Daily Field Observation Report
|
|
- Brooke Moody
- 5 years ago
- Views:
Transcription
1 Daily Field Observation Report Project: Chappaqua Station Site Remediation Date: 08/25/2017, Day 50 Project Number: Report By: Claire Bearden Representative On-Site: NRC, PS&S, LeChase, NYSDEC, JMC Rentals, Cove Rentals, WCD Group, Tectonic Engineering, Carlin & Simpson 1.0 Weather Temperature Humidity Wind Precipitation ** Weather Conditions Low: 59 F High: 77 F Low: 42 % High: 87 % Direction: N / NW Speed: 8 mph (14 mph gusts) N/A Humid (AM), sunny 2.0 Community Air Monitoring Data Summary 2.1 Maximum Observed Background Readings: VOC: 0.0 ppm; PM-10: 267 µg/m 3 Station ID UW / DW VOC 15-Min Avg (ppm)* VOC 15-Min Avg Max (ppm)* PM Min Avg (µg/m 3 ) PM Min Avg Max (µg/m 3 ) N-74 UW N-81 DW S-77 DW S-79 DW N-51 DW E-37 DW * - Volatile Organics reported in parts per million (ppm) ** - Daily precipitation information obtained from on-site weather station UW Upwind Station DW Downwind Station 2.2 Air Monitoring Equipment Notes: N/A 2.3 CAMP Visual Observations: Visible mist from BioSolve 2.4 CAMP Action Level Alert(s) Triggered (Yes or No): No 2.5 CAMP Action Level Alert Details: See attached CAMP Exceedance Notification Report (if applicable) Enclosed Attachments: Attachment A: Table RA-1: Remedial Action Manifest Attachment B: Odor Assessment Forms Attachment C: Odor Complaints Log \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 1 of 9
2 3.0 Work Activities Time 08/25/ Daily Activities NRC continues remedial excavation of area B-2, A-3 PS&S activates off-site CAMP stations NRC- daily safety meeting with on-site personnel PS&S activates on-site CAMP stations WCD Group, NYSDEC on-site First round of JC Transport trucks arrive on-site for pick-up and disposal of excavated material to Clean Earth of Carteret, New Jersey (CECNJ) Refer to Attachment A for full schedule of JC Transport trucks on and off-site NRC applies Rusmar Foam and BioSolve with deodorant continuously throughout duration of excavation Cove rentals on-site throughout day for delivery of ASTM 57 stone (1 load) and structural fill (4 loads) PS&S, NRC perform morning Odor Assessment Tour Refer to Attachment B for Odor Assessment Form NRC staples poly sheeting to all exposed slopes of excavation NRC stops dewatering excavation treating remaining groundwater in tank and demobilizing (next week) NRC places triaxial geogrid along the base of excavation NRC places woven filter fabric over geogrid NRC continues backfilling B-2, A-3 with ASTM 57 drainage stone NRC places structural fill in western end of B-2 / southern end of A-3; uses roller for compaction Second round of JC Transport trucks arrive on-site for pick-up and disposal of excavated material to Clean Earth of Carteret, New Jersey (CECNJ) Refer to Attachment A for full schedule of JC Transport trucks on and off-site NRC applies Rusmar Foam and BioSolve with deodorant continuously throughout duration of excavation PS&S, NRC, NYSDEC conclude additional trucks will be needed to completed extended excavation of B-2 NRC reserved 3 JC Transport trucks for Tuesday morning (8/29/17) to complete extended excavation Tectonic Engineering on-site to survey points for excavator Carlin & Simpson on-site for compaction testing of backfill NRC backfills 36 ASTM 57 stone in northern section of B-2 PS&S, NRC perform afternoon Odor Assessment Tour Refer to Attachment B for Odor Assessment Form PS&S deactivates on-site CAMP stations NRC- daily tailgate meeting and sign out with on-site personnel NRC, PS&S, LeChase, NYSDEC off-site PS&S deactivates off-site CAMP stations \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 2 of 9
3 TABLE 1 - Daily Materials Tracking FRIDAY AUGUST 25, 2017 Chappaqua Station, LLC Former Chappaqua Coal/Fuel and Humble Oil Site Village of Chappaqua (Town of New Castle), Westchester County, New York NYSDEC BCP Site Number: C Daily Remedial Action Daily Remedial Action Units Remarks Remedial Excavation: Off- Site Disposal ~100 Tons 4 Total Loads Imported Fill Material ~25 ASTM 57; ~100 Structural Tons 1 Load ASTM 57 Stone; 4 Loads Structural Fill TABLE 2 CAMP PID Verification FRIDAY AUGUST 25, 2017 Former Chappaqua Coal/Fuel and Humble Oil Site Village of Chappaqua (Town of New Castle), Westchester County, New York NYSDEC BCP Site Number: C CAMP Station PID Value (ppm) Handheld PID Value (ppm) Notes N N S S N E \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 3 of 9
