Corrigendum No /ASCL/ Date: 7 th February 2019

Size: px
Start display at page:

Download "Corrigendum No /ASCL/ Date: 7 th February 2019"

Transcription

1 14/ASCL/ Date: 7 th February 2019 Name of Tender: REQUEST FOR PROPOSAL FOR SELECTION OF MASTER SYSTEM INTEGRATOR (MSI) FOR IMPLEMENTATION OF INTEGRATED COMMAND AND CONTROL CENTER (ICCC) AND e-governance BASED SMART CITY SOLUTIONS AT ALIGARH. 1. Corrigendum 4 Last Date and Time submission of Bids 07/02/2019 at 1500 hrs. 15/02/2019 at 1700 hrs. 2. Corrigendum 4 Technical Bid Opening 16/02/2019 at 1730 hrs. 08/02/2019 at 1600 hrs. 3. General Submission of Proposal In addition to the Technical Bid and financial bid submitted online, the bidders shall submit complete set of technical bid and financial bid separately in hard copy. EMD, Technical and Financial bids shall be sealed and packed in separate envelopes clearly marking on the top of the envelopes Envelope 1- EMD in form BG in original, Envelope 2-Technical Proposal & Envelope -3 Financial Proposal. The Technical Proposal Envelope shall contain all the documents in original, sealed and stamped on all the pages. No information of financial proposal shall be in the envelope of technical proposal. Failure to adhere will result in treating bid as non-responsive. Financial Proposal Envelope shall contain duly filled up revised price bid format including the format as per E-

2 Procurement portal. Both the envelopes shall be sealed and packed in an outer envelope clearly mentioning the name of the Project, addressed to Chief Executive Officer, Aligarh Smart City Limited Room No. 108, Sewa Bhawan, Church Compound, Civil Lines, Aligarh , Uttar Pradesh The hard copy shall be submitted before 16/02/2019 at 1700 hrs. Failure to submit the Hard Copy of the EMD in form of BG in Original and the Proposal (Both technical and financial) in the prescribed format will lead to treating the bid as non-responsive. Also, all the contents of the hard copy submission (both technical and financial proposal) shall be same as per the documents submitted in the e-portal (other than the revised price bid format (Addendum 2/Corrigendum 5). Any deviations in the documents in hard copy submission to submission in e-portal, the documents submitted in e-portal shall be considered for evaluation (other than the revised price bid format( Addendum 2/Corrigendum 5). 4. Clause (6), pg no 38 The Authority will notify the date and venue for conducting such proof of concept / technical demonstration to the prospective bidders. The date for conducting the proof of concept/technical demonstration to the prospective bidders is scheduled from 22 nd February 2019.

3 5. Corrigendum 5 ICT components The Bidder (any member in case of consortium) shall have successfully executed any 04 (four) of below mentioned projects with cumulative value of INR 150 crore in last Ten (10) years (excluding civil work) ICT components The Bidder (any member in case of consortium) shall have successfully executed any 04 (four) of below mentioned projects with cumulative value of INR 150 crore in last Ten (10) years (excluding civil work) b) Experience in installation of min. 500 outdoor cameras (with 200 outdoor camera in a single project) (Min cut- off value of successfully executed cumulative projects in this segment is INR 20 Crores) c) ICCC/Command and control center (Min cut- off value of successfully executed cumulative projects in this segment is INR 5 Crores) d) Intelligent traffic management (Min cut- off value of successfully executed and cumulative value projects in this segment is INR 10 Crores) e) e-municipality/ e-governance project (Min cut- off value of successfully executed cumulative projects in this segment is INR 2 Crores) f) GIS solution & integration with smart solutions experience (Min cut- off value of successfully executed cumulative projects in this segment is INR 5 Crores) a) Data Center including Servers- Storage Infrastructure establishment (Min cut- off value of successfully executed cumulative projects in this segment is INR 10 Crores) b) Experience in installation of min. 500 outdoor cameras (with 200 outdoor cameras in a single project) (Min cut- off value of successfully executed cumulative projects in this segment is INR 20 Crores) c) ICCC/Command and control center (Min cut- off value of successfully executed cumulative projects in this segment is INR 5 Crores) d) Intelligent traffic management (Min cut- off value of successfully executed and cumulative value projects in this segment is INR 10 Crores) e) e-municipality/ e-governance project (Min cut- off value of successfully executed cumulative projects in this segment is INR 2 Crores) f) GIS solution & integration with smart solutions experience (Min cut- off value of successfully executed cumulative projects in this segment is INR 5 Crores) 6. Hyper Converged All contact center related components including ACD, All contact center related components including ACD, PABX,

