1 APPENDIX D Geotechnical Study

2 Preliminary Geotechnical Assessment Proposed Honda Dealership W Martin Luther King Jr Blvd Los Angeles, California For Celebrity Holdings May 13, 2016 GDC Project No. LA-1265

3 Celebrity Realty Holdings, LLC May 13, S. Figueroa Street GDC Project No. LA-1265 Los Angeles, California Attention: Subject: Mr. Joe Shuster Preliminary Geotechnical Assessment Proposed Honda Dealership W Martin Luther King Jr. Blvd, Los Angeles, CA Los Angeles, California Dear Mr. Shuster: Group Delta Consultants (GDC) is pleased to submit this preliminary geotechnical assessment report for the proposed Honda Dealership development planned at: Martin Luther King Jr Blvd (APN ), Martin Luther King Jr Blvd (APN and APN ), 705 W 40th Place (APN ), Martin Luther King Blvd (APN ), And ½ W 40th Place (APN ). Our scope of work was conducted in general accordance with our proposal dated September 1, 2015, which was authorized on October 2, 2015 and on subsequent communications with the project team. We appreciate the opportunity to provide geotechnical services for this project. If you have any questions pertaining to this report, or if we can be of further service, please do not hesitate to contact us. Sincerely, Group Delta Consultants Jaime Bueno, P.E. Associate Engineer Distribution: Addressee (via ) Spencer Kallick and Edgar Khalatian, Mayer Brown LLP (via ) David Litty, Enclave Enterprises (via ) Chris Hampson, Meridian Consultants (via )

4 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page i GDC Project No. LA-1265 TABLE OF CONTENTS 1.0 INTRODUCTION Background Project Description Scope of Work Data Review GEOTECHNICAL INVESTIGATION Field Investigation SITE CONDITIONS Surface Conditions Subsurface Conditions Groundwater CEQA GEOTECHNICAL HAZARDS Geologic Setting Local Seismicity Ground Surface Rupture Liquefaction and Seismic Settlement Landslides Expansive Soils Other DISCUSSION AND RECOMMENDATIONS General Demolition Temporary Excavation and Shoring Grading and Backfill Foundations Bearing Value Settlement Lateral Capacity Floor Slab... 10

5 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page ii GDC Project No. LA Seismic Considerations LIMITATIONS REFERENCES LIST OF FIGURES Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Site Location Map Exploration Location Plan CDMG Groundwater Map CDMG Geology Map City of LA Fault Rupture Study Area Map State of California Earthquake Fault and Seismic Hazard Zones Map City of LA Areas Susceptible to Liquefaction Map APPENDICES Appendix A Field Exploration

6 PRELIMINARY GEOTECHNICAL ASSESSMENT REPORT PROPOSED HONDA DEALERSHIP DEVELOPMENT W MARTIN LUTHER KING JR. BLVD LOS ANGELES, CALIFORNIA 1.0 INTRODUCTION 1.1 Background Group Delta Consultants, Inc. (GDC) performed a preliminary geotechnical assessment to address the geotechnical/geology hazards as identified in Appendix G of the California Environmental Quality Act ( CEQA ) guidelines and to provide preliminary geotechnical design recommendations for project planning purposes. Our scope of work was based on our project understanding and communications with Mayer Brown, Enclave Enterprises, and the project team. The intent of this report is to serve as a geotechnical assessment for the objectives stated above and it is not sufficient for use as a design-level report for final design or building plan approval. 1.2 Project Description Our project understanding is based on the following documents: Architectural plans titled HONDA Los Angeles by WAGNER Architecture Group, dated February 18, GDC understands that the proposed project consists of two sites: 1) Honda car dealership and 2) Parking structure, as shown on the Site Location Map, Figure 1. The car dealership will consist of five (5) stories above grade with an approximate ground floor area of 35,000 square feet (sf). The dealership site is located on the southeast corner of the W Martin Luther King Jr Blvd and Hoover St. The site is made up of the following lots: Martin Luther King Blvd (APN and APN ), 705 W 40 th Place (APN ), Martin Luther King Blvd (APN ), And ½ W 40 th Place (APN ). The parking structure will consist of five (5) stories of above-grade parking with an approximate ground floor area of 23,440 sf. The parking structure site is located on the southwest corner of the intersection between W Martin Luther King Jr Blvd and Hoover St and is located at Martin Luther King Blvd (APN ). We understand that the proposed development does not include any basement levels. We also understand that a groundwater infiltration system is being planned for the site. The location and depth of this system have not been finalized.

7 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 2 GDC Project No. LA Scope of Work The objective of this preliminary assessment is to address factors identified in Appendix G of the CEQA guidelines and to provide preliminary geotechnical design recommendations for project planning. The recommendations were developed based on review of the conceptual drawings for the proposed development and subsurface data collected from our field investigations at the site. We performed the following general scope of work: Reviewed the project plans referenced in Section 1.2 and the references listed in Section 1.4; Performed a visual site reconnaissance to evaluate the existing site conditions; Performed a geotechnical subsurface exploration program, including advancing borings and cone penetration tests (CPT s), to evaluate the existing site-specific subsurface conditions; Assessed geologic and soil factors identified in Appendix G of the CEQA guidelines including fault rupture potential, strong seismic ground shaking, liquefaction potential, landslide potential, and presence of expansive soil; Developed preliminary geotechnical recommendations for foundations and earthwork. Identified geotechnical issues which should be addressed during a design-level investigation. Although we used geotechnical information from the Phase I and Phase II Environmental Site Assessment reports referenced in Section 1.4, our scope of work does not include any environmental review of those reports and our report does not present any environmental conclusions or recommendations. The referenced environmental reports should be consulted for environmental conditions on site. 1.4 Data Review Our preliminary geotechnical assessment for the project site included review of the following: Alquist-Priolo fault maps; Seismic Hazard Zone Report for the Hollywood Quadrangle (Report 026); Safety Element of the General Plan for the City of Los Angeles; Ground motion information from the United States Geological Survey (USGS), Websites include: o o Historical topographic maps from the USGS. ALTA/ACSM Land Title Survey for the subject site, prepared by Commercial Development Resources (CDR), dated March 25, 2015.