4 08/25/2017 Site overview photo View to the north. Photo of NRC continuing excavation of A-3. View to the southeast. \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 4 of 9
5 Photo of stapled poly sheeting on exposed excavation slopes - View to the southeast. Photo of NRC placing ASTM 57 stone for backfill of B-2 View to the northeast. \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 5 of 9
6 Attachment A Table RA-1: Remedial Action Manifest \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 6 of 9
7 Truck Number Table RA-1: Remedial Action Manifest Chappaqua Station, LLC Former Chappaqua Coal/Fuel and Humble Oil Site Village of Chappaqua (Town of New Castle), Westchester County, New York Date Time In NYSDEC BCP Site Number: C Time Disposal Truck Inspection Out Facility Manifest Number Remarks NJ- AT778U 25-Aug Completed- CEB CECNJ NJ- AT779U 25-Aug Completed- CEB CECNJ NJ- AT778U 25-Aug Completed- CEB CECNJ NJ- AT779U 25-Aug Completed- CEB CECNJ \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 7 of 9
8 Attachment B August 24, 2017 Odor Assessment Forms \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 8 of 9
9 Field Observations Parameter Site: Date: Chappaqua Station Odor Assessment Form Chappaqua Station, LLC - Remedial Action and Excavation Approach Friday August 25, 2017 Observer Location Wind Rating Odor Description/Comments Description of location (Use streets landmarks, addresses, etc.) Direction (Wind Blows From) Orientation (Downwind/Upwind) Approximate Wind Speed Description of odors (e.g. strength & persistence), other source(s) of odors, variable weather, etc. Time (0-3 Rating) Northerly Route 1. 9 Hunts Lane Parking Lot S Downwind < 2 MPH 10:04 0 Slight odor of pavement sealant (parking lot) 2. Site Gate S Downwind < 2 MPH 10:07 0 No Odors Observed < 2 MPH Westerly Route 1.Quaker Street & Hunts Place Intersection S Downwind < 2 MPH 10:09 0 No Odors Observed 2. Site Gate S Downwind < 2 MPH 10:11 0 No Odors Observed Easterly Route 1. King Street & N. Greeley Ave IntersectionS Downwind < 2 MPH 10:17 0 Food odor observed 2. King Street & Allen Place Corner S Downwind < 2 MPH 10:20 0 Food odor observed 3. Allen Place to Bridge Stairs S Upwind < 2 MPH 10:23 0 Asphalt odor observed Additional Notes: 1 Remedial Action Excavation Approach continued from 0807 Hours to 0840 Hours (2 Trucks, First Round) Sketch/Map: Relevant work activities occurring on-site during odor assessment: 1 Stockpiling backfill stone Odor Assessment Team Members: PS&S (Claire Bearden) NRC (Zak Arnhold) Template \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Odor Assessment Report\ (AM) Odor Assessment Form.xlsx
10 Field Observations Parameter Site: Date: Chappaqua Station Odor Assessment Form Chappaqua Station, LLC - Remedial Action and Excavation Approach Friday August 25, 2017 Observer Location Wind Rating Odor Description/Comments Description of location (Use streets landmarks, addresses, etc.) Direction (Wind Blows From) Orientation (Downwind/Upwind) Approximate Wind Speed Description of odors (e.g. strength & persistence), other source(s) of odors, variable weather, etc. Time (0-3 Rating) Northerly Route 1. 9 Hunts Lane Parking Lot N Upwind < 2 MPH Slight odor of pavement sealant (parking lot) 2. Site Gate N Downwind < 2 MPH No Odors Observed < 2 MPH Westerly Route 1.Quaker Street & Hunts Place Intersection N Downwind < 2 MPH No Odors Observed 2. Site Gate N Downwind < 2 MPH No Odors Observed Easterly Route 1. King Street & N. Greeley Ave IntersectionStagnant Stagnant Stagnant No Odors observed Faint odor from weir tank (cover open to check H King Street & Allen Place Corner N Downwind < 2 MPH level) 3. Allen Place to Bridge Stairs N Downwind < 2 MPH No Odors observed Additional Notes: 1 Remedial Action Excavation Approach continued from 1210 Hours to 1248 Hours (2 Trucks, Last Round) Sketch/Map: Relevant work activities occurring on-site during odor assessment: 1 Compaction of backfill Odor Assessment Team Members: PS&S (Claire Bearden) NRC (Zak Arnhold) Template \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Odor Assessment Report\ (PM) Odor Assessment Form.xlsx
11 Attachment C August 24, 2017 Odor Complaints Log \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Daily's\ Daily Field Report.docx Page 9 of 9
