1 Monitoring and measurement techniques on water fluxes and sediment export in dryland ecosystems Project by: all SESAMs Bedload sampling station A bedload trap was installed within the Ribera Salada Catchment (Pre-Pyrenees, Spain) by the SESAM partners from the University of Lleida and from the Forestry Centre of Catalonia (Prof. Ramon Batalla and colleagues) in July 2005 in the middle reaches of the catchment (with a contributing area of around 100 km 2 ). The station is composed of three automatic bedload pit traps, a NEP-390-CBL Turbidity probe, an ISCO-3700 automatic sampler with 24 1-litre sample bottles and a water level actuator, and a water level sensor. The bedload trap was installed to enable a continuous measurement of bedload flux for single rainstorm events with a sampling period of at least five hours. The bedload trap consists of a concrete structure which contains a metal box with a capacity of 0.22 m 3 supported on top of a water pillow (MSC Survival), which records the increase by weight of the entering bedload and transmits it by a means of a pressure sensor (PTX-1730) to a Campbell CR1000 data-logger. Sediment capacity of each trap is around 330 kg (submerged weight). Recording interval is 5 minutes. Pit traps have been preliminary calibrated and fully operate since mid-november 2005, together with the rest of the instrumentation. A water temperature sensor was installed during December Figure 1 displays photographs of the installation of the sediment transport station, with particular attention to the bedload pit trap. The specific design of the bedload trap was based on previous works done by Garcia et al. (2000). Besides permanent instrumentation, sediment transport devices will be deployed from the bridge above the station during floods to complement the automatic sediment transport records. Bedload will be measured by means of a 76 kg 152 mm-intake Helley- Smith Sampler and suspended sediment by means of a US DH-74 depth integrated sampler (for details see Vericat and Batalla 2005). Figure 1: Installation of the bedload trap at the Ribera Salada Watershed Figure 2 shows the bedload sampling station in progress, as inspected during a field excursion with a group of students in September

2 Figure 2: Functioning of the bedload trap (from left to right: traps after a flood event, entire sampling station with equipment in metal box to the right side of the picture, filled traps with open lid) References: Garcia, C., Laronne, J. B., and Sala, M., 2000, Continuous monitoring of bedload flux in a mountain gravel-bed river: Geomorphology, v. 34, p Vericat, D. and Batalla, R. J., (2005). Sediment transport in a highly regulated fluvial system during two consecutive floods (lower Ebro River, NE Iberian Peninsula): Earth Surface Processes and Landforms, v. 30, p Water-stage sediment sampler Three water-stage sediment samplers were installed within the Bengue Basin in Brazil in The samplers enable the measurement of suspended sediments in the river water with sediment concentration being measured at different depths of water flow inside the river. The sampler is specifically designed for flow events in dryland, ephemeral rivers where runoff occurs only a few times each year. The samplers were constructed within the workshops of the GFZ (Geoforschungszentrum Potsdam). Figure 3 shows photographs of an installed sampler: the metal sampler holder in the dry, ephemeral riverbed, the box containing 15 sampling bottles, and the numbered sediment sampling bottles. Figure 3: Automatic sediment sampler, left: dry riverbed, middle: sampling box, right: individual bottles The water-stage sediment sampler needs to be emptied and reset after each flood event, which might become problematic if no local agency is available to do so consistently. Other problems included nesting of insects in the box (especially after extended periods without runoff) and the clocking of the tubes leading to the sampling bottles with organic litter. Water discharge, suspended sediment and turbidity data: A turbidity meter was installed in July 2005 at the outlet of the Isabena Catchment (at the gauging station Capella, no. 47 of the Ebro Water Authorities), as depicted in Figure 4, which enables the continuous measurement of turbidity with a temporal resolution of 15 minutes. The device is a NEP- 390-CBL Turbidity probe NTU (-2.5 v to * 2.5 v dc). Data is collected by means of Campbell CR10X data-logger. At the same location, an ISCO-3700 Sampler with water level actuator 2

3 was installed that takes up to 24 1-litre water samples for a single flood event. Direct water samples are regularly taken to support the calibration of the turbidity and automatic sampler measurements. Figure 4: Capella Station: Turbidimeter probe and ISCO-3700 sampler Figure 5: Flood event at the Capella Station with substantial sediment transport on Temporary sediment storage in dryland riverbeds The temporary sediment storage along the Isabena River (Pre-Pyrenees, north-east Spain) was assessed with a simple technique after Hilton and Lisle (1993) for 78 cross-sections along a river stretch of about 33 km. The technique as shows in Figure 6 was applied to determine the role and the order of magnitude of in-channel storage in the annual sediment budget of the catchment. The total storage volume allows then the estimation of the residence time of fine sediments in the river system. Figure 6: Spatial sampling procedure of temporary river storage (after Hilton and Lisle 1993) The following methodology was employed during the sampling of the sediment storage: 1. Sampling interval of cross-sections: metres 3

