LHC Status and CERN s future plans. Lyn Evans
|
|
- Stuart Miller
- 6 years ago
- Views:
Transcription
1 LHC Status and CERN s future plans Lyn Evans
2 Machine layout L. Evans EDMS document no
3 Cryodipole overview Equivalent dipoles Jan Jan Jan Jan Jan Jan Jan Jan-08 Cold masses delivered Cryodipoles cold tests passed Cryodipoles prepared for installation Cryodipoles assembled Cryodipoles assigned to position in ring Cryodipoles installed L. Evans EDMS document no
4 Short Straight Section overview Equivalent SSS Jan Jan Jan Jan Jan Jan Jan Jan-08 Cold masses delivered SSS assembled SSS cold test passed SSS assigned to position in ring SSS prepared for installation SSS installed L. Evans EDMS document no
5 Bending strength of dipoles Cold mass Firm 1 Firm 2 40 Int transf func (Tm/kA) Firm 3 upper limit for single magnet (3 sigma) Units lower limit for single magnet (3 sigma) Magnet progressive number AT-MAS -40 L. Evans EDMS document no
6 Completion of magnet cryostating & tests, 1 March 2007 Cryostating Cold tests 425 FTE.years 640 FTE.years L. Evans EDMS document no
7 Descent of the last magnet, 26 April km underground at 2 km/h! L. Evans EDMS document no
8 Dipole-dipole interconnect L. Evans EDMS document no
9 Dipole-dipole interconnect: electrical splices L. Evans EDMS document no
10 Magnet interconnections 100% General Advancement of Interconnects per Sector 16-July-2007 Close W & Jumper 90% Weld Package I & VAC tests 80% N-Line Package 70% 60% 50% Cryo-Lines Welding & Testing Electrical Interconnects & QA per halfcell IC preparation 40% 30% 20% 10% 0% sector 1-2 sector 2-3 sector 3-4 sector 4-5 sector 5-6 sector 6-7 sector 7-8 sector 8-1 L. Evans EDMS document no
11 Global pressure test of Sector 4-5, 12 May 2007 L. Evans EDMS document no
12 Flushing machine - Wk 2 January 07 Before After Kapton bits Metal strips 50 h + 8 L of Water L. Evans EDMS document no
13 Q1.R8 L. Evans EDMS document no
14 Cooldown of Sector 7-8 From RT to 80K precooling with LN tons of LN2 (64 trucks of 20 tons). Three weeks for the first sector. From 80K to 4.2K. Cooldown with refrigerator. Three weeks for the first sector tons of material to be cooled. From 4.2K to 1.9K. Cold compressors at 15 mbar. Four days for the first sector. L. Evans EDMS document no
15 Large helium refrigerator for cooling down to 4.5 K K to 75 K K to 20 K 41 g/s liquefaction 600 kw precooling to 80 K with LN2 (up to ~5 tons/h) L. Evans EDMS document no
16 First cool-down of Sector 7-8 LHC sector 78 - First cooldown Temperature (K) Return temperature Magnet temp. Supply temperature Active cooling in all thermal shields and cryogenic tranfer lines. All magnets isolated. Thermal shield temp. Active cooling in all thermal shields and cryogenic tranfer lines. All magnets isolated /01/07 18:00 21/01/07 18:00 27/01/07 18:00 Re-start of active cooling for cryogenic transfer lines 02/02/07 18:00 08/02/07 18:00 Re-start of active cooling for magnets 14/02/07 18:00 20/02/07 18:00 26/02/07 18:00 04/03/07 18:00 Time (UTC) 10/03/07 18:00 Supply temperature Return temperature Magnet temperature (average over sector) Thermal shields temp. (average over sector) L. Evans EDMS document no
17 Hydrodynamic cold compressors for 1.8 K refrigeration 120 g/s GHe from 15 mbar with 4 stages L. Evans EDMS document no
18 First cool-down of Sector 7-8 Magnet temperature profile along Sector 7-8 during final cool down to He II L. Evans EDMS document no
19 Sector 7-8 Cooldown L. Evans EDMS document no
20 First powering of main quadrupoles L. Evans EDMS document no
21 Cool-Down until Saturday Cool-Down Speed Avg. Cold Mass Temperature /5/07 6:00 7/6/07 6:00 7/7/07 6:00 7/8/07 6:00 7/9/07 6:00 7/10/07 6:00 7/11/07 6:00 7/12/07 6:00 7/13/07 6:00 7/14/07 6:00 7/15/07 6:00 7/16/07 6:00 7/17/07 6:00 7/18/07 6:00 7/19/07 6:00 Date planned [K] measured [K] data S7-8 [K] L. Evans EDMS document no
22 Installation & equipment commissioning Procurement problems of remaining components (DFBs, collimators) now settled Good progress of installation and interconnection work, proceeding at high pace in tunnel Numerous non-conformities intercepted by QA program, but resulting in added work and time Technical solutions found for inner triplet problems and repair well underway. Commissioning of first sectors can proceed by isolating faulty triplets, but will have to be re-done with repaired triplets (needing additional warm-up/cooldown cycles) First sector cooled down to nominal temperature and operated with superfluid helium; teething problems with cold compressor operation have now been fixed. Second sector being cooled down. Power tests have started. L. Evans EDMS document no
