1 Appendix 12.9: The Habitat and Disturbance Calculations 1.1 Introduction 1 This appendix details the approach, assumptions and results of the process adopted to quantify habitat loss and degradation as a result of the construction of the proposed wind farm for the ecological impact assessment presented in Chapter 12. Habitat loss, disturbance and potential degradation has been estimated using the Phase 1 habitat survey results and the scheme layout design as released in December Where there is uncertainty various assumptions have been made regarding the construction methodology to arrive at a realistic worst case estimates. 2 This rest of this appendix is structured into the following sections: Calculating Direct Habitat Calculating the Extent of Habitat and Disturbance The Calculations The Results 1.2 Estimating Habitat / Potential Change 3 Direct habitat loss will occur as a result of the construction of the permanent elements of the wind farm infrastructure such as the wind turbine bases, crane pads, control building, access roads, passing places and turning points. 4 There are three main types of access road proposed: Upgrade to existing forestry tracks; New 'cut' roads constructed on hard ground, on less than one metre depth of peat, or on steeper gradients (greater than 1:10); and New 'floated' roads constructed on softer ground of typically greater than 1 m peat depth. 5 Cut roads can have a greater impact on terrestrial habitats because of the associated earthworks, in particular where the track runs across a slope requiring a cutting and embankment to be created. Cut tracks also normally require drainage ditches. The extent of floated track construction is not known at this time. Therefore, for the purposes of the habitat loss estimates it has been assumed that only cut roads will be used at South Kyle, even though a number of the new roads will pass over peat exceeding 1 m depth and would therefore be floated. 6 The dimensions assumed for the estimates of direct habitat loss for each of the built elements of the proposed wind farm are provided in Table below Zone of Construction Disturbance 7 Further to direct habitat losses there will be an area of ground surrounding the finished structure which will be subject to physical disturbance (that is plant trafficking and excavations). For the purposes of the habitat disturbance estimates it has been assumed that drainage ditches, cable trenches, banked Page 1 of 8

2 cut faces/batters around the turbine bases, associated compounds, crane pads and access roads, would be within 5 m of the finished structure. Therefore, an additional 5 m wide zone around the footprint of the structure has been included in the estimations of habitat loss / disturbance Zone of Hydrological Change 8 Some habitats adjacent to the zone of physical construction disturbance, particularly those sensitive to changes in surface hydrology such as blanket bog, will be indirectly affected due to hydrological changes associated with excavations for turbine foundations, borrow pits and access roads etc. At South Kyle, the most sensitive habitats to hydrological changes are blanket bog, modified bog, wet heath and acid/neutral flushes. 9 Hydrological changes may over time alter the plant species cover and composition in sensitive habitat types. If this were the case, the original type of habitat may change. An example of this is when blanket bog has new drainage ditches created adjacent to it causing a lowering in the water level and losses of bog specialist plant species being replaced by species that can tolerate drier conditions. This change over time is regarded as an indirect loss or degradation of habitat. 10 Areas of such blanket bog, modified bog and wet heath habitats within the proposed survey area are confined to small areas, typically along forestry rides, although there is a significant extent of blanket bog between turbines 7 and 10. Plants which are characteristic of these habitats are adapted to low nutrient, acidic and wet conditions, and therefore the maintenance of a high water table is critical to the long-term maintenance of these species. Artificial drainage of peat can cause the loss of such species; particularly bog mosses (Sphagnum spp.). In extreme cases this may result in enough loss of vegetation cover and structure to cause the eventual erosion of exposed peat. 11 In order to assess the full potential impact of construction works in sensitive habitats, it is therefore necessary to assume a potential zone of influence over the adjacent vegetation within the habitat change estimates so that longer-term changes to natural hydrology can be assessed. 12 Rani Nayak et al. (2008) provide examples from a literature review of measured zones of hydrological influence in blanket bogs and provided a regression equation to enable estimates of the extent of drainage effects around an area of disturbance. In order to use this equation is it necessary to have estimates of the hydraulic conductivity of the peat at the site that is being considered, taking into consideration broad patterns of variation in peat condition. Detailed information on hydraulic conductivity is not available for the South Kyle wind farm site. However, based on the case examples and information on peat hydrology impacts provided in Rani Nayak et al. (2008) a conservative potential zone of hydrological disturbance as a result of the proposed construction works in the relevant habitats has been assumed to be a 10 m wide strip beyond the zone of construction disturbance. 13 Calculations regarding the dimensions of each wind turbine site are based on an indicative hardstanding layout provided on 15 October The hardstanding layout described the location of the hardstanding and crane pads in relation to the turbine base. The 5 m construction disturbance zone and 10 m hydrological disturbance zone were therefore applied around a Page 2 of 8