4 2. Record station number, GPS location while standing at bankful level on the right side of the river (looking downstream, European Datum 1950 UTM Zone 30N) 3. Record approximate width, depth and form at bankful discharge (sketch river stretch) 4. Start survey of sediment storage at the right side of the river, at bankful level 5. Along 1-metre intervals (horizontal line) record perpendicular to the flow direction: a) sampling interval in metres, b) sampling interval covered with water: yes/no, c) % fraction of fine sediments, d) 5 measurements of the height (in cm) of the sediment layer (from right to left), every 20 cm, using the graduated steel bar. The high-resolution height measurements of sediment thickness in the riverbed can then be transformed to sediment volume or mass (per unit metre width of the cross-section) to obtain estimates for the mass of sediment stored in a river stretch. The high spatial resolution data on riverbed storage volume can then be related to estimates of riverbed slope, shape, geological, geomorphological and cross-sectional characteristics along the longitudinal profile of the river to study geospatial units and pattern formation of the river system. Figure 7a shows as an example an ephemeral river stretch in which sediment from upslope badland areas was deposited after a large rainstorm event; Figure 7b shows two students at a typical river cross-section during the field campaign. Figure 7: Temporary sediment storage and its measurement in the ephemeral riverbed of the Isabena Catchment Publications: Hilton, Sue; Lisle, Thomas E Measuring the fraction of pool volume filled with fine sediment. Research Note PSW-RN-414. Albany, California: Pacific Southwest Research Station, Forest Service, U.S. Department of Agriculture. 11 p. available online. Infiltration measurements with hood-infiltrometer Infiltration measurements were carried out on badland formations, agricultural fields and abandoned fields in the Isabena Catchment (Pre-Pyrenees, Spain) to obtain information on the saturated hydraulic conductivity of different soils. For the soil hydraulic measurements, a hood infiltrometer (UGT Müncheberg) was used consisting of an infiltration vessel, a U-tube-manometer, 2 hoods and cover bag. The advantage of the hood infiltrometer in comparison to other infiltration measurement devises is its minimal disturbance of the soil matrix and its small water requirement. The infiltration is done by placing a circular shaped hood filled with water directly on the soil surface. Thus, no contact layer on the soil surface is necessary. The pressure head in the water filled hood is regulated by a Mariotte water supply. The effective pressure head at the soil surface can be adjusted between zero and any negative pressure up to the bubble point of the soil. The pressure head and the bubble point can be measured directly via an U-pipe manometer and the stand pipe of the hood. For calculation of the hydraulic conductivity after Wooding s equation (Wooding 1968, steady state infiltration) two hoods are used with a ratio of 2 : 1 in terms of the covered infiltration area at the soil surface. Wherever possible, the measurement was repeated at a depth of 30 cm below the soil surface. In addition, a soil sample was taken with a 100 cm³ ring cylinder at most sample sites to estimate bulk density and 4

5 particle size distribution. The saturated soil hydraulic conductivity can be calculated by using equations proposed by Gardener (1958) and Wooding (1968), also described in UGT (2004). Figure 8: Hood-infiltrometer measurements in the Isabena Catchment Measurements on the badland slopes proved to be difficult in the field, as the hood has to be set up in a horizontal position. On the badlands this could only be assured measuring on a ridge or by levelling the soil which disturbs natural soil surface conditions. Durations of individual measurements varied between 1 and 6 hours. The measured values for hydraulic conductivities were highly variable even for similar soil and vegetation cover conditions, which can be either explained by the high heterogeneity of dryland soils, or by the complicated installation and handling of the equipment. References: Appel, K. (2006) Characterisation of badlands and modelling of soil erosion in the Isábena watershed, NE Spain. Charakterisierung und Modellierung von Bodenerosion auf Badlands im Isábena- Einzugsgebiet, NO-Spanien. Unpublished Diplomarbeit, University of Potsdam, Germany Gardner, W.R. (1958): Some steady-state solutions of unsaturated moisture flow equations with application to evaporation from a water table. In: Soil science 85, Wooding, R.A. (1968): Steady infiltration from a shallow circular pond. In: Water Resources Research 4, UGT (2004) Bedienungsanleitung für das Haubeninfiltrometer. Umweltgerätetechnik GmbH. Müncheberg. River characteristics To enable the parameterisation of process-based river transport models, a spatial distributed data set on water flow and sediment-transport characteristics were collected for ten river stretches along the Isabena River (Pre-Pyrenees, Spain) ranging from very narrow, turbulent mountain to very wide, shallow lowland stretches. Data for the following parameters were collected: Detailed cross-section and longitudinal slope profiles Flow velocity measurements for the determination of Manning s n Riverbed gradation Vegetation type and cover inside and surrounding the river stretch Water temperature and oxygen content 1. River survey Cross-sections were surveyed with a high-precision total station with an interval of minimum 0.25 metres, and information on current water depth, bankful depth, and flood-prone areas were taken. The longitudinal height profile over a distance of 6 30 channel widths in length were measured for the derivation of slope estimates. 5