12 Community Odor Complaints Log Chappaqua Station NYSDEC Site #C Village of Chappaqua (Town of New Castle), Westchester County, New York A. CERP - CS Complaint Initial Log B. Odor Assessment Team Response Odor Complaint Number Date Time Complainant Name Complainant Contact Person Location of Odor Complaint Weather Conditions Site Work at Time of Odor Complaint Odor Assessment Team Tour Time Odor Assessment Team Tour Observations Odor Assessment Team Odor Complaint Action (Closed or Open/Action Required) 1 8/18/2017 9:00 AM William Wedge 1 PM HOTLINE N/A 8/18/ Prospect Drive Construction Entrance 2 8/18/2017 4:03 PM Ed Frank Saw Mill Off-Ramp 9 AM HOTLINE N/A 8/20/ PM HOTLINE N/A 8/20/ PM HOTLINE N/A 8/20/ /21/2017 7:07 AM William Wedge 1 PM HOTLINE N/A 8/21/ PM HOTLINE N/A 8/21/ Prospect Drive Construction Entrance Overcast, Humid, High of 86 o Fahrenheit Overcast, Humid, High of 86 o Fahrenheit 0700 Hours (7 AM): Clear Skies, High of 75 o Fahrenheit Remedial Action Excavation in Area B-1 and Direct Load-Out of Trucks. Biosolve and Foam Application in accordance with the Revised Remedial Action Excavation Approach. Remedial Action Excavation in Area B-1 and Installation of Construction Dewatering Sump No Site Work at 0700 Hours; Project Team Safety Brief and Review of Day's Site Operations Meeting. Site Intrusive Work commenced at 0800 Hours 0830 Hours to 0900 Hours 1530 Hours to 1600 Hours 0915 Hours to 0942 Hours "0" Odor Assessment Tour; No Odors Observed at the ; On-Going Remedial Action Site Perimeter Excavation with Rusmar Foam and Biosolve Application Assessment Tour; No Odors Observed at the ; On-Going Remedial Action Excavation with Rusmar Foam and Biosolve Application "0" Odor Assessment Tour; No Odors Observed at the ; On-Going Remedial Action Site Perimeter Excavation with Rusmar Foam and Biosolve Application Odor Complaint was received after the 4 PM Monday, August 21, 2017 Hotline Check and before the 9 AM Tuesday, August 22, 2017 Hotline Check. Please note that the "Easterly Route" Odor Assessment Tour was performed from 1526 Hours to 1532 Hours on Monday, August 21, 2017 along the Allen Place parking lot and no odors were observed. 4 8/21/2017 4:32 PM Linda Frank N/A 8/22/ AM HOTLINE N/A 8/22/ PM HOTLINE N/A 8/22/ PM HOTLINE Parking lot in front of train station 1500 Hours (3 PM): Partly Cloudy, High of 85 o Fahrenheit Remedial Action Excavation Backfill in Area B Hours to 1532 Hours ; On-Going Remedial Action Excavation with Rusmar Foam and Biosolve Application. EDITORIAL NOTE: In accordance with the "Train Station Parking Lot Resurfacing - August 21-25, 2017" Notice "0" Odor that was posted inside the Chappaqua, New York train Assessment Tour; station; the asphalt pavement parking lot resurface No Odors activities commenced on Monday, August 21, 2017 and Observed at the these "asphalt pavement parking lot resurfacing Site Perimeter activities" will result in odors. N/A 8/23/2017 N/A 8/24/2017 N/A 8/24/2017 N/A 8/24/ AM HOTLINE 1 PM HOTLINE 4 PM HOTLINE OdorComplaintLog \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Odor Complaints Log\ Odor Complaint Log ( PSSUpdate).xlsx
13 Community Odor Complaints Log Chappaqua Station NYSDEC Site #C Village of Chappaqua (Town of New Castle), Westchester County, New York A. CERP - CS Complaint Initial Log B. Odor Assessment Team Response Odor Complaint Number Date Time Complainant Name Complainant Contact Person Location of Odor Complaint Weather Conditions Site Work at Time of Odor Complaint Odor Assessment Team Tour Time Odor Assessment Team Tour Observations Odor Assessment Team Odor Complaint Action (Closed or Open/Action Required) Odor Complaint was received after the 4 PM Thursday, August 24, 2017 Hotline Check and before the 9 AM Friday, August 25, 2017 Hotline Check. Please note that the "Westerly Route" Odor Assessment Tour was performed from 1415 Hours to 1419 Hours on Thursday, August 24, 2017 along Hunts Place towards Quaker Street and no odors were observed. 5 8/24/2017 6:38 PM Howie Goldberg N/A 8/25/ AM HOTLINE N/A 8/25/ PM HOTLINE N/A 8/25/ PM HOTLINE Driving over Bridge towards pond 1700 Hours (5 PM): Sunny, High of 78 o Fahrenheit No Site Work at 1830 Hours; All Personnel Off-Site at 1700 Hours 1407 Hours to 1433 Hours ; Site was foamed and backfilled with ASTM 57 Stone. EDITORIAL NOTE: In accordance with the "Train Station Parking Lot Resurfacing - August 21-25, "0" Odor 2017" Notice that was posted inside the Chappaqua, Assessment Tour; New York train station; the asphalt pavement parking lot No Odors resurface activities continued on Thursday, August 24, Observed at the 2017 and these "asphalt pavement parking lot Site Perimeter resurfacing activities" will result in odors OdorComplaintLog \\psands.aec\projectdata\projects\04736\0002\reports\environmental\chappaqua RA Oversight\Field Reports\Odor Complaints Log\ Odor Complaint Log ( PSSUpdate).xlsx
