1 Hardening the Entergy System Prepared by: Marika Ball-Damberg Olivia Hayes Fatimata Dia Edwin Unzalu

2 TABLE OF CONTENTS EXECUTIVE SUMMARY 3 INTRODUCTION 3 I. AN EFFICIENT ENTERGY SYSTEM 3 II. HOW TO MEASURE HARDENING AND RESILIENCY 3-4 III.COSTS 4-5 IV. SIMILAR STATES TO LOUISIANA Mississippi Mississippi s PSC Hurricane Katrina Electric Utility Customer Relief and Electric Utility System Restoration Act Storm Investigations Results of Mississippi s Legislation 3.2 Florida Storm Hardening Rules Cost Recovery for Storm Hardening Securitization of Storm Costs Storm Reserve Accounting Infrastructure Hardening & Storm Resiliency Measures Results of Florida Legislation 3.3 New Jersey Storm Investigations Vegetation Management Undergrounding Reliability Regulations Infrastructure hardening & storm resiliency measures Results of New Jersey legislation V. POLICY OPTIONS AND RECOMMENDATIONS FOR LOUISIANA Vegetation Management 4.2 Wind/Flood protection 4.3 Modernization 4.4 General Readiness VI. LOGIC MODELS FOR RECOMMENDATIONS VII. LOGIC MODELS FOR LOUISIANA AND FLORIDA 20 VIII. APPENDIX A VII. REFERENCES

3 EXECUTIVE SUMMARY Entergy Corporation provides electricity to approximately 2.7 million customers, and has seven locations in Louisiana, Arkansas, Mississippi, and Texas. After Hurricane Rita and Katrina, the Entergy system in Louisiana was responsible for 670,000 power outages in the Louisiana and Mississippi area. Problem: The Entergy system needs be hardened and become more resilient when a large-scale storm strikes. The US Department of Energy defines hardening as physically changing the infrastructure to make it less susceptible to damage from extreme wind, flooding, or flying debris. Resiliency is defined as the ability of an energy facility to recover quickly from damage to any of its components or to any of the external systems on which it depends. After comparing Louisiana to other states, we recommend that the Entergy Corporation implement undergrounding, vegetation management, increased modernization, and general readiness. INTRODUCTION After the hurricane season of 2005, it became clear that Entergy s system to deal with a largescale storm was inefficient. The US Geological Survey reported that the Entergy system could have started its transmission system back up by September 9. However, on September 9 Entergy still had 500 transformers and 50 substations under water. In addition, there was no apparent damage done to Entergy s nuclear power plant and it still did not reopen until September 30. Entergy needs to be able to recover from a storm in less than a month, and analysis of different states indicates how this quicker process can be accomplished. If these measures are taken, Entergy will recover quicker, be less harmful to the environment, and have far fewer customers without power or utilities. I. AN EFFICIENT ENTERGY SYSTEM A multifaceted approach is needed to make the Entergy system more efficient, thereby making it a hardened and more resilient system. There are four general ways in which to harden and make Entergy more resilient: implement vegetation management, wind and flood protection, modernization, and general readiness. II. HOW TO MEASURE RESILIENCY AND HARDENING: Resiliency and hardening can be measured in two ways: statistics and customer feedback. After implementing a new resiliency system, the first time to measure resiliency is a year. After a year, utility poles percentage increase in stability will be used to measure how resilient they became. In addition, all new infrastructure and undergrounding will also be measured according to the percentage increase they experienced in effectiveness, and how much costs went down due to new techniques. Then, customers will complete a survey including satisfaction with power companies and amount of power outages during the year and length of the outages. These two 3

4 strategies will be combined to measure how far the amount of resiliency and hardening the system has come after a year. Entergy should set an exact landmark for what percentage of utility poles standing means they were successful. They should do the same for infrastructure and undergrounding. There should be an exact percentage of customers overall satisfaction that means success to Entergy as well. For example, Entergy could say that once 70% of utility poles last through strong storms and 80% of customers report they are satisfied, they have been successful in that year. Below is a chart of the standard procedure energy companies follow after a storm hits their area and customers lose power and utilities, and it shows how all parts of system restoration will take place and how it will affect the customer. The graph and multiple others used in this report come from Quanta Technology, a expertise-based, independent consulting company providing business and technical expertise to the energy and utility industries. Source: Quanta Technology III. COSTS When Entergy evaluates the cost effectiveness of different hardening strategies, they typically look at an extended period of time and how much money they will spend initially, and how much they would save by a certain year. Below are three graphs estimating the costs for a new 4

5 substation, four different kinds of utility poles, and total utilities cost for undergrounding. All cost tables courtesy of Quanta Technology After evaluating some of the costs that can be involved in implementing new systems, it is important to see if and how other places have done this and if it was successful. We will look at what Mississippi, Florida, and New Jersey have done to improve their hardening and resiliency measures. 5

6 IV. WHAT OTHER STATES HAVE DONE 3.1 Mississippi Mississippi s PSC The state of Mississippi has what is called a Public Service Commission. The Public Service Commission s job is to regulate all of the power and utility companies within Mississippi and make sure they are reliable, consistent, and customers are pleased. In 2006, the Mississippi PSC issued financing orders that permitted Mississippi Power and Entergy Mississippi to issue securitized storm bonds to recover the costs of Hurricane Katrina that were not reimbursed through community grants or other payments. Securitized bonds are companies selling their money making assets to investors, essentially financing your assets Hurricane Katrina Electric Utility Customer Relief and Electric Utility System Restoration Act The 2006 act was passed by the state legislature, and allowed the State Bond Commission to issue bonds to finance recovery costs. The bond debt service is repaid by a system of restoration surcharge on customers bills, and is reset to companies annually to recover 110% of annual debt service Storm investigations After approving the selling of bonds, the Mississippi PSC determined certain actions the state should take to prevent storm damage in the future. Jurisdictional Mississippi companies were ordered to harden their locations to withstand hurricane winds 10 miles inland from potential flooding. Mississippi Power was also authorized to use the proceeds from its bond sale to build a new storm operations center that was further from shore. This way, the center had less chance of getting damaged as quickly when storms began to affect the state Results of Mississippi legislation After the Hurricane Katrina Electric Utility Customer Relief and Electric Utility System Restoration Act was put in place, electric utility customers were given relief from traditional methods of recovering system restoration costs. Normally, customers were forced to pay large sums of money to get their power and utilities back, and now that responsibility is in the hands of the state. The 2006 act has held up so far, and is still in place. After the 2008 hurricane season, the state proved that the new system was working better because there were less damaged poles, transformers, and transmission lines. The number of power outages also went down. 3.2 Florida Storm Hardening Rules Florida has utilized a multi faceted approach to storm hardening that includes the development of new rules and regulations of vegetation management and other hardening activities, the development of overhead and underground construction standards, requirements for the filing of utility plans, and required investments by utilities with cost recovery pre-determined. The Public Service Commission of Florida wants people to file tariffs that reduce the costs of undergrounding to the customers. Florida has also initiated research programs at Florida 6

