1 Prepared for Dominion 5000 Dominion Boulevard Glen Allen, Virginia EMERGENCY ACTION PLAN VIRGINIA ELECTRIC AND POWER COMPANY CHESTERFIELD POWER STATION LOWER ASH POND CHESTERFIELD COUNTY, VIRGINIA for Prepared by 9211 Arboretum Parkway, Suite 200 Richmond, Virginia MV1373 April 2017

2 Table of Contents 1. Basic Information Emergency Action Plan Overview Notification... 4 a. Stage 1 Notification... 4 b. Stage 2 Notification... 5 c. Stage 3 Notification Statement Of Purpose Project Description... 7 a. General Vicinity... 7 b. General Description of Dam Emergency Detection, Evaluation, and Classification... 9 a. Flow Depth in Emergency Spillway... 9 b. Rainfall Depths c. Observation Frequency d. Public Roads Downstream of the Dam e. Additional Emergency Conditions f. Relaxation of Emergency Conditions Responsibilities Under the EAP a. Dam Owner/Operator Responsibilities b. Responsibility for Notification c. Responsibility for Evacuation d. Responsibility for Termination and Follow-Up e. EAP Coordinator Responsibility f. Methods for Notification and Warning g. Evacuation Procedures Preparedness a. Surveillance b. Routine Inspections c. Alternative Systems of Communication d. Emergency Supplies Inundation Zone Property Owners and Residents Acknowledgement by Dam Owner/Operator Certification by Preparer Figure 1 Vicinity Map Figure 2 Dam Break Inundation Zone Mapping (Sheet 1 of 1) LAP EAP i April 2017

3 Appendix A Appendix B Appendix C Analyses of Impounding Structure Failure Floods Plans for Training, Exercising, Updating, and Posting the Emergency Action Plan Additional Resources LAP EAP ii April 2017

4 1. BASIC INFORMATION Name of Impounding Structure: Lower Ash Pond Dam Inventory Number: VA00823 Other Name (if any): Hazard Potential Classification, Virginia Dam Safety Regulations: Low Significant High (Circle One) Name of Owner: Virginia Electric and Power Company Address: 5000 Dominion Boulevard, Glen Allen, Virginia Telephone: ( ) Name of Dam Operator: Beverly Wood Address: 500 Coxendale Road, Chester, VA Telephone: (Business) (804) (Cell) (804) Name of Alternate Dam Operator: Chris Dibble Address: 500 Coxendale Road, Chester, VA Telephone: (Business) (804) (Cell) Name of 24-Hour Dispatch Center: Virginia Emergency Operations Center Address: 7700 Midlothian Turnpike, North Chesterfield, VA Telephone: (Business) ; or local emergency # 911 Chesterfield County Emergency Management Coordinator: Name: Emily Ashley Address: Trade Court, North Chesterfield, VA Telephone: (Business) (804) Chesterfield County Police and Fire Department: Address: (Police) Iron Bridge Rd., Chesterfield, VA 23832; (Fire) Iron Bridge Rd., Chesterfield, VA Telephone: (Business) (804) (Police); (804) (Fire) Name of Primary EAP Coordinator: Beverly Wood Address: 500 Coxendale Road, Chester, VA Telephone: (Business) (804) (Cell) (804) Name of Secondary EAP Coordinator: Chris Dibble Address: 500 Coxendale Road, Chester, VA Telephone: (Business) (804) (Cell) Note: All elevations in this EAP are referenced to NAVD88 Datum LAP EAP 1 April 2017

5 2. EMERGENCY ACTION PLAN OVERVIEW Three emergency stages, ranked by severity, will be established for the Lower Ash Pond. Emergency Stage Definitions Stage 1: Non-Emergency failure is unlikely, and storm development or operational malfunction is slow in advancing to a potential emergency. This stage indicates a situation is developing such that the dam is not in danger of failing, but if it continues failure may be possible. Stage 2: Potential Failure storm development or operational malfunction that could result in failure of the dam is quickly accelerating. This stage indicates that a situation is developing that could result in a dam failure. Stage 3: Imminent Failure storm development or operational malfunction has reached a point that the failure of the dam has started or is imminent. This stage indicates dam failure is expected or occurring and may result in flooding that will threaten life and/or property downstream of the dam. Stage 2 conditions include Stage 1 conditions and responsibilities, and Stage 3 conditions include both Stage 1 and Stage 2 conditions and responsibilities. The Dam Owner, Dam Operator, or Designee may use the following Table to assess weather conditions and operational conditions at the dam to determine the appropriate actions for notifying emergency personnel during potential and actual emergencies. The closest rain gauge to the Lower Ash Pond Dam is located at the Richmond International Airport and operated by the National Weather Service. Therefore, rain gauge monitoring references to obtaining rainfall data from the airport LAP EAP 2 April 2017

6 Step 1: Emergency Condition Detection Event Detection: See Section 6 Assess Situation: Determine Emergency Level Using Section 6 Emergency Stage 1 Emergency Stage 2 Emergency Stage 3 Step 2: Emergency Level Non-Emergency Incident Potential Dam Failure Situation Urgent Slowly Developing Situation Quickly Developing Situation Dam Failure is Imminent or In Progress See Definition Above See Definition Above See Definition Above Step 3: Notification and Communication Stage 1 Notification List Stage 2 Notification List Stage 3 Notification List See Section 3a See Section 3b See Section 3c Step 4: Expected Action Inspect Dam, Spillway, Level, and Monitor Rain Gauge at Richmond International Airport Every 6 hours Inspect Dam, Spillway, Level, and Monitor Rain Gauge at Richmond International Airport Every 2 hours Continuous Inspection of Dam, Spillway, Level, and Monitor Rain Gauge at Richmond International Airport Monitor and Listen to Weather Forecasts Notify Emergency Responders Continuous Contact with Emergency Responders Step 5: Termination and Follow Up Termination of Monitoring Conditions at the Dam and Proceed to evaluate damages and plans for repairs Normal methods of detecting potential emergency situations at the dam consist of surveillance monitoring and observing instrument readings. For conditions beyond the normal range of operations, contact the Chesterfield County Emergency Communications Center (ECC) for assistance with evaluation of the conditions LAP EAP 3 April 2017

