Operational Experience with J-PARC Injection and Extraction Systems

Size: px
Start display at page:

Download "Operational Experience with J-PARC Injection and Extraction Systems"

Transcription

1 Operational Experience with J-PARC Injection and Extraction Systems Pranab Kumar Saha Japan Proton Accelerator Research Complex (J-PARC) 46th ICFA Advanced Beam Dynamics Workshop ( HB2010 ) Morschach, Switzerland. ( 27 Sept. 1 Oct ) P.K. Saha HB2010 1

2 J-PARC (JAEA & KEK) Neutrino Beam Line to Kamioka Linac 181 MeV at present, 400 MeV with ACS [600 MeV SCL in phase2 for TEF] 3 GeV Rapid Cycling Synchrotron (RCS) 50 GeV Main Ring Synchrotron (MR) [30 GeV in 1 st phase] Materials & Life Science Facility (MLF) JFY 2006 / 2007 JFY 2008 JFY 2009 Hadron Experimental Hall P.K. Saha HB2010 2

3 J-PARC (JAEA & KEK) RCS Inj. Neutrino Beam Line to Kamioka Materials & Life Science Facility (MLF) JFY 2006 / 2007 JFY 2008 JFY 2009 Hadron Experimental Hall P.K. Saha HB2010 3

4 J-PARC today In operation P.K. Saha HB2010 4

5 Introduction and Outline J-PARC (Japan Proton Accelerator Research Complex) is a MW-class accelerator complex for multi-purpose research covering the Material and Life Science, Nuclear and Particle Physics and Nuclear Engineering as well. The entire facility already entered into an operational mode for users. Outline: 1. RCS injection and extraction systems. Recent Achievements and Issues. 2. MR injection and Extraction systems. Recent Achievements and Issues. P.K. Saha HB2010 5

6 B(T) 3-GeV RCS Design parameters Circumference m Superperiodicity 3 Harmonic number 2 No of bunch 2 Injection energy Extraction energy Repetition rate Particles per pulse Output beam power 181 MeV (400 MeV with ACS) 3 GeV 25 Hz 2.5e13-5e13 (8.3e13 with 1 MW) MW (1 MW with upgraded Linac) Operation mode Transition gamma 9.14 GeV Number of dipoles 24 quadrupoles sextupoles 60 (7 families) 18 (3 families) steerings 52 RF cavities 12 (11 at present) Time(msee) 6

7 3-GeV RCS H0 Dump (4kW) RCS Injection area 2 nd Foil 1 st Foil 3 rd Foil HSTM VSTM DUMP-Q DSEP2 DSEP1 PBH4 PBH3 QFM H injection beam ISEP1 PBV1 PBV2 ISEP2 PBH2 PBH1 SB1 QFL SB2 SB3 SB4 QDL 7

8 Recent achievements and Issues with RCS injection Recent achievements: Transverse painting injection: Realistic painting injection with good accuracy in both H&V planes are being performed. Keep controlling uncontrolled beam loss at the injection for a stable and high power operation. Foil issue concerning life time: Not yet any real problem! A single foil is using for nearly a year which includes several user runs with a beam power of 120 kw! Waste beam monitoring at the H0 (injection) dump Able to monitoring even a lower (0.4%) waste beam (0.4% of the present inj. beam (7.2kW) 30W ) at the H0 dump. Direct monitoring of the foil life time. P.K. Saha HB2010 8

9 Recent achievements and Issues with RCS injection Waste beam monitoring at the H0 (injection) dump Stripping efficiency ~ 99.6% Waste beam ~ 0.4% H0CT raw signal FFT Peak RF Frequency (0.94 MHz) Inj beam: 7.2kW 120kW@3GeV Off-line analysis Peak:15mA, Macro:500 s, Duty:560ns, 2b 18kW eqiv. (Full inj. beam) FFT RF Fundamental Freq. 940kHz Linear scale (0.38±0.05)% Good S/N ratio Raw signal P.K. Saha HB2010 9

10 Recent achievements and Issues with RCS injection Recent achievements: Transverse painting injection: Realistic painting injection with good accuracy in both H&V planes are being performed. Keep controlling uncontrolled beam loss at the injection for a stable and high power operation. Foil issue concerning life time: Not yet any real problem! A single foil is using for nearly a year which includes several user runs with a beam power of 120 kw! Waste beam monitoring at the H0 (injection) dump Able to monitoring even a lower (0.4%) waste beam (0.4% of the present inj. beam (7.2kW) 30W ) at the H0 dump. Direct monitoring of the foil life time. P.K. Saha HB

11 RCS injection: Recent issues Foil Scattering loss: -- Two uncontrolled hot points near the RCS injection area (1) H0 dump branch, (2) Near QFM (BPM2-1) (mostly at the ring side and only in the horizontal direction) Caused by the large angle multiple Coulomb scattering at the foil! P.K. Saha HB

12 Ring Collimator Foil scattering loss H0-Septum2 H0-Q QFM H0-Septum1 QDL PBH3 PBH4 QFL SB1 SB2 SB3 1 st Foil SB4 Typical residual radiation 120 kw user operation ~ 5 hours after beam shutdown 1200~1700 on contact ( 60~ cm apart ) P.K. Saha HB

13 y(mm) x(mm) Acceptance simulation Courtesy: H. Harada Horizontal -30mrad +30mrad Geant + SAD w/ 10 8 macro particles Two hot points only in the horizontal direction at the H0 branch and BPM locations are identified. FOIL Vertical QDL H0 PBH3 PBH4 branch BPM QFM x QFL ISEP1,2 1 st Foil QDL Shift bump orbit Painting 100 Painting 200 S PBH1,2 SB1 SB2 SB3 SB4 PBH3,4 Orbit moves towards outer side w/ larger painting area Loss reduced in the inner side! P.K. Saha HB

