1 EVALUATION AN ECOMMENATIONS EPOT Pavement Management eport Merrimac, MA February 218 Prepared for: of Merrimac 2 School Street Merrimac, MA 18 Prepared by:

2 of Merrimac, Massachusetts Pavement Management Program Table of Contents 1. Introduction and Methodology Overview Community Profile Establish oadway Inventory atabase 2 1. Pavement Inspection ata 3 1. Capital Improvement Planning 2. Summary of Findings 2.1 Sidewalks 2.2 Curb eveal 2.3 PCI and epair Bands Appendices Appendix A: Pavement epair Method Banding and Backlogs Pavement epair Methods and Banding Backlog Summary by epair Method Backlog Summary by Functional Class Appendix B: Pavement Condition Index eports and Mapping Existing Conditions Sorted by Street Segment Street Name and Acceptance PCI and epair Method, Sorted by PCI Streets with Sidewalk and Curbing Street Striping Shirley Pavement Conditions Map Appendix C: Capital Improvement Plan (CIP) Proposed FY218 FY222 oadway Improvement Plan Summary Proposed FY218 FY222 oadway Improvement Plan Year Projected PCI (Current CIP) Year Projected PCI (No CIP) Year Projected PCI ($K Per Year) Capital Improvement Plan Map 1

3 of Merrimac, Massachusetts Pavement Management Program 1. Introduction and Methodology 1.1 Overview The of Merrimac retained WorldTech Engineering LLC to provide engineering services to assist the in establishing a baseline inventory and perform a condition assessment program to be used in the development of the s Pavement Management Program. The scope of the work included collecting and analyzing field data on roadways pertinent to the development of a multi year Capital Improvement Plan (CIP) to assist the in the implementation of recommendations with respect to pavement preservation. ata collection focused on identifying distresses in the s roadway network, focusing on owned streets. 1.2 Community Profile The of Merrimac is a predominantly rural community which includes a total population of,338 (21 MassO Municipal atabank), and a land area of approximately 8. square miles, which yields a population density of 72 persons per square mile. There are approximately 1. centerline miles of roadway in, of which 37 miles are owned, and the remainder, are under the jurisdiction of the Massachusetts epartment of Transportation (MassOT), Private, State, and currently. 1.3 Establish oadway Inventory atabase WorldTech utilizes the MassOT oad Inventory File (IF) coupled with GIS data available from the to establish the Pavement Management Program atabase in Microsoft Access. WorldTech coordinated with the to ensure the list of roadways identified as accepted in the IF is consistent with the s current list of accepted maintained roadways (37 miles). A report will be provided to the of Merrimac highlighting accepted streets that are not included in the IF. Since the IF is used to calculate a percentage of the Chapter 9 funding that is allocated to each municipality, roadway mileage updates are encouraged to ensure that each municipality receives their correct Chapter 9 apportionment. WorldTech will assist the in preparing and submitting roadway inventory mileage updates to MassOT as applicable. 2

4 of Merrimac, Massachusetts Pavement Management Program 1. Pavement Inspection ata WorldTech field verified all existing pavement inspection data and integrated it into a Pavement Management atabase. Pavement inspections were completed in the field utilizing a field laptop computer and Microsoft Access atabase. The attribute data collected includes; Sidewalks Length and Width; Curb Type and eveal; Material (, Asphalt, Brick, Mix); Condition (Good,, Poor) Pavement Attributes Length and Width; oadway Material; Alligator Cracking; andom Cracking; Transverse/Longitudinal Cracking; Potholes; aveling; utting; Patching; Pavement Condition Index (PCI) Striping Centerline Striping; Edge Line Striping; Multi Lane and Bike Lanes Pavement distresses identified in the inspection data are incorporated into the database by severity (Low, Moderate, High) and extent ( 1%) for each roadway segment. This attribute data is used to calculate a Pavement Condition Index (PCI) for each roadway segment based on the procedures outlined in AM 33, Standard Practice for oads and Parking Lots Pavement Condition Index Surveys. The PCI is a numerical measure of the pavement s integrity and surface operational condition, ranging from (worst) to 1 (best). Curb, sidewalk, and striping data was also collected and inventoried simultaneously with the pavement data. Curb attributes collected in the field included only the type and reveal. Sidewalk data collected in the field included material type, width, and overall condition. Field data will be used to establish roadway repair strategies (i.e. eclamation, Mill and Overlay, Crack Seal) and unit costs using PCI banding to reflect the type and severity of pavement distresses. We will develop a series of reports and GIS maps that represent existing pavement 3

5 of Merrimac, Massachusetts Pavement Management Program conditions. Backlog reports will also be generated as part of this project. The maps will be delivered at an appropriate size and scale as requested by the. 1. Capital Improvement Planning WorldTech is working with the to develop a multi year Capital Improvement Program (CIP) including roadway improvement projects consistent with the s priorities. The Proposed CIP will be provided in bound paper format and a series of GIS maps depicting the plan in graphic form. 2. Summary of Findings 2.1 Sidewalks Sidewalks are provided along a total of 1.7 (33%) miles of accepted streets. Of these, the total mileage of streets with sidewalk on both sides is 3. miles, and additional 11.1 miles of streets have sidewalk on one side only (Figure 1). Sidewalks Present on oadways Miles One Side Both Sides No Sidewalk Figure 1: Summary of Sidewalk Mileage on oads

6 of Merrimac, Massachusetts Pavement Management Program 2.2 Curb eveal Curb reveal can be a determining factor in repair treatment as pavement milling and overlay typically requires a minimum reveal of inches. The total mileage of streets with a curb reveal of less than inches (including no curb on one side) is 28.1 miles, while 1.7 miles of road have a curb reveal of inches or more on both sides (Figure 2). Streets with a curb reveal of less than inches may require full depth pavement rehabilitation Curb eveal Over and Below Inches Miles " or Higher Under " Curb eveal Figure 2: Summary of Curb eveal Mileage on oads 2.3 PCI and epair Bands The Pavement Condition Index (PCI) varies throughout Merrimac and has a wide average of 8. It is shown graphically below (Figure 3) in groups outlined by predefined repair bands. The total mileage of roadways with a PCI range of 3 and the repair band eclamation is 8.1 miles. 8.1 miles of road fall into the PCI range of 3 with the repair band Mill Level and Overlay. The total mileage of roadways with a PCI range of 7 and the repair band Level and Overlay is. miles. An Overlay with a corresponding PCI range of 7 8 is represented on 2.7 miles of roadway..1 miles of road fall into the PCI range of 8 9 with the repair band Crack Seal. 7. miles were determined to be efer Maintenance as the corresponding roads were in excellent condition and landed in the PCI range of 9 1.

7 of Merrimac, Massachusetts Pavement Management Program 9 1 (efer Maintenance), 7. PCI BEAKOWN (MILES) 3 (eclamation), (Crackseal), (Overlay), (Mill Level & Overlay), (Level & Overlay),. Figure 3: Summary of PCI and epair Bands on Accepted oads

8 of Merrimac, Massachusetts Pavement Management Program Pavement epair Methods and Banding epair Method PCI ange Unit Cost (per sy) eclamation 3 $13.8 Mill Level and Overlay 3 $27.1 Level and Overlay 7 $1.1 Overlay 7 8 $7.8 Crack Seal 8 9 $1. efer Maintenance 9 11 $. Note: Actual repair method may vary based on subsurface conditions or other site specific criteria. 2/13/218 Page 1 of 1

9 of Merrimac, Massachusetts Pavement Management Program Backlog Summary by epair Method epair Method Length (Miles) Estimated Cost Average PCI eclamation 8.1 $,737,1 23 Mill Level and Overlay 8.1 $1,12,31 1 Level and Overlay. $282,732 Overlay 2.7 $,17 7 Crack Seal.1 $12,37 8 efer Maintenance 7. $ 1 Total 3.9 $17,712,72 Average PCI: Note: ue to rounding, numbers may not add up to totals 8 2/13/218 Page 1 of 1

10 of Merrimac, Massachusetts Pavement Management Program Backlog Summary by Functional Classification epair Method Length Cost Minor Arterial Crack Seal.8 Miles $11,81 efer Maintenance. Miles $ Level and Overlay.3 Miles $,1 Mill Level and Overlay. Miles $131,22 Overlay.2 Miles $1,9 Totals for Class: 2.1 Miles $21,9 Average PCI by Segment: 7 Crack Seal 2. Miles $32,3 efer Maintenance. Miles $ Level and Overlay 3. Miles $39,12 Mill Level and Overlay. Miles $1,81,291 Overlay 2. Miles $18,277 eclamation. Miles $7,9, Totals for Class: 23.9 Miles $1,3,21 Average PCI by Segment: 9 Collector Crack Seal 1. Miles $12,37 efer Maintenance 1.1 Miles $ Level and Overlay 1. Miles $282,732 Mill Level and Overlay 2.7 Miles $1,12,31 Overlay. Miles $,17 eclamation 3.1 Miles $,737,1 Totals for Class: 9.9 Miles $7,9,33 Average PCI by Segment: Overal Totals: 3.9 Miles $17,712,72 Average PCI: 7 Note: ue to rounding, numbers may not add up to totals 2/13/218 Page 1 of 1

11 of Merrimac, Massachusetts Pavement Management Program PCI and epair Cost Sorted By Street Name Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost ABBOTT SAWYE EET CHUCH EET ,98 3. Level and Overlay $3,3.8 AAMS LOCU EET UNION EET , Overlay $12,7. AHEN CI WE SHOE OA CUL E SAC Level and Overlay $12,79.87 ALNETTE 1 EA EN COLGAN OA Level and Overlay $7,38. ALNETTE 2 COLGAN OA GEYONE OA Overlay $2,1. ALNETTE 3 GEYONE OA WE SHOE OA Overlay $3,27.8 ALNETTE WE SHOE OA EA EN Level and Overlay $3,19.97 ATTITASH 1 EA MAIN EET PLEASANT VIEW OA ,22 3. Mill Level and Overlay $,.87 ATTITASH 2 PLEASANT VIEW OA HILLSIE AVENUE , Crack Seal $1,22.8 ATTITASH 3 HILLSIE AVENUE MEAOW AVENUE efer Maintenance $. ATTITASH MEAOW AVENUE EA EN Overlay $,8.82 BANCOFT LN IVE OA EA EN Level and Overlay $8,.91 BATLETT SCHOOL EET MILL EET , efer Maintenance $. BATTIS 1 HIGHLAN OA HUSE OA 18 2,8 1. eclamation $,81. BATTIS 2 HUSE OA GAVEL OA ,91 1. eclamation $397,7. BATTIS 3 GAVEL OA BICH MEAOW LOOP , eclamation $1,3,889.2 BEA HILL 1 EA MAIN EET SPENCE WAY , eclamation $27,7.7 BEA HILL 2 SPENCE WAY HOUSE # , eclamation $38,993.7 BEA HILL 3 HOUSE #1 HOUSE # , efer Maintenance $. BEA HILL HOUSE #2 LANE TEN ACE OA , eclamation $38,993.7 BEA HILL LANE TEN ACE OA OL BEA HILL OA 22 1, eclamation $18,92.7 BEA HILL OL BEA HILL OA OL BEA HILL OA ,3 1. efer Maintenance $. BEA HILL 7 OL BEA HILL OA WE SHOE OA efer Maintenance $. BEA HILL 8 WE SHOE OA LAKEWOOS AVENUE 22 12, Level and Overlay $7,11.2 BEA HILL 9 LAKEWOOS AVENUE OL BEA HILL OA ,79 3. Mill Level and Overlay $129,8.9 BEA HILL 1 OL BEA HILL OA HAIMAN OA , eclamation $93, BEA HILL 11 HAIMAN OA NEW HAMPSHIE ATE , eclamation $8,1.1 BELMOE 1 WEMINIE OA MAPLETON OA Level and Overlay $2,123.2 BELMOE 2 MAPLETON OA PINEHU EET ,7. Level and Overlay $2, /13/218 Page 1 of 9

12 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost BILLING IGEFIEL EET EA EN Mill Level and Overlay $,33.8 BICH MEAOW LOOP 1 BICH MEAOW OA BATTIS OA Level and Overlay $. BICH MEAOW LOOP 2 BATTIS OA BICH MEAOW OA , eclamation $183,28.22 BICH MEAOW 1 WE MAIN EET WE PAISH LANE 2 238, Mill Level and Overlay $18,1.1 BICH MEAOW 2 WE PAISH LANE PAVEMENT CHANGE 2 18, Mill Level and Overlay $1,3.9 BICH MEAOW 3 PAVEMENT CHANGE PAVEMENT CHANGE 2 18, efer Maintenance $. BICH MEAOW WE PAISH LANE BICH MEAOW LOOP 2 18, Mill Level and Overlay $1,3.9 BICH MEAOW BICH MEAOW LOOP FINN LANE 2 2 1, Mill Level and Overlay $3,272. BICH MEAOW FINN LANE HEATH OA , eclamation $9,92. BANY BOW HAVEHILL TOWN LINE HAVEHILL TOWN LINE , eclamation $21,912.3 BOA 1 EA MAIN EET LANCAE COUT 2 1, Crack Seal $1,89.2 BOA 2 LANCAE COUT MILL EET , Overlay $1,99.9 BOA 3 ON AMP HIGH EET 21 1, Crack Seal $1, BOA HIGH EET SOUTH PLEASANT EET 2 122, eclamation $3,93.7 BOA SOUTH PLEASANT EET IVE OA ,. Level and Overlay $1,231. BOA HIGH EET CUL E SAC 1 9 1, eclamation $17,8.1 BUSH HILL 1 HAIMAN OA MOON LIT WAY ,1. Level and Overlay $1,27.1 BUSH HILL 2 MOON LIT WAY ASHLEY LANE , Overlay $1,19.1 BUSH HILL 3 ASHLEY LANE HIGHLAN OA , Level and Overlay $3,72.97 BUNSIE LN 1 EMEY EET UNEVEGAN IVE ,7 3. Level and Overlay $2,8. BUNSIE LN 2 UNEVEGAN IVE UNEVEGAN IVE , Crack Seal $3,31.8 CENTAL 1 SCHOOL EET CENTAL Mill Level and Overlay $2, CENTAL 2 CENTAL 1 GEEN EET Level and Overlay $,17.3 CHAMPION 1 EMEY EET GLENN OA Mill Level and Overlay $2,3.18 CHAMPION 2 GLENN OA TIMOTHY EET , Level and Overlay $3,9.8 CHASE CESCENT 1 NOYES LANE WE PAISH LANE , Crack Seal $2,8.8 CHASE CESCENT 2 WE PAISH LANE EVENS TEACE efer Maintenance $. CHASE CESCENT 3 EVENS TEACE NOYES LANE , efer Maintenance $. CHUCH 1 WINTE EET HANSOM IVE 2 8 2, Overlay $1,1.9 CHUCH 2 HANSOM IVE WILLOWALE IVE , Mill Level and Overlay $17, CHUCH 3 WILLOWALE IVE NICHOLS EET 28 1,92 3. Level and Overlay $23,98.1 CHUCH NICHOLS EET ABBOTT EET ,3. Level and Overlay $1,77. CHUCH ABBOTT EET MAPLE EET 28 1,. Level and Overlay $19,818. CHUCH MAPLE EET PINE EET Level and Overlay $13,8.2 2/13/218 Page 2 of 9

13 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost CHUCH 7 PINE EET POSPECT EET Overlay $3,721.1 CHUCH 8 POSPECT EET JUKINS COUT Overlay $,.77 CHUCH 9 JUKINS COUT MECHANICS EET , Overlay $11,72.81 CHUCH 1 MECHANICS EET GOVE EET ,2 1. efer Maintenance $. CHUCH 11 GOVE EET EA MAIN EET efer Maintenance $. CLEMENT PL WE PAISH LANE EVENS TEACE , Crack Seal $2,. COLBY CUIE AVENUE EA EN Mill Level and Overlay $,723. COLGAN WE SHOE OA ALNETTE OA , eclamation $17,72.23 CUIE AVE COLBY EET WE MAIN EET efer Maintenance $. UNEVEGAN 1 BUNSIE AVENUE BUNSIE AVENUE , Overlay $13,98.33 UNEVEGAN 2 BUNSIE AVENUE EA MAIN EET , Level and Overlay $18,82. EA MAIN 1 LIBETY EET SCHOOL EET efer Maintenance $. EA MAIN 2 SCHOOL EET CHUCH EET efer Maintenance $. EMEY 1 EA MAIN EET TAILE PAK OA , Mill Level and Overlay $31,22. EMEY 2 TAILE PAK OA BUNSIE LANE 2 9 2, Overlay $17,817.9 EMEY 3 OVEPASS CHAMPION EET Overlay $3,397.9 EMEY CHAMPION EET TIMOTHY OA , Level and Overlay $33,823. EMEY TIMOTHY OA SUNSET TEACE Level and Overlay $9,777.1 EMEY SUNSET TEACE MILE OA Level and Overlay $1,1. EQUEIAN WAY HALEY OA CUL E SAC 2 7 2, Mill Level and Overlay $,38.7 FAIFIEL AVE WE MAIN EET EA EN efer Maintenance $. FAINGTON FIEL HALEY OA CUL E SAC , Mill Level and Overlay $9, FEEAL WAY MILL EET EA EN 2 177, eclamation $,.17 FOE GOVE EET WE MAIN EET 1 1, eclamation $18,92.31 FIEN SOUTH PLEASANT EET IVE OA eclamation $79,1. GLENN 1 CHAMPION EET HSE # Level and Overlay $13,27.1 GLENN 2 HSE #8 TIMOTHY OA 2 1,21. Mill Level and Overlay $32,8.9 GEEN LEAF WE MAIN EET EA EN 2 1 1, Overlay $11,2.28 GEEN 1 LOCU EET CENTAL EET , Overlay $11,9.83 GEEN 2 CENTAL EET SCHOOL EET , Overlay $9,28.1 GEENLEAF CI 1 (NE) WHITTIE IVE CUL E SAC Mill Level and Overlay $2,3.18 GEENLEAF CI 2 (SW) WHITTIE IVE CUL E SAC ,29 3. Mill Level and Overlay $27,8. GOVE 1 OCHA EET FOE EET ,1 3. Mill Level and Overlay $37,83.23 GOVE 2 FOE EET WOOLAN EET Mill Level and Overlay $1,38.1 2/13/218 Page 3 of 9

