Environmental Statement South Kyle Wind Farm August Appendix 12.9: The Habitat Loss and Disturbance Calculations
|
|
- Laura Knight
- 5 years ago
- Views:
Transcription
1 Appendix 12.9: The Habitat and Disturbance Calculations 1.1 Introduction 1 This appendix details the approach, assumptions and results of the process adopted to quantify habitat loss and degradation as a result of the construction of the proposed wind farm for the ecological impact assessment presented in Chapter 12. Habitat loss, disturbance and potential degradation has been estimated using the Phase 1 habitat survey results and the scheme layout design as released in December Where there is uncertainty various assumptions have been made regarding the construction methodology to arrive at a realistic worst case estimates. 2 This rest of this appendix is structured into the following sections: Calculating Direct Habitat Calculating the Extent of Habitat and Disturbance The Calculations The Results 1.2 Estimating Habitat / Potential Change 3 Direct habitat loss will occur as a result of the construction of the permanent elements of the wind farm infrastructure such as the wind turbine bases, crane pads, control building, access roads, passing places and turning points. 4 There are three main types of access road proposed: Upgrade to existing forestry tracks; New 'cut' roads constructed on hard ground, on less than one metre depth of peat, or on steeper gradients (greater than 1:10); and New 'floated' roads constructed on softer ground of typically greater than 1 m peat depth. 5 Cut roads can have a greater impact on terrestrial habitats because of the associated earthworks, in particular where the track runs across a slope requiring a cutting and embankment to be created. Cut tracks also normally require drainage ditches. The extent of floated track construction is not known at this time. Therefore, for the purposes of the habitat loss estimates it has been assumed that only cut roads will be used at South Kyle, even though a number of the new roads will pass over peat exceeding 1 m depth and would therefore be floated. 6 The dimensions assumed for the estimates of direct habitat loss for each of the built elements of the proposed wind farm are provided in Table below Zone of Construction Disturbance 7 Further to direct habitat losses there will be an area of ground surrounding the finished structure which will be subject to physical disturbance (that is plant trafficking and excavations). For the purposes of the habitat disturbance estimates it has been assumed that drainage ditches, cable trenches, banked Page 1 of 8
2 cut faces/batters around the turbine bases, associated compounds, crane pads and access roads, would be within 5 m of the finished structure. Therefore, an additional 5 m wide zone around the footprint of the structure has been included in the estimations of habitat loss / disturbance Zone of Hydrological Change 8 Some habitats adjacent to the zone of physical construction disturbance, particularly those sensitive to changes in surface hydrology such as blanket bog, will be indirectly affected due to hydrological changes associated with excavations for turbine foundations, borrow pits and access roads etc. At South Kyle, the most sensitive habitats to hydrological changes are blanket bog, modified bog, wet heath and acid/neutral flushes. 9 Hydrological changes may over time alter the plant species cover and composition in sensitive habitat types. If this were the case, the original type of habitat may change. An example of this is when blanket bog has new drainage ditches created adjacent to it causing a lowering in the water level and losses of bog specialist plant species being replaced by species that can tolerate drier conditions. This change over time is regarded as an indirect loss or degradation of habitat. 10 Areas of such blanket bog, modified bog and wet heath habitats within the proposed survey area are confined to small areas, typically along forestry rides, although there is a significant extent of blanket bog between turbines 7 and 10. Plants which are characteristic of these habitats are adapted to low nutrient, acidic and wet conditions, and therefore the maintenance of a high water table is critical to the long-term maintenance of these species. Artificial drainage of peat can cause the loss of such species; particularly bog mosses (Sphagnum spp.). In extreme cases this may result in enough loss of vegetation cover and structure to cause the eventual erosion of exposed peat. 11 In order to assess the full potential impact of construction works in sensitive habitats, it is therefore necessary to assume a potential zone of influence over the adjacent vegetation within the habitat change estimates so that longer-term changes to natural hydrology can be assessed. 