7 universities to research new methods that would reduce storm damage costs and assess the costs and benefits of different measures. Below is a chart of case studies conducted in Florida where overhead circuits were moved underground. Source: Quanta Technology Cost Recovery for Storm Hardening In 2006, the Florida PSC approved new hardening plan. Progress Energy Florida then requested that they be allowed to approve storm-hardening costs through their storm reserve account. Their request was denied by the Florida PSC. The PSC established a uniform procedure when investorowned electric utilities should calculate the amounts due as contributions in-aid-of construction from customers who wanted new or upgraded facilities Securitization of Storm Costs After the damage from Hurricanes Charley, Frances, and Jeanne in 2004, a statute was enacted in 2005 giving Florida utilities the ability to recover storm costs by selling securitized bonds. The utilities suffered additional damage from Hurricanes Dennis, Katrina, Rita, and Wilma in 2005, and were therefore approved issuance of huge sums of money in storm-recovery bonds. For example, Florida Power and Light was approved $708 million in storm-recovery bonds Storm Reserve Accounting In 2007, the PSC allowed utilities to establish storm reserve accounts to capitalize the costs of storm recovery to those accounts. Utilities could petition the commission for the recovery of balance in a reserve account plus another amount to replenish the storm reserve Infrastructure Hardening & Storm Resiliency Measures After May 2007, utilities companies are now required to file detailed storm reports after every storm. The reports include detailed standards, policies, practices, and procedures they used to enhance reliability of overhead and underground electrical T&D facilities while abiding by state provisions. It also requires utility companies to explain a systematic approach the utility will follow to enhance reliability and reduce the restoration costs and power outage times from extreme storms. They were also expected to include pole attachment standards that were in place at the time of the storm. Florida also called for a three-year vegetation management cycle for distribution circuits, post-storm data collection and forensic analysis, increased utility coordination with local governments, and a natural disaster preparedness and recovery program. The following chart shows the amount of money Florida power and utility companies spent on new projects such as undergrounding assessments and wind monitoring projects for the years clearly has the largest amount of money spent by far, and this is due to the storm-hardening plan that was put into place at the end of 2006 by the Florida PSC. 7

8 3.2.6 Results of Florida Legislation The Edison Electric Institute calls Florida unique because of Florida s comprehensive program for hardening infrastructure to reduce damage from future storms. The plan went into place in 2007 and is still in place today, with a few amends having been made. Progress Energy Florida instituted an automated 24 hour outage line that is capable of handling 125,000 calls per our. This is a much more productive way for the power companies to figure out where to send power trucks. In addition, they have a customer service center open 24 hours a day that direct crews to the most affected areas quickly. The following chart shows all of the areas Florida has improved on, and the fact that all of these hardening programs were implemented before other states policies. Table courtesy of Quanta Technology 3.3 New Jersey 8

9 3.3.1 Storm investigations The New Jersey Board of Public Utilities (BPU) investigated restoration efforts by the state s electric distribution companies prior, during, and after Hurricane Irene. The BPU recommended developing a vegetation management program, an Incident Command System, use of company websites to provide estimated time of restoration, conducting storm training, and external analysis of each company s restoration experiences. The BPU also announced the beginning of an investigation into the state of preparedness and responsiveness of the electric distribution companies prior to, during, and after Hurricane Sandy Vegetation management The state of New Jersey has in place comprehensive vegetation management regulations for the EDCs. Each time there is a violation of these regulations; there can be penalties up to $100 a day Undergrounding Undergrounding of distribution lines is governed in section 14:3 of the New Jersey Administrative code. Distribution lines are required to be constructed underground for new residential developments constructed after August Reliability Regulations Currently, the New Jersey General Assembly is considering Assembly Bill 2760, which says that the BPU would be required to establish uniform reliability and restoration standard for investorowned electric and gas utilities. This would mean that utilities would need a service reliability plan and an emergency communications strategic plan approved by the BPU. They would also need to review strategies to get rid of potential flooding of substations constructed within flood hazard areas defined by the Department of Environmental Protection. The bill would also include civil penalties to be paid for by electric utilities for problems in service delivery, preparedness, communications, and responsiveness in emergencies. These funds would be used to increase the public utilities service reliability Infrastructure hardening & storm resiliency measures After Superstorm Sandy hit New Jersey in October 2012, the state implemented new hardening and resiliency measures. These measures consisted of reevaluating the provision of restoration information to specific customer classes that include special needs customers and well-water dependent customers. Also, coordinating more closely with state and local crews working to clear the roads and remove storm debris. EDCs should direct full implementation of its Preliminary Communications Plan for any severe weather events Results of New Jersey legislation Since Superstorm Sandy in October 2012, New Jersey has not experienced any major storms. Most of their hardening and resiliency standards were implemented after the effects of Sandy were felt. Therefore, the state cannot be fully sure of how effective these new strategies are until they experience a storm of the same or greater magnitude. Below, we have created a comprehensive table for Mississippi, Florida, and New Jersey and what they have implemented. 9

10 State Active PSC Securitized bonds Vegetation management Undergrounding Hardening and resiliency measures FL X X X X X LA X X MI X X X X NJ X X X V. POLICY OPTIONS AND RECOMMENDATIONS FOR LOUISIANA 4.1 Vegetation Management Vegetation management is defined as the use of mechanical, chemical (herbicide) and other techniques to ensure the safe and reliable operation of transmission lines. In states such as Pennsylvania, New Jersey, and Mississippi, state Public Service Commissions have implemented different forms of vegetation management. We recommend that Louisiana implement a vegetation management cycle similar to the one implemented in Florida that runs on a six-year cycle. Vegetation Management consists of keeping trees away from power lines and investing in safe, reliable operations of the electric delivery system. Entergy Corporation has shown interest in utilizing vegetation management as a solution to their problem of destroying wetlands. Entergy should create utility poles made of only steel, not wood, and place them in areas where there is not a huge amount of tree cover. If there is tree cover, the trees need to be trimmed around power lines in order to ensure the preventing of mass power outages due to downed trees. Entergy should utilize herbicides as well to treat pesky plants growing from the ground. Herbicides are safe to use as long as they are not used within 35 feet of water or wetlands. The overall goal of Entergy when utilizing vegetation management should be to reduce the amount of power outages and reduce the amount of damage to the local environment. Vegetation management has worked efficiently for states such as New Jersey and Florida where they used the tree trimming and herbicide techniques. Below is an example of vegetation management in place in New Jersey. Following the picture is a diagram of the exact measurements of power lines and trees in order to abide by vegetation management standards. As you can see, the power lines are not touching any trees, and therefore the likelihood of a power outage due to trees falling on the power lines is much lower. 10