14 rate rate Comparison of beam loss between simulation and experiment ( Geant + SAD ) ( Integrated BLM signal ) (1) H0 branch (ring side) (2) Near QFM (ring side) 1/3m ode(sim ulation) 1/3m ode(m easurem ent) 1/3m ode(sim ulation) 1/3m ode(m easurem ent) DCm ode(sim ulation) DCm ode(m easurem ent) DCm ode(sim ulation) Dcm ode(m easurem ent) Consistent! Consistent! /3 mode: foil hit = DC mode w/ paint 150 : foil hit =9 BLM 0.4 gain was different 0.2 Bigger painting area Lower foil hit for 1/30.2 and DC mode Painting area paint ( mm mrad) Painting area paint( mm mrad) P.K. Saha HB

15 Solutions 1. Optimized foil size reduce foil hit rate ~ 1/2 Current foil size : 110(H)x40(V) Linac beam : ~7 x 7 mm 2 y: 10 mm 40 mm Already installed Check next run!! New foil size 110(H)x15(V) mm 2 x:7 mm Not sufficient!! Residual radiation with 300 kw operation might left about 1.5 msv/h! 2. Local shield Collimator is in consideration! Simulation shows that can localize the beam losses. To be installed in 2011 maintenance period! P.K. Saha HB

16 inner outer Example of localization Courtesy: H. Harada w/ collimator Collimator FOIL QDL H0 branch PBH3.4 BPM2-1 QFM P.K. Saha HB

17 RCS Extraction Kicker Magnets(1~8) Beam transport lines to MLF to MR RCS Septum Magnets(1~3) P.K. Saha HB

18 Progress (1) RCS Extraction: Recent progress and Issues 120 kw user operation for MLF and a max of 300 kw equivalent beam to the MR without any noticeable beam loss at the extraction region kw kw 20 kw Run#20 ~ Run#26 Run#27 ~ Run#34 P.K. Saha HB

19 Progress (1) RCS Extraction: Recent progress and Issues 120 kw user operation for MLF and a max of 300 kw equivalent beam to the MR without any noticeable beam loss at the extraction region. Progress (2) Extraction with 7 kickers (instead of 8 in normal operation) made possible 3500 without any problem 250 Can 3000 reduce the downtime for Kicker 120 kw thyratron exchange (3~4 hrs) Progress 2500 (3) Proper conditioning 2000 and ranging method and setting a suitable rise time for thyratrons 1500 of the kicker magnets. 100 Greatly 1000 increased the life time of thyratron Auto feedback 500 of the kicker 20 kw drift and monitoring thyratron life 50 time. Stabilize extraction 4 kw 0 orbit ( 1 st and 2 nd bunch) 0 Reduce unscheduled downtime for thyratron exchange. Run#20 ~ Run#26 Run#27 ~ Run#34 Altogether makes it possible for almost a negligible downtime related to RCS kicker failure!! P.K. Saha HB

20 Issues RCS Extraction: Recent progress and Issues No other serious issue except leakage field from the extraction DC septa and one bending magnet in the 3NBT line. Extra Shielding done but reduced only ~ 40% cause ~9 mm of COD done correction by steering magnets but in addition to the K0 component it includes also K1 and Skew-K1 components! Destroy Ring Superperiodicity, Excite non structure resonances, etc. Detail: H. Hotchi et. al. PRST-AB 12, (2009) no space for further shielding! Correction by 2~3 additional small quadrupoles are in consideration! P.K. Saha HB

21 Main Ring (MR): Injection and Extractions Bunch configuration in the MR Beam abort line Fast extraction FX Rf cavities Hadron Experimental Hall RCS BT collimators 3-50 BT Injection Ring collimators Neutrino beamline Circumference : m Repetition Rate: ~0.3 Hz Inj. Energy : 3 GeV Ext. Energy : 30 GeV No of Bunches : 8 (6 in day1) Hadron beamline Slow extraction SX Injection Septa MR Injection system MWPM Injection Kickers To Super-Kamiokande Dump Kickers 3 GeV beam dump (3kW) 3-50BT Collimators Bump magnets Dump Septa FWPM P.K. Saha HB

22 Main Ring (MR): Injection and Extractions Bunch configuration in the MR Beam abort line Fast extraction FX Rf cavities Hadron Experimental Hall RCS Neutrino beamline MR Fast Extraction (FX) system Kicker magnets ( Total: 5 ) Septum magnets ( Total: 8 ) BT collimators 3-50 BT Injection Ring collimators Circumference : m Repetition Rate: ~0.3 Hz Inj. Energy : 3 GeV Ext. Energy : 30 GeV No of Bunches : 8 (6 in day1) To Super-Kamiokande Hadron beamline Slow extraction SX P.K. Saha HB

23 Main Ring (MR): Injection and Extractions Bunch configuration in the MR Beam abort line Fast extraction FX Rf cavities Hadron Experimental Hall RCS Neutrino beamline Unstable region BT collimators 3-50 BT Injection Ring collimators Circumference : m Repetition Rate: ~0.3 Hz Inj. Energy : 3 GeV Ext. Energy : 30 GeV No of Bunches : 8 (6 in day1) Hadron beamline Slow extraction SX Stable region By exciting 3 rd order resonance To Super-Kamiokande MR Slow Extraction (SX) System P.K. Saha HB ESS (1~2) MS (1~3)

24 Intensity (x10 13 ppp) Loss count MR Injection and Extraction: Achievements A total of 6 bunches injection already been able to perform keeping the beam loss in limit. Typical injection loss: 100~200W < 450W collimator limit Injection Collimators SX 1.6 km BLM# FX Courtesy: T. Koseki 100 kw (7.5 e13 ppp!) FX for the NU user operation. (although done only for 3 min) A maximum of 2.6 KW SX for early commissioning of the HD experiment facility. (Although duty factor still very low: ~11% ) FX 100 KW Operation! DCCT Time (ms) DCCT SX 1.9 kw operation P.K. Saha HB

25 Injection MR Injection and Extraction Issues Leakage field from the injection septum II magnet Done extra shielding this summer hope to reduced ~10% Fast Extraction Slower rise time: 1.6 s < required for 8 bunch operation (<1.1 s) Heating problem in the ferrite core limits the NU operation to ~50KW Replacement just done. A faster rise time (<1 s) expectable and also hopefully no more heating problem up to 750 kw! 8 bunches operation would become available Slow Extraction system Low duty factor of only ~11% Several studies including ripple reduction in the ring magnets power supply, ripple reduction using RF noise, new algorithm for the spill feedback system are in progress. P.K. Saha HB

