1 BANK OF SANCTION FOR ROB & BRIDGES (UPDATED ON ). Budget allotment under head 5054 R&B plan for construction of ROB & Bridges for the year is Rs Crore which is further reduce to Rs Crore (Rs Crore transfer to PMGSY). Following works of ROB/RUB & Bridges which are already in during the Financial Year ROB/RUB Sr. No. SH/ MDR/ ODR Name of ROB 1. SH Construction of 2 lane ROB at Shahbad on Level crossing no 98 AC in Km. 179/19-21 on Delhi Ambala line crossing Shahbad Thol road in Kurukshetra Distt. (C01/2006/3678) 2. SH Construction of 2 lane approaches of ROB to be constructed in Delhi Ambala section (New Sonepat Station) X-ing at L/C 27-B Sonepat Gohana road Km in Sonepat Distt. (C03/2006/3870) 3. SH Construction of 2 lane ROB at Nilokheri on L/C no. 78-AB in Km. 139 on Delhi Ambala line crossing Nilokheri Kaul road in Karnal Distt. (C03/2006/3862) 4. MDR ROB at Karnal on level x-ing No. C-69 in Km. 120/11-13 on Delhi Ambala line x-ing Karnal Munak Road (C03/2012/19996) 5. MDR ROB at Assaudha (Bahadurgarh) on level x-ing No. 31-C in Km on Delhi-Bhatinda line on Kharkhoda Asssaudha Road in Distt. Jhajjar. (C13/2012/19906) 6. SH ROB at Gohana on level x-ing No. 31 on Rohtak Gohana Panipat line x-ing Gohana Jind road in Distt. Sonepat. (C13/2011/16930) 7. SH ROB at Sampla in lieu of LC No. C-38 on Delhi-Bhatinda line x-ing Sonepat Kharkhoda Sampla Jhajjar road at RD Admn. Appl. upto Rs. in during the month 04/2014 Bank of sanctions (Rs.in lacs) Remarks Work in Work in Work in Work in Work in Work in Work in
2 (C04/2011/16676) 8. ODR Construction of additional 2 lane RUB near Shani Mandir Km.44/9-10 on Delhi Ambala section at Sonepat District (Deposit work). (C13/2012/18984) 9. ODR Construction of 2 nos. Limited Height subway for Geeta and Sri Nagar Colony at Rohtak (Deposit work). 10. ODR Construction of RUB at Kaithal Bye-pass connecting Kaithal Jind road & Khanouri road in Kaithal District. (C07/2011/16824) 11. MDR ROB at Bhiwani LC no. 53-B on Bhiwani Hansi road. (C08/2011/17709) 12. MDR ROB at GT road to Nahra Bahadurgarh road on Delhi Ambala line L/C no. 21 (HSRDC) (C13/2011/17768) 13. ODR ROB at Palwal Alawalpur road on Delhi Palwal line L/C No. 566 (HSRDC). (C05/2011/17818) 14. ODR 4 lane ROB in lieu of LC No B on Delhi Bathinda railway line at Jind km on NH-7I (NH Section) (C10/2011/17372) 15. ODR Construction of Subway under ROB on Kaithal-Jind road crossing Kurukshetra Narwana line (Deposit work) (C07/2012/18071) 16. MDR ROB at Jakhal-Kulan-Bhatu road at L/C No. 167 in Fatehabad Distt. (C06/2011/15890) 17. SH Construction of ROB at Km on Rewari-Bhatinda railway line on bye pass connecting Dadri-Bhiwani and Dadri-Bond road near village Rawaldhi at Dadri in Haryana. (Deposit work). (C08/2012/19452) 18. SH Construction of 2 lane ROB on LC No. 26-B at Sonepat on Sonepat Kharkhoda road in Sonepat Distt. (CM Announcement Code 5169) (C15/2012/19674) 19. Low height subway in between Mal Godam road to Anaj Mandi at Bahadurgarh (Deposit work) Work in Work in Work in Work in Work in Work in Work in Payment Work in Work in Work in Payment
3 20. ODR Construction of RUB 1x4x4 m RCC Box on Km. 11/11-12 section Hisar Sadalpur railway line near village Deva in Hisar Distt. (Deposit work) (C06/2013/21951) 21. ODR Construction of RUB 1x4x4 m RCC Box on Km. 19/2-3 section Hisar Sadalpur railway line crossing Chirod Chaudhriwas Kachapath near village Chirod in Hisar Distt. (Deposit work) (C06/2013/21952) Payment Payment TOTAL % cost will be borne by as per cost sharing policy except for work at Sr. No. 9, 15, 17, 19, 20 & % of Rs = Rs lacs Bank of sanction in case of ROB = Lacs or Rs crore. 1. Construction and Reconstruction of Bridges under Head 5054 (work to be executed by bridge section) 19 nos. bridges are at various stages and total bank of sanction is Rs crore (Copy enclosed at Annexure - II) 3. Following ROBs /RUBs have been included in the work programme but not yet taken up. Sr. No. Name of work 1. ROB at Bhattu Ludeher Jamalpur road (MDR No. 103) at L/C No. 123 in Fatehabad Distt. (C06/2011/15889) 2. Construction of ROB at Nalwa-Umra/Hisar at L/C no. 80 in Hisar Distt. (C06/2012/18012) 3. ROB at Bhiwani Hansi road to Tosham Bye pass at L/C No. 54-A in Bhiwani Distt Adm. Appl. Crore) Year of inclusion in railway work programme ROB at Hisar Ghursal road (SH No. 10) at L/C No. 100 in Hisar Distt. (C06/2011/16015) 5. ROB at Bajida Jattan to Sirsi at L/C No. 67 in Karnal Distt. 6. ROB at Uchana to Rukhanpur Km.2 nd at L/C No. 73 in Karnal Distt. Remarks