14 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost GOVE 3 WOOLAN EET SUMME EET , Level and Overlay $2,12. GOVE SUMME EET CHUCH EET , Mill Level and Overlay $7,.9 GUNNISON WE MAIN EET NOYES LANE , Crack Seal $2,181.2 HALEY 1 HEATH OA WE HALEY OA , Level and Overlay $12,79.7 HALEY 2 WE HALEY OA EQUEIAN WAY 2 12, Mill Level and Overlay $33,2. HALEY 3 EQUEIAN WAY NEW HAMPSHIE ATE , Crack Seal $1,83. HANSOM 1 CHUCH EET LANAU LANE ,7 3. Mill Level and Overlay $,82.2 HANSOM 2 LANAU LANE LANAU LANE 2 187,92. Mill Level and Overlay $133,.8 HANSOM 3 LANAU LANE CUL E SAC , Level and Overlay $23,12.7 HAIMAN 1 BEA HILL OA OL BEA HILL OA ,13. Mill Level and Overlay $7,.2 HAIMAN 2 OL BEA HILL OA E OAK ACES , eclamation $92,793.9 HAIMAN 3 E OAK ACES HIGHLAN OA ,982. Mill Level and Overlay $8,.8 HEATH BOOK HEATH OA CUL E SAC , Mill Level and Overlay $8,7. HEATH 1 HALEY OA HEATH BOOK OA ,29 1. eclamation $9,8.98 HEATH 2 HEATH BOOK OA HAVEHILL CITY LINE 2 19, eclamation $93,23. HEATHE CI SAWYE EET CUL E SAC 2 8 1, Level and Overlay $1, HIGH 1 BOA EET BOA EET Overlay $,379.3 HIGH 2 BOA EET SOUTH PLEASANT EET , eclamation $31,13.88 HIGH 3 SOUTH PLEASANT EET IVE OA , Level and Overlay $1,9.82 HIGHLAN 1 CHUCH EET HAIMAN OA , Overlay $13,7.9 HIGHLAN 2 HAIMAN OA HUSE OA 2 21, Mill Level and Overlay $17,18.9 HIGHLAN 3 HUSE OA BUSH HILL OA 2 27,819. Mill Level and Overlay $18, HIGHLAN BUSH HILL OA BATTIS OA , Mill Level and Overlay $98,39.8 HIGHLAN BATTIS OA NEW HAMPSHIE ATE , Crack Seal $3,7. HILLSIE AVE 1 ATTITASH EET MEIMACK AVENUE ,28 1. efer Maintenance $. HILLSIE AVE 2 MEIMACK AVENUE EA EN efer Maintenance $. JUKINS CT CHUCH EET EA EN Mill Level and Overlay $22,23.12 LAKE AVE FEN AVENUE EA EN Level and Overlay $,87.1 LANCAE CT BOA EET SCHOOL EET efer Maintenance $. LANAU LN HANSOM IVE HANSOM IVE ,23. Level and Overlay $31, LANE TEN ACE 1 BEA HILL OA SHOE OA , eclamation $21,83.9 LANE TEN ACE 2 SHOE OA SHOE OA eclamation $9,. LIBETY 1 EA MAIN EET MECHANICS EET Level and Overlay $12,32.9 LIBETY 2 MECHANICS EET EN OF PAVEMENT ,87. Mill Level and Overlay $,21. 2/13/218 Page of 9

15 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost LINCOLN 1 WOOLAN EET WINTE EET eclamation $7,9.8 LINCOLN 2 WINTE EET SUMME EET 2 7 1, Level and Overlay $2,3.23 LISA CI TAILE PAK OA TAILE PAK OA ,3 3. Level and Overlay $, LITTLE PON 1 MEIMAC EET LITTLE PON OA ,39 1. efer Maintenance $. LITTLE PON 2 LITTLE PON OA SPING HILL OA , efer Maintenance $. LITTLE PON 3 SPING HILL OA SPING HILL OA ,93 1. efer Maintenance $. LITTLE PON SPING HILL OA LITTLE PON OA ,88 1. efer Maintenance $. LITTLES CT WE MAIN EET EA EN efer Maintenance $. LOCU GOVE AVE MILE EET WALNUT EET efer Maintenance $. LOCU GOVE LOCU EET COLONIAL IVE , Mill Level and Overlay $7,3.77 LOCU 1 IVE OA LOCU GOVE OA , Mill Level and Overlay $87,291.7 LOCU 2 LOCU GOVE OA INTEATE HIGHWAY 22 1,2 3. Mill Level and Overlay $3,99.99 LOCU 3 INTEATE HIGHWAY WALNUT EET Crack Seal $2.1 LOCU WALNUT EET MILE EET Level and Overlay $8,72.1 LOCU MILE EET PLEASANT EET 2 1 1, Level and Overlay $1,28.33 LOCU PLEASANT EET AAMS EET Level and Overlay $8,72.1 LOCU 7 AAMS EET GEEN EET Level and Overlay $,29. LOCU 8 GEEN EET WE MAIN EET 2 3 1, Level and Overlay $1,723.7 MAPLE 1 SAWYE EET SUMME EET efer Maintenance $. MAPLE 2 SUMME EET CHUCH EET , Crack Seal $1,2.7 MEAOW AVE 1 ATTITASH EET LAKE AVENUE Crack Seal $8.13 MEAOW AVE 2 LAKE AVENUE PINE BLUFF AVENUE Crack Seal $ MEAOW AVE 3 PINE BLUFF AVENUE MEIMACK AVENUE Level and Overlay $8,3.7 MECHANICS LIBETY EET CHUCH EET Mill Level and Overlay $2,99.38 MEIMAC 1 IVE OA MYTHICAL EET , 8 1. Crack Seal $,28.3 MEIMAC 2 MYTHICAL EET LITTLE PON OA , Crack Seal $1,93.73 MEIMAC 3 LITTLE PON OA HAVEHILL CITY LINE ,1 9. efer Maintenance $. MEIMACK AVE 1 HILLSIE AVENUE MEAOW AVENUE efer Maintenance $. MEIMACK AVE 2 MEAOW AVENUE OAK CICLE eclamation $92,3. MILE 1 IVE OA PAVEMENT CHANGE , efer Maintenance $. MILE 2 PAVEMENT CHANGE EMEY EET , eclamation $91,72.37 MILE 3 EMEY EET SUNSET TEACE , Mill Level and Overlay $8,3.8 MILE SUNSET TEACE AMESBUY TOWN LINE Level and Overlay $7,7.9 MILE 1 SCHOOL EET VALE EET Overlay $,28.3 2/13/218 Page of 9

16 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost MILE 2 VALE EET LOCU EET 2 1, Crack Seal $1,88.8 MILL 1 SCHOOL EET BOA EET ,33 1. efer Maintenance $. MILL 2 BOA EET FEEAL WAY Level and Overlay $,.18 MILL 3 FEEAL WAY EA MAIN EET , eclamation $192,983.8 MOON LIT WAY BUSH HILL OA EA EN , eclamation $3,23. MOUNTAIN VIEW AVE WE MAIN EET EA EN eclamation $7,313.3 MYTHICAL MEIMAC EET VALLEY EET ,23 1. efer Maintenance $. NICHOLS 1 CHUCH EET SAWYE EET 2 1 2, Overlay $1,9.9 NICHOLS 2 SAWYE EET WINTE EET 2 7 1, Overlay $7,71.33 NOTH 2 IVE OA CUL E SAC , eclamation $2,91.98 NOYES LN 1 GUNNISON IVE CHASE CESCENT ,1 9. efer Maintenance $. NOYES LN 2 CHASE CESCENT CHASE CESCENT , Crack Seal $2,.8 NOYES LN 3 CHASE CESCENT GUNNISON IVE 2 7 1, Crack Seal $1,7.2 OAK CI 1 AMESBUY TOWN LINE MEIMACK AVENUE Mill Level and Overlay $17,31.9 OAK CI 2 MEIMACK AVENUE EA EN Level and Overlay $3,1.8 OL BEA HILL 1 HAIMAN OA EA EN ,232. Level and Overlay $,72.2 OL BEA HILL 2 BEA HILL OA BEA HILL OA 1 1 1, eclamation $22,31. OCHA 1 WE MAIN EET GOVE EET 2 3 1, eclamation $237,8.7 OCHA 2 GOVE EET OCHA EET ,2. Level and Overlay $37,1.1 OCHA 3 OCHA EET OCHA EET ,82. Level and Overlay $39,97.83 OCHA OCHA EET OCHA EET , Mill Level and Overlay $8,13.7 PINE BLUFF AVE MEAOW AVENUE EA EN Mill Level and Overlay $13,.1 PINE 1 CHUCH EET SUMME EET ,73 9. efer Maintenance $. PINE 2 SUMME EET SPING EET efer Maintenance $. PINE 3 SPING EET WINTE EET , efer Maintenance $. PINEHU BELLMOE EET IGEFIEL EET Mill Level and Overlay $9,3.11 PLEASANT 1 LOCU EET VALE EET 2 2 1,9 1. efer Maintenance $. PLEASANT 2 VALE EET SCHOOL EET efer Maintenance $. PLEASANT VIEW ATTITASH EET AMESBUY TOWN LINE , efer Maintenance $. POSPECT HILL EA MAIN EET EA EN 1 7 1, eclamation $17,813.3 POSPECT 1 CHUCH EET SUMME EET ,1 9. efer Maintenance $. POSPECT 2 SUMME EET SPING EET efer Maintenance $. POSPECT 3 SPING EET WINTE EET ,87 1. efer Maintenance $. AILOA AVE CHUCH EET EA EN eclamation $98,8.81 2/13/218 Page of 9

17 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost E OAK ACES 1 HAIMAN OA E OAK ACES , eclamation $,.18 E OAK ACES 2 (NE) E OAK ACES CUL E SAC 2 3 1,13 1. eclamation $192,892.8 E OAK ACES 3 (SW) E OAK ACES CUL E SAC eclamation $13, IGEFIEL 1 PINEHU EET BILLING EET , efer Maintenance $. IGEFIEL 2 BILLING EET WEMINIE OA Mill Level and Overlay $,17.81 IVE 1 AMESBUY TOWN LINE SKUNK OA 22 1,2 1. efer Maintenance $. IVE 2 SKUNK OA BANCOFT LANE 22 21,1 3. Mill Level and Overlay $1,131. IVE 3 BANCOFT LANE MILE OA eclamation $122,772. IVE MILE OA BOA EET , eclamation $212,91. IVE BOA EET FIEN EET eclamation $13,72.1 IVE FIEN EET HIGH EET Mill Level and Overlay $9,88.9 IVE 7 HIGH EET PAVEMENT CHANGE ,3. Level and Overlay $1,2.7 IVE 8 PAVEMENT CHANGE LOCU EET , Crack Seal $7,87.8 IVE 9 LOCU EET MEIMAC EET , Crack Seal $3,7. IVE 1 MEIMAC EET HAVEHILL CITY LINE 2 299, Crack Seal $7,277.2 SAWYE 1 PINE EET MAPLE EET efer Maintenance $. SAWYE 2 MAPLE EET HEATHE CICLE efer Maintenance $. SAWYE 3 HEATHE CICLE ABBOTT EET Crack Seal $17. SAWYE ABBOTT EET NICHOLS EET efer Maintenance $. SCHOOL 1 EA MAIN EET LANCAE COUT ,2 1. efer Maintenance $. SCHOOL 2 LANCAE COUT CENTAL EET efer Maintenance $. SCHOOL 3 CENTAL EET GEEN EET efer Maintenance $. SCHOOL GEEN EET PLEASANT EET efer Maintenance $. SCHOOL PLEASANT EET MILE EET ,21 1. efer Maintenance $. SCHOOL MILE EET MILL EET ,98 1. efer Maintenance $. SHAON CI 1 TAILE PAK OA PIVATE OA 2 2 1, Crack Seal $1,187.2 SHAON CI 2 PIVATE OA WENY WAY efer Maintenance $. SHAON CI 3 WENY WAY PIVATE OA efer Maintenance $. SHAON CI PIVATE OA PIVATE OA Overlay $2,88.99 SHAON CI PIVATE OA TAILE PAK OA 2 1, Overlay $8,93.72 SHOE 1 LANE TEN ACE OA SHOE OA eclamation $7,88.18 SHOE 2 EA EN SHOE OA Level and Overlay $1,98.73 SHOE 3 SHOE OA LANE TEN ACE OA Mill Level and Overlay $12,8.9 SHOE LANE TEN ACE OA EA EN Level and Overlay $2,78.3 2/13/218 Page 7 of 9

18 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost SKUNK IVE OA MILE OA 22 18, Overlay $32,2.97 SOUTH PLEASANT 1 TANNEY LANE BOA EET eclamation $18,99.37 SOUTH PLEASANT 2 BOA EET FIEN EET eclamation $8,97. SOUTH PLEASANT 3 FIEN EET HIGH EET eclamation $17,23.8 SOUTH PLEASANT HIGH EET EA EN ,7 9. eclamation $197,2.88 SPENCE WAY BEA HILL OA CUL E SAC 2 7 1, Level and Overlay $1,3.9 SPING HILL LITTLE PON OA LITTLE PON OA , efer Maintenance $. SPING POSPECT EET PINE EET efer Maintenance $. EVENS TE 1 WE PAISH LANE CLEMENT PLACE 2 9 1, Level and Overlay $18,723.8 EVENS TE 2 CLEMENT PLACE CHASE CESCENT 2 3 1, Overlay $8,739.9 SUMME 1 MAPLE EET PINE EET efer Maintenance $. SUMME 2 PINE EET POSPECT EET ,3 1. efer Maintenance $. SUMME 3 POSPECT EET LINCOLN EET efer Maintenance $. SUMME LINCOLN EET VENOME EET efer Maintenance $. SUMME VENOME EET GOVE EET efer Maintenance $. SUNSET TE EMEY EET MILE OA , Level and Overlay $29,23.3 TIMOTHY 1 EMEY EET GLENN OA Level and Overlay $1,11.89 TIMOTHY 2 GLENN OA CHAMPION EET Mill Level and Overlay $17,93.17 TOWN FOE WINTE EET EA EN eclamation $123,39.3 TAILE PAK 1 EMEY EET SHAON CICLE efer Maintenance $. TAILE PAK 2 SHAON CICLE LISA CICLE efer Maintenance $. TAILE PAK 3 LISA CICLE SHAON CICLE efer Maintenance $. TAILE PAK SHAON CICLE LISA CICLE efer Maintenance $. UNION 1 CUIE AVENUE UNION EET 1 1,73 1. efer Maintenance $. UNION 2 UNION EET EXTENSION AAMS EET efer Maintenance $. UNION 3 AAMS EET WE MAIN EET efer Maintenance $. UNION EET EXT UNION EET LOCU EET , Crack Seal $3,981. VALE PLEASANT EET MILE EET Overlay $3,33.2 VALLEY 1 CHENUT EET MYTHICAL EET efer Maintenance $. VALLEY 2 MYTHICAL EET CUL E SAC ,2 1. efer Maintenance $. VENOME SUMME EET WINTE EET ,1 1. efer Maintenance $. WALLACE WAY EA MAIN EET EA EN , eclamation $38,177.9 WALNUT LOCU EET LOCU GOVE AVENUE , eclamation $27,7.7 WE HALEY HALEY OA NEW HAMPSHIE ATE , Crack Seal $3,8.9 2/13/218 Page 8 of 9

19 Street Name From To Width (ft) Length (ft) Area (SY) PCI Priority epair epair Cost WE MAIN 1 CHUCH EET LITTLES COUT efer Maintenance $. WE MAIN 2 LITTLES COUT FAIFIEL AVENUE efer Maintenance $. WE MAIN 3 FAIFIEL AVENUE LOCU EET ,19 1. efer Maintenance $. WE MAIN LOCU EET FOE EET 3 3 1, efer Maintenance $. WE MAIN FOE EET UNION EET 3 3 1,83 1. efer Maintenance $. WE MAIN UNION EET OCHA EET efer Maintenance $. WE PAISH LN 1 BICH MEAOW OA CLEMENT PLACE , Overlay $12,23.33 WE PAISH LN 2 CLEMENT PLACE EVENS TEACE , Overlay $2,89. WE PAISH LN 3 EVENS TEACE CHASE CESCENT 2 9 1, efer Maintenance $. WE SHOE 1 BEA HILL OA COLGAN OA , eclamation $9,173.8 WE SHOE 2 COLGAN OA GEYONE OA Mill Level and Overlay $12,2.8 WE SHOE 3 GEYONE OA WE SHOE OA Level and Overlay $12,39. WE SHOE ALNETTE OA WE SHOE OA Level and Overlay $, WE SHOE WE SHOE OA AHEN CICLE , Mill Level and Overlay $3,97.1 WE SHOE AHEN CICLE EA EN Overlay $8.9 WEMINIE WE MAIN EET BELLMOE EET , eclamation $217,. WHITTIE WE MAIN EET GEENLEAF CICLE , eclamation $288,11. WILLOWALE 1 CHUCH EET WILLOWALE IVE , 3. Mill Level and Overlay $2,283.2 WILLOWALE 2 WILLOWALE IVE WILLOWALE IVE 2 198,21. Mill Level and Overlay $11,18.1 WINTE 1 CHUCH EET TOWN FOE OA , eclamation $1, WINTE 2 TOWN FOE OA NICHOLS EET Level and Overlay $9, WINTE 3 NICHOLS EET PINE EET , Mill Level and Overlay $1,9.8 WINTE PINE EET POSPECT EET ,18 3. Level and Overlay $1,782.8 WINTE POSPECT EET LINCOLN EET Mill Level and Overlay $1,39.3 WINTE LINCOLN EET VENOME EET Mill Level and Overlay $21, WOOLAN 1 WE MAIN EET GOVE EET , eclamation $292,.18 WOOLAN 2 GOVE EET VENOME EET 2 1, eclamation $197,8.83 WOOLAN 3 VENOME EET LINCOLN EET Level and Overlay $1,92.91 WOOLAN LINCOLN EET EA EN Level and Overlay $,2. Total Backlog: $22,72,1 2/13/218 Page 9 of 9

20 of Merrimac, Massachusetts Pavement Management Program Streets Sorted By Street Name and Acceptance Street Name From To Width Length Accepted ABBOTT EET.19 Miles ABBOTT SAWYE EET CHUCH EET AAMS EET.1 Miles AAMS LOCU EET UNION EET AHEN CICLE.1 Miles AHEN CI WE SHOE OA CUL E SAC 2 32 ALNETTE OA.212 Miles ALNETTE 1 EA EN COLGAN OA ALNETTE 2 COLGAN OA GEYONE OA ALNETTE 3 GEYONE OA WE SHOE OA ALNETTE WE SHOE OA EA EN 12 1 ATTITASH EET.31 Miles ATTITASH 1 EA MAIN EET PLEASANT VIEW OA ATTITASH 2 PLEASANT VIEW OA HILLSIE AVENUE ATTITASH 3 HILLSIE AVENUE MEAOW AVENUE 22 2 ATTITASH MEAOW AVENUE EA EN BANCOFT LANE.8 Miles BANCOFT LN IVE OA EA EN 12 8 BATLETT EET.12 Miles BATLETT SCHOOL EET MILL EET 2 71 BATTIS OA Miles BATTIS 1 HIGHLAN OA HUSE OA 18 2 BATTIS 2 HUSE OA GAVEL OA BATTIS 3 GAVEL OA BICH MEAOW LOOP BEA HILL OA 2.98 Miles BEA HILL 1 EA MAIN EET SPENCE WAY BEA HILL 2 SPENCE WAY HOUSE # BEA HILL 3 HOUSE #1 HOUSE # /13/218 Page 1 of 13

