GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD

Size: px
Start display at page:

Download "GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD"

Transcription

1 ADDENDUM TO GEOTECHNICAL EXPLORATION REPORT PROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD CITY OF LOS ANGELES, CALIFORNIA Prepared for: OPT Beverly, LLC 6400 South Fiddlers Green Circle, #1820 Greenwood Village, Colorado Project No November 22, 2016

2 November 22, 2016 Project No OPT Beverly, LLC 6400 South Fiddlers Green Circle, #1820 Greenwood Village, Colorado Attention: Subject: Reference: Mr. William Rothacker, Jr. Addendum to Geotechnical Exploration Report Proposed Commercial/Retail Development 7967, & 8015 Beverly Boulevard City of Los Angeles, California Leighton Consulting, Inc., 2016, Updated Geotechnical Exploration Report, Proposed Commercial/Retail Development, 7967, & 8015 Beverly Boulevard, City of Los Angeles, California, Project No , dated October 6, INTRODUCTION In accordance with your request and authorization, Leighton Consulting, Inc. (Leighton) is pleased to present this addendum to our referenced Updated Geotechnical Exploration Report for the project (Leighton, 2016) in response to the items included in the City of Los Angeles Geology and Soils Correction Letter dated November 2, It should be noted that it is our understanding that the proposed development of the western parcel ( & 8015 Beverly Boulevard) has been revised to include a total of three levels below grade, extending the bottom of the lowest basement level to approximately 48 feet below the existing ground surface (bgs). The proposed development for the eastern parcel (7967 Beverly Boulevard) remains the same with two levels planned below grade.

3 RESPONSES TO REVIEW COMMENTS A copy of the Geology and Soils Correction Letter prepared by the City of City of Los Angeles and dated November 2, 2016 is included in Appendix A. For convenience, the items included in the correction letter are presented below in italics before Leighton s responses. Comment No. 1 Provide a revised Geologic Map based on a licensed surveyors prepared topographic base map, clearly depicting the proposed project including retaining wall locations and the location of geologic cross sections. Include on the map any lithologic contacts, bedding attitudes, locations of slumps, landslides, or faults relative to the subject site, proposed topographic profiles, and proposed structures and required Code setbacks ( ). Response to Comment No. 1 Figure 1, Geotechnical Map, included with this addendum report depicts the project site boundaries and limits of excavation for subterranean construction on an ALTA/ACSM Land Title Survey base map. In addition, the Geotechnical Map also shows the locations of our subsurface explorations and geotechnical cross sections A-A through C-C (see Figures 2 and 3). It should be noted that we recently drilled and installed two monitoring wells and one pumping well at the project site for subsequent groundwater sampling for groundwater characterization and design of permanent dewatering system. Attached is the boring log for PW-1 drilled at the western parcel. Due to the proximity of the wells to previous borings, sampling was focused on depths previously unsampled, primarily deeper than 50 feet bgs in boring PW-1. Attached is the boring log for PW-1 drilled at the western parcel. Comment No. 2 Provide geological cross sections illustrating existing and proposed grades and structures. Clearly depict any surcharging buildings on the cross section(s). Response to Comment No. 2 Please see Figures 2 and 3, Geotechnical Cross Sections A-A through C-C, included with this report. 2

4 Comment No. 3 The Department does not accept liquefaction analysis solely based on CPT sounding data. Analysis must be based on SPT data. CPT sounding data may be utilized to more precisely establish boundaries between layers. Provide analysis based on SPT data. Response to Comment No. 3 To specifically enable CPT/SPT correlation, the boring PW-1 was performed immediately adjacent to CPT-1. However, because sampling was not performed in PW- 1 for depths shallower than 30 feet, the SPT and Modified California sampler data from the adjacent boring LB-1 was used for depths shallower than 30 feet. Fines content was estimated for each layer based on boring logs and CPT correlations. As shown in Appendix C, Liquefaction Analysis, there is good correlation between the CPT- and SPT-based cyclic resistance ratios (CRRs). However, more liquefiable layers are identified in the CPT analysis. This is as expected because thin, discrete sandy layers cannot be identified by SPTs performed at 5-foot intervals. Based on the above discussion, liquefaction susceptibility and seismic settlement was evaluated using CPT data. All layers were included in the seismic settlement calculation. No layers were omitted based on factor of safety. Results of our analysis indicate the potential for liquefaction at the site is low. The results of the liquefaction analysis are provided in Appendix C. Comment No. 4 Provide design calculations to substantiate the recommendations for temporary excavations and permanent walls for a minimum factor of safety of 1.25 and 1.5, respectively. Response to Comment No. 4 The requested slope stability analysis results are presented in Appendix D. We used peak shear strengths to evaluate temporary conditions and ultimate shear strengths to evaluate permanent conditions. Results indicate that 23 pounds per cubic foot (pcf) of equivalent fluid pressure is sufficient to obtain a factor of safety of We recommended 35 pcf for cantilevered shoring. 3