4 7. ROB at Adhoya Chappar Road at L/C No. 109 in Ambala Distt. (C01/2011/16546) 8. RUB at L/C No. 124 on link road from old Delhi Road to Village Jandli at Ambala City in Ambala Distt. 9. ROB at Link road G.T. road to Ghel at L/C No. 128-C in Ambala Distt. 10. Construction of RUB on various villages of Loharu Constituency (Deposit work) 11. Construction of ROB at LC No. 107 in Mustafabad yard on Sharanpur-Ambala section on Ladwa Mustafabad road in Yamuna Nagar Distt. Total Payment made to the department and tender under process in department % cost will be borne by as per cost sharing policy except for work at Sr. No. 10 i.e. is Rs Crores. Rs = , 50% of = Rs Crore Bank of sanction in case of ROB = ( ) = Crore Total bank of sanction ( ) = Rs Crore. Budget allotment under Head 5054 R&B (Plan) for Construction of ROBs and Bridges is Rs Crore for the year , further reduced to Rs Crore (Rs Crore transfer to PMGSY). The Bank of Sanction according to original budget i.e. Rs Crore is 5.79 times. After reducing the budget from Rs Crore to Rs Crore, the Bank of Sanction comes to 7.48 times. Annexure- II CONSTRUCTION & RE- CONSTRUCTION BRIDGES UNDER HEAD 5054 Sr. No. SH/ MD R/ ODR Name of the Bridges 1. ODR Construction of HL Bridge 5 span of 17 m each over W.J.C. crossing Radaur Jathlana road in km in Yamuna Nagar Distt (C02/2011/16168). Admn. App. Upto during the month 04/2014 Bank of sanction lacs) Remarks Work in
5 2. ODR Construction of H.L. Bridge having 4 span mtr. each over creak of Roon Nadi X-ing road from Toka sahib Gurudwara to Jhiriwala in Ambala district. (C02/2012/18274) 3. MDR Reconstruction of H.L. Bridge including approaches on Bhakra Main Branch Canal X-ing Jakhal- Dharsul Bhuna Jakhal Pabra- Sarsodh Road (MDR-102) KM Village Meond Kalan in Fatehabad Distt. (C06/2010/15138) 4. SH Construction of H. L. Bridge over Bhakhra Main Branch (BMB) X-ing Nizampur Narnaul Mahendargarh Dadri Bhiwani Hansi Barwala Tohana Munak upto State Border (SH-17) (Road ID No. 5369) Km (in Tohana City Portion) in Fatehabad Distt. (C06/2011/17800) 5. SH Construction of H. L. Bridge over Fatehabad Disty. X-ing Nizampur Narnaul Mahendargarh Dadri Bhiwani Hansi Barwala Tohana Munak upto State Border (SH-17) (Road ID No. 5369) Km (in Tohana City Portion) in Fatehabad Distt. (C06/2011/17801) 6. ODR Construction of bridge (single lane) at RD on downstream side just adjacent to the existing 5 span 6.65 C/C each bride over J.L.N. crossing Saragthal to Kasanda road in Sonepat Distt (C13/2012/18055) 7. ODR Construction of bridge (single lane) at RD on downstream side just adjacent to the existing 5 span 4.25 mtrs C/C each bride over Bhalout sub branch crossing Saragthal to Kasanda road in Sonepat Distt. (C13/2011/17472) 8. ODR Construction of 3 span 8.00 m each box type V.R. Bridge at RD of Kaithal drain leading Kaithal to Village Diwal in Kaithal Distt. 9. SH (C07/2010/14667) Re-construction of new bridge on Karnal Kaithal road at RD near Mundri village on sirsa branch in Kaithal Distt (C07/2012/18133) Work in Bridge, approaches work except Bitumen work Work Work in Work in Work in Mastic work balance on Bridge portion Work in
6 10. SH Construction of 2 spans 4.00 mtr. Each (34 Skew) RCC type bridge on Jakholi Distributory at RD crossing Kaithal Jind road near village Kassan in Kaithal Distt. Improvement (C07/2012/18137) 11. ODR Reconstruction of Bridge on Sarswati Drain x-ing Kangthali to Kheri Gulam ali road near village Paharpur (C07/2012/17968) 12. ODR Reconstn. Of bridge on Batta to Sajuma Road RD 2350 ( Sirsa branch 25327) (C07/2012/18198) 13. ODR Reconstn. Of bridge on Kalayat Sajuma road RD 2065 ( Sirsa Branch RD ) (C07/2012/18196) 14. SH Re-construction of bridge on Butana branch RD crossing Panipat- Assandh road in Jind Distt. (C07/2011/17061) 15. SH Construction of new H.L. Bridge down stream side of existing bridge on Ghagger river at Km. 235 on Kaithal- Patiala road in Kaithal distt. (C07/2013/20870) 16. ODR Construction of HL Bridge 5 span 20 m each replaced with damaged 100 m bridge on Kalri to Khukhani road (Road ID 7209) in Karnal Distt Work Work Work in Work in Work in Work in Work recently allotted 17. SH Reconstruction of Bridge on Dadri Chhuchakwas road at RD (Badhwana Disty.) in Bhiwani Distt. (C08/2012/21710) 18. SH Reconstruction of Bridge on Sonepat Murthal road x-ing drain No. 6 at RD 5775 in Sonepat Distt. (C13/2012/17904) 19. ODR Reconstruction of Bridge by providing 2 span 6.00 m each RCC type bridge at Freozpur Jhirka Biwan road at RD 9000 m in Mewat Distt Tender returned to SE office Work in Total of All Circle