21 Street Name From To Width Length Accepted BEA HILL HOUSE #2 LANE TEN ACE OA BEA HILL LANE TEN ACE OA OL BEA HILL OA 22 BEA HILL OL BEA HILL OA OL BEA HILL OA BEA HILL 7 OL BEA HILL OA WE SHOE OA BEA HILL 8 WE SHOE OA LAKEWOOS AVENUE BEA HILL 9 LAKEWOOS AVENUE OL BEA HILL OA BEA HILL 1 OL BEA HILL OA HAIMAN OA BEA HILL 11 HAIMAN OA NEW HAMPSHIE ATE LINE BELMOE OA.18 Miles BELMOE 1 WEMINIE OA MAPLETON OA 18 7 BELMOE 2 MAPLETON OA PINEHU EET BILLING EET.21 Miles BILLING IGEFIEL EET EA EN BICH MEAOW LOOP.71 Miles BICH MEAOW LOOP 1 BICH MEAOW OA BATTIS OA 39 BICH MEAOW LOOP 2 BATTIS OA BICH MEAOW OA BICH MEAOW OA 1.83 Miles BICH MEAOW 1 WE MAIN EET WE PAISH LANE BICH MEAOW 2 WE PAISH LANE PAVEMENT CHANGE 2 18 BICH MEAOW 3 PAVEMENT CHANGE PAVEMENT CHANGE 2 18 BICH MEAOW WE PAISH LANE BICH MEAOW LOOP 2 18 BICH MEAOW BICH MEAOW LOOP FINN LANE 2 2 BICH MEAOW FINN LANE HEATH OA BANY BOW OA.1 Miles BANY BOW HAVEHILL TOWN LINE HAVEHILL TOWN LINE BOA EET.82 Miles BOA 1 EA MAIN EET LANCAE COUT 2 BOA 2 LANCAE COUT MILL EET BOA 3 ON AMP HIGH EET 21 BOA HIGH EET SOUTH PLEASANT EET BOA SOUTH PLEASANT EET IVE OA BOA HIGH EET CUL E SAC 1 9 BUSH HILL OA.32 Miles BUSH HILL 1 HAIMAN OA MOON LIT WAY /13/218 Page 2 of 13

22 Street Name From To Width Length Accepted BUSH HILL 2 MOON LIT WAY ASHLEY LANE BUSH HILL 3 ASHLEY LANE HIGHLAN OA BUNSIE LANE.39 Miles BUNSIE LN 1 EMEY EET UNEVEGAN IVE BUNSIE LN 2 UNEVEGAN IVE UNEVEGAN IVE CENTAL EET.128 Miles CENTAL 1 SCHOOL EET CENTAL CENTAL 2 CENTAL 1 GEEN EET 1 2 CHAMPION EET.2 Miles CHAMPION 1 EMEY EET GLENN OA 2 31 CHAMPION 2 GLENN OA TIMOTHY EET CHASE CESCENT.39 Miles CHASE CESCENT 1 NOYES LANE WE PAISH LANE 2 89 CHASE CESCENT 2 WE PAISH LANE EVENS TEACE 2 38 CHASE CESCENT 3 EVENS TEACE NOYES LANE 2 39 CHUCH EET 1.17 Miles CHUCH 1 WINTE EET HANSOM IVE 2 8 CHUCH 2 HANSOM IVE WILLOWALE IVE 2 19 CHUCH 3 WILLOWALE IVE NICHOLS EET 28 CHUCH NICHOLS EET ABBOTT EET CHUCH ABBOTT EET MAPLE EET 28 CHUCH MAPLE EET PINE EET CHUCH 7 PINE EET POSPECT EET CHUCH 8 POSPECT EET JUKINS COUT CHUCH 9 JUKINS COUT MECHANICS EET CHUCH 1 MECHANICS EET GOVE EET CHUCH 11 GOVE EET EA MAIN EET CLEMENT PLACE.1 Miles CLEMENT PL WE PAISH LANE EVENS TEACE COLBY EET.3 Miles COLBY CUIE AVENUE EA EN 1 1 COLGAN OA.12 Miles COLGAN WE SHOE OA ALNETTE OA /13/218 Page 3 of 13

23 Street Name From To Width Length Accepted CUIE AVENUE.7 Miles CUIE AVE COLBY EET WE MAIN EET 18 3 UNEVEGAN IVE.231 Miles UNEVEGAN 1 BUNSIE AVENUE BUNSIE AVENUE 2 71 UNEVEGAN 2 BUNSIE AVENUE EA MAIN EET 2 79 EA MAIN EET. Miles EA MAIN 1 LIBETY EET SCHOOL EET EA MAIN 2 SCHOOL EET CHUCH EET 3 18 EMEY EET. Miles EMEY 1 EA MAIN EET TAILE PAK OA 2 39 EMEY 2 TAILE PAK OA BUNSIE LANE 2 9 EMEY 3 OVEPASS CHAMPION EET 2 18 EMEY CHAMPION EET TIMOTHY OA 2 89 EMEY TIMOTHY OA SUNSET TEACE 2 29 EMEY SUNSET TEACE MILE OA 2 29 EQUEIAN WAY.13 Miles EQUEIAN WAY HALEY OA CUL E SAC 2 7 FAIFIEL AVENUE.9 Miles FAIFIEL AVE WE MAIN EET EA EN 1 27 FAINGTON FIEL OA.17 Miles FAINGTON FIEL HALEY OA CUL E SAC FEEAL WAY.33 Miles FEEAL WAY MILL EET EA EN FOE EET.12 Miles FOE GOVE EET WE MAIN EET 1 FIEN EET.71 Miles FIEN SOUTH PLEASANT EET IVE OA 1 37 GLENN OA.1 Miles GLENN 1 CHAMPION EET HSE # GLENN 2 HSE #8 TIMOTHY OA 2 GEEN LEAF IVE.12 Miles GEEN LEAF WE MAIN EET EA EN 2 1 2/13/218 Page of 13

24 Street Name From To Width Length Accepted GEEN EET.177 Miles GEEN 1 LOCU EET CENTAL EET GEEN 2 CENTAL EET SCHOOL EET 28 1 GEENLEAF CICLE.138 Miles GEENLEAF CI 1 (NE) WHITTIE IVE CUL E SAC 2 31 GEENLEAF CI 2 (SW) WHITTIE IVE CUL E SAC 2 38 GOVE EET.17 Miles GOVE 1 OCHA EET FOE EET GOVE 2 FOE EET WOOLAN EET GOVE 3 WOOLAN EET SUMME EET 2 92 GOVE SUMME EET CHUCH EET 2 93 GUNNISON IVE.18 Miles GUNNISON WE MAIN EET NOYES LANE HALEY OA 1.8 Miles HALEY 1 HEATH OA WE HALEY OA HALEY 2 WE HALEY OA EQUEIAN WAY 2 HALEY 3 EQUEIAN WAY NEW HAMPSHIE ATE LINE HANSOM IVE.13 Miles HANSOM 1 CHUCH EET LANAU LANE 2 77 HANSOM 2 LANAU LANE LANAU LANE HANSOM 3 LANAU LANE CUL E SAC 2 12 HAIMAN OA.921 Miles HAIMAN 1 BEA HILL OA OL BEA HILL OA HAIMAN 2 OL BEA HILL OA E OAK ACES HAIMAN 3 E OAK ACES HIGHLAN OA HEATH BOOK OA.22 Miles HEATH BOOK HEATH OA CUL E SAC HEATH OA.71 Miles HEATH 1 HALEY OA HEATH BOOK OA HEATH 2 HEATH BOOK OA HAVEHILL CITY LINE 2 19 HEATHE CICLE.8 Miles HEATHE CI SAWYE EET CUL E SAC 2 8 2/13/218 Page of 13

25 Street Name From To Width Length Accepted HIGH EET.38 Miles HIGH 1 BOA EET BOA EET 2 32 HIGH 2 BOA EET SOUTH PLEASANT EET HIGH 3 SOUTH PLEASANT EET IVE OA 2 28 HIGHLAN OA 1.7 Miles HIGHLAN 1 CHUCH EET HAIMAN OA HIGHLAN 2 HAIMAN OA HUSE OA 2 21 HIGHLAN 3 HUSE OA BUSH HILL OA 2 27 HIGHLAN BUSH HILL OA BATTIS OA 2 13 HIGHLAN BATTIS OA NEW HAMPSHIE ATE LINE HILLSIE AVENUE.2 Miles HILLSIE AVE 1 ATTITASH EET MEIMACK AVENUE 1 78 HILLSIE AVE 2 MEIMACK AVENUE EA EN JUKINS COUT.88 Miles JUKINS CT CHUCH EET EA EN 1 3 LAKE AVENUE.3 Miles LAKE AVE FEN AVENUE EA EN 1 22 LANCAE COUT. Miles LANCAE CT BOA EET SCHOOL EET 2 31 LANAU LANE.1 Miles LANAU LN HANSOM IVE HANSOM IVE 2 82 LANE TEN ACE OA.39 Miles LANE TEN ACE 1 BEA HILL OA SHOE OA LANE TEN ACE 2 SHOE OA SHOE OA LIBETY EET.28 Miles LIBETY 1 EA MAIN EET MECHANICS EET 18 2 LIBETY 2 MECHANICS EET EN OF PAVEMENT LINCOLN EET.13 Miles LINCOLN 1 WOOLAN EET WINTE EET 2 18 LINCOLN 2 WINTE EET SUMME EET 2 7 LISA CICLE.2 Miles LISA CI TAILE PAK OA TAILE PAK OA /13/218 Page of 13

26 Street Name From To Width Length Accepted LITTLE PON OA 1.17 Miles LITTLE PON 1 MEIMAC EET LITTLE PON OA LITTLE PON 2 LITTLE PON OA SPING HILL OA 2 83 LITTLE PON 3 SPING HILL OA SPING HILL OA 2 93 LITTLE PON SPING HILL OA LITTLE PON OA 2 38 LITTLES COUT. Miles LITTLES CT WE MAIN EET EA EN LOCU GOVE AVENUE. Miles LOCU GOVE AVE MILE EET WALNUT EET LOCU GOVE OA.21 Miles LOCU GOVE LOCU EET COLONIAL IVE LOCU EET.8 Miles LOCU 1 IVE OA LOCU GOVE OA LOCU 2 LOCU GOVE OA INTEATE HIGHWAY 22 LOCU 3 INTEATE HIGHWAY WALNUT EET LOCU WALNUT EET MILE EET LOCU MILE EET PLEASANT EET 2 1 LOCU PLEASANT EET AAMS EET LOCU 7 AAMS EET GEEN EET LOCU 8 GEEN EET WE MAIN EET 2 3 MAPLE EET.187 Miles MAPLE 1 SAWYE EET SUMME EET MAPLE 2 SUMME EET CHUCH EET MEAOW AVENUE.1 Miles MEAOW AVE 1 ATTITASH EET LAKE AVENUE 1 31 MEAOW AVE 2 LAKE AVENUE PINE BLUFF AVENUE MEAOW AVE 3 PINE BLUFF AVENUE MEIMACK AVENUE 1 33 MECHANICS EET. Miles MECHANICS LIBETY EET CHUCH EET 2 37 MEIMAC EET.393 Miles MEIMAC 1 IVE OA MYTHICAL EET MEIMAC 2 MYTHICAL EET LITTLE PON OA 32 2 MEIMAC 3 LITTLE PON OA HAVEHILL CITY LINE /13/218 Page 7 of 13

27 Street Name From To Width Length Accepted MEIMACK AVENUE.11 Miles MEIMACK AVE 1 HILLSIE AVENUE MEAOW AVENUE 1 32 MEIMACK AVE 2 MEAOW AVENUE OAK CICLE MILE OA 1.31 Miles MILE 1 IVE OA PAVEMENT CHANGE MILE 2 PAVEMENT CHANGE EMEY EET MILE 3 EMEY EET SUNSET TEACE 28 9 MILE SUNSET TEACE AMESBUY TOWN LINE MILE EET.18 Miles MILE 1 SCHOOL EET VALE EET MILE 2 VALE EET LOCU EET 2 MILL EET.3 Miles MILL 1 SCHOOL EET BOA EET 18 7 MILL 2 BOA EET FEEAL WAY 1 3 MILL 3 FEEAL WAY EA MAIN EET 1 99 MOON LIT WAY.18 Miles MOON LIT WAY BUSH HILL OA EA EN 2 98 MOUNTAIN VIEW AVENUE.9 Miles MOUNTAIN VIEW AVE WE MAIN EET EA EN MYTHICAL EET.111 Miles MYTHICAL MEIMAC EET VALLEY EET 19 8 NICHOLS EET.29 Miles NICHOLS 1 CHUCH EET SAWYE EET 2 1 NICHOLS 2 SAWYE EET WINTE EET 2 7 NOTH EET.392 Miles NOTH 2 IVE OA CUL E SAC NOYES LANE.28 Miles NOYES LN 1 GUNNISON IVE CHASE CESCENT 2 93 NOYES LN 2 CHASE CESCENT CHASE CESCENT NOYES LN 3 CHASE CESCENT GUNNISON IVE 2 7 OAK CICLE.92 Miles OAK CI 1 AMESBUY TOWN LINE MEIMACK AVENUE 1 33 OAK CI 2 MEIMACK AVENUE EA EN /13/218 Page 8 of 13

28 Street Name From To Width Length Accepted OL BEA HILL OA.8 Miles OL BEA HILL 1 HAIMAN OA EA EN OL BEA HILL 2 BEA HILL OA BEA HILL OA 1 1 OCHA EET.781 Miles OCHA 1 WE MAIN EET GOVE EET 2 3 OCHA 2 GOVE EET OCHA EET 2 98 OCHA 3 OCHA EET OCHA EET EXTENSION OCHA OCHA EET EXTENSION OCHA EET PINE BLUFF AVENUE. Miles PINE BLUFF AVE MEAOW AVENUE EA EN PINE EET.282 Miles PINE 1 CHUCH EET SUMME EET PINE 2 SUMME EET SPING EET PINE 3 SPING EET WINTE EET 22 2 PINEHU EET.1 Miles PINEHU BELLMOE EET IGEFIEL EET 1 21 PLEASANT EET.17 Miles PLEASANT 1 LOCU EET VALE EET 2 2 PLEASANT 2 VALE EET SCHOOL EET 2 33 PLEASANT VIEW OA.29 Miles PLEASANT VIEW ATTITASH EET AMESBUY TOWN LINE POSPECT HILL.133 Miles POSPECT HILL EA MAIN EET EA EN 1 7 POSPECT EET.27 Miles POSPECT 1 CHUCH EET SUMME EET 2 73 POSPECT 2 SUMME EET SPING EET POSPECT 3 SPING EET WINTE EET 2 89 AILOA AVENUE.77 Miles AILOA AVE CHUCH EET EA EN 1 E OAK ACES.3 Miles E OAK ACES 1 HAIMAN OA E OAK ACES E OAK ACES 2 (NE) E OAK ACES CUL E SAC 2 3 E OAK ACES 3 (SW) E OAK ACES CUL E SAC /13/218 Page 9 of 13

29 Street Name From To Width Length Accepted IGEFIEL EET.19 Miles IGEFIEL 1 PINEHU EET BILLING EET 1 88 IGEFIEL 2 BILLING EET WEMINIE OA 1 17 IVE OA 3.99 Miles IVE 1 AMESBUY TOWN LINE SKUNK OA 22 IVE 2 SKUNK OA BANCOFT LANE IVE 3 BANCOFT LANE MILE OA IVE MILE OA BOA EET 2 72 IVE BOA EET FIEN EET 2 28 IVE FIEN EET HIGH EET IVE 7 HIGH EET PAVEMENT CHANGE IVE 8 PAVEMENT CHANGE LOCU EET IVE 9 LOCU EET MEIMAC EET 18 1 IVE 1 MEIMAC EET HAVEHILL CITY LINE SAWYE EET.12 Miles SAWYE 1 PINE EET MAPLE EET SAWYE 2 MAPLE EET HEATHE CICLE SAWYE 3 HEATHE CICLE ABBOTT EET 18 7 SAWYE ABBOTT EET NICHOLS EET SCHOOL EET.3 Miles SCHOOL 1 EA MAIN EET LANCAE COUT 28 2 SCHOOL 2 LANCAE COUT CENTAL EET 2 11 SCHOOL 3 CENTAL EET GEEN EET 2 2 SCHOOL GEEN EET PLEASANT EET 2 33 SCHOOL PLEASANT EET MILE EET 2 73 SCHOOL MILE EET MILL EET SHAON CICLE.2 Miles SHAON CI 1 TAILE PAK OA PIVATE OA 2 2 SHAON CI 2 PIVATE OA WENY WAY SHAON CI 3 WENY WAY PIVATE OA 2 12 SHAON CI PIVATE OA PIVATE OA 2 12 SHAON CI PIVATE OA TAILE PAK OA 2 SHOE OA.229 Miles SHOE 1 LANE TEN ACE OA SHOE OA 1 7 SHOE 2 EA EN SHOE OA /13/218 Page 1 of 13

30 Street Name From To Width Length Accepted SHOE 3 SHOE OA LANE TEN ACE OA 1 1 SHOE LANE TEN ACE OA EA EN 1 17 SKUNK OA.33 Miles SKUNK IVE OA MILE OA SOUTH PLEASANT EET.377 Miles SOUTH PLEASANT 1 TANNEY LANE BOA EET 1 8 SOUTH PLEASANT 2 BOA EET FIEN EET 1 28 SOUTH PLEASANT 3 FIEN EET HIGH EET 1 2 SOUTH PLEASANT HIGH EET EA EN 1 81 SPENCE WAY.77 Miles SPENCE WAY BEA HILL OA CUL E SAC 2 7 SPING HILL OA.719 Miles SPING HILL LITTLE PON OA LITTLE PON OA SPING EET.77 Miles SPING POSPECT EET PINE EET 2 EVENS TEACE.182 Miles EVENS TE 1 WE PAISH LANE CLEMENT PLACE 2 9 EVENS TE 2 CLEMENT PLACE CHASE CESCENT 2 3 SUMME EET.27 Miles SUMME 1 MAPLE EET PINE EET 2 29 SUMME 2 PINE EET POSPECT EET 2 38 SUMME 3 POSPECT EET LINCOLN EET 2 23 SUMME LINCOLN EET VENOME EET SUMME VENOME EET GOVE EET SUNSET TEACE.22 Miles SUNSET TE EMEY EET MILE OA TIMOTHY OA.98 Miles TIMOTHY 1 EMEY EET GLENN OA 2 28 TIMOTHY 2 GLENN OA CHAMPION EET 2 29 TOWN FOE OA.77 Miles TOWN FOE WINTE EET EA EN 2 7 TAILE PAK OA.18 Miles TAILE PAK 1 EMEY EET SHAON CICLE 2 2 2/13/218 Page 11 of 13