26 Summary Overall operational experience with J-PARC injection and extraction systems are satisfactory, although there remains several issues especially, for further higher power and log term operation. Foil scattering loss is one of the main issues at the RCS injection. Leakage field effect from the RCS DC extraction magnets is also one big issue to concern. New kicker system for the FX and improvement of SX duty factor are two main issues in the MR. Most of the issues are fairly understood and many measures have already been taken in this summer maintenance period. P.K. Saha HB

27 Questions and Answers General questions: 1. What is the most significant design challenge for this system? Ans: Stripping foil. Long survival at high temperature (>1800K). In general, time-consuming process rather than to say challenging in designing the injection and extraction systems and was the compromise of the following items: i) Aperture requirement along possible beam trajectories. ii) Field strength of septum magnets against saturations. iii) Shielding space for the leakage from the septum magnets. 2. Are the calculation/simulation tools available in the field adequate for this problem? Ans: Mostly adequate 3. Is the knowledge base in the field sufficient? Ans: In general yes but experimental studies especially, with high power are necessary. A couple of more questions: 1. Does the system perform as expected? Yes 2. Did the simulations/calculations performed during the design stage accurately predict the actual performance? Ans: Almost yes. P.K. Saha HB

28 Extra slides P.K. Saha HB

29 Beam Position (mm) RCS injection issues cont d What cause this? IGBT switching freq. 6kHz 8 multiple assemblies makes 48kHz ripple Effect: Resonance at 6.2 =48*2/470=0.204 How to cure? Prospect for 400MeV =96/614=0.156 Expecting smaller ripple amplitude Because, IGBT assemblies are doubled. Current control accuracy would be better Suppression by LPF Ripple of Shift bump Revolution freq.@181mev Affects RCS operating tune! Side band at 0.2 Revolution freq.@400mev Need to be compromised with falling time Cooling for LPF elements are necessary DC storage mode Stationary RF bucket~1sec SB 25Hz operation BPM turn-by-turn data SB off Time SB on P.K. Saha HB Frequency

30 Delay(ns) T(ns) RCS Kickers auto feedback result Kicker waveform KM2 KM6 Threshold Two thyratrons for each kickers Reference CH1 Measure CH1 Reference CH2 Measure CH2 Monitor T from the reference Kicker#8 Log Thyratron1 Thyratron2 ±30ns Thyratron1 Thyratron2 450ns Time ( s) Time ( s) Unstable Thyratron Exchanged P.K. Saha HB

31 Delay(ns) T(ns) Kicker#8 after thyratron 2 exchange Kicker down ±30ns No drift at all! P.K. Saha HB

32 Vertical steering magnets (IVSTM1-2) H from linac Vertical paint-bump magnets (PBV1-2) QDN BM QFN Pulsed Steering Magnet (PSTR1,2) 400 MeV injection ) Horizontal steering magnets (IHSTM1-2) BM QDX Injection septa (ISEP1-2) Horizontal paint-bump magnets (PBH1-2) QFL L3BT upstream (exclude steering) Vertical Paint Bump 1,2 (PBV1,2) Pulsed Steering 1,2 (PSTR1,2) Injection Septum 1,2 (ISEP1,2) H0 Dump line Dump Septum1,2 (DSEP1,2) Dump Quad Dump Steering (1V, 1H) RCS Injection System Dump-line septa (DSEP1-2) 2nd MWPM4 foil K-BPM MWPM3 MWPM5 3rd MWPM2 foil I-BPM P.K. Saha HB st foil Shift-bump magnets (SB1-4) QDL Vertical and horizontal steering magnets (DVSTM and DHSTM) Quadrupole magnet MWPM6 QFM Horizontal paint-bump magnets (PBH3-4) Ring Circulation orbit side MWPM7 Injection beam dump (4 kw) Collimator RCS adopted H - charge-exchange injection scheme. Horizontal Paint Bump 1~4 (PBH1~4) Shift bump 1~4 (SB1~4) QFL, QDL

33 How works the whole system J-PARC timing chart P.K. Saha HB

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC THO3AB3 Proceedings of HB, East-Lansing, MI, USA PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC P.K. Saha, H. Harada, H. Hotchi and T. Takayanagi J-PARC

More information

HIGH POWER BEAM OPERATION OF THE J-PARC RCS AND MR. Yoichi Sato for J-PARC Accelerator Group May 3 rd, 2018 THYGBF1, IPAC2018

HIGH POWER BEAM OPERATION OF THE J-PARC RCS AND MR. Yoichi Sato for J-PARC Accelerator Group May 3 rd, 2018 THYGBF1, IPAC2018 HIGH POWER BEAM OPERATION OF THE J-PARC RCS AND MR Yoichi Sato for J-PARC Accelerator Group May 3 rd, 2018 THYGBF1, IPAC2018 1 Contents Overview RCS 1 MW beam test Compatibility of both MLF and Main Ring

More information

Front end, linac upgrade, and commissioning of J-PARC. Y. Liu KEK/J-PARC, Japan

Front end, linac upgrade, and commissioning of J-PARC. Y. Liu KEK/J-PARC, Japan KEK Front end, linac upgrade, and commissioning of J-PARC j-parc Y. Liu KEK/J-PARC, Japan ICFA mini-workshop on Beam Commissioning for High Intensity Accelerators Dongguan, China, June 8-10, 2015 Outlines

More information

Technological Challenges for High-Intensity Proton Rings

Technological Challenges for High-Intensity Proton Rings Technological Challenges for High-Intensity Proton Rings Yoshishige Yamazaki 52 nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams Park Plaza Beijing West, September

More information

How J-PARC recovered from the big earthquake

How J-PARC recovered from the big earthquake How J-PARC recovered from the big earthquake KEK / Fujio Naito Outline About J-PARC The earthquake Damage on J-PARC Recovery plan Beam study results Summary J-PARC (Japan Proton Accelerator Research Complex)