5 The recommended uniform rectangular earth pressure of 25H (where H is the height of the shored wall) for braced excavation results in a factor of safety of The recommended permanent basement at-rest wall pressure of 55 pcf results in a factor of safety of CLOSING We appreciate the opportunity to be of continued service on this project. If you have any questions or if we can be of further service, please contact us at (866) LEIGHTON; specifically at the phone extensions or as listed below. Respectfully submitted, LEIGHTON CONSULTING, INC. Jeffrey M. Pflueger, PG, CEG 2499 Associate Geologist Extension 4257, jpflueger@leightongroup.com JMP/CCK/lr Carl C. Kim, PE, GE 2620 Senior Principal Engineer Extension: 4262, ckim@leightongroup.com Attachments: Figure 1 Geotechnical Map Figure 2 Geotechnical Cross Section A-A Figure 3 Geotechnical Cross Section B-B and C-C Distribution: (1) Addressee Appendix A City of Los Angeles Geology and Soils Report Correction Letter dated November 2, 2016 Appendix B Geotechnical Boring and Pumping Well Log PW-1 Appendix C Liquefaction Analysis Appendix D Slope Stability Analysis 4

6 Approximate Location of Hollow Stem Auger Boring Converted to Pumping Well & > Approximate Location of Hollow Stem Auger Boring Converted to Monitoring Well!, Approximate Location of Cone Penetration Test (CPT) & Approximate Location of Hollow Stem Auger Boring ( & % Geotechnical Cross Section Limits of Excavation Edinburrgh Avenue Legend % Approximate Site Boundary 0 ³ Beverly Boulevard Beverly Boulevard Feet Project: Eng/Geol: CCK/JMP Scale: 1 " = 30 ' Date: November 2016 Base Map: ESRI ArcGIS Online 2016 Travis Edwards.JRN Civil Engineers, Thematic Information: Leighton Author: Leighton Geomatics (btran) Map Saved as V:\Drafting\11143\002\Maps\11143_002_F01_GM_ mxd on 11/11/2016 9:10:39 AM GEOTECHNICAL MAP Figure , , & 8015 Beverly Boulevard Los Angeles, California Leighton

7 Western Parcel ( & 8015 Beverly Boulevard) Eastern Parcel (7967 Beverly Boulevard) A Existing Building Proposed Building Existing Building Qa LB-3 (Proj. I 15') CPT-2 (Proj. I 20') T.D.11.5' LB-2 (Proj. I 24') T.D.21.5' G.W.@11.9' CPT-1 (Proj. I 22')/ Afu PW-1 (Proj. I 22') MW-1 (Proj. I 5') LB-1 (Proj. I 15') Qa Existing Building N. Edinburgh Avenue Existing Building Proposed Building Afu Qa LB-4 (Proj. I 27') LB-5 (Proj. I 17')/ LB-6 (Proj. I 13') T.D.11.5' Existing Parking Lot A' ELEVATION (FEET) Proposed Subterranean Structure T.D.54.3' T.D.75.6' T.D.51.5' G.W.@13.9' T.D.71.5' G.W.12'/14' Proposed Subterranean Structure T.D.76.5' G.W.@13.9' ELEVATION (FEET) W-E Proj: Eng/Geol: CCK/JMP Scale: 1"=30' Date: November 2016 Reference: CROSS SECTION A-A' 7969, , & 8015 Beverly Boulevard Los Angeles, California Figure 2 Leighton V:\DRAFTING\11143\002\CAD\ \ _F02-03_CS_ DWG ( :58:28PM) Plotted by: btran