23 General schedule Engineering run originally foreseen at end 2007 now precluded by delays in installation and equipment commissioning. 450 GeV operation now part of normal setting up procedure for beam commissioning to high-energy General schedule has been revised, accounting for inner triplet repairs and their impact on sector commissioning All technical systems commissioned to 7 TeV operation, and machine closed April 2008 Beam commissioning starts May 2008 First collisions at 14 TeV c.m. July 2008 Luminosity evolution will be dominated by our confidence in the machine protection system and by the ability of the detectors to absorb the rates. No provision in success-oriented schedule for major mishaps, e.g. additional warm-up/cooldown of sector L. Evans EDMS document no
24 LHC General Schedule, 5 July 2007 General schedule Baseline rev. 4.0 Global pressure test &Consolidation Cool-down Powering Tests Interconnection of the continuous cryostat Leak tests of the last sub-sectors Inner Triplets repairs & interconnections Global pressure test &Consolidation Flushing Cool-down Warm up Powering Tests L. Evans EDMS document no
25 European Strategy Group (1/2) [Quotes from the official statement July 14, 2006] Consolidation and upgrade of injectors LHC upgrade and maximum performance injectors L. Evans EDMS document no
26 European Strategy Group (2/2) [Quotes from the official statement July 14, 2006] R & D for LHC upgrade and ν facility preparation for ν facility L. Evans EDMS document no
27 CERN accelerator complex L. Evans EDMS document no
28 Upgrade procedure 1. Lack of reliability: Ageing accelerators (PS is 48 years old!) operating far beyond initial parameters need for new accelerators designed for the needs of SLHC 2. Main performance limitation: Excessive incoherent space charge tune spreads ΔQ SC at injection in the PSB (50 MeV) and PS (1.4 GeV) because of the high required beam brightness N/ε*. ΔQ SC with N ε N ε b X, Y b X, Y R 2 βγ : number of : normalized transverse emittances R : mean radius of protons/bunch the accelerator βγ :classical relativistic parameters need to increase the injection energy in the synchrotrons Increase injection energy in the PSB from 50 to 160 MeV kinetic Increase injection energy in the SPS from 25 to 50 GeV kinetic Design the PS successor (PS2) with an acceptable space charge effect for the maximum beam envisaged for SLHC: => injection energy of 4 GeV L. Evans EDMS document no
29 Upgrade components Proton flux / Beam power 50 MeV 160 MeV Linac2 Linac4 1.4 GeV 4 GeV PSB LPSPL Output energy 26 GeV 50 GeV 450 GeV 1 TeV PS SPS PS2 SPS+ LPSPL: Low Power Superconducting Proton Linac (4 GeV) PS2: High Energy PS (~ 5 to 50 GeV 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) SLHC: Superluminosity LHC (up to cm -2 s -1 ) DLHC: Double energy LHC (1 to ~14 TeV) 7 TeV ~ 14 TeV LHC / SLHC DLHC L. Evans EDMS document no
30 Layout of the new injectors SPS PS2 SPL PS Linac4 L. Evans EDMS document no
31 Linac4 building and infrastructure klystron hall (above ground) H - source & RFQ accelerating tunnel L. Evans EDMS document no
32 Linac4 and SPL buildings SPL tunnel Linac4 klystron hall SPL klystron gallery Linac4 tunnel L. Evans EDMS document no
33 Stage 1: Linac4 (1/3) Linac4 beam characteristics Ion species H - Output energy 160 MeV Bunch frequency MHz Max. repetition rate 2 Hz Beam pulse duration 0.4 ms Chopping factor (beam on) 62% Source current 80 ma RFQ output current 70 ma Linac current 64 ma Average current during beam pulse 40 ma Beam power 5.1 kw Particles p. pulse Transverse emittance (source) 0.2 mm mrad Transverse emittance (linac) 0.4 mm mrad L. Evans EDMS document no
34 Stage 1: Linac4 (2/3) Linac4 structures 3 MeV 50 MeV 102 MeV 160 MeV H - source RFQ chopper DTL CCDTL PIMS MHz L. Evans EDMS document no
35 Stage 1: Linac4 (3/3) Direct benefits of the new linac Stop of Linac2: End of recurrent problems with Linac2 (vacuum leaks, etc.) End of use of obsolete RF triodes (hard to get + expensive) Higher performance: Space charge decreased by a factor of 2 in the PSB => potential to double the beam brightness and fill the PS with the LHC beam in a single pulse, => easier handling of high intensity. Potential to double the intensity per pulse. Low loss injection process (Charge exchange instead of betatron stacking) High flexibility for painting in the transverse and longitudinal planes (high speed chopper at 3 MeV in Linac4) First step towards the SPL: Linac4 will provide beam for commissioning LPSPL + PS2 without disturbing physics. Benefits for users of the PSB Good match between space charge limits at injection in the PSB and PS => for LHC, no more long flat bottom at PS injection + shorter flat bottom at SPS injection: easier/ more reliable operation / potential for ultimate beam from the PS More intensity per pulse available for PSB beam users (ISOLDE) up to 2 More PSB cycles available for other uses than LHC L. Evans EDMS document no