12 Rani Nayak et al. (2008) provide examples from a literature review of measured zones of hydrological influence in blanket bogs and provided a regression equation to enable estimates of the extent of drainage effects around an area of disturbance. In order to use this equation is it necessary to have estimates of the hydraulic conductivity of the peat at the site that is being considered, taking into consideration broad patterns of variation in peat condition. Detailed information on hydraulic conductivity is not available for the South Kyle wind farm site. However, based on the case examples and information on peat hydrology impacts provided in Rani Nayak et al. (2008) a conservative potential zone of hydrological disturbance as a result of the proposed construction works in the relevant habitats has been assumed to be a 10 m wide strip beyond the zone of construction disturbance. 13 Calculations regarding the dimensions of each wind turbine site are based on an indicative hardstanding layout provided on 15 October The hardstanding layout described the location of the hardstanding and crane pads in relation to the turbine base. The 5 m construction disturbance zone and 10 m hydrological disturbance zone were therefore applied around a Page 2 of 8
3 single indicative hardstanding layout which includes 'turbine base + hardstanding + 2 crane pads'. 14 Calculations for the 5 m construction zone and 10 m hydrological disturbance zone around the site roads were considered separately to the indicative hardstanding layout. 15 However, as each site road would run adjacent to each of these 'turbine base + hardstanding +2 crane pads' areas, the disturbance areas are likely to be overestimated because they are, in effect, double-counted where the road is contiguous with the 'turbine base + hardstanding +2 crane pads ' areas. 16 The construction zone and hydrological disturbance zone estimations are therefore a worst-case scenario. 17 A revised turbine layout, including site roads, for the wind farm design was issued in early December This relocated turbine 49 and turbine 50. However, there was no new release of the indicative hardstanding layout; therefore, the indicative hardstanding layout was edited by MBEC to ensure that the turbine 49 and turbine 50 indicative hardstanding layouts were placed adjacent to the new road design. 1.3 The Calculations 18 The dimensions and extents of the various infrastructure elements for the proposed South Kyle wind farm are provided in Table below. Page 3 of 8
4 TABLE The Dimensions and Extents of the South Kyle Wind Farm Infrastructure As Provided in Chapter 4 Infrastructure Number or Length (km) Maximum Dimensions assumed (m) Total footprint area Turbine foundations, hardstandings, and crane pads Permanent wind monitoring masts 50 For each wind turbine: Hardstanding area = 45 m x 25 m = 1125 m 2 Foundations = 17 m diameter = 226 m 2 Each crane pad = 15 m x 10 m = 150 m 2 ; therefore two crane pads = 300 m 2 6 For each met mast (exact footprint not provided): Reinforced concrete foundation = 7 m x 7 m = 49 m m depth anchor points required for guy wires need concrete foundations (negligible area) Crane hardstanding adjacent to each mast = 15 m x 10 m = 150 m Temporary storage areas Temporary compounds Permanent welfare facility compound (part of a temporary compound) Electrical substation Windfarm connection compound m x 100 m m x 50 m m x 15 m No dimensions provided m x 35 m 0.12 Upgrading of existing site roads 25.9 km Existing roads would be widened by 2 m on average (from approximately 3 m to 5 m width) Approx New site roads 30.8 km 5 m running surface Approx Passing places and turning points 50 Approximately 40 m x 5 m (The exact location not provided so it is assumed they are equally spaced along the tracks, i.e. there is passing place on 3.6% of track.) Approx 1.00 Borrow pits 8 The original data provided in a shapefile from November 2012 are used. (There was a revised borrow pit footprint of ha provided in December 2012 but this has not been used, as requested by Vattenfall. This means that the impact from the borrow pits uses the worst-case scenario.) Total area Page 4 of 8
5 19 The total footprint (that is the area subject to permanent habitat loss and which could not be restored for at least the lifetime of the wind farm) has therefore been estimated at approximately 57 ha. 1.4 The Results Direct Habitat 20 Table at the end of this appendix shows how the total estimated direct habitat loss from the construction of the proposed wind farm divided across different habitat types without considering any indirect impacts and excluding the meteorological masts The Total Extent of Habitat and Change 21 Table at the end of this appendix provides the cumulative total estimates for direct loss and potential indirect change to hydrologicallysensitive habitats for each element of wind farm infrastructure. These losses and potential changes have been are fully considered within the ecological impact assessment reported in Chapter 12 (see Section ). 1.5 References Nayak D.R., Miller, D., Nolan, A., Smith P. & Smith J. (2008). Calculating Carbon Savings From Wind Farms On Scottish Peat Lands- A New Approach. The Scottish Government website. Page 5 of 8