2059-PUBLIC WORKS (ESTABLISHMENT)
Sr. No. STATEMENT SHOWING OBJECT HEAD WISE BUDGET ALLOTMENT / EXPENDITURE FOR THE MONTH OF 5/2016 DURING THE YEAR 2016-2017 OFFICE OF THE ENGINEER IN CHIEF HARYANA, P.W.D. (B&R). (Rs. in lacs) Major Head
More informationCROP COMBINATION REGION: A SPATIO-TEMPORAL ANALYSIS OF HARYANA: &
212 CROP COMBINATION REGION: A SPATIO-TEMPORAL ANALYSIS OF HARYANA:1990-93&2009-12 Subhash chander 1 Abstract Agriculture being a basic activity plays a vital role in Indian economy. The studies of crop
More informationNATURE AND EXTENT OF MICROFINANCE IN HARYANA
CHAPTER - 3 NATURE AND EXTENT OF MICROFINANCE IN HARYANA In this chapter, nature, extent and progress of microfinance have been discussed related to our study area of Haryana. To analyze the status and
More informationFigure 2.1: Constituent Area
2 The Region 2.1 CONSTITUENT AREA The National Capital Region includes NCT-Delhi, nine districts of Haryana, six districts of Uttar Pradesh and one district of Rajasthan. Total area of the region is 34,144
More informationRequest for Proposal (RFP)
Request for Proposal (RFP) For Appointment Concurrent Auditor for District Health & Family Welfare Societies (DH&FWS) State Haryana for Audit all programmes under NHM & Non NHM [2018-19] REQUEST FOR PROPOSAL
More informationLand Use and Land Cover Mapping and Change Detection in Jind District of Haryana Using Multi-Temporal Satellite Data
Land Use and Land Cover Mapping and Change Detection in Jind District of Haryana Using Multi-Temporal Satellite Data Ravindra Prawasi, M.P. Sharma, T. P. Babu, Om Pal, Saroj, Kirti Yadav, R.S.Hooda Abstract
More informationROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS
ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS Need for GIS Voluminous/ Manual Data Vs Digital Need for GIS CE - C&B (North) KPWD Secretary Office CE - C&B (South) Dispersed
More informationDue to the above development proposal we propose to start the project at Km instead of Km
Development Proposals compatibility with the existing pavement, ROW and utilities. The general considerations followed for fixing the proposed horizontal alignment are as follows: Maximum utilization of
More information3. HYDROMETEROLOGY. 3.1 Introduction. 3.2 Hydro-meteorological Aspect. 3.3 Rain Gauge Stations
3. HYDROMETEROLOGY 3.1 Introduction Hydrometeorology is a branch of meteorology and hydrology that studies the transfer of water and energy between the land surface and the lower atmosphere. Detailed hydrological
More informationChapter- I. Introduction. population lived in urban areas.' The newly revised United Nations estimates indicate
Chapter- I Introduction 1.1 Statement of the Problem: In 190 I, about 8 per cent of the world's population lived in urban areas.' The newly revised United Nations estimates indicate that at mid-1993, 43
More informationWastelands Analysis and Mapping of Bhiwani District, Haryana
Wastelands Analysis and Mapping of Bhiwani District, Haryana Virender Sihag Research Scholar, Department of Geography, OPJS University, Churu, Rajasthan ABSTRACT This study aimed at monitoring, mapping,
More informationURBAN SPRAWL AND SPATIO TEMPORAL ANALYSIS OF HISAR CITY IN HARYANA USING REMOTE SENSING & GIS TECNOLOGY
URBAN SPRAWL AND SPATIO TEMPORAL ANALYSIS OF HISAR CITY IN HARYANA USING REMOTE SENSING & GIS TECNOLOGY Shashikant 1, Pallavi Singh 2, R. D. Doi 3, Ankur Sharma 4, Ravinder Kumar 5, Parveen Bhatti 6 Abstract
More informationURBAN PLANNING OF JIND CITY, HARYANA USING GEO-INFORMATICS
URBAN PLANNING OF JIND CITY, HARYANA USING GEO-INFORMATICS Rajeev 1, Dr. Sultan Singh 2 Abstract: GIS (Geographical Information System) is a computer based integrated database management system that stores
More informationINTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 7, No 2, 2016
INTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 7, No 2, 2016 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4380 Development of micro
More informationMode of Ph.D. (Full Time/Par t Time. Registrati on No.