More information

Design Status of the PEFP RCS

Design Status of the PEFP RCS Design Status of the PEFP RCS HB2010, Morschach, Switzerland J.H. Jang 1) Y.S. Cho 1), H.S. Kim 1), H.J. Kwon 1), Y.Y. Lee 2) 1) PEFP/KAERI, 2) BNL (www.komac.re.kr) Contents PEFP (proton engineering frontier

More information

The optimization for the conceptual design of a 300 MeV proton synchrotron *

The optimization for the conceptual design of a 300 MeV proton synchrotron * The optimization for the conceptual design of a 300 MeV proton synchrotron * Yu-Wen An ( 安宇文 ) 1,2), Hong-Fei Ji ( 纪红飞 ) 1,2), Sheng Wang ( 王生 ) 1,2), Liang-Sheng Huang ( 黄良生 ) 1,2;1) 1 Institute of High

More information

Beam monitors in J-PARC

Beam monitors in J-PARC Beam monitors in J-PARC KEK, Accelerator division H. Kuboki Introduction: Beam Monitors in J-PARC BPM system in J-PARC Main Ring BPM gain calibration (Beam Based Gain Calibration (BBGC)) T. Toyama, S.

More information

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS 1.5-GeV FFAG Accelerator as Injector to the BNL-AGS Alessandro G. Ruggiero M. Blaskiewicz,, T. Roser, D. Trbojevic,, N. Tsoupas,, W. Zhang Oral Contribution to EPAC 04. July 5-9, 5 2004 Present BNL - AGS

More information

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE N. Tani#, T. Morishita, S. Meigo, M. Harada, H. Stefanus, JAEA/J-PARC, Tokai, Japan M. Shirakata, T. Ishii, Y. Fujii, Y. Shirakabe,

More information

DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY

DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY FFAG11, Sept.13-17, 2011, Oxford DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY N.Ikeda, Y.Yonemura, Y.Mori* Kyusyu University *invited FFAG11, Sept.13-17, 2011, Oxford DEVELOPMENTS OF FFAG IN JAPAN Osaka,RCNP

More information

The TESLA Dogbone Damping Ring

The TESLA Dogbone Damping Ring The TESLA Dogbone Damping Ring Winfried Decking for the TESLA Collaboration April 6 th 2004 Outline The Dogbone Issues: Kicker Design Dynamic Aperture Emittance Dilution due to Stray-Fields Collective

More information

STATUS OF THE J-PARC FACILITY

STATUS OF THE J-PARC FACILITY STATUS OF THE J-PARC FACILITY Shoji Nagamiya, J-PARC Center, 2-4 Shirakata Shirane, Tokai-Mura, Ibaraki 319-1195, Japan Abstract J-PARC (Japan Proton Accelerator Research Complex) consists of three accelerators

More information

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland Michael Böge 1 SLS Team at PSI Michael Böge 2 Layout of the SLS Linac, Transferlines Booster Storage Ring (SR) Beamlines and Insertion Devices

More information

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007 LIS section meeting PS2 design status Y. Papaphilippou April 30 th, 2007 Upgrade of the injector chain (R. Garoby, PAF) Proton flux / Beam power 50 MeV 160 MeV Linac2 Linac4 1.4 GeV ~ 5 GeV PSB SPL RCPSB

More information

Longitudinal Top-up Injection for Small Aperture Storage Rings

Longitudinal Top-up Injection for Small Aperture Storage Rings Longitudinal Top-up Injection for Small Aperture Storage Rings M. Aiba, M. Böge, Á. Saá Hernández, F. Marcellini and A. Streun Paul Scherrer Institut Introduction Lower and lower horizontal emittances

More information

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Chin-Cheng Kuo On behalf of the TPS Lattice Design Team Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring Workshop

More information

On-axis injection into small dynamic aperture

On-axis injection into small dynamic aperture On-axis injection into small dynamic aperture L. Emery Accelerator Systems Division Argonne National Laboratory Future Light Source Workshop 2010 Tuesday March 2nd, 2010 On-Axis (Swap-Out) injection for

More information

New and accelerator research facility, using MW-class high power proton beams at both 3 GeV and 30 GeV. J-PARC Tokai KEK Tsukuba LINAC 400 MeV Rapid Cycle Synchrotron Energy : 3 GeV Repetition : 25 Hz

More information

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002 Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002 Linac Booster o 4.5-4.8e12 ppp at 0.5 Hz o Space charge (30% loss in the first 5 ms) o Main magnet field quality

More information

NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING

NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING M. J. Shirakata, S. Igarashi, K. Ishii, Y. Sato, and J. Takano J-PARC/KEK, Tokai/Tsukuba, Ibaraki, Japan Abstract The beam collimation system of J-PARC

More information

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education Introduction Outline CESR Overview CESR Layout Injector Wigglers

More information

Space Charge Studies on the ISIS Ring

Space Charge Studies on the ISIS Ring Space Charge Studies on the ISIS Ring C M Warsop, D J Adams, B Jones, S J Payne, B G Pine, H V Smith, C C Wilcox, R E Williamson, ISIS, RAL, UK with contributions from S Machida, C R Prior, G H Rees &

More information

Welcome to J-PARC NBI 2017

Welcome to J-PARC NBI 2017 The 10th International Workshop on Neutrino Beams and Instrumentation (NBI 2017), IVIL, Tokai-mura, 18-22 September 2017 Welcome to J-PARC NBI 2017 Tadashi Koseki J-PARC Center, KEK &JAEA Hadron accelerators

More information

Advanced Storage Photon Ring Source Upgrade Project:

Advanced Storage Photon Ring Source Upgrade Project: Advanced Storage Photon Ring Source Upgrade Project: The Shielding World s for Leading the Hard X-ray Light Source Advanced Photon Source - Upgrade Bradley J. Micklich Radiation Physicist Argonne National

More information

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se 3.2.7 Booster Injection and Extraction 3.2.7.1 Overview The Booster has two magnet systems for injection: Septum Si Kicker Ki The Booster has three magnet systems for extraction: Kicker Ke, comprising

More information

Preliminary design study of JUICE. Joint Universities International Circular Electronsynchrotron