8 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 3 GDC Project No. LA-1265 Phase I Environmental Site Assessment Report performed at 730, 740, and 800 West martin Luther King Jr Blvd and 4011 South Hoover Street, prepared by Andersen Environmental (AE), dated January 30,2015; Phase I Environmental Site Assessment Report performed at 601 West 40 th Place, prepared by AE, dated August 25, 2015; Phase II Subsurface Soil Assessment at a Former Gasoline Station at 800 West Martin Luther King Jr Blvd, prepared by JHA Environmental, dated March 13, Our findings and conclusions are discussed below. 2.0 GEOTECHNICAL INVESTIGATION 2.1 Field Investigation GDC performed a field investigation on October 14 and October 22, 2015 at the subject site. The specific exploration locations were selected based on an initial site visit and the data review. Exploration locations were cleared through Underground Service Alert (USA) prior to mobilizing field equipment; site access and exploration locations were cleared with the site owners. Our exploration locations are shown on Figure 2, Exploration Location Plan. The original location of CPT-1 had to be moved east due to a concrete obstruction encountered approximately 1 foot below ground near the center of the parking structure site. The field investigation consisted of the following: Two (2) hollow stem auger borings advanced to a depth of 51.5 feet each; Three (3) CPT soundings advanced to depths of approximately 33 feet, 34 feet, and 34 feet. The CPT soundings were terminated at the indicated depths due to encountering refusal. Seismic shear wave velocity measurements were performed in CPT-2. Both relatively undisturbed samples (Modified California) and Standard Penetration Test (SPT) samples were collected from the borings. Bulk samples of near-surface soil were collected at shallow depths. The explorations were performed under full time observation of a GDC field engineer, who maintained logs of the soil encountered, classified the material, and assisted in obtaining soil samples. Boring logs and CPT logs are provided in Appendix A. 3.0 SITE CONDITIONS 3.1 Surface Conditions The majority of the site consists of at-grade asphalt parking lots. The proposed dealership lot currently has one commercial building along Hoover Street and asphalt parking. The site is

9 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 4 GDC Project No. LA-1265 relatively flat with elevations ranging from approximately 174 to 178 feet above mean sea level (above msl). 3.2 Subsurface Conditions The site is mostly covered by asphalt pavement consisting of approximately 4 inches of asphalt over 10 inches of base. These thicknesses are based on our observations at our boring locations but may vary across the site. Concrete was encountered at a depth of one (1) foot when attempting to advance CPT-1. As previously mentioned, the location of CPT-1 was moved approximately five (5) feet east from its original location in order to avoid the unknown concrete obstruction. Below the asphalt pavement, very loose to medium dense silty sand was encountered to a depth of about 10 feet. Underlying this silty sand are layers of loose to medium dense sand, silty sand, and firm to stiff silt and elastic silt to a depth of about 30 feet. The silt to elastic silt layers were observed in Boring B-2 from approximate depths of 15 to 25 feet, while these layers were observed in CPT-2 and CPT-3 at approximate depths of 15 to 17 feet and in CPT-1 and CPT-2 at approximate depths of 27 to 32 feet bgs. Dense sand with variable gravel content was encountered from about 32 feet to the maximum depth explored (51.5 feet). A sandy silt layer was encountered from a depth of approximately 40 to 50 feet in Boring B Groundwater Groundwater was not encountered down to 51.5 feet below ground surface (bgs) during the field investigation. The Phase II report prepared by AE didn t report groundwater at their maximum depth explored of 75 feet bgs. Based on the Seismic Hazard Zone Report for the Hollywood Quadrangle, historic high groundwater depths at the site are about 50 feet bgs, as shown on Figure 3. The California Department of Water Resources data library shows a monitoring well located about 1.2 miles west of the site, where a groundwater depth of 162 feet bgs was measured in CEQA GEOTECHNICAL HAZARDS 4.1 Geologic Setting Regionally, the site is located within the seismically active Los Angeles Basin area of southern California. The basin underwent transtensional stresses with subsidence between northwest and east-west trending fault systems and began opening up over 7 million years ago (Wright 1991). Today, the basin is undergoing transpresssional stress bound by surrounding uplifting thrust blocks including the Whittier, Palos Verdes, and Santa Monica-Hollywood-Raymond fault systems. Internally, the basin is filled with sedimentation thousands of feet thick and is structurally influenced by thrusting fault blocks and strike-slip fault expressions trending northwest (Dolan, et al., 1995). The regional geology is presented in the Site Geologic Map on Figure 4. Specific site subsurface conditions were presented in Section 3.2 above.