DEENBANDHU CHHOTU RAM UNIVERSITY OF SCIENCE & TECHLOGY, MURTHAL (SONEPAT) DEPARTMENT OF PHYSICS Detail Information of students admitted in Department of Physics from 2009 onwards: 1. Students admitted
More informationTHE STUBBLE BURNING IN THE STATES OF PUNJAB & HARYANA: A GIS BASED SPATIO-TEMPORAL ANALYSIS (from 2012 to 2017)
Scholarly Research Journal for Interdisciplinary Studies, Online ISSN 2278-8808, SJIF 2018 = 6.371, www.srjis.com PEER REVIEWED JOURNAL, NOV-DEC, 2018, VOL- 6/48 THE STUBBLE BURNING IN THE STATES OF PUNJAB
More informationMINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY SURVEY, DETAILED PROJECT REPORT OF EXISTING TWO LANE PLUS SHOULDER TO (4LANING OF TALWANDI
More informationCgl+AJIn. 3TTTef Office of the Commissioner ttzi '75,()ciict) 3irpmFzi, Central Excise, Customs & Service Tax Commissionerate, Vadodara-1
Cgl+AJIn 3TTTef Office of the Commissioner ttzi 41-11 '75,()ciict) 3irpmFzi, Central Excise, Customs & Service Tax Commissionerate, Vadodara-1 ttzt nic1-114 c 4-4r, i mtfi, c1514.fl - 390 007 Central Excise
More informationUrban Sprawl of Hisar city using Remote sensing & GIS A case study
Urban Sprawl of Hisar city using Remote sensing & GIS A case study Pardeep Kumar, Sandeep Kumar,Chander Shekhar Punjab Remote Sensing Centre Ludhiana Abstract :- Urban Sprawl Refers to the extent of Urbanization,
More informationPlantations Mapping of Dabwali, Rania and Ellenabad blocks of Sirsa District Using on Screen Visual Interpretation Approach on WV-2 Data
s Mapping of Dabwali, Rania and Ellenabad blocks of Sirsa District Using on Screen Visual Interpretation Approach on WV-2 Data Savita 1, Veena 2, Reetu Sharma 3 Haryana Space Applications Centre (HARSAC),
More informationIBPS PO PHASE - I (SOLUTION)
(1 5) : Floor 9 8 7 6 5 4 1 REASONING Person I H D B G A F E C Person Karnal Hisar Sirsa Rohtak Jind Panipat Ambala Gohana Sonipat 1. (1). (). (5) 4. (5) 5. (4) (6-10) : Tribhuvan Praveen (Green Car) (Brown
More informationKRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana
KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana 113 Dated: 30 June 2018 To, The Director (IA Division, Non-Coal Mining), Ministry of Environment, Forest and Climate Change (MoEF&CC) Indira Paryavaran
More informationLand use land cover thematic mapping using remote sensing & GIS Techniques: A case study of district Hisar
2018; 4(7): 06-10 ISSN Print: 2394-7500 ISSN Online: 2394-5869 Impact Factor: 5.2 IJAR 2018; 4(7): 06-10 www.allresearchjournal.com Received: 02-05-2018 Accepted: 04-06-2018 Research Scholar, Department
More informationDELINEATION OF NATIONAL CAPITAL REGION
AIM To analyze the given article and understand the concept of regional delineation and its relation with planning techniques. GAURAB DAS MAHAPATRA 2015MURP010 DELINEATION OF NATIONAL CAPITAL REGION MPLN0107
More informationExisting road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study.