6 TABLE Estimates of the Area of Phase 1 Habitats Lost (permanent and long term) based on Survey Area Estimates given in Table 12.7 of the Ecology Chapter. The percentage of the total area refers to the 2012 ecological survey area (Figure12.1). (If the habitat is not shown, there is no impact.) Description Met mast foundations Met mast crane hardstanding 1 New access tracks 2 Existing access tracks improvements (3m to 5m width) 2 Passing places 3 Turbine hardstanding 4 Turbine foundation Turbine crane pads Borrow pits Temporary compounds Temporary storage area Permanent welfare facility 5 Windfarm Connection Compound Sustation Total Area % of Total Footprint Area as a % of habitat within the 2012 ecological survey area Coniferous plantation woodland Dense/continuous scrub Coniferous recently-felled woodland Unimproved acid grassland Semi-improved acid grassland Marsh/marshy grassland Acid dry dwarf shrub heath Wet dwarf shrub heath Dry heath/acid grassland mosaic Wet heath/acid grassland mosaic Page 6 of 8
7 Blanket bog Wet modified bog Acid/neutral flush Standing water Other (borrow pit) Total Exact met mast foundation and crane hardstanding footprints have not been provided so the worst case scenario locations (centred on the point locations provided) are used as described in Table Access track footprint areas (particularly for new access tracks) vary from Table This is because GIS data has been used for Table and so is corrected for curving tracks and overlapping areas at junctions etc. 3 It is assumed that the footprint for passing places is 3.6% of the footprint for the tracks, as described in Table Turbine infrastructure footprint provided in December 2012 has been used as no footprint has been provided with the dimensions provided in July 2013 (Table ). The December 2012 footprint dimensions vary slightly from those shown in Table : Hardstanding area = 45 m x 28 m, Foundations = 242 m 2, Crane pads = 180 m 2 x 2, thus slightly overestimating the habitat area. 5 The permanent welfare cabin will remain during the lifetime of the wind farm. This will be within the temporary compound/storage area which will be removed at the end of the construction phase. There is therefore some over accounting for this 0.04 ha cabin area. Page 7 of 8
8 TABLE Combined Direct and Potential Indirect of Phase 1 Habitat Types to Each Type of Infrastructure Associated with Proposed South Kyle Wind Farm for the Most Sensitive Habitats Likely to be Affected by Changes to Hydrology Description Met Mast Infrastructure New access tracks Existing Access Tracks Improvements Passing places Turbine Foundation, Hardstanding & Crane Pads Borrow pits Temporary compounds/ temporary storage areas 1 Windfarm connection compound Substations Total area as % of habitat within 2012 ecological survey area Marsh/marshy grassland Wet dwarf shrub heath Blanket bog Wet modified bog Acid/neutral flush Total The permanent welfare facility is accounted for in the dimensions of the temporary compound/temporary storage area. Page 8 of 8
GIS data classes used within the November 2013 Environmental Statement Engineering Maps
LWM-HS2-EN-DAT-000-000001 P01 22 January 2014 GIS data classes used within the November 2013 Environmental Statement Engineering Maps Document No.:LWM-HS2-EN-DAT-000-000001 Revision Author Checked by Approved
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationUK NEA Economic Analysis Report Cultural services: Mourato et al. 2010
Appendix A Hedonic regressions: Further data description The environmental data used to construct variables for the hedonic regressions come from the Centre for Ecology and Hydrology, the Generalised Land
More informationDREDGING A land manager s guide to the rules
DREDGING A land manager s guide to the rules Introduction Farmers have long practised sediment management, commonly referred to as dredging. The introduction of controls on these activities in 2006 was
More informationAppendix E: Cowardin Classification Coding System
Appendix E: Cowardin Classification Coding System The following summarizes the Cowardin classification coding system and the letters and numbers used to define the USFWS NWI wetland types and subtypes:
More informationSIF_7.1_v2. Indicator. Measurement. What should the measurement tell us?