8 Existing Alley PW-1 (Proj. I 12') CPT-1 (Proj. I 10') LB-3 (Proj. I 34') LB-1 (Proj. I 13') T.D.11.5' MW-1 (Proj. I 12') Western Parcel ( & 8015 Beverly Boulevard) CPT-2 (Proj. I 27') LB-2 (Proj. I 12') Afu T.D.21.5' G.W.@11.9' Existing Building Qa Proposed Building Beverly Boulevard T.D.11.5' Afu Eastern Parcel (7967 Beverly Boulevard) B B' C C' Existing Alley LB-6 (Proj. I 13') LB-5 (Proj. I 11') T.D.11.5' LB-4 (Proj. I 7') Existing Building Qa Proposed Building Beverly Boulevard ELEVATION (FEET) T.D.71.5' G.W.@12' T.D.51.5' G.W.@13.9' T.D.75.6' T.D.71.5' G.W.@14' T.D.54.3' Proposed Subterranean Structure ELEVATION (FEET) ELEVATION (FEET) Proposed Subterranean Structure T.D.76.5' G.W.@13.9' ELEVATION (FEET) N-S N-S Proj: Eng/Geol: CCK/JMP Scale: 1"=30' Date: November 2016 Reference: CROSS SECTION B-B' AND C-C' 7969, , & 8015 Beverly Boulevard Los Angeles, California Figure 3 Leighton V:\DRAFTING\11143\002\CAD\ \ _F02-03_CS_ DWG ( :58:50PM) Plotted by: btran

9 APPENDIX A City of Los Angeles Geology and Soils Report Correction Letter dated November 2, 2016

10

11

12 APPENDIX B Geotechnical Boring and Pumping Well Log PW-1

13 GEOTECHNICAL BORING AND MONITORING WELL LOG PW-1 Project No. Project Drilling Co. Drilling Method Location OPT Beverly J & H Drilling Co. Hollow Stem Auger - 140lb - Autohammer - 30" Drop 8001 Beverly Blvd., Los Angeles, CA Starting Drill Date Ending Drill Date Hole Diameter Ground Elevation Logged / Inspected By " 188' BM / SAM Elevation Feet 0Depth Feet N Graphic Log S Sample No. Blows Per 6 Inches Dry Density pcf Moisture Content, % Soil Class. (U.S.C.S.) SOIL DESCRIPTION This Soil Description applies only to a location of the exploration at the time of sampling. Subsurface conditions may differ at other locations and may change with time. The description is a simplification of the actual conditions encountered. Transitions between soil types may be 3.5-inches asphalt concrete (AC) over 5-inches aggregate base (AB) Artificial fill, uncertified (Afu) WELL DIAGRAM Cement Seal at 0-2' and Traffic Rated Well Box at Surface Type of Tests Quaternary Alluvium (Qal) 4" Solid PVC Casing at 0'-20' Cement/Bentonite Grout Backfill at 2'-10' Bentonite Seal at 10'-12' #2/12 Sand Filter Pack at 12'-71.5' " Slotted (0.020) PVC Casing at 20'-70' SAMPLE TYPES: B BULK SAMPLE C CORE SAMPLE G GRAB SAMPLE R RING SAMPLE S SPLIT SPOON SAMPLE T TUBE SAMPLE TYPE OF TESTS: -200 % FINES PASSING AL ATTERBERG LIMITS CN CONSOLIDATION CO COLLAPSE CR CORROSION CU UNDRAINED TRIAXIAL DS EI H MD PP RV DIRECT SHEAR EXPANSION INDEX HYDROMETER MAXIMUM DENSITY POCKET PENETROMETER R VALUE SA SE SG UC SIEVE ANALYSIS SAND EQUIVALENT SPECIFIC GRAVITY UNCONFINED COMPRESSIVE STRENGTH * * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * * Page 1 of 3