4 infrastructure 7. Video Conferencing Solution 8. Annexure B.1. Fixed Surveillance 295 PABX, Gateways, Recording, CTI must be from same OEM. The camera should be dual camera with automatic voice tracking feature and face recognition cameras and each camera should be 10x optical zoom 8.Lens type: Vari-Focal Motorized Lens 8-50 mm, Auto Iris, Corrected IR cut filter 9. Field Switch Switch should have wire rate switching capacity of minimum 24 Gbps or more. 10. RFP Volume I, Page No- he Bidder (any member in case of consortium) 48, B2, shall have successfully executed projects in Experience implementation of ITMS in last five (5) years. ach project should include any of the three (03) components from below list- 1. Variable Message Sign Board 2. ITMS including ANPR, RLVD/SVD 3. Emergency Call Box and PA System, Mobile App/Desktop Portal for Citizen Services, and Kiosk based government/citizen services 4. Adaptive Traffic Control System Number of projects implemented. Marks will be allotted as follows: No. of successfully executed projects 4 or Gateways, Recording, CTI may be from same or different OEM. The camera should be dual camera and each camera should be 5X optical zoom or more. 8.Lens type: Vari-Focal Lens 8-50 mm, Auto Iris, Corrected IR cut filter Switch should have wire rate switching capacity of minimum 20 Gbps or more The Bidder (any member in case of consortium) shall have successfully executed projects in last Ten (10) years. Each project should include any of the three (03) components from below list- 1. Variable Message Sign Board or e-challan System 2. ITMS including ANPR, RLVD/SVD 3. Emergency Call Box or PA 4. Adaptive Traffic Control System Number of projects implemented. Marks will be allotted as follows: No. of successfully executed projects 4 or more = 5 marks No. of Successfully executed projects 3 = 3

5 more = 5 marks No. of Successfully executed projects 3 = 3 Marks No. of Successfully executed projects 2 = 1 Marks The cumulative value of project should not be less than INR 60 Cr and each project should be at least 10 Cr. Marks No. of Successfully executed projects 2 = 1 Marks The cumulative value of project should not be less than INR 60 Cr and each project should be at least 5 (five) Cr. 2. General Clarification: a) If in case, Bidder has signed NDA with end customer, letter from client along with extracted copy of work and CA Certificate for completion with value of project will be considered as document proof of project.

6 Clarification on ITMS & Surveillance component s Location with Quantity # Junction Name Police Station Co-ordinates No. of Arms Latitude Longitude PTZ FIX Details VDC ANPR SVD (Vehicle detector ) RLVD VaMS PA ECB (Variable message signage) (Public announce ment) (Emergen cy Call Box) Environm ental sensor FRS 1. Kunji Lal Tiraha Kotwali 27 52'48.70"N 78 4'15.20"E Chowraha Bhujpura Chowraha Haddi Godam Tiraha Turkman Gate Kotwali 27 52'32.36"N 78 3'37.09"E Kotwali 27 52'29.90"N 78 3'30.00"E Kotwali 27 52'32.38"N 78 3'38.52"E Handewali Gali Kotwali 27 52'48.80"N 78 4'15.50"E Sasni Gate Sasni Gate 27 52'4.49"N 78 4'14.85"E Hatras Adda Sasni Gate 27 52'36.85"N 78 4'31.83"E Delhi Gate Delhi Gate 27 52'54.70"N 78 3'43.14"E Gonda More Delhi Gate 27 52'8.50"N 78 2'40.80"E Gonda Pool Delhi Gate 27 52'22.90"N 78 1'57.90"E Nada Pool Delhi Gate 27 53'21.45"N 78 1'55.27"E Rasalganj (Agrasen Chauraha) Banna Devi 27 53'17.50"N 78 4'23.80"E Kabarkutta (ABD) Banna Devi 27 53'17.60"N 78 4'23.80"E Barahdwari-1 Delhi Gate 27 53'6.14"N 78 4'6.02"E Gandhi Bagh / Company Bagh (Awantika Bai Chowk) Gandhi Park 27 53'8.77"N 78 4'26.01"E