Indicator 7 Area of natural and semi-natural habitat Measurement 7.1 Area of natural and semi-natural habitat What should the measurement tell us? Natural habitats are considered the land and water areas
More informationThe River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant
The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the
More informationSouthwest LRT Habitat Analysis. May 2016 Southwest LRT Project Technical Report
Southwest LRT Habitat Analysis Southwest LRT Project Technical Report This page intentionally blank. Executive Summary This technical report describes the habitat analysis that was performed to support
More information6 MACRAES MINING PROJECT MINERAL ZONE
6 MACRAES MINING PROJECT MINERAL ZONE 6.1 ZONE STATEMENT The Macraes Mining Zone applies to the area of land controlled by Macraes Mining Limited and included in Mining Permit 41-064 at the date of public
More informationDefining the Limit of Regulated Areas. C.1 Defining the River or Stream Flood Hazard 138. C.2 Defining the River or Stream Erosion Hazard 139
C.1 Defining the River or Stream Flood Hazard 138 C.2 Defining the River or Stream Erosion Hazard 139 C.3 Defining Watercourses 141 C.4 Defining the Lake Ontario Shoreline Flood, Erosion and Dynamic Beach
More informationAPPENDIX L.3 ARCHAEOLOGICAL MONITORING REPORT (JOHN CRONIN & ASSOCIATES)
Grousemount Wind Farm, Co. Kerry Environmental Impact Statement - Volume 2 of 3 August 2015 APPENDIX L.3 ARCHAEOLOGICAL MONITORING REPORT (JOHN CRONIN & ASSOCIATES) Appendix L: Cultural Heritage Barnastooka
More informationConsulting Services (Pty.) Ltd.
Wetland Consulting Services (Pty.) Ltd. 98/726/07 P.O. Box 72295 Lynnwood Ridge Pretoria 0040 Consulting Services (Pty.) Ltd. Specialist wetland and riparian consultants Room S 57 Building 33 CSIR Meiring
More information1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,
Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER
More informationTHE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:
THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL
More informationBest Management Practices for Coldwater Fisheries Enhancement and Restoration
Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation
More information2.1.2 Land cover data
2.1.2 Land cover data Land cover data was used as an approximate measure of the different habitat groupings throughout Britain. Land cover data was obtained from three sources The European Environment
More informationAppendix I Feasibility Study for Vernal Pool and Swale Complex Mapping
Feasibility Study for Vernal Pool and Swale Complex Mapping This page intentionally left blank. 0 0 0 FEASIBILITY STUDY BY GIC AND SAIC FOR MAPPING VERNAL SWALE COMPLEX AND VERNAL POOLS AND THE RESOLUTION
More informationFavourable Condition of Blanket Bog on Peak District SSSIs. Richard Pollitt Lead Adviser, Conservation & Land Management, Dark and South West Peak
Favourable Condition of Blanket Bog on Peak District SSSIs Richard Pollitt Lead Adviser, Conservation & Land Management, Dark and South West Peak Definitions SSSI Site of Special Scientific Interest statutory
More informationWhere
Where What Past Updated Construction Parameters Assumed start date 2030 6 year bulk EW duration plus approx. 1 year enabling works and early construction activities Enabling and early activities includes
More informationISSUED FOR CONSTRUCTION
PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite
More informationSediment Control Log (SCL)
Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control
More information(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998