10 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 5 GDC Project No. LA Local Seismicity The site is located within an active seismic area. The site may experience severe seismic shaking in the future due to nearby faults. A list of faults considered capable of producing significant shaking at the site is provided in the table below (2008 USGS National Seismic Hazard Maps). ABBREVIATED FAULT NAME Table 1. List of Faults Max. Magnitude (Mw) 1 Approximate Closest Distance (km) Fault Type 2 PUENTE HILLS Rev NEWPORT INGLEWOOD (N. LA Basin) SS ELYSIAN PARK (UPPER) Rev ELYSIAN PARK (LOWER) Rev HOLLYWOOD SS COMPTON Rev SANTA MONICA SS PUENTE HILLS (SANTA FE SPRINGS) Rev NEWPORT INGLEWOOD (S. LA BASIN) SS ANACAPA-DUME ALT Rev 1 Based on Ellsworth and Hanks/Bakun relation (USGS 2008) 2 SS= Strike Slip; Rev = Reverse The proposed project should be designed in accordance with current local building codes in order to mitigate the local seismicity hazard at the site. Current California Building Code (CBC 2013) preliminary seismic design parameters are presented in Section 5.7 of this report. 4.3 Ground Surface Rupture The site is not located within an Alquist-Priolo Special Studies Zone or within a City of Los Angeles Fault Rupture Study Area. Active faults have not been mapped on the site. The latest version of the earthquake fault zone for the Hollywood Quadrangle, dated November 6, 2014, shows the Newport Inglewood fault zone is approximately 3.8 miles west of the site, as shown on Figure 6. Since there are no active surface or subsurface faults mapped as crossing or projecting toward the site in the geologic literature reviewed, the possibility of ground surface fault rupture at the subject site is considered low. 4.4 Liquefaction and Seismic Settlement Liquefaction involves sudden loss in strength of a saturated, cohesionless soil caused by the buildup of pore water pressure during cyclic loading, such as that produced by an earthquake. This increase in pore water pressure can temporarily transform the soil into a fluid mass, resulting in differential settlements and ground deformations. Typically, liquefaction occurs in areas where there are loose soils and the depth to groundwater is less than 50 feet from the surface. Seismic

11 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 6 GDC Project No. LA-1265 shaking can also cause ground settlement without liquefaction occurring, including settlement of dry sands above the water table. According to the Seismic Hazards Zone Map the site is not located within the State Liquefaction Seismic Hazard Zone for the Hollywood Quadrangle, 1998, as shown on Figure 6. According to the City of Los Angeles Safety Element the site is not within an area susceptible to liquefaction, as shown on Figure 7. The historical high ground water is reported to be about 50 feet below the ground surface (CGS, 1998). Therefore, the potential for liquefaction at the site is considered low. Seismically-induced settlement of the dry upper silty sand and sandy silt is expected to be in the range of up to approximately 0.7 inch for the current site conditions due to the loose sandy soils in the upper 10 to 15 feet. The magnitude of seismically-induced settlements can be mitigated by one or a combination of the following options: Remove and recompact upper loose sandy soils prior to building construction. The depths of removal and recompaction can be determined during a design-level geotechnical investigation and once final foundation dimensions and loads are known. Recompaction of on-site soils may be required up to depths of approximately 10 to 15 feet under the proposed buildings. Implement a ground improvement program. Ground improvement could consist of stone columns, grout columns, or ground densification through vibratory methods such as deep dynamic compaction or rapid impact compaction. Incorporate seismically-induced total and differential settlements in the structural design. Support the site building on pile foundations. 4.5 Landslides The project site and surrounding area is relatively flat and is not located within a State of California Earthquake-Induced Landslide Hazard Zone, as shown on Figure 6. There are no significant slopes that can present a landslide hazard at or near the site. Therefore, landslides are not considered a hazard at the site. 4.4 Expansive Soils Based on our field investigation, SPT and CPT logs show the majority of subsurface soils consist of silty sand and sand with varying amounts of gravel. Elastic silts were encountered during our field exploration at depths greater than 15 feet. These elastic silts had low plasticity and are not considered to be expansive.

12 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 7 GDC Project No. LA Other Existing site conditions include the presence of loose sandy soils in the upper 10 to 15 feet. These loose soils have the potential to induce excessive total and differential settlements of the proposed building foundations. This issue can be mitigated through one or a combination of the following options: Remove and recompact upper loose sandy soils prior to building construction. The depths of removal and recompaction can be determined during a design-level geotechnical investigation and once final foundation dimensions and loads are known. Recompaction of on-site soils may be required up to depths of approximately 10 to 15 feet under the proposed buildings. Support the buildings on larger footings or a mat to reduce bearing pressures. Implement a ground improvement program. Ground improvement could consist of stone columns, grout columns, or ground densification through vibratory methods such as deep dynamic compaction or rapid impact compaction. Incorporate seismically-induced total and differential settlements in the structural design. Support the site building on pile foundations. The specific option can be selected during the project design based on the results of a designlevel geotechnical investigation, building load requirements, and structural design. 5.0 DISCUSSION AND RECOMMENDATIONS 5.1 General Based on a review of existing subsurface information and the conceptual plans, it is our opinion that the proposed project is feasible from a geotechnical standpoint. Following proper site grading, the proposed construction can be supported on conventional spread footings or mat foundations founded on engineered compacted fill or improved ground as noted in Section 4 above. For preliminary discussion, we have assumed that loose sandy soils would be removed and placed back as engineered fill. Preliminary geotechnical recommendations for design planning are discussed in the following sections. However, a design-level geotechnical investigation will be required to develop geotechnical recommendations for final design. A design-level geotechnical investigation will require additional drilling and sampling of geotechnical borings, laboratory testing to confirm engineering parameters, and further engineering analyses. 5.2 Demolition Prior to the start of earthwork, the existing building and improvements on the site will require demolition and removal, including the existing foundations, slabs, pavements, walls and utilities. Remnants of previous construction could be encountered anywhere on the site. The civil