14 GEOTECHNICAL BORING AND MONITORING WELL LOG PW-1 Project No. Project Drilling Co. Drilling Method Location OPT Beverly J & H Drilling Co. Hollow Stem Auger - 140lb - Autohammer - 30" Drop 8001 Beverly Blvd., Los Angeles, CA Starting Drill Date Ending Drill Date Hole Diameter Ground Elevation Logged / Inspected By " 188' BM / SAM Elevation Feet Depth Feet 30 N Graphic Log S Sample No. Blows Per 6 Inches Dry Density pcf Moisture Content, % Soil Class. (U.S.C.S.) SOIL DESCRIPTION This Soil Description applies only to a location of the exploration at the time of sampling. Subsurface conditions may differ at other locations and may change with time. The description is a simplification of the actual conditions encountered. Transitions between soil types may be gradual. WELL DIAGRAM Type of Tests 155 S Sandy CLAY, bluish gray, moist, very stiff, non-plastic to low plasticity, fine to medium sand S2 8 6 Sandy CLAY, bluish gray, very moist to wet, stiff, non-plastic, fine to coarse sand with a few Poorly graded sand layer #2/12 Sand Filter Pack at 15'-71.5' 145 S Sandy CLAY, bluish gray, wet, medium dense/very stiff, low plasticity, fine to medium sand, few gravels 45 4" Slotted (0.020) PVC Casing at 20'-70' 140 S Gravelly SAND, bluish gray, wet, dense, medium to coarse sand, few 1-2" gravels 50 S SAND, bluish green to white, wet, dense, fine to medium sand 135 S Clayey SAND, bluish gray to gray, very moist, medium dense, medium to coarse sand, grades into clay 55 S Silty SAND, bluish gray, moist to very moist, dense, fine to medium sand, some clay 130 S Clayey SAND, bluish gray, moist, dense, fine to medium sand 60 SAMPLE TYPES: B BULK SAMPLE C CORE SAMPLE G GRAB SAMPLE R RING SAMPLE S SPLIT SPOON SAMPLE T TUBE SAMPLE TYPE OF TESTS: -200 % FINES PASSING AL ATTERBERG LIMITS CN CONSOLIDATION CO COLLAPSE CR CORROSION CU UNDRAINED TRIAXIAL DS EI H MD PP RV DIRECT SHEAR EXPANSION INDEX HYDROMETER MAXIMUM DENSITY POCKET PENETROMETER R VALUE SA SE SG UC SIEVE ANALYSIS SAND EQUIVALENT SPECIFIC GRAVITY UNCONFINED COMPRESSIVE STRENGTH * * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * * Page 2 of 3

15 GEOTECHNICAL BORING AND MONITORING WELL LOG PW-1 Project No. Project Drilling Co. Drilling Method Location OPT Beverly J & H Drilling Co. Hollow Stem Auger - 140lb - Autohammer - 30" Drop 8001 Beverly Blvd., Los Angeles, CA Starting Drill Date Ending Drill Date Hole Diameter Ground Elevation Logged / Inspected By " 188' BM / SAM Elevation Feet Depth Feet 60 N Graphic Log S Sample No. S9 Blows Per 6 Inches Dry Density pcf Moisture Content, % Soil Class. (U.S.C.S.) SC SOIL DESCRIPTION This Soil Description applies only to a location of the exploration at the time of sampling. Subsurface conditions may differ at other locations and may change with time. The description is a simplification of the actual conditions encountered. Transitions between soil types may be Clayey SAND, bluish gray, moist to very moist, medium dense, fine to medium sand WELL DIAGRAM Type of Tests 125 S Clayey SAND, bluish gray, very moist, medium dense, fine to medium sand #2/12 Sand Filter Pack at 15'-71.5' 65 S Clayey SAND, bluish gray, very moist, medium dense, fine to medium sand, shell fragments present 4" Slotted (0.020) PVC Casing at 20'-70' 120 S Same as above S Clayey SAND, bluish gray, moist, medium dense, fine to coarse sand, some shell fragments Total Depth of Boring: 71.5 feet Groundwater encountered at 12 feet Pumping well installed per Well Diagram on 11/2/ SAMPLE TYPES: B BULK SAMPLE C CORE SAMPLE G GRAB SAMPLE R RING SAMPLE S SPLIT SPOON SAMPLE T TUBE SAMPLE TYPE OF TESTS: -200 % FINES PASSING AL ATTERBERG LIMITS CN CONSOLIDATION CO COLLAPSE CR CORROSION CU UNDRAINED TRIAXIAL DS EI H MD PP RV DIRECT SHEAR EXPANSION INDEX HYDROMETER MAXIMUM DENSITY POCKET PENETROMETER R VALUE SA SE SG UC SIEVE ANALYSIS SAND EQUIVALENT SPECIFIC GRAVITY UNCONFINED COMPRESSIVE STRENGTH * * * This log is a part of a report by Leighton and should not be used as a stand-alone document. * * * Page 3 of 3