31 Street Name From To Width Length Accepted TAILE PAK 2 SHAON CICLE LISA CICLE 2 9 TAILE PAK 3 LISA CICLE SHAON CICLE TAILE PAK SHAON CICLE LISA CICLE 2 13 UNION EET.222 Miles UNION 1 CUIE AVENUE UNION EET EXTENSION 1 UNION 2 UNION EET EXTENSION AAMS EET 2 3 UNION 3 AAMS EET WE MAIN EET 2 17 UNION EET EXTENSION.29 Miles UNION EET EXT UNION EET LOCU EET VALE EET.88 Miles VALE PLEASANT EET MILE EET 1 2 VALLEY EET.213 Miles VALLEY 1 CHENUT EET MYTHICAL EET 18 VALLEY 2 MYTHICAL EET CUL E SAC VENOME EET.121 Miles VENOME SUMME EET WINTE EET 2 37 WALLACE WAY.217 Miles WALLACE WAY EA MAIN EET EA EN WALNUT EET.179 Miles WALNUT LOCU EET LOCU GOVE AVENUE 18 9 WE HALEY OA.3 Miles WE HALEY HALEY OA NEW HAMPSHIE ATE LINE WE MAIN EET.3 Miles WE MAIN 1 CHUCH EET LITTLES COUT WE MAIN 2 LITTLES COUT FAIFIEL AVENUE WE MAIN 3 FAIFIEL AVENUE LOCU EET 3 37 WE MAIN LOCU EET FOE EET 3 3 WE MAIN FOE EET UNION EET 3 3 WE MAIN UNION EET OCHA EET 3 97 WE PAISH LANE.1 Miles WE PAISH LN 1 BICH MEAOW OA CLEMENT PLACE 2 37 WE PAISH LN 2 CLEMENT PLACE EVENS TEACE WE PAISH LN 3 EVENS TEACE CHASE CESCENT 2 9 2/13/218 Page 12 of 13

32 Street Name From To Width Length Accepted WE SHOE OA.9 Miles WE SHOE 1 BEA HILL OA COLGAN OA WE SHOE 2 COLGAN OA GEYONE OA 2 2 WE SHOE 3 GEYONE OA WE SHOE OA 2 39 WE SHOE ALNETTE OA WE SHOE OA WE SHOE WE SHOE OA AHEN CICLE WE SHOE AHEN CICLE EA EN 1 8 WEMINIE OA.11 Miles WEMINIE WE MAIN EET BELLMOE EET WHITTIE IVE.1 Miles WHITTIE WE MAIN EET GEENLEAF CICLE WILLOWALE IVE.1 Miles WILLOWALE 1 CHUCH EET WILLOWALE IVE 2 87 WILLOWALE 2 WILLOWALE IVE WILLOWALE IVE WINTE EET.72 Miles WINTE 1 CHUCH EET TOWN FOE OA WINTE 2 TOWN FOE OA NICHOLS EET WINTE 3 NICHOLS EET PINE EET WINTE PINE EET POSPECT EET 22 8 WINTE POSPECT EET LINCOLN EET WINTE LINCOLN EET VENOME EET WOOLAN EET.33 Miles WOOLAN 1 WE MAIN EET GOVE EET 2 89 WOOLAN 2 GOVE EET VENOME EET 2 WOOLAN 3 VENOME EET LINCOLN EET 2 32 WOOLAN LINCOLN EET EA EN 1 2 2/13/218 Page 13 of 13

33 of Merrimac, Massachusetts Pavement Management Program Owned Streets Sorted By PCI Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class BATTIS eclamation $,81. FIEN eclamation $79,1. HEATH eclamation $9,8.98 E OAK ACES 3 (SW) eclamation $13, SOUTH PLEASANT eclamation $18,99.37 SOUTH PLEASANT eclamation $17,23.8 SOUTH PLEASANT eclamation $197,2.88 HAIMAN eclamation $92,793.9 WEMINIE eclamation $217,. NOTH eclamation $2,91.98 BEA HILL eclamation $38,993.7 Collector WALNUT eclamation $27,7.7 HEATH eclamation $93,23. BICH MEAOW eclamation $9,92. FEEAL WAY eclamation $,.17 WOOLAN eclamation $197,8.83 Collector MILL eclamation $192,983.8 WALLACE WAY eclamation $38,177.9 BICH MEAOW LOOP eclamation $183,28.22 BEA HILL eclamation $18,92.7 Collector LANE TEN ACE eclamation $21,83.9 MOON LIT WAY eclamation $3,23. OL BEA HILL eclamation $22,31. BEA HILL eclamation $27,7.7 Collector WE SHOE eclamation $9,173.8 WHITTIE eclamation $288,11. WINTE eclamation $1, Collector FOE eclamation $18,92.31 BOA eclamation $17,8.1 2/13/218 Page 1 of 8

34 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class WOOLAN eclamation $292,.18 Collector MILE eclamation $91,72.37 Collector OCHA eclamation $237,8.7 POSPECT HILL eclamation $17,813.3 AILOA AVE eclamation $98,8.81 HIGH eclamation $31,13.88 MEIMACK AVE eclamation $92,3. BEA HILL eclamation $8,1.1 Collector BANY BOW eclamation $21,912.3 BOA eclamation $3,93.7 Collector COLGAN eclamation $17,72.23 LINCOLN eclamation $7,9.8 IVE eclamation $212,91. Collector SHOE eclamation $7,88.18 TOWN FOE eclamation $123,39.3 BATTIS eclamation $1,3, BEA HILL eclamation $93, Collector LANE TEN ACE eclamation $9,. MOUNTAIN VIEW AVE eclamation $7,313.3 JUKINS CT Mill Level and Overlay $22,23.12 IGEFIEL Mill Level and Overlay $,17.81 BICH MEAOW Mill Level and Overlay $3,272. EMEY Mill Level and Overlay $31,22. HIGHLAN Mill Level and Overlay $17,18.9 Collector WE SHOE Mill Level and Overlay $12,2.8 BEA HILL Mill Level and Overlay $129,8.9 Collector BICH MEAOW Mill Level and Overlay $1,3.9 GEENLEAF CI 2 (SW) Mill Level and Overlay $27,8. HANSOM Mill Level and Overlay $,82.2 LOCU Mill Level and Overlay $3,99.99 Minor Arterial WILLOWALE Mill Level and Overlay $2,283.2 ATTITASH Mill Level and Overlay $,.87 GOVE Mill Level and Overlay $37,83.23 LOCU GOVE Mill Level and Overlay $7,3.77 2/13/218 Page 2 of 8

35 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class IVE Mill Level and Overlay $1,131. Collector MILE Mill Level and Overlay $8,3.8 Collector OCHA Mill Level and Overlay $8,13.7 BILLING Mill Level and Overlay $,33.8 BICH MEAOW Mill Level and Overlay $18,1.1 BICH MEAOW Mill Level and Overlay $1,3.9 HEATH BOOK Mill Level and Overlay $8,7. HIGHLAN Mill Level and Overlay $98,39.8 Collector COLBY Mill Level and Overlay $,723. HANSOM Mill Level and Overlay $133,.8 HAIMAN Mill Level and Overlay $7,.2 PINEHU Mill Level and Overlay $9,3.11 WINTE Mill Level and Overlay $1,39.3 Collector CHAMPION Mill Level and Overlay $2,3.18 GOVE Mill Level and Overlay $7,.9 CENTAL Mill Level and Overlay $2, OAK CI Mill Level and Overlay $17,31.9 CHUCH Mill Level and Overlay $17, Collector EQUEIAN WAY Mill Level and Overlay $,38.7 HALEY Mill Level and Overlay $33,2. GOVE Mill Level and Overlay $1,38.1 HIGHLAN Mill Level and Overlay $18, Collector HAIMAN Mill Level and Overlay $8,.8 GLENN Mill Level and Overlay $32,8.9 MECHANICS Mill Level and Overlay $2,99.38 WILLOWALE Mill Level and Overlay $11,18.1 FAINGTON FIEL Mill Level and Overlay $9, PINE BLUFF AVE Mill Level and Overlay $13,.1 TIMOTHY Mill Level and Overlay $17,93.17 SHOE Mill Level and Overlay $12,8.9 WE SHOE Mill Level and Overlay $3,97.1 WINTE Mill Level and Overlay $21, Collector LIBETY Mill Level and Overlay $,21. IVE Mill Level and Overlay $9,88.9 Collector 2/13/218 Page 3 of 8

36 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class HALEY Level and Overlay $12,79.7 WOOLAN Level and Overlay $1,92.91 BEA HILL Level and Overlay $7,11.2 Collector CHAMPION Level and Overlay $3,9.8 LOCU Level and Overlay $1,28.33 Minor Arterial BELMOE Level and Overlay $2,88.11 BOA Level and Overlay $1,231. Collector LANAU LN Level and Overlay $31, BUSH HILL Level and Overlay $1,27.1 CHUCH.8 28 Level and Overlay $19,818. Collector OCHA Level and Overlay $39,97.83 BANCOFT LN Level and Overlay $8,.91 GLENN Level and Overlay $13,27.1 OL BEA HILL Level and Overlay $,72.2 IVE Level and Overlay $1,2.7 Collector EMEY Level and Overlay $9,777.1 GOVE Level and Overlay $2,12. HEATHE CI Level and Overlay $1, SPENCE WAY Level and Overlay $1,3.9 WE SHOE Level and Overlay $12,39. HANSOM Level and Overlay $23,12.7 LOCU Level and Overlay $1,723.7 Minor Arterial WINTE Level and Overlay $9, Collector CHUCH Level and Overlay $1,77. Collector LOCU Level and Overlay $8,72.1 Minor Arterial OCHA Level and Overlay $37,1.1 CENTAL Level and Overlay $,17.3 ALNETTE Level and Overlay $7,38. HIGH Level and Overlay $1,9.82 MILL Level and Overlay $,.18 SUNSET TE Level and Overlay $29,23.3 ALNETTE Level and Overlay $3,19.97 BELMOE Level and Overlay $2,123.2 LIBETY Level and Overlay $12,32.9 2/13/218 Page of 8

37 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class ABBOTT Level and Overlay $3,3.8 CHUCH Level and Overlay $13,8.2 Collector SHOE Level and Overlay $1,98.73 BUNSIE LN Level and Overlay $2,8. LINCOLN Level and Overlay $2,3.23 LOCU Level and Overlay $,29. Minor Arterial CHUCH Level and Overlay $23,98.1 Collector LISA CI Level and Overlay $, TIMOTHY Level and Overlay $1,11.89 WINTE Level and Overlay $1,782.8 Collector BUSH HILL Level and Overlay $3,72.97 UNEVEGAN Level and Overlay $18,82. EMEY Level and Overlay $1,1. WE SHOE Level and Overlay $, AHEN CI Level and Overlay $12,79.87 LOCU Level and Overlay $8,72.1 Minor Arterial MEAOW AVE Level and Overlay $8,3.7 MILE Level and Overlay $7,7.9 Collector OAK CI Level and Overlay $3,1.8 EVENS TE Level and Overlay $18,723.8 WOOLAN Level and Overlay $,2. EMEY Level and Overlay $33,823. SHOE Level and Overlay $2,78.3 BICH MEAOW LOOP Level and Overlay $. LAKE AVE Level and Overlay $,87.1 CHUCH Overlay $3,721.1 Collector VALE Overlay $3,33.2 ALNETTE Overlay $2,1. UNEVEGAN Overlay $13,98.33 GEEN LEAF Overlay $11,2.28 SKUNK Overlay $32,2.97 ALNETTE Overlay $3,27.8 BOA Overlay $1,99.9 Minor Arterial BUSH HILL Overlay $1,19.1 2/13/218 Page of 8

38 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class EMEY Overlay $17,817.9 HIGHLAN Overlay $13,7.9 Collector NICHOLS Overlay $7,71.33 CHUCH Overlay $,.77 Collector SHAON CI Overlay $8,93.72 WE SHOE Overlay $8.9 ATTITASH Overlay $,8.82 EMEY Overlay $3,397.9 GEEN Overlay $11,9.83 NICHOLS Overlay $1,9.9 SHAON CI Overlay $2,88.99 WE PAISH LN Overlay $12,23.33 AAMS Overlay $12,7. GEEN Overlay $9,28.1 HIGH Overlay $,379.3 CHUCH Overlay $11,72.81 Collector CHUCH Overlay $1,1.9 Collector WE PAISH LN Overlay $2,89. MILE Overlay $,28.3 EVENS TE Overlay $8,739.9 ATTITASH Crack Seal $1,22.8 BOA Crack Seal $1,89.2 Minor Arterial HALEY Crack Seal $1,83. MEAOW AVE Crack Seal $8.13 BUNSIE LN Crack Seal $3,31.8 CLEMENT PL Crack Seal $2,. IVE Crack Seal $7,277.2 UNION EET EXT Crack Seal $3,981. MILE Crack Seal $1,88.8 BOA Crack Seal $1, Collector WE HALEY Crack Seal $3,8.9 MEIMAC Crack Seal $,28.3 Minor Arterial NOYES LN Crack Seal $2,.8 MAPLE Crack Seal $1,2.7 2/13/218 Page of 8

39 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class SHAON CI Crack Seal $1,187.2 HIGHLAN Crack Seal $3,7. Collector LOCU Crack Seal $2.1 Minor Arterial SAWYE Crack Seal $17. GUNNISON Crack Seal $2,181.2 CHASE CESCENT Crack Seal $2,8.8 MEAOW AVE Crack Seal $ MEIMAC Crack Seal $1,93.73 Minor Arterial NOYES LN Crack Seal $1,7.2 CHASE CESCENT efer Maintenance $. PINE efer Maintenance $. BATLETT efer Maintenance $. WE PAISH LN efer Maintenance $. LITTLES CT efer Maintenance $. MEIMAC efer Maintenance $. Minor Arterial TAILE PAK efer Maintenance $. PINE efer Maintenance $. HILLSIE AVE efer Maintenance $. MAPLE efer Maintenance $. NOYES LN efer Maintenance $. POSPECT efer Maintenance $. SHAON CI efer Maintenance $. TAILE PAK efer Maintenance $. MEIMACK AVE efer Maintenance $. SAWYE efer Maintenance $. PLEASANT VIEW efer Maintenance $. IGEFIEL efer Maintenance $. SPING efer Maintenance $. ATTITASH efer Maintenance $. BEA HILL efer Maintenance $. Collector BICH MEAOW efer Maintenance $. CHASE CESCENT efer Maintenance $. CHUCH efer Maintenance $. Collector CUIE AVE efer Maintenance $. 2/13/218 Page 7 of 8

40 Street Segment Length (mi) Length (Ft) Width PCI epair epair Cost Functional Class EA MAIN efer Maintenance $. Minor Arterial FAIFIEL AVE efer Maintenance $. HILLSIE AVE efer Maintenance $. LANCAE CT efer Maintenance $. LITTLE PON efer Maintenance $. LOCU GOVE AVE efer Maintenance $. MILE efer Maintenance $. Collector MILL efer Maintenance $. MYTHICAL efer Maintenance $. PINE efer Maintenance $. PLEASANT efer Maintenance $. POSPECT efer Maintenance $. IVE efer Maintenance $. Collector SAWYE efer Maintenance $. SCHOOL efer Maintenance $. SPING HILL efer Maintenance $. SUMME efer Maintenance $. TAILE PAK efer Maintenance $. UNION efer Maintenance $. VALLEY efer Maintenance $. VENOME efer Maintenance $. WE MAIN efer Maintenance $. Minor Arterial 2/13/218 Page 8 of 8

41 of Merrimac, Massachusetts Complete Streets Program Sidewalk Condition Summary With etailed escription and Curbing Length Width Material Condition Curb Type eveal ABBOTT EET Segment: ABBOTT From: SAWYE EET CHUCH EET AAMS EET Segment: AAMS From: LOCU EET UNION EET AHEN CICLE Segment: AHEN CI From: WE SHOE OA CUL E SAC 32 Sloped Granite 32 Sloped Granite ALNETTE OA Segment: ALNETTE 1 From: EA EN COLGAN OA Segment: ALNETTE 2 From: COLGAN OA GEYONE OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

42 Segment: ALNETTE 3 From: GEYONE OA Segment: ALNETTE From: WE SHOE OA Length Width Material Condition Curb Type eveal WE SHOE OA EA EN 1 1 ATTITASH EET Segment: ATTITASH 1 From: EA MAIN EET PLEASANT VIEW OA Segment: ATTITASH 2 From: PLEASANT VIEW OA HILLSIE AVENUE 92 Bit. Berm (Standard) 92 Bit. Berm (Standard) Segment: ATTITASH 3 From: HILLSIE AVENUE MEAOW AVENUE Segment: ATTITASH From: MEAOW AVENUE EA EN BANCOFT LANE Segment: BANCOFT LN From: IVE OA EA EN /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

43 Length Width Material Condition Curb Type eveal BATLETT EET Segment: BATLETT From: SCHOOL EET MILL EET BATTIS OA Segment: BATTIS 1 From: HIGHLAN OA HUSE OA 2 2 Segment: BATTIS 2 From: HUSE OA GAVEL OA Segment: BATTIS 3 From: GAVEL OA BICH MEAOW LOOP BEA HILL OA Segment: BEA HILL 1 From: EA MAIN EET SPENCE WAY Segment: BEA HILL 2 From: SPENCE WAY HOUSE # /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

44 Length Width Material Condition Curb Type eveal Segment: BEA HILL 3 From: HOUSE #1 HOUSE # Segment: BEA HILL From: HOUSE #2 Segment: BEA HILL From: LANE TEN ACE OA Segment: BEA HILL From: OL BEA HILL OA Segment: BEA HILL 7 From: OL BEA HILL OA Segment: BEA HILL 8 From: WE SHOE OA Segment: BEA HILL 9 From: LAKEWOOS AVENUE LANE TEN ACE OA OL BEA HILL OA OL BEA HILL OA WE SHOE OA LAKEWOOS AVENUE OL BEA HILL OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

45 Segment: BEA HILL 1 From: OL BEA HILL OA Segment: BEA HILL 11 From: HAIMAN OA Length Width Material Condition Curb Type eveal HAIMAN OA NEW HAMPSHIE ATE LINE BELMOE OA Segment: BELMOE 1 From: WEMINIE OA MAPLETON OA 7 7 Segment: BELMOE 2 From: MAPLETON OA PINEHU EET BILLING EET Segment: BILLING From: IGEFIEL EET EA EN BICH MEAOW LOOP Segment: BICH MEAOW LOOP 1 From: BICH MEAOW OA BATTIS OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