13 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 8 GDC Project No. LA-1265 engineer should identify the presence and location of all existing utilities on and adjacent to the site. Precautions will be required to remove, relocate or protect existing utilities, as appropriate. 5.3 Temporary Excavation and Shoring Very loose to loose silty sand was encountered on the proposed dealership property up to approximately 10 to 15 feet bgs. Depending on the final project details, temporary shoring may be required to support the walls of the excavation for removal and recompaction of loose soils. The contractor will be responsible for the design of the shoring. The shoring designer should consider the project requirements and geotechnical conditions to select an appropriate shoring system. If the excavation is exposed during periods of rainfall, provisions for collection of the runoff should be made. All surface drainage should be controlled and prevented from running down into the excavation. Ponding water should not be allowed within the excavation. Any collected water should be pumped out. Soils softened by wetting should be removed and backfilled as directed by the geotechnical engineer. All excavation slopes and shoring systems should meet minimum requirements of the Occupational Safety and Health (OSHA) Standards. Maintaining safe and stable slopes on excavations is the responsibility of the contractor and will depend on the nature of the soils and groundwater conditions encountered and the contractor s method of excavation. Excavations during construction should be carried out in such a manner that failure or ground movement will not occur. The short-term stability of excavation depends on many factors, including slope angle, engineering characteristics of the subsurface materials, height of the excavation, and length of time the excavation remains unsupported and exposed to equipment vibrations, rainfall, and desiccation. The contractor should perform any additional studies deemed necessary to supplement the information contained in this report for the purpose of planning and executing his excavation plan. Recommendations regarding sloped temporary excavations and shoring are provided in the sections below. 5.4 Grading and Backfill Site preparation may require excavation of the upper loose soils and placing these soils back into the excavation as compacted fill under the proposed structures. Subsurface soils underlying pavements, hardscape, and landscape areas will need to be over-excavated and recompacted to a depth of approximately 3 feet below grade. Excavation can be readily accomplished with light to heavy effort using conventional heavy-duty grading equipment such as scrapers, loaders, dozers, and excavators. Concrete, brick, old foundations, or other below-ground debris and structures from previous developments at the site may be encountered during the excavations. The depths of required over-excavation and compaction of on-site soils should be further assessed during a design-level geotechnical investigation.

14 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 9 GDC Project No. LA-1265 We recommend foundations and floor slabs be supported on engineered fill compacted to at least 95% of the maximum dry density as determined by the modified Proctor compaction test (ASTM D1557). The subgrade soils and compacted fill should be tested and approved by the project geotechnical engineer prior to construction of footings or floor slabs. If loose, disturbed, or otherwise unsuitable soils are found at the bottom of the excavation, these soils shall be removed or brought to near-optimum moisture content (+2%), recompacted, and tested to a minimum of 95% relative compaction prior to placement of fill or footing construction. The onsite soils may be used for compacted fill. All permanent fill/backfill soils should be brought to near-optimum moisture content and compacted with heavy-duty compaction equipment. Compaction shall be done in maximum 8- inch loose lifts. A sufficient number of field density and laboratory compaction tests should be performed during construction to verify minimum compaction requirements. We recommend that all permanent fills be compacted to a minimum relative compaction of 95% of the maximum dry density determined in accordance with ASTM D1557. Footing excavations should be clean and free of loose or wet soils and should be observed and tested by the project geotechnical engineer before placement of steel or concrete. 5.5 Foundations Bearing Value The allowable bearing value for design will be based on the foundation dimensions and the method used to mitigate for the presence of very loose to loose silty sand on site. For preliminary estimates we have assumed footings supported on engineered fill. Tables 2 and 3 below present preliminary allowable bearing pressures for footings bearing on engineered fill prepared in accordance with the recommendations of this report. The allowable bearing values presented in Table 2 below are based on the assumption that total static settlements should be limited to a maximum of one (1) inch. These values are for preliminary assessment only and may be revised during a design-level geotechnical investigation. Table 2. Preliminary Allowable Bearing Pressure for Square Footings Footing Dimension Allowable Bearing 2 x 2 2,500 psf 5 x 5 3,500 psf 10 x 10 3,500 psf Alternatively, the proposed structure may be supported on mat foundations. The final bearing capacity of footings and modulus of subgrade reaction for a mat should be based on an evaluation of settlement and can be provided during the design-level geotechnical investigation, considering the actual foundation loading. Footing excavations should be observed by the project

15 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 10 GDC Project No. LA-1265 geotechnical engineer before placement of concrete to verify that the foundation conditions meet the requirements of the geotechnical report. The project geotechnical engineer may perform compaction tests, probing, or use other methods to verify that the foundations will be supported in competent soils. If disturbed, wet, or otherwise unsuitable soils are encountered, or if water saturates the soils, the soils shall be excavated or stabilized as recommended by the project geotechnical engineer Settlement The preliminary bearing values presented in Table 2 above are based on total static settlements of up to 1 inch and static differential settlements of up to 0.5 inches. Seismically-induced settlements should also be incorporated into the structural design Lateral Capacity Resistance to lateral loads can be provided by friction developed between the bottom of footings and the supporting soil, and by the passive soil pressure developed on the face of the footing. For preliminary design purposes, an allowable passive fluid pressure of 200 pcf and a coefficient of friction of 0.4 may be used for lateral sliding resistance of footings 5.6 Floor Slab Floor slabs may be placed on a properly prepared subgrade. To reduce the potential for moisture transmission through slabs where moisture sensitive covering will be installed, we recommend that a vapor retarder shall be used. In accordance with ACI 302.2R-06, the material must comply with the requirements of ASTM E 1745, Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs, and have a permeance of less than 0.01 perms per ASTM E96. The installation of the moisture barrier should comply with ASTM E Reference is made to ACI 302.2R, Section 7.2 concerning whether to place 2 inches of sand over the barrier. 5.7 Seismic Considerations The site is classified as Seismic Site Class D based on the results of our feasibility-level field investigation. In accordance with the provision of the 2013 California Building Code, we recommend the following preliminary seismic design parameters for the site: Table 4. Seismic Design Parameters Latitude: , Longitude: , Site Class D PARAMETER Value Reference Mapped Spectral Response Acceleration at Short Period (SS) 2.019g Chapter 11 and