7 # Junction Name Police Station 16. D S Degree College 17. Ramlila Maidan Achal Tal (ABD) 18. Gilhraj Mandir par 19. Madhupura Tiraha (ABD) 20. Lal Diggi Tiraha (ABD) 21. Centre Point (ABD) 22. Control Room ke Samne (ABD) Co-ordinates No. of Arms Latitude Longitude PTZ FIX Details VDC ANPR SVD (Vehicle detector ) RLVD VaMS PA ECB (Variable message signage) (Public announce ment) (Emergen cy Call Box) Environm ental sensor Gandhi Park 27 52'52.45"N 78 4'34.85"E Gandhi Park 27 52'47.68"N 78 4'37.70"E Gandhi Park 27 52'42.36"N 78 4'31.60"E Civil Lines 27 53'17.90"N 78 4'32.90"E Civil Lines 27 54'7.31"N 78 4'32.92"E Civil Lines 27 53'28.30"N 78 4'43.80"E Civil Lines 27 53'53.40"N 78 4'29.40"E AMU Circle (ABD) Civil Lines 27 54'17.96"N 78 4'34.77"E Abdulla Tiraha Civil Lines 27 54'2.64"N 78 4'57.57"E Jakriya Market Civil Lines 27 54'56.11"N 78 5'7.81"E FRS Subhash Chowk (Akroor Chowk) Samsad Market (ABD) Railway Station Entry Civil Lines 27 53'39.20"N 78 4'26.70"E Civil Lines 27 54'35.24"N 78 4'10.60"E Civil Lines 27 53'18.94"N 78 4'31.93"E Quarsi Quarsi 27 54'19.90"N 78 6'9.59"E Kisanpur Tiraha Quarsi 27 53'43.36"N 78 5'23.51"E Gandhi Eye Tiraha Kela Nagar Marris Road (ABD) Quarsi 27 53'24.61"N 78 4'56.50"E Quarsi 27 54'15.17"N 78 5'23.41"E Quarsi 27 53'54.18"N 78 5'11.33"E

8 # Junction Name Police Station 34. Masudabad (ABD) 35. Dubey Ka Parao (ABD) 36. Madar Gate (ABD) 37. Khirnigate 38. Eta Chungi 39. Mirumal 40. Barahdwari - 2 Co-ordinates No. of Arms Latitude Longitude PTZ FIX Details VDC ANPR SVD (Vehicle detector ) RLVD VaMS PA ECB (Variable message signage) (Public announce ment) (Emergen cy Call Box) Environm ental sensor Banna Devi 27 53'39.70"N 78 3'55.00"E Gandhi Park 27 52'59.19"N 78 4'31.20"E Kotwali 27 52'47.86"N 78 4'25.21"E Sasni Gate 27 52'29.76"N 78 4'29.98"E Gandhi Park 27 52'29.92"N 78 5'47.28"E Gandhi Park 27 53'8.00"N 78 4'16.80"E Banna Devi 27 53'5.88"N 78 4'4.15"E Diwani ke Samne Civil Lines 27 54'16.10"N 78 4'16.90"E Achal Taal Tiraha Gandhi Park 27 52'48.84"N 78 4'33.42"E FRS Abdul Kareem Sabji Mandi (ABD) Collectorate Tiraha Tasvir Mahal (ABD) Barchi Bahadur Tiraha Manik Chowk Tiraha Kotwali 27 52'56.23"N 78 4'9.30"E Kotwali 27 52'54.90"N 78 4'8.80"E Civil Lines 27 54'15.70"N 78 4'17.90"E Civil Lines 27 53'57.63"N 78 4'21.27"E Civil Lines 27 53'36.20"N 78 4'20.60"E Kotwali 27 52'55.30"N 78 4'24.94"E Tehseel Tiraha Banna Devi 27 53'43.30"N 78 3'45.20"E Kayampur Mod Quarsi 27 53'36.01"N 78 6'36.14"E FM Tower Tiraha Quarsi 27⁰56'23.1"N 78⁰04'58.6"E

9 # Junction Name Police Station 52. Jamalpur Crossing Co-ordinates No. of Arms Latitude Longitude PTZ FIX Details VDC ANPR SVD (Vehicle detector ) RLVD VaMS PA ECB (Variable message signage) (Public announce ment) (Emergen cy Call Box) Environm ental sensor Civil Lines 27 56'2.30"N 78 4'50.08"E Near OLF School Quarsi 27 53'51.15"N 78 5'34.48"E FRS Khaireshwar Mamu Bhanja Tiraha Agra Road Mathura Road Changer Agra Road Changer D S College ke Samne Dodhpur KAMAALPUR CHAURAHA MATHURA ROAD OLD BYPASS HIGHWAY KE NEECHE TALAASHPUR KHURD Soot Mill Chauraha / Sarsoul Chauraha PS Loadha 27 53'31.10"N 78 1'25.42"E Gandhi Park 27 53'6.88"N 78 4'18.80"E Sasni Gate 27 51'11.80"N 78 3'36.80"E Sasni Gate 27 50'45.40"N 78 4'41.00"E Gandhi Park 27 53'2.10"N 78 4'34.30"E Civil Lines 27 54'22.02"N 78 5'7.40"E Gandhi Park 27⁰51'00.4"N 78⁰06'40.9"E Sasni Gate 27⁰51'25.5"N 78⁰03'05.0"E KotwaliThana 27⁰51'48.8"N 78⁰02'47.8"E Banna Devi 27⁰90'43.81"N 78⁰04'76.46"E Jama Masjid Chowk (ABD) Kotwali Total Count Sd/- Chief Executive Officer, Aligarh Smart City Limited