16 APPENDIX C Liquefaction Analysis

17 Leighton Consulting, Inc. Geotechnical Engineers Cowan Irvine, CA SPT BASED LIQ UEFACTION ANALYSIS REPORT Project title : OPT Beverly CPT file : CPT-01 :: Input parameters and analysis properties :: Analysis method: Fines correction method: Sampling method: Borehole diameter: Rod length: Hammer energy ratio: NCEER 1998 Idriss & Seed Sampler wo liners 65 mm to 11 5mm G.W.T. (in-situ): G.W.T. (earthq.): Earthquake magnitude M w : Peak ground acceleration: SPT results rounding mode: Location : 7967, , & 8015 Beverly Blvd. Los Angeles Nearest N SPT N SPT plot plot 5.00 N(SPT) N1(60) N1(60)cs CSR CSR vs CRR vs CRR plot plot CRR CPT CSR CRR Depth (ft) Depth (ft) SPT Blow Count CSR & CRR Liquefaction CRR CRR clean clean sand sand curve curve 0.50 Cyclic Stress Ratio No Liquefaction Corrected Blow Count N1(60),cs CLiq v CPT Liquefaction Assessment Software - Report created on: 11/22/2016, 1:38:27 PM Project file: C:\Users\carl\OneDrive\Documents\2015 projects\11143 OPT Beverly\Analyses\Cliq\11143 Liquefaction2.clq 1

18 This software is licensed to: Carl Kim CPT name: CPT-01 :: Cyclic Stress Ratio fully adjusted (CSR*) numeric results :: No Depth (ft) Weight (pcf) u o (tsf) σ v (tsf) σ' v (tsf) r d CSR K σ MSF CSR * Abbreviations Depth: u 0: σ v: σ v': r d: CSR: MSF: K σ: CSR * : Depth from free surface where SPT was performed (ft) Water pressure at test point (tsf) Total overburden pressure at test point (tsf) Effective overburden pressure based on GWT during earthquake (tsf) Nonlinear shear mass factor Cyclic Stress Ratio () Effective overburden stress factor Magnitude Scaling Factor CSR fully adjusted :: Cyclic Resistance Ratio (CRR) numeric results :: No Depth (ft) Fines % u o (tsf) σ v (tsf) σ' v (tsf) N SPT C N C R C B C S C E N 1(60) α β N 1(60),cs CRR 7.5 F.S CLiq v CPT Liquefaction Assessment Software - Report created on: 11/22/2016, 1:38:27 PM Project file: C:\Users\carl\OneDrive\Documents\2015 projects\11143 OPT Beverly\Analyses\Cliq\11143 Liquefaction2.clq 2

19 This software is licensed to: Carl Kim CPT name: CPT-01 :: Cyclic Resistance Ratio (CRR) numeric results :: No Depth (ft) Fines % u o (tsf) σ v (tsf) σ' v (tsf) N SPT C N C R C B C S C E N 1(60) α β N 1(60),cs CRR 7.5 F.S Abbreviations Depth: Weight: u 0: σ v: σ v': N SPT: C N: C E: Depth from free surface where SPT was performed (ft) Soil unit weight from previous test point to current (pcf) Water pressure at test point (tsf) Total overburden pressure at test point (tsf) Effective overburden pressure based on in situ GWT (tsf) Number of blows count in the field (blows/feet) Overburden pressure factor Energy ratio factor C B: C R: C S: N 1(60): α: β: N 1(60),cs: CRR 7.5: F.S.: Borehole diameter factor Rod length factor Sampling method factor Number of blows corrected for 60% energy Fines correction coefficient Fines correction coefficient Number of blows corrected for 60% energy and fines Cyclic Resistance Ratio for M<sub>w</sub> 7.50 Factor of safety against liquefaction CLiq v CPT Liquefaction Assessment Software - Report created on: 11/22/2016, 1:38:27 PM Project file: C:\Users\carl\OneDrive\Documents\2015 projects\11143 OPT Beverly\Analyses\Cliq\11143 Liquefaction2.clq 3