16 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 11 GDC Project No. LA-1265 Mapped Spectral Response Acceleration at 1 Second Period (S1) 0.717g Chapter 22 of ASCE 7-10 Site Coefficient for Site Class D (Fa) 1.0 Site Coefficient for Site Class D (Fv) 1.5 Design Earthquake Spectral Response Acceleration at Short Period (SDS) Design Earthquake Spectral Response Acceleration at 1 Second Period (SD1) 1.346g 0.717g The seismic design parameters were calculated using the USGS Seismic Design Maps Web Application ( 6.0 LIMITATIONS This consultation was performed in accordance with generally accepted Geotechnical Engineering principles and practice. The professional engineering work and judgments presented in this report meet the standard of care of our profession at this time. No other warranty, expressed or implied, is made. This report has been prepared for Celebrity Holdings and the proposed project and is to be used to address CEQA geology hazards and for preliminary planning purposes. It may not contain sufficient information for other parties or other purposes, and should not be used for other projects or other purposes, such as final design, without review and approval by GDC. The recommendations contained in this report are preliminary, and based on conceptual plans for the project. This report is not sufficient to obtain a building permit. A design-level geotechnical report is required before final design plans can be developed.

17 Preliminary Geotechnical Assessment May 13, 2016 W Martin Luther King Blvd, CA Page 12 GDC Project No. LA REFERENCES California Geological Survey, 1998, Seismic Hazard Zone Report for the Hollywood 7.5-Minute Quadrangle, Los Angeles County, California, Seismic Hazard Zone Report 026, Plate 1.2. California Geological Survey, (1999), State of California Seismic Hazard Zones Map, Hollywood Quadrangle, Los Angeles County, California, March 25, City of Los Angeles, 1996, Safety Element of the Los Angeles City General Plan, August 8, 1996, adopted November 26, United States Geological Survey, 2015, Anderson Environmental, Phase 1 Environmental Site Assesssment Report performed at 730, 740, and 800 West Martin Luther King Jr Blvd and 4011 South Hoover Street, dated Januarly 30, Anderson Environmental, Phase 1 Environmental Site Assessment Report performed at 601 West 40 th Place, dated August 25, Anderson Environmental, Phase 2 Subsurface Soil Assessment at a Former Gasoline Station at 800 West Martin Luther King Jr Blvd, dated March 13, 2015.

18 FIGURES

19 SITE VICINITY N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1265_Figures 1-5.dwg, 1/20/2016 2:41:27 PM, josemiguelt REFERENCE: GOOGLE MAPS DATE: DRAWN BY: REVIEW: APPROVED BY: PREPARED BY: 10/28/ JMT DS GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA ' 2000' SITE LOCATION MAP PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BLVD., LOS ANGELES, CA PROJECT NUMBER: SCALE: AS SHOWN FIGURE NUMBER: LA

20 W. MARTIN LUTHER KING BLVD. B-2 CPT-1 CPT-2 B-1 PROPOSED PARKING STRUCTURE PROPOSED DEALERSHIP CPT-3 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1265_Figures 1-5.dwg, 1/20/2016 2:44:21 PM, josemiguelt LEGEND B-1 APPROXIMATE LOCATION OF BORING CPT-1 APPROXIMATE LOCATION OF CPT APPROXIMATE SITE BOUNDARY REFERENCE: GOOGLE MAPS DATE: REVIEW: PREPARED BY: 10/28/ DRAWN BY: APPROVED BY: S. HOOVER STREET JMT DS GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA ' 100' PROPOSED BORING AND CPT LOCATION MAP PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BLVD., LOS ANGELES, CA PROJECT NUMBER: SCALE: AS SHOWN FIGURE NUMBER: LA

21 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1265_Figures 1-5.dwg, 1/20/2016 2:46:38 PM, josemiguelt REVIEW: PREPARED BY: LEGEND 30 DATE: DRAWN BY: PROJECT NUMBER: 10/28/ BOREHOLE SITE APPROVED BY: JMT DS SITE VICINITY DEPTH OF GROUNDWATER IN FEET REFERENCE: PLATE 1.2 OF CDMG SEISMIC HAZARD ZONE REPORT 026, 1998 GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA CDMG GROUND WATER MAP PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BLVD., LOS ANGELES, CA SCALE: LA-1265 AS SHOWN FIGURE NUMBER: 3

22 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1265_Figures 1-5.dwg, 1/20/2016 2:48:19 PM, josemiguelt DATE: DRAWN BY: PROJECT NUMBER: REVIEW: 10/28/2015 PREPARED BY: - - APPROVED BY: JMT DS Qya2 REFERENCE: PLATE 1.1 OF CDMG SEISMIC HAZARD ZONE REPORT 026, 1998 SITE VICINITY GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA CDMG GEOLOGY MAP PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BLVD., LOS ANGELES, CA SCALE: LA-1265 AS SHOWN FIGURE NUMBER: 4

23 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1265_Figures 1-5.dwg, 1/20/2016 2:52:21 PM, josemiguelt REVIEW: LEGEND DATE: DRAWN BY: PROJECT NUMBER: 10/28/2015 PREPARED BY: - - APPROVED BY: JMT DS GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA STUDY AREA MAP SITE VICINITY CITY OF LOS ANGELES FAULT RUPTURE PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BLVD., LOS ANGELES, CA SCALE: LA-1265 AS SHOWN FIGURE NUMBER: 5

24 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1256_Figure 6 Earthquake Zones.dwg, 1/20/2016 3:00:42 PM, josemiguelt SITE VICINITY 0 Reference: CGS, EARTHQUAKE ZONES OF REQUIRED INVESTIGATION, HOLLYWOOD QUADRANGLE, EARTHQUAKE FAULT ZONES, 2014, SEISMIC HAZARD ZONES, DRAWN BY: DATE: 10/28/2015 REVIEW: JMT APPROVED BY: DS PREPARED BY: GROUP DELTA CONSULTANTS, INC 370 Amapola Ave. Suite 212 Torrance, CA ' STATE OF CALIFORNIA EARTHQUAKE FAULT AND SEISMIC HAZARD ZONES MAP PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BOULEVARD LOS ANGELES, CA 8000' PROJECT NUMBER: LA-1256 SCALE: AS SHOWN FIGURE NUMBER: 6