7 3. NOTIFICATION a. Stage 1 Notification The following flow chart is to be utilized upon determination of Stage 1 Conditions at the dam: Observer of Emergency Situation Dam Owner/Operator/EAP Coordinator Beverly Wood (804) ; (804) (cell) OR Station Director (804) ; (757) (cell) Dominion Power Generation Engineer Mike Winters, PE (804) ; (804) (cell) VA DCR Division of Dam Safety Region 2 Dam Safety Engineer Mark Kil l gore, PE (804) ; (888) (Cell) Legend: Primary level call s Second level call (as necessary) Message from the dam operator to the ECC: I am at evaluating the general conditions at the Lower Ash Pond dam and coordinating with the observer of the emergency situation as recommended in the emergency action plan. We are currently at Stage 1. If conditions change, we may move to Stage 2 and perform more frequent evaluations. Otherwise, we will visit and make observations every 6 hours LAP EAP 4 April 2017

8 b. Stage 2 Notification The following flow chart is to be utilized upon determination of Stage 2 Conditions at the dam: LAP EAP 5 April 2017

9 c. Stage 3 Notification The following flow chart is to be utilized upon determination of Stage 3 Conditions at the dam: LAP EAP 6 April 2017

10 4. STATEMENT OF PURPOSE The Lower Ash Pond is designed and operated pursuant to Virginia Department of Conservation and Recreation Dam Safety and US Environmental Protection Agency Disposal of Coal Combustion Residuals from Electric Utilities regulations and generally accepted engineering practices. The purpose of this Emergency Action Plan (EAP) is to provide critical information and a plan of action in the event of an emergency situation at the Lower Ash Pond. The plan addresses the following: Delineation of inundation areas downstream of the dam; Procedures for determining when to initiate various emergency response levels; Provisions for notification of emergency responders and owners of potentially affected downstream residences and structures; Emergency preparedness and exercises; and Documentation of evacuation routes. This plan is intended to meet the requirements of 4 VAC of the Virginia Department of Conservation and Recreation Dam Safety regulations and 40 CFR (a)(3) of the Federal Disposal of Coal Combustion Residuals From Electric Utilities Final Rule (CCR rule). Pursuant to 40 CFR (a)(2) of the CCR rule, a hazard potential classification assessment was performed for this surface impoundment in October The assessment of the Lower Ash Pond resulted in a hazard potential classification of significant hazard under the CCR rule. 5. PROJECT DESCRIPTION a. General Vicinity The Lower Ash Pond is located just south of Coxendale Road about half a mile southeast of Chesterfield Power Station in Chesterfield County, Virginia. A site vicinity map is included in Figure 1. To the west, the Lower Ash Pond is bounded by a water feature commonly known as the Thermal Channel, which is the receiving body of water for non-contact cooling water effluent associated with operation of the Chesterfield Power Station. To the south, the pond is bounded by the old channel (oxbow) of the James River and open space. To the east, the pond is bounded by Henricus Park Road and the Dutch Gap Conservation Area, which is comprised of wetland and forested areas. b. General Description of Dam The Lower Ash Pond was formed in 1964 by constructing an earthen embankment dam on its east, south and west sides to form a pond with a normal pool surface area of approximately 30 acres. The maximum height of the ash pond perimeter embankment is about 20 feet. The east, west and south embankments have crest elevations ranging between El 18.5 and El In accordance with s VPDES permit, surface water from the top of the pond is discharged from the Lower Ash Pond into Farrar Gut, an oxbow of the James River, through the pond s principal spillway / decant structure, which is located near the southwest corner of the pond. The principal spillway system consists of a pipe and riser with a crest elevation of 15.8 feet. The pipe is a 27-inch diameter reinforced concrete pipe with a length of about 90 feet. The pipe has an upstream invert at El 9.4 and a downstream invert at El 6.8. The riser is a two-stage concrete structure. The first stage consists of an opening on the upstream face of the riser with an invert at El The opening has dimensions of 6.25 feet long by 0.8 feet high. The weir at this opening can be adjusted between El 15.8 and El 17.2 to control the water level in the pond. The second stage is a square LAP EAP 7 April 2017

11 opening on top of the riser at El This opening, which has dimensions of 5.9 feet by 5.4 feet, is covered with a grate. There is also an emergency spillway to the north of the riser structure. The emergency spillway is located on the access road at the top of the embankment and has a bottom width of approximately 100 feet with an invert of El LAP EAP 8 April 2017