6 2. Measurement of flow velocity Flow velocity was measured with an OTT C2 small current meter followed the very detailed procedure of Harrelson et al At least readings were taken for each river cross-section with an interval of 0.25 to 100 cm. Each reading lasted at least 40 seconds and was taken at a depth of 0.6 times the total depth of current water level. 3. Riverbed gradation was estimated following two methods described by Harrelson et al and Kondolf et al. 2003: a) Photographic method: at one to three locations at each cross-section, a photograph was taken from a height of approximately metres with scale in the picture. Additionally, soil samples of finer sediments were collected and analysed in the laboratory for their particle size distribution. 6

7 b) Wolman-Pebble count (1954): For each cross-section, a 100-sample pebble count was carried out using the random step-toe procedure. Samples on particle size were drawn randomly by wading through the river section close to the previously survey cross-section, and drawing the particles that are closest to the toe of the collector s wader. The intermediate axes of the particle was measured (neither the longest nor shortest of the three mutually perpendicular sides of each particle picked up). If distinctly different homogenous facies exist, each facie was sampled individually. Particles were categorised by using Wentworth size classes in which the size doubles with each class (2, 4, 8, 16, 32, etc.) or smaller class intervals based on 1/2 phi values. The method is very well described in Harrelson et al. (1994). Data analysis on particle size distribution was carried out using the statistical methods by Bunte and Abt (2001). 4. Characterisation of river reach: Each river reach was classified according to the scheme of Montgomery and Buffington (1997) and Rosgen (1997). Montogmery and Buffington (1997) classified channel-reach morphology in mountain drainage basins into seven distinct reach types mainly as a function of sediment-transport and flow dyanmic characteristics: colluvial, bedrock, and five alluvial channel types (cascade, step pool, plane bed, pool riffle, and dune ripple). Their classification is based on a coupling of reach-level channel processes with the spatial arrangement of reach morphologies, their links to hillslope processes, and external forcing by confinement, riparian vegetation, and woody debris. Rosgen (1994) categorises rivers according to morphological stream characteristics such as entrenchment, gradient, width/depth ratio, sinuosity, bed material and landforms (Figure 9 and Figure 10). 7

8 Figure 9: Rosgen classification by pattern, profile and dimension (Rosgen 1994) Figure 10: Rosgen classification by bed material and cross-section characteristics (Rosgen 1994) In addition, following a rather descriptive approach, for each cross-section the dominant vegetation inside and along the river was determined as well as the % vegetation cover inside the main channel. Water temperature and oxygen content was measured with a multi-sensor device. 8

9 References Bunte, Kristin; Abt, Steven R Sampling surface and subsurface particle-size distributions in wadable gravel-and cobble-bed streams for analyses in sediment transport, hydraulics, and streambed monitoring. Gen. Tech. Rep. RMRS-GTR-74. Fort Collins,CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Research Station. 428 p. available online. Harrelson, C. C., C. L. Rawlins, J. P. Potyondy (1994) Stream channel reference sites: An illustrated guide to field technique. United States Department of Agriculture. Forest Service General Technical Report RM-245. available online. Kondolf, G. M., T. E. Lisle, G. M. Wolman (2003) Bed Sediment Measurement in: Tools in fluvial geomorphology edited by G. M. Kondolf and Herve Piegay, Wiley, Chichester Montgomery, D. R. and J. M. Buffington (1997) Channel-reach morphology in mountain drainage basins. GSA Bulletin 109 (5), p Rosgen, D. L., A classification of natural rivers. CATENA 22 (1994):

Quantification of the temporal storage at characteristic cross-sections at the Isabena river in the Pre-Pyrenees of Spain Anita Becker

Quantification of the temporal storage at characteristic cross-sections at the Isabena river in the Pre-Pyrenees of Spain Anita Becker Quantification of the temporal storage at characteristic cross-sections at the Isabena river in the Pre-Pyrenees of Spain Anita Becker Tutor: Dr. Eva-Nora Müller Co-tutor: Dr. Ramon J. Batalla Villanueva

More information

Business. Meteorologic monitoring. Field trip? Reader. Other?