25 N:\Projects\ \LA-1265 Celebrity-800 W MLK BLVD., LA\dwg\LA-1256_Figure 7 City of LA Liquefaction Map.dwg, 1/20/2016 2:56:43 PM, josemiguelt REFERENCE: SAFETY ELEMENT EXHIBIT B AREAS SUSCEPTIBLE TO LIQUIFACTION DATE: REVIEW: PREPARED BY: DRAWN BY: 10/28/2015 JMT GROUP DELTA CITY OF LOS ANGELES MAP OF CONSULTANTS, INC AREAS SUSCEPTIBLE TO LIQUEFACTION PROJECT NUMBER: LA-1256 SCALE: APPROVED BY: DS SITE VICINITY 370 Amapola Ave. Suite 212 Torrance, CA PROPOSED HONDA DEVELOPMENT MARTIN LUTHER KING BOULEVARD LOS ANGELES, CA AS SHOWN FIGURE NUMBER: 7

26 APPENDIX A FIELD EXPLORATION

27 COARSE GRAINED SOILS (less than 50% fines passing the No. 200 Sieve) FINE GRAINED SOILS (50% or more fines passing the No. 200 Sieve) UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D-2487) PRIMARY DIVISIONS CLEAN GRAVEL GROUP SYMBOL GW SECONDARY DIVISIONS Well-graded gravel, gravel with sand, little or no fines GRAVEL (Less than 5% fines) GP Poorly-graded gravel, gravel with sand, little or no fines (% GRAVEL > % SAND) "DIRTY" GRAVEL GM Silty gravel, silty gravel with sand, silty or non-plastic fines (More than 12% fines) GC Clayey gravel, clayey gravel with sand, clayey or plastic fines CLEAN SAND SW Well-graded sand, sand with gravel, little or no fines SAND (Less than 5% fines) SP Poorly-graded sand, sand with gravel, little or no fines (% SAND >. % GRAVEL) "DIRTY" SAND SM Silty sand, silty sand with gravel, silty or non-plastic fines (More than 12% fines) SC Clayey sand, clayey sand with gravel, clayey or plastic fines ML Inorganic silt, sandy silt, gravelly silt, or clayey silt with low plasticity SILTS AND CLAYS CL Inorganic clay of low to medium plasticity, sandy clay, gravelly clay, silty clay, Lean Clay (Liquid Limit less than 50) OL Low to medium plasticity Silt or Clay with significant organic content (vegetative matter) MH Inorganic elastic silt, sandy silt, gravelly silt, or clayey silt of medium to high plasticity SILTS AND CLAYS CH Inorganic clay of high plasticity, Fat Clay (Liquid Limit 50 or more) OH Medium to high plasticity Silt or Clay with significant organic content (vegetative matter) HIGHLY ORGANIC SOILS PT Peat or other highly organic soils Dual symbols are used for coarse grained soils with 5 to 12% fines (ex: SP-SM), and for soils with Atterberg Limits falling in the CL-ML band in the Plasticity Chart. Borderline classifications between groups may be indicated by two symbols separated by a slash (ex: CL/CH, SW/GW). COARSE GRAINED SOILS Blowcount SPT 1 (CAL) (0-6) 5-10 (7-15) (16-45) (46-75) >50 (>75) CONSISTENCY CLASSIFICATION Consistency Very Loose Loose Med. Dense Dense Very Dense Blowcount 3 SPT 1 (CAL) 2 <2 (<3) 2-4 (3-6) 5-8 (7-12) 9-15 (13-22) (23-45) >31 (>45) FINE GRAINED SOILS Consistency Undrained Shear Strenth 3, S u (ksf) Very Soft < 0.25 Soft Firm Stiff Very Stiff Hard >4.0 MOISTURE CLASSIFICATION Absence of moisture, dusty, dry to the touch Damp but no visible water Visible free water, usually soil is below water table 1. Number of blows of a 140-lb. hammer falling 30-inches to drive a 2-inch OD (1.375-inch ID) [ASTM D-1585] the final 12-inches of driving 2. Number of blows of a 140-lb. hammer falling 30-inches to drive a 3-inch OD (2.42- inch ID) the final 12-inches of driving. 3. Undrained shear strength of cohesive soils predicted from field blowcounts is generally unreliable. Where possible, consistency should be based on S u data from pocket penetrometer, torvane, or laboratory testing. CLASSIFICATION CRITERIA BASED ON LABORATORY TESTS Grain Size Classification CLAY AND SILT SAND GRAVEL Fine Medium Coarse Fine Coarse COBBLES US Std Sieve Grain Size (mm) BOULDERS Classification of earth materials shown on the logs is based on field inspection and should not be construed to imply laboratory analysis unless so stated. Coefficient of Uniformity: C u = D 60 / D 10 Coefficient of Curvature: C C = (D 30 ) 2 / (D 10 x D 60 ) D 10 = 10% of the soil is finer than this diameter D 30 = 30% of the soil is finer than this diameter D 30 = 60% of the soil is finer than this diameter SW C u >6 and C c between 1 and 3 GW C u >4 and C c between 1 and 3 GP or SP Clean gravel or sand not meeting requirement for GW or SW GM or SM Plots below "A" Line on Plasticity Chart or PI < 4 GC or SC Plots above "A" Line on Plasticity Chart and PI > 7 A 1