Daily Field Observation Report
Daily Field Observation Report Project: Chappaqua Station Site Remediation Date: 08/30/2017, Day 54 Representative On-Site: NRC, PS&S, LeChase, Carlin & Simpson, Olivieri Rentals Project Number: 04736.0002
More informationSHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES
More informationTown of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY
Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish
More informationMonroe County: Key West and Lower Keys
FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please
More informationCustom Weather Forecast
1 of 23 Custom Weather Forecast 2018 Chicago Yacht Club s Race To Mackinac- Cruising Division Disclaimer: The user assumes all risk related to the use of this Custom Weather Forecast. The crew of the participating
More informationIWT Scenario 2 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014
IWT Scenario 2 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014 09 10 11 12 13 Scenario 2 Timeline December 9-13 Tue Wed Thu Fri Sat Tue, Dec. 9 @ 5 am 2014 2014 2014
More informationJohn A. Carlson Snow and Ice Removal
John A. Carlson Snow and Ice Removal A. Introduction 1. The purpose of the Snow and Ice Removal Operation Plan is to provide all personnel who are involved in snow and ice removal a single source document,
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationWeather Briefing. Coastal Storm Monday-Wednesday Dec 8-10, National Weather Service. Prepared 12/8/14 6:30 AM
Weather Briefing Coastal Storm Monday-Wednesday Dec 8-10, 2014 National Weather Service http://www.weather.gov/nyc Prepared 12/8/14 6:30 AM Overview of Potential Hazards A strong low pressure system will
More informationFundamentals of Transmission Operations
Fundamentals of Transmission Operations Load Forecasting and Weather PJM State & Member Training Dept. PJM 2014 9/10/2013 Objectives The student will be able to: Identify the relationship between load
More informationAddendum to the. Submitted to U.S. EPA Region 9 March 17, Prepared by:
Addendum to the Exceptional Events Demonstration for 2015 Ozone Exceedance in Washoe County from the 2015 California Wildfires August 21, 2015 Submitted to U.S. EPA Region 9 March 17, 2017 Prepared by:
More informationWinter Storm Briefing #3 Monday Evening Wednesday Evening
Winter Storm Briefing #3 Monday Evening Wednesday Evening Tuesday March 14, 2017 Disclaimer: The information contained within this briefing is time-sensitive. Do not use after 4AM Wednesday. Applies to
More informationCITY OF MINOT SNOW REMOVAL PLAN November 2017
CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationAPPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT
APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT (2) Tractors with Front End Loader and Box Blade (1) Unit used to load sand and salt mix (1) Unit used to remove plowed snow in parking
More informationMemorandum. Air Sampling
Memorandum TO: David Yelton, City of Beverly Hills DATE: December 8, 2015 CC: Heidi Rous, PCR Services FROM: Everest Yan and Audrey Vinant Tang, PCR Services RE: BEVERLY HILLS ARSENIC MONITORING MEMO This
More informationJune 17, 2015 Lab Exercise
June 17, 2015 Lab Exercise Objective: To become comfortable with: Interpreting heavy rainfall forecast products and ingredients before an event (Part 1) Monitoring key heavy rainfall products during an
More informationCITY OF MINOT SNOW REMOVAL PLAN October 2018
CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationUDOT Weather Program Traffic Operations Center
UDOT Weather Program Traffic Operations Center Presentation Goals You MUST account for weather in your Traffic Management program Provide you with information on proven tools and strategies You NEED a
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationGREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)
GREEN SHEET California Department of Forestry and Fire Protection (CAL FIRE) Informational Summary Report of Serious CAL FIRE Injuries, Illnesses, Accidents and Near Serious Accidents Fire Engine Rollover
More informationThe Climate of Murray County