Business. Meteorologic monitoring. Field trip? Reader. Other? Business Meteorologic monitoring Field trip? Reader Other? Classification Streams Characterization Discharge measurements Why classify stream channels? Why Classify Stream Channels? Provides a common language

More information

Stream Classification

Stream Classification Stream Classification Why Classify Streams? Communication Tool Describe Existing Conditions & Trends Describe Restoration Goals Research Tool Morphologic Stream Classification Systems Schumm (1977) Alluvial

More information

Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge

Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge Module # 6 Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge Iowa s River Restoration Toolbox Level 1 / Base Training Overview of Basic Field Data Collection Site Map Cross Sections

More information

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A APPENDIX A FLUVIAL AUDIT METHOD STATEMENT Fluvial Audit Methodology INTRODUCTION The procedure used to characterize the geomorphic and sedimentary regimes of the River Till is an adaptation of the Fluvial

More information

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT STREAM CLASSIFICATION & RIVER ASSESSMENT Greg Babbit Graduate Research Assistant Dept. Forestry, Wildlife & Fisheries Seneca Creek, Monongahela National Forest, West Virginia OBJECTIVES Introduce basic

More information

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs. Riparian Assessment vs. Monitoring Riparian Assessment What is a healthy stream? Determine stream/riparian health Determine change or trend, especially in response to mgmt Classification = designation

More information

MEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA

MEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA MEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA Prepared by Eric Larsen, Ph.D. Mark Rains, Ph.D. October 2006 INTRODUCTION

More information

Extension of the WASA model: Water and sediment routing in the river network

Extension of the WASA model: Water and sediment routing in the river network Extension of the WASA model: Water and sediment routing in the river network Working Report SESAM-Project, University of Potsdam, July 2005 Eva Nora Müller enmue@uni-potsdam.de 1 Introduction to model

More information

PolyMet NorthMet Project

PolyMet NorthMet Project RS 26 Draft-01 December 8, 2005 RS26 Partridge River Level 1 Rosgen Geomorphic Survey Rosgen Classification Partridge River from Headwaters to Colby Lake Prepared for PolyMet NorthMet Project December

More information

GEOL 332 Lab 4 Mad River River Bed

GEOL 332 Lab 4 Mad River River Bed Name: Date: Team Name: Team Members: Our goal today is to characterize some fluvial sediments, at two different sites along the Mad River, and within each site. We will form teams and describe sediments

More information

Rosgen Classification Unnamed Creek South of Dunka Road

Rosgen Classification Unnamed Creek South of Dunka Road Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September

More information

San Joaquin River Tributary Sediment Transport and Geomorphology Study

San Joaquin River Tributary Sediment Transport and Geomorphology Study Study 22 San Joaquin River Tributary Sediment Transport and Geomorphology Study Public Draft 2013 Monitoring and Analysis Plan September 2012 22.0 San Joaquin River Tributary Sediment Transport and Geomorphology

More information

NATURAL RIVER. Karima Attia Nile Research Institute

NATURAL RIVER. Karima Attia Nile Research Institute NATURAL RIVER CHARACTERISTICS Karima Attia Nile Research Institute NATURAL RIVER DEFINITION NATURAL RIVER DEFINITION Is natural stream of water that flows in channels with ih more or less defined banks.

More information

WP3: MORPH SAMPLING STRATEGY AND CHEMICAL ANALYSIS OF SEDIMENTS IN THE BARASONA RESERVOIR

WP3: MORPH SAMPLING STRATEGY AND CHEMICAL ANALYSIS OF SEDIMENTS IN THE BARASONA RESERVOIR SAMPLING STRATEGY AND CHEMICAL ANALYSIS OF SEDIMENTS IN THE BARASONA RESERVOIR PROPOSAL FOR COLLABORATION BETWEEN WP3 AND WP5 TECHNICAL DETAILS Description: Sediment sampling and chemical analysis for

More information

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water. Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general

More information

Vermont Stream Geomorphic Assessment. Appendix J. Vermont Regional Hydraulic Geometry Curves

Vermont Stream Geomorphic Assessment. Appendix J. Vermont Regional Hydraulic Geometry Curves Vermont Stream Geomorphic Assessment Appendix J Vermont Regional Hydraulic Geometry Curves River Management Program Vermont Water Quality Division November, 2001 Natural Resources - J0 - VT Agency of Background

More information

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 Geomorphology Geology 450/750 Spring 2004 Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 This exercise is intended to give you experience using field data you collected

More information

Monitoring Headwater Streams for Landscape Response to

Monitoring Headwater Streams for Landscape Response to Monitoring Headwater Streams for Landscape Response to Climate Change Matthew Connor, PhD Connor nvironmental, nc. www.oe-i.com icom Healdsburg, California verview Headwater stream geomorphology Response

More information

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy. 1 2 Function... Sevier River... to successfully carry sediment and water from the watershed....dissipate energy. 3 ALLUVIAL FEATURES 4 CHANNEL DIMENSION The purpose of a stream is to carry water and sediment

More information

Woodstock, Route 26 Stream Relocation Project

Woodstock, Route 26 Stream Relocation Project MAINE DEPARTMENT OF TRANSPORTATION 2006 POST - CONSTRUCTION MONITORING REPORT: Woodstock, Route 26 Stream Relocation Project Year 1 of 5 Compensation for the Woodstock, Route 26 Highway Reconstruction

More information

Technical Supplement 3E. Rosgen Stream Classification Technique Supplemental Materials. (210 VI NEH, August 2007)

Technical Supplement 3E. Rosgen Stream Classification Technique Supplemental Materials. (210 VI NEH, August 2007) Technical Supplement 3E (210 VI NEH, August 2007) Issued August 2007 Cover photo: The Rosgen stream classification system uses morphometric data to characterize streams. Advisory Note Techniques and approaches

More information

Do you think sediment transport is a concern?