(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998 (Gazette No. 19519, Notice No. 1540. Commencement date: 29 January 1999 [Proc. No. 8, Gazette No. 19703]) ENVIRONMENTAL IMPACT ASSESSMENT
More informationSupplementary material: Methodological annex
1 Supplementary material: Methodological annex Correcting the spatial representation bias: the grid sample approach Our land-use time series used non-ideal data sources, which differed in spatial and thematic
More information08/01/2012. LiDAR. LiDAR Benefits. LiDAR-BASED DELINEATION OF WETLAND BORDERS. CCFFR-2012 Society for Canadian Limnologists:
LiDAR CCFFR-2012 Society for Canadian Limnologists: Science for Wetland Policy and Management LiDAR-BASED DELINEATION OF WETLAND BORDERS Distance from laser to ground and back again: Determined as laser-pulse
More informationRESTORING ACTIVE BLANKET BOG IN IRELAND Project reference: LIFE02NAT/IRL/8490
Page 1 of 34 RESTORING ACTIVE BLANKET BOG IN IRELAND Project reference: LIFE02NAT/IRL/8490 A REPORT ON THE RESTORATION OF PROJECT SITE No. 13. CROAGHONAGH, CO. DONEGAL. Compiled by: John Conaghan 11 Dun
More informationCreating ponds for Marsh Clubmoss Lycopodielle inundata
Creating ponds for Marsh Clubmoss Lycopodielle inundata Freshwater Habitats Trust 1. What is Marsh Clubmoss? Marsh Clubmoss Lycopodiella inundata is not a true moss but a primitive non-flowering plant
More informationSolutions to Flooding on Pescadero Creek Road
Hydrology Hydraulics Geomorphology Design Field Services Photo courtesy Half Moon Bay Review Solutions to Flooding on Pescadero Creek Road Prepared for: San Mateo County Resource Conservation District
More information13 SHADOW FLICKER Introduction Methodology
Table of contents 13 SHADOW FLICKER... 13-1 13.1 Introduction... 13-1 13.2 Methodology... 13-1 13.2.1 Factors Influencing Shadow Flicker Occurrence... 13-2 13.2.2 Shadow Flicker Analysis Methodology...
More informationAppendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility
Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December
More informationAgenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections
Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationCoarse Sediment Traps
Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily
More informationGlobal Biogeography. Natural Vegetation. Structure and Life-Forms of Plants. Terrestrial Ecosystems-The Biomes
Global Biogeography Natural Vegetation Structure and Life-Forms of Plants Terrestrial Ecosystems-The Biomes Natural Vegetation natural vegetation is the plant cover that develops with little or no human
More informationComparing losses and gains in biodiversity: Lessons learnt from HS2 Phase One
Comparing losses and gains in biodiversity: Lessons learnt from HS2 Phase One John Simmons (URS) & David Collins (HS2 Ltd) IEEM Spring Conference, Birmingham 18 th March 2014 Environmental Overview Consultants
More informationUGRC 144 Science and Technology in Our Lives/Geohazards
UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education
More informationDeveloping a Landscape-Level Reference Standard Wetland Profile for the Prairie Pothole Region, Montana
Developing a Landscape-Level Reference Standard Wetland Profile for the Prairie Pothole Region, Montana Prepared for: The U.S. Environmental Protection Agency Prepared by: Melissa Hart and Linda Vance
More informationGully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion
Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,
More informationEROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT
PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.