11 Picture and diagram courtesy of New Jersey Board of Public Utilities 11

12 Pros of vegetation management -Fewer outages -Shorter outages -Fewer momentary interruptions -Improved power quality -Tear-downs of energized lines and equipment are reduced -Burn down of conductors is reduced -Trimmed feeders reduce the time and cost of storm restoration -Trimming trees makes the distribution system safer -Trimming trees makes electricity delivery more reliable Cons of vegetation management -Vegetation management is very expensive -Often cited as the highest recurring maintenance expense -It is difficult to evaluate the effectiveness of vegetation management programs on a short time scale Overall, the pros of vegetation management outweigh the cons. Therefore, we recommend vegetation management as an effective strategy to reduce the number and cost of power outages. 4.2 Wind and Flood protection (undergrounding) In order to implement flood and wind protection for an area, there are certain steps Entergy can take. Firstly, Entergy should focus on building and strengthening levees and floodwalls. In the aftermath of Katrina and Rita, one of the biggest contributors to the massive flooding in New Orleans was the failure of the levees. After the 2005 hurricane season, New Orleans rebuilt their levee system to make it stronger in preparation for future storms. Poles on the levees reaching multiple feet underground were all changed to steel in order to be a more stable protection for the city. Since the new levees are many feet underground and have not yet failed, it would be possible to move power lines underground as well. It would be the job of the Louisiana PSC to make sure lines built underground did not harm any of the outside environments. Electrical engineer Charlie Brown says it is easier to start and restore an underground system. Another action to create wind and flood protection is elevating substations and pumping stations. After Katrina, the majorities of Entergy s substations were left underwater, and were therefore no use to the company. Elevating substations and brining them farther inland allows them to have a higher chance to withstand a strong storm, and high winds and rainfall. One aspect that would completely change the Entergy system would be to bury power lines underground. In Florida, the Public Service Commission ordered power lines to be built underground. Burying power lines underground, also called undergrounding, severely reduces the amount of vulnerability Entergy has when strong winds and rainfall come with a storm. If power lines are located underground, they cannot be blown down, and therefore no power outages would result. This would be one of the most effective ways for Entergy to recover at a faster rate from future storms. Below is a chart illustrating the underground equipment failure rates based on storm surge zone and hurricane category. The graph shows that underground equipment failure is overall much lower than power lines above ground. 12

13 Source: Quanta Technology Entergy should upgrade damaged poles and structures. While this step is fairly simple, it is crucial to the success of the entire operation. Prior to Katrina, some utility poles in New Orleans were made of wood, some of metal. Therefore, some poles immediately came down, some lasted a bit longer, but most ended up destroyed. All utility poles need to be constructed in a unified way to be effective. All of the poles should be rebuilt as completely steel structures. Steel has a far higher chance of withstanding hurricane force winds and rain. Pros of undergrounding -Improved aesthetics -Lower tree trimming cost -Lower storm damage and restoration cost -Fewer motor vehicle accidents -Reduced live-wire contact -Fewer outages during normal weather -Fewer structures impacting sidewalks Cons of undergrounding -Possible environmental damage such as soil erosion -Reduced life expectancy -Higher maintenance and operating costs -Higher cost for new data bandwidth After evaluating the pros and cons of undergrounding and wind/flood protection, we once again think the pros outweigh the cons and believe Entergy should implement undergrounding to prevent massive outages during and after storms. 4.3 Modernization The biggest problem the Entergy Corporation experienced immediately after Hurricane Katrina was a lack of effective telecommunications. Staff could not get in touch with one another, and the Entergy Headquarters in downtown New Orleans was underwater and unusable. After Katrina, nearly 1,800 Entergy staff were immediately relocated and another 1,000 members of the workforce were in some way affected by the storm. Entergy experienced a delay in getting emergency contact information to its employees. 13

14 Entergy was not prepared for how large scale Katrina would be, and therefore had not set up any other locations to handle operations once their headquarters was not usable. All of the electrical systems in Entergy need to be upgraded in order for the company to be able to communicate to staff and customers immediately after loss of electricity and utilities. Entergy should install asset databases and tools in order to keep up with fast paced storms. Weather data and detection devices technology is advancing at rapid speed, and Entergy needs to advance at the same rate. Having outdated technology when in the face of a storm is unacceptable. Entergy is responsible to 670,000 customers in the Louisiana area, and must provide them with the best service possible. The only way to achieve the best service is to have the most up to date technology. That way, Entergy can warn customers before storms, keep them updated during, and communicate with them after. 4.4 General readiness After Katrina, hundreds of thousands of customers were left without power and utilities, and had no way of knowing when they would get them back. Entergy has 3 companies within the Louisiana area: Entergy New Orleans, Entergy Louisiana, and Entergy Gulf States. The figure below shows all of the prominent power and utility companies on the Gulf Coast. Source: US Department of Energy Each Entergy companies need to conduct hurricane preparedness planning and training. This consists of educating customers and citizens of the city on how to prepare for storms and, more importantly, what to do once a storm hits. This way, Entergy will not be as flooded with complaints directly after a large outage, and people will be more knowledgeable on how to deal with not having power and utilities. Customers can also better prepare for possible outages beforehand, and secure their homes. Knowledge of what is coming is crucial for the customers 14

15 and staff of Entergy alike. In a survey conducted by Quanta Technology on areas of improvement, better education of customers and public was ranked first. Aside from problems directly related to the Entergy system itself, there are outside factors the company cannot control. Climate change is very present in the world, and is especially seen in the Gulf Coast area. New Orleans is specifically vulnerable to sea level rise. Entergy needs to educate their customers on climate change, and increase awareness. Storm surges associated with storms are expected to rise, and higher waters will overcome slowly more lands. Entergy needs to do its part in two ways. Firstly, move all of their operations and equipment further inland to avoid water damage. Secondly, advising customers of sea level increase and the increasing vulnerability of New Orleans to these rising sea levels. Therefore, people who live closer to the water will know what extra preparations they need to take to prepare for the storm, and possibly take action to move closer inland. Providing knowledge to your customers is a smart way for a company to have a solid relationship with customers. Entergy has many aspects in which they need to improve, but the people have a duty too. Customers need to cooperate with Entergy to ensure that they are as prepared as they can be for incoming storms. A knowledgeable Entergy Corporation and knowledgeable customer base would result in New Orleans and the Louisiana area being more prepared than they were after the 2005 hurricane season. Utilizing vegetation management, wind and flood protection, increased modernization, and general readiness will best harden and increase the resilience of the Entergy System. Each one of our recommendations comes directly from the success of these programs in other states. Vegetation management was implemented in Florida, New Jersey, and Mississippi. The outcomes of vegetation management were positive in all three states. Undergrounding was implemented in Florida, and has been extremely cost beneficial to the state ever since. Modernization was implemented in Florida in the 2007 Public Service Commission report to the state, and case studies have shown that these methods reduce costs and damage to the environment. General readiness is a recommendation that comes from all three states, but is also specific to what Entergy Louisiana must act on in order to see a hardened and more resilient system. 15