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Request for Empanelment

Request for Empanelment Request for Empanelment (Empanelment is method/procedure/way to seek technical & financial or financial quotation from eligible firm/organization/academic institute to short list eligible contender for

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Bangladesh Weather and Climate Services Regional Project (BWCSRP) Bangladesh Weather and Climate Regional Project (BWCSRP) Type of Method RFB, RFP, Direct Contracting RFQ None Review Thresholds Review Thresholds ( Cost of the Contract/Package) >=US$ 10,000,000 Works

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 8 AM02 - Texas A&M University Purchase Order P.O. Date: 12/19/2016 Purchase Order Number AM02-17-P041414 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

ADDENDUM NO. 1 TO THE BIDDING /CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF COCOA BEACH BID NO: CB15-002

ADDENDUM NO. 1 TO THE BIDDING /CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF COCOA BEACH BID NO: CB15-002 ADDENDUM NO. 1 TO THE BIDDING /CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF COCOA BEACH GEOGRAPHIC INFORMATION SYSTEM (GIS) SERVICES CONTRACT BID NO: CB15-002 March 11, 2016 To All Interested Bidders:

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND

REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND SUDAN REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF THERMO HYGROMETER -UNDP GLOBAL FUND Date: August 8 th 2010 REFERENCE:RFQ/KRT/GF/10/049 Dear Sir / Madam: You are kindly requested to submit your quotation

More information

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth

More information

What is 511? Need for 511 Services. Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services

What is 511? Need for 511 Services. Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services Leon F. Osborne University of North Dakota Regional Weather Information Center Grand Forks, ND David L.

More information

Reserve Forecast Details

Reserve Forecast Details 10-26th St South of Maryland Reserve (1552) Opening Balance 158,947 158,947 0 0 0 0 0 0 0 0 1058 - Street Construction 0 (158,947) 0 0 0 0 0 0 0 0 Total 0 (158,947) 0 0 0 0 0 0 0 0 Closing Balance 158,947

More information

Amended Specifications as per the Pre Bid meeting held on in Chapter 4

Amended Specifications as per the Pre Bid meeting held on in Chapter 4 NIPER-G/PUR/GLOBAL/2018/06 Tender Specification for Nano Particle Size (DLS based), Zeta Potential, Molecular weight, Micro rheology measurement A proven complete system should have the measurement facility

More information

PRE MONSOON TROPICAL CYCLONE ALERT (LAILA)

PRE MONSOON TROPICAL CYCLONE ALERT (LAILA) PRE MONSOON TROPICAL CYCLONE ALERT (LAILA) (Updated as on 19 th May, 2010, 10.00 AM) A pre-monsoon Tropical Cyclone alert has been issued for all the coastal districts of Orissa by the Special Relief Commissioner

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators. IESO Training

Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators. IESO Training Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators IESO Training May 2017 Centralized Forecasting - Registration and Communication Requirements

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal Request for Tenders Community Development, Parks & Recreation Facility Snow Removal Community Development, Parks & Recreation Yorkton, Saskatchewan Closing Date: Friday October 5, 2018 at 4:00 p.m. The

More information

Procurement Plan for Project of Integrated Urban and Tourism Development

Procurement Plan for Project of Integrated Urban and Tourism Development Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan for Project of Integrated Urban and Tourism Development I. General 1.

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

Letter of Delegation. Upfront Purchase Price (AED)

Letter of Delegation. Upfront Purchase Price (AED) application form Business Devices Welcome to Etisalat. Please complete this form if you are applying for Business Devices. Please note that incomplete information may cause delays in service provisioning.

More information

SONOMA COUNTY FIRE TIMELINE. November 1, 2017

SONOMA COUNTY FIRE TIMELINE. November 1, 2017 SONOMA COUNTY FIRE TIMELINE November 1, 2017 1 In the late evening of Sunday, October 8, 2017, and the early morning hours of Monday, October 9, 2017, fire swept through the Santa Rosa area including areas

More information

[Kumar et. al., Vol.3 (Iss.9): September, 2016] ISSN: Impact Factor: (I2OR)

[Kumar et. al., Vol.3 (Iss.9): September, 2016] ISSN: Impact Factor: (I2OR) IJETMR URBAN SPATIAL GROWTH AND LANDUSE CHANGE DETECTION ANALYSIS OF ALIGARH CITY, UTTAR PRADESH, INDIA USING HIGH RESOLUTION REMOTE SENSING DATA, GEOGRAPHICAL INFORMATION SYSTEM (GIS) AND GLOBAL POSITIONING

More information

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan (Text in italic font is meant for instruction to staff and should be deleted in

More information

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program: Education:

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program:  Education: The National Weather Service (NWS) has implemented a voluntary recognition program to help large outdoor venues, including those on university campuses, better protect staff and patrons from the dangers