3 single indicative hardstanding layout which includes 'turbine base + hardstanding + 2 crane pads'. 14 Calculations for the 5 m construction zone and 10 m hydrological disturbance zone around the site roads were considered separately to the indicative hardstanding layout. 15 However, as each site road would run adjacent to each of these 'turbine base + hardstanding +2 crane pads' areas, the disturbance areas are likely to be overestimated because they are, in effect, double-counted where the road is contiguous with the 'turbine base + hardstanding +2 crane pads ' areas. 16 The construction zone and hydrological disturbance zone estimations are therefore a worst-case scenario. 17 A revised turbine layout, including site roads, for the wind farm design was issued in early December This relocated turbine 49 and turbine 50. However, there was no new release of the indicative hardstanding layout; therefore, the indicative hardstanding layout was edited by MBEC to ensure that the turbine 49 and turbine 50 indicative hardstanding layouts were placed adjacent to the new road design. 1.3 The Calculations 18 The dimensions and extents of the various infrastructure elements for the proposed South Kyle wind farm are provided in Table below. Page 3 of 8

4 TABLE The Dimensions and Extents of the South Kyle Wind Farm Infrastructure As Provided in Chapter 4 Infrastructure Number or Length (km) Maximum Dimensions assumed (m) Total footprint area Turbine foundations, hardstandings, and crane pads Permanent wind monitoring masts 50 For each wind turbine: Hardstanding area = 45 m x 25 m = 1125 m 2 Foundations = 17 m diameter = 226 m 2 Each crane pad = 15 m x 10 m = 150 m 2 ; therefore two crane pads = 300 m 2 6 For each met mast (exact footprint not provided): Reinforced concrete foundation = 7 m x 7 m = 49 m m depth anchor points required for guy wires need concrete foundations (negligible area) Crane hardstanding adjacent to each mast = 15 m x 10 m = 150 m Temporary storage areas Temporary compounds Permanent welfare facility compound (part of a temporary compound) Electrical substation Windfarm connection compound m x 100 m m x 50 m m x 15 m No dimensions provided m x 35 m 0.12 Upgrading of existing site roads 25.9 km Existing roads would be widened by 2 m on average (from approximately 3 m to 5 m width) Approx New site roads 30.8 km 5 m running surface Approx Passing places and turning points 50 Approximately 40 m x 5 m (The exact location not provided so it is assumed they are equally spaced along the tracks, i.e. there is passing place on 3.6% of track.) Approx 1.00 Borrow pits 8 The original data provided in a shapefile from November 2012 are used. (There was a revised borrow pit footprint of ha provided in December 2012 but this has not been used, as requested by Vattenfall. This means that the impact from the borrow pits uses the worst-case scenario.) Total area Page 4 of 8

5 19 The total footprint (that is the area subject to permanent habitat loss and which could not be restored for at least the lifetime of the wind farm) has therefore been estimated at approximately 57 ha. 1.4 The Results Direct Habitat 20 Table at the end of this appendix shows how the total estimated direct habitat loss from the construction of the proposed wind farm divided across different habitat types without considering any indirect impacts and excluding the meteorological masts The Total Extent of Habitat and Change 21 Table at the end of this appendix provides the cumulative total estimates for direct loss and potential indirect change to hydrologicallysensitive habitats for each element of wind farm infrastructure. These losses and potential changes have been are fully considered within the ecological impact assessment reported in Chapter 12 (see Section ). 1.5 References Nayak D.R., Miller, D., Nolan, A., Smith P. & Smith J. (2008). Calculating Carbon Savings From Wind Farms On Scottish Peat Lands- A New Approach. The Scottish Government website. Page 5 of 8