Do you think sediment transport is a concern? STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,

More information

Appendix E Rosgen Classification

Appendix E Rosgen Classification Appendix E Stream Type s Using the morphometric parameters described above, stream reaches are classified into 7 major stream types (Aa+ through G) based on s (1996) criteria. The relevant stream classifications

More information

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis

More information

SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling

SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling Annual Report University of Potsdam, Germany E. N. Müller, G. Mamede, T. Francke, R. J. Batalla, J.C. de Araujo, A. Güntner,

More information

SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling

SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling SESAM - Sediment Export from large Semi-Arid Catchments: Measurement and Modelling SESAM Sediment Export from large Semi-Arid Catchments: Measurement and Modelling Interim Report 2006 06/12/2006 E. N.

More information

BZ471, Steam Biology & Ecology Exam

BZ471, Steam Biology & Ecology Exam BZ471, Eam1, p.1 BZ471, Steam Biology & Ecology Eam Name Multiple choice When benthic organisms enter the water column with a regular diel periodicity: a) catastrophic drift b) behavioral drift c) constant

More information

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or

More information

Overview of fluvial and geotechnical processes for TMDL assessment

Overview of fluvial and geotechnical processes for TMDL assessment Overview of fluvial and geotechnical processes for TMDL assessment Christian F Lenhart, Assistant Prof, MSU Research Assoc., U of M Biosystems Engineering Fluvial processes in a glaciated landscape Martin

More information

What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?

What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? Gregory Indivero 31 October 2011 What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? What discharge was required to deposit observed

More information

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE YASUO NIHEI AND YUICHI IMASHIMIZU Department of Civil Eng., Tokyo University of Science, 2641 Yamazaki, Noda-shi 278-851,

More information

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan Erosion, Debris Mows and Environment in Mountain Regions (Proceedings of the Chengdu Symposium, July 1992). IAHS Publ. no. 209, 1992. 423 The effectiveness of check dams in controlling upstream channel

More information

SECTION G SEDIMENT BUDGET

SECTION G SEDIMENT BUDGET SECTION G SEDIMENT BUDGET INTRODUCTION A sediment budget has been constructed for the for the time period 1952-2000. The purpose of the sediment budget is to determine the relative importance of different

More information

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement Surface Water SECTION 9.1 Surface Water Movement In your textbook, read about surface water and the way in which it moves sediment. Complete each statement. 1. An excessive amount of water flowing downslope

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

Tom Ballestero University of New Hampshire. 1 May 2013

Tom Ballestero University of New Hampshire. 1 May 2013 Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the

More information

Each basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation

Each basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation DRAINAGE BASINS A drainage basin or watershed is defined from a downstream point, working upstream, to include all of the hillslope & channel areas which drain to that point Each basin is surrounded &

More information

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the

More information

Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1. David A. Greenfield 2 Dennis M. Palladino 3

Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1. David A. Greenfield 2 Dennis M. Palladino 3 Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1 David A. Greenfield 2 Dennis M. Palladino 3 ABSTRACT Watersheds that have been severely impacted by mining can no longer transport

More information

Experience from Sediment Transport Monitoring and Investigations in the Rio Cordon

Experience from Sediment Transport Monitoring and Investigations in the Rio Cordon Geophysical Research Abstracts, Vol. 7, 06419, 2005 SRef-ID: 1607-7962/gra/EGU05-A-06419 European Geosciences Union 2005 Experience from Sediment Transport Monitoring and Investigations in the Rio Cordon

More information

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b. ES 105 Surface Processes I. Hydrologic cycle A. Distribution 1. +97% in oceans 2. >3% surface water a. +99% surface water in glaciers b. >1/3% liquid, fresh water in streams and lakes~1/10,000 of water

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time Broad-Scale Models Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda GOAL Predict Channel Characteristics in Space and Time Assess Potential for Fish Use and Productivity Assess

More information

Calculation of Stream Discharge Required to Move Bed Material

Calculation of Stream Discharge Required to Move Bed Material Calculation of Stream Discharge Required to Move Bed Material Objective: Students will map two sections of a stream and calculate the depth, velocity, and discharge of flows required to move the stream

More information

Measurement of bed load with the use of hydrophones in mountain torrents

Measurement of bed load with the use of hydrophones in mountain torrents 222 Erosion ami Sediment Transport Measurement in Rivers: Technological and Methodological Advances (Proceedings ol'lhe Oslo Workshop. June 2002). IAHS Publ. 283. 2003. Measurement of bed load with the

More information

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN Conor Shea - Hydrologist U.S. Fish and Wildlife Service Conservation Partnerships Program Arcata, CA Learning Objectives Examine

More information

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades?