Preliminary design study of JUICE. Joint Universities International Circular Electronsynchrotron Preliminary design study of JUICE Joint Universities International Circular Electronsynchrotron Goal Make a 3th generation Synchrotron Radiation Lightsource at 3 GeV Goal Make a 3th generation Synchrotron

More information

Sunday morning: Beam Dynamics Issues. Session highlights and outstanding questions. M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University

Sunday morning: Beam Dynamics Issues. Session highlights and outstanding questions. M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University Sunday morning: Beam Dynamics Issues Session highlights and outstanding questions M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University Summary -Electron cloud induced instabilities observed for

More information

Status of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL

Status of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL Status of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL Outline 2 Why we doing it? What is Coherent electron Cooling System description Subsystem performance Plan for Run 18 e-n Luminosity

More information

Turn-by-Turn Beam Position Measurements at ANKA with LIBERA ELECTRON

Turn-by-Turn Beam Position Measurements at ANKA with LIBERA ELECTRON Turn-by-Turn Beam Position Measurements at ANKA with LIBERA ELECTRON E.Huttel, I.Birkel, A.S.Müller, P.Wesolowski About ANKA Test by Frequency Generator Experiences in the Booster Experiences in the Storage

More information

Performance Studies of the Vibration Wire Monitor on the Test Stand with Low Energy Electron Beam

Performance Studies of the Vibration Wire Monitor on the Test Stand with Low Energy Electron Beam Proc. 2nd Int. Symp. Science at J-PARC Unlocking the Mysteries of Life, Matter and the Universe http://dx.doi.org/10.7566/jpscp.8.012024 Performance Studies of the Vibration Wire Monitor on the Test Stand

More information

Status of the ESR And Future Options

Status of the ESR And Future Options Status of the ESR And Future Options M. Steck for the Storage Ring Division (C. Dimopoulou, A. Dolinskii, S. Litvinov, F. Nolden, P. Petri, U. Popp, I. Schurig) Outline 1) New Old ESR 2) Slow (Resonant)

More information

Accelerator Design and Construction Progress of TPS Project

Accelerator Design and Construction Progress of TPS Project Accelerator Design and Construction Progress of TPS Project Taiwan Light Source (TLS), a 120-m storage ring originally designed for 1.3 GeV, was commissioned and opened to users in 1993. The energy of

More information

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns)

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns) K K DA ΦNE TECHNICAL NOTE INFN - LNF, Accelerator Division Frascati, 11/01/2017 Note: G-73 PRELIMINARY CONSIDERATIONS ON THE USE OF DAΦNE POSITRON RING AS A PULSE STRETCHER FOR THE DAΦNE LINAC S. Guiducci

More information

Lattice Design of 2-loop Compact ERL. High Energy Accelerator Research Organization, KEK Miho Shimada and Yukinori Kobayashi

Lattice Design of 2-loop Compact ERL. High Energy Accelerator Research Organization, KEK Miho Shimada and Yukinori Kobayashi Lattice Design of 2-loop Compact ERL High Energy Accelerator Research Organization, KEK Miho Shimada and Yukinori Kobayashi Introduction Wepromote the construction of the compact Energy Recovery Linac(cERL)

More information

Application of Carbon Nanotube Wire for Beam Profile Measurement of Negative Hydrogen Ion Beam

Application of Carbon Nanotube Wire for Beam Profile Measurement of Negative Hydrogen Ion Beam FRXGBD3 Application of Carbon Nanotube Wire for Beam Profile Measurement of Negative Hydrogen Ion Beam 4 th, May, 2018 Akihiko Miura, J-PARC, JAEA Tomoaki Miyao, J-PARC, KEK Katsuhiro Moriya, J-PARC, JAEA

More information

A Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:

A Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems: A Project to convert TLS Booster to hadron accelerator 1. Basic design TLS is made of a 50 MeV electron linac, a booster from 50 MeV to 1.5 GeV, and a storage ring. The TLS storage ring is currently operating

More information

Accelerator Physics. Accelerator Development

Accelerator Physics. Accelerator Development Accelerator Physics The Taiwan Light Source (TLS) is the first large accelerator project in Taiwan. The goal was to build a high performance accelerator which provides a powerful and versatile light source

More information

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses P. Spiller, K. Blasche, B. Franczak, J. Stadlmann, and C. Omet GSI Darmstadt, D-64291 Darmstadt, Germany Abstract:

More information

Proposal to convert TLS Booster for hadron accelerator

Proposal to convert TLS Booster for hadron accelerator Proposal to convert TLS Booster for hadron accelerator S.Y. Lee -- Department of Physics IU, Bloomington, IN -- NSRRC Basic design TLS is made of a 50 MeV electron linac, a booster from 50 MeV to 1.5 GeV,

More information

Nick Walker (for WG3) Snowmass, 2001

Nick Walker (for WG3) Snowmass, 2001 Nick Walker (for WG) Snowmass, 2 General Layout Complete Lattice Final Telescope Beam switchyard Collimation System - basic concept - spoiler protection (MES) - halo tracking (dynamic aperture) Hardware

More information

The CIS project and the design of other low energy proton synchrotrons

The CIS project and the design of other low energy proton synchrotrons The CIS project and the design of other low energy proton synchrotrons 1. Introduction 2. The CIS project 3. Possible CMS 4. Conclusion S.Y. Lee IU Ref. X. Kang, Ph.D. thesis, Indiana University (1998).

More information

Multi-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications

Multi-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications Multi-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications N.N.Alexeev, D.G.Koshkarev and B.Yu.Sharkov Institute for Theoretical and Experimental Physics, B.Cheremushk.

