvam, C.P. Kulkarni, R.N. Chatterjee and Bh. V. Ramana Murty Indian Institute of Tropical Meteorology
More informationCost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling
Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling HEPEX 10 th University Workshop June 25 th, 2014 NOAA Center for Weather and Climate Thomas D. Veselka and Les Poch Argonne
More informationWorkshop on Wind Forecasting Applications to Utility Planning and Operations. Phoenix, Arizona 19 February 2009
Workshop on Wind Forecasting Applications to Utility Planning and Operations Phoenix, Arizona 19 February 2009 Integrating Forecasting into the EMS and Control Center by the Portuguese TSO Rui Pestana
More informationSHORT TERM LOAD FORECASTING
Indian Institute of Technology Kanpur (IITK) and Indian Energy Exchange (IEX) are delighted to announce Training Program on "Power Procurement Strategy and Power Exchanges" 28-30 July, 2014 SHORT TERM
More informationWheeling Tariffs FY to FY and. Retail Supply Tariffs
Wheeling Tariffs FY2009-10 to FY2013-14 and Retail Supply Tariffs FY2009-10 Order 20 th March 2009 Andhra Pradesh Electricity Regulatory Commission Singareni Bhavan, Red Hills, Lakdi-Ka-Pool, Hyderabad
More informationवषय: 31/12/18 स 06/01/19 तक क स ह क लए आरआरएएस ल ख क ववरण. Sub: RRAS Settlement Account Statement for the week of 31/12/18 to 06/01/19
भ रत सरक र क य व त धकरण द ण य व त स म त, र स क स स र ड ब गल र :-0 00 Government of India Central Electricity Authority Southern Regional Committee, Race Course Cross Road BENGALURU - 0 00 Phone : 00 -
More informationCOAL EXPLORATION & RESOURCES
COAL EXPLORATION & RESOURCES Chapter-3 3.1 INTRODUCTION Exploration for Coal in the country is carried out in two broad stages i.e. the Regional Exploration and Detailed Exploration. The regional exploration
More informationDetailed Storm Rainfall Analysis for Hurricane Ivan Flooding in Georgia Using the Storm Precipitation Analysis System (SPAS) and NEXRAD Weather Radar
Detailed Storm Rainfall Analysis for Hurricane Ivan Flooding in Georgia Using the Storm Precipitation Analysis System (SPAS) and NEXRAD Weather Radar Ed Tomlinson, PhD and Bill Kappel Applied Weather Associates
More informationPerformance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements
Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements P. Mukhopadhyay V. Pandey Rajkumar Anumasula Chandan Kumar Sunil Patil Srinivas Chitturi
More informationAlberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 2013 Jamaica, 5 December 2013 (remotely, unfortunately)
013 Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 013 Jamaica, 5 December 013 (remotely, unfortunately) Historical and projected changes in World primary energy demand
More informationResearch Paper ANALYSIS OF POWER SYSTEM STABILITY FOR MULTIMACHINE SYSTEM D. Sabapathi a and Dr. R. Anita b
Research Paper ANALYSIS OF POWER SYSTEM STABILITY FOR MULTIMACHINE SYSTEM D. Sabapathi a and Dr. R. Anita b Address for Correspondence a Research Scholar, Department of Electrical & Electronics Engineering,
More information16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller
1 16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots David Mueller 2 Transmission System Harmonics Studies In the US, the closure of older coal fired plants is a driver
More informationWater Resource & Management Strategies
Water Resource & Management Strategies National Conference on Integrated Water Resource Management for enhancing Farmers' Income March 22, 2017, Hotel Park, New Delhi Nalin Rawal Chief Business head Agribusiness
More informationAlectra Utilities List of Station Capacity
lectra Utilities List of Station Capacity s per Distribution System Code this list represents the llocated Capacity on stations owned by lectra Utilities (formerly PowerStream) as of July 1st, 2018. llocated
More informationRevised Statement of Reactive Energy Charges
Revised Statement of Reactive Energy Charges For The eriod From 21/01/19 To 27/01/19 A. REACTIVE EERGY CHARGES WITH THE OOL Entity AMOUT AMOUT-ro Rata (Rs) AYABLE(-)/RECEIVABLE(+) ADHRA RADESH 7247304.987
More informationSITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL
SITE SELECTION CRITERIA FOR A SOLAR PV PLANT Under The Guidence of SOHEL PATEL CONTENTS Introduction Selection of land 1.area longitude & latitude 2.quality of soil 3.soil test report 4.Terrain & contours
More information'+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee
'+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power ~~~~ Northern Regional Power Committee No: NRPCIOPRJI03/02/201S13179-3204 Dated:01.03.201S ('Q'1f J!. ~. tft. flr~') ttch-4 ~ 18-n:,"Tth- ~
More informationRenewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas
Renewables and the Smart Grid Trip Doggett President & CEO Electric Reliability Council of Texas North American Interconnected Grids The ERCOT Region is one of 3 North American grid interconnections. The
More informationPower System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies
Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, 2011 Wind Power Forecasting tools and methodologies Amanda Kelly Principal Engineer Power System Operational Planning Operations
More informationLOCAL CLIMATOLOGICAL DATA Monthly Summary July 2013
Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 12 14
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR
More informationCapacity Scarcity Condition Monday, September 3, 2018 Two primary factors led to the implementation of OP 4 event Significant generation outages and r
S E P T E M B E R 1 2, 2 0 1 8 September 3 OP-4 Event and Capacity Scarcity Condition Vamsi Chadalavada E X E C U T I V E V I C E P R E S I D E N T A N D C H I E F O P E R A T I N G O F F I C E R Capacity
More informationLOCAL CLIMATOLOGICAL DATA Monthly Summary September 2016
Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11
More informationGlacier Monitoring: WAPDA s Initiative in the Upper Indus Basin
Pakistan Water and Power Development Authority (WAPDA) Glacier Monitoring & Research Centre Glacier Monitoring: WAPDA s Initiative in the Upper Indus Basin Asim Rauf Khan, Project Director GMRC WAPDA 17-18
More informationA stochastic integer programming approach to the optimal thermal and wind generator scheduling problem
A stochastic integer programming approach to the optimal thermal and wind generator scheduling problem Presented by Michael Chen York University Industrial Optimization Seminar Fields Institute for Research
More informationLong Range Forecast Update for 2014 Southwest Monsoon Rainfall
Earth System Science Organization (ESSO) Ministry of Earth Sciences (MoES) India Meteorological Department PRESS RELEASE New Delhi, 9 June 2014 Long Update for 2014 Southwest Monsoon Rainfall HIGHLIGHTS
More informationValue of Forecasts in Unit Commitment Problems
Tim Schulze, Andreas Grothery and School of Mathematics Agenda Motivation Unit Commitemnt Problem British Test System Forecasts and Scenarios Rolling Horizon Evaluation Comparisons Conclusion Our Motivation
More informationCAISO Participating Intermittent Resource Program for Wind Generation
CAISO Participating Intermittent Resource Program for Wind Generation Jim Blatchford CAISO Account Manager Agenda CAISO Market Concepts Wind Availability in California How State Supports Intermittent Resources
More informationIncreasing Transmission Capacities with Dynamic Monitoring Systems
INL/MIS-11-22167 Increasing Transmission Capacities with Dynamic Monitoring Systems Kurt S. Myers Jake P. Gentle www.inl.gov March 22, 2012 Concurrent Cooling Background Project supported with funding
More informationReport on System-Level Estimation of Demand Response Program Impact
Report on System-Level Estimation of Demand Response Program Impact System & Resource Planning Department New York Independent System Operator April 2012 1 2 Introduction This report provides the details
More informationSystem Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres
IESO_REP_0292 System Impact Assessment Addendum #2 Greenfield & St. lair Energy entres onnection Assessment & Approval Process Issue 3.0 Greenfield Energy entre AA I 2004-167 Applicant: Greenfield Energy
More informationPower situation Sweden, english text
, english text Estimated inflow in Sweden (not spill corrected) 1%, median and 9% probability 196-216 TWh/week 7 6 5 4 3 Past 6 weeks Prior period 1 resp 9% probability, 196-216 2 1 Apr Jun Aug Oct Dec
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR
More informationCYCLONE LAILA RED WARNING. May 19, 2010 (23.45 hrs)
CYCLONE LAILA RED WARNING May 19, 2010 (23.45 hrs) The severe cyclonic storm LAILA over westcentral and adjoining southwest Bay of Bengal remained practically stationary and lay centred at 2030 hrs IST
More informationIndian Ocean Forecast System (INDOFOS) Abhisek Chatterjee
Indian Ocean Forecast System (INDOFOS) Abhisek Chatterjee Earth System Sciences Organisation (ESSO) Indian National Centre for Ocean Information Services (INCOIS) Ministry of Earth Sciences, Government
More informationEnergy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D
IT Solutions for Renewables Energy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D carlos.castano@gnarum.com I. Who we are II. Customers Profiles