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT 1 TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT RFQ for Geotechnical Investigations and Foundation Recommendations TCML/MS/RFQ1/2017 October 2017

More information

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services JOB SITES: GreenTrees of Huntley 11417 E. Main Street Huntley, IL 60142 SilverTrees Apartments 5901 Milwaukee Street Richmond,

More information

The Kentucky Mesonet: Entering a New Phase

The Kentucky Mesonet: Entering a New Phase The Kentucky Mesonet: Entering a New Phase Stuart A. Foster State Climatologist Kentucky Climate Center Western Kentucky University KCJEA Winter Conference Lexington, Kentucky February 9, 2017 Kentucky

More information

HELLA AGLAIA MOBILE VISION GMBH

HELLA AGLAIA MOBILE VISION GMBH HELLA AGLAIA MOBILE VISION GMBH DRIVING SOFTWARE INNOVATION H E L L A A g l a i a M o b i l e V i s i o n G m b H I C o m p a n y P r e s e n t a t i o n I D e l h i, A u g u s t 2 0 1 7 11 Hella Aglaia

More information

The World Bank Cities and Climate Change (P123201)

The World Bank Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 13 ARCHIVED on 17-May-2018 ISR31517

More information

1994: JV formed for civil engineering consultancy COWI/KX A/s, Denmark(51%) IFU, Denmark (24% ) IL&FS Infrastructure Dev Corp, India(25%)

1994: JV formed for civil engineering consultancy COWI/KX A/s, Denmark(51%) IFU, Denmark (24% ) IL&FS Infrastructure Dev Corp, India(25%) Company Profile 1994: JV formed for civil engineering consultancy COWI/KX A/s, Denmark(51%) IFU, Denmark (24% ) IL&FS Infrastructure Dev Corp, India(25%) 1998: Start of mapping as a new segment of Business.

More information

Trade Show Planning Timeline by Cory Ann Ellis

Trade Show Planning Timeline by Cory Ann Ellis Trade Planning Timeline Action +2 9-2 6-9 3-6 -3 At the < After Action +2 9-2 6-9 3-6 -3 At the < After Select your show(s) Clarify Value of Research: cost, history, # of attendees, ROI, past vendors,

More information

Digital Development of Territories. Pedro Leite Member of the Board of Directors

Digital Development of Territories. Pedro Leite Member of the Board of Directors Digital Development of Territories Pedro Leite Member of the Board of Directors Digital Development of Territories Pedro Leite Member of the Board of Directors Azores Archipelago 9 islands located in the

More information

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank China: Qinghai Xining Urban Transport Project (P127867) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2016 ISR24068 Implementing Agencies:

More information

TRAVEL DEMAND MODEL. Chapter 6

TRAVEL DEMAND MODEL. Chapter 6 Chapter 6 TRAVEL DEMAND MODEL As a component of the Teller County Transportation Plan development, a computerized travel demand model was developed. The model was utilized for development of the Transportation

More information

UPKAR PRAKASHAN, AGRA 2

UPKAR PRAKASHAN, AGRA 2 By Dr. Lal & Jain UPKAR PRAKASHAN, AGRA 2 Publishers Publishers UPKAR PRAKASHAN (An ISO 9001 : 2000 Company) 2/11A, Swadeshi Bima Nagar, AGRA 282 002 Phone : 4053333, 2530966, 2531101 Fax : (0562) 4053330,

More information

Institute for Plasma Research (An Autonomous Institute of Dept. of Atomic Energy) Bhat, Gandhinagar

Institute for Plasma Research (An Autonomous Institute of Dept. of Atomic Energy) Bhat, Gandhinagar (An Autonomous Institute of Dept. of Atomic Energy) ITEM DESCRIPTION TERMS & CONDITIONS SST-1 Network Up-gradation which include Supply of fiber optic based ethernet networking components, installation,

More information

REPORT ON INVESTMENTS

REPORT ON INVESTMENTS REPORT ON INVESTMENTS D.T2.3.3 Investments for technical equipment for the implementation of Web-GIS platform in Mantova 1 Local support group designing Mantova Web-GIS platform. Picture by Maria Giulia

More information

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819) Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 23-Nov-2018 ISR34538 Implementing Agencies:

More information

Intelligent Retailing at Airports. com ARIS Nov

Intelligent Retailing at Airports.  com ARIS Nov Intelligent Retailing at Airports www.wincor-nixdorf. com ARIS Nov 2008 1 Intelligent Retailing at Airports Why bother The answer is with obvious retailing at $$$money. all? www.wincor-nixdorf. com ARIS

More information

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan for Ghana Transport Sector Improvement Project (P151026) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan for Ghana Transport Sector Improvement Project (P151026) I. General 1. Bank s approval