More informationOrica Australia Pty Ltd Ammonium Nitrate Facility Upgrade
Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies
More informationSOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY
REPORT On contract research for Bohlweki Environmental SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY February 2007 By D.G. Paterson ARC-Institute for Soil, Climate and Water, Private
More informationUsing Weather and Climate Information for Landslide Prevention and Mitigation
Using Weather and Climate Information for Landslide Prevention and Mitigation Professor Roy C. Sidle Disaster Prevention Research Institute Kyoto University, Japan International Workshop on Climate and
More informationBIOMES. Definition of a Biome. Terrestrial referring to land. Climatically controlled sets of ecosystems. Characterized by distinct vegetation
BIOMES An Introduction to the Biomes of the World Definition of a Biome Terrestrial referring to land Climatically controlled sets of ecosystems Characterized by distinct vegetation 1 In a Biome There
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationRestoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders
.7 Reconnecting remnant meanders River Little Ouse Location - Thetford, Norfolk TL87082 Date of construction - 994 Length 900m Cost 5,000 Maximum extent of flooding during winter floods BTO boundary Small
More informationProvide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.
Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and
More informationAccounting for increased flow resistance due to lateral momentum loss in restoration designs using 2-stage channels
Skamania 2005 Accounting for increased flow resistance due to lateral momentum loss in restoration designs using 2-stage channels Outline Aim and Objectives Definition Use of 2-stage channels in stream
More informationAppendix J Vegetation Change Analysis Methodology
Appendix J Vegetation Change Analysis Methodology Regional Groundwater Storage and Recovery Project Draft EIR Appendix-J April 2013 APPENDIX J- LAKE MERCED VEGETATION CHANGE ANALYSIS METHODOLOGY Building
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationAPPENDIX B WORKSHEETS & EXHIBITS
APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions
More informationW I N D R E S O U R C E A S S E S S M E N T
W I N D R E S O U R C E A S S E S S M E N T Annual Energy Production Project: Hundhammer_WS_Express Layout: Layout1 Customer: WindSim 2014-01-29 WindSim AS Fjordgaten 15, N- 3125 Tønsberg, Norway phone.:
More informationInstream Erosion Control General
Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationTowards modelling global soil erosion and its importance for the terrestrial carbon cycle
Towards modelling global soil erosion and its importance for the terrestrial carbon cycle Tom Vanwalleghem 1 and Jed Kaplan 2 1 - Group for Rural Hydrology and Hydraulics, Department of Agronomy, University
More informationDirector, Operations Services, Met-Ed
Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast
More informationRestoring river-floodplain interconnection and riparian habitats along the embanked Danube between Neuburg and Ingolstadt (Germany)
Restoring river-floodplain interconnection and riparian habitats along the embanked Danube between Neuburg and Ingolstadt (Germany) Dipl.-Geogr. Gerald Blasch Department of Physical Geography, Cath. University
More informationBipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25
± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154
More informationMs. A. Mormando's Class *
8 th Grade Science Essential Standard: 8.E.1.1 Explain the structure of the hydrosphere including: Water distribution on Earth; Local river basin and water availability Stream - A stream is a body of water
More informationGIS ANALYSIS OF DRIVERS OF EROSION AND GULLYING IN SOUTHEAST NIGERIA
GIS ANALYSIS OF DRIVERS OF EROSION AND GULLYING IN SOUTHEAST NIGERIA Mayowa FASONA & Ademola OMOJOLA Department of Geography University of Lagos, Nigeria mfasona@unilag.edu.ng Outline Background Methodology
More informationSurvey of Garreg-hir 15 May ) Introduction 2) Equipment used and Conditions for Survey 3) The Survey 3.1) Character of Hill
Survey of Garreg-hir 15 May 2011 The Team: John Barnard, Graham Jackson and Myrddyn Phillips 1) Introduction Garreg-hir (Section 31A, OS 1:50000 Map 136, Grid Ref. SN998977) is listed as a marginal Marilyn
More information3 DESCRIPTION OF THE PROPOSED DEVELOPMENT
3 DESCRIPTION OF THE PROPOSED DEVELOPMENT As described in Chapter 2, the Preferred Option for the Bandon River (Bandon) Drainage Scheme comprises a combination of flood defences and dredging. The proposed
More informationYaneev Golombek, GISP. Merrick/McLaughlin. ESRI International User. July 9, Engineering Architecture Design-Build Surveying GeoSpatial Solutions
Yaneev Golombek, GISP GIS July Presentation 9, 2013 for Merrick/McLaughlin Conference Water ESRI International User July 9, 2013 Engineering Architecture Design-Build Surveying GeoSpatial Solutions Purpose
More informationVisualising Types of Uncertainty in Spatial Information
Visualising Types of Uncertainty in Spatial Information Peter Fisher City University, London National Academy of Sciences, 3-4 March 2005 Outline Issues The Problem The variety and levels of uncertainty
More informationHow Can DOT Operations and Maintenance Prepare for Extreme Weather Events?