6 TABLE Estimates of the Area of Phase 1 Habitats Lost (permanent and long term) based on Survey Area Estimates given in Table 12.7 of the Ecology Chapter. The percentage of the total area refers to the 2012 ecological survey area (Figure12.1). (If the habitat is not shown, there is no impact.) Description Met mast foundations Met mast crane hardstanding 1 New access tracks 2 Existing access tracks improvements (3m to 5m width) 2 Passing places 3 Turbine hardstanding 4 Turbine foundation Turbine crane pads Borrow pits Temporary compounds Temporary storage area Permanent welfare facility 5 Windfarm Connection Compound Sustation Total Area % of Total Footprint Area as a % of habitat within the 2012 ecological survey area Coniferous plantation woodland Dense/continuous scrub Coniferous recently-felled woodland Unimproved acid grassland Semi-improved acid grassland Marsh/marshy grassland Acid dry dwarf shrub heath Wet dwarf shrub heath Dry heath/acid grassland mosaic Wet heath/acid grassland mosaic Page 6 of 8

7 Blanket bog Wet modified bog Acid/neutral flush Standing water Other (borrow pit) Total Exact met mast foundation and crane hardstanding footprints have not been provided so the worst case scenario locations (centred on the point locations provided) are used as described in Table Access track footprint areas (particularly for new access tracks) vary from Table This is because GIS data has been used for Table and so is corrected for curving tracks and overlapping areas at junctions etc. 3 It is assumed that the footprint for passing places is 3.6% of the footprint for the tracks, as described in Table Turbine infrastructure footprint provided in December 2012 has been used as no footprint has been provided with the dimensions provided in July 2013 (Table ). The December 2012 footprint dimensions vary slightly from those shown in Table : Hardstanding area = 45 m x 28 m, Foundations = 242 m 2, Crane pads = 180 m 2 x 2, thus slightly overestimating the habitat area. 5 The permanent welfare cabin will remain during the lifetime of the wind farm. This will be within the temporary compound/storage area which will be removed at the end of the construction phase. There is therefore some over accounting for this 0.04 ha cabin area. Page 7 of 8

8 TABLE Combined Direct and Potential Indirect of Phase 1 Habitat Types to Each Type of Infrastructure Associated with Proposed South Kyle Wind Farm for the Most Sensitive Habitats Likely to be Affected by Changes to Hydrology Description Met Mast Infrastructure New access tracks Existing Access Tracks Improvements Passing places Turbine Foundation, Hardstanding & Crane Pads Borrow pits Temporary compounds/ temporary storage areas 1 Windfarm connection compound Substations Total area as % of habitat within 2012 ecological survey area Marsh/marshy grassland Wet dwarf shrub heath Blanket bog Wet modified bog Acid/neutral flush Total The permanent welfare facility is accounted for in the dimensions of the temporary compound/temporary storage area. Page 8 of 8

GIS data classes used within the November 2013 Environmental Statement Engineering Maps

GIS data classes used within the November 2013 Environmental Statement Engineering Maps LWM-HS2-EN-DAT-000-000001 P01 22 January 2014 GIS data classes used within the November 2013 Environmental Statement Engineering Maps Document No.:LWM-HS2-EN-DAT-000-000001 Revision Author Checked by Approved

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

UK NEA Economic Analysis Report Cultural services: Mourato et al. 2010

UK NEA Economic Analysis Report Cultural services: Mourato et al. 2010 Appendix A Hedonic regressions: Further data description The environmental data used to construct variables for the hedonic regressions come from the Centre for Ecology and Hydrology, the Generalised Land

More information

DREDGING A land manager s guide to the rules

DREDGING A land manager s guide to the rules DREDGING A land manager s guide to the rules Introduction Farmers have long practised sediment management, commonly referred to as dredging. The introduction of controls on these activities in 2006 was

More information

Appendix E: Cowardin Classification Coding System

Appendix E: Cowardin Classification Coding System Appendix E: Cowardin Classification Coding System The following summarizes the Cowardin classification coding system and the letters and numbers used to define the USFWS NWI wetland types and subtypes:

More information

SIF_7.1_v2. Indicator. Measurement. What should the measurement tell us?