2 Road Network 2.1 Existing Road Network The existing transport network in National Capital Region is radial in nature. It comprises of expressways, national highways, state highways, major district and
More informationSBI ASSOCIATES (Clerk) MOCK TEST (SOLUTION)
Centres at: MUKHERJEE NAGAR MUNIRKA UTTAM NAGAR DILSHAD GARDEN ROHINI BADARPUR JAIPUR GURGAON NOIDA MEERUT VARANASI ROHTAK PANIPAT SONEPAT BAHADURGARH PATNA AGRA CHANDIGARH LUCKNOW ALLAHABAD SBI ASSOCIATES
More informationCorrigendum No /ASCL/ Date: 7 th February 2019
14/ASCL/ 2018-19 Date: 7 th February 2019 Name of Tender: REQUEST FOR PROPOSAL FOR SELECTION OF MASTER SYSTEM INTEGRATOR (MSI) FOR IMPLEMENTATION OF INTEGRATED COMMAND AND CONTROL CENTER (ICCC) AND e-governance
More information3. High-III a) Jalandhar & Amritsar outside M.C. Limits within 15 Km A. Residential Plotted B. Residential Group Housing*
CHARGES FOR RESIDENTIAL PLOTTED,RESIDENTIAL GROUP HOUSING,COMMERCIAL, HOSPITALS, MULTIMEDIA CENTRES,HOTELS, PETROL PUMPS & GAS GODOWNS IN DIFFERENT POTENTIAL ZONES OF PUNJAB (Rs. in lacs/gross acres) Sr.No.
More informationGOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs
GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT ESTIMATED COST : Rs. 1392.42 Crores DESIGNED IRRIGATION : 40000 Ha. COST PER HACT. : Rs. 3.48 Lakhs ''EVERY
More informationThematic Mapping in Siwani Area, District Bhiwani using Remote Sensing and Gis
International Journal of Research in Geography (IJRG) Volume 3, Issue 2, 2017, PP 12-17 ISSN 2454-8685 (Online) DOI: http://dx.doi.org/10.20431/2454-8685.0302002 www.arcjournals.org Thematic Mapping in
More informationCkk< eksle dk;kzy; izk-eks-iw- dsunz yksnh jksm ubz fnyyh-
भ रत सरक र भ रत म सम व ज ञ न व भ ग (प थ व ज ञ न म त र ऱय) Ckk< eksle dk;kzy; izk-eks-iw- dsunz yksnh jksm ubz fnyyh- फ न न. 24629096@ 24623537 फ क स न. 24642591 GOVERNMENT OF INDIA INDIA METEOROLOGICAL
More informationSurveying I. Unit - I. Different methods and instruments are being used to facilitate the work of
Surveying I Unit - I Definition of Survey Surveying is the art of determining the relative positions of different objects on the surface of the earth by measuring the horizontal distances between them,
More informationThe spatial distribution of rainfall, extreme indices in Haryana (INDIA) using geographic information system
2018; 7(2): 3624-3629 E-ISSN: 2278-4136 P-ISSN: 2349-8234 JPP 2018; 7(2): 3624-3629 Received: 22-01-2018 Accepted: 23-02-2018 Mamta Diwan Singh Anurag Poonam Dept of Mathematics, Statistics & Physics,
More informationEstimation of Seismic Hazard Using PSHA in and around National Capital Region (NCR) of India
Geosciences 2017, 7(4): 109-116 DOI: 10.5923/j.geo.20170704.01 Estimation of Seismic Hazard Using PSHA in and around National Capital Region (NCR) of India S. Sarkar, D. Shanker * Department of Earthquake
More informationPirai river (Bolivia)
Pirai river (Bolivia) Confluent of the Amazon river which average discharge is only 6 m3/s, but with peak discharge over 5000 m3/s, a challenge for river basin management and for flood control HYDROEUROPE
More informationGEO-INFORMATICS AND SPACE TECHNOLOGY FOR PROPERTIES DIGITAL TAX MAP : CASE STUDY ON LOCAL ADMINISTRATIVE WONG KONG MUNICIPALITY, PHITSANULOK, THAILAND
GEO-INFORMATICS AND SPACE TECHNOLOGY FOR PROPERTIES DIGITAL TAX MAP : CASE STUDY ON LOCAL ADMINISTRATIVE WONG KONG MUNICIPALITY, PHITSANULOK, THAILAND Vicharn Amarakul Regional Center of Geo-Informatics
More informationA SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS
A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS ROMAN P., I. 1, OROS C., R. 2 ABSTRACT. A simple GIS method for obtaining flooded areas. This paper presents a method for obtaining flooded areas near to
More informationKENDRIYA VIDYALAYA REWARI QUESTION BANK FOR HALF YEARLY EXAM
KENDRIYA VIDYALAYA REWARI QUESTION BANK FOR HALF YEARLY EXAM CLASS-III SUB: MATHEMATICS KNOWLEDGE I. Answer the following. CONCEPT 1. Indicate the place value of encircled figure. a) 4 4 7 b) 4 9 7 c)
More informationFour Mile Run Levee Corridor Stream Restoration
Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)
More information33. Eroding downstream left bank, new bridge, Attlebridge (TG ).