46 Segment: BICH MEAOW LOOP 2 From: BATTIS OA Length Width Material Condition Curb Type eveal BICH MEAOW OA BICH MEAOW OA Segment: BICH MEAOW 1 From: WE MAIN EET WE PAISH LANE Segment: BICH MEAOW 2 From: WE PAISH LANE PAVEMENT CHANGE Segment: BICH MEAOW 3 From: PAVEMENT CHANGE PAVEMENT CHANGE Segment: BICH MEAOW From: WE PAISH LANE BICH MEAOW LOOP Segment: BICH MEAOW From: BICH MEAOW LOOP FINN LANE 2 2 Segment: BICH MEAOW From: FINN LANE HEATH OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

47 Length Width Material Condition Curb Type eveal BANY BOW OA Segment: BANY BOW From: HAVEHILL TOWN LINE HAVEHILL TOWN LINE BOA EET Segment: BOA 1 From: EA MAIN EET LANCAE COUT Bit. Berm (Standard) Asphalt Bit. Berm (Standard) Segment: BOA 2 From: LANCAE COUT MILL EET 898 Bit. Berm (Standard) 898 Asphalt Poor Bit. Berm (Standard) Segment: BOA 3 From: ON AMP HIGH EET Asphalt Poor Segment: BOA From: HIGH EET SOUTH PLEASANT EET Segment: BOA From: SOUTH PLEASANT EET IVE OA Segment: BOA From: HIGH EET CUL E SAC 9 9 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 7 of 7

48 Length Width Material Condition Curb Type eveal BUSH HILL OA Segment: BUSH HILL 1 From: HAIMAN OA MOON LIT WAY Segment: BUSH HILL 2 From: MOON LIT WAY ASHLEY LANE Segment: BUSH HILL 3 From: ASHLEY LANE HIGHLAN OA BUNSIE LANE Segment: BUNSIE LN 1 From: EMEY EET UNEVEGAN IVE 92 Sloped Granite 92 Sloped Granite Segment: BUNSIE LN 2 From: UNEVEGAN IVE UNEVEGAN IVE 132 Sloped Granite 132 Sloped Granite CENTAL EET Segment: CENTAL 1 From: SCHOOL EET CENTAL /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 8 of 7

49 Segment: CENTAL 2 From: CENTAL 1 Length Width Material Condition Curb Type eveal GEEN EET 2 2 CHAMPION EET Segment: CHAMPION 1 From: EMEY EET GLENN OA 31 Sloped Granite 31 Sloped Granite Segment: CHAMPION 2 From: GLENN OA TIMOTHY EET 979 Sloped Granite 979 Sloped Granite CHASE CESCENT Segment: CHASE CESCENT 1 From: NOYES LANE WE PAISH LANE Segment: CHASE CESCENT 2 From: WE PAISH LANE EVENS TEACE Segment: CHASE CESCENT 3 From: EVENS TEACE NOYES LANE /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 9 of 7

50 Length Width Material Condition Curb Type eveal CHUCH EET Segment: CHUCH 1 From: WINTE EET HANSOM IVE 8 8 Asphalt Bit. Berm (Standard) Segment: CHUCH 2 From: HANSOM IVE WILLOWALE IVE 19 Mix Bit. Berm (Standard) 19 Vertical Granite Segment: CHUCH 3 From: WILLOWALE IVE NICHOLS EET Bit. Berm (Standard) Segment: CHUCH From: NICHOLS EET ABBOTT EET Segment: CHUCH From: ABBOTT EET MAPLE EET Mix Mix Segment: CHUCH From: MAPLE EET PINE EET 297 Asphalt 297 Mix Segment: CHUCH 7 From: PINE EET POSPECT EET 19 Asphalt 19 Good 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

51 Segment: CHUCH 8 From: POSPECT EET Segment: CHUCH 9 From: JUKINS COUT Segment: CHUCH 1 From: MECHANICS EET Segment: CHUCH 11 From: GOVE EET Length Width Material Condition Curb Type eveal JUKINS COUT MECHANICS EET GOVE EET EA MAIN EET Asphalt Mix Good Good Excellent Excellent Excellent Excellent Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite CLEMENT PLACE Segment: CLEMENT PL From: WE PAISH LANE EVENS TEACE 877 Asphalt 877 COLBY EET Segment: COLBY From: CUIE AVENUE EA EN 1 1 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 11 of 7

52 Length Width Material Condition Curb Type eveal COLGAN OA Segment: COLGAN From: WE SHOE OA ALNETTE OA 1 1 CUIE AVENUE Segment: CUIE AVE From: COLBY EET WE MAIN EET 3 Poor Cement 2 3 UNEVEGAN IVE Segment: UNEVEGAN 1 From: BUNSIE AVENUE BUNSIE AVENUE 71 Sloped Granite 71 Sloped Granite Segment: UNEVEGAN 2 From: BUNSIE AVENUE EA MAIN EET 79 Sloped Granite 79 Sloped Granite EA MAIN EET Segment: EA MAIN 1 From: LIBETY EET SCHOOL EET 177 Excellent Vertical Granite 177 Excellent Vertical Granite Segment: EA MAIN 2 From: SCHOOL EET CHUCH EET 18 Excellent Vertical Granite 18 Excellent Vertical Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 12 of 7

53 Length Width Material Condition Curb Type eveal EMEY EET Segment: EMEY 1 From: EA MAIN EET TAILE PAK OA Segment: EMEY 2 From: TAILE PAK OA BUNSIE LANE 9 9 Segment: EMEY 3 From: OVEPASS CHAMPION EET Segment: EMEY From: CHAMPION EET TIMOTHY OA Segment: EMEY From: TIMOTHY OA SUNSET TEACE Segment: EMEY From: SUNSET TEACE MILE OA EQUEIAN WAY Segment: EQUEIAN WAY From: HALEY OA CUL E SAC 7 Sloped Granite 7 Sloped Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 13 of 7

54 Length Width Material Condition Curb Type eveal FAIFIEL AVENUE Segment: FAIFIEL AVE From: WE MAIN EET EA EN FAINGTON FIEL OA Segment: FAINGTON FIEL From: HALEY OA CUL E SAC FEEAL WAY Segment: FEEAL WAY From: MILL EET EA EN FOE EET Segment: FOE From: GOVE EET WE MAIN EET FIEN EET Segment: FIEN From: SOUTH PLEASANT EET IVE OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

55 Length Width Material Condition Curb Type eveal GLENN OA Segment: GLENN 1 From: CHAMPION EET HSE #8 31 Sloped Granite 31 Sloped Granite Segment: GLENN 2 From: HSE #8 TIMOTHY OA Sloped Granite Sloped Granite GEEN LEAF IVE Segment: GEEN LEAF From: WE MAIN EET EA EN 1 1 GEEN EET Segment: GEEN 1 From: LOCU EET CENTAL EET Mix Poor Segment: GEEN 2 From: CENTAL EET SCHOOL EET 1 1 GEENLEAF CICLE Segment: GEENLEAF CI 1 (NE) From: WHITTIE IVE CUL E SAC /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

56 Segment: GEENLEAF CI 2 (SW) From: WHITTIE IVE CUL E SAC Length Width Material Condition Curb Type eveal GOVE EET Segment: GOVE 1 From: OCHA EET FOE EET Poor Segment: GOVE 2 From: FOE EET WOOLAN EET 233 Asphalt eplace 233 Segment: GOVE 3 From: WOOLAN EET SUMME EET 92 ombination (enter in notes 92 ombination (enter in notes Segment: GOVE From: SUMME EET CHUCH EET 93 Mix 93 Mix Poor GUNNISON IVE Segment: GUNNISON From: WE MAIN EET NOYES LANE /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

57 Length Width Material Condition Curb Type eveal HALEY OA Segment: HALEY 1 From: HEATH OA WE HALEY OA Segment: HALEY 2 From: WE HALEY OA EQUEIAN WAY Segment: HALEY 3 From: EQUEIAN WAY NEW HAMPSHIE ATE LINE HANSOM IVE Segment: HANSOM 1 From: CHUCH EET LANAU LANE 77 Asphalt Good Sloped Granite 77 Sloped Granite Segment: HANSOM 2 From: LANAU LANE LANAU LANE 187 Asphalt Good Sloped Granite 187 Sloped Granite Segment: HANSOM 3 From: LANAU LANE CUL E SAC 12 Asphalt Good Sloped Granite 12 Sloped Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 17 of 7

58 Length Width Material Condition Curb Type eveal HAIMAN OA Segment: HAIMAN 1 From: BEA HILL OA OL BEA HILL OA Segment: HAIMAN 2 From: OL BEA HILL OA E OAK ACES Segment: HAIMAN 3 From: E OAK ACES HIGHLAN OA HEATH BOOK OA Segment: HEATH BOOK From: HEATH OA CUL E SAC Asphalt Cement 1189 Cement HEATH OA Segment: HEATH 1 From: HALEY OA HEATH BOOK OA Segment: HEATH 2 From: HEATH BOOK OA HAVEHILL CITY LINE /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 18 of 7

59 Length Width Material Condition Curb Type eveal HEATHE CICLE Segment: HEATHE CI From: SAWYE EET CUL E SAC 8 Vertical Granite 8 Vertical Granite HIGH EET Segment: HIGH 1 From: BOA EET BOA EET 32 Asphalt 32 Segment: HIGH 2 From: BOA EET SOUTH PLEASANT EET Mix Segment: HIGH 3 From: SOUTH PLEASANT EET IVE OA 28 Good 28 HIGHLAN OA Segment: HIGHLAN 1 From: CHUCH EET HAIMAN OA Segment: HIGHLAN 2 From: HAIMAN OA HUSE OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 19 of 7

60 Segment: HIGHLAN 3 From: HUSE OA Segment: HIGHLAN From: BUSH HILL OA Segment: HIGHLAN From: BATTIS OA Length Width Material Condition Curb Type eveal BUSH HILL OA BATTIS OA NEW HAMPSHIE ATE LINE HILLSIE AVENUE Segment: HILLSIE AVE 1 From: ATTITASH EET MEIMACK AVENUE Segment: HILLSIE AVE 2 From: MEIMACK AVENUE EA EN JUKINS COUT Segment: JUKINS CT From: CHUCH EET EA EN 3 3 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

61 Length Width Material Condition Curb Type eveal LAKE AVENUE Segment: LAKE AVE From: FEN AVENUE EA EN LANCAE COUT Segment: LANCAE CT From: BOA EET SCHOOL EET 31 Vertical Granite 31 Excellent Vertical Granite LANAU LANE Segment: LANAU LN From: HANSOM IVE HANSOM IVE 82 Asphalt Good Sloped Granite 82 Sloped Granite LANE TEN ACE OA Segment: LANE TEN ACE 1 From: BEA HILL OA SHOE OA Segment: LANE TEN ACE 2 From: SHOE OA SHOE OA LIBETY EET Segment: LIBETY 1 From: EA MAIN EET MECHANICS EET 2 2 Mix eplace 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 21 of 7

62 Segment: LIBETY 2 From: MECHANICS EET Length Width Material Condition Curb Type eveal EN OF PAVEMENT LINCOLN EET Segment: LINCOLN 1 From: WOOLAN EET WINTE EET Segment: LINCOLN 2 From: WINTE EET SUMME EET 7 7 LISA CICLE Segment: LISA CI From: TAILE PAK OA TAILE PAK OA LITTLE PON OA Segment: LITTLE PON 1 From: MEIMAC EET LITTLE PON OA 881 Asphalt 881 Segment: LITTLE PON 2 From: LITTLE PON OA SPING HILL OA 83 Asphalt 83 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 22 of 7

63 Segment: LITTLE PON 3 From: SPING HILL OA Segment: LITTLE PON From: SPING HILL OA Length Width Material Condition Curb Type eveal SPING HILL OA LITTLE PON OA Asphalt Asphalt LITTLES COUT Segment: LITTLES CT From: WE MAIN EET EA EN LOCU GOVE AVENUE Segment: LOCU GOVE AVE From: MILE EET WALNUT EET LOCU GOVE OA Segment: LOCU GOVE From: LOCU EET COLONIAL IVE 1272 Bit. Berm (Standard) 1272 Bit. Berm (Standard) LOCU EET Segment: LOCU 1 From: IVE OA LOCU GOVE OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 23 of 7

64 Segment: LOCU 2 From: LOCU GOVE OA Segment: LOCU 3 From: INTEATE HIGHWAY Segment: LOCU From: WALNUT EET Segment: LOCU From: MILE EET Segment: LOCU From: PLEASANT EET Segment: LOCU 7 From: AAMS EET Segment: LOCU 8 From: GEEN EET Length Width Material Condition Curb Type eveal INTEATE HIGHWAY WALNUT EET MILE EET PLEASANT EET 1 1 AAMS EET GEEN EET WE MAIN EET 3 3 Asphalt Asphalt Mix Asphalt Asphalt Mix Asphalt Poor Poor Good Good Bit. Berm (Standard) Bit. Berm (Standard) Vertical Granite Vertical Granite Bit. Berm (Standard) Bit. Berm (Standard) 3 2 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

65 Length Width Material Condition Curb Type eveal MAPLE EET Segment: MAPLE 1 From: SAWYE EET SUMME EET Poor Segment: MAPLE 2 From: SUMME EET CHUCH EET Mix Poor MEAOW AVENUE Segment: MEAOW AVE 1 From: ATTITASH EET LAKE AVENUE Segment: MEAOW AVE 2 From: LAKE AVENUE PINE BLUFF AVENUE Segment: MEAOW AVE 3 From: PINE BLUFF AVENUE MEIMACK AVENUE MECHANICS EET Segment: MECHANICS From: LIBETY EET CHUCH EET Vertical Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

66 Length Width Material Condition Curb Type eveal MEIMAC EET Segment: MEIMAC 1 From: IVE OA MYTHICAL EET 1138 Bit. Berm (Standard) 1138 Bit. Berm (Standard) Segment: MEIMAC 2 From: MYTHICAL EET LITTLE PON OA 2 2 Segment: MEIMAC 3 From: LITTLE PON OA HAVEHILL CITY LINE MEIMACK AVENUE Segment: MEIMACK AVE 1 From: HILLSIE AVENUE MEAOW AVENUE Segment: MEIMACK AVE 2 From: MEAOW AVENUE OAK CICLE MILE OA Segment: MILE 1 From: IVE OA PAVEMENT CHANGE 219 Poor 219 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

67 Segment: MILE 2 From: PAVEMENT CHANGE Segment: MILE 3 From: EMEY EET Segment: MILE From: SUNSET TEACE Length Width Material Condition Curb Type eveal EMEY EET SUNSET TEACE 9 9 AMESBUY TOWN LINE Poor Poor MILE EET Segment: MILE 1 From: SCHOOL EET VALE EET 333 Asphalt Poor 333 Segment: MILE 2 From: VALE EET LOCU EET Asphalt Poor MILL EET Segment: MILL 1 From: SCHOOL EET BOA EET 7 7 Segment: MILL 2 From: BOA EET FEEAL WAY 3 3 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 27 of 7

68 Segment: MILL 3 From: FEEAL WAY Length Width Material Condition Curb Type eveal EA MAIN EET MOON LIT WAY Segment: MOON LIT WAY From: BUSH HILL OA EA EN MOUNTAIN VIEW AVENUE Segment: MOUNTAIN VIEW AVE From: WE MAIN EET EA EN MYTHICAL EET Segment: MYTHICAL From: MEIMAC EET VALLEY EET 8 Bit. Berm (Standard) 8 Bit. Berm (Standard) NICHOLS EET Segment: NICHOLS 1 From: CHUCH EET SAWYE EET 1 1 Segment: NICHOLS 2 From: SAWYE EET WINTE EET 7 7 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 28 of 7

69 Length Width Material Condition Curb Type eveal NOTH EET Segment: NOTH 2 From: IVE OA CUL E SAC NOYES LANE Segment: NOYES LN 1 From: GUNNISON IVE CHASE CESCENT Segment: NOYES LN 2 From: CHASE CESCENT CHASE CESCENT Segment: NOYES LN 3 From: CHASE CESCENT GUNNISON IVE 7 7 OAK CICLE Segment: OAK CI 1 From: AMESBUY TOWN LINE MEIMACK AVENUE Segment: OAK CI 2 From: MEIMACK AVENUE EA EN /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 29 of 7

70 Length Width Material Condition Curb Type eveal OL BEA HILL OA Segment: OL BEA HILL 1 From: HAIMAN OA EA EN Segment: OL BEA HILL 2 From: BEA HILL OA BEA HILL OA 1 1 OCHA EET Segment: OCHA 1 From: WE MAIN EET GOVE EET 3 3 Mix Poor Segment: OCHA 2 From: GOVE EET OCHA EET Asphalt Good ombination (enter in notes Segment: OCHA 3 From: OCHA EET OCHA EET EXTENSION 112 Vertical Granite 112 Asphalt Good Vertical Granite Segment: OCHA From: OCHA EET EXTENSION OCHA EET 17 Vertical Granite 17 Asphalt Good Vertical Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

71 Length Width Material Condition Curb Type eveal PINE BLUFF AVENUE Segment: PINE BLUFF AVE From: MEAOW AVENUE EA EN PINE EET Segment: PINE 1 From: CHUCH EET SUMME EET Segment: PINE 2 From: SUMME EET SPING EET Segment: PINE 3 From: SPING EET WINTE EET 2 2 PINEHU EET Segment: PINEHU From: BELLMOE EET IGEFIEL EET PLEASANT EET Segment: PLEASANT 1 From: LOCU EET VALE EET 2 Mix Poor 2 Mix Poor 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 31 of 7

72 Segment: PLEASANT 2 From: VALE EET Length Width Material Condition Curb Type eveal SCHOOL EET PLEASANT VIEW OA Segment: PLEASANT VIEW From: ATTITASH EET AMESBUY TOWN LINE POSPECT HILL Segment: POSPECT HILL From: EA MAIN EET EA EN 7 7 POSPECT EET Segment: POSPECT 1 From: CHUCH EET SUMME EET Mix eplace Segment: POSPECT 2 From: SUMME EET SPING EET Segment: POSPECT 3 From: SPING EET WINTE EET Mix Poor 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 32 of 7

73 Length Width Material Condition Curb Type eveal AILOA AVENUE Segment: AILOA AVE From: CHUCH EET EA EN E OAK ACES Segment: E OAK ACES 1 From: HAIMAN OA E OAK ACES Segment: E OAK ACES 2 (NE) From: E OAK ACES CUL E SAC 3 3 Segment: E OAK ACES 3 (SW) From: E OAK ACES CUL E SAC IGEFIEL EET Segment: IGEFIEL 1 From: PINEHU EET BILLING EET Segment: IGEFIEL 2 From: BILLING EET WEMINIE OA /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 33 of 7