28 GW GW-GM GW-GC GP-GM Well-graded GRAVEL with SAND Poorly graded GRAVEL Well-graded GRAVEL with SILT Well-graded GRAVEL with CLAY (or SILTY CLAY) Well-graded GRAVEL with CLAY and SAND (or SILTY CLAY and SAND) Poorly graded GRAVEL with CLAY (or SILTY CLAY) GP-GC Poorly graded GRAVEL with CLAY and SAND (or SILTY CLAY and SAND) GM Well-graded SAND with CLAY (or SILTY CLAY) SW-SC Well-graded SAND with CLAY and GRAVEL (or SILTY CLAY and GRAVEL) SM SC Poorly graded SAND with SILT SILTY SAND with GRAVEL CLAYEY SAND with GRAVEL SILTY, CLAYEY SAND SC-SM SILTY, CLAYEY SAND with GRAVEL PT Poorly graded GRAVEL with SAND Well-graded GRAVEL with SILT and SAND Poorly graded GRAVEL with SILT and SAND SILTY GRAVEL CLAYEY GRAVEL SILTY, CLAYEY GRAVEL Well-graded SAND Well-graded SAND with GRAVEL Poorly graded SAND Poorly graded SAND with GRAVEL Well-graded SAND with SILT and GRAVEL Poorly graded SAND with SILT and GRAVEL SILTY SAND CLAYEY SAND PEAT COBBLES COBBLES and BOULDERS BOULDERS GROUP SYMBOLS AND NAMES Graphic / Symbol Group Names Graphic / Symbol Group Names GP GC GC-GM SW SP SW-SM SP-SM Well-graded GRAVEL Poorly graded GRAVEL with SILT SILTY GRAVEL with SAND CLAYEY GRAVEL with SAND SILTY, CLAYEY GRAVEL with SAND Well-graded SAND with SILT Poorly graded SAND with CLAY (or SILTY CLAY) SP-SC Poorly graded SAND with CLAY and GRAVEL (or SILTY CLAY and GRAVEL) CL CL-ML ML OL OL CH MH OH OH OL/OH DRILLING METHOD SYMBOLS Lean CLAY Lean CLAY with SAND Lean CLAY with GRAVEL SANDY lean CLAY SANDY lean CLAY with GRAVEL GRAVELLY lean CLAY GRAVELLY lean CLAY with SAND SILTY CLAY SILTY CLAY with SAND SILTY CLAY with GRAVEL SANDY SILTY CLAY SANDY SILTY CLAY with GRAVEL GRAVELLY SILTY CLAY GRAVELLY SILTY CLAY with SAND SILT SILT with SAND SILT with GRAVEL SANDY SILT SANDY SILT with GRAVEL GRAVELLY SILT GRAVELLY SILT with SAND ORGANIC lean CLAY ORGANIC lean CLAY with SAND ORGANIC lean CLAY with GRAVEL SANDY ORGANIC lean CLAY SANDY ORGANIC lean CLAY with GRAVEL GRAVELLY ORGANIC lean CLAY GRAVELLY ORGANIC lean CLAY with SAND ORGANIC SILT ORGANIC SILT with SAND ORGANIC SILT with GRAVEL SANDY ORGANIC SILT SANDY ORGANIC SILT with GRAVEL GRAVELLY ORGANIC SILT GRAVELLY ORGANIC SILT with SAND Fat CLAY Fat CLAY with SAND Fat CLAY with GRAVEL SANDY fat CLAY SANDY fat CLAY with GRAVEL GRAVELLY fat CLAY GRAVELLY fat CLAY with SAND Elastic SILT Elastic SILT with SAND Elastic SILT with GRAVEL SANDY elastic SILT SANDY elastic SILT with GRAVEL GRAVELLY elastic SILT GRAVELLY elastic SILT with SAND ORGANIC fat CLAY ORGANIC fat CLAY with SAND ORGANIC fat CLAY with GRAVEL SANDY ORGANIC fat CLAY SANDY ORGANIC fat CLAY with GRAVEL GRAVELLY ORGANIC fat CLAY GRAVELLY ORGANIC fat CLAY with SAND ORGANIC elastic SILT ORGANIC elastic SILT with SAND ORGANIC elastic SILT with GRAVEL SANDY elastic ELASTIC SILT SANDY ORGANIC elastic SILT with GRAVEL GRAVELLY ORGANIC elastic SILT GRAVELLY ORGANIC elastic SILT with SAND ORGANIC SOIL ORGANIC SOIL with SAND ORGANIC SOIL with GRAVEL SANDY ORGANIC SOIL SANDY ORGANIC SOIL with GRAVEL GRAVELLY ORGANIC SOIL GRAVELLY ORGANIC SOIL with SAND C CL CP CR CU DS EI PI PL PM PP R SE FIELD AND LABORATORY TESTS Consolidation (ASTM D ) Collapse Potential (ASTM D ) Compaction Curve (CTM ) Corrosion, Sulfates, Chlorides (CTM ; CTM ; CTM ) Consolidated Undrained Triaxial (ASTM D ) Direct Shear (ASTM D ) Expansion Index (ASTM D ) M Moisture Content (ASTM D ) OC Organic Content (ASTM D ) P Permeability (CTM ) PA Particle Size Analysis (ASTM D [2002]) Liquid Limit, Plastic Limit, Plasticity Index (AASHTO T 89-02, AASHTO T 90-00) Point Load Index (ASTM D ) Pressure Meter Pocket Penetrometer R-Value (CTM ) Sand Equivalent (CTM ) SG Specific Gravity (AASHTO T ) SL Shrinkage Limit (ASTM D ) SW Swell Potential (ASTM D ) TV Pocket Torvane UC Unconfined Compression - Soil (ASTM D ) Unconfined Compression - Rock (ASTM D ) UU Unconsolidated Undrained Triaxial (ASTM D ) UW Unit Weight (ASTM D ) VS Vane Shear (AASHTO T [2004]) SAMPLER GRAPHIC SYMBOLS Standard Penetration Test (SPT) Standard California Sampler Modified California Sampler Shelby Tube NX Rock Core Bulk Sample Piston Sampler HQ Rock Core Other (see remarks) WATER LEVEL SYMBOLS Auger Drilling Rotary Drilling Dynamic Cone or Hand Driven Diamond Core First Water Level Reading (during drilling) Static Water Level Reading (after drilling, date) DEFINITIONS FOR CHANGE IN MATERIAL Term Definition Symbol Change in material is observed in the Material sample or core, and the location Change of change can be accurately measured. Estimated Material Change Change in material cannot be accurately located because either the change is gradational or because of limitations in the drilling/sampling methods used. Ref.: Caltrans Soil and Rock Logging Classification, and Presentation Manual (2010) GROUP GROUP DELTA CONSULTANTS, INC. FIGURE NUMBER GEOTECHNICAL ENGINEERS AND GEOLOGISTS PROJECT NAME A-1B A-1b PROJECT NUMBER EXPO LRT PHASE 2 PROJECT L-949 Soil/Rock Boundary Material changes from soil characteristics to rock characteristics. DELTA CONSULTANTS BORING RECORD LEGEND #2