33. Eroding downstream left bank, new bridge, Attlebridge (TG 12831675). 58 34. Eroding upstream right bank at Attlebridge Hall (TG 13871557), ford and cattle crossing. 35. Eroding upstream left bank at
More informationInternational Journal of Scientific Research and Reviews
Case Study Available online www.ijsrr.org ISSN: 2279 0543 International Journal of Scientific Research and Reviews Study on the Pattern of Land Use /Land Cover Change in Sonipat District of NCR, A Block
More informationPublished On 29 Aug, :37 IST & Updated on 31 Aug, :49 IST By Rachit Hirani at CarDekho.com 2089 Views Comments
Brio-logue Published On 29 Aug, 2012 18:37 IST & Updated on 31 Aug, 2012 13:49 IST By Rachit Hirani at CarDekho.com 2089 Views Comments The memories of my first Brio experience are still fresh. This was
More informationRiver Ice Modelling. Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada
River Ice Modelling Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada Submitted to F.E. Hicks, PhD, PEng, FCSCE Professor, Dept. of Civil and Environmental Engineering University of Alberta
More informationApplication of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS
Risk Analysis V: Simulation and Hazard Mitigation 263 Application of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS M. Mori Department of Information and Computer Science, Kinki University, Japan
More informationINTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 3, No 1, 2012
INTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 3, No 1, 2012 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4380 Risk and vulnerability
More informationFee Notification Published in Gazette of India vide S.O. No (E) dated
/ NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU. BHOPAL Name of work: Four Laning of Obedullaganj Betul section of NH69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 (approx. length 121.36 km) (excluding
More informationSANAND BRANCH CANAL CCA DETAILS OF DISTRIBUTORIES AND MINORS
SANAND BRANCH CANAL DETAILS OF DISTRIBUTORIES AND MINORS 1 Name of Branch Canal : Sanand Branch 2 Off taking chainage from NMC ( ) : 258.632Kms. 3 Type of Canal : Ridge Canal 4 of Branch canal () : 28.170
More informationTidal flood outline (No changes proposed)
Tidal flood outline (No changes proposed) SWRBD CFRAM Study Flood Risk Review Site Inspection Report Name: Schull Hydrometric Area: 20 County: Cork Unique OPW ID: 200303 Site Type: CAR Source of Flooding:
More informationCADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS
CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS Lecturer PhD. eng. MAGDOLNA EVA KONCSAG, 1 Decembrie 1918 University of Alba Iulia, Romania ABSTRACT.
More information6.4 Sensitivity Tests
6.4 Sensitivity Tests 6.4.1 Sensitivity of Floodplain Inundation to Width of Dry Culvert The preliminary design for the Expressway based on consideration of possible future climate effects to 2090 assumed
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.
More informationLandslide Disaster Management in Sri Lanka and Nichola Oya as a Case study. Group 16 Gamini Jayathissa Udeni Nawagamuwa
Landslide Disaster Management in Sri Lanka and Nichola Oya as a Case study Group 16 Gamini Jayathissa Udeni Nawagamuwa Taiwan Sri lanka >2582 mm, max >5000mm NE= Nov. to Feb 1750 2500 mm >2500 mm Central
More informationCalculating the suspended sediment load of the Dez River
Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Osio Symposium, August 1992). IAHS Publ. no. 210, 1992. 219 Calculating the suspended sediment load of the Dez River
More informationReport for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.
Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired
More informationSBI ASSOCIATE JUNIOR ASSISTANT (PH-I) 2016 MOCK TEST PAPER - 4 (SOLUTION)
Centres at: MUKHERJEE NAGAR MUNIRKA UTTAM NAGAR DILSHAD GARDEN ROHINI BADARPUR JAIPUR GURGAON LAXMI NAGAR GHAZIABAD NOIDA MEERUT VARANASI ROHTAK PANIPAT SONEPAT PATNA AGRA CHANDIGARH LUCKNOW ALLAHABAD
More informationJ. K. NARWAL B.Tech (Gold-Medalist), M.Tech(ME) Assistant Professor Depatment of Mechanical Engineering Geeta Engineering College, Panipat
MECHANICALVIBRATIONS J. K. NARWAL B.Tech (Gold-Medalist), M.Tech(ME) Assistant Professor Depatment of Mechanical Engineering Geeta Engineering College, Panipat AN ISO 9001:2008 CERTIFIED COMPANY Vayu Education
More informationMINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM
MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY
More informationDetailed Biodata. Award
Dr. Mohamad Yusuf Associate Professor Department of Chemistry, Punjabi University, Patiala-147002, Punjab, India. Ph. No. +91-1753046410 (Off.) Fax No. +91-1752283073 E-mail: yusuf_sah04@yahoo.co.in Web:
More informationAppendix A Flood Damages in 2013
Appendix A Flood Damages in 2013 RPT2-2014-07-09-App_A_Highwood_River_Flood_Damage_In_2013.Docx Table of Contents page Sign-Off 1. Flood Damage in 2013... 1 1.1 Background... 1 1.2 Town of High River...
More informationINTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY
INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY A PATH FOR HORIZING YOUR INNOVATIVE WORK ASSESSMENT OF RESERVOIR SEDIMENTATION IN PANSHET RESERVOIR BY HYBRID METHOD N.