More information

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi HKUST Jockey Club Institute for Advanced Study CEPC Linac Injector HEP218 22 Jan, 218 Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi Institute of High Energy

More information

Proposta per l'uso di DAFNE come allungatore d'impulso per il fascio di positroni del Linac

Proposta per l'uso di DAFNE come allungatore d'impulso per il fascio di positroni del Linac Proposta per l'uso di DAFNE come allungatore d'impulso per il fascio di positroni del Linac S. Guiducci 29 novembre 2017 11/29/17 1 The PADME experiment at BTF The PADME experiment proposes a search for

More information

Lattice Design and Performance for PEP-X Light Source

Lattice Design and Performance for PEP-X Light Source Lattice Design and Performance for PEP-X Light Source Yuri Nosochkov SLAC National Accelerator Laboratory With contributions by M-H. Wang, Y. Cai, X. Huang, K. Bane 48th ICFA Advanced Beam Dynamics Workshop

More information

Low energy electron storage ring with tunable compaction factor

Low energy electron storage ring with tunable compaction factor REVIEW OF SCIENTIFIC INSTRUMENTS 78, 075107 2007 Low energy electron storage ring with tunable compaction factor S. Y. Lee, J. Kolski, Z. Liu, X. Pang, C. Park, W. Tam, and F. Wang Department of Physics,

More information

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU J. W. Xia, Y. F. Wang, Y. N. Rao, Y. J. Yuan, M. T. Song, W. Z. Zhang, P. Yuan, W. Gu, X. T. Yang, X. D. Yang, S. L. Liu, H.W.Zhao, J.Y.Tang, W. L. Zhan, B.

More information

Compressor Lattice Design for SPL Beam

Compressor Lattice Design for SPL Beam EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN A&B DIVISION AB-Note-27-34 BI CERN-NUFACT-Note-153 Compressor Lattice Design for SPL Beam M. Aiba Abstract A compressor ring providing very short proton

More information

RF BARRIER CAVITY OPTION FOR THE SNS RING BEAM POWER UPGRADE

RF BARRIER CAVITY OPTION FOR THE SNS RING BEAM POWER UPGRADE RF BARRIER CAVITY OPTION FOR THE SNS RING BEAM POWER UPGRADE J.A. Holmes, S.M. Cousineau, V.V. Danilov, and A.P. Shishlo, SNS, ORNL, Oak Ridge, TN 37830, USA Abstract RF barrier cavities present an attractive

More information

Partikel terapi accelerator (Siemens)

Partikel terapi accelerator (Siemens) Partikel terapi accelerator (Siemens) 1 Dose and intensity Range of Proton energy: Carbon energy: 30 cm (50-)250 MeV (100-)430 MeV/u=5GeV Dose of 2 Gy (=J/kg) in 2(10) l in 2 min. Particle intensity 6

More information

Reactor & Spallation Neutron Sources

Reactor & Spallation Neutron Sources Reactor & Spallation Neutron Sources Oxford School of Neutron Scattering Oxford, 2011-09-06 Ken Andersen ESS Instruments Division ISIS ILL Time evolution: Major neutron sources ILL BENSC (D) SINQ (CH)

More information

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI S. Srichan #, A. Kwankasem, S. Boonsuya, B. Boonwanna, V. Sooksrimuang, P. Klysubun Synchrotron Light Research Institute, 111 University Ave, Muang District,

More information

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements A. Shemyakin 1, M. Alvarez 1, R. Andrews 1, J.-P. Carneiro 1, A. Chen 1, R. D Arcy 2, B. Hanna 1, L. Prost 1, V.

More information

BEAM LOSS DUE TO FOIL SCATTERING IN THE SNS ACCUMULATOR RING*

BEAM LOSS DUE TO FOIL SCATTERING IN THE SNS ACCUMULATOR RING* BEAM LOSS DUE TO FOIL SCATTERING IN THE SNS ACCUMULATOR RING* J.A. Holmes and M.A. Plum, ORNL, Oak Ridge, TN, 37831, USA* Abstract In order to better understand the contribution of from the primary stripper

More information

Introductory slides: Ferrite. Ferrite

Introductory slides: Ferrite. Ferrite Injection, extraction and transfer Kicker magnet w Pulsed magnet with very fast rise time (00 ns few µs) Introductory slides: Ferrite Kickers, septa and normalised phase-space Injection methods Single-turn

More information

China high-intensity accelerator technology developments for Neutron Sources & ADS

China high-intensity accelerator technology developments for Neutron Sources & ADS AT/INT-04 China high-intensity accelerator technology developments for Neutron Sources & ADS J. Wei, Tsinghua University, China S.N. Fu, IHEP, CAS, China International Topical Meeting on Nuclear Research

More information

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX J-PARC JAPAN PROTON ACCELERATOR RESEARCH COMPLEX Facilities at J-PARC The J PARC stands for Japan Proton Accelerator Research Complex and it is a new and exciting accelerator research facility in Japan.

More information

SSA Measurements with Primary Beam at J-PARC

SSA Measurements with Primary Beam at J-PARC SSA Measurements with Primary Beam at J-PARC Joint UNM/RBRC Workshop on Orbital Angular Momentum in Albuquerque February 25 th, 2006 Yuji Goto (RIKEN/RBRC) February 25, 2006 Yuji Goto (RIKEN/RBRC) 2 Introduction

More information

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev. Compressor Ring Valeri Lebedev Fermilab Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions Muon Collider Workshop Newport News, VA Dec. 8-1, 8 Where do we go?

More information

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team Diagnostics at the MAX IV 3 GeV storage ring during commissioning PPT-mall 2 Åke Andersson On behalf of the MAX IV team IBIC Med 2016, linje Barcelona Outline MAX IV facility overview Linac injector mode

More information

Beam loss background and collimator design in CEPC double ring scheme

Beam loss background and collimator design in CEPC double ring scheme Beam loss background and collimator design in CEPC double ring scheme Sha Bai 9 th International Particle Accelerator Conference (IPAC 18), Vancouver, Canada, Apr 29-May 4, 2018. 2018-05-01 Outline Introduction

More information

Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design

Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 10, 054701 (2007) Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design E. Keil* CERN, Geneva,

More information

New injection scheme using a pulsed quadrupole magnet in electron storage rings

New injection scheme using a pulsed quadrupole magnet in electron storage rings PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 1, 12351 (27) New injection scheme using a pulsed quadrupole magnet in electron storage rings Kentaro Harada,* Yukinori Kobayashi, Tsukasa Miyajima,

More information

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21 Transverse dynamics Selected topics Erik Adli, University of Oslo, August 2016, Erik.Adli@fys.uio.no, v2.21 Dispersion So far, we have studied particles with reference momentum p = p 0. A dipole field