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades? Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades? Faith Fitzpatrick USGS WI Water Science Center, Middleton, WI fafitzpa@usgs.gov

More information

Sediment Transport V: Estimating Bed-Material Transport in Gravel-Bed Rivers. UC Berkeley January 2004 Peter Wilcock

Sediment Transport V: Estimating Bed-Material Transport in Gravel-Bed Rivers. UC Berkeley January 2004 Peter Wilcock Sediment Transport V: Estimating Bed-Material Transport in Gravel-Bed Rivers UC Berkeley January 2004 Peter Wilcock Target: sediment rating curve Q s = ƒ(q) Approaches Predict from a flow & transport model

More information

Surface Water and Stream Development

Surface Water and Stream Development Surface Water and Stream Development Surface Water The moment a raindrop falls to earth it begins its return to the sea. Once water reaches Earth s surface it may evaporate back into the atmosphere, soak

More information

Watershed concepts for community environmental planning

Watershed concepts for community environmental planning Purpose and Objectives Watershed concepts for community environmental planning Dale Bruns, Wilkes University USDA Rural GIS Consortium May 2007 Provide background on basic concepts in watershed, stream,

More information

Diego Burgos. Geology 394. Advisors: Dr. Prestegaard. Phillip Goodling

Diego Burgos. Geology 394. Advisors: Dr. Prestegaard. Phillip Goodling Sediment Transport into an Urban Tributary Junction Diego Burgos Geology 394 Advisors: Dr. Prestegaard Phillip Goodling 1 Abstract Tributary junctions are an important component of stream morphology and

More information

Pebble Count Substrate Study

Pebble Count Substrate Study Pebble Count Substrate Study Adapted from: Harrelson, C.C., Rawlins, C.L., Potyondy, J.P., 1994. Bed and Bank Material Characterization in Stream Channel Reference Sites: An Illustrated Guide to Field

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY

CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY Chad A. Whaley, Department of Earth Sciences, University of South Alabama, MobileAL, 36688. E-MAIL: caw408@jaguar1.usouthal.edu The ultimate goal of this

More information

1 University of. 3 Univ. of. 4 Deutsches Geo. 2 Univ. Federal. 6 Federal Inst. of. 5 Forestry Technology. Potsdam, Germany.

1 University of. 3 Univ. of. 4 Deutsches Geo. 2 Univ. Federal. 6 Federal Inst. of. 5 Forestry Technology. Potsdam, Germany. Process-based Modeling of Erosion and Sediment Transport in meso-scale Mediterranean Catchments: from the Hillslopes via the River System to Reservoirs Axel Bronstert 1, José c. de Araújo 2, Ramon J. Batalla

More information

Impacts of Upstream Disturbances on Downstream Sediment Yield and Morphology in the Presence of Best Management Practices

Impacts of Upstream Disturbances on Downstream Sediment Yield and Morphology in the Presence of Best Management Practices Impacts of Upstream Disturbances on Downstream Sediment Yield and Morphology in the Presence of Best Management Practices Ilkim Cavus M.S. Student Dr. Latif Kalin Professor Auburn University, School of

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

WP3: MORPH DELIVERABLE 3.1 OPERATING SEDIMENT TRANSPORT AND SEDIMENTOLOGICAL NETWORK

WP3: MORPH DELIVERABLE 3.1 OPERATING SEDIMENT TRANSPORT AND SEDIMENTOLOGICAL NETWORK DELIVERABLE 3.1 Document 1. Report OPERATING SEDIMENT TRANSPORT AND SEDIMENTOLOGICAL NETWORK TECHNICAL DETAILS Description: Report corresponding to the deliverable 3.1 of the Work Package 3 MORPH: Impacts

More information

Water quality needs: Flow, velocity. Fish biologists need: Critical depth or velocity. Hydrology gives flows m 3 /s or day

Water quality needs: Flow, velocity. Fish biologists need: Critical depth or velocity. Hydrology gives flows m 3 /s or day Environmental Water Allocation Hydraulics Dr L Beevers Heriot Watt University, it UK l.beevers@hw.ac.uk Overview Why hydraulics in EWA? Different types of flows Theory Case studies Review Why do we need

More information

Characteristics of Step-Pool Morphology in the Mountain Streams of Japan

Characteristics of Step-Pool Morphology in the Mountain Streams of Japan Disaster Mitigation of Debris Flows, Slope Failures and Landslides 379 Characteristics of Step-Pool Morphology in the Mountain Streams of Japan Tatsuya Okazaki, 1) Yutaka Gonda, 2) Yohei Nishii 3) and

More information

Analysis of coarse sediment connectivity in semiarid river channels

Analysis of coarse sediment connectivity in semiarid river channels Sediment Transfer tlirongh the Fluviai System (Proceedings of a symposium held in Moscow, August 2004). IAHS Publ. 288, 2004 269 Analysis of coarse sediment connectivity in semiarid river channels J. M.