16 VI. LOGIC MODELS FOR RECOMMENDATIONS 1. Vegetation Management Inputs Outputs Outcomes What Louisiana puts in: - Money: $65,000,000 (amount based on 6 year cycle that trims about 2,500 miles of trees, based on Florida s vegetation management program of Chart located below) - Time: 6 years (standard amount of time to complete full vegetation cycle) - Leaders: Entergy board of directors (heads of Entergy Louisiana, Entergy Gulf States, and Entergy New Orleans are in charge of implementing the system. Some of these leaders are Rod West, Maureen Bateman, Leo Denault, and Alexis Herman.) What Louisiana does: - Trim all trees near power lines - Use herbicide to prevent plants from growing on utility poles. However, herbicide use will stop within 35 feet of water - Replace all utility poles with steel - Communicate with property owners to remove downed vegetation that could be affecting power lines - Label trees that are above undergrounding systems - Trim feeders to reduce the time of storm restoration -Short term: -Visible power lines that are no longer susceptible to damage from surrounding trees -Medium term: -No downed power lines and fewer momentary power outages -No burning down of conductors -Long term: -Far fewer power outages due to vegetation touching power lines -Shorter power outages -Overall improved power quality Table Courtesy of Florida PSC 16

17 2. Undergrounding Inputs Outputs Outcomes What Louisiana puts in: -Money: $120,000,000 (amount based on chart on page 9 estimating total cost of all undergrounding, published by Quanta Technology.) -Time: 2 years (based on how long it took Florida to implement undergrounding) -Leaders: Since the project requires closing off streets for periods of time, the Entergy board of directors needs to get in contact and work with New Orleans city council. Working with local government officials is crucial so that residents are aware of what is happening.) What Louisiana does: - Elevates substations, creates new substations further inland - Move all power lines underground - Upgrade any damaged poles or structures -Short term: Fewer motor vehicle crashes and improved aesthetics -Medium term: -Fewer outages during storms -Less damage to environment due to no electric poles above ground -Long term: -Quicker recovery time after large scale storms -Lower recovery costs due to significantly lower power and utility outages 17

18 3. Modernization Inputs Outputs Outcomes -What Louisiana puts in: -Money: -No exact measurement, estimate for an entirely new electrical system & database is $5,000,000. -People: -Allocate 500 Entergy employees to reach out to all customers & inform them on the new technology. -Electricians hired to consult on the most effective new way of implementing telecommunications. -Workers hired to set up new databases in all Entergy offices. -Time: -1 year. Consulting on new telecommunications strategies should take no longer than 6 months. During those 6 months, Employees will reach out to customers and inform them of what is going on. -After the 6 months, another 6 months is allocated to restructuring the telecommunications system in all Entergy offices. - What Louisiana does: - Consults with electricians to find best new telecommunications strategies - Inform customers of new communications standards - Make sure all Entergy employees have ways of contacting one another if and when a large-scale storm hits. -Short term: -More educated customers who are aware of what emergency communications they have available to them -Medium term: -New database for Entergy & new telecommunications strategies -Long term: -Effective emergency response and communication between Entergy officials and customers in the face of a large-scale storm. 18

19 4. General readiness Inputs Outputs Outcomes -What Louisiana puts in: -Time: 1 year -Trainers: Entergy Board of Directors, Entergy Louisiana, New Orleans, and Gulf States staff members. - What Louisiana does: - Entergy Board of Directors teaches their individual staff members hurricane preparedness tips and what to do when a storm comes. These staff members are each assigned an area of their customer base, and they send out newsletters to each customer containing information on preparedness strategies, climate change awareness, and what to do when a storm does come. -Short term: -Climate change brought to the attention of customers -Medium term: -Customers and staff members are knowledgeable about how to deal with largescale storms in the event of one. -Long term: -Quicker recovery time due to more efficient communications between customers and staff after a large-scale storm because of their training on how to deal with storms. 19

20 VII. LOGIC MODELS FOR LOUISIANA AND FLORIDA Florida Inputs Outputs Outcomes -What Florida puts in: -Money: -$708 billion given to Florida Power and Light to go into storm-recovery bonds -People: -Florida PSC employees organizing standards for Florida power and utility companies to abide by -Time: -Requirements instated in 2007, yearly inspections followed. Program still in place, exact amount of time not yet determined. - What Florida does: -Studies on hurricanes initiated in Implemented storm hardening plan in 2006 to establish storm reserve accounts. -Funded university research on extreme wind damage -Published vegetation management best practices among storm hardening initiatives -Short term: -Electric utility poles that meet state inspections made completely of steel. -Medium term: -Storm hardening plan increases utility poles ability to resist wind damage -Long term: -Knowledge on how to deal with future storms -Surplus money due to undergrounding Louisiana Inputs Outputs Outcomes -What Louisiana has put in: -Time: -Entergy Corporation has been working on a new transmission and distributionhardening plan since Plan is still in place, not finished yet. -Money: -Spent $119 million on a pilot strategy in Port Fourchon to implement things such as vegetation management system, T&D infrastructure -People: -Entergy Corporation employees and PSC members VIII. APPENDIX A - What Louisiana is doing: -Currently forming a proposal for the Louisiana PSC in hopes of acquiring money in investments to start implementing undergrounding and vegetation management. -Entergy not being proactive enough, proposal at a stand still. Entergy needs to keep this proposal as a first priority in order to begin the hardening process. -Short term: -Proposal given to PSC to get money for investments. -Medium term: -Money is given by Louisiana PSC, and hardening plan is laid out, Entergy begins the process of upgrading databases and telecommunications -Long term: -Louisiana has working Transmission and Distribution plan, is able to recover from large-scale storms faster. 20

21 Below is a comprehensive table of all measures different power and utility companies in the states discussed have taken. (Table information courtesy of Edison Electric Institute) 21

22 22

23 23

24 These companies can be compared to the companies in Louisiana and what they have done: 24

25 Tables courtesy of Edison Electric Institute 25

26 VIII. REFERENCES 1. Abi-Samra, Nicholas. "Hardening Transmission and Distribution Services." Quanta Technology, n.d. Web. 30 Oct < files/hardening%20td%20systems%20against%20extreme%20weather%20events%20- %20formatted.pdf>. 2. "Bond Company Description." Investor.nexteraenergy.com. NextEra Energy, Inc., Web. 10 Nov < 3. "BPU Vegetation Management Plan." Sierra Club, 18 May Web. 7 Nov <>. 4. Brown, Richard. "Undergrounding Assessment Phase 3 Report." Quanta Technology, 5 May Web. 6 Nov < 5. Brown, Richard. "Cost-benefit Analysis of the Deployment of Utility Infrastructure Upgrades." Quanta Technology, 4 Mar Web. 28 Oct < >. 6. Campbell, Richard J. "Weather-related Power Outages and Electric System Resiliency." Congressional Research Service, 28 Aug Web. 10 Nov < 7. "Enhancing Reliability of Florida's Distribution and Transmission Grids." Florida Public Service Commission, July Web. 7 Oct < 8. Hammer, Stephen. "Climate Change Adaptation in the US Electric Utility Sector." Massachusetts Institute of Technology, Web. 30 Oct < 9. Haught, Debbie. "Electric Grid." Energy.gov. Smart Energy, Web. 6 Nov < f%20the%20us%20electric%20grid%20- %20SGIG%20Article%20in%20Metering%20International%20Issue%201% pdf>. 10. "Integrated Vegetation Management Fact Sheet." Environmental Protection Agency, 9 May Web. 5 Nov < 11. "Laws and Regulations." Pacific Gas and Electric Company, Web. 4 Nov < 12. "Leadership." Entergy: Power of the People. Entergy Corporation, Web. 11 Nov < 13. Morrow, Donald J. "The Challenge of Effective Transmission Planning." Quanta Technology, Sept Web. 28 Oct < 14. "Post Sandy Enhancement Plan." Coned.com. Orange and Rockland Utilities, n.d. Web. 2 Nov < 15. "The PSC's Role." Florida Public Service Commission, Web. 7 Nov < 16. "Report on the Workshop for Best Practices in Vegetation Management." Floridapsc.com. Florida's Electric Utilities, 5 Mar Web. 11 Nov