More information

Overview of Acceleration

Overview of Acceleration Overview of Acceleration R B Palmer, Scott Berg, Steve Kahn (presented by Steve Kahn) Nufact-04 RF Frequency Acc types and System Studies Linacs RLA s FFAG s Injection/Extraction US Study 2a acceleration

More information

Tools of Particle Physics I Accelerators

Tools of Particle Physics I Accelerators Tools of Particle Physics I Accelerators W.S. Graves July, 2011 MIT W.S. Graves July, 2011 1.Introduction to Accelerator Physics 2.Three Big Machines Large Hadron Collider (LHC) International Linear Collider

More information

Spin Feedback System at COSY

Spin Feedback System at COSY Spin Feedback System at COSY 21.7.2016 Nils Hempelmann Outline Electric Dipole Moments Spin Manipulation Feedback System Validation Using Vertical Spin Build-Up Wien Filter Method 21.7.2016 Nils Hempelmann

More information

BEAM DYNAMICS ISSUES IN THE SNS LINAC

BEAM DYNAMICS ISSUES IN THE SNS LINAC BEAM DYNAMICS ISSUES IN THE SNS LINAC A. Shishlo # on behalf of the SNS Accelerator Group, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract A review of the Spallation Neutron Source (SNS) linac beam dynamics

More information

Commissioning of the SNS Beam Instrumentation

Commissioning of the SNS Beam Instrumentation Commissioning of the SNS Beam Instrumentation Commissioning of the SNS Beam Instrumentation Tom Shea for the SNS Diagnostics Team Oak Ridge National Laboratory (ORNL), Oak Ridge, TN, USA The Spallation

More information

Conceptual design of an accumulator ring for the Diamond II upgrade

Conceptual design of an accumulator ring for the Diamond II upgrade Journal of Physics: Conference Series PAPER OPEN ACCESS Conceptual design of an accumulator ring for the Diamond II upgrade To cite this article: I P S Martin and R Bartolini 218 J. Phys.: Conf. Ser. 167

More information

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams Peter Spiller HB2008 26.8.2008 GSI/FAIR Accelerator Facility Primary Beam Intensity x 100-1000 Secondary Beam Intensity

More information

Status of KEK-E391a and Future Prospects on K L π 0 νν at KEK. GeiYoub Lim IPNS, KEK

Status of KEK-E391a and Future Prospects on K L π 0 νν at KEK. GeiYoub Lim IPNS, KEK Status of KEK-E391a and Future Prospects on K L π 0 νν at KEK GeiYoub Lim IPNS, KEK E391a Collaboration Joint Institute for Nuclear Research (Dubna), Russia High Energy Accelerator Research Organization,

More information

Beam Diagnostics for Low Energy Proton and H - Accelerators. Vic Scarpine Fermilab 2012 BIW April 16-19, 2012

Beam Diagnostics for Low Energy Proton and H - Accelerators. Vic Scarpine Fermilab 2012 BIW April 16-19, 2012 Beam Diagnostics for Low Energy Proton and H - Accelerators Vic Scarpine Fermilab 2012 BIW April 16-19, 2012 Outline High-power proton/h- accelerator future Generic accelerator front-ends Typical diagnostic

More information

Diagnostics Needs for Energy Recovery Linacs

Diagnostics Needs for Energy Recovery Linacs Diagnostics Needs for Energy Recovery Linacs Georg H. Hoffstaetter Cornell Laboratory for Accelerator-based Sciences and Education & Physics Department Cornell University, Ithaca New York 14853-2501 gh77@cornell.edu

More information

Beam Diagnostics. Measuring Complex Accelerator Parameters Uli Raich CERN BE-BI

Beam Diagnostics. Measuring Complex Accelerator Parameters Uli Raich CERN BE-BI Beam Diagnostics Measuring Complex Accelerator Parameters Uli Raich CERN BE-BI CERN Accelerator School Prague, 2014 Contents Some examples of measurements done with the instruments explained during the

More information

Review of ISOL-type Radioactive Beam Facilities

Review of ISOL-type Radioactive Beam Facilities Review of ISOL-type Radioactive Beam Facilities, CERN Map of the nuclear landscape Outline The ISOL technique History and Geography Isotope Separation On-Line Existing facilities First generation facilities

More information

2.6 Electron transport lines

2.6 Electron transport lines 2.6 Electron transport lines 2.6 Electron transport lines Overview The electron transport lines consist of all of the electron beamline segments that are neither part of the Linacs nor part of the injector.

More information

STATUS OF BEPC AND PLAN OF BEPCII

STATUS OF BEPC AND PLAN OF BEPCII STATUS OF BEPC AND PLAN OF BEPCII C. Zhang for BEPCII Team Institute of High Energy Physics, P.O.Box 918, Beijing 139, China Abstract The status of the Beijing Electron-Positron Collider (BEPC) and plans

More information

Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC )

Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC ) Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC ) Hayanori TAKEI, Koichiro HIRANO, Kazuyoshi TSUTSUMI 1) and Shin-ichiro MEIGO J-PARC Center, Japan Atomic Energy Agency,

More information

ELECTRON COOLING EXPERIMENTS IN CSR*

ELECTRON COOLING EXPERIMENTS IN CSR* ELECTRON COOLING EXPERIMENTS IN CSR* Xiaodong Yang #, Guohong Li, Jie Li, Xiaoming Ma, Lijun Mao, Ruishi Mao, Tailai Yan, Jiancheng Yang, Youjin Yuan, IMP, Lanzhou, 730000, China Vasily V. Parkhomchuk,

More information

ILC Beam Dynamics Studies Using PLACET

ILC Beam Dynamics Studies Using PLACET ILC Beam Dynamics Studies Using PLACET Andrea Latina (CERN) July 11, 2007 John Adams Institute for Accelerator Science - Oxford (UK) Introduction Simulations Results Conclusions and Outlook PLACET Physical

More information

The FAIR Accelerator Facility

The FAIR Accelerator Facility The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC SIS100 HESR pbar target SuperFRS goals: higher intensity (low charge states) higher energy (high charge states) production of

More information

3.2.2 Magnets. The properties of the quadrupoles, sextupoles and correctors are listed in tables t322_b,_c and _d.

3.2.2 Magnets. The properties of the quadrupoles, sextupoles and correctors are listed in tables t322_b,_c and _d. 3.2.2 Magnets The characteristics for the two types of combined function magnets,bd and BF, are listed in table t322_a. Their cross-sections are shown, together with the vacuum chamber, in Figure f322_a.