More information

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Floodplain modeling Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Scientific Staff: Dr Carmen Maftei, Professor, Civil Engineering Dept. Dr Konstantinos

More information

Fluvial Processes In Dryland Rivers

Fluvial Processes In Dryland Rivers WILLIAM L. GRAF Fluvial Processes In Dryland Rivers Reprint of First Edition, Copyright 1988 Copyright 2002 by William L. Graf All rights reserved. No part of this book may be reproduced, stored in a retrieval

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

GLG598 Surface Processes and Landform Evolution K. Whipple Fall 2012 VERDE RIVER: FLOW MECHANICS, ROUGHNESS, AND SHEAR STRESS

GLG598 Surface Processes and Landform Evolution K. Whipple Fall 2012 VERDE RIVER: FLOW MECHANICS, ROUGHNESS, AND SHEAR STRESS VERDE RIVER: FLOW MECHANICS, ROUGHNESS, AND SHEAR STRESS This lab will introduce you to some common field techniques and some general understanding of the geomorphic processes operating in a stream. The

More information

May 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences

May 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences May 7, 2013 Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences Background Funded in 2009 under EPA 2100 Grant for $30k and managed by SFEP Project Goals: Update original

More information

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College Hydrologic Cycle The hydrologic cycle is a summary of the circulation of Earth s water supply. Processes involved in the hydrologic

More information

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir ISSN 2320-9100 11 International Journal of Advance Research, IJOAR.org Volume 1, Issue 8,August 2013, Online: ISSN 2320-9100 MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq

More information

Discharge. Discharge (Streamflow) is: Q = Velocity (L T -1 ) x Area (L 2 ) Units: L 3 T -1 e.g., m 3 s -1. Velocity. Area

Discharge. Discharge (Streamflow) is: Q = Velocity (L T -1 ) x Area (L 2 ) Units: L 3 T -1 e.g., m 3 s -1. Velocity. Area Discharge Discharge (Streamflow) is: Q = Velocity (L T -1 ) x Area (L 2 ) Units: L 3 T -1 e.g., m 3 s -1 Velocity Area Where is the average velocity?? 3 Source: Brooks et al., Hydrology and the Management

More information

Sediment storage and transport in coarse bed streams: scale considerations

Sediment storage and transport in coarse bed streams: scale considerations Gravel-Bed Rivers VI: From Process Understanding to River Restoration H. Habersack, H. Pie gay, M. Rinaldi, Editors r 2008 Elsevier B.V. All rights reserved. 473 18 Sediment storage and transport in coarse

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation. River Response River Response Sediment Water Wood Confinement Valley slope Channel morphology Bank material Flow obstructions Riparian vegetation climate catchment vegetation hydrological regime channel

More information

Why Stabilizing the Stream As-Is is Not Enough

Why Stabilizing the Stream As-Is is Not Enough Why Stabilizing the Stream As-Is is Not Enough Several examples of alternatives to the County s design approach have been suggested. A common theme of these proposals is a less comprehensive effort focusing

More information

STUDY PERFORMANCE REPORT

STUDY PERFORMANCE REPORT STUDY PERFORMANCE REPORT State: Michigan Project No.: F-80-R-8 Study No.: 230702 Title: Effects of sediment traps on Michigan river channels Period Covered: October 1, 2006 to September 30, 2007 Study

More information

GEOL 652. Poudre River Fieldtrip

GEOL 652. Poudre River Fieldtrip GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning

More information

Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly.

Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly. Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly. Brett Jordan Phd, PE HydroGeo Designs LLC. Land and Water Services Inc. THE GOOD THE BAD THE UGLY THE GOOD THE

More information

Sediment dynamics and sub-recent sediment budget of the braided sandur system at Sandane, Erdalen (Nordfjord, western Norway)

Sediment dynamics and sub-recent sediment budget of the braided sandur system at Sandane, Erdalen (Nordfjord, western Norway) Sediment dynamics and sub-recent sediment budget of the braided sandur system at Sandane, Erdalen (Nordfjord, western Norway) A.A. Beylich (1,2), L. Hansen (1), S. Liermann (3), D. Gintz (3), K. Laute