More information

Exploit your geodata to enable smart cities and countries

Exploit your geodata to enable smart cities and countries Exploit your geodata to enable smart cities and countries Carsten Rönsdorf, Head of Advisory Services Middle East Practice Manager Future Cities, standards and 3D 24 November 2014 Importance of Standards

More information

inovitas be on site with infra3d

inovitas be on site with infra3d inovitas be on site with infra3d be inspired... Infrastructure has an immense property value and is a prerequisite for a functioning competitive economy. In this context, the modes of transport such as

More information

Evaluating e-government : implementing GIS services in Municipality

Evaluating e-government : implementing GIS services in Municipality Evaluating e-government : implementing GIS services in Municipality Municipality of Thessaloniki - G.I.S. Unit Misirloglou Symeon Head of the GIS Unit ESRI UC - 2016 The GIS Section - subset of the department

More information

Law Enforcement Solutions and Applications

Law Enforcement Solutions and Applications ArcGIS for Solutions and Applications Solutions and Applications ArcGIS for Platform ArcGIS for Collection of solutions and applications for law enforcement. Built on the ArcGIS platform. For any named

More information

Prior Review Thresholds

Prior Review Thresholds Public Disclosure Authorized I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting

More information

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA Location and Acreage Approximately 1,863 acres of land in San Patricio County, located in the ETJ northwest of the existing City Limits. Metes and

More information

Estimated Amount (Rs.)

Estimated Amount (Rs.) Tender no.-pm/pwd/tender/2013-14/132 Date:- 08/11/13 Sealed Tender Paper in printed form, as specified, are invited by the Chairman, from reliable, resourceful and bonafied Agencies with Sound technical

More information

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. OTHER TOPICS Index No. X-1 PROCEDURES MEMORANDUM TO: FROM: SUBJECT: MCC Students and Staff Office of the President Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. DATE:

More information

q 'v jn ^ l ^ P T (Tr f ^ R ), V lu *T. 6 6, fctcvft g r r ^ ^ q f tu R arjwth qf^k.

q 'v jn ^ l ^ P T (Tr f ^ R ), V lu *T. 6 6, fctcvft g r r ^ ^ q f tu R arjwth qf^k. Ph. No. Office : 011-25221059 Fax:011-25225546 Em ail: acri.delhi@gmail.com acri-demi@nic.in eftn ~ S F J W T F T 011-25221059 vto 'ft- 011-25225546 acri.delhi@gmail.com acri-delhi@nic.in q 'v jn ^ l ^

More information

São Paulo Metropolis and Macrometropolis - territories and dynamics of a recent urban transition

São Paulo Metropolis and Macrometropolis - territories and dynamics of a recent urban transition São Paulo Metropolis and Macrometropolis - territories and dynamics of a recent urban transition Faculty of Architecture and Urbanism of São Paulo University Prof. Dr. Regina M. Prosperi Meyer WC2 - World

More information

Delay Attribution Board. Guidance No. DAB-28

Delay Attribution Board. Guidance No. DAB-28 Delay Attribution Board Guidance No. DAB-28 1. Introduction 1.1. The Delay Attribution Board (the Board) received a request for guidance in connection with the Attribution of TRUST incident 253013 2B07

More information

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project I. General Plan Mozambique: P125120 - Greater Maputo Water Supply Expansion Project 1. Bank s approval Date of the procurement Plan 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

GIS. in the City of Lewiston Maine

GIS. in the City of Lewiston Maine GIS in the City of Lewiston Maine The purpose of this slideshow is to provide an overview of the city GIS and how it is used, maintained and accessed in-house as well as by the public. Please simply hit

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

MAPPS 2012 Geospatial Products and Services Excellence Awards Awards Entry Form

MAPPS 2012 Geospatial Products and Services Excellence Awards Awards Entry Form MAPPS 2012 Geospatial Products and Services Excellence Awards 2012 Awards Entry Form Please include a copy of this document with the project/product submission Entry Information Submission Number: 1741558

More information

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions

More information

Technical Requirements. Version No. 1.0 Effective Date 10/1/2008

Technical Requirements. Version No. 1.0 Effective Date 10/1/2008 PURPOSE This document applies to wind Generators and describes technical standards that such wind Generators must satisfy to be qualified as a Participating Intermittent Resource (PIR) under the CAISO

More information

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DE 05-142 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for License to Construct and Maintain Electric Lines Over and Across the Public Waters of the Nashua River in the City of Nashua, New Hampshire

More information

Using GIS Online for tracking development of roadway construction plans. Tom Cox Viraj Perera

Using GIS Online for tracking development of roadway construction plans. Tom Cox Viraj Perera Using GIS Online for tracking development of roadway construction plans Tom Cox Viraj Perera 9 Districts District 6 Located in the Capital City Springfield, IL LAND OF LINCOLN Home to: Abraham Lincoln

More information

POSITION DESCRIPTION. Position Title: Geographic Information Systems (GIS) Coordinator Department: Engineering