The Climate of Murray County Murray County is part of the Crosstimbers. This region is a transition between prairies and the mountains of southeastern Oklahoma. Average annual precipitation ranges from
More informationThe Climate of Seminole County
The Climate of Seminole County Seminole County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationWinter Maintenance on Ontario s Highways
Ministry of Transportation Winter Maintenance on Ontario s Highways MTO Eastern Region November 18, 2015, Northumberland County Council Outline 1. Winter Maintenance Areas - Eastern Region 2. Winter Maintenance
More informationIWT Scenario 1 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014
Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014 23 24 25 26 27 Scenario 1 Timeline November 23-27 Sun Mon Tue Wed Thu Thanksgiving Day Sunday, Nov. 23 @ 430 pm NWS
More informationHydrologic Briefing Tropical Storm Harvey
Hydrologic Briefing Tropical Storm Harvey 5:00 PM CDT Sunday, August 27, 2017 Prepared by: Jennifer Dunn/Christina Barron NWSCorpus www.weather.gov/corpuschristi Situation Overview Tropical Storm Harvey
More informationPage 1. Name:
Name: 1) As the difference between the dewpoint temperature and the air temperature decreases, the probability of precipitation increases remains the same decreases 2) Which statement best explains why
More informationThe Climate of Marshall County
The Climate of Marshall County Marshall County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average
More informationRed Butte Creek Oil Release Air Monitoring Journal Date Location (Time) Analyte Method Result GPS Location Comment
Date Location (Time) Analyte Method Result GPS Location Comment 8/23/10 Miller Park, along Red Butte Creek (1130-1150) Confluence of Jordan River and Red Butte Creek (1030-1040) Garden Park Ward, 1140
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationSeptember 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department
MEDIA RELEASE September 13, 2018 The City continues to prepare for and monitor the track and potential impacts of Hurricane Florence. Current guidance from the National Weather Service, the National Hurricane
More informationThe Climate of Payne County
The Climate of Payne County Payne County is part of the Central Great Plains in the west, encompassing some of the best agricultural land in Oklahoma. Payne County is also part of the Crosstimbers in the
More informationArizona Climate Summary September 2014 Summary of conditions for August 2014
Arizona Climate Summary September 2014 Summary of conditions for August 2014 August 2014 Temperature and Precipitation Summary August 1 st 16 th : The first 5 days of August were quite wet with high pressure
More informationPhotographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1
1 Southwest 10/27/15 Looking southwest on Copper Park Lane viewing clearing and grubbing of area south of Copper Park Lane prior to excavation. 2 Southeast 10/29/15 Looking southeast at the sump and pump
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationCITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015
CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationMONTGOMERY COUNTY SNOW PLAN
2018 2019 MONTGOMERY COUNTY SNOW PLAN COMMUNICATION DURING SNOW/ICE SITUATIONS Communication will be established prior/during all winter storms between the Sheriff s Office, Public Works Department, and
More informationThe Climate of Bryan County
The Climate of Bryan County Bryan County is part of the Crosstimbers throughout most of the county. The extreme eastern portions of Bryan County are part of the Cypress Swamp and Forest. Average annual
More informationSnow Response in an Urban Setting
Snow Response in an Urban Setting Pat Kennedy, PE Denver Street Maintenance Road and Street Supervisors Conference October 15, 2013 Yakima, WA 2 Denver Agenda Population ~600,000 Metropolitan area 2.5
More informationNOAA s National Weather Service Philadelphia/Mt. Holly NJ
Next Briefing Package: Friday, October 2, 2015 no later than 300 PM Hazards and Impacts: Overview: A dangerous weather pattern still threatens our region. Threats include very heavy rainfall, inland river
More informationTROPICAL STORM NATE BRIEFING
TROPICAL STORM NATE BRIEFING 5:00 AM CDT Friday, October 6, 2017 Prepared by: NWS NWSNewOrleans www.weather.gov/neworleans Situation Overview No significant changes to the track forecast this morning.