SIF_7.1_v2. Indicator. Measurement. What should the measurement tell us? Indicator 7 Area of natural and semi-natural habitat Measurement 7.1 Area of natural and semi-natural habitat What should the measurement tell us? Natural habitats are considered the land and water areas

More information

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the

More information

Southwest LRT Habitat Analysis. May 2016 Southwest LRT Project Technical Report

Southwest LRT Habitat Analysis. May 2016 Southwest LRT Project Technical Report Southwest LRT Habitat Analysis Southwest LRT Project Technical Report This page intentionally blank. Executive Summary This technical report describes the habitat analysis that was performed to support

More information

6 MACRAES MINING PROJECT MINERAL ZONE

6 MACRAES MINING PROJECT MINERAL ZONE 6 MACRAES MINING PROJECT MINERAL ZONE 6.1 ZONE STATEMENT The Macraes Mining Zone applies to the area of land controlled by Macraes Mining Limited and included in Mining Permit 41-064 at the date of public

More information

Defining the Limit of Regulated Areas. C.1 Defining the River or Stream Flood Hazard 138. C.2 Defining the River or Stream Erosion Hazard 139

Defining the Limit of Regulated Areas. C.1 Defining the River or Stream Flood Hazard 138. C.2 Defining the River or Stream Erosion Hazard 139 C.1 Defining the River or Stream Flood Hazard 138 C.2 Defining the River or Stream Erosion Hazard 139 C.3 Defining Watercourses 141 C.4 Defining the Lake Ontario Shoreline Flood, Erosion and Dynamic Beach

More information

APPENDIX L.3 ARCHAEOLOGICAL MONITORING REPORT (JOHN CRONIN & ASSOCIATES)

APPENDIX L.3 ARCHAEOLOGICAL MONITORING REPORT (JOHN CRONIN & ASSOCIATES) Grousemount Wind Farm, Co. Kerry Environmental Impact Statement - Volume 2 of 3 August 2015 APPENDIX L.3 ARCHAEOLOGICAL MONITORING REPORT (JOHN CRONIN & ASSOCIATES) Appendix L: Cultural Heritage Barnastooka

More information

Consulting Services (Pty.) Ltd.

Consulting Services (Pty.) Ltd. Wetland Consulting Services (Pty.) Ltd. 98/726/07 P.O. Box 72295 Lynnwood Ridge Pretoria 0040 Consulting Services (Pty.) Ltd. Specialist wetland and riparian consultants Room S 57 Building 33 CSIR Meiring

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Best Management Practices for Coldwater Fisheries Enhancement and Restoration Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation

More information

2.1.2 Land cover data

2.1.2 Land cover data 2.1.2 Land cover data Land cover data was used as an approximate measure of the different habitat groupings throughout Britain. Land cover data was obtained from three sources The European Environment

More information

Appendix I Feasibility Study for Vernal Pool and Swale Complex Mapping

Appendix I Feasibility Study for Vernal Pool and Swale Complex Mapping Feasibility Study for Vernal Pool and Swale Complex Mapping This page intentionally left blank. 0 0 0 FEASIBILITY STUDY BY GIC AND SAIC FOR MAPPING VERNAL SWALE COMPLEX AND VERNAL POOLS AND THE RESOLUTION

More information

Favourable Condition of Blanket Bog on Peak District SSSIs. Richard Pollitt Lead Adviser, Conservation & Land Management, Dark and South West Peak

Favourable Condition of Blanket Bog on Peak District SSSIs. Richard Pollitt Lead Adviser, Conservation & Land Management, Dark and South West Peak Favourable Condition of Blanket Bog on Peak District SSSIs Richard Pollitt Lead Adviser, Conservation & Land Management, Dark and South West Peak Definitions SSSI Site of Special Scientific Interest statutory

More information

Where

Where Where What Past Updated Construction Parameters Assumed start date 2030 6 year bulk EW duration plus approx. 1 year enabling works and early construction activities Enabling and early activities includes

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998

(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998 (13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998 (Gazette No. 19519, Notice No. 1540. Commencement date: 29 January 1999 [Proc. No. 8, Gazette No. 19703]) ENVIRONMENTAL IMPACT ASSESSMENT

More information

Supplementary material: Methodological annex

Supplementary material: Methodological annex 1 Supplementary material: Methodological annex Correcting the spatial representation bias: the grid sample approach Our land-use time series used non-ideal data sources, which differed in spatial and thematic

More information

08/01/2012. LiDAR. LiDAR Benefits. LiDAR-BASED DELINEATION OF WETLAND BORDERS. CCFFR-2012 Society for Canadian Limnologists:

08/01/2012. LiDAR. LiDAR Benefits. LiDAR-BASED DELINEATION OF WETLAND BORDERS. CCFFR-2012 Society for Canadian Limnologists: LiDAR CCFFR-2012 Society for Canadian Limnologists: Science for Wetland Policy and Management LiDAR-BASED DELINEATION OF WETLAND BORDERS Distance from laser to ground and back again: Determined as laser-pulse

More information

RESTORING ACTIVE BLANKET BOG IN IRELAND Project reference: LIFE02NAT/IRL/8490

RESTORING ACTIVE BLANKET BOG IN IRELAND Project reference: LIFE02NAT/IRL/8490 Page 1 of 34 RESTORING ACTIVE BLANKET BOG IN IRELAND Project reference: LIFE02NAT/IRL/8490 A REPORT ON THE RESTORATION OF PROJECT SITE No. 13. CROAGHONAGH, CO. DONEGAL. Compiled by: John Conaghan 11 Dun

More information

Creating ponds for Marsh Clubmoss Lycopodielle inundata

Creating ponds for Marsh Clubmoss Lycopodielle inundata Creating ponds for Marsh Clubmoss Lycopodielle inundata Freshwater Habitats Trust 1. What is Marsh Clubmoss? Marsh Clubmoss Lycopodiella inundata is not a true moss but a primitive non-flowering plant

More information

Solutions to Flooding on Pescadero Creek Road

Solutions to Flooding on Pescadero Creek Road Hydrology Hydraulics Geomorphology Design Field Services Photo courtesy Half Moon Bay Review Solutions to Flooding on Pescadero Creek Road Prepared for: San Mateo County Resource Conservation District

More information

13 SHADOW FLICKER Introduction Methodology

13 SHADOW FLICKER Introduction Methodology Table of contents 13 SHADOW FLICKER... 13-1 13.1 Introduction... 13-1 13.2 Methodology... 13-1 13.2.1 Factors Influencing Shadow Flicker Occurrence... 13-2 13.2.2 Shadow Flicker Analysis Methodology...

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Global Biogeography. Natural Vegetation. Structure and Life-Forms of Plants. Terrestrial Ecosystems-The Biomes

Global Biogeography. Natural Vegetation. Structure and Life-Forms of Plants. Terrestrial Ecosystems-The Biomes Global Biogeography Natural Vegetation Structure and Life-Forms of Plants Terrestrial Ecosystems-The Biomes Natural Vegetation natural vegetation is the plant cover that develops with little or no human

More information

Comparing losses and gains in biodiversity: Lessons learnt from HS2 Phase One

Comparing losses and gains in biodiversity: Lessons learnt from HS2 Phase One Comparing losses and gains in biodiversity: Lessons learnt from HS2 Phase One John Simmons (URS) & David Collins (HS2 Ltd) IEEM Spring Conference, Birmingham 18 th March 2014 Environmental Overview Consultants

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education

More information

Developing a Landscape-Level Reference Standard Wetland Profile for the Prairie Pothole Region, Montana

Developing a Landscape-Level Reference Standard Wetland Profile for the Prairie Pothole Region, Montana Developing a Landscape-Level Reference Standard Wetland Profile for the Prairie Pothole Region, Montana Prepared for: The U.S. Environmental Protection Agency Prepared by: Melissa Hart and Linda Vance

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY

SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY REPORT On contract research for Bohlweki Environmental SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY February 2007 By D.G. Paterson ARC-Institute for Soil, Climate and Water, Private

More information

Using Weather and Climate Information for Landslide Prevention and Mitigation

Using Weather and Climate Information for Landslide Prevention and Mitigation Using Weather and Climate Information for Landslide Prevention and Mitigation Professor Roy C. Sidle Disaster Prevention Research Institute Kyoto University, Japan International Workshop on Climate and

More information

BIOMES. Definition of a Biome. Terrestrial referring to land. Climatically controlled sets of ecosystems. Characterized by distinct vegetation

BIOMES. Definition of a Biome. Terrestrial referring to land. Climatically controlled sets of ecosystems. Characterized by distinct vegetation BIOMES An Introduction to the Biomes of the World Definition of a Biome Terrestrial referring to land Climatically controlled sets of ecosystems Characterized by distinct vegetation 1 In a Biome There