POSITION DESCRIPTION. Position Title: Geographic Information Systems (GIS) Coordinator Department: Engineering POSITION DESCRIPTION Position Title: Geographic Information Systems (GIS) Coordinator Department: Engineering Reports To: Engineering Supervisor FLSA Status: Exempt Date: April 2018 PRIMARY OBJECTIVE OF

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Fish Pond. Old Secretariate. Shaheed Smarak

Fish Pond. Old Secretariate. Shaheed Smarak Fish Pond Old Secretariate Shaheed Smarak HOW SATELLITE SCANS EARTH. Rajbhawan area viewed by IKONOS 1 meter sensor Very high resolution (40 cm) Orbi-Image data Higher the resolution better the geometric

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

Oman NSDI Business Values and Future Directions. Hassan Alawi Alghazali Acting Director General National Spatial Data Infrastructure

Oman NSDI Business Values and Future Directions. Hassan Alawi Alghazali Acting Director General National Spatial Data Infrastructure Oman NSDI Business Values and Future Directions Hassan Alawi Alghazali Acting Director General National Spatial Data Infrastructure Presentation Outline Geospatial Maturity Current Challenges NCSI s Role

More information

Leaving the Ivory Tower of a System Theory: From Geosimulation of Parking Search to Urban Parking Policy-Making

Leaving the Ivory Tower of a System Theory: From Geosimulation of Parking Search to Urban Parking Policy-Making Leaving the Ivory Tower of a System Theory: From Geosimulation of Parking Search to Urban Parking Policy-Making Itzhak Benenson 1, Nadav Levy 1, Karel Martens 2 1 Department of Geography and Human Environment,

More information

SUMMARY. Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10

SUMMARY. Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10 CPRNW Meeting 10 Agenda Item 3.2.1 CPRNW10/3/2/VIII MSI Self Assessment - NAVAREA VIII Submitted by INDIA SUMMARY Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10

More information

UN-GGIM: User case studies ISRAEL

UN-GGIM: User case studies ISRAEL UNGGIM: User case studies ISRAEL ISRAEL GIS for 2008 Integrated Population Census GIS was used as a main infrastructure for the 2008 Israeli integrated census of population The Integrated Census is based

More information

Excel Geomatics: Offering Excellence with Unique Consultancy & Services

Excel Geomatics: Offering Excellence with Unique Consultancy & Services Excel Geomatics: Offering Excellence with Unique Consultancy & Services Providing consultancy and value Added Services using Remote Sensing, Photogrammetry and LiDAR in areas such as Agriculture, Forestry,

More information

Working with Rumaila's Supply Chain

Working with Rumaila's Supply Chain Working with Rumaila's Supply Chain 2 3 With a heritage of over half a century of continued oil and gas production, Rumaila's vast resources makes it comparable with the very largest producing fields in

More information

Status and Future Direction of HTS Power Application in KEPCO

Status and Future Direction of HTS Power Application in KEPCO Oct.26-28, 2011, Thailand PL-18 CIGRE-AORC 2011 www.cigre-aorc.com Status and Future Direction of HTS Power Application in KEPCO K. W. Jeong, B. S. Moon, S. K. Park Grid Planning Office, KEPCO Korea SUMMARY

More information

Digital Weft. InterPARES as common thread in Vancouver s Digital Preservation Programme. CITRA Oslo Sept 15, 2010

Digital Weft. InterPARES as common thread in Vancouver s Digital Preservation Programme. CITRA Oslo Sept 15, 2010 Digital Weft InterPARES as common thread in Vancouver s Digital Preservation Programme CITRA Oslo Sept 15, 2010 Presentation Structure Context and Background City of Vancouver Archives and Records Programmes

More information

How to buy a telescope for your institution

How to buy a telescope for your institution How to buy a telescope for your institution by Dr. Frank Melsheimer DFM Engineering, Inc. 1035 Delaware Avenue, Unit D Longmont, Colorado 80501 phone 303-678-8143 fax 303-772-9411 www.dfmengineering.com

More information

Status of Quarters as per Quarter Allotment Database as on

Status of Quarters as per Quarter Allotment Database as on A B C D E Total A B C D E Total A B C D E Total A B C D E 0 Total Colonies: 190 5397 6052 1410 285 56 13200 4551 4811 962 243 47 10614 807 1223 431 39 9 2509 39 18 17 3 1. ARAM BAGH 0 1 0 0 0 1 0 1 0 0

More information

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION Celebrity Announcement Coming Soon! A Look Back... A Unique, Educational SELL-OUT EVENT Are you looking

More information

CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS

CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS PURPOSE: This chapter establishes the administration and use of to improve the quality and accessibility of Department s spatial information and support graphical