12 6. EMERGENCY DETECTION, EVALUATION, AND CLASSIFICATION The dam owner and/or operator is responsible for operation and maintenance of this dam. The dam operator and the field observer are responsible for monitoring conditions at the dam, spillway, and staff gauge and notifying the Local Government Emergency Services Coordinators when emergency stage conditions are activated. The dam owner/operator may initiate this EAP based on the issuance of a flood watch or warning in the area, or if conditions at the dam indicate that water levels in the impoundment will rise to the point where there is flow through the emergency spillway. Embankment erosion, appurtenant malfunction, or any of the other conditions described in this section may also dictate initiation of the emergency action. While it is the dam owner s responsibility to initiate this process, the Local Government EOC may contact the dam owner to inform the team that a flood watch has been issued locally by the NWS and team members would initiate their duties as required in this EAP. Depth of flow through the emergency spillway is the best indication of flood conditions and should be used as an indicator of the potential impacts downstream. In the absence of actual flow depth data through the emergency spillway, measured rainfall depths in inches monitored in the contributing watershed may be used to determine the emergency level. Visual observations should be made by a team member so that accurate and up to date information can be provided to the EOC. a. Flow Depth in Emergency Spillway Reservoir pool level, associated with the flow depth in the emergency spillway, is the prime indicator of flooding conditions at Dominion Generation Lower Ash Pond. Initiate a Stage 1 Condition when the reservoir pool level is at elevation 17 feet (pool elevation can be read electronically from the level sensor or visually from the staff gauge located at the riser). This is one foot below the level of the emergency spillway and would provide for increased monitoring as pool levels begin approaching the emergency spillway elevation. Initiate a Stage 2 Condition when the reservoir pool level is at elevation 18 feet (pool elevation can be read electronically from the level sensor or visually from the staff gauge located at the riser). This is the crest elevation of the emergency spillway and the spillway flow depth would therefore be zero feet, but the spillway would be on the verge of discharging. Initiate a Stage 3 Condition when the reservoir pool level is at elevation 18.5 feet, or the flow depth in the emergency spillway is 0.5 feet (pool elevation can be read electronically from the level sensor or visually from the staff gauge located at the riser). This would occur when the pool level would be one-half-feet below the dam crest and would indicate that overtopping of the dam embankment could soon occur LAP EAP 9 April 2017

13 b. Rainfall Depths Rainfall depth for various storm durations are another indicator of potential flooding conditions. Initiate a Stage 1 Condition upon issuance of NWS flood warnings or for a continuous rainfall longer than 24 hours of any depth at the closest NWS gage (Richmond International Airport). Initiate a Stage 2 Condition for the following rainfall depths (100-year event): 5.6 inches in six hours 7.0 inches in 12 hours 8.4 inches in 24 hours Initiate a Stage 3 Condition for the following rainfall depths (1,000-yr event): 8.2 inches in six hours 10.7 inches in 12 hours 13.1 inches in 24 hours c. Observation Frequency Dam, spillway, and staff gauge observations shall occur at frequencies determined by the Emergency Stage condition: Stage 1 conditions observations shall occur at six-hour intervals Stage 2 conditions observations shall occur at two-hour intervals Stage 3 conditions continuous observation Observers should use safety and be aware of the potential for flooded roads along the route to the dam. Monitoring and surveillance of conditions at the dam will continue under emergency conditions as long as safety is not in question. d. Public Roads Downstream of the Dam There are no public roads downstream of the dam that would be impacted as a result of a dam failure LAP EAP 10 April 2017

14 e. Additional Emergency Conditions The following table is to be used to initiate emergency conditions during events other than those related to precipitation and reservoir pool levels. If any of these conditions are observed, Dominion s Power Generation Engineering group should be contacted for further discussion, observation, and/or technical direction. Event Situation Emergency Stage Emergency Spillway and Channel Seepage, including observation of a break in the liner Sinkholes Embankment Cracking Visual movement of the spillway channel with no flow 1 Spillway is flowing and erosion/head cutting is observed 3 New seepage areas on or near the dam 1 New seepage areas with cloudy discharge or increasing flow rate Observation of new sinkhole on embankment 1 Rapidly enlarging sinkhole 3 New cracks in embankment greater than ¼ inch wide without seepage Cracks in embankment with seepage Cracks in embankment with rapidly increasing seepage 3 Embankment Movement Visual movement of the embankment slope 1 Sudden or rapidly progressing slides of the slopes 3 Vortex in pond Whirlpool with discharge downstream 3 Measureable earthquake felt or reported on or within 50 miles of the dam 1 Earthquake Earthquake resulting in visible damage to the dam 1 Security Threat, Sabotage, and Vandalism Earthquake resulting in potential uncontrolled release of water from the dam Verified bomb threat that, if carried out, could result in damage to the dam Detonated bomb that has resulted in damages to the dam or its appurtenances Damage to the dam or appurtenances with no impacts to the functioning of the dam Damage to the dam or appurtenances that has resulted in seepage flow Damage to the dam or appurtenances that has resulted in potential uncontrolled water release LAP EAP 11 April 2017

15 f. Relaxation of Emergency Conditions Emergency conditions can be rescinded when the following events occur: The NWS ends a flash flood warning. After heavy rains have ended, the water level in the impoundment is below elevation 17 feet (the emergency spillway crest), and the water level is receding. In the event of an earthquake, overtopping of the dam, evacuation of inundation areas, or other serious problems resulting in a triggering of emergency conditions, the dam must be inspected by a knowledgeable professional engineer of the dam site. Termination of emergency conditions occurs when all entities notified of the emergency condition have been communicated with and informed of current non-emergency conditions LAP EAP 12 April 2017