36 Stage 2 2 CDR2 LPSPL for SPS & LHC SPL 3 different designs: Stage 2: LPSPL + PS2 (1/3) LPSPL and SPL beam characteristics Energy (GeV) Beam power (MW) Rep. frequency (Hz) Protons/pulse (x ) Av. Pulse current (ma) Pulse duration (ms) Bunch frequency (MHz) Physical length (m) 430 ~ CDR2 (2006) based on 700 MHz high-gradient cavities LPSPL for LHC (2007) with low beam power, for the needs of the LHC SPL at higher energy, for the needs of neutrino production L. Evans EDMS document no
37 Stage 2: LPSPL + PS2 (2/3) PS2 Injection energy kinetic (GeV) Extraction energy kinetic (GeV) ~ 50 13/25 Circumference (m) Maximum intensity LHC (25ns) (p/b) 4.0 x x Maximum intensity for fixed target physics (p/p) 1.2 x x Maximum energy per beam pulse (kj) Max ramp rate (T/s) Repetition time at 50 GeV (s) ~ /2.4 Max. effective beam power (kw) PS2 beam characteristics PS L. Evans EDMS document no
38 Stage 2: LPSPL + PS2 (3/3) Direct benefits of the LPSPL + PS2 Stop of PSB and PS: End of recurrent problems (damaged magnets in the PS, etc.) End of maintenance of equipment with multiple layers of modifications End of operation of old accelerators at their maximum capability Safer operation at higher proton flux (adequate shielding and collimation) Higher performance: Capability to deliver 2.2 the ultimate beam for LHC to the SPS => potential to prepare the SPS for supplying the beam required for the SLHC, Higher injection energy in the SPS + higher intensity and brightness => easier handling of high intensity. Potential to increase the intensity per pulse. Benefits for users of the LPSPL and PS2 More than 50 % of the LPSPL pulses will be available (not needed by PS2) => New nuclear physics experiments extension of ISOLDE (if no EURISOL) Upgraded characteristics of the PS2 beam wrt the PS (energy and flux) Potential for a higher proton flux from the SPS L. Evans EDMS document no
39 Stage 2 : SPL Upgrade the LPSPL into an SPL (multi- MW beam power at 2-52 GeV): 50 Hz rate with upgraded infrastructure (electricity, water, cryo-plants, ) 40 ma beam current by doubling the number of klystrons in the superconducting part Possible users EURISOL (2 nd generation ISOL-type RIB facility) => special deflection system(s) out of the SPL into a transfer line => new experimental facility with capability to receive 5 MW beam power => potential of supplying β-unstable isotopes to a β-beam facility Neutrino factory => energy upgrade to 5 GeV (+70 m of sc accelerating structures) => 2 fixed energy rings for protons (accumulator & compressor) => accelerator complex with target, μ capture-cooling-acceleration (20-50 GeV) and storage L. Evans EDMS document no
40 Planning 3 MeV test place ready Linac4 approval CDR 2 SPL & PS2 approval Start for Physics L. Evans EDMS document no
International Scientific Spring 2010, March 1-6, 1. R. Garoby. slhc
International Scientific Spring 2010, March 1-6, 1 2010 R. Garoby slhc 1. Plans for future LHC injectors 2. Implementation stages 3. Final words R.G. 2 3/10/2009 R.G. 3 3 3/10/2009 Motivation 1. Reliability
More informationUPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1110 UPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX R. Garoby CERN,
More informationLHC Commissioning in 2008
LHC Commissioning in 2008 Mike Lamont AB/OP Schedule slides c/o Lyn Evans (MAC 14/6/07) Status: Installation & equipment commissioning LHC commissioning - CMS June 07 2 Procurement problems of remaining
More informationslhc-project-report-0034
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics slhc Project slhc Project Report 0034 Synergies between the needs of LHC, neutrinos and Radio-active Ion Beams R. Garoby,
More informationMarcos Dracos IPHC-IN2P3/CNRS Strasbourg. 2 December 2008 M. Dracos, BENE 1
Marcos Dracos IPHC-IN2P3/CNRS Strasbourg 2 December 2008 M. Dracos, BENE 1 Staging neutrino facilities towards the NF Cover "high" 13 range Cost effective facility Low intensity SPL already approved, Detector
More informationLIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007
LIS section meeting PS2 design status Y. Papaphilippou April 30 th, 2007 Upgrade of the injector chain (R. Garoby, PAF) Proton flux / Beam power 50 MeV 160 MeV Linac2 Linac4 1.4 GeV ~ 5 GeV PSB SPL RCPSB
More informationCurrent and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London
Current and Future Developments in Accelerator Facilities Jordan Nash, Imperial College London Livingston chart (circa 1985) Nearly six decades of continued growth in the energy reach of accelerators Driven
More informationLHC Luminosity and Energy Upgrade
LHC Luminosity and Energy Upgrade Walter Scandale CERN Accelerator Technology department EPAC 06 27 June 2006 We acknowledge the support of the European Community-Research Infrastructure Activity under