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders .7 Reconnecting remnant meanders River Little Ouse Location - Thetford, Norfolk TL87082 Date of construction - 994 Length 900m Cost 5,000 Maximum extent of flooding during winter floods BTO boundary Small

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Accounting for increased flow resistance due to lateral momentum loss in restoration designs using 2-stage channels

Accounting for increased flow resistance due to lateral momentum loss in restoration designs using 2-stage channels Skamania 2005 Accounting for increased flow resistance due to lateral momentum loss in restoration designs using 2-stage channels Outline Aim and Objectives Definition Use of 2-stage channels in stream

More information

Appendix J Vegetation Change Analysis Methodology

Appendix J Vegetation Change Analysis Methodology Appendix J Vegetation Change Analysis Methodology Regional Groundwater Storage and Recovery Project Draft EIR Appendix-J April 2013 APPENDIX J- LAKE MERCED VEGETATION CHANGE ANALYSIS METHODOLOGY Building

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

W I N D R E S O U R C E A S S E S S M E N T

W I N D R E S O U R C E A S S E S S M E N T W I N D R E S O U R C E A S S E S S M E N T Annual Energy Production Project: Hundhammer_WS_Express Layout: Layout1 Customer: WindSim 2014-01-29 WindSim AS Fjordgaten 15, N- 3125 Tønsberg, Norway phone.:

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Towards modelling global soil erosion and its importance for the terrestrial carbon cycle

Towards modelling global soil erosion and its importance for the terrestrial carbon cycle Towards modelling global soil erosion and its importance for the terrestrial carbon cycle Tom Vanwalleghem 1 and Jed Kaplan 2 1 - Group for Rural Hydrology and Hydraulics, Department of Agronomy, University

More information

Director, Operations Services, Met-Ed

Director, Operations Services, Met-Ed Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast

More information

Restoring river-floodplain interconnection and riparian habitats along the embanked Danube between Neuburg and Ingolstadt (Germany)

Restoring river-floodplain interconnection and riparian habitats along the embanked Danube between Neuburg and Ingolstadt (Germany) Restoring river-floodplain interconnection and riparian habitats along the embanked Danube between Neuburg and Ingolstadt (Germany) Dipl.-Geogr. Gerald Blasch Department of Physical Geography, Cath. University

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154

More information

Ms. A. Mormando's Class *

Ms. A. Mormando's Class * 8 th Grade Science Essential Standard: 8.E.1.1 Explain the structure of the hydrosphere including: Water distribution on Earth; Local river basin and water availability Stream - A stream is a body of water

More information

GIS ANALYSIS OF DRIVERS OF EROSION AND GULLYING IN SOUTHEAST NIGERIA

GIS ANALYSIS OF DRIVERS OF EROSION AND GULLYING IN SOUTHEAST NIGERIA GIS ANALYSIS OF DRIVERS OF EROSION AND GULLYING IN SOUTHEAST NIGERIA Mayowa FASONA & Ademola OMOJOLA Department of Geography University of Lagos, Nigeria mfasona@unilag.edu.ng Outline Background Methodology

More information

Survey of Garreg-hir 15 May ) Introduction 2) Equipment used and Conditions for Survey 3) The Survey 3.1) Character of Hill

Survey of Garreg-hir 15 May ) Introduction 2) Equipment used and Conditions for Survey 3) The Survey 3.1) Character of Hill Survey of Garreg-hir 15 May 2011 The Team: John Barnard, Graham Jackson and Myrddyn Phillips 1) Introduction Garreg-hir (Section 31A, OS 1:50000 Map 136, Grid Ref. SN998977) is listed as a marginal Marilyn

More information

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT 3 DESCRIPTION OF THE PROPOSED DEVELOPMENT As described in Chapter 2, the Preferred Option for the Bandon River (Bandon) Drainage Scheme comprises a combination of flood defences and dredging. The proposed

More information

Yaneev Golombek, GISP. Merrick/McLaughlin. ESRI International User. July 9, Engineering Architecture Design-Build Surveying GeoSpatial Solutions

Yaneev Golombek, GISP. Merrick/McLaughlin. ESRI International User. July 9, Engineering Architecture Design-Build Surveying GeoSpatial Solutions Yaneev Golombek, GISP GIS July Presentation 9, 2013 for Merrick/McLaughlin Conference Water ESRI International User July 9, 2013 Engineering Architecture Design-Build Surveying GeoSpatial Solutions Purpose