More information

COPYRIGHTED MATERIAL. 1 Introduction

COPYRIGHTED MATERIAL. 1 Introduction 1 Introduction GIS technology has been used in a variety of government and semi-government organisations since the late 1970s. However it has only been in the last two decades that GIS has become a technology

More information

Allo Fiber City Checklist

Allo Fiber City Checklist Allo Fiber City Checklist Experience Fiber Internet + TV + Phone Like Never Before. Gigabit Internet speeds have the power to move communities forward by contributing to economic development and heightening

More information

Snow and Ice Removal

Snow and Ice Removal Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,

More information

Lightcloud Application

Lightcloud Application Controlling Your Lightcloud System Lightcloud Application Lightcloud Application Navigating the Application Devices Device Settings Organize Control Energy Scenes Schedules Demand Response Power Up State

More information

Empowering water/wastewater network management with GIS

Empowering water/wastewater network management with GIS Empowering water/wastewater network management with GIS Ioannis Kavouras_GIS Manager Surveying Engineer, MSc, MBA The Company responsible for fresh water distribution & sanitation serving 1.500.000 citizens

More information

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501 REISSUED 10/09/2017 SECTION 001116 ADVERTISEMENT FOR BIDS 1. Sealed bids will be received by Ottumwa Community School District for construction of the following: Ottumwa Schafer Stadium 8-Lane Track Bids

More information

Application of GIS in Public Transportation Case-study: Almada, Portugal

Application of GIS in Public Transportation Case-study: Almada, Portugal Case-study: Almada, Portugal Doutor Jorge Ferreira 1 FSCH/UNL Av Berna 26 C 1069-061 Lisboa, Portugal +351 21 7908300 jr.ferreira@fcsh.unl.pt 2 FSCH/UNL Dra. FCSH/UNL +351 914693843, leite.ines@gmail.com

More information

NLCIL RESERVES THE RIGHT TO CONDUCT REVERSE AUCTION ON ITEM WISE SITE COST BASIS AFTER PRICE BID OPENING SUBJECT TO

NLCIL RESERVES THE RIGHT TO CONDUCT REVERSE AUCTION ON ITEM WISE SITE COST BASIS AFTER PRICE BID OPENING SUBJECT TO NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

By Editorial Board Pratiyogita Darpan UPKAR PRAKASHAN, AGRA-2

By Editorial Board Pratiyogita Darpan UPKAR PRAKASHAN, AGRA-2 By Editorial Board Pratiyogita Darpan UPKAR PRAKASHAN, AGRA-2 Publishers Publishers UPKAR PRAKASHAN (An ISO 9001 : 2000 Company) 2/A, Swadeshi Bima Nagar, AGRA 282 002 Phone : 4053333, 2530966, 25301 Fax

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 13 AM02 - Texas A&M University Purchase Order P.O. Date: 12/20/2016 Purchase Order Number AM02-17-P041529 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

KENYA-TANZANIA POWER INTERCONNECTION PROJECT

KENYA-TANZANIA POWER INTERCONNECTION PROJECT KENYA-TANZANIA POWER INTERCONNECTION PROJECT MINUTES OF THE PRE-BID MEETING AND SITE VISITS 17 TH - 19 TH AUGUST 2015 KETRACO Offices, Capitol Hill Square, Upper hill, Nairobi, Kenya ATTENDANCE Name: Designation:

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of

More information

Office of Technology Partnerships GIS Collaboration

Office of Technology Partnerships GIS Collaboration Office of Technology Partnerships GIS Collaboration State GIS Update April 21, 2017 Mark Holmes, GISP Outline MGF Upgrade Project Census Programs Imagery Update LiDAR Update Open Discussion 2 MGF Background

More information

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan for Eth Expressway Project ( P148850) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan for Eth Expressway Project ( P148850) 1. Bank s approval Date of the

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 174421 VAN NUYS CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLAY PERMANENT [Q] CONDITIONS ORDINANCE An ordinance AMENDING Section 12.04 of the Los Angeles Municipal Code by amending the

More information

PURCHASE OF LAB EQUIPMENTS FOR CHEMISTRY [Kindly enclose a signed copy of this document along with the TENDER Document]

PURCHASE OF LAB EQUIPMENTS FOR CHEMISTRY [Kindly enclose a signed copy of this document along with the TENDER Document] T.K.M. COLLEGE OF ARTS & SCIENCE KOLLAM, Kerala 6900, INDIA www.tkmcas.ac.in Tender No 20/FIST/ ITEMS PURCHASE OF LAB EQUIPMENTS FOR CHEMISTRY [Kindly enclose a signed copy of this document along with

More information

Building a National Data Repository

Building a National Data Repository Building a National Data Repository Mladen Stojic, Vice President - Geospatial 1/30/2013 2012 Intergraph Corporation 1 Information has meaning and gives power only when shared and distributed. Information,

More information