More informationLinac4: From Initial Design to Final Commissioning
Linac4: From Initial Design to Final Commissioning Alessandra M Lombardi for the LINAC4 Team 1 Oliver.Abevrle,Davide.Aguglia,Luca.Arnaudon,Philippe.Baudrenghien, Giulia.Bellodi Caterina.Bertone,Yannic.Body,Jan.Borburgh,Enrico.Bravin,Olivier.Brunner,Jean-
More informationLarge Hadron Collider at CERN
Large Hadron Collider at CERN Steve Playfer 27km circumference depth 70-140m University of Edinburgh 15th Novemebr 2008 17.03.2010 Status of the LHC - Steve Playfer 1 17.03.2010 Status of the LHC - Steve
More informationThe Large Hadron Collider Lyndon Evans CERN
The Large Hadron Collider Lyndon Evans CERN 1.9 K 2.728 K T The coldest ring in the universe! L.R. Evans 1 The Large Hadron Collider This lecture. LHC Technologies Magnets Cryogenics Radiofrequency Vacuum
More informationThe LHC: the energy, cooling, and operation. Susmita Jyotishmati
The LHC: the energy, cooling, and operation Susmita Jyotishmati LHC design parameters Nominal LHC parameters Beam injection energy (TeV) 0.45 Beam energy (TeV) 7.0 Number of particles per bunch 1.15
More informationStatus of the LIU project and progress on space charge studies
Status of the LIU project and progress on space charge studies S. Gilardoni CERN BE/ABP In collaboration with: J. Coupard, H. Damerau, A. Funken, B. Goddard, K. Hanke, A. Lombardi, D. Manglunki, M. Meddahi,
More informationOVERVIEW OF THE LHEC DESIGN STUDY AT CERN
OVERVIEW OF THE LHEC DESIGN STUDY AT CERN 1 CERN CH-1211 Geneve 23, Switzerland E-mail: Oliver.bruning@cern.ch Abstract The Large Hadron electron Collider (LHeC) offers the unique possibility of exploring
More informationOptimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses
Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses P. Spiller, K. Blasche, B. Franczak, J. Stadlmann, and C. Omet GSI Darmstadt, D-64291 Darmstadt, Germany Abstract:
More informationThe LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN
The LHC Collider STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN Outline of Talk The LHC Stored energy and protection systems 2008 start-up 2008 accident
More informationLHC status & 2009/2010 operations. Mike Lamont
LHC status & 2009/2010 operations Mike Lamont Contents 7-9-09 LHC status - CMS week 2 Consolidation brief recall Splices Operational energies Potential performance Present status Plans for 2009-2010 Consolidation
More informationTools of Particle Physics I Accelerators
Tools of Particle Physics I Accelerators W.S. Graves July, 2011 MIT W.S. Graves July, 2011 1.Introduction to Accelerator Physics 2.Three Big Machines Large Hadron Collider (LHC) International Linear Collider
More informationAccelerators for Beginners and the CERN Complex
Accelerators for Beginners and the CERN Complex Rende Steerenberg CERN, BE/OP 2 Contents Why Accelerators and Colliders? The CERN Accelerator Complex Cycling the Accelerators & Satisfying Users The Main
More informationLHC upgrade based on a high intensity high energy injector chain
LHC upgrade based on a high intensity high energy injector chain Walter Scandale CERN AT department PAF n. 6 CERN, 15 September 2005 luminosity and energy upgrade Phase 2: steps to reach maximum performance
More informationLHC operation in 2015 and prospects for the future
LHC operation in 2015 and prospects for the future Moriond Workshop La Thuile March 2016 Jörg Wenninger CERN Beams Department Operation group / LHC For the LHC commissioning and operation teams 1 Moriond
More informationLHC. Construction Understanding first the commissioning. Prospects for
LHC Overview The problem what and is fixing LHC it? Construction Understanding first the commissioning problem Making Beam sure commissioning there no Titanic II Prospects for 2009 2010 LHC is a superconducting
More information1.5-GeV FFAG Accelerator as Injector to the BNL-AGS
1.5-GeV FFAG Accelerator as Injector to the BNL-AGS Alessandro G. Ruggiero M. Blaskiewicz,, T. Roser, D. Trbojevic,, N. Tsoupas,, W. Zhang Oral Contribution to EPAC 04. July 5-9, 5 2004 Present BNL - AGS
More informationLHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris
LHC accelerator status and prospects 2 nd September 2016 - Paris LHC (Large Hadron Collider) 14 TeV proton-proton accelerator-collider built in the LEP tunnel Lead-Lead (Lead-proton) collisions 1983 :
More informationAccelerator Design and Construction Progress of TPS Project
Accelerator Design and Construction Progress of TPS Project Taiwan Light Source (TLS), a 120-m storage ring originally designed for 1.3 GeV, was commissioned and opened to users in 1993. The energy of
More informationEngines of Discovery