More informationTown of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan
Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county
More informationThe Climate of Pontotoc County
The Climate of Pontotoc County Pontotoc County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeast Oklahoma. Average
More information1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots
City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently
More informationWeather Report. PCAS Camp 2009/10. By Chris Mckenzie
Weather Report PCAS Camp 2009/10 By Chris Mckenzie Abstract An AWS (Automatic Weather Station) was set up at PCAS camp, located on the Ross Ice Shelf in the Windless Bight (figure 1). Data was measured
More informationCoastal Storm. Wednesday through Friday, 3/6-8/2013 Weather Briefing
Coastal Storm Wednesday through Friday, 3/6-8/2013 Weather Briefing Prepared 2:00 PM EST Wednesday, March 6, 2013 National Weather Service New York, NY Purpose of Briefing Promote Situational Awareness
More informationCropCast Corn and Soybean Report Kyle Tapley Monday, March 20, 2017
Accumulated Rainfall (inches) Accumulated GDDs Temperature ( F)/Wind Speed (mph) Precipitation (inches) CropCast Corn and Soybean Report Kyle Tapley Monday, March 20, 2017 Peoria, IL Regional Forecast
More informationActive Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director
Active Traffic & Safety Management System for Interstate 77 in Virginia Chris McDonald, PE VDOT Southwest Regional Operations Director Interstate 77 at Fancy Gap Mountain Mile markers 0-15 Built in late
More informationTrip and Parking Generation Study of Orem Fitness Center-Abstract
Trip and Parking Generation Study of Orem Fitness Center-Abstract The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation study
More informationTrip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945
Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed
More informationArizona Climate Summary
Arizona Climate Summary March 2014 Summary of conditions for February 2014 February 2014 Temperature and Precipitation Summary February 1 st 16 th : We started off the month of February with some moisture
More informationThe Following was Noted: US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG
US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG Wanamaker Bldg, 7th Floor 100 Penn Square East Philadelphia, PA 19107-3396,USA Site Visit Report Date: Tuesday, Nov. 6,
More informationFleming County High School Flemingsburg, KY 41041
Fleming County High School Flemingsburg, KY 41041 Date Mon 02/06/2017 Job # Prepared By Clay Barton 02/06/17 02:31PM 02/06/17 02:57PM 02/06/17 03:03PM 02/06/17 03:19PM Weather 6:00 AM:29 F Clear Wind:
More informationHydrologic Briefing Tropical Storm Harvey
Hydrologic Briefing Tropical Storm Harvey 10:30 AM CDT Sunday, August 27, 2017 Prepared by: John Metz NWSCorpus www.weather.gov/corpuschristi Situation Overview Tropical Storm Harvey Harvey to remain a
More informationDICAMBA 2018: HOPE MEETS REALITY
DICAMBA 2018: HOPE MEETS REALITY Bryan Young 2018 CPDA Summer Conference - Chicago Dicamba What Happened in 2017? 2/23/2018 2 1 Official Dicamba-related Injury Investigations as Reported by State Departments
More informationArizona Climate Summary
Arizona Climate Summary April 2014 Summary of conditions for March 2014 March 2014 Temperature and Precipitation Summary March 1 st 16 th : We started off the month of March with a significant precipitation
More informationArizona Climate Summary April 2013
Arizona Climate Summary April 2013 Summary of conditions for March 2013 March 2013 Temperature and Precipitation Summary March 1 st 16 th : March began as a ridge of high pressure progressed across the
More informationThe Climate of Grady County
The Climate of Grady County Grady County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 33 inches in northern
More informationTRAFFIC ALERT FOR WEEK OF February 4 8, 2008
TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during
More informationArizona Climate Summary October 2013
Arizona Climate Summary October 2013 Summary of conditions for September 2013 September 2013 Temperature and Precipitation Summary September 1 st 16 th : With moist conditions still present throughout
More informationJan 7, 2017 Winter Weather Event
Jan 7, 2017 Winter Weather Event Decision Support Briefing # 5 Assessment for northeast South Carolina & southeast North Carolina National Weather Service Wilmington NC 4 PM EST Friday January 6, 2017
More informationThe Climate of Haskell County
The Climate of Haskell County Haskell County is part of the Hardwood Forest. The Hardwood Forest is characterized by its irregular landscape and the largest lake in Oklahoma, Lake Eufaula. Average annual
More informationAppendix C Traffic Study
Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield
More informationNOAA s National Weather Service Philadelphia/Mt. Holly NJ
Next Briefing Package: Thursday, October 1, 2015 no later than 300 PM Hazards and Impacts: Overview: A dangerous weather pattern is developing for our region. Threats include very heavy rainfall, inland
More information3. As warm, moist air moves into a region, barometric pressure readings in the region will generally 1. decrease 2. increase 3.