16 7. RESPONSIBILITIES UNDER THE EAP This section is intended to clearly outline the responsibilities of parties involved in all EAP procedures, including notification, surveillance, classification, evacuation, and termination. a. Dam Owner/Operator Responsibilities 1. The dam owner/operator IS RESPONSIBLE for notifying the local EOC of any problem or potential problem at the dam site. 2. The dam owner/operator/eap Coordinator WILL DETERMINE when Stage 1 conditions are met at the dam and WILL INITIATE dam surveillance accordingly. 3. The dam owner/operator/eap Coordinator WILL DETERMINE when Stage 2 conditions are met at the dam. 4. The dam owner/operator/eap Coordinator WILL DETERMINE when Stage 3 conditions are met at the dam. 5. The dam owner/operator/eap Coordinator WILL MAKE THE DECISION that an emergency condition no longer exists at the dam. 6. The dam owner/operator WILL BE RESPONSIBLE for operating pumps as needed for the dam to function effectively. b. Responsibility for Notification 1. The dam owner/operator/eap Coordinator WILL NOTIFY the 24-hour dispatch center and Chesterfield County EOC before beginning dam surveillance under Stage 1 conditions. 2. The dam owner/operator/eap Coordinator WILL NOTIFY the 24-hour dispatch center and the Chesterfield County EOC when Stage 2 conditions are met, in order to alert them to perform actions required for Stage 2 conditions and to review actions that may be required for the safety and protection of people and property and to mobilize their evacuation team. The dam owner/operator WILL NOTIFY the Regional Dam Safety Engineer and Dominion Power Generation Engineering that Stage 2 conditions have been implemented. 3. The dam owner/operator/eap Coordinator WILL NOTIFY the 24-hour dispatch center and the Chesterfield County EOC to initiate warning/evacuation of residents when Stage 3 conditions or imminent dam failure are probable. The dam owner/operator WILL NOTIFY the Regional Dam Safety Engineer and Dominion Power Generation Engineering that Stage 3 conditions have been implemented. c. Responsibility for Evacuation 1. The Chesterfield County EOC WILL NOTIFY the people, business owners, and land owners in the inundation zone (attached to the Dam Break Inundation Maps) of the potential emergency or evacuation prior to or in the event Stage 3 conditions are met. There will be no evacuations associated with the implementation of this Emergency Action Plan. There are no occupied structures or publicly travelled roads within the inundation zone LAP EAP 13 April 2017

17 2. The Chesterfield County EOC and 24-hour dispatch center should utilize their Standard Emergency Procedures (SEPs) to implement in the event that dam failure is possible or occurring. These SEPs should include evacuation plans. d. Responsibility for Termination and Follow-Up 1. Once the Stage 3 condition has been met, the dam owner/operator/eap Coordinator will continue to provide the Chesterfield County EOC with information concerning water level rise, erosion in the emergency spillway, and/or dam overtopping, as provided by the dam/spillway/staff gauge observer. It is particularly important for the Chesterfield County EOC to know when a breach is occurring to evacuate their rescue personnel. The staff gauge observer will remain at the dam until released from duty by the EOC. 2. Regional flooding may occur prior to an incident at this dam and could continue for long periods of time. The staff gauge observer needs to have plans for staying or returning to the dam as conditions worsen. The termination responsibility should be handled by the EOC. 3. Post flood event discussions should be used to determine strengths and weaknesses in the EAP while the experience is fresh in the minds of those living through it. e. EAP Coordinator Responsibility The EAP coordinator will be responsible for EAP-related activities, including (but not limited to) preparing revisions to the EAP, establishing training seminars, and coordinating annual face-to-face EAP exercises between representatives of the owner/operator and local emergency responders. This person will be the EAP contact if any involved parties have questions about the plan. f. Methods for Notification and Warning The following notification and warning method(s) are to be used during an emergency: Telephone/Reverse 911 automated warning systems Police/fire/sheriff radio dispatch vehicles with loudspeakers, bullhorns, etc. Personal runners from door-to-door alerting residents (as required) Radio/television broadcasts for area involved (as required) g. Evacuation Procedures There will be no evacuations associated with the implementation of this Emergency Action Plan. There are no occupied structures or publicly travelled roads within the inundation zone LAP EAP 14 April 2017

18 8. PREPAREDNESS a. Surveillance This dam is unattended under normal operating conditions. The Dam Owner/Operator or EAP Coordinator should monitor the status of weather fronts through the NWS. The NWS maintains a hurricane center that reports on hurricanes, tropical storms & tropical depressions as they travel and affect coastal and inland areas. The web site address is: The station is staffed 24 hours per day by the Operations Department. An operator would be dispatched from the on-shift crew to observe the staff gauge during an emergency situation. The staff gauge observer should never put themselves in harm s way. In the event a hurricane or tropical depression occurs with high winds, the staff gauge observer shall use extreme caution while monitoring conditions. Preplanned access routes should be utilized, given that small streams crossing under state and local roads may flood, preventing safe access. The gauge observers and staff should never attempt to cross a road that has flood water crossing it at a depth greater than one-foot unless the vehicle is specially designed for that purpose. Alternative routes should be chosen for access by foot in the event that a car is unsafe for use. Other alternative means of transportation may be considered. b. Routine Inspections The Lower Ash Pond is inspected weekly by members of the station Environmental/Chemistry team in accordance with applicable Coal Combustion Residuals regulations. It is inspected monthly in accordance with the Virginia Dam Owner s Handbook. If any findings trigger an action level, the EAP will be put into place immediately. Any findings in question will be discussed with a Dominion Power Generation Engineer and a resolution determined by the next monthly inspection. Any maintenance needs will be relayed to the grounds contractor or landfill contractor within one calendar week. c. Alternative Systems of Communication Communications during a major rainfall event may be problematic. Telephone land lines may be used as the first means of communication. Cellular telephones can be used to supplement the land lines. Unfortunately, telephone lines, like electrical lines, are subject to damage by falling trees so radio communication during these events is normally required. d. Emergency Supplies Stockpiling of Materials and Equipment: The location of necessary supplies and materials, such as barricades, sand, sandbags, etc. are either stored onsite or readily available through our emergency response contractors. Emergency access to supplies and equipment should be planned before any emergency is called. Appendix C lists sources and locations of supplies and equipment that may be required during an emergency along with addresses and telephone numbers of the sources/suppliers LAP EAP 15 April 2017