Engines of Discovery R.S. Orr Department of Physics University of Toronto Berkley 1930 1 MeV Geneva 20089 14 TeV Birth of Particle Physics and Accelerators 1909 Geiger/Marsden MeV a backscattering - Manchester
More informationThanks to all Contributors
Thanks to all Contributors High Gradient versus High Field Dr. José Miguel Jiménez CERN Technology Department Head CERN-Spain Liaison Officer 2 Main topics A worldwide success? Full exploitation of the
More informationSPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST
SPPC Study and R&D Planning Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST Main topics Pre-conceptual design study Studies on key technical issues R&D
More informationREPORT OF THE HIGH INTENSITY PROTONS WORKING GROUP
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN AB DEPARTMENT CERN-AB-2004-022 OP/RF REPORT OF THE HIGH INTENSITY PROTONS WORKING GROUP M. Benedikt, K. Cornelis, R. Garoby, E. Métral, F. Ruggiero, M. Vretenar
More informationERL FACILITY AT CERN FOR APPLICATIONS
ERL FACILITY AT CERN FOR APPLICATIONS Erk Jensen (CERN) Big thanks to contributors: A. Bogacz (JLAB), O. Brüning, R. Calaga, V. Chetvertkova, E. Cormier (CELIA), R. Jones, M. Klein, A. Valloni, D. Pellegrini,
More informationReview of ISOL-type Radioactive Beam Facilities
Review of ISOL-type Radioactive Beam Facilities, CERN Map of the nuclear landscape Outline The ISOL technique History and Geography Isotope Separation On-Line Existing facilities First generation facilities
More informationPlans for the LHC Luminosity Upgrade Summary of the CARE-HHHAPD-LUMI-05 workshop
Plans for the LHC Luminosity Upgrade Summary of the APD-LUMI-05 workshop Walter Scandale CERN AT department LHC project seminar Geneva, 10 November 2005 We acknowledge the support of the European Community-Research
More informationDesign Status of the PEFP RCS
Design Status of the PEFP RCS HB2010, Morschach, Switzerland J.H. Jang 1) Y.S. Cho 1), H.S. Kim 1), H.J. Kwon 1), Y.Y. Lee 2) 1) PEFP/KAERI, 2) BNL (www.komac.re.kr) Contents PEFP (proton engineering frontier
More informationChallenges and Plans for the Proton Injectors *
Chapter 16 Challenges and Plans for the Proton Injectors * R. Garoby CERN, BE Department, Genève 23, CH-12, Switzerland The flexibility of the LHC injectors combined with multiple longitudinal beam gymnastics
More informationMuch of this material comes from lectures given by Philippe Lebrun (head of CERN's Accelerator Technology Department), at SUSSP, Aug
! " # # $ ' ( # # $ %& ) Much of this material comes from lectures given by Philippe Lebrun (head of CERN's Accelerator Technology Department), at SUSSP, Aug. 2009. http://www.ippp.dur.ac.uk/workshops/09/sussp65/programme/
More informationTransverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21
Transverse dynamics Selected topics Erik Adli, University of Oslo, August 2016, Erik.Adli@fys.uio.no, v2.21 Dispersion So far, we have studied particles with reference momentum p = p 0. A dipole field
More informationMulti-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications
Multi-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications N.N.Alexeev, D.G.Koshkarev and B.Yu.Sharkov Institute for Theoretical and Experimental Physics, B.Cheremushk.
More informationPlans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams
Plans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams Special acknowledgements to T.Bohl, C.Carli, E.Carlier, H.Damerau, L.Ducimetière, R.Garoby, S.Gilardoni, S.Hancock,
More informationELECTRON COOLING OF PB54+ IONS IN LEIR
ELECTRON COOLING OF PB+ IONS IN LEIR G. Tranquille, CERN, Geneva, Switzerland Abstract Electron cooling is central in the preparation of dense bunches of lead beams for the LHC. Ion beam pulses from the
More informationThe TESLA Dogbone Damping Ring
The TESLA Dogbone Damping Ring Winfried Decking for the TESLA Collaboration April 6 th 2004 Outline The Dogbone Issues: Kicker Design Dynamic Aperture Emittance Dilution due to Stray-Fields Collective
More informationShort Introduction to CLIC and CTF3, Technologies for Future Linear Colliders
Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders Explanation of the Basic Principles and Goals Visit to the CTF3 Installation Roger Ruber Collider History p p hadron collider
More informationCERN & the High Energy Frontier
CERN & the High Energy Frontier Emmanuel Tsesmelis CERN Directorate Office Corfu Summer Institute 13th Hellenic School & Workshop on Elementary Particle Physics & Gravity Corfu, Greece 1 September 2013
More informationOverview of HEMC Scheme
Overview of HEMC Scheme R. B. Palmer, (BNL) JLab 2/28/2011 My birthday Progress on Cooling simulations New Acceleration sequence with higher transmission New System transmission estimate New Wall power
More informationCompressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.