More informationPage:25 CHAPTER - 3 Project Road Description
Page:25 CHAPTER - 3 Project Road Description Page:26 CHAPTER 3 : PROJECT ROAD DESCRIPTION 3.1 Background Seppa, the district headquarters of East Kameng district, is connected to the outside world by a
More informationThe main objectives of the present study are mentioned as follows:
Dr. Madan Mohan Assistant Professor of Geography Project Director, ICSSR (MoHRD), ND. The main objectives of the present study are mentioned as follows: to geovisualize population pressure on urban landscape;
More informationRural Road Network Planning by using GIS Methodology
Rural Road Network Planning by using GIS Methodology Javedali M Jalegar a a Assistance Professor, Department of Civil Engineering AVNIET, Ibrahimpatnam, Hyderabad, Ch. Shaheen Begum b b Post Graduate Student,
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationSEM-2016(01HI CIVIL ENGINEERING. Paper Answer all questions. Question No. 1 does not have internal choice,
Roll No. Candidate should write his/her Roll No. here. Total No. of Questions : 5 No. of Printed Pages : 8 SEM-2016(01HI CIVIL ENGINEERING Paper - 11 Time : 3 Hours ] [ Total Marks : 300 Instructions to
More informationPMGSY National GIS GIS DATA STANDARD (Version 5) (Compared to the previous document version, additional explanations incorporated)
PMGSY National GIS GIS DATA STANDARD (Version 5) (Compared to the previous document version, additional explanations incorporated) All the States should follow this GIS data standard. For the spatial data
More informationFeature Extraction using Normalized Difference Vegetation Index (NDVI): a Case Study of Panipat District
Feature Extraction using Normalized Difference Vegetation Index (NDVI): a Case Study of Panipat District Seema Rani, Rajeev 2, Ravindra Prawasi 3 Haryana Space Applications Centre, CCS HAU Campus, Hisar
More informationCHAPTER 5 PLAN OUTLAYS
Five Year Plan CHAPTER 5 PLAN OUTLAYS A&N Islands was given the status of a Union Territory on 1 st November, 1956. Till then it was a part D state and was borne on the Budget of the Union Home Ministry.
More informationContract Labour (Regulation & Abolition) Central Rules FORM XIII See Rule 75 Register of Workmen Employed by Contractor
FORM XIII See Rule 75 Register of Workmen Employed by Contractor Smart Data Processing Services Pvt. Ltd., 72, Janpath, Delhi Nature of Employment / Designation Permanent Home Address of workman (Village
More informationErosion Information Paper Eagle City and Eagle Village, Alaska Current as of January 21, 2008
U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper Eagle City and Eagle Village, Alaska Current as of January 21, 2008 Community Information The City of Eagle, population
More informationASSESSMENT OF RESERVOIR SEDIMENTATION USING REMOTE SENSING SATELLITE IMAGERIES
ASSESSMENT OF RESERVOIR SEDIMENTATION USING REMOTE SENSING SATELLITE IMAGERIES Kamuju Narasayya S. Narasaiah U C Roman Assistant Research Officer Research Officer Senior Research Officer Central Water
More informationNCHM Counselling 2017
NCHM Counselling 2017 Round No. 1 Opening Rank (OR) and Closing Rank (CR) Institute Name IHM Bengaluru IHM Bhopal IHM Bhopal IHM Bhubaneswar AIHM Chandigarh IHM Chennai IHM Chennai IHM Gandhi Nagar SC
More informationTemplate for Sediment and Erosion Control Plan General Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationNLCIL RESERVES THE RIGHT TO CONDUCT REVERSE AUCTION ON ITEM WISE SITE COST BASIS AFTER PRICE BID OPENING SUBJECT TO
NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.
More informationAssessment and Management of Urban Sprawl through Geo-informatics in Panchkula District, Haryana, India
Assessment and Management of Urban Sprawl through Geo-informatics in Panchkula District, Haryana, India Dr. Rohtas Godara* 1, Vinod Kumar 2, Dr. Rina 3, Dr. Ashok Beniwal 4, Dr B. C. Jat 5 1. Department
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationDevelopment from Representation? A Study of Quotas for the Scheduled Castes in India. Online Appendix
Development from Representation? A Study of Quotas for the Scheduled Castes in India Online Appendix Francesca Refsum Jensenius December 1, 2014 1 Description of Data The constituency-level estimates of
More informationVilla Monterey Improvement Association 2018 Annual Audit Scottsdale, Arizona
2018 Annual Audit Scottsdale, Arizona Performed By Rick Morine March 25, 2019 Arizona Revised Statute (A.R.S.) 33-1810 requires the board of directors provide for an annual audit of an association s financial
More informationSURVEYING Chapter 1 Introduction
PHILADELPHIA UNIVERSITY Faculty of Engineering. Department of Civil Engineering. SURVEYING Chapter 1 Introduction Surveying : the art or science of measuring and representing natural and artificial features
More informationYELLOWSTONE RIVER FLOOD STUDY REPORT TEXT
YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294
More informationRequest for Empanelment
Request for Empanelment (Empanelment is method/procedure/way to seek technical & financial or financial quotation from eligible firm/organization/academic institute to short list eligible contender for
More information2 GRAPH AND NETWORK OPTIMIZATION. E. Amaldi Introduction to Operations Research Politecnico Milano 1
2 GRAPH AND NETWORK OPTIMIZATION E. Amaldi Introduction to Operations Research Politecnico Milano 1 A variety of decision-making problems can be formulated in terms of graphs and networks Examples: - transportation
More informationCommunity Erosion Assessment Napakiak, Alaska 15 January 2008
1. Community: Napakiak, Alaska Community Erosion Assessment Napakiak, Alaska 15 January 2008 Figure 1: Napakiak Location & Vicinity Map 2. Community Profile Summary: Napakiak is a 2 nd class city of 378
More informationActual Amount (US$) Process Status. Pending Interventions.