27 < preport.pdf>. 17. "Safety." PPl Electric Utilities Corporation, n.d. Web. 2 Nov < 18. "Vegetation Management." Mecklenburg Electric Cooperative, Web. 7 Nov < 19. "Weathering The Storm." Greater Baton Rouge Business Report, Web. 6 Nov < 20. Young, Tara. "Before and After the Storm." Edison Electric Institute, Jan Web. 8 Nov < 27

Winter Ready DC District of Columbia Public Service Commission

Winter Ready DC District of Columbia Public Service Commission Winter Ready DC District of Columbia Public Service Commission Presented by: Michael Poncia, Vice President, Customer Operations, Pepco Holdings October 26, 2017 Preparing our System Improving our system

More information

Superstorm Sandy What Risk Managers and Underwriters Learned

Superstorm Sandy What Risk Managers and Underwriters Learned Superstorm Sandy What Risk Managers and Underwriters Learned Gary Ladman Vice President, Property Underwriting AEGIS Insurance Services, Inc. Superstorm Sandy Change in the Weather Recent years appears

More information

The Hardening of Utility Lines Implications for Utility Pole Design and Use

The Hardening of Utility Lines Implications for Utility Pole Design and Use NORTH AMERICAN WOOD POLE COUNCIL TECHNICAL BULLETIN The Hardening of Utility Lines Implications for Utility Pole Design and Use Prepared by: Martin Rollins, P.E. Abstract The hurricanes of 2005 caused

More information

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015 Consolidated Edison Company of New York, Inc. Electric Distribution Storm Hardening Initiatives Paul V. Stergiou Distribution Engineering October 14 th, 2015 Energy For New York City And Westchester 3.3

More information

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018 1 PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018

More information

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016. Town of Havana, Fl. Response to Review of Electric Utility Hurricane Preparedness and Restoration Actions- Applies only to Hermine and Irma. Maria and Nate posed no serious threat to Havana. Staging for

More information

f<~~ ~ Gulf Power April16, 2018

f<~~ ~ Gulf Power April16, 2018 ~ Gulf Power Rhonda J. Alexander One Energy Place I 1anage' Pensacola. ~l 32520-0780 Regulatory Fooecastmg & Procong 850 444 67,13 tel 850.:144 6026 fax r jale>xad @~out her nro com April16, 2018 Ms. Carlotta

More information

Southern California Edison Wildfire Mitigation & Grid Resiliency

Southern California Edison Wildfire Mitigation & Grid Resiliency Southern California Edison Wildfire Mitigation & Grid Resiliency California State Legislative Conference Committee on Wildfire Preparedness and Response August 7, 2018 CALIFORNIA S WILDFIRE RISK Year-Round

More information

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? Keeping your power on is our business Whether your business is large, small or somewhere in between, we understand that a power outage presents special challenges

More information

2016 HURRICANE SEASON PREPARATION. March 30, 2016

2016 HURRICANE SEASON PREPARATION. March 30, 2016 2016 HURRICANE SEASON PREPARATION March 30, 2016 Hurricane Season Plan Preparation Communication Restoration Distribution Vegetation Management Mainline Trimming (3 Year Cycle) Mainline Annual Trim Schedule

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared November 13, 2015 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

URD Cable Fault Prediction Model

URD Cable Fault Prediction Model 1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared September 1, 2013 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Post-Hurricane Recovery: How Long Does it Take?

Post-Hurricane Recovery: How Long Does it Take? Post-Hurricane Recovery: How Long Does it Take? Implications for disaster recovery after hurricanes Harvey and Irma In the following report, BuildFax analyzed the geographic areas impacted by three of

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 1 Service Reliability reports N O V E M B E R 2 0 1 2 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA BEFORE THE CORPORATION COMMISSION OF OKLAHOMA IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR AN ORDER OF THE COMMISSION ) CAUSE NO. PUD 20110008 AUTHORIZING APPLICANT TO

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 2 Service Reliability reports N O V E M B E R 2 0 1 3 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

RESILIENCE: THE NEW REALITY JEFFREY D. KNUEPPEL DEPUTY GENERAL MANAGER MARCH 17, 2015

RESILIENCE: THE NEW REALITY JEFFREY D. KNUEPPEL DEPUTY GENERAL MANAGER MARCH 17, 2015 RESILIENCE: THE NEW REALITY JEFFREY D. KNUEPPEL DEPUTY GENERAL MANAGER MARCH 17, 2015 EXTREME WEATHER = EXTREME COST EIGHT SEPARATE BILLION DOLLAR EXTREME WEATHER EVENTS ACROSS U.S. IN 2014 JANUARY 2014

More information

2006 & 2007 Pre-Hurricane Scenario Analyses

2006 & 2007 Pre-Hurricane Scenario Analyses 2006 & 2007 Pre-Hurricane Scenario Analyses Executive Summary May 2007 Page 1 OF X FOR OFFICIAL USE ONLY 4 Public Availability to be Determined Under 5 U.S.C. 552 NOTE: Limited Distribution. Release of

More information

Director, Operations Services, Met-Ed

Director, Operations Services, Met-Ed Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast

More information

Comparative Analysis of Hurricane Vulnerability in New Orleans and Baton Rouge. Dr. Marc Levitan LSU Hurricane Center. April 2003

Comparative Analysis of Hurricane Vulnerability in New Orleans and Baton Rouge. Dr. Marc Levitan LSU Hurricane Center. April 2003 Comparative Analysis of Hurricane Vulnerability in New Orleans and Baton Rouge Dr. Marc Levitan LSU Hurricane Center April 2003 In order to compare hurricane vulnerability of facilities located in different

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions The Use of Geographic Information Systems (GIS) by Local Governments Giving municipal decision-makers the power to make better decisions Case Study: Examples of GIS Usage by Local Governments in North

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

Geospatial natural disaster management

Geospatial natural disaster management Geospatial natural disaster management disasters happen. are you ready? Natural disasters can strike almost anywhere at any time, with no regard to a municipality s financial resources. These extraordinarily

More information

Top 10 Actions a CIO Can Take to Prepare for a Hurricane

Top 10 Actions a CIO Can Take to Prepare for a Hurricane May 2013 Walter E. Washington Convention Center Washington, DC Top 10 Actions a CIO Can Take to Prepare for a Hurricane Lessons learned from Hurricane Sandy Bill Venteicher Marketing Manager Dell Email