Compressor Ring Valeri Lebedev Fermilab Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions Muon Collider Workshop Newport News, VA Dec. 8-1, 8 Where do we go?
More informationStatus of the LHC Machine
Status of the LHC Machine J. Wenninger CERN Beams Department Operation Group Acknowledgements to R. Schmidt for some slides and many discussions. 1 Outline Introduction Commissioning 2008 Incident of September
More informationWhy are particle accelerators so inefficient?
Why are particle accelerators so inefficient? Philippe Lebrun CERN, Geneva, Switzerland Workshop on Compact and Low-Consumption Magnet Design for Future Linear and Circular Colliders CERN, 9-12 October
More informationA Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:
A Project to convert TLS Booster to hadron accelerator 1. Basic design TLS is made of a 50 MeV electron linac, a booster from 50 MeV to 1.5 GeV, and a storage ring. The TLS storage ring is currently operating
More informationOverview of LHC Accelerator
Overview of LHC Accelerator Mike Syphers UT-Austin 1/31/2007 Large Hadron Collider ( LHC ) Outline of Presentation Brief history... Luminosity Magnets Accelerator Layout Major Accelerator Issues U.S. Participation
More informationCEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi
HKUST Jockey Club Institute for Advanced Study CEPC Linac Injector HEP218 22 Jan, 218 Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi Institute of High Energy
More informationSTATUS OF BEPC AND PLAN OF BEPCII
STATUS OF BEPC AND PLAN OF BEPCII C. Zhang for BEPCII Team Institute of High Energy Physics, P.O.Box 918, Beijing 139, China Abstract The status of the Beijing Electron-Positron Collider (BEPC) and plans
More informationELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF
ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF Lia Merminga and Yaroslav Derbenev Center for Advanced Studies of Accelerators, Jefferson Laboratory,
More informationAdvanced Design of the FAIR Storage Ring Complex
Advanced Design of the FAIR Storage Ring Complex M. Steck for the FAIR Technical Division and the Accelerator Division of GSI The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC
More informationAccelerators. There are some accelerators around the world Nearly all are for industrial (20 000) or clinical use (10 000)
Accelerators There are some 30 000 accelerators around the world Nearly all are for industrial (20 000) or clinical use (10 000) Scientific research community (~ 100) Synchrotron light sources Ion beam
More informationReport on PIAVE G. Bisoffi
Report on PIAVE G. Bisoffi International Scientific Committee, Legnaro February 10th, 2005 Context: Upgrade of the LNL Nuclear Physics Facility 3. CRYOGENIC SYSTEM UPGRADE 5. ALPI Energy Upgrade 4 3 4.
More informationStatus and Outlook of the LHC
Status and Outlook of the LHC Enrico Bravin - CERN BE-BI J-PARC visit seminar 6 July 2017 Outlook Overview of LHC Objectives for run2 Parameters for 2016/2017 and differences w.r.t. 2015 Summary of commissioning
More informationNICA Project at JINR Nuclotron-based Ion Collider facility I.Meshkov for NICA team
Workshop on Beam Cooling and Related Topics COOL 11 NICA Project at JINR Nuclotron-based Ion Collider facility I.Meshkov for NICA team, Ukraine hosted by JINR, Dubna 1 Contents Introduction: The goal of
More informationRING-RING DESIGN. Miriam Fitterer, CERN - KIT for the LHeC study group
RING-RING DESIGN Miriam Fitterer, CERN - KIT for the LHeC study group LHeC Design Options LHeC Design Options Linac-Ring LHeC Design Options Linac-Ring Ring-Ring Point 4 P Z4 5 P M4 5 P X4 6 Point 5 P
More informationPhysics 610. Adv Particle Physics. April 7, 2014
Physics 610 Adv Particle Physics April 7, 2014 Accelerators History Two Principles Electrostatic Cockcroft-Walton Van de Graaff and tandem Van de Graaff Transformers Cyclotron Betatron Linear Induction
More informationTUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER
TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER B. Mikulec, A. Findlay, V. Raginel, G. Rumolo, G. Sterbini, CERN, Geneva, Switzerland Abstract In the near future, a new
More informationFirst propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division
First propositions of a lattice for the future upgrade of SOLEIL A. Nadji On behalf of the Accelerators and Engineering Division 1 SOLEIL : A 3 rd generation synchrotron light source 29 beamlines operational
More informationHow J-PARC recovered from the big earthquake
How J-PARC recovered from the big earthquake KEK / Fujio Naito Outline About J-PARC The earthquake Damage on J-PARC Recovery plan Beam study results Summary J-PARC (Japan Proton Accelerator Research Complex)
More informationFAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany
FAIR AT GSI P. Spiller, GSI, Darmstadt, Germany Abstract Based on the experience of the existing GSI facility and with the aim to apply new technical concepts in phase space cooling and fast ramping of
More informationThe FAIR Accelerator Facility