Teacher: Mr. Prizzi Castle Learning Review 1 1. Which process most directly results in cloud formation? 1. condensation 3. precipitation 2. transpiration 4. radiation 2. An air mass originating over north
More informationThe Climate of Kiowa County
The Climate of Kiowa County Kiowa County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 24 inches in northwestern
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationIssued by: National Weather Service San Joaquin Valley - Hanford CA. Issue time: 409 AM PST Wed Jan
Forecast Information Location: New_Exchequer_Dam Updated: January 16, 2019, 11:45 am NWS Weather Discussion: Issued by: National Weather Service San Joaquin Valley - Hanford CA Issue time: 409 AM PST Wed
More informationA Prepared Marylander Creates a Resilient Maryland
Maryland Emergency Management Agency Operations Directorate Hazardous Winter Weather Outlook Briefing March 5, 2013 0800 A Prepared Marylander Creates a Resilient Maryland A strong low pressure will track
More informationphoto courtesy of
BRITISH VIRGIN ISLANDS REPORT TROPICAL STORM JEANNE photo courtesy of www.bviplatinum.com PREPARED BY THE DEPARTMENT OF DISASTER MANAGEMENT 1 EVENT 13 th -16 th September, 2004 TROPICAL STORM JEANNE Sequence
More informationAdvance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018
Advance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018 1 OVERVIEW BGE s load response programs are split between two programs Peak Rewards and Smart Energy Rewards
More informationState Of Wisconsin Department of Military Affairs
State Of Wisconsin Department of Military Affairs Division of Emergency Management Brian M. Satula Administrator Scott Walker Governor For more information contact: Tod Pritchard Office: 608-242-3324 Cell:
More informationThe Sunland Park flyover ramp is set to close the week of March 19 until early summer
March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10
More informationCONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.
NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July
More informationRed Butte Creek Oil Release Air Monitoring Journal Date Location (Time) Analyte Method Result GPS Location Comment
Date Location (Time) Analyte Method Result GPS Location Comment 6/30/10 ~1800 East Sunnyside Ave. (1110-1145) Miller Park, along Red Butte Creek (1150-1210) 0.2-1.0 ppm 1 Upstream of pressure-washing crews.
More informationVermont State Climate Office Climate Impacts Summary December Dr. Lesley-Ann Dupigny-Giroux Stephen Hogan
Vermont State Climate Office Climate Impacts Summary December 2010 Dr. Lesley-Ann Dupigny-Giroux Stephen Hogan December 2010 was marked by a number of severe events including wind damage, large snowfalls
More informationMIAMI-SOUTH FLORIDA National Weather Service Forecast Office
MIAMI-SOUTH FLORIDA National Weather Service Forecast Office http://www.weather.gov/miami June 2015 South Florida Weather Summary Dry East, Wet West...Drought Remains SE Florida July 3, 2015: Depending
More informationCAMPUS SNOW REMOVAL DARRIN BEAR EDSON AND CREW
CAMPUS SNOW REMOVAL DARRIN BEAR EDSON AND CREW Meet the team: NIGHT EQUIPMENT CREW: NATHAN LEAD OPERATOR CASEY OPERATOR JOSHUA OPERATOR DAY EQUIPMENT CREW: IAN LEAD OPERATOR JAMIE OPERATOR TERRY OPERATOR
More informationUNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION
MAI-2017-05 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Facility Diatomaceous Earth Fatal Electrical
More informationSOLUT TO AUGUST 25 T SPREAD 7 AUGUST 20 TH
MANITOBA METIS FEDER ATION MATRIX SOLUT IONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 7 AUGUST 20 TH TO AUGUST 25 T T H 1 1. PURPOSE OF THIS REPORT The report is a weekly
More informationThe results of KCB s site inspection observations and our recommendations for further work are presented herein.