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September Review of Florida s Investor-Owned Electric Utilities 2 0 1 5 Service Reliability Reports September 2 0 1 6 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November Review of Florida s Investor-Owned Electric Utilities 2 0 1 6 Service Reliability Reports November 2 0 1 7 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

Phases of Disaster Response. John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler

Phases of Disaster Response. John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler Phases of Disaster Response John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler BP Oil Spill One of the worst man made disasters in human history The BP oil spill occurred in April of 2010 when the Deepwater

More information

3Chapter Three: Rescue and Response

3Chapter Three: Rescue and Response 17 16 Report Science Title and the Storms: the USGS Response to the Hurricanes of 2005 3Chapter Three: Rescue and Response This chapter documents the U.S. Geological Survey s (USGS) humanitarian rescue

More information

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart)

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart) Table G - 6. Actions Identified by the () (From Master Action Chart) Multi-Hazard Plan, 2017 Action Comments 5 All-Hazards Local Planning & Regulations Update the Operations Plan on an annual basis. Work

More information

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s 4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s Sewerage Masahiro Hikino* and Gaku Sato** *Planning Section, Planning and Coordinating Division, Bureau of Sewerage, Tokyo Metropolitan Government

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

2015 Plymouth Rock Assurance New Jersey Hurricane Preparedness Study

2015 Plymouth Rock Assurance New Jersey Hurricane Preparedness Study 2015 Plymouth Rock Assurance New Jersey Hurricane Preparedness Study About This Study Tropical storms and hurricanes directly and indirectly impact New Jersey and its 130 miles of Atlantic coastline. Although

More information

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician How Power is Restored After a Severe Storm Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician Hurricanes, ice storms, tornadoes One inch of ice on a single span of electric

More information

Jefferson Parish GIS Hurricane Response Review. From the information given by A.J. Tapie, GIS Manager of Jefferson Parish, the use of

Jefferson Parish GIS Hurricane Response Review. From the information given by A.J. Tapie, GIS Manager of Jefferson Parish, the use of Neil Dixon and Ryan Ziegelbauer URPL 969 3/10/2006 Jefferson Parish GIS Hurricane Response Review From the information given by A.J. Tapie, GIS Manager of Jefferson Parish, the use of GIS in the Parish

More information

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject A. Basic Data 1. Subproject Title: Poverty-Environment Mapping to Support Decision Making 2. Country Director: Adrian Ruthenberg

More information

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company Aid to Critical Infrastructure and Key Resources During a Disaster Pete Grandgeorge MidAmerican Energy Company MidAmerican Energy Company Approximately 3,000 employees and 100 staffed facilities 1.4 million

More information

Southington. Challenges

Southington. Challenges Southington Southington, similar to its next-door neighbor Berlin, is a suburban community in the southeast part of the region. Originally an agricultural community, Southington has also hosted industry

More information

A Utility s Response and Recovery. Marc Butts Southern Company 03/19/2014

A Utility s Response and Recovery. Marc Butts Southern Company 03/19/2014 A Utility s Response and Recovery Marc Butts Southern Company 03/19/2014 Service territory across four states: 120,000 square miles Serves approximately 4 million customers Other Subsidiaries: Southern

More information

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS 2014 STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS FILED: March 2, 2015 REVISED: August 17, 2015 2014 Storm Implementation Plan & Annual Reliability Performance Reports EXECUTIVE SUMMARY...

More information

4.2: Disaster Mitigation Strategies

4.2: Disaster Mitigation Strategies WMO/CAS/WWW SEVENTH INTERNATIONAL WORKSHOP ON TROPICAL CYCLONES 4.2: Disaster Mitigation Strategies Rapporteurs: Bill Read Regional Specialized Meteorological Center (RSMC) WMO Region IV 11691 SW 17 th

More information

Hurricane Katrina. Learning Objective: -Analyse the causes, effects and responses of a tropical storm

Hurricane Katrina. Learning Objective: -Analyse the causes, effects and responses of a tropical storm Hurricane Katrina Learning Objective: -Analyse the causes, effects and responses of a tropical storm Learning Outcomes: -Classify the impacts of Hurricane Katrina -Apply understanding to an exam question

More information

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 Smart Grid Opportunities Being Pursued Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 OUR DREAM!! BNL s Smarter Electric Grid Research, Innovation, Development. Demonstration, Deployment

More information

Best Practices Natural Disasters Action Plan

Best Practices Natural Disasters Action Plan Best Practices Natural Disasters Action Plan MODERATORS: Jeannie Chiaromonte, CAR Vice President / National Remarketing Manager Bank of America Chuck Novince, CAR Vice President National Accounts Manheim

More information

United States Multi-Hazard Early Warning System

United States Multi-Hazard Early Warning System United States Multi-Hazard Early Warning System Saving Lives Through Partnership Lynn Maximuk National Weather Service Director, Central Region Kansas City, Missouri America s s Weather Enterprise: Protecting

More information

Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems. T. DOKIC, P.-C. CHEN, M. KEZUNOVIC Texas A&M University USA

Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems. T. DOKIC, P.-C. CHEN, M. KEZUNOVIC Texas A&M University USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems

More information

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH 5.1 Overview Plaquemines Parish is the area where the last portion of the Mississippi River flows out into the Gulf of Mexico (see Figures

More information

Earth Wind & Fire. Game Changing Restoration Options in the Texas Chenier Plain

Earth Wind & Fire. Game Changing Restoration Options in the Texas Chenier Plain Earth Wind & Fire Game Changing Restoration Options in the Texas Chenier Plain EARTH: The Chenier Plain is a 5 million acre coastal region in Southwest Louisiana and Southeast Texas providing landscape

More information

Lake Lure Community Meeting with Duke Energy

Lake Lure Community Meeting with Duke Energy Lake Lure Community Meeting with Duke Energy A community meeting was held on February 11, 2019 at Lake Lure Town Hall to discuss electric service to the town and surrounding areas. Lake Lure staff worked

More information

Lesson: Don t Wait For the Storm

Lesson: Don t Wait For the Storm Lesson: Don t Wait For the Storm Developing a GIS for Plaquemines Parish, Louisiana Presented by: Daniel Mellott, GISP Burk Kleinpeter, Inc. Where is Plaquemines Parish? 1998 GIS Feasibility Study User

More information

Risk Assessment and Mitigation. Hurricane Checklist

Risk Assessment and Mitigation. Hurricane Checklist Risk Assessment and Mitigation Hurricane Checklist Hurricane Checklist Hurricanes are severe tropical storms with sustained winds of at least 74 miles per hour. Hurricane winds can reach 160 miles per

More information

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION INTRODUCTION Floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Flood effects can be local, impacting a neighborhood

More information

Agenda. Superstorm Sandy. Preparations. Impact. Restoration. Back-Office Support. Going forward ON IT