More informationJawaharlal Nehru National Solar Mission
Jawaharlal Nehru National Solar Mission National Solar Mission-Phase-I Journey so far NTPC Vidyut Vyapar Nigam Ltd. 1 11/5/2012 Background India is located in the equatorial sun belt of the earth, thereby
More informationHindcasting Wave Conditions on the North American Great Lakes
Hindcasting Wave Conditions on the North American Great Lakes D. Scott 1, D. Schwab 2, C. Padala 1, and P. Zusek 1 1. & Associates 2. Great Lakes Environmental Research Laboratory, NOAA Lake Ontario 310
More informationReal-Life Observations of Power System Dynamic Phenomena Some Interesting Aspects
Real-Life Observations of Power System Dynamic Phenomena Some Interesting Aspects A.M.Kulkarni Department of Electrical Engineering, IIT Bombay and Visiting Professor, University of Manitoba The Indian
More informationDevelopment of wind rose diagrams for Kadapa region of Rayalaseema
International Journal of ChemTech Research CODEN (USA): IJCRGG ISSN: 0974-4290 Vol.9, No.02 pp 60-64, 2016 Development of wind rose diagrams for Kadapa region of Rayalaseema Anil Kumar Reddy ChammiReddy
More informationDIMACS, Rutgers U January 21, 2013 Michael Caramanis
Power Market Participation of Flexible Loads and Reactive Power Providers: Real Power, Reactive Power, and Regulation Reserve Capacity Pricing at T&D Networks DIMACS, Rutgers U January 21, 2013 Michael
More informationJackson County 2013 Weather Data
Jackson County 2013 Weather Data 61 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data
More informationCECOER. Renewable Energy Control Center. How technologies have boosted remote operations. Agder Energi-konferansen
CECOER Renewable Energy Control Center How technologies have boosted remote operations Agder Energi-konferansen 2018 30.-31. mai, Kristiansand GLOBAL LEADER IN INFRASTRUCTURE, WATER, SERVICES AND RENEWABLE
More informationCENTRAL ELECTRICITY AUTHORITY G O & D WING OPERATION PERFORMANCE MONITORING DIVISION ENERGY GENERATION, PROGRAMME, AND PLANT LOAD FACTOR
1.SUMMARY - ALL INDIA Category CENTRAL ELECTRICITY AUTHORITY G O & D WING OPERATION PERFORMANCE MONITORING DIVISION ENERGY GENERATION, ME, AND PLANT LOAD FACTOR AN OVERVIEW : DATE : REPORT 1 / PAGE 1 MAY-2016
More informationIrradiance Forecasts for Electricity Production. Satellite-based Nowcasting for Solar Power Plants and Distribution Networks
www.dlr.de Chart 1 > European Space Solutions 2013 > 6th November 2013 Irradiance Forecasts for Electricity Production Satellite-based Nowcasting for Solar Power Plants and Distribution Networks Marion
More informationContents. Diaphragm in pressure pipe: Steady state head loss evolution and transient phenomena. Nicolas J. Adam Giovanni De Cesare
Diaphragm in pressure pipe: Steady state head loss evolution and transient phenomena Nicolas J. Adam Giovanni De Cesare Contents Introduction FMHL pumped-storage plant Experimental set-up Steady head losses
More informationelgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.
Elia linemen install Ampacimon real time sensors that will communicate with the dynamic thermal ratings software to control energy import levels over this transmission line. OV RH AD TRAN MI ION D namic
More informationProgrammers A B C D Solution:
P a g e Q: A firm has normally distributed forecast of usage with MAD=0 units. It desires a service level, which limits the stock, out to one order cycle per year. Determine Standard Deviation (SD), if
More informationASSESSMENT OF RESERVOIR SEDIMENTATION USING REMOTE SENSING SATELLITE IMAGERIES
ASSESSMENT OF RESERVOIR SEDIMENTATION USING REMOTE SENSING SATELLITE IMAGERIES Kamuju Narasayya S. Narasaiah U C Roman Assistant Research Officer Research Officer Senior Research Officer Central Water
More informationANSWER THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (SHRI PIYUSH GOYAL)
268. SHRI JUGAL KISHORE: GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA UNSTARRED QUESTION NO.268 TO BE ANSWERED ON 17 TH NOVEMBER, 2016 ILLEGAL MINING OF IRON ORE AND MANGANESE Will the Minister of MINES
More informationForecast solutions for the energy sector
Forecast solutions for the energy sector A/S Lyngsø Allé 3 DK-2970 Hørsholm Henrik Aalborg Nielsen, A/S 1 Consumption and production forecasts Heat load forecasts for district heating systems usually for
More informationURTDSM Initiative in India and Controlled Islanding using PMU Measurements
URTDSM Initiative in India and Controlled Islanding using PMU Measurements Akhil Raj Gopal Gajjar Meenal Chougule Narayanan Rajagopal Prashant Navalkar Rajeev Gajbhiye S. A. Soman PowerAnser Labs, IIT