74 Length Width Material Condition Curb Type eveal IVE OA Segment: IVE 1 From: AMESBUY TOWN LINE SKUNK OA Segment: IVE 2 From: SKUNK OA BANCOFT LANE Segment: IVE 3 From: BANCOFT LANE MILE OA Segment: IVE From: MILE OA BOA EET Segment: IVE From: BOA EET FIEN EET Poor Segment: IVE From: FIEN EET HIGH EET Good Segment: IVE 7 From: HIGH EET PAVEMENT CHANGE ombination (enter in notes 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

75 Segment: IVE 8 From: PAVEMENT CHANGE Segment: IVE 9 From: LOCU EET Segment: IVE 1 From: MEIMAC EET Length Width Material Condition Curb Type eveal LOCU EET MEIMAC EET 1 1 HAVEHILL CITY LINE SAWYE EET Segment: SAWYE 1 From: PINE EET MAPLE EET Segment: SAWYE 2 From: MAPLE EET HEATHE CICLE Segment: SAWYE 3 From: HEATHE CICLE ABBOTT EET 7 7 Asphalt Excellent Segment: SAWYE From: ABBOTT EET NICHOLS EET Mix 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

76 Length Width Material Condition Curb Type eveal SCHOOL EET Segment: SCHOOL 1 From: EA MAIN EET LANCAE COUT 2 Excellent Vertical Granite 2 Excellent Vertical Granite Segment: SCHOOL 2 From: LANCAE COUT CENTAL EET 11 Good 11 Mix Segment: SCHOOL 3 From: CENTAL EET GEEN EET 2 Good 2 Asphalt Poor Segment: SCHOOL From: GEEN EET PLEASANT EET Mix eplace Segment: SCHOOL From: PLEASANT EET MILE EET Segment: SCHOOL From: MILE EET MILL EET 738 eplace 738 SHAON CICLE Segment: SHAON CI 1 From: TAILE PAK OA PIVATE OA 2 2 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

77 Segment: SHAON CI 2 From: PIVATE OA Segment: SHAON CI 3 From: WENY WAY Segment: SHAON CI From: PIVATE OA Segment: SHAON CI From: PIVATE OA WENY WAY Length Width Material Condition Curb Type eveal PIVATE OA PIVATE OA TAILE PAK OA SHOE OA Segment: SHOE 1 From: LANE TEN ACE OA SHOE OA 7 7 Segment: SHOE 2 From: EA EN SHOE OA Segment: SHOE 3 From: SHOE OA LANE TEN ACE OA 1 1 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 37 of 7

78 Segment: SHOE From: LANE TEN ACE OA EA EN Length Width Material Condition Curb Type eveal SKUNK OA Segment: SKUNK From: IVE OA MILE OA SOUTH PLEASANT EET Segment: SOUTH PLEASANT 1 From: TANNEY LANE BOA EET 8 8 Segment: SOUTH PLEASANT 2 From: BOA EET FIEN EET Segment: SOUTH PLEASANT 3 From: FIEN EET HIGH EET 2 2 Segment: SOUTH PLEASANT From: HIGH EET EA EN /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 38 of 7

79 Length Width Material Condition Curb Type eveal SPENCE WAY Segment: SPENCE WAY From: BEA HILL OA CUL E SAC 7 Sloped Granite 7 Sloped Granite SPING HILL OA Segment: SPING HILL From: LITTLE PON OA LITTLE PON OA 379 Asphalt Poor 379 SPING EET Segment: SPING From: POSPECT EET PINE EET EVENS TEACE Segment: EVENS TE 1 From: WE PAISH LANE CLEMENT PLACE 9 9 Asphalt Segment: EVENS TE 2 From: CLEMENT PLACE CHASE CESCENT 3 3 SUMME EET Segment: SUMME 1 From: MAPLE EET PINE EET /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 39 of 7

80 Segment: SUMME 2 From: PINE EET Segment: SUMME 3 From: POSPECT EET Segment: SUMME From: LINCOLN EET Segment: SUMME From: VENOME EET Length Width Material Condition Curb Type eveal POSPECT EET LINCOLN EET VENOME EET GOVE EET Mix Poor Poor Poor SUNSET TEACE Segment: SUNSET TE From: EMEY EET MILE OA TIMOTHY OA Segment: TIMOTHY 1 From: EMEY EET GLENN OA 28 Sloped Granite 28 Sloped Granite Segment: TIMOTHY 2 From: GLENN OA CHAMPION EET 29 Sloped Granite 29 Sloped Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

81 Length Width Material Condition Curb Type eveal TOWN FOE OA Segment: TOWN FOE From: WINTE EET EA EN 7 Bit. Berm (Standard) 7 TAILE PAK OA Segment: TAILE PAK 1 From: EMEY EET SHAON CICLE 2 2 Segment: TAILE PAK 2 From: SHAON CICLE LISA CICLE 9 9 Segment: TAILE PAK 3 From: LISA CICLE SHAON CICLE Segment: TAILE PAK From: SHAON CICLE LISA CICLE UNION EET Segment: UNION 1 From: CUIE AVENUE UNION EET EXTENSION 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 1 of 7

82 Segment: UNION 2 From: UNION EET EXTENSION Segment: UNION 3 From: AAMS EET Length Width Material Condition Curb Type eveal AAMS EET 3 3 WE MAIN EET Asphalt Mix Vertical Granite Vertical Granite UNION EET EXTENSION Segment: UNION EET EXT From: UNION EET LOCU EET Asphalt Vertical Granite VALE EET Segment: VALE From: PLEASANT EET MILE EET 2 2 VALLEY EET Segment: VALLEY 1 From: CHENUT EET MYTHICAL EET Segment: VALLEY 2 From: MYTHICAL EET CUL E SAC /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 2 of 7

83 Length Width Material Condition Curb Type eveal VENOME EET Segment: VENOME From: SUMME EET WINTE EET Asphalt WALLACE WAY Segment: WALLACE WAY From: EA MAIN EET EA EN WALNUT EET Segment: WALNUT From: LOCU EET LOCU GOVE AVENUE 9 Poor Bit. Berm (Standard) 9 WE HALEY OA Segment: WE HALEY From: HALEY OA NEW HAMPSHIE ATE LINE WE MAIN EET Segment: WE MAIN 1 From: CHUCH EET LITTLES COUT 297 Excellent Vertical Granite Excellent Vertical Granite Segment: WE MAIN 2 From: LITTLES COUT FAIFIEL AVENUE 282 Excellent Vertical Granite 282 Excellent Vertical Granite 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 3 of 7

84 Segment: WE MAIN 3 From: FAIFIEL AVENUE Segment: WE MAIN From: LOCU EET Segment: WE MAIN From: FOE EET Segment: WE MAIN From: UNION EET Length Width Material Condition Curb Type eveal LOCU EET FOE EET 3 3 UNION EET 3 3 OCHA EET Excellent Excellent Excellent Excellent Excellent Excellent Excellent Excellent Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite Vertical Granite WE PAISH LANE Segment: WE PAISH LN 1 From: BICH MEAOW OA CLEMENT PLACE 37 Sloped Granite 37 3 Asphalt Poor Sloped Granite Segment: WE PAISH LN 2 From: CLEMENT PLACE EVENS TEACE Asphalt Poor Segment: WE PAISH LN 3 From: EVENS TEACE CHASE CESCENT 9 9 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

85 Length Width Material Condition Curb Type eveal WE SHOE OA Segment: WE SHOE 1 From: BEA HILL OA COLGAN OA Segment: WE SHOE 2 From: COLGAN OA GEYONE OA 2 2 Segment: WE SHOE 3 From: GEYONE OA WE SHOE OA Segment: WE SHOE From: ALNETTE OA WE SHOE OA Segment: WE SHOE From: WE SHOE OA AHEN CICLE Segment: WE SHOE From: AHEN CICLE EA EN 8 8 WEMINIE OA Segment: WEMINIE From: WE MAIN EET BELLMOE EET /13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

86 Length Width Material Condition Curb Type eveal WHITTIE IVE Segment: WHITTIE From: WE MAIN EET GEENLEAF CICLE WILLOWALE IVE Segment: WILLOWALE 1 From: CHUCH EET WILLOWALE IVE 87 Asphalt Sloped Granite 87 Sloped Granite Segment: WILLOWALE 2 From: WILLOWALE IVE WILLOWALE IVE 198 Asphalt Sloped Granite 198 Sloped Granite WINTE EET Segment: WINTE 1 From: CHUCH EET TOWN FOE OA 181 Asphalt Good Bit. Berm (Standard) 181 Segment: WINTE 2 From: TOWN FOE OA NICHOLS EET 287 Asphalt Poor 287 Segment: WINTE 3 From: NICHOLS EET PINE EET 781 Asphalt eplace 781 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page of 7

87 Segment: WINTE From: PINE EET Segment: WINTE From: POSPECT EET Segment: WINTE From: LINCOLN EET Length Width Material Condition Curb Type eveal POSPECT EET 8 8 LINCOLN EET VENOME EET Asphalt Asphalt Poor WOOLAN EET Segment: WOOLAN 1 From: WE MAIN EET GOVE EET 89 Mix Poor 89 Mix Poor Segment: WOOLAN 2 From: GOVE EET VENOME EET Mix Mix Poor Segment: WOOLAN 3 From: VENOME EET LINCOLN EET Segment: WOOLAN From: LINCOLN EET EA EN 2 2 2/13/218 This ocument is Intended For General Planning and Information Purposes Only. Page 7 of 7

88 of Merrimac, Massachusetts Pavement Management Program Streets Sorted By Street Name, With Striping Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even ABBOTT EET.19 Miles ABBOT SAWYE EET CHUCH EET 22 1,22 AAMS EET.1 Miles AAMS LOCU EET UNION EET AHEN CICLE.1 Miles AHEN CI WE SHOE OA CUL E SAC 2 32 ATTITASH EET.31 Miles ATTITASH 1 EA MAIN EET PLEASANT VIEW OA ATTITASH 2 PLEASANT VIEW OA HILLSIE AVENUE ATTITASH 3 HILLSIE AVENUE MEAOW AVENUE 22 2 ATTITASH MEAOW AVENUE EA EN BATLETT EET.12 Miles BATLETT SCHOOL EET MILL EET 2 71 BATTIS OA.2 Miles BATTIS 1 HIGHLAN OA HUSE OA 18 2, BATTIS 2 HUSE OA GAVEL OA 18 1,7 BEA HILL OA 2.98 Miles BEA HILL 1 EA MAIN EET SPENCE WAY YCL BEA HILL 2 SPENCE WAY HOUSE #1 22 1,12 YCL BEA HILL 3 HOUSE #1 HOUSE #2 22 1,12 YCL BEA HILL HOUSE #2 LANE TEN ACE OA 22 1,12 YCL BEA HILL LANE TEN ACE OA OL BEA HILL OA 22 YCL BEA HILL OL BEA HILL OA OL BEA HILL OA BEA HILL 7 OL BEA HILL OA WE SHOE OA BEA HILL 8 WE SHOE OA LAKEWOOS AVENUE 22 1,2 BEA HILL 9 LAKEWOOS AVENUE OL BEA HILL OA 22 1,91 BEA HILL 1 OL BEA HILL OA HAIMAN OA 22 2,788 BEA HILL 11 HAIMAN OA NEW HAMPSHIE ATE LINE 22 1,73 BELMOE OA.18 Miles BELMOE 1 WEMINIE OA MAPLETON OA /12/218 Page 1 of 1

89 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even BELMOE 2 MAPLETON OA PINEHU EET BILLING EET.21 Miles BILLING IGEFIEL EET EA EN BICH MEAOW OA 1.83 Miles BICH MEAOW 1 WE MAIN EET WE PAISH LANE 2 2,38 BICH MEAOW 2 WE PAISH LANE PAVEMENT CHANGE 2 1,8 BICH MEAOW 3 PAVEMENT CHANGE PAVEMENT CHANGE 2 1,8 BICH MEAOW WE PAISH LANE BICH MEAOW LOOP 2 1,8 BICH MEAOW BICH MEAOW LOOP FINN LANE 2 2 BICH MEAOW FINN LANE HEATH OA 22 1,87 BOA EET.82 Miles BOA 1 EA MAIN EET LANCAE COUT 2 BOA 2 LANCAE COUT MILL EET BOA 3 ON AMP HIGH EET 21 BOA HIGH EET SOUTH PLEASANT EET 2 1,22 BOA SOUTH PLEASANT EET IVE OA BOA HIGH EET CUL E SAC 1 9 BUNSIE LANE.112 Miles BUNSIE LN 1 EMEY EET UNEVEGAN IVE CENTAL EET.128 Miles CENTAL 1 SCHOOL EET CENTAL CENTAL 2 CENTAL 1 GEEN EET 1 2 CHAMPION EET.2 Miles CHAMPION 1 EMEY EET GLENN OA 2 31 CHAMPION 2 GLENN OA TIMOTHY EET CHASE CESCENT.39 Miles CHASE CESCENT 1 NOYES LANE WE PAISH LANE 2 89 CHASE CESCENT 2 WE PAISH LANE EVENS TEACE 2 38 CHASE CESCENT 3 EVENS TEACE NOYES LANE 2 39 CHUCH EET 1.17 Miles CHUCH 1 WINTE EET HANSOM IVE 2 8 CHUCH 2 HANSOM IVE WILLOWALE IVE 2 1,9 CHUCH 3 WILLOWALE IVE NICHOLS EET 28 CHUCH NICHOLS EET ABBOTT EET CHUCH ABBOTT EET MAPLE EET 28 CHUCH MAPLE EET PINE EET /12/218 Page 2 of 1

90 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even CHUCH 7 PINE EET POSPECT EET CHUCH 8 POSPECT EET JUKINS COUT CHUCH 9 JUKINS COUT MECHANICS EET CHUCH 1 MECHANICS EET GOVE EET YCL Bike Lane Bike Lane CHUCH 11 GOVE EET EA MAIN EET YCL Bike Lane Bike Lane CLEMENT PLACE.1 Miles CLEMENT PL WE PAISH LANE EVENS TEACE COLBY EET.3 Miles COLBY CUIE AVENUE EA EN 1 1 CUIE AVENUE.7 Miles CUIE AVE COLBY EET WE MAIN EET 18 3 UNEVEGAN IVE.1 Miles UNEVEGAN 1 BUNSIE AVENUE BUNSIE AVENUE 2 71 EA MAIN EET. Miles EA MAIN 1 LIBETY EET SCHOOL EET EA MAIN 2 SCHOOL EET CHUCH EET 3 18 EMEY EET. Miles EMEY 1 EA MAIN EET TAILE PAK OA 2 39 EMEY 2 TAILE PAK OA BUNSIE LANE 2 9 EMEY 3 OVEPASS CHAMPION EET 2 18 EMEY CHAMPION EET TIMOTHY OA 2 89 EMEY TIMOTHY OA SUNSET TEACE 2 29 EMEY SUNSET TEACE MILE OA 2 29 EQUEIAN WAY.13 Miles EQUEIAN WAY HALEY OA CUL E SAC 2 7 GLENN OA.8 Miles GLENN 1 CHAMPION EET HSE # GEEN EET.177 Miles GEEN 1 LOCU EET CENTAL EET GEEN 2 CENTAL EET SCHOOL EET 28 1 GOVE EET.17 Miles GOVE 1 OCHA EET FOE EET GOVE 2 FOE EET WOOLAN EET GOVE 3 WOOLAN EET SUMME EET 2 92 GOVE SUMME EET CHUCH EET /12/218 Page 3 of 1

91 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even GUNNISON IVE.18 Miles GUNNISON WE MAIN EET NOYES LANE HALEY OA 1.8 Miles HALEY 1 HEATH OA WE HALEY OA 2 3,32 HALEY 2 WE HALEY OA EQUEIAN WAY 2, HALEY 3 EQUEIAN WAY NEW HAMPSHIE ATE LINE HANSOM IVE.13 Miles HANSOM 1 CHUCH EET LANAU LANE 2 77 HANSOM 2 LANAU LANE LANAU LANE 2 1,87 HANSOM 3 LANAU LANE CUL E SAC 2 12 HAIMAN OA.921 Miles HAIMAN 1 BEA HILL OA OL BEA HILL OA HAIMAN 2 OL BEA HILL OA E OAK ACES 22 2,772 HAIMAN 3 E OAK ACES HIGHLAN OA 22 1,22 HEATH BOOK OA.22 Miles HEATH BOOK HEATH OA CUL E SAC 2 1,189 HEATH OA.71 Miles HEATH 1 HALEY OA HEATH BOOK OA 2 1,813 HEATH 2 HEATH BOOK OA HAVEHILL CITY LINE 2 1,9 HEATHE CICLE.8 Miles HEATHE CI SAWYE EET CUL E SAC 2 8 HIGH EET.38 Miles HIGH 1 BOA EET BOA EET 2 32 HIGH 2 BOA EET SOUTH PLEASANT EET 2 1,19 HIGH 3 SOUTH PLEASANT EET IVE OA 2 28 HIGHLAN OA 1.7 Miles HIGHLAN 1 CHUCH EET HAIMAN OA HIGHLAN 2 HAIMAN OA HUSE OA 2 2,1 HIGHLAN 3 HUSE OA BUSH HILL OA 2 2,7 HIGHLAN BUSH HILL OA BATTIS OA 2 1,3 HIGHLAN BATTIS OA NEW HAMPSHIE ATE LINE 2 1,92 HILLSIE AVENUE.2 Miles HILLSIE AVE 1 ATTITASH EET MEIMACK AVENUE 1 78 HILLSIE AVE 2 MEIMACK AVENUE EA EN /12/218 Page of 1

92 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even JUKINS COUT.88 Miles JUKINS CT CHUCH EET EA EN 1 3 LANAU LANE.1 Miles LANAU LN HANSOM IVE HANSOM IVE 2 82 LIBETY EET.3 Miles LIBETY 1 EA MAIN EET MECHANICS EET 18 2 LIBETY 2 MECHANICS EET EN OF PAVEMENT LIBETY 3 EN OF PAVEMENT CHUCH EET LINCOLN EET.13 Miles LINCOLN 1 WOOLAN EET WINTE EET 2 18 LINCOLN 2 WINTE EET SUMME EET 2 7 LITTLE PON OA 1.17 Miles LITTLE PON 1 MEIMAC EET LITTLE PON OA LITTLE PON 2 LITTLE PON OA SPING HILL OA 2 83 LITTLE PON 3 SPING HILL OA SPING HILL OA 2 93 LITTLE PON SPING HILL OA LITTLE PON OA 2 3,8 LOCU GOVE AVENUE. Miles LOCU GOVE AVE MILE EET WALNUT EET LOCU EET.8 Miles LOCU 1 IVE OA LOCU GOVE OA 22 1,322 LOCU 2 LOCU GOVE OA INTEATE HIGHWAY 22 LOCU 3 INTEATE HIGHWAY WALNUT EET LOCU WALNUT EET MILE EET LOCU MILE EET PLEASANT EET 2 1 LOCU PLEASANT EET AAMS EET LOCU 7 AAMS EET GEEN EET LOCU 8 GEEN EET WE MAIN EET 2 3 MAPLE EET.187 Miles MAPLE 1 SAWYE EET SUMME EET MAPLE 2 SUMME EET CHUCH EET MEAOW AVENUE.1 Miles MEAOW AVE 1 ATTITASH EET LAKE AVENUE 1 31 MEAOW AVE 2 LAKE AVENUE PINE BLUFF AVENUE MEAOW AVE 3 PINE BLUFF AVENUE MEIMACK AVENUE 1 33 MEIMAC EET.393 Miles 2/12/218 Page of 1