Agenda. Superstorm Sandy. Preparations. Impact. Restoration. Back-Office Support. Going forward ON IT Agenda Superstorm Sandy Preparations Impact Restoration Back-Office Support Going forward 2 Corporate Overview Con Edison, Inc. Assets $40 billion (est.), 2012 Operating Revenue $12 billion 2012 Net Income

More information

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS EB-- Exhibit D Page of DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS FIVE-YEAR HISTORICAL RELIABILITY PERFORMANCE THESL tracks System Average Interruption Frequency Index

More information

Hurricane Tracking Lab

Hurricane Tracking Lab Hurricane Tracking Lab Background: Hurricanes are one of nature s most powerful disasters. To equal the power of a hurricane, one would have to set off about a thousand nuclear devices per second for as

More information

2014 Emergency Preparedness Conference. Tuesday, June 3, 2014 The Wildwoods Convention Center 4501 Boardwalk Wildwood, New Jersey 08260

2014 Emergency Preparedness Conference. Tuesday, June 3, 2014 The Wildwoods Convention Center 4501 Boardwalk Wildwood, New Jersey 08260 2014 Emergency Preparedness Conference Tuesday, June 3, 2014 The Wildwoods Convention Center 4501 Boardwalk Wildwood, New Jersey 08260 A Look back at Winter 2013-2014 A Look ahead to the 2014 Hurricane

More information

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation

More information

Timeframe. Crow Wing County, Baxter, Brainerd, Breezy Point, Crosby, Crosslake, Cuyuna, Deerwood, Emily, Fifty

Timeframe. Crow Wing County, Baxter, Brainerd, Breezy Point, Crosby, Crosslake, Cuyuna, Deerwood, Emily, Fifty Table G - 13. s Identified for by the () (From Crow Wing County Master Chart) 1 5 9 All- Hazards All- Hazards Winter Work to ensure that all Crow Wing County residents are aware of and sign-up for the

More information

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Alexander Chung, M.Sc. Candidate C-Change Student Research Associate May 2013 The Community of Little Anse Coastal community

More information

Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018

Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018 Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018 June 2 0 1 8 State of Florida Florida Public Service Commission Division of Engineering Table of Contents Table

More information

City of Punta Gorda Community Emergency Management Plan 2013

City of Punta Gorda Community Emergency Management Plan 2013 City of Punta Gorda Community Emergency Management Plan 2013 Hurricane Andrew- August 24, 1992 Category 5 hurricane. The second-most-destructive hurricane in U.S. history. The first named storm of the

More information

HURRICANE PREPAREDNESS GUIDE

HURRICANE PREPAREDNESS GUIDE HURRICANE PREPAREDNESS GUIDE BE PREPARED! TABLE OF CONTENTS Basic Preparedness Tips... 3 Preparing Your Home... 4 What To Do... 5 Make a Hurricane Plan... 6 Important Information... 7 pacu.com 800.433.7228

More information

Hurricanes in the Gulf of Mexico: The History and Future of the Texas Coast

Hurricanes in the Gulf of Mexico: The History and Future of the Texas Coast # 82 Hurricanes in the Gulf of Mexico: The History and Future of the Texas Coast Dr. Kerry Emanuel January 8, 2013 Produced by and for Hot Science - Cool Talks by the Environmental Science Institute. We

More information

WINTER STORM Annex II

WINTER STORM Annex II WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential

More information

DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017

DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017 DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES WAYS & MEANS SUBCOMMITTEE ON NATURAL RESOURCES MARCH 2, 2017 1 ABOUT DOGAMI AGENCY MISSION, VISION & GOALS 2 Lidar image of a stream network along the Umpqua

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

Hurricane Preparedness

Hurricane Preparedness TAKING THE WIND OUT OF HURRICANE DAMAGE National Oceanic and Atmospheric Administration is predicting another near or above average season in 2018, expecting up to 16 storms and nine hurricanes, several

More information

Ice Mass & Sea Level Change Unit 5: New York City vignettes

Ice Mass & Sea Level Change Unit 5: New York City vignettes Ice Mass & Sea Level Change Unit 5: New York City vignettes Becca Walker and Leigh Stearns Part 1: Background With a population of nearly 20 million people and 2400 km of coastline, the NYC region is susceptible

More information

Research Report. Hurricane Sandy. 20F Science Extreme Weather. October, By: November 5th, 2013 Period 6 20F Science Submitted to: Miss Brunel

Research Report. Hurricane Sandy. 20F Science Extreme Weather. October, By: November 5th, 2013 Period 6 20F Science Submitted to: Miss Brunel 20F Science Extreme Weather Research Report Hurricane Sandy October, 2012 By: November 5th, 2013 Period 6 20F Science Submitted to: Miss Brunel Table of Contents 1.0 Introduction... 2 2.0 Summary of [Hurricanes]...

More information

Hurricanes A 5 Day Unit Plan. Kristy Scott EDUC 651 October 30, nd grade

Hurricanes A 5 Day Unit Plan. Kristy Scott EDUC 651 October 30, nd grade Hurricanes A 5 Day Unit Plan Kristy Scott EDUC 651 October 30, 2006 2 nd grade Unit Overview Unit Description: The focus of this unit is to combine the students experiences of Hurricane Katrina with the

More information

Hurricanes and coastal storms pose a risk because powerful winds and storm surges can:

Hurricanes and coastal storms pose a risk because powerful winds and storm surges can: HURRICANES A hurricane is a violent area of low pressure forming in the tropical Atlantic Ocean from June to November. August and September are peak months. (Similar Western Pacific Ocean storms are called

More information

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Operations Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: December 2, 2013 SUBJECT/REPORT NO: Winter Control

More information

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available Using Operating Experience to Prevent or Mitigate Nuclear Events What Is, Was and Will Be Available Introduction Remember, it is by understanding the lessons learned from past events that we can adequately

More information

Hurricane Katrina August 29 th, 2005 Costliest Disaster/One of the 5 deadliest Hurricanes in US History. Total Cost: Approx. $100 Billion in damages O

Hurricane Katrina August 29 th, 2005 Costliest Disaster/One of the 5 deadliest Hurricanes in US History. Total Cost: Approx. $100 Billion in damages O Eddie Katz Hurricane Katrina August 29 th, 2005 Costliest Disaster/One of the 5 deadliest Hurricanes in US History. Total Cost: Approx. $100 Billion in damages Over 15 million affected by Katrina whether

More information

Docket No EU Review of electric utility hurricane preparedness and restoration actions.