19 9. INUNDATION ZONE PROPERTY OWNERS AND RESIDENTS The Inundation Map is presented as Figure 2 in this document. There are no occupied parcels in the inundation zone of this dam LAP EAP 16 April 2017

20

21 FIGURES

22 Map courtesy of Bing Maps Lower Ash Pond Figure 1. Vicinity Map

23 Figure 2. Dam Breach Inundation Map (Map taken from Dam Breach Analysis Report and Inundation Mapping prepared by Schnabel Engineering, dated July 2015)

24 Figure 2. Dam Breach Inundation Map (Map taken from Dam Breach Analysis Report and Inundation Mapping prepared by Schnabel Engineering, dated July 2015)

25 APPENDIX A Analyses of Impounding Structure Failure Floods

26 APPENDIX A Analyses of Impounding Structure Failure Floods The structure failure flood for Dominion Generation Lower Ash Pond is the Probable Maximum Flood event. A complete analysis of this event is located in the construction permit application report for the dam, dated July LAP EAP A-1 April 2017

27 APPENDIX B Plans for Training, Exercising, Updating, and Posting the Emergency Action Plan

28 APPENDIX B Plans for Training, Exercising, Updating, and Posting the Emergency Action Plan 1. Training Emergency action planning, generally, will be held once a year for responsible staff personnel. 2. Exercises a. Table Top Exercises - Table top exercises will be held, at a minimum, once every six years. This exercise will occur in the year that certification is required. b. Drills - A drills will be conducted each year by the owner except when a table top exercise is required. c. Annual drills will be conducted to verify lines of communication, phone numbers, personnel roles, and responsibilities. All parties on the Stage II/III notification flowchart are invited and encouraged to attend; however attendance from station personnel is mandatory. Record the invitation of the drill to emergency response representatives and the drill attendance and details in the Training Record. 3. Updating This EAP will be checked yearly during the drill exercise to determine if names, addresses, and telephone numbers of the people shown in Section 7 are accurate. The document will be updated at any time when a major change is determined to have occurred and noted in the plan s revision log. If an annual review of the EAP indicates that no amendments are necessary, a note shall be placed in the revision log noting that no changes were made during the annual review. 4. Posting This document will be on file with: Dominion (Dam Owner) Chesterfield County Emergency Operations Center VA Department of Conservation and Recreation (DCR), Division of Dam Safety VA Department of Emergency Management LAP EAP B-1 April 2017

29 EAP Lower Ash Pond VA00823 Distribution Record Revision No. Date Entered Changed By Description of Change Original LAP EAP B-2 April 2017

30 APPENDIX C ADDITIONAL RESOURCES

31 APPENDIX C Additional Resources Directory of Additional Personnel with Dam Safety Expertise In addition to personnel shown elsewhere in this plan, the following list identifies other individuals with expertise in dam safety, design and construction that may be consulted about taking specific actions at the dam when there is an emergency situation: Name Telephone Responsibility DCR, Division of Dam Safety Mark Killgore Lucas demelo, Geosyntec Consultants, Inc. (804) (O) (888) (Cell) (410) (O) (443) (Cell) Dam Safety Regional Engineer Consulting Design Engineer Supplies and Resources The resources listed in the table below may be utilized in the event of an emergency. The Dam Owner/Operator shall update the list of available resources on an annual basis and confirm that adequate quantities of the resources listed are available in the event of an emergency. Heavy equipment service and rental Rish Equipment Company 1410 West Hundred Road Chester, VA Hertz Equipment Rental 9300 Burge Ave Richmond, VA (804) Sand and Gravel Supply Vulcan Materials Company Iron Bridge Road Chester, VA (804) J.B. Mulch Sales Chester Road Chester, VA (804) Pumps, Generators, Lights Hertz Equipment Rental 9300 Burge Ave Richmond, VA (804) Pipe Laborers Others Carl M. Henshaw Drainage Products Inc Ramblewood Dr. Chester, VA (804) CLC Construction Labor Contractors of Richmond 5380 Laburnum Ave Richmond, VA (804) LAP EAP C-1 April 2017

Emergency Action Plan

Emergency Action Plan EMERGENCY ACTION PLAN Emergency Action Plan Virginia Electric and Power Company Possum Point Power Station Inventory Number 153020 Ash Pond D Dam Dumfries, Virginia Submitted To: Dominion Energy 5000 Dominion

More information

,,... Geosyntec C> consultants EMERGENCY ACTION PLAN

,,... Geosyntec C> consultants EMERGENCY ACTION PLAN ,,... ~~,.. Prepared for rill' Dom1n1on Dominion 5000 Dominion Boulevard Glen Allen, Virginia 23060 EMERGENCY ACTON PLAN VRGNA ELECTRC AND POWER COMPANY CHESTERFELD POWER STATON LOWER ASH POND CHESTERFELD

More information

Emergency Action Plan (EAP) Tata Pond Dam

Emergency Action Plan (EAP) Tata Pond Dam For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION INTRODUCTION Floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Flood effects can be local, impacting a neighborhood