93 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even MEIMAC 1 IVE OA MYTHICAL EET 32 1,138 MEIMAC 2 MYTHICAL EET LITTLE PON OA 32 2 MEIMAC 3 LITTLE PON OA HAVEHILL CITY LINE MEIMACK AVENUE.11 Miles MEIMACK AVE 1 HILLSIE AVENUE MEAOW AVENUE 1 32 MEIMACK AVE 2 MEAOW AVENUE OAK CICLE MILE OA 1.31 Miles MILE 1 IVE OA PAVEMENT CHANGE 28 2,19 MILE 2 PAVEMENT CHANGE EMEY EET 28 2,19 MILE 3 EMEY EET SUNSET TEACE 28 9 MILE SUNSET TEACE AMESBUY TOWN LINE MILE EET.18 Miles MILE 1 SCHOOL EET VALE EET MILE 2 VALE EET LOCU EET 2 MILL EET.3 Miles MILL 1 SCHOOL EET BOA EET 18 7 MILL 2 BOA EET FEEAL WAY 1 3 MILL 3 FEEAL WAY EA MAIN EET 1 99 MYTHICAL EET.111 Miles MYTHICAL MEIMAC EET VALLEY EET 19 8 NICHOLS EET.29 Miles NICHOLS 1 CHUCH EET SAWYE EET 2 1, NICHOLS 2 SAWYE EET WINTE EET 2 7 NOTH EET.723 Miles NOTH 1 EA MAIN EET EA EN 18 1,7 NOTH 2 IVE OA CUL E SAC 1 2,71 NOYES LANE.28 Miles NOYES LN 1 GUNNISON IVE CHASE CESCENT 2 93 NOYES LN 2 CHASE CESCENT CHASE CESCENT NOYES LN 3 CHASE CESCENT GUNNISON IVE 2 7 OL BEA HILL OA.3 Miles OL BEA HILL 1 HAIMAN OA EA EN 18 1,1 OCHA EET.12 Miles OCHA 1 WE MAIN EET GOVE EET 2 3 2/12/218 Page of 1

94 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even PINE BLUFF AVENUE. Miles PINE BLUFF AVE MEAOW AVENUE EA EN PINE EET.282 Miles PINE 1 CHUCH EET SUMME EET PINE 2 SUMME EET SPING EET PINE 3 SPING EET WINTE EET 22 2 PLEASANT EET.17 Miles PLEASANT 1 LOCU EET VALE EET 2 2 PLEASANT 2 VALE EET SCHOOL EET 2 33 POSPECT HILL.133 Miles POSPECT HILL EA MAIN EET EA EN 1 7 POSPECT EET.27 Miles POSPECT 1 CHUCH EET SUMME EET 2 73 POSPECT 2 SUMME EET SPING EET POSPECT 3 SPING EET WINTE EET 2 89 AILOA AVENUE.77 Miles AILOA AVE CHUCH EET EA EN 1 E OAK ACES.3 Miles E OAK ACES 1 HAIMAN OA E OAK ACES 2 1,227 E OAK ACES 2 (NE) E OAK ACES CUL E SAC 2 3 E OAK ACES 3 (SW) E OAK ACES CUL E SAC 2 39 IGEFIEL EET.19 Miles IGEFIEL 1 PINEHU EET BILLING EET 1 88 IGEFIEL 2 BILLING EET WEMINIE OA 1 17 IVE OA 3.99 Miles IVE 1 AMESBUY TOWN LINE SKUNK OA 22 IVE 2 SKUNK OA BANCOFT LANE 22 2,1 IVE 3 BANCOFT LANE MILE OA IVE MILE OA BOA EET 2 72 IVE BOA EET FIEN EET 2 28 IVE FIEN EET HIGH EET IVE 7 HIGH EET PAVEMENT CHANGE 18 3,718 IVE 8 PAVEMENT CHANGE LOCU EET 18 3,718 IVE 9 LOCU EET MEIMAC EET 18 1, IVE 1 MEIMAC EET HAVEHILL CITY LINE 2 2,99 2/12/218 Page 7 of 1

95 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even SAWYE EET.12 Miles SAWYE 1 PINE EET MAPLE EET SAWYE 2 MAPLE EET HEATHE CICLE SAWYE 3 HEATHE CICLE ABBOTT EET 18 7 SAWYE ABBOTT EET NICHOLS EET SCHOOL EET.3 Miles SCHOOL 1 EA MAIN EET LANCAE COUT 28 2 SCHOOL 2 LANCAE COUT CENTAL EET 2 11 SCHOOL 3 CENTAL EET GEEN EET 2 2 SCHOOL GEEN EET PLEASANT EET 2 33 SCHOOL PLEASANT EET MILE EET 2 73 SCHOOL MILE EET MILL EET SKUNK OA.33 Miles SKUNK IVE OA MILE OA 22 1,8 SOUTH PLEASANT EET.377 Miles SOUTH PLEASANT 1 TANNEY LANE BOA EET 1 8 SOUTH PLEASANT 2 BOA EET FIEN EET 1 28 SOUTH PLEASANT 3 FIEN EET HIGH EET 1 2 SOUTH PLEASANT HIGH EET EA EN 1 81 SPENCE WAY.77 Miles SPENCE WAY BEA HILL OA CUL E SAC 2 7 SPING HILL OA.719 Miles SPING HILL LITTLE PON OA LITTLE PON OA 2 3,79 SPING EET.77 Miles SPING POSPECT EET PINE EET 2 EVENS TEACE.182 Miles EVENS TE 1 WE PAISH LANE CLEMENT PLACE 2 9 EVENS TE 2 CLEMENT PLACE CHASE CESCENT 2 3 SUMME EET.27 Miles SUMME 1 MAPLE EET PINE EET 2 29 SUMME 2 PINE EET POSPECT EET 2 38 SUMME 3 POSPECT EET LINCOLN EET 2 23 SUMME LINCOLN EET VENOME EET SUMME VENOME EET GOVE EET SUNSET TEACE.22 Miles 2/12/218 Page 8 of 1

96 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even SUNSET TE EMEY EET MILE OA 1 1,12 TIMOTHY OA.98 Miles TIMOTHY 1 EMEY EET GLENN OA 2 28 TIMOTHY 2 GLENN OA CHAMPION EET 2 29 TOWN FOE OA.77 Miles TOWN FOE WINTE EET EA EN 2 7 UNION EET.222 Miles UNION 1 CUIE AVENUE UNION EET EXTENSION 1 UNION 2 UNION EET EXTENSION AAMS EET 2 3 UNION 3 AAMS EET WE MAIN EET 2 17 UNION EET EXTENSION.29 Miles UNION EET EXT UNION EET LOCU EET 2 1,22 SWEL SWEL VALE EET.88 Miles VALE PLEASANT EET MILE EET 1 2 VALLEY EET.213 Miles VALLEY 1 CHENUT EET MYTHICAL EET 18 VALLEY 2 MYTHICAL EET CUL E SAC VENOME EET.121 Miles VENOME SUMME EET WINTE EET 2 37 WALNUT EET.179 Miles WALNUT LOCU EET LOCU GOVE AVENUE 18 9 WE HALEY OA.3 Miles WE HALEY HALEY OA NEW HAMPSHIE ATE LINE 18 1,829 WE MAIN EET.3 Miles WE MAIN 1 CHUCH EET LITTLES COUT WE MAIN 2 LITTLES COUT FAIFIEL AVENUE WE MAIN 3 FAIFIEL AVENUE LOCU EET 3 37 WE MAIN LOCU EET FOE EET 3 3 WE MAIN FOE EET UNION EET 3 3 WE MAIN UNION EET OCHA EET 3 97 WE PAISH LANE.1 Miles WE PAISH LN 1 BICH MEAOW OA CLEMENT PLACE 2 37 WE PAISH LN 2 CLEMENT PLACE EVENS TEACE 2 1,17 WE PAISH LN 3 EVENS TEACE CHASE CESCENT 2 9 2/12/218 Page 9 of 1

97 Street Nam From To Width Length Centerline Striping Edgeline Odd Edgeline Even WE SHOE OA.39 Miles WE SHOE 1 BEA HILL OA COLGAN OA 2 1,81 WE SHOE 2 COLGAN OA GEYONE OA 2 2 WE SHOE 3 GEYONE OA WE SHOE OA 2 39 WEMINIE OA.11 Miles WEMINIE WE MAIN EET BELLMOE EET WILLOWALE IVE.1 Miles WILLOWALE 1 CHUCH EET WILLOWALE IVE 2 87 WILLOWALE 2 WILLOWALE IVE WILLOWALE IVE 2 1,98 WINTE EET.72 Miles WINTE 1 CHUCH EET TOWN FOE OA 22 1,81 WINTE 2 TOWN FOE OA NICHOLS EET WINTE 3 NICHOLS EET PINE EET WINTE PINE EET POSPECT EET 22 8 WINTE POSPECT EET LINCOLN EET WINTE LINCOLN EET VENOME EET WOOLAN EET.287 Miles WOOLAN 1 WE MAIN EET GOVE EET WOOLAN 2 GOVE EET VENOME EET 28 WOOLAN 3 VENOME EET LINCOLN EET /12/218 Page 1 of 1

98 of Merrimac Pavement Management ± H A BE ILL SH BU -3 BUSH HILL BU SH H - 2 ILL - 1 BE A H OL 3 BE A HIL L - ILL S LA KE W OO ET ALN LL - 8 HO TS S E W E) BE A HI LL E -1 N E AH AMESBUY CI - 7 E - -3 BATTIS LL BEA HI -1 HA NS OM WALLAC E WAY HS T- 1 HIG - AI N M W ES T BOA -1-3 VE - 1 VE G O - HA O C 1 LN - LE K S TS T E UN SK WE PA I SH 2 - L E MI 1 T- IVE - MI IVE LE - N BA O C L FT N IVE IVE H IEN F G HI PI NE HU - TS N YL NE SO AN AS LE P H UT TAN 2 - E O V LE - H 2 A G HI G -2 N EN GL 2 B O I M - T TS A 3 H T NO BO A S T- U LOC ON PI AM - 1 B O T ET NS I M 1 SCHO OL - 2 LNU WA SU - N- CH L MIL NO YE SL 2 N EN GL T- YS E EM - 3 G O P- 2 LO O W EA O 1 HM I- 2 T- YS E EM NC I- LL MI NC L -1 O A SH O A SH HIL BI C T-1 HS ITAS ATT I - 1 T EC SP 1 T- YS E EM C LISA H T NO O P A 2 1 T- TS US IS TE E FEEAL WAY U 1 B LN- - 1 C LO 3 T EX ET E T NS L MI I NS N - EL IE NS T TT S TLE BA W ES TM IN IO UN -1 2 T- TS US 1 IO UN 1 T- NS 2 T- NS EE LE VA A PLE NT SA G B O LOC T- LS OO - W HI TT IE SCH T- TS US AM A T SS T-1 YS ET LIB LN LN T-1 HS G 1 EEN ION 3 EF IE L NOYE S L NNO YE S 1 UN SC EN T- I G E W AVE IE W SH I PA O E O ME A O B - 2 Y BE LM H 3 - CU BI C VE WA VIE AIN NT PL U MO AF LE EN AS EC - C LO HA E G AN T ES W TH HEA B CH C ES TS T B BU 1 AL NT CE E AV 3 - T HU L AN IEL O C Y T BE LI W OO CT IF FA W EN 9C T- TS US O EA C M LE CH - C LO M IS PA E W 2 GOVE - LI TT LE S HEATH BOOK N - HL CT U ME O FO 3 OCHA - 2 S CH L AN JU IN K - E MM SU W OO 2 T- NS N VE -1 T C PE OS -7 T GS - H CH IN SP E NT WI C BI -1 HA - T-1 U 3 - HEATH O C L AN LIN L CO BI O P - W W - 1 OP T-2 ILL ME AO CH O A ME LO W O S PINE E AV A O AIL CH TE WIN 1 - S PINE 2 - LE MAP AY W E C H BEA Y LE T-3 - A LE MAP S PINE BI CH PLAIOW, NH T BO AB CH H NIC 2 LS O H 1 E- AV -3 EN SP CHU E E WY SA O NF TOW H CK NIC 1 T- SS L O IMA ILL 3 - T-2 HS ITAS ATT H A BE CH E IV - 7 WE NEWBUY -1 GU N NI SO N VE I VE I N Legend 9 PCI IM AC M E LE TT LI PO WE NEWBUY N VALLEY 2 IVE -1-3 UT N CHE AL IC 1 TH MY - ME IMA C -2 2 Not ated 3- Mill Level Overlay -7 Level and Overlay - LIT TLE PO N AMESBUY -3 eclamation - 1 LE TT LI PO IM AC NG I SP LL HI LITTLE P ON - 3 HAVEHILL ME FIE L W U TO N LO WIL CH ING 1 - ME 1 E- AV W E VIE SI L T L HI AN AS PLE 1 - FA ALE VE EA LAK - 2 CHUCH E -1 SH - ATTITA N LA AC EN T E - 1 LL CH HI TE WIN U - 1 A BE CH -3 Y LE -1 A OM NS HA H LN OAK CI AN HL AU SHOE -3 SHO HIG T ES W LA N -1 (N ALNETTE -3 OM NS HA E O AK AC SE 2-1 UNEV EGAN -2 1 ACES- LAN HAIMAN -3 HI E OAK HIGH BATTIS -2 HA LEY - 2 BE A TE WE SHOE - LL AV E HI GEYON E HA IMAN 3 - BE A COLGAN BATTIS N LA NW AY H -1 IG HALE Y - HILL H NEWTON, NH E IA - 1 IM HA LA N HIGHLAN - EQU IT WA Y ASHLEY LN HI GH NL AN MO O 7-8 Overlay 8-9 Crackseal 9-1 efer Maintenance

City of Phoenix Pavement Management System. Ryan Stevens Civil Engineer III Street Transportation Department November 15, 2017

City of Phoenix Pavement Management System. Ryan Stevens Civil Engineer III Street Transportation Department November 15, 2017 City of Phoenix Pavement Management System Ryan Stevens Civil Engineer III Street Transportation Department November 15, 2017 Outline City of Phoenix Street Network Automated data collection Distresses

More information

The State of Michigan Transportation Asset Management Council 2006 PASER Survey Of Shiawassee County

The State of Michigan Transportation Asset Management Council 2006 PASER Survey Of Shiawassee County The State of Michigan Transportation Asset Management Council 2006 PASER Survey Of Shiawassee County Prepared by the Genesee County Metropolitan Planning Commission Staff 1 The State of Michigan Transportation

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data

Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data By: Glenn Locke, GISP, PMP 1 GIS-T May, 2013 Presentation Overview Purpose of Project Methodology

More information

0.143 Hickory Circle

0.143 Hickory Circle Rank Width Leng ROAD NAME Total Feet Miles Cregar Road House 132 to Muni Bound 37.3 20' to 32 0.343 Mill Street McDonald Street to Trail 32.8 20 0.133 Academy Street 32.3 18 0.066 Sunset Drive 32.3 33

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016

Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016 Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016 Presented By Steve Hossack, GIS Database Administrator 2016 Esri User

More information

CDTC s Regional Sidewalk Inventory

CDTC s Regional Sidewalk Inventory CDTC s Regional Sidewalk Inventory Overview CDTC created a GIS-based inventory of existing sidewalk infrastructure in all 77 municipalities within CDTC s planning area. This inventory indicates presence

More information

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Presented By Steve Hossack, GIS Database Administrator 2018 ITE/IMSA Spring Conference Maricopa County

More information

Non-Destructive Pavement Evaluation to Assess Flood Damage in The City of Calgary

Non-Destructive Pavement Evaluation to Assess Flood Damage in The City of Calgary Non-Destructive Pavement Evaluation to Assess Flood Damage in The City of Calgary Venkat Lakkavalli P. Eng., M. Sc. The City of Calgary Alberta, Canada Presented at TAC 2014, Montreal (Karim, M et al.

More information

2016 APWA Snow Conference. Web-based GIS for Municipal Snow Operations

2016 APWA Snow Conference. Web-based GIS for Municipal Snow Operations 2016 APWA Snow Conference Web-based GIS for Municipal Snow Operations Christopher M. Cignoli, P.E. - Director of Public Works, Springfield, MA Bob Houldson - Director IT Services for the Department of

More information

2. Evaluation of Pavement Condition Index (PCI)

2. Evaluation of Pavement Condition Index (PCI) Journal of Engineering Sciences, Assiut University, Vol. 41 No1 pp. - January 2013 DETERIORATION OF EGYPTIAN DESERT ROADS IN AL-MINEA DISTRICT Afaf Mahmoud 1, Hassan Y. Ahmed 2, Ayman M. Othman 3 1 Civil

More information

Integration of Geographic Information System (GIS) and PAVER System Toward Efficient Pavement Maintenance Management System (PMMS)

Integration of Geographic Information System (GIS) and PAVER System Toward Efficient Pavement Maintenance Management System (PMMS) Jordan Journal of Civil Engineering, Volume 12, No. 3, 2018 Integration of Geographic Information System (GIS) and PAVER System Toward Efficient Pavement Maintenance Management System (PMMS) Mohammed Taleb

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

RIVA to GeoDatabase Mapping

RIVA to GeoDatabase Mapping RIVA to GeoDatabase Mapping Summary The City of Prince George has recently updated the Database Schema for all GIS feature Classes in order to better suit the needs of our CMMS application (CityWorks).