How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four
More informationData and Information Management. UK All Energy 22 nd May Presented by Leo James
Data and Information Management UK All Energy 22 nd May 2013 Presented by Leo James Strategic Development Plans Observations at the outset Data and information management and dissemination: company or
More informationSPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang
SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION By Renee Vandermause & Chun-Yao Yang Outline Sediment Degradation - Erosion vs Sediment Yield - Sediment Yield - Methods for estimation - Defining Sediment
More informationSHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA
SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA Document Control Status Written by Approved by Date Comment Revision A T.Lam D.Bolton 14/03/14 Initial Revision B T.Lam D.Bolton
More informationAnnual transport rates at two locations on the fore-slope.
Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at
More informationSHORELINE PROVISIONS RESIDENTIAL LOT
By-law Discussion Paper #1 SHORELINE PROVISIONS RESIDENTIAL LOT Meeting Dates: April 6 to May 29, 2000 and February 13, 2001 Official Plan Policies Intent preserve ribbon of life preserve shoreline character
More informationCritical success factors for revegetation of heavily polluted sites.
Critical success factors for revegetation of heavily polluted sites. A cost-benefit analysis tool. Jan Japenga, Paul Römkens, Luc Bonten Soil Science Centre ALTERRA Green World Research, Wageningen University
More informationResearch Themes The development of GIS based methodology for the identification of potential wet grassland restoration sites
Catchment and Coastal Environments Research Group Research Themes The development of GIS based methodology for the identification of potential wet grassland restoration sites Dr Andrew Williams email a.williams@plymouth.ac.uk
More informationFluvial Geomorphic Guidelines
Fluvial Geomorphic Guidelines FACT SHEET I: GEOMORPHOLOGICAL HAZARDS CONFINED AND UNCONFINED WATERCOURSES Channel migration and erosion can create substantial risk to inappropriately located infrastructure
More informationIdentifying Trends in Exclusions and Feature Revisions to Promote Better Recon. Surface Water Status Monitoring Network
Identifying Trends in Exclusions and Feature Revisions to Promote Better Recon Surface Water Status Monitoring Network Andy Woeber GIS Analyst Watershed Monitoring Section FDEP Tallahassee Surface water
More informationBig Chino Valley Pumped Storage Project (FERC No ) Vegetation Mapping and Habitat Assessment Study Plan
March 21, 2018 1.0 Introduction Big Chino Valley Pumped Storage LLC (BCV), a subsidiary of ITC Holdings Corp. (ITC), submitted a preliminary permit application to the Federal Energy Regulatory Commission
More informationStream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)
Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental
More informationA p p l i c a t i o n D r a w i n g s : R e v i s i o n B Updated in response to submissions
: R e v i s i o n Updated in response to submissions C o n t e n t s 1. Existing Site Plan 2. Proposed Site Plan 3. Proposed Circulation Plan 4. Proposed uildings and Driveways 5. Proposed Vegetation Strategy
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationCarmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018
Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project
More informationSoil is formed from the weathering of rocks. Weathering: the breaking down of parent material (rock). There are 3 types of weathering:
Soil is formed from the weathering of rocks. Weathering: the breaking down of parent material (rock). There are 3 types of weathering: Physical, Chemical Biological. The natural forces carry this out:
More informationTracing and tracking sediment sources in river catchments
Insert image here Insert image here Tracing and tracking sediment sources in river catchments Adrian Collins and Yusheng Zhang www.adas.co.uk Delivering the WFD 1 The sediment problem information on sediment