20 APPENDIX D Slope Stability Analysis

21 Cross Section A-A': Slope Stability - Temporary P:\INFOCUS PROJECTS\ \11143 OPT Beverly\002 Design Geo Exploration and Soil Gas Survey\Analyses\CS A-A' Slope Stability Static At rest.slim Method: bishop simplified Factor of Safety: 1.25 Center: , Radius: Left Slip Surface Endpoint: , Right Slip Surface Endpoint: , Left Slope Intercept: Right Slope Intercept: lbs/ft2 250 W CLAY lbs/ft2 Material Name Color Unit Weight (lbs/ 3) Sat. Unit Weight (lbs/ 3) Strength Type Cohesion (psf) Phi (deg) Water Surface 100 CLAY Mohr Coulomb Water Surface SLIDEINTERPRET Project PROPOSED COMMERCIAL/RETAIL DEVELOPMENT Analyzed By Date SP Units November 2016 feet Condition Scale Static 1:360 Project No.:

22 Cross Section A-A': Slope Stability - Temporary P:\INFOCUS PROJECTS\ \11143 OPT Beverly\002 Design Geo Exploration and Soil Gas Survey\Analyses\CS A-A' Slope Stability Static At rest_rectangular.slim Method: bishop simplified Factor of Safety: 1.66 Center: , Radius: Left Slip Surface Endpoint: , Right Slip Surface Endpoint: , Left Slope Intercept: Right Slope Intercept: W lbs/ft2 CLAY Material Name Color Unit Weight (lbs/ 3) Sat. Unit Weight (lbs/ 3) Strength Type Cohesion (psf) Phi (deg) Water Surface 100 CLAY Mohr Coulomb Water Surface Project SLIDEINTERPRET PROPOSED COMMERCIAL/RETAIL DEVELOPMENT Analyzed By Date SP Units November 2016 feet Condition Scale Static 1:360 Project No.:

23 Cross Section A-A': Slope Stability - Permanent P:\INFOCUS PROJECTS\ \11143 OPT Beverly\002 Design Geo Exploration and Soil Gas Survey\Analyses\CS A-A' Slope Stability Static At rest_permanent.slim Method: bishop simplified Factor of Safety: 1.54 Center: , Radius: Left Slip Surface Endpoint: , Right Slip Surface Endpoint: , Left Slope Intercept: Right Slope Intercept: lbs/ft2 250 W CLAY lbs/ft2 Material Name Color Unit Weight (lbs/ 3) Sat. Unit Weight (lbs/ 3) Strength Type Cohesion (psf) Phi (deg) Water Surface 100 CLAY Mohr Coulomb Water Surface SLIDEINTERPRET Project PROPOSED COMMERCIAL/RETAIL DEVELOPMENT Analyzed By Date SP Units November 2016 feet Condition Scale Static 1:360 Project No.:

September 7, 2017 (Revised November 1, 2017)

September 7, 2017 (Revised November 1, 2017) September 7, 2017 (Revised November 1, 2017) Project No. 10113.002 Environmental Advisors 2400 East Katella Avenue, Suite 800 Anaheim, California 92806 Attention: Subject: Mr. Greg McCafferty Response

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM C A U T I O N!! (THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM EQLique&Settle2. THE AUTHOR IS HEREBY RELEASED OF ANY LIABILITY FOR ANY INCORRECT USE OF THIS SAMPLE

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Supplemental Report 3

Supplemental Report 3 Supplemental Report 3 Geology Geotechnical Engineering 14428 Hamlin St., #200 Van Nuys, CA 91401 Office (818) 994-8895 Fax (818) 994-8599 www.geoconceptsinc.com November 5, 2010 Whole Foods c/o Goldman

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Evaluation of Geotechnical Hazards

Evaluation of Geotechnical Hazards Evaluation of Geotechnical Hazards by Geoffrey R. Martin Appendix B: Evaluation of Geotechnical Hazards Describes Evaluation Procedures Soil Liquefaction Soil Settlement Surface Fault Rupture Flooding

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Liquefaction assessments of tailings facilities in low-seismic areas