More information

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION 1 SNOW CONTROL OPERATIONS The following are the standard operating procedures f snow removal operations. 1. Plowing operations

More information

System Mapping Case Studies

System Mapping Case Studies System Mapping Case Studies 1. Madison Getting Started Three Step Approach 2. Rocky Hill Maximizing resources 3. Putman Boots on the ground CT Map Rocky Hill Putnam Madison Madison Community Profile Getting

More information

Pavement Preservation Strategy Selection

Pavement Preservation Strategy Selection Pavement Preservation Strategy Selection By R. Gary Hicks and Ding Cheng California Pavement Preservation (CP2) Center California State University, Chico Prepared for NCPP Nashville TN August 2012 CP2C

More information

Puerto Rico Transportation Asset Management Plan

Puerto Rico Transportation Asset Management Plan Puerto Rico Transportation Asset Management Plan PR-TAMP April 12, 2018 April 12, 2018 The Project Team Gordon Proctor Shobna Varma Jose Carro, P.E. Zaida Rico, P.E., Ph.D. gordon@proctorassociates.com

More information

Committee Meeting November 6, 2018

Committee Meeting November 6, 2018 Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan

More information

Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum #3 Prioritization. July 23, P age

Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum #3 Prioritization. July 23, P age Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum 3 Prioritization July 23, 2015 1 P age Contents Introduction... 3 Project Definition... 3 Prioritization Criteria and Data

More information

TRAVEL DEMAND MODEL. Chapter 6

TRAVEL DEMAND MODEL. Chapter 6 Chapter 6 TRAVEL DEMAND MODEL As a component of the Teller County Transportation Plan development, a computerized travel demand model was developed. The model was utilized for development of the Transportation

More information

Town of Windsor. Department of Public Works

Town of Windsor. Department of Public Works Town of Windsor Department of Public Works 860.285.1855 TOWN OF WINDSOR PUBLIC WORKS SNOW REMOVAL PLAN In Windsor, as throughout the New England states, winter can bring a variety of weather conditions

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

APPENDIX I: Traffic Forecasting Model and Assumptions

APPENDIX I: Traffic Forecasting Model and Assumptions APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan.

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

HPMS Rule on Collecting Pavement Condition Data. Roger Smith Sui Tan

HPMS Rule on Collecting Pavement Condition Data. Roger Smith Sui Tan HPMS Rule on Collecting Pavement Condition Data Roger Smith Sui Tan Final Rule Issued January Affects Local agencies that have non-state NHS roads/ street For which you report HPMS data to Caltrans 2 Final

More information

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS Typical ADT (Average Daily Traffic) UAL COUNTY OADWAY STANDADS AND SPECIFICATIONS Local oad A Local oad B Local oad C Minor Collector Major Collector Arterial 0-120 120-600 600-1,500 1,250-5,000 >4,500

More information

How GIS Can Help With Tribal Safety Planning

How GIS Can Help With Tribal Safety Planning How GIS Can Help With Tribal Safety Planning Thomas A. Horan, PhD Brian Hilton, PhD Arman Majidi, MAIS Center for Information Systems and Technology Claremont Graduate University Goals & Objectives This

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

Policy Title: Snow Removal & Ice Control Policy #: PW

Policy Title: Snow Removal & Ice Control Policy #: PW Village of Fruitvale Corporate Policy Manual Policy Title: Snow Removal & Ice Control Policy #: PW-2012-01 Section: PUBLIC WORKS Initially Approved: 2012 06 04 Last Reviewed: 2013 05 06 Council Approval:

More information

GIS ANALYSIS METHODOLOGY

GIS ANALYSIS METHODOLOGY GIS ANALYSIS METHODOLOGY No longer the exclusive domain of cartographers, computer-assisted drawing technicians, mainframes, and workstations, geographic information system (GIS) mapping has migrated to

More information

Country Residential High and Low Density Areas

Country Residential High and Low Density Areas Country Residential Low Density Subject Area HIGHWAY 16 SHERWOOD PARK HIGHWAY HIGHWAY 21 AIR PHOTO Country Residential Low Density Area Subject Area PLANNING & DEVELOPMENT SERVICES Drawn By: M.Fraser Date

More information

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING 1. Snow Removal Procedures Steven Lang 2. 2020 Budget Streets & Highways Tom Dankert

More information

Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems

Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems Esri Canada Infrastructure Asset Management Leadership Forum November 1, 2017 Toronto, ON David Loukes, P. Eng., FEC Andy

More information

Creating a Pavement Management System Using GIS

Creating a Pavement Management System Using GIS Christopher Castruita PPD 631 Prof. Barry Waite & Prof. Bonnie Shrewsbury Creating a Pavement Management System Using GIS Problem Definition As is the case with many cities, the city of La Cañada Flintridge

More information

Office of Enterprise Technology

Office of Enterprise Technology Office of Enterprise Technology Transforming the Maricopa Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System January 21, 2016 Presented By Steve Hossack, GIS Database

More information

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814 Final City of Colusa STREETS & ROADWAYS MASTER PLAN October 2009 660 J Street Suite 390 Sacramento, CA 95814 TABLE OF CONTENTS I. INTRODUCTION... 1 Report Organization...1 II. ANALYSIS METHODOLOGY... 2

More information

TOWN OF BASALT SNOW MANAGEMENT PLAN

TOWN OF BASALT SNOW MANAGEMENT PLAN TOWN OF BASALT SNOW MANAGEMENT PLAN Introduction Snow management in the Town of Basalt is the responsibility of the Department of Public Works. The overall goal is the restoration of clear, passable pavement

More information

TRAFFIC FORECAST METHODOLOGY

TRAFFIC FORECAST METHODOLOGY CHAPTER 5 TRAFFIC FORECAST METHODOLOGY Introduction Need for County-Level Traffic Forecasting 2030 HC-TSP Model Methodology Model Calibration Future Traffic Forecasts Hennepin County Transportation Systems

More information

GIS Data and Technology to Support Transportation & MPO Decision-Making & Planning. using an Eco-Logical* Approach within the Kansas City Region

GIS Data and Technology to Support Transportation & MPO Decision-Making & Planning. using an Eco-Logical* Approach within the Kansas City Region GIS Data and Technology to Support Transportation & MPO Decision-Making & Planning using an Eco-Logical* Approach within the Kansas City Region Authors (in alphabetical order): Tom Gerend, Tom Jacobs,

More information

The Winter of Zero Visibility

The Winter of Zero Visibility The Winter of Zero Visibility Tom Reynolds & Shawn Patterson Town of Marshfield, MA Marc Valenti Town of Lexington, MA Insert Marshfield Picture Here Daniel Nee City of Boston, MA Who is: Town of Lexington

More information

H. R heading to fund the award and oversight by the Administrator of grants made under this heading. FEDERAL HIGHWAY ADMINISTRATION

H. R heading to fund the award and oversight by the Administrator of grants made under this heading. FEDERAL HIGHWAY ADMINISTRATION H. R. 1 92 heading to fund the award and oversight by the Administrator of grants made under this heading. FEDERAL HIGHWAY ADMINISTRATION HIGHWAY INFRASTRUCTURE INVESTMENT For an additional amount for

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

TOWN OF WINDSOR SNOW CONTROL PLAN

TOWN OF WINDSOR SNOW CONTROL PLAN TOWN OF WINDSOR SNOW CONTROL PLAN 2013-2014 Revised 10/30/13 WCS Page 1 TOWN OF WINDSOR SNOW CONTROL PLAN GOAL One of the primary goals of the Public Works Department is to provide for the safe and orderly

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 April, 2017 FISCAL YEARS 2018-2021 MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM FOR THE GRAND FORKS - EAST GRAND FORKS METROPOLITAN

More information

Oklahoma GIS for GeoCIP

Oklahoma GIS for GeoCIP GeoCIP Program Partners Oklahoma GIS for GeoCIP A Center for Spatial Analysis Report to Oklahoma GI Council 6 November 2009 The CSA team Kathy Hines Tran Trung Semiha Caliskan Peter Camili Scott March

More information

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z)

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z) MULTNOMAH COUNTY 1620 SE 190th Avenue Portland, OR 97233 (503) 988-5050 PCI by Section - District 4 (A to Z) PCI for Maintenance District 4 (A to Z) Number Name Funct. Class Surface Type Begin Location

More information

Town of Oconomowoc Snow & Ice Control Policy

Town of Oconomowoc Snow & Ice Control Policy Town of Oconomowoc Snow & Ice Control Policy Introduction The purpose of this policy is to provide a detailed overview of the Town s snow & ice control operations including its goals and objectives. All

More information

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish

More information

Pavements. CP2 Center CA PP Conference

Pavements. CP2 Center CA PP Conference Treatment t Selection for Flexible Pavements By R. Gary Hicks CP2 Center CA PP Conference April 9, 2008 Outline of Presentation What is Treatment Selection? Why use Treatment Selection? Example of the

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

Linear Referencing in Boulder County, CO. Getting Started

Linear Referencing in Boulder County, CO. Getting Started Linear Referencing in Boulder County, CO Getting Started 1 Authors Janie Pierre GIS Technician, Boulder County Road centerline and storm sewer geodatabases & maps John Mosher GIS Specialist, Boulder County

More information

Analysis of Rutting and Roughness Distresses in PCC Pavements Overlaid with Asphalt Concrete

Analysis of Rutting and Roughness Distresses in PCC Pavements Overlaid with Asphalt Concrete Analysis of Rutting and Roughness Distresses in PCC Pavements Overlaid with Asphalt Concrete Kavussi, A. Associate Professor, Tarbiat Modares University, Tehran, Iran SYNOPSIS Concrete slab pavements overlaid

More information

TOWN OF GRAND FALLS WINDSOR

TOWN OF GRAND FALLS WINDSOR TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned

More information

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA)

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) June 18, 2012 Evaluation of De-Icing and Anti-Icing Technologies OPERA Project Number: 2010-2 Project Sponsor:

More information

Enterprise Linear Referencing at the NYS Department of Transportation

Enterprise Linear Referencing at the NYS Department of Transportation Enterprise Linear Referencing at the NYS Department of Transportation One Highway Network to Support Many Business Processes May 9, 2018 May 9, 2018 2 Agenda An overview of Linear Referencing How NYSDOT

More information

SYSTEMATIC EVALUATION OF RUN OFF ROAD CRASH LOCATIONS IN WISCONSIN FINAL REPORT

SYSTEMATIC EVALUATION OF RUN OFF ROAD CRASH LOCATIONS IN WISCONSIN FINAL REPORT SYSTEMATIC EVALUATION OF RUN OFF ROAD CRASH LOCATIONS IN WISCONSIN FINAL REPORT DECEMBER 2004 DISCLAIMER This research was funded by the Wisconsin Department of Transportation. The contents of this report

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study.

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study. 2 Road Network 2.1 Existing Road Network The existing transport network in National Capital Region is radial in nature. It comprises of expressways, national highways, state highways, major district and

More information

2010/2011 Winter Weather Summary

2010/2011 Winter Weather Summary 2010/2011 Winter Weather Summary Number of Days of Snow Alerts* Precipitation Snow Rain October 0 6 Trace.91 inches November 0 16 1.1 inches.47 inches December 2 20 17.9 inches 1.54 inches 7.5" first alert

More information

City of Hailey Public Works - Street Division

City of Hailey Public Works - Street Division City of Hailey Public Works - Street Division Snow Removal Policy 2015-2016 PRESEASON The Public Works Department s primary objective during the winter storm season is to provide safe transportation, emergency

More information

MS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG

MS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG MS4: MAPPING CHALLENGES Mike Towle Associate Planner, WestCOG mtowle@westcog.org Please contact or attribute author before using any images or data from this presentation Overview I. Theory and background

More information

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,

More information

MODELING OF 85 TH PERCENTILE SPEED FOR RURAL HIGHWAYS FOR ENHANCED TRAFFIC SAFETY ANNUAL REPORT FOR FY 2009 (ODOT SPR ITEM No.

MODELING OF 85 TH PERCENTILE SPEED FOR RURAL HIGHWAYS FOR ENHANCED TRAFFIC SAFETY ANNUAL REPORT FOR FY 2009 (ODOT SPR ITEM No. MODELING OF 85 TH PERCENTILE SPEED FOR RURAL HIGHWAYS FOR ENHANCED TRAFFIC SAFETY ANNUAL REPORT FOR FY 2009 (ODOT SPR ITEM No. 2211) Submitted to: Ginger McGovern, P.E. Planning and Research Division Engineer

More information

Census and USGS: Bringing Improved TIGER to The National Map. Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS

Census and USGS: Bringing Improved TIGER to The National Map. Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS Census and USGS: Bringing Improved TIGER to The National Map Jennie Karalewich-Census Andrea Johnson- Census Dick Vraga- USGS USGS and the Census Bureau Since 1880 there has been a close working relationship

More information

Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works

Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works 1. The Town is responsible for the removal of snow and providing ice control on Town streets as well as road to the

More information

Dunn County Snow Removal Policy

Dunn County Snow Removal Policy Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern

More information

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,

More information

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT Planning and Development Department 14 North Street Claremont, New Hampshire 03743 Ph: (603) 542-7008 Fax: (603) 542-7033 Email: cityplanner@claremontnh.com www.claremontnh.com CLAREMONT MASTER PLAN 2017:

More information

GIS Geographic Information Systems

GIS Geographic Information Systems GIS Geographic Information Systems Connecting your Community Ruekert Mielke WAUKESHA WHO WE ARE DATE ESTABLISHED 1946 SERVING LOCAL PEOPLE. SOLVING LOCAL PROBLEMS. TYPE OF ORGANIZATION Ruekert & Mielke,

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Drexel Woods Homeowner s Association, Inc Baltimore National Pike, Box 158 Catonsville, MD 21228

Drexel Woods Homeowner s Association, Inc Baltimore National Pike, Box 158 Catonsville, MD 21228 Drexel Woods Homeowner s Association, Inc. 6400 Baltimore National Pike, Box 158 Catonsville, MD 21228 Request for Proposal Landscaping and Snow Removal Contract Organizational Overview Drexel Woods Homeowner

More information

COUNCIL POLICY BACKGROUND

COUNCIL POLICY BACKGROUND COUNCIL POLICY Policy Title: Snow and Ice Control Policy Policy Number: TP004 Report Number: TTP2003-39, C2007-44, LPT2011-57 Approved by: City Council Effective Date: Interim policy approved 2009 December

More information

MEMORANDUM (DRAFT) DRAFT

MEMORANDUM (DRAFT) DRAFT 117 Commercial St. NE, Suite 310 Salem, OR 97301 503.391.8773 www.dksassociates.com MEMORANDUM (DRAFT) DATE: February 15, 2017 TO: FROM: SUBJECT: Alex Dupey, MIG Scott Mansur, PE, PTOE; Garth Appanaitis,

More information

City of Manassas Department of Public Works Snow Removal Plan September 2016

City of Manassas Department of Public Works Snow Removal Plan September 2016 City of Manassas Department of Public Works Snow Removal Plan September 2016 City of Manassas Department of Public Works Snow Removal Plan September 2016 Purpose To outline priorities and processes for

More information

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board Investigation of Hot Mix Asphalt Surfaced Pavements Skid Resistance in Maryland State Highway Network System By Wenbing Song, Xin Chen, Timothy Smith, and Adel Hedfi Wenbing Song MDSHA, Office of Material

More information

City of Laramie, Wyoming SNOW AND ICE POLICY

City of Laramie, Wyoming SNOW AND ICE POLICY City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and

More information

Boone County GIS has the right to inquire about and investigate the use of any requested products and deny access to anyone based on concerns relating to privacy, security, public health, public safety,

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

BRUNSWICK COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1

BRUNSWICK COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1 North Carolina State Highway Patrol Coastal Evacuation Plan 1 Contact Information for Emergency Management Director and EOC Contact Address Telephone Number Brian Watts Building C 3325 Old Ocean Hwy. Bolivia,

More information

Louisiana Transportation Engineering Conference. Monday, February 12, 2007

Louisiana Transportation Engineering Conference. Monday, February 12, 2007 Louisiana Transportation Engineering Conference Monday, February 12, 2007 Agenda Project Background Goal of EIS Why Use GIS? What is GIS? How used on this Project Other site selection tools I-69 Corridor

More information

SNOWPLOWING/ICE CONTROL POLICY

SNOWPLOWING/ICE CONTROL POLICY SNOWPLOWING/ICE CONTROL POLICY BACKGROUND: The Town of White Bear, Minnesota, finds that in the best interest of the residents of the Town to assume basic responsibility for the control of snow and ice

More information

City of Manassas Department of Public Works Snow Removal Plan September 2018

City of Manassas Department of Public Works Snow Removal Plan September 2018 City of Manassas Department of Public Works Snow Removal Plan September 2018 City of Manassas Department of Public Works Snow Removal Plan September 2018 Purpose To outline priorities and processes for

More information

of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south.

of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south. Page 312 of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south. (Code 1980, 26-133; Code 2003, 22-267) Secs. 46-310

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

Community and Infrastructure Services Committee

Community and Infrastructure Services Committee REPORT TO: DATE OF MEETING: November 7, 2016 Community and Infrastructure Services Committee SUBMITTED BY: Cynthia Fletcher, Interim Executive Director INS 519-741- PREPARED BY: WARD(S) INVOLVED: 2600

More information

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement The scope of work that follows incorporates and covers

More information

GIS SERVICE CENTER MAP ORDER FORM

GIS SERVICE CENTER MAP ORDER FORM Steven V. Stenger County Executive Pam Reitz Director of Administration GIS SERVICE CENTER MAP ORDER FORM 1. Print this form. 2. Fill out the form calculate and include the total cost of your order. 3.

More information

DOWNTOWN SUB-AREA. Final Parking Study. Prepared for: City of Bellingham. March Prepared by:

DOWNTOWN SUB-AREA. Final Parking Study. Prepared for: City of Bellingham. March Prepared by: Final Parking Study DOWNTOWN SUB-AREA Prepared for: City of Bellingham March 2013 Prepared by: 11730 118 th Avenue NE, Suite 600 Kirkland, WA 98034-7120 Phone: 425-821-3665 Fax: 425-825-8434 www.transpogroup.com

More information

Snow and Ice Removal

Snow and Ice Removal Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,

More information

Hari Priya Pemmaraju Venkata NRS 509 November, 28th 2005

Hari Priya Pemmaraju Venkata NRS 509 November, 28th 2005 Hari Priya Pemmaraju Venkata NRS 509 November, 28th 2005 Geographic Information System for Pavement Management Pavements are one of the critical elements of the highway transportation infrastructure in

More information

Date: March 31, 2014 PATE; fyril 2.3,2 >H

Date: March 31, 2014 PATE; fyril 2.3,2 >H aj BRAMPTON fifs Rower City XH-l-f r.t "»* City Council The Corporation of the City of Brampton SRAMPTON CITY COUNCIL Date: March 31, 2014 PATE; fyril 2.3,2 >H File: POO GR VisWhtoJed ^t'th-meeh'^a Subject:

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

Aerial Photograph-Based Pavement Surface Distress Detection and Evaluation

Aerial Photograph-Based Pavement Surface Distress Detection and Evaluation Aerial Photograph-Based Pavement Surface Distress Detection and Evaluation César Hernández Gracia Antonio Sahuquillo Piñero AF2913-Road Construction and Maintenance Table of Contents 1. Introduction 2.

More information

CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised

CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY Revised 12-7-17 In order for a snow and ice removal program to be effective, a written policy must be established. This policy will guide personnel of the Street

More information

City of Pittsfield. Snow and Ice Control Plan

City of Pittsfield. Snow and Ice Control Plan City of Pittsfield Snow and Ice Control Plan Overall Program The City of Pittsfield encompasses 42.5 square miles and has a population of approximately 45,000 people. The City is responsible for snow and

More information