The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC SIS100 HESR pbar target SuperFRS goals: higher intensity (low charge states) higher energy (high charge states) production of
More informationCLIC Detector studies status + plans
CLIC Detector studies status + plans Contents: - Introduction to CLIC accelerator - 2004 CLIC Study group report: "Physics at the CLIC Multi-TeV Linear Collider - CERN participation in Linear Collider
More informationChopping High-Intensity Ion Beams at FRANZ
Chopping High-Intensity Ion Beams at FRANZ C. Wiesner, M. Droba, O. Meusel, D. Noll, O. Payir, U. Ratzinger, P. Schneider IAP, Goethe-Universität Frankfurt am Main Outline 1) Introduction: The FRANZ facility
More informationBeam. RF antenna. RF cable
Status of LEP2 J. Wenninger, SL Operation for the SL division LEPC September 1998 Outline Optics and RF for 1998 Beam current limitations Injection and ramp Performance at high energy Conclusions LEPC/15-09-98
More informationStatusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)
Statusreport Status of the GSI accelerators for FRS operation Jens Stadlmann (FAIR Synchrotrons) Overview Intensities reached and "candidates" for experiments. Uranium? Upgrade program New developments:
More informationMeasurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron
Measurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron Urschütz Peter (AB/ABP) CLIC meeting, 29.10.2004 1 Overview General Information on the PS Booster Synchrotron Motivation
More informationThe LHC. Part 1. Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna
The LHC Part 1 Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna Organizzazione Part 1 Part 2 Part 3 Introduction Energy challenge Luminosity
More informationPhysics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -
Physics 736 Experimental Methods in Nuclear-, Particle-, and Astrophysics - Accelerator Techniques: Introduction and History - Karsten Heeger heeger@wisc.edu Homework #8 Karsten Heeger, Univ. of Wisconsin
More informationSC magnets for Future HEHIHB Colliders
SC magnets for Future HEHIHB Colliders presented by L. Bottura WAMS, Archamps, March 22-23,2004 Overview Few selected examples of drivers for R&D in the next 10 years LHC upgrades scenarios (why? how?)
More informationA high intensity p-linac and the FAIR Project
A high intensity p-linac and the FAIR Project Oliver Kester Institut für Angewandte Physik, Goethe-Universität Frankfurt and GSI Helmholtzzentrum für Schwerionenforschung Facility for Antiproton and Ion
More informationSPIRAL 2 Commissioning Status
SPIRAL 2 Commissioning Status Jean-Michel Lagniel (GANIL) for the SPIRAL 2 Team With thanks to the SPIRAL 2 team Page 1 Menu 1- SPIRAL 2 facility (Phase 1) presentation 2- Injector commisionning (Sources
More informationThe CIS project and the design of other low energy proton synchrotrons
The CIS project and the design of other low energy proton synchrotrons 1. Introduction 2. The CIS project 3. Possible CMS 4. Conclusion S.Y. Lee IU Ref. X. Kang, Ph.D. thesis, Indiana University (1998).
More informationThe 2015 erhic Ring-Ring Design. Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory
The 2015 erhic Ring-Ring Design Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory The Relativistic Heavy Ion Collider RHIC Two superconducting storage rings 3833.845 m circumference
More informationPhysics at Accelerators
Physics at Accelerators Course outline: The first 4 lectures covers the physics principles of accelerators. Preliminary plan: Lecture 1: Accelerators, an introduction. Acceleration principles. Lecture
More informationProposal to convert TLS Booster for hadron accelerator
Proposal to convert TLS Booster for hadron accelerator S.Y. Lee -- Department of Physics IU, Bloomington, IN -- NSRRC Basic design TLS is made of a 50 MeV electron linac, a booster from 50 MeV to 1.5 GeV,
More informationPreliminary design of proton and ion linacs for SPPC Injector
Preliminary design of proton and ion linacs for SPPC Injector Y.R. Lu, X.W.Zhu,H.P. Li, Q. Fu, J. Liu, F.J.Jia, K. Zhu, Z. Wang State Key Lab of Nuclear Physics and Technology, Peking University J.Y. Tang,
More informationEUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - ACCELERATORS AND TECHNOLOGY SECTOR
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - ACCELERATORS AND TECHNOLOGY SECTOR CERN-ATS-2012-009 Cryogenic Studies for the Proposed CERN Large Hadron Electron Collider (LHeC) F. Haug (on behalf of
More informationCompressor Lattice Design for SPL Beam
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN A&B DIVISION AB-Note-27-34 BI CERN-NUFACT-Note-153 Compressor Lattice Design for SPL Beam M. Aiba Abstract A compressor ring providing very short proton
More informationBERLinPro. An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN
BERLinPro An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN BERLinPro: ERL demonstration facility to prepare the ground for a few GeV ERL @ Berlin-Adlershof Goal: 100MeV, 100mA beam Small emittance,