July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited
More informationThe Climate of Texas County
The Climate of Texas County Texas County is part of the Western High Plains in the north and west and the Southwestern Tablelands in the east. The Western High Plains are characterized by abundant cropland
More informationFIN STABILIZER OPERATIONS TRAINING COURSE
FIN STABILIZER OPERATIONS TRAINING COURSE Who Should Attend: Captains, engineers, and yacht crew who are interested in learning more about operating the Quantum fin type stabilizer systems. Experience
More informationCropCast Corn and Soybean Report Kenny Miller Tuesday, March 14, 2017
Accumulated Rainfall (inches) Accumulated GDDs Temperature ( F)/Wind Speed (mph) Precipitation (inches) CropCast Corn and Soybean Report Kenny Miller Tuesday, March 14, 2017 Peoria, IL Regional Forecast
More informationWhat s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description
What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation
More informationSNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy
Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),
More informationCalifornia OES Weather Threat Briefing
California OES Weather Threat Briefing Wednesday, January 16, 2019 9:00 AM PST Day 1: Strong winds, heavy mountain snow and heavy rain with isolated thunderstorms across much of the state through Thursday
More informationApril snowmelt and record rainfall resulted in flooding across portions of Vermont
Vermont State Climate Office Climate Impacts Summary April 2011 Dr. Lesley-Ann Dupigny-Giroux Stephen Hogan April snowmelt and record rainfall resulted in flooding across portions of Vermont During the
More informationFlood Scenario Worksheet
Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,
More informationHurricane Irma. City of Cocoa Beach September 8 12, 2017
Hurricane Irma City of Cocoa Beach September 8 12, 2017 Monitoring prior to landfall Expected effects What happened What went well What didn t go well Changes and improvements After Action Outline Storm
More informationCropCast Corn and Soybean Report Kenny Miller Monday, March 13, 2017
Accumulated Rainfall (inches) Accumulated GDDs Temperature ( F)/Wind Speed (mph) Precipitation (inches) CropCast Corn and Soybean Report Kenny Miller Monday, March 13, 2017 Peoria, IL Regional Forecast
More informationSECURITY REGULATED PORT BOUNDARY DESCRIPTION
SECURITY REGULATED PORT BOUNDARY DESCRIPTION Description of State: Northern Territory Map Number: 68738 The Security Regulated is all of that area of land and water contained within and bounded by a line
More informationWinter Maintenance Report
98.4 Official State Snowfall 150 Truck Stations 1,813 Full-time and Backup Snowfighters 840 Plow trucks - includes 47 reserve plows 30,585 Lane Miles 85% Frequency Achieving Bare Lanes 2017-18 Winter Maintenance
More informationArizona Climate Summary September 2017 Summary of conditions for August 2017
August 2017 Temperature and Precipitation Summary Arizona Climate Summary September 2017 Summary of conditions for August 2017 August 1 st 15 th : The monsoon activity that ended July continued into the
More informationVORTEX-2: SUNY Oswego Soundings Team Significant Observed Weather Events Kevin M. Smith
VORTEX-2: SUNY Oswego Soundings Team Significant Observed Weather Events Kevin M. Smith Summary Last Updated: Final Update The following is a chronological listing of significant weather conditions observed
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden
More informationReal Time On-Site Odor and VOC Emission Measurements Using a znose
Real Time On-Site Odor and VOC Emission Measurements Using a znose Edward J. Staples, Electronic Sensor Technology, EST@ESTCAL.COM Remediation Site Description Remediation of contaminated soil from where
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationMajor Hurricane Matthew Briefing Situation Overview
Major Hurricane Matthew Briefing Situation Overview At 5 p.m. Tuesday, Category 4 Hurricane Matthew was about 860 miles South-Southeast of Mayport, Florida, moving north around 10 mph. Maximum sustained
More informationCity of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016
Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist
More information