Docket No EU Review of electric utility hurricane preparedness and restoration actions. Arthur J. Grant Lacerte, Jr. Vice President & General Counsel 1701 W. CARROLL STREET KISSIMMEE, FLORIDA 34742-3219 407/933-7777 FAX 407/933-2655 December 15, 2017 Wesley Taylor, Esquire Public Service

More information

The Role of the Louisiana Geographic Information Center in the Response to Hurricane Katrina

The Role of the Louisiana Geographic Information Center in the Response to Hurricane Katrina The Role of the Louisiana Geographic Information Center in the Response to Hurricane Katrina By: Jared Chapiewsky & Laura Brown For: URPL 969- GIS Applications in Response to Hurricane Katrina Date: March

More information

TXWARN Tabletop Exercise: Hurricane Helen

TXWARN Tabletop Exercise: Hurricane Helen TXWARN Tabletop Exercise: Hurricane Helen July 31, 2015 Administrative Details In-studio participants and remote participants Situation manual Evaluations Training hours 1 In Studio: Welcome and Introductions

More information

Undergrounding Assessment Phase 3 Report: Ex Ante Cost and Benefit Modeling

Undergrounding Assessment Phase 3 Report: Ex Ante Cost and Benefit Modeling Final Report Undergrounding Assessment Phase 3 Report: Ex Ante Cost and Benefit Modeling Prepared for: Prepared by: Contact: Florida Electric Utilities Quanta Technology Le Xu, PhD lxu@quanta-technology.com

More information

Page G Crow Wing County Multi-Hazard Mitigation Plan, 2017

Page G Crow Wing County Multi-Hazard Mitigation Plan, 2017 Table G - 10. s Identified by the () (From Crow Wing County Master Chart) 1 5 All- Hazards All- Hazards Work to ensure that all Crow Wing County residents are aware of and sign-up for the County s Emergency

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

GIS Geographical Information Systems. GIS Management

GIS Geographical Information Systems. GIS Management GIS Geographical Information Systems GIS Management Difficulties on establishing a GIS Funding GIS Determining Project Standards Data Gathering Map Development Recruiting GIS Professionals Educating Staff

More information

Randall W. Parkinson, Ph.D., P.G. Institute of Water and Environment Florida International University

Randall W. Parkinson, Ph.D., P.G. Institute of Water and Environment Florida International University An Update on Adaptation Action Activities Undertaken Since Completion of the City of Satellite Beach (FL) Vulnerability Assessment to Rising Seas (2010) Randall W. Parkinson, Ph.D., P.G. Institute of Water

More information

Strategic Planning of Tuvalu Meteorological Service

Strategic Planning of Tuvalu Meteorological Service WMO Regional Seminar on Enhancing Service Delivery by National Meteorological & Hydrological Services (NMHSs( NMHSs) ) in RA V Kuala Lumpur, Malaysia, 2 6 April 2007 Strategic Planning of Tuvalu Meteorological

More information

The Tampa Bay Catastrophic Plan Presentation to CFGIS Users Group FDOT District 5 Urban Offices - Orlando July 30, 2010

The Tampa Bay Catastrophic Plan Presentation to CFGIS Users Group FDOT District 5 Urban Offices - Orlando July 30, 2010 The Tampa Bay Catastrophic Plan Presentation to CFGIS Users Group FDOT District 5 Urban Offices - Orlando July 30, 2010 Brady Smith Senior Planner Tampa Bay Regional Planning Council Introduction Recent

More information

Monday, November 26, :30 a.m. EST

Monday, November 26, :30 a.m. EST Monday, November 26, 2018 8:30 a.m. EST Significant Activity Nov 23-26 Significant Events: CA Wildfires Tropical Activity: Atlantic No new tropical cyclones are expected during the next 5 days Eastern

More information

Complete Weather Intelligence for Public Safety from DTN

Complete Weather Intelligence for Public Safety from DTN Complete Weather Intelligence for Public Safety from DTN September 2017 White Paper www.dtn.com / 1.800.610.0777 From flooding to tornados to severe winter storms, the threats to public safety from weather-related

More information

Responses to Questions Related to the October 10, 2012, Partners in Business Meeting

Responses to Questions Related to the October 10, 2012, Partners in Business Meeting Responses to Questions Related to the October 10, 2012, Partners in Business Meeting Question 1: Regarding the update on the ITC-Entergy transaction, what is the expected impact to ITC Midwest rates and

More information

Daily Operations Briefing. Monday, October 9, :30 a.m. EDT

Daily Operations Briefing. Monday, October 9, :30 a.m. EDT Daily Operations Briefing Monday, October 9, 2017 8:30 a.m. EDT Significant Activity Oct 8-9 Significant Events: Response for Hurricane Maria Tropical Activity: Atlantic Tropical Depression Seventeen Eastern

More information

Using Remote Sensing Technologies to Improve Resilience

Using Remote Sensing Technologies to Improve Resilience 4 Using Remote Sensing Technologies to Improve Resilience Ronald T. Eguchi CEO, ImageCat, Inc. 6 years ago The world had just survived the Y2K bug with no major incidents Nations around the world commit

More information

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects Information Item Date: June 22, 2015 To: From: Subject: Mayor and City Council Debbie Lee, Communications and Public Affairs Officer Update on Southern California Edison s Capital Improvement Projects

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

Hurricane KATRINA Lessons Learned for Managing Risk

Hurricane KATRINA Lessons Learned for Managing Risk Hurricane KATRINA Lessons Learned for Managing Risk Steven L. Stockton, P.E. Deputy Director of Civil Works U.S. Army Corps of Engineers What Happened? Storm Path from August 23 to 31, 2005 Mon. August

More information

ALL TENANTS BRENNER REAL ESTATE GROUP

ALL TENANTS BRENNER REAL ESTATE GROUP TO: FROM: ALL TENANTS BRENNER REAL ESTATE GROUP RE: EMERGENCY NATURAL DISASTER PROCEDURES & PREP Brenner Real Estate Group, in an effort to better prepare it s properties and tenants, has compiled this

More information

Hurricanes. Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding.

Hurricanes. Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding. Hurricanes Hurricanes Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding. Hurricanes also known as: cyclone (Indian Ocean) or typhoon

More information

Natural Disasters. in Florida. Severe Thunderstorms

Natural Disasters. in Florida. Severe Thunderstorms Natural Disasters in Florida SC.6.E.7.7 Investigate how natural disasters have affected human life in Florida. Severe Thunderstorms While the typical afternoon thunderstorm in Florida may not appear to

More information

Steps to Reduce the Risk of Tornado Damage in Commercial Structures

Steps to Reduce the Risk of Tornado Damage in Commercial Structures Hanover Risk Solutions Steps to Reduce the Risk of Tornado Damage in Commercial Structures About 1,000 tornadoes occur each year in the United States, causing an average of $1.1 billion in property damage

More information

Friday, September 7, :30 a.m. EDT

Friday, September 7, :30 a.m. EDT Friday, September 7, 2018 8:30 a.m. EDT Tropical Depression Gordon - Final Situation (Advisory #20 as of 5:00 a.m. EDT) Located 30 miles S of Little Rock, AR Moving N at 5 mph; this motion expected to

More information

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE Floods Floods Introduce this topic by explaining that floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Display

More information

IAA CAT RESPONSE HURRICANE HARVEY. Sealy CAT Yard

IAA CAT RESPONSE HURRICANE HARVEY. Sealy CAT Yard IAA CAT RESPONSE HURRICANE HARVEY Sealy CAT Yard 17,600+ KAR Team Members EVERY CATASTROPHE IS DIFFERENT Every catastrophe is different. Timing, intensity, landfall location and population are just a few

More information