More information

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 Meeting outline 1. Progress update on the City of San Jose s recovery efforts 2. Water district presentation on: Weather situation

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Annex B Natural No-Notice Event

Annex B Natural No-Notice Event Annex B Natural No-Notice Event Version: 1.0 Effective: 10/01/2015 Revision Date: 10/01/2015 Approved By: John Pitcher Purpose The purpose of Natural No-Notice Event Annex is to ensure the safety of BHCC

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May

More information

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE Floods Floods Introduce this topic by explaining that floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Display

More information

WINTER STORM Annex II

WINTER STORM Annex II WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM Purpose: The Public Transportation Department and contracted provider will provide safe transportation for AnchorRIDES customers and employees during severe weather or emergency conditions. AnchorRIDES

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Dunn County Snow Removal Policy

Dunn County Snow Removal Policy Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern

More information

Severe Storm Response Version # 1-0-1

Severe Storm Response Version # 1-0-1 Severe Storm Response Version # 1-0-1 Weather Warnings Environment Canada issues severe weather warnings, watches and advisories Weather Watch Severe weather may develop. Weather Warning Severe weather

More information

Lessons Learned and Shared

Lessons Learned and Shared Lessons Learned and Shared Plan for the worst. Hope for the best. Remember that hope is not a strategy. Agnes 8 Lessons 1. Identify Susceptible Communities 2. Develop a Plan 3. Threat Recognition 4. Review

More information

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS Page 1. PURPOSE 2 2. DEFINITIONS 2 3. GENERAL OVERVIEW 2 4. SPECIFIC PROCEDURES 3 4.1

More information

The Leader in Landscape Solutions

The Leader in Landscape Solutions The Leader in Landscape Solutions Emergency Action Plan Hurricane Preparedness Go To Mainscape.com For More Information! Purpose: To provide the Federation at Kings Point and their residents an informative

More information

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES Page 1 of 5 Volume: Operation Section: 20.00 Number: 20.09 Subject: Weather Watches, Warnings, Advisory s and Spotter Activation Date Issued: 28 March

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3 Trainee Manual C02 CITY OF SASKATOON Water and Sewer Section Severe Storm Response Trainee Manual CITY OF SASKATOON Severe Storm Response Trainee Manual City of Saskatoon Severe Storm Response Trainees

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available Using Operating Experience to Prevent or Mitigate Nuclear Events What Is, Was and Will Be Available Introduction Remember, it is by understanding the lessons learned from past events that we can adequately

More information

Appendix C. Pleasure Lake Emergency Action Plan

Appendix C. Pleasure Lake Emergency Action Plan Appendix C Pleasure Lake Emergency Action Plan EMERGENCY ACTION PLAN PLEASURE LAKE DAM NYS ID DAM NO. 163-1597 NAT DAM ID NO. NY00345 SULLIVAN COUNTY NEW YORK SUBMITTED TO: FALLSBURG FISHING AND BOATING

More information

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT (2) Tractors with Front End Loader and Box Blade (1) Unit used to load sand and salt mix (1) Unit used to remove plowed snow in parking

More information

United States Multi-Hazard Early Warning System

United States Multi-Hazard Early Warning System United States Multi-Hazard Early Warning System Saving Lives Through Partnership Lynn Maximuk National Weather Service Director, Central Region Kansas City, Missouri America s s Weather Enterprise: Protecting

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions

More information

EMERGENCY WARNING SYSTEM PROCEDURES FOR DEBRIS FLOWS IN WESTERN OREGON

EMERGENCY WARNING SYSTEM PROCEDURES FOR DEBRIS FLOWS IN WESTERN OREGON EMERGENCY WARNING SYSTEM PROCEDURES FOR DEBRIS FLOWS IN WESTERN OREGON Updated: 12/03/2007 by the Oregon Department of Forestry and the Oregon Department of Geology and Mineral Industries Debris flows

More information

StormReady Supporter Application Form updated by NWS Chanhassen on April 7, Name of Applying Entity: Point of Contact: Title:

StormReady Supporter Application Form updated by NWS Chanhassen on April 7, Name of Applying Entity: Point of Contact: Title: NATIONAL WEATHER SERVICE 1733 Lake Drive West Chanhassen, Minnesota www.weather.gov/twincities www.stormready.noaa.gov 952-361-6671, todd.krause@noaa.gov StormReady Supporter Application Form updated by

More information

Severe Weather Hazards Are Real

Severe Weather Hazards Are Real Severe Weather Hazards Are Real In the past 10 years, more than 40 people have died and dozens more injured as a result of weatherrelated events in Minnesota (not including motor vehicles.) The top severe

More information

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Alexander Chung, M.Sc. Candidate C-Change Student Research Associate May 2013 The Community of Little Anse Coastal community

More information

Tippecanoe County ARES Net Formats NET 1-4. Net Formats

Tippecanoe County ARES Net Formats NET 1-4. Net Formats 1. Introduction Net Formats To provide a basis for carrying out the mission of the Tippecanoe County, Indiana, Amateur Radio Emergency Service (ARES ), guidelines must be in place to meet the communications

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

SITUATION REPORT #7 September 8 th, 2017

SITUATION REPORT #7 September 8 th, 2017 MCO AIRPORT EMERGENCY OPERATIONS CENTER SITUATION REPORT #7 September 8 th, 2017 STATE OF FLORIDA REGION V FEMA REGION IV GENERAL INFORMATION Local State of Emergency Declaration Number: 17-235 Dated:

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

Complete Weather Intelligence for Public Safety from DTN

Complete Weather Intelligence for Public Safety from DTN Complete Weather Intelligence for Public Safety from DTN September 2017 White Paper www.dtn.com / 1.800.610.0777 From flooding to tornados to severe winter storms, the threats to public safety from weather-related

More information

Safety Issue: Types of weather emergencies and natural. Weather Emergencies

Safety Issue: Types of weather emergencies and natural. Weather Emergencies Overview Safety Issue: Rapid and effective response to weather emergencies and other natural disasters whether during or after work hours takes forethought and careful planning. Types of weather emergencies

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

Hurricane Matthew Threats and Impacts Briefing for Eastern NC

Hurricane Matthew Threats and Impacts Briefing for Eastern NC Hurricane Matthew Threats and Impacts Briefing for Eastern NC October 6 th, 2016 Date/Time Created: 10/6/2016, Noon EDT National Weather Service Newport/Morehead City, NC Hurricane Matthew Key Points Changes

More information

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 INTRODUCTION Emergency Action Plans (EAPs) are critical to reducing the risks

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Procedure Procedure: Emergency Weather Plan - Events Department/Division: Section: Date Originated: Culture & Recreation April 30, 2013 Approval: Approval: Date Revised: Reference: HUR130-016

More information

Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown

Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown You will not know the depth of the water nor will you know the condition of the road under the water. Many people

More information

Tornado Drill Exercise Plan (EXPLAN)

Tornado Drill Exercise Plan (EXPLAN) Tornado Drill Exercise Plan (EXPLAN) As part of the National Weather Service s (NWS) Severe Weather Preparedness Week in Indiana Purdue University March 19, 2019 As of Feb 19, 2019 TABLE OF CONTENTS Introduction...

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Wildfire Preparedness

Wildfire Preparedness Wildfire Preparedness Wildfires are common disasters that can spread quickly, especially during dry conditions. More than 100,000 wildfires clear 4-5 million acres of land in the US every year. Wildfires

More information

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016 VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016 This manual was prepared for Visit Mississippi Gulf Coast staff in the event of a crisis, and will help to distinguish the appropriate course

More information

SEVERE WEATHER 101. Flood Basics

SEVERE WEATHER 101. Flood Basics SEVERE WEATHER 101 Flood Basics What is flooding? Flooding is an overflowing of water onto land that is normally dry. Floods can happen during heavy rains, when ocean waves come on shore, when snow melts

More information

Emergency Action Guidelines for NH 4-H Animal Events

Emergency Action Guidelines for NH 4-H Animal Events Emergency Action Guidelines for NH 4-H Animal Events Purpose: This plan outlines guidelines designed to help ensure NH 4-H Animal Events and Shows are prepared for emergencies and severe weather conditions.

More information

GC Briefing. Weather Sentinel Hurricane Florence. Status at 5 PM EDT (21 UTC) Today (NHC) Discussion. September 13, 2018

GC Briefing. Weather Sentinel Hurricane Florence. Status at 5 PM EDT (21 UTC) Today (NHC) Discussion. September 13, 2018 GC Briefing September 13, 2018 Weather Sentinel Hurricane Florence Tropical storm conditions have been reported for areas of North Carolina and will continue to spread inland to the west and south. Hurricane

More information

Policy and Procedure for Emergency Planning

Policy and Procedure for Emergency Planning Viera Children s Academy 3395 Viera Boulevard Viera, Florida 32940 (321) 4332330 (321) 4332331 fax Policy and Procedure for Emergency Planning Director Signature Date Purpose: To ensure that in the event

More information

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Paul Rooney 5/31/16 Paul Rooney Assistant Vice President of Operations Valencia College

Paul Rooney 5/31/16 Paul Rooney Assistant Vice President of Operations Valencia College Section: VSP 2 Valencia Security Policy Title: Severe Weather Policy Date: May 24, 2016 Page Number: 1 of 9 SEVERE WEATHER POLICY Security Department Valencia College REVIEWED BY: Robert Pigman Bill Macauley

More information

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018 1 PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018

More information

Tornado Safety: 2013 Practical Steps for Weather-Related Emergencies

Tornado Safety: 2013 Practical Steps for Weather-Related Emergencies Tornado Safety: 2013 Practical Steps for Weather-Related Emergencies Campbell County Public Safety One County, One Mission, One Call Away Tornado Preparedness Day March 12, 2013 As 62 tornadoes struck

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program: Education:

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program:  Education: The National Weather Service (NWS) has implemented a voluntary recognition program to help large outdoor venues, including those on university campuses, better protect staff and patrons from the dangers

More information

Rebuilding Flood-Conscious Society

Rebuilding Flood-Conscious Society A zone where strong flood flow or river bank erosion by levee breach are anticipated, which likely to occur collapsing/washing away of house. Set up the joint councils by relative stakeholders(river managers,

More information

HAZARD COMMUNICATION SAFETY PROGRAM

HAZARD COMMUNICATION SAFETY PROGRAM Hazard Communication Program HAZARD COMMUNICATION SAFETY PROGRAM 1. Purpose. To provide an effective, written hazard communication program in compliance with company, State and Federal regulatory requirements.