More information

Appendix III-A Descriptions of Channel Habitat Types

Appendix III-A Descriptions of Channel Habitat Types Appendix III-A Descriptions of Channel Habitat Types Table of Contents Channel Habitat Typing Background... 3 Small Estuarine Channel (ES)... 7 Large Estuarine Channel (EL)... 9 Low Gradient Large Floodplain

More information

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Abstract The Waterbury Dam was completed in October 1938 as a method of flood control in the Winooski Valley. The construction began in April1935

More information

Ways To Identify Background Verses Accelerated Erosion

Ways To Identify Background Verses Accelerated Erosion Ways To Identify Background Verses Accelerated Erosion Establish Background Condition From Old Ground Photos, Aerial Photos, and Maps Compare Rate Over Time At the Same Location, or for Reaches Channel

More information

APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels

APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels B-1 B-2 APPENDIX B HYDRAULIC CONSIDERATIONS FOR PIPELINE CROSSINGS OF STREAM CHANNELS Pipeline crossings of perennial, intermittent,

More information

PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE

PART 2:! FLUVIAL HYDRAULICS HYDROEUROPE PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE 2009 1 HYDROEUROPE 2009 2 About shear stress!! Extremely complex concept, can not be measured directly!! Computation is based on very primitive hypotheses that

More information

Squaw Creek. General Information

Squaw Creek. General Information General Information is a tributary to the Salmon River. It enters the north side of the river about 0 miles downstream of North Fork, Idaho. The study reach is about a 30 ft length of stream about 2 miles

More information

Estimation of Bed Load Transport in River Omi, South Western Nigeria using Grain Size Distribution Data

Estimation of Bed Load Transport in River Omi, South Western Nigeria using Grain Size Distribution Data International Journal of Engineering and Technology Volume 2 No. 9, September, 2012 Estimation of Bed Load Transport in River Omi, South Western Nigeria using Grain Size Distribution Data A.A. Adegbola

More information

FUTURE MEANDER BEND MIGRATION AND FLOODPLAIN DEVELOPMENT PATTERNS NEAR RIVER MILES 241 TO 235, SACRAMENTO RIVER

FUTURE MEANDER BEND MIGRATION AND FLOODPLAIN DEVELOPMENT PATTERNS NEAR RIVER MILES 241 TO 235, SACRAMENTO RIVER FUTURE MEANDER BEND MIGRATION AND FLOODPLAIN DEVELOPMENT PATTERNS NEAR RIVER MILES 241 TO 235, SACRAMENTO RIVER Eric W. Larsen University of California, Davis With the assistance of Evan Girvetz REPORT

More information

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM

More information

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis 2009 MWEA Annual Conference Rob Myllyoja, CET rmyllyoja@hrc-engr.com Watershed Assessment of River

More information

Important Copyright Information

Important Copyright Information Important Copyright Information The following content is provided for educational purposes by the workshop presenter. This content may or may not have been peer reviewed. Information, opinions and recommendations

More information

Surface Water Short Study Guide

Surface Water Short Study Guide Name: Class: Date: Surface Water Short Study Guide Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The three ways in which a stream carries

More information

MEANDER MIGRATION MODEL ASSESSMENT FOR THE 50- AND 100-YEAR STORMS, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA

MEANDER MIGRATION MODEL ASSESSMENT FOR THE 50- AND 100-YEAR STORMS, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA MEANDER MIGRATION MODEL ASSESSMENT FOR THE 50- AND 100-YEAR STORMS, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA Prepared by Eric Larsen, Ph.D. Mark Rains, Ph.D. October 2006 TABLE OF

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

Streams. Water. Hydrologic Cycle. Geol 104: Streams

Streams. Water. Hydrologic Cycle. Geol 104: Streams Streams Why study streams? Running water is the most important geologic agent in erosion, transportation and deposition of sediments. Water The unique physical and chemical properties of water make it

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

Geomorphology Studies

Geomorphology Studies Geomorphology Studies Technical Workgroup Meeting February 14, 2012 Prepared by: Tetra Tech Prepared for: Alaska Energy Authority Overall Goal Geomorphology Studies Two studies Geomorphology Study (RSP

More information

FOREST RESEARCH INSTITUTE, DEHRADUN

FOREST RESEARCH INSTITUTE, DEHRADUN PROJECT REPORT DRAINAGE AND REPLENISHMENT STUDY OF MINED AREA OF GANGA SHYAMPUR RIVER HARIDWAR Submitted to UTTARAKHAND FOREST DEVELOPMENT CORPORATION (UFDC) 73, Nehru Road, Deharadun Prepared&Submitted

More information

Weathering, Erosion, Deposition, and Landscape Development

Weathering, Erosion, Deposition, and Landscape Development Weathering, Erosion, Deposition, and Landscape Development I. Weathering - the breakdown of rocks into smaller particles, also called sediments, by natural processes. Weathering is further divided into

More information