More information

Visualising Types of Uncertainty in Spatial Information

Visualising Types of Uncertainty in Spatial Information Visualising Types of Uncertainty in Spatial Information Peter Fisher City University, London National Academy of Sciences, 3-4 March 2005 Outline Issues The Problem The variety and levels of uncertainty

More information

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four

More information

Data and Information Management. UK All Energy 22 nd May Presented by Leo James

Data and Information Management. UK All Energy 22 nd May Presented by Leo James Data and Information Management UK All Energy 22 nd May 2013 Presented by Leo James Strategic Development Plans Observations at the outset Data and information management and dissemination: company or

More information

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION By Renee Vandermause & Chun-Yao Yang Outline Sediment Degradation - Erosion vs Sediment Yield - Sediment Yield - Methods for estimation - Defining Sediment

More information

SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA

SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA Document Control Status Written by Approved by Date Comment Revision A T.Lam D.Bolton 14/03/14 Initial Revision B T.Lam D.Bolton

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

SHORELINE PROVISIONS RESIDENTIAL LOT

SHORELINE PROVISIONS RESIDENTIAL LOT By-law Discussion Paper #1 SHORELINE PROVISIONS RESIDENTIAL LOT Meeting Dates: April 6 to May 29, 2000 and February 13, 2001 Official Plan Policies Intent preserve ribbon of life preserve shoreline character

More information

Critical success factors for revegetation of heavily polluted sites.

Critical success factors for revegetation of heavily polluted sites. Critical success factors for revegetation of heavily polluted sites. A cost-benefit analysis tool. Jan Japenga, Paul Römkens, Luc Bonten Soil Science Centre ALTERRA Green World Research, Wageningen University

More information

Research Themes The development of GIS based methodology for the identification of potential wet grassland restoration sites

Research Themes The development of GIS based methodology for the identification of potential wet grassland restoration sites Catchment and Coastal Environments Research Group Research Themes The development of GIS based methodology for the identification of potential wet grassland restoration sites Dr Andrew Williams email a.williams@plymouth.ac.uk

More information

Fluvial Geomorphic Guidelines

Fluvial Geomorphic Guidelines Fluvial Geomorphic Guidelines FACT SHEET I: GEOMORPHOLOGICAL HAZARDS CONFINED AND UNCONFINED WATERCOURSES Channel migration and erosion can create substantial risk to inappropriately located infrastructure

More information

Identifying Trends in Exclusions and Feature Revisions to Promote Better Recon. Surface Water Status Monitoring Network

Identifying Trends in Exclusions and Feature Revisions to Promote Better Recon. Surface Water Status Monitoring Network Identifying Trends in Exclusions and Feature Revisions to Promote Better Recon Surface Water Status Monitoring Network Andy Woeber GIS Analyst Watershed Monitoring Section FDEP Tallahassee Surface water

More information

Big Chino Valley Pumped Storage Project (FERC No ) Vegetation Mapping and Habitat Assessment Study Plan

Big Chino Valley Pumped Storage Project (FERC No ) Vegetation Mapping and Habitat Assessment Study Plan March 21, 2018 1.0 Introduction Big Chino Valley Pumped Storage LLC (BCV), a subsidiary of ITC Holdings Corp. (ITC), submitted a preliminary permit application to the Federal Energy Regulatory Commission

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

A p p l i c a t i o n D r a w i n g s : R e v i s i o n B Updated in response to submissions

A p p l i c a t i o n D r a w i n g s : R e v i s i o n B Updated in response to submissions : R e v i s i o n Updated in response to submissions C o n t e n t s 1. Existing Site Plan 2. Proposed Site Plan 3. Proposed Circulation Plan 4. Proposed uildings and Driveways 5. Proposed Vegetation Strategy

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Soil is formed from the weathering of rocks. Weathering: the breaking down of parent material (rock). There are 3 types of weathering:

Soil is formed from the weathering of rocks. Weathering: the breaking down of parent material (rock). There are 3 types of weathering: Soil is formed from the weathering of rocks. Weathering: the breaking down of parent material (rock). There are 3 types of weathering: Physical, Chemical Biological. The natural forces carry this out:

More information

Tracing and tracking sediment sources in river catchments

Tracing and tracking sediment sources in river catchments Insert image here Insert image here Tracing and tracking sediment sources in river catchments Adrian Collins and Yusheng Zhang www.adas.co.uk Delivering the WFD 1 The sediment problem information on sediment

More information

Managing uncertainty when aggregating from pixels to parcels: context sensitive mapping and possibility theory

Managing uncertainty when aggregating from pixels to parcels: context sensitive mapping and possibility theory Department of Geography Managing uncertainty when aggregating from pixels to parcels: context sensitive mapping and possibility theory Dr Lex Comber ajc36@le.ac.uk www.le.ac.uk/gg/staff/academic_comber.htm

More information

Environmental Statement South Kyle Wind Farm August 2013

Environmental Statement South Kyle Wind Farm August 2013 15 PEAT, GEOLOGY AND CARBON BALANCE... 2 15.1 Introduction... 2 15.2 Methodology... 2 15.2.1 Desk Study... 3 15.2.2 Site Reconnaissance and Peat Probing... 3 15.3 Baseline conditions... 5 15.3.1 Results

More information

Minimum Standards for Wetland Delineations

Minimum Standards for Wetland Delineations Minimum Standards for Wetland Delineations Jason Gipson Chief, Utah/Nevada Regulatory Branch Sacramento District Regulatory Program Workshop 16 Mar 2016 US Army Corps of Engineers Delineation Report Minimum

More information

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017

More information

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS C Ryan 1, D Tetley 2, C Kinsey 3 1 & 2 Catchment Simulation Solutions, NSW 3 Co-ordinator Stormwater and Structural

More information

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time Broad-Scale Models Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda GOAL Predict Channel Characteristics in Space and Time Assess Potential for Fish Use and Productivity Assess

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

D. Adaptive Radiation

D. Adaptive Radiation D. Adaptive Radiation One species new species: A new species: B new species: C new species: D Typically occurs when populations of a single species... invade a variety of new habitats, evolve under different

More information

Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time.

Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time. Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time. The major biomes, for example, usually maintain a characteristic

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

STAATSKOERANT, 7 APRIL 2017 No Environmental Affairs, Department of/ Omgewingsake, Departement van

STAATSKOERANT, 7 APRIL 2017 No Environmental Affairs, Department of/ Omgewingsake, Departement van Environmental Affairs, Department of/ Omgewingsake, Departement van 324 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice (3/2014)

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Exercise 6: Working with Raster Data in ArcGIS 9.3

Exercise 6: Working with Raster Data in ArcGIS 9.3 Exercise 6: Working with Raster Data in ArcGIS 9.3 Why Spatial Analyst? Grid query Grid algebra Grid statistics Summary by zone Proximity mapping Reclassification Histograms Surface analysis Slope, aspect,

More information

Ecological Succession

Ecological Succession Ecological Succession Most natural ecosystems are in a state of equilibrium. This means that their biotic and abiotic features remain relatively constant over time. The major biomes, for example, usually

More information

Lab objectives. Identify dominant plant species in Mer Bleue. Summarize and report quantitative data efficiently and accurately in graphs and tables.

Lab objectives. Identify dominant plant species in Mer Bleue. Summarize and report quantitative data efficiently and accurately in graphs and tables. 1 Lab objectives Identify dominant plant species in Mer Bleue Summarize and report quantitative data efficiently and accurately in graphs and tables. Understand how sampling variability influences our

More information

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES The SedAlp Project: WP6: INTERACTION WITH STRUCTURES 6 th International conference Water in the Alps Herrenchiemsee, 12 th of October, 2016 Jošt Sodnik Contents Structure of SedAlp project (www.sedalp.eu)

More information

Flooding in Dolgellau

Flooding in Dolgellau Flooding in Dolgellau Graham Hall MMath, PhD University of Wales, Bangor Background Flooding has historically been a cause for concern in Dolgellau. Following a serious flood in December 1964 when shops

More information

Subtidal permanently flooded with tidal water. Irregularly exposed surface exposed by tides less often than daily

Subtidal permanently flooded with tidal water. Irregularly exposed surface exposed by tides less often than daily Types of Wetlands Tidal Systems COASTAL WETLAND ECOSYSTEMS Tidal Salt Marshes Tidal Freshwater Marshes Mangrove Wetlands Tidal Estuarine Wetland 1 Definition and Formation of Estuaries u Estuary : partially

More information