More information

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1 A Simple Procedure for Estimating Loss of Life from Dam Failure Wayne J. Graham, P.E. 1 INTRODUCTION Evaluating the consequences resulting from a dam failure is an important and integral part of any dam

More information

STORM COWBOY. FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION

STORM COWBOY. FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION FANNIN COUNTY A.R.E.S. and R.A.C.E.S. STORM COWBOY Reference Manual SKYWARN MISSION TO LOCATE POSSIBLE THREATS TO LIFE AND PROPERTY AND PROVIDE INFORMATION FROM WHICH WARNINGS CAN ISSUED TABLE OF CONTENTS

More information

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10 Develop a Disaster Preparedness Plan Assess your risks of natural and manmade disasters Purchase adequate insurance and ensure that you have the types of coverage you may need Keep employee contact information

More information

Probable Maximum Precipitation Study

Probable Maximum Precipitation Study Probable Maximum Precipitation Study Virginia Floodplain Management Association Workshop Thursday, October 29, 2015 Robert T. Bennett, PE, RA, CFM DCR Dam Safety & Floodplain Management Definition (4VAC50-20-50.H)

More information

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw BRACEBRIDGE, ONT Springtime is fast approaching and flooding in low lying areas of the Town is a potential risk due to melting snow and spring rain fall. Flooding can also be experienced during extreme

More information

Comprehensive Emergency Management Plan

Comprehensive Emergency Management Plan Comprehensive Emergency Management Plan Section 6- Severe Weather/Wildfire Annex Blank Intentionally 2 CEMP Annex 6 11 Severe Weather / Wildfire Annex I. PURPOSE This plan outlines the procedures to be

More information

STATE OF WISCONSIN/ DEPARTMENT OF MILITARY AFFAIRS WISCONSIN EMERGENCY MANAGEMENT 2400 WRIGHT STREET P.O. BOX 7865 MADISON, WISCONSIN 53707-7865 608-242-3232 February 22, 2007 Re: Tornado and Severe Weather

More information

photo courtesy of

photo courtesy of BRITISH VIRGIN ISLANDS REPORT TROPICAL STORM JEANNE photo courtesy of www.bviplatinum.com PREPARED BY THE DEPARTMENT OF DISASTER MANAGEMENT 1 EVENT 13 th -16 th September, 2004 TROPICAL STORM JEANNE Sequence

More information

ICE STORM! a mini tabletop exercise for home care agencies

ICE STORM! a mini tabletop exercise for home care agencies 1 ICE STORM! a mini tabletop exercise for home care agencies HCA Education and Research Winter 2010 2011 2 What is a tabletop exercise? People come together to review and discuss a hypothetical emergency

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION: BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION: The Roads Department of Boone County is responsible for providing snow removal for approximately 1100 miles of county roads. The Roads

More information

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM Purpose: The Public Transportation Department (PTD) and AnchorRIDES paratransit contractor will provide transportation in as safe a manner as effectively possible. Paratransit vehicles primarily operate

More information

LABORATORY MANAGEMENT PLAN (LMP) TABLE OF CONTENTS 4. UNIVERSITY OF PITTSBURGH LMP PART I CHEMICAL WASTE REMOVAL FROM LABORATORIES...

LABORATORY MANAGEMENT PLAN (LMP) TABLE OF CONTENTS 4. UNIVERSITY OF PITTSBURGH LMP PART I CHEMICAL WASTE REMOVAL FROM LABORATORIES... Page 1 of 9 (LMP) TABLE OF CONTENTS 1. INTRODUCTION...2 2. APPLICABILITY...2 3. LMP REQUIREMENTS...3 3.1 PART I: ENFORCEABLE REQUIREMENTS...3 3.2 PART II: NON-ENFORCEABLE REQUIREMENTS...4 4. UNIVERSITY

More information

SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE

SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE ALGORITHM Staff Member becomes aware of Severe Weather Assess Threat Imminent Tornado Strike NO Notify Supervisor

More information

City of Punta Gorda Community Emergency Management Plan 2013

City of Punta Gorda Community Emergency Management Plan 2013 City of Punta Gorda Community Emergency Management Plan 2013 Hurricane Andrew- August 24, 1992 Category 5 hurricane. The second-most-destructive hurricane in U.S. history. The first named storm of the

More information

Significant Flooding Expected

Significant Flooding Expected Significant Flooding Expected Decision Support Briefing #5 As of: 9:00 AM September 14, 2018 What Has Changed? Flash Flood Watch now in effect for part of area, will be expanded later today 9/14/2018 9:23

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

The City of Ottawa Flood Hazards

The City of Ottawa Flood Hazards The City of Ottawa Flood Hazards The City of Ottawa is located in North Central LaSalle County, approximately 45 miles West of Joliet and 90 miles South of Rockford. The primary water course and sources

More information

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How

More information

While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that:

While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that: While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that: Produces hail at least three-quarters of an inch in diameter. Has winds of 58 miles

More information

SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES. Plan/Event Information for:

SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES. Plan/Event Information for: SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES Plan/Event Information for: Dates of Event/Site (Enter On-going for a plan) CONTACT INFORMATION: Name: Phone: Email: I. GENERAL A. This severe weather plan

More information

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms Inclement Weather Preparedness Tornadoes and Severe Thunderstorms Let s find out How do we prepare ahead of time? What is the difference between a watch and a warning? What are the severe weather communications

More information

September 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department

September 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department MEDIA RELEASE September 13, 2018 The City continues to prepare for and monitor the track and potential impacts of Hurricane Florence. Current guidance from the National Weather Service, the National Hurricane

More information

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS 2008 Prepared by the staff of the Cayman Islands National Weather Service TROPICAL STORM DOLLY Formed 194 miles west of Grand Cayman July 19 th. The tropical

More information

ROLLING RIVER SCHOOL DIVISION POLICY

ROLLING RIVER SCHOOL DIVISION POLICY ROLLING RIVER SCHOOL DIVISION POLICY Transportation Storm EBCD/P The School Division is responsible for the safe transportation of students on school buses. The Division shall exercise due care and caution

More information