Liquefaction assessments of tailings facilities in low-seismic areas Page 1 Liquefaction assessments of tailings facilities in low-seismic areas Holly Rourke SRK Consulting, Perth, WA, Australia Caroline Holmes SRK Consulting, Perth, WA, Australia This paper was first presented

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Soils. Technical English - I 10 th week

Soils. Technical English - I 10 th week Technical English - I 10 th week Soils Soil Mechanics is defined as the branch of engineering science which enables an engineer to know theoretically or experimentally the behavior of soil under the action

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0 VC 605'-0 VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE INDEX TO PLANS SHEET. 2'-" VC 6'-" VC BB EB 1 1 1 1 1 TV - " TV CONDUITS (COX E 8 - " ELECTRIC CONDUITS (SDG & E T - " TELEPHONE CONDUITS 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET. 2.

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Class Principles of Foundation Engineering CEE430/530

Class Principles of Foundation Engineering CEE430/530 Class Principles of Foundation Engineering CEE430/530 1-1 General Information Lecturer: Scott A. Barnhill, P.E. Lecture Time: Thursday, 7:10 pm to 9:50 pm Classroom: Kaufmann, Room 224 Office Hour: I have

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Soil Dynamics Prof. Deepankar Choudhury Department of Civil Engineering Indian Institute of Technology, Bombay

Soil Dynamics Prof. Deepankar Choudhury Department of Civil Engineering Indian Institute of Technology, Bombay Soil Dynamics Prof. Deepankar Choudhury Department of Civil Engineering Indian Institute of Technology, Bombay Module - 4 Dynamic Soil Properties Lecture - 23 Cyclic Stress Ratio, Evaluation of CRR, Correction

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Safety Factor Assessment Report. Area 15 DTE Monroe Power Plant

Safety Factor Assessment Report. Area 15 DTE Monroe Power Plant Submitted to DTE Energy, Inc. Submitted by AECOM 1300 East 9th Street, Suite 500 Cleveland, OH 44114 March 2018 AECOM Project No. 60516675 Safety Factor Assessment Report Area 15 DTE Monroe Power Plant

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

The attitude he maintains in his relation to the engineer is very well stated in his own words:

The attitude he maintains in his relation to the engineer is very well stated in his own words: Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings

More information

APPENDIX D. Geotechnical Study

APPENDIX D. Geotechnical Study APPENDIX D Geotechnical Study Preliminary Geotechnical Assessment Proposed Honda Dealership W Martin Luther King Jr Blvd Los Angeles, California For Celebrity Holdings May 13, 2016 GDC Project No. LA-1265

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

Liquefaction and Foundations

Liquefaction and Foundations Liquefaction and Foundations Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Seismic Design of Reinforced Concrete Buildings 26 30 November, 2012 What is Liquefaction? Liquefaction

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Evaluation of soil liquefaction using the CPT Part 1

Evaluation of soil liquefaction using the CPT Part 1 Evaluation of soil liquefaction using the CPT Part 1 Dr. Peter K. Robertson Webinar #7 2013 CPT Guide 5 th Edition Download FREE copy from: Robertson & Cabal (Robertson) 5 th Edition 2012 www.greggdrilling.com

More information

GEOLOGIC SUBSURFACE CONDITIONS. October 31, 2017 Project No

GEOLOGIC SUBSURFACE CONDITIONS. October 31, 2017 Project No October 31, 2017 Project No. 108205001 Ms. Shawna Anderson San Dieguito River Park Joint Powers Authority 18372 Sycamore Creek Road Escondido, California 92025 Subject: Addendum to Geotechnical Evaluation

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Warmate Tamunonengiyeofori Geostrat International Services Limited, Rivers State, Nigeria www.geostratinternational.com info@geostratinternational.com,

More information

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

Should you have any questions regarding this clarification, please contact the undersigned at or (925) October 8, 2015 Revised October 13, 2015 Contra Costa Community College District 500 Court Street Martinez, CA 94553 Attention: Ron Johnson Subject: Clarification of Grading Requirements Diablo Valley

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

GEOTECHNICAL INVESTIGATION FOR SEISMIC ISSUES FOR K-REACTOR AREA AT SAVANNAH RIVER SITE ABSTRACT

GEOTECHNICAL INVESTIGATION FOR SEISMIC ISSUES FOR K-REACTOR AREA AT SAVANNAH RIVER SITE ABSTRACT GEOTECHNICAL INVESTIGATION FOR SEISMIC ISSUES FOR K-REACTOR AREA AT SAVANNAH RIVER SITE Gonzalo Castro, Ph.D., P.E. GEI Consultants, Inc. 1021 Main Street Winchester, MA 01890 Chester Q. Reeves, P.E. Westinghouse

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses.