More information

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics ThomX Machine Advisory Committee (LAL Orsay, March 20-21 2017) Ring Beam Dynamics A. Loulergue, M. Biagini, C. Bruni, I. Chaikovska I. Debrot, N. Delerue, A. Gamelin, H. Guler, J. Zang Programme Investissements

More information

+ EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN PS DIVISION. The CERN Antiproton Decelerator (AD) Operation, Progress and Plans for the Future

+ EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN PS DIVISION. The CERN Antiproton Decelerator (AD) Operation, Progress and Plans for the Future + EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN PS DIVISION PS/OP/Note/2002-040 The CERN Antiproton Decelerator (AD) Operation, Progress and Plans for the Future P.Belochitskii, T.Eriksson (For the AD

More information

Accelerator development

Accelerator development Future Colliders Stewart T. Boogert John Adams Institute at Royal Holloway Office : Wilson Building (RHUL) W251 Email : sboogert@pp.rhul.ac.uk Telephone : 01784 414062 Lectures aims High energy physics

More information

LHC Status and CERN s future plans. Lyn Evans

LHC Status and CERN s future plans. Lyn Evans LHC Status and CERN s future plans Lyn Evans Machine layout L. Evans EDMS document no. 859415 2 Cryodipole overview 1250 1000 Equivalent dipoles 750 500 250 0 01-Jan-01 01-Jan-02 01-Jan-03 01-Jan-04 01-Jan-05

More information

Advanced Design of the FAIR Storage Ring Complex

Advanced Design of the FAIR Storage Ring Complex Advanced Design of the FAIR Storage Ring Complex M. Steck for the FAIR Technical Division and the Accelerator Division of GSI The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC

More information

ILC Damping Ring Alternative Lattice Design (Modified FODO)

ILC Damping Ring Alternative Lattice Design (Modified FODO) ILC Damping Ring Alternative Lattice Design (Modified FODO) Yi-Peng Sun 1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics, CAS, China 2 State Key Laboratory of Nuclear Physics

More information

Lorentz Laser-Assisted Stripping (Lolas) for H - /H 0 Injection into Proton Drivers

Lorentz Laser-Assisted Stripping (Lolas) for H - /H 0 Injection into Proton Drivers CERN NuFACT Note 115 INFN-LNL Lolas Note 01/02 Legnaro, May 2002 Lorentz Laser-Assisted Stripping (Lolas) for H - /H 0 Injection into Proton Drivers Ugo Gastaldi INFN Laboratori Nazionali di Legnaro Via

More information

MEASURING AND CONTROLLING ENERGY SPREAD IN CEBAF

MEASURING AND CONTROLLING ENERGY SPREAD IN CEBAF MEASURING AND CONTROLLING ENERGY SPREAD IN CEBAF Abstract G. A. Krafft, J.-C. Denard, R. W. Dickson, R. Kazimi, V. A. Lebedev, and M. G. Tiefenback TJNAF, Newport News, VA2366, USA As compared to electron

More information

Low slice emittance preservation during bunch compression

Low slice emittance preservation during bunch compression Low slice emittance preservation during bunch compression S. Bettoni M. Aiba, B. Beutner, M. Pedrozzi, E. Prat, S. Reiche, T. Schietinger Outline. Introduction. Experimental studies a. Measurement procedure

More information

INJECTION AND DUMP CONSIDERATIONS FOR A 16.5 TEV HE-LHC

INJECTION AND DUMP CONSIDERATIONS FOR A 16.5 TEV HE-LHC INJECTION AND DUMP CONSIDERATIONS FOR A 16.5 TEV HE-LHC B. Goddard, M. Barnes, W. Bartmann, J. Borburgh, C. Bracco, L. Ducimetière, V. Kain, M. Meddahi, V. Mertens, V. Senaj, J. Uythoven, CERN, Geneva,

More information

LOLA: Past, present and future operation

LOLA: Past, present and future operation LOLA: Past, present and future operation FLASH Seminar 1/2/29 Christopher Gerth, DESY 8/5/29 FLASH Seminar Christopher Gerth 1 Outline Past Present Future 8/5/29 FLASH Seminar Christopher Gerth 2 Past

More information

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons) Statusreport Status of the GSI accelerators for FRS operation Jens Stadlmann (FAIR Synchrotrons) Overview Intensities reached and "candidates" for experiments. Uranium? Upgrade program New developments:

More information

Accelerators. There are some accelerators around the world Nearly all are for industrial (20 000) or clinical use (10 000)

Accelerators. There are some accelerators around the world Nearly all are for industrial (20 000) or clinical use (10 000) Accelerators There are some 30 000 accelerators around the world Nearly all are for industrial (20 000) or clinical use (10 000) Scientific research community (~ 100) Synchrotron light sources Ion beam

More information

Accelerator Complex U70 of IHEP-Protvino: Status and Prospects for Upgrade

Accelerator Complex U70 of IHEP-Protvino: Status and Prospects for Upgrade NRC Kurchatov Institute INSTITUTE FOR HIGH ENERGY PHYSICS () 1, Nauki Sq., Protvino, Moscow Region, 142281, Russia Accelerator Complex U70 of -Protvino: Status and Prospects for Upgrade Sergey IVANOV 16

More information

Optics considerations for

Optics considerations for Optics considerations for ERL x-ray x sources Georg H. Hoffstaetter* Physics Department Cornell University Ithaca / NY Georg.Hoffstaetter@cornell.edu 1. Overview of Parameters 2. Critical Topics 3. Phase

More information

Particle physics experiments

Particle physics experiments Particle physics experiments Particle physics experiments: collide particles to produce new particles reveal their internal structure and laws of their interactions by observing regularities, measuring

More information