More informationStatus & Plans for the TRIUMF ISAC Facility
Status & Plans for the TRIUMF ISAC Facility P.W. Schmor APAC 07, Jan 29-Feb 2 Indore, India TRIUMF ISAC Schematic Layout of TRIUMF/ISAC with H- Driver, ISOL Production & Post Accelerators ISAC-II High
More informationPhysics Potential of existing and future LBL ν beams
Mauro Mezzetto Istituto Nazionale di Fisica Nucleare, Sezione di Padova Physics Potential of existing and future LBL ν beams NBI 2002, March 14-18,2002, - CERN M. Mezzetto, Physics Potential of existing
More informationAn Electron Linac Photo-Fission Driver for the Rare Isotope Program at TRIUMF
CANADA S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada
More informationSuperconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA
Superconducting Magnets for Future Electron-Ion Collider Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA Mini-workshop on Accelerator, IAS, HKUST, Hong Kong, January 18-19, 2018 1 Outline
More informationLC Commissioning, Operations and Availability
International Technology Recommendation Panel X-Band Linear Collider Path to the Future LC Commissioning, Operations and Availability Tom Himel Stanford Linear Accelerator Center April 26-27, 2004 Integrating
More informationLow Energy RHIC electron Cooling (LEReC)
Low Energy RHIC electron Cooling (LEReC) LEReC overview: project goal and cooling approach Alexei Fedotov MEIC Collaboration Meeting 30 31 LEReC Project Mission/Purpose The purpose of the LEReC is to provide
More informationOverview of Acceleration
Overview of Acceleration R B Palmer, Scott Berg, Steve Kahn (presented by Steve Kahn) Nufact-04 RF Frequency Acc types and System Studies Linacs RLA s FFAG s Injection/Extraction US Study 2a acceleration
More informationMuon Front-End without Cooling
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Muon Front-End without Cooling CERN-Nufact-Note-59 K. Hanke Abstract In this note a muon front-end without cooling is presented. The muons are captured, rotated
More informationRun II Status and Prospects
Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004 Run II Status and Prospects - Spalding 1 Contents Introduction Major elements of the Run II campaign Present performance Status of the upgrade
More informationSLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland
SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland Michael Böge 1 SLS Team at PSI Michael Böge 2 Layout of the SLS Linac, Transferlines Booster Storage Ring (SR) Beamlines and Insertion Devices
More informationIII. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education
III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education Introduction Outline CESR Overview CESR Layout Injector Wigglers
More informationLHC Commissioning and First Operation
LHC Commissioning and First Operation PPC 2010, July 12, 2010, Turin, Italy Steve Myers Director for Accelerators and Technology, CERN Geneva (On behalf of the LHC team and international collaborators)
More information8 lectures on accelerator physics
8 lectures on accelerator physics Lectures can be found at Lecture 1 and 2: Introduction Why do we accelerate? What are the important parameters for characterizing accelerators Lecture 3 and 4: Examples
More informationSMR/ Summer School on Particle Physics June LHC Accelerators and Experiments (part I) Marzio Nessi CERN, Switzerland
SMR/1847-2 Summer School on Particle Physics 11-22 June 2007 LHC Accelerators and Experiments (part I) Marzio Nessi CERN, Switzerland CERN-RRB-2004-152 LHC Accelerators and Experiments (part I) ICTP Marzio
More informationOn-axis injection into small dynamic aperture
On-axis injection into small dynamic aperture L. Emery Accelerator Systems Division Argonne National Laboratory Future Light Source Workshop 2010 Tuesday March 2nd, 2010 On-Axis (Swap-Out) injection for
More informationAWAKE: The Proton Driven Plasma Wakefield Acceleration Experiment at CERN. Alexey Petrenko on behalf of the AWAKE Collaboration
AWAKE: The Proton Driven Plasma Wakefield Acceleration Experiment at CERN Alexey Petrenko on behalf of the AWAKE Collaboration Outline Motivation AWAKE at CERN AWAKE Experimental Layout: 1 st Phase AWAKE
More information(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.
Introduction One of the main events in the field of particle physics at the beginning of the next century will be the construction of the Large Hadron Collider (LHC). This machine will be installed into
More informationHiggs Factory Magnet Protection and Machine-Detector Interface
Higgs Factory Magnet Protection and Machine-Detector Interface Nikolai Mokhov Fermilab MAP Spring Workshop May 27-31, 2014 Outline MDI Efforts Building Higgs Factory Collider, Detector and MDI Unified
More informationCERN Ideas and Plans for a Neutrino Factory
EUROPEAN ORGANISATION FOR NUCLEAR RESEARCH CERN - PS DIVISION CERN/PS 2000-064 (PP) CERN-NUFACT Note 45 CERN Ideas and Plans for a Neutrino Factory H. Haseroth, for the CERN Neutrino Factory Working Group
More information