More informationManaging uncertainty when aggregating from pixels to parcels: context sensitive mapping and possibility theory
Department of Geography Managing uncertainty when aggregating from pixels to parcels: context sensitive mapping and possibility theory Dr Lex Comber ajc36@le.ac.uk www.le.ac.uk/gg/staff/academic_comber.htm
More informationEnvironmental Statement South Kyle Wind Farm August 2013
15 PEAT, GEOLOGY AND CARBON BALANCE... 2 15.1 Introduction... 2 15.2 Methodology... 2 15.2.1 Desk Study... 3 15.2.2 Site Reconnaissance and Peat Probing... 3 15.3 Baseline conditions... 5 15.3.1 Results
More informationMinimum Standards for Wetland Delineations
Minimum Standards for Wetland Delineations Jason Gipson Chief, Utah/Nevada Regulatory Branch Sacramento District Regulatory Program Workshop 16 Mar 2016 US Army Corps of Engineers Delineation Report Minimum
More informationTechnical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology
Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017
More informationCONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS
CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS C Ryan 1, D Tetley 2, C Kinsey 3 1 & 2 Catchment Simulation Solutions, NSW 3 Co-ordinator Stormwater and Structural
More informationDan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time
Broad-Scale Models Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda GOAL Predict Channel Characteristics in Space and Time Assess Potential for Fish Use and Productivity Assess
More informationImpact : Changes to Existing Topography (Less than Significant)
4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as
More informationD. Adaptive Radiation
D. Adaptive Radiation One species new species: A new species: B new species: C new species: D Typically occurs when populations of a single species... invade a variety of new habitats, evolve under different
More informationMost natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time.
Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time. The major biomes, for example, usually maintain a characteristic
More informationRock Sizing for Batter Chutes
Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,
More informationSTAATSKOERANT, 7 APRIL 2017 No Environmental Affairs, Department of/ Omgewingsake, Departement van
Environmental Affairs, Department of/ Omgewingsake, Departement van 324 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice (3/2014)
More information[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.
Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of
More informationExercise 6: Working with Raster Data in ArcGIS 9.3
Exercise 6: Working with Raster Data in ArcGIS 9.3 Why Spatial Analyst? Grid query Grid algebra Grid statistics Summary by zone Proximity mapping Reclassification Histograms Surface analysis Slope, aspect,
More informationEcological Succession
Ecological Succession Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time. The major biomes, for example, usually
More informationLab objectives. Identify dominant plant species in Mer Bleue. Summarize and report quantitative data efficiently and accurately in graphs and tables.
1 Lab objectives Identify dominant plant species in Mer Bleue Summarize and report quantitative data efficiently and accurately in graphs and tables. Understand how sampling variability influences our
More informationThe SedAlp Project: WP6: INTERACTION WITH STRUCTURES
The SedAlp Project: WP6: INTERACTION WITH STRUCTURES 6 th International conference Water in the Alps Herrenchiemsee, 12 th of October, 2016 Jošt Sodnik Contents Structure of SedAlp project (www.sedalp.eu)
More informationFlooding in Dolgellau
Flooding in Dolgellau Graham Hall MMath, PhD University of Wales, Bangor Background Flooding has historically been a cause for concern in Dolgellau. Following a serious flood in December 1964 when shops
More informationSubtidal permanently flooded with tidal water. Irregularly exposed surface exposed by tides less often than daily
Types of Wetlands Tidal Systems COASTAL WETLAND ECOSYSTEMS Tidal Salt Marshes Tidal Freshwater Marshes Mangrove Wetlands Tidal Estuarine Wetland 1 Definition and Formation of Estuaries u Estuary : partially
More information