Page 1 PROCUREMENT PLAN Sri Lanka : Sri Lanka Strategic Cities Development Project General Information Country: Sri Lanka Banks Approval Date of the Original Plan: 2016-08-24 Revised Plan Date(s): (comma
More informationTemplate for Sediment and Erosion Control Plan General Instructions. Section Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationRetail Price List. 200 Plus Skilled Manpower 35+ Domestic Market w.e.f. 01/06/2015 This price list supersedes all previous price list(s).
Cold Shrink Type Cable Jointing upto 66kV Screen Separable Connection System upto 36kV Heat Shrinkable Components & Tubing/ Tapes Heat Shrink Type Cable Jointing upto 66kV Retail Price List Domestic Market
More informationResolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution
Resolution Number: 112612(2) Resolution Title: Snow Policy Signed: 11/26/12 DAVIS COUNTY Snow Policy Resolution A RESOLUTION TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY Letter of Intent (LoI) for mining of Stone Along with associated Minor Minerals comprising an area of 22.40 Ha for mining of mineral in village Pichopa Kalan Plot No. 2, Tehsil: Dadri,
More informationSANAND BRANCH CANAL. There are 19 bridges and 8 Nala crossing located on the canal for passing through the region.
SANAND BRANCH CANAL 1 Name of Canal : SANAND BRANCH CANAL 2 Off taking chainage from NMC (Km.) : 258.632 Kms. 3 Type of Canal : Ridge Canal 4 of Branch Canal (Km.) : 28.170 Km. 5 F.S.L. of Main Canal (mt.)
More informationMINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM
MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY
More informationEXTENSIVE GOLD TREND DISCOVERED AT THE BASAWA GOLD PROJECT, LIBERIA
Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimiangold.com ABN 11 113 931 105 11 April 2012 The Company Announcements
More informationANSWER MINISTER OF STATE IN THE MINISTRY OF HOME AFFAIRS (SHRI MANIKRAO HODLYA GAVIT)
1 of 6 11/9/2007 6:54 PM GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO 3306 ANSWERED ON 21.12.2004 MISUSE OF SECTION 498-A OF IPC 3306. SHRI CHANDRA SEKHAR SAHU Will the
More informationFirst Coast TIM Meeting
First Coast TIM Meeting Tuesday, November 15 th, 2016 Meeting Minutes **Please note: The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. ** Introductions Dee Dee
More informationQUESTION BANK ENGINEERS ACADEMY. Hinge E F A D. Theory of Structures Determinacy Indeterminacy 1
Theory of Structures eterminacy Indeterminacy 1 QUSTION NK 1. The static indeterminacy of the structure shown below (a) (b) 6 (c) 9 (d) 12 2. etermine the degree of freedom of the following frame (a) 1
More informationEstimated Amount (Rs.)
Tender no.-pm/pwd/tender/2013-14/132 Date:- 08/11/13 Sealed Tender Paper in printed form, as specified, are invited by the Chairman, from reliable, resourceful and bonafied Agencies with Sound technical
More informationAnnotated Bibliography of River Avulsions Pat Dryer Geography 364 5/14/2007
Annotated Bibliography of River Avulsions Pat Dryer Geography 364 5/14/2007 1 Table of Contents Introduction 2 Annotations I. River avulsions and their deposits 2 II. Channel avulsion on alluvial fans
More informationTHE ROLE OF GEOSPATIAL TECHNOLOGY IN SOCIAL AMENITIES FOR RURAL DEVELOPMENT
THE ROLE OF GEOSPATIAL TECHNOLOGY IN SOCIAL AMENITIES FOR RURAL DEVELOPMENT ANAND P. PANDIT, P.G. Department of Geography, New Arts Commerce and Science College, Ahmednagar. (MS) INDIA MADHUKAR R. KARALE
More informationSAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #
SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE
More informationCOLORING PAGES. Follow Raindy the Raindrop as he travels from your house out to sea.
COLORING PAGES www.hcfcd.org Follow Raindy the Raindrop as he travels from your house out to sea. Raindy the Raindrop falls from the sky and lands on your house or in your neighborhood. Once he s on the
More informationMap Name(s) and Date(s) Historical Map - Slice A
Ordnance Survey Plan Published 1975 The historical maps shown were reproduced from maps predominantly held at the scale adopted for England, Wales and Scotland in the 1840`s. In 1854 the 1:2,500 scale
More information