8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses. 8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses. 8.2. Some soils show a peak shear strength. Why and what type(s)

More information

Soil Behaviour in Earthquake Geotechnics

Soil Behaviour in Earthquake Geotechnics Soil Behaviour in Earthquake Geotechnics KENJI ISHIHARA Department of Civil Engineering Science University of Tokyo This publication was supported by a generous donation from the Daido Life Foundation

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Geotechnical Subsoil Investigation for the Design of Water Tank Foundation

Geotechnical Subsoil Investigation for the Design of Water Tank Foundation International Journal of Scientific and Research Publications, Volume 4, Issue 3, March 2014 1 Geotechnical Subsoil Investigation for the Design of Water Tank Foundation * Ngerebara Owajiokiche Dago, **

More information

Project Site. Plate A-3. Soil Survey Map. Project No.: LE15070

Project Site. Plate A-3. Soil Survey Map. Project No.: LE15070 B-4 B-2 B-1 B-5 B-3 N Project No.: LE15070 Boring Location Map Plate A-2 N Project Site Project No.: LE15070 Soil Survey Map Plate A-3 N Project Site Project No.: LE15070 Topographic Map Plate A-4

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the Proposed Project. The Geotechnical Engineering Investigation (the

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California May 7, 2015 May 7, 2015 Project No. GT13-16 Prepared for: CEMEX 5180 Golden Foothills, Parkway El Dorado Hills, California 95762 7400 Shoreline Drive, Ste. 6 Stockton, California 95219 Tel: 209-472-1822

More information

Comparison of different methods for evaluating the liquefaction potential of sandy soils in Bandar Abbas

Comparison of different methods for evaluating the liquefaction potential of sandy soils in Bandar Abbas Comparison of different methods for evaluating the liquefaction potential of sandy soils in Bandar Abbas M. Mosaffa¹ & M. Rafiee² 1.Geotechnical M.S. student Hormozgan University, Bandar Abbas, Iran(Email:Amestris@gmail.com).Geotechnical

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

Assessment of Risk of Liquefaction - A Case Study

Assessment of Risk of Liquefaction - A Case Study Assessment of Risk of Liquefaction - A Case Study ASHWAI JAI Deptt. of Civil Engineering ational Institute Technology Kurukshetra-136119 IDIA ashwani.jain66@yahoo.com Abstract: - Catastrophic failures

More information

Use of CPT in Geotechnical Earthquake Engineering

Use of CPT in Geotechnical Earthquake Engineering Use of CPT in Geotechnical Earthquake Engineering Prof. Scott M. Olson, PhD, PE Use of Cone Penetration Test for Foundation Analysis and Design 2006 Annual Meeting Transportation Research Board Geotechnical

More information

APPENDIX C GEOTECHNICAL EXPLORATION REPORT AND RESPONSE TO CGS REVIEW COMMENTS

APPENDIX C GEOTECHNICAL EXPLORATION REPORT AND RESPONSE TO CGS REVIEW COMMENTS APPENDIX C GEOTECHNICAL EXPLORATION REPORT AND RESPONSE TO CGS REVIEW COMMENTS SAN FRANCISO UNIFIED SCHOOL DISTRICT CLAIRE LILIENTHAL (SCOTT CAMPUS) 3-8 SCHOOL NEW CLASSROOM AND GYMNASIUM BUILDING AND

More information

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report APPENDICES Appendix A City Standard Details Appendix B Engineering Geology Report APPENDIX A CITY STANDARDS DETAILS APPENDIX B ENGINEERING GEOLOGY REPORT ENGINEERING GEOLOGY REPORT WATER

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Introduction to Soil Mechanics

Introduction to Soil Mechanics Introduction to Soil Mechanics Sela Sode and Colin Jones WILEY Blackwell Contents Preface Dedication and Acknowledgments List of Symbols Soil Structure 1.1 Volume relationships 1.1.1 Voids ratio (e) 1.1.2

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information