29 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-1 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG DESCRIPTION AND CLASSIFICATION ASPHALT CONCRETE (3") BASE (10") SILTY SAND (SM); dark brown; moist; fine to medium SAND. 175 Bulk-1 5 S-1 w.o.h Very loose; brown to dark brown; moist; fine SAND; trace GRAVEL S Poorly-graded SAND (SP); loose to medium dense; light grayish brown; dry; fine to medium SAND. 165 GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ S-3 S GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA Same as above. SILTY SAND (SM); loose to medium dense; brown; dry to moist; fine SAND. THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A2 a

30 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-1 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. S-5 PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" 24 MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG DESCRIPTION AND CLASSIFICATION Poorly-graded SAND (SP); medium dense; light brown to light gray; dry; fine to medium SAND; trace SILT; trace GRAVEL S Dense; light grayish brown to brown; dry to moist; few to little GRAVEL S Very dense; light brown to brown; dry; fine to coarse SAND; little GRAVEL. 140 GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ S-8 S / /9" 71 GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA Same as above. Well-graded SAND with GRAVEL (SW); very dense; light brown; dry; fine to coarse SAND; fine to medium GRAVEL. THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A2 b

31 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-1 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. S-10 PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" 54 MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG Well-graded SAND with GRAVEL (SW) (continued). Same as above. Total Depth: 51.5 Feet. DESCRIPTION AND CLASSIFICATION 125 Groundwater not encountered. Boring backfilled with cement/bentonite slurry and topped with cold patch GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A2 c

32 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-2 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG DESCRIPTION AND CLASSIFICATION ASPHALT (5") SILTY SAND (SM); dark brown; moist; fine to medium SAND. Bulk S Medium dense S Poorly-graded SAND (SP); medium dense; light grayish brown; moist; fine to medium SAND. GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ S-3 S GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA SILT (ML); soft to firm; brown; moist; trace fine SAND. Stiff. THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A3 a

33 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-2 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. S-5 PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" 16 MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG DESCRIPTION AND CLASSIFICATION SILTY SAND (SM); medium dense; brown; moist; fine SAND R Well-graded SAND with GRAVEL (SW); very dense; light brown to dark brown; moist; fine to coarse SAND; fine to coarse GRAVEL S Same as above GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ S-8 S GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA Same as above SILT/Elastic SILT (ML/MH); very stiff; light grayish brown; moist. Red staining. THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A3 b

34 BORING RECORD PROJECT NAME PROJECT NUMBER HOLE ID MLK Honda Dealership LA-1265 B-2 SITE LOCATION START FINISH SHEET NO. Martin Luther King Jr Blvd, Los Angeles, CA 10/14/ /14/ of 3 DRILLING COMPANY DRILL RIG DRILLING METHOD LOGGED BY CHECKED BY Martini CME 75 Hollow Stem Auger D. Sanchez J. Bueno HAMMER TYPE (WEIGHT/DROP) HAMMER EFFICIENCY (ERi) BORING DIA. (in) TOTAL DEPTH (ft) GROUND ELEV (ft) DEPTH/ELEV. GW (ft) Hammer: 140 lbs., Drop: 30 in. 8" / na DRIVE SAMPLER TYPE(S) & SIZE (ID) NOTES SPT / na DURING DRILLING AFTER DRILLING DEPTH (feet) ELEVATION (feet) SAMPLE TYPE SAMPLE NO. S-10 PENETRATION RESISTANCE (BLOWS / 6 IN) BLOW/FT "N" 74 MOISTURE (%) DRY DENSITY (PCF) PASSING #200 (%) ATTERBERG LIMITS (LL:PL:PI) POCKET PEN (tsf) OTHER TESTS DRILLING METHOD GRAPHIC LOG Poorly-graded SAND (SP); very dense; light brown; moist; fine SAND. Total Depth: 51.5 Feet. DESCRIPTION AND CLASSIFICATION Groundwater not encountered. Boring backfilled with cement/bentonite slurry and topped with cold patch GDC_LOG_BORING_2011 LA-1265 BORING LOGS.GPJ GDCLOG.GDT 3/10/ GROUP DELTA CONSULTANTS, INC. 370 Amapola Ave., Suite 212 Torrance, CA THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. FIGURE A3 c

35

36

37

38 730 & 800 Martin Luther King Jr Blvc Los Angeles, CA CPT Shear Wave Measurements S-Wave Interval Tip Geophone Travel S-Wave Velocity S-Wave Depth Depth Distance Arrival from Surface Velocity CPT-2 (ft) (ft) (ft) (msec) (ft/sec) (ft/sec) Shear Wave Source Offset = 5 ft S-Wave Velocity from Surface = Travel Distance/S-Wave Arrival Interval S-Wave Velocity = (Travel Dist2-Travel Dist1)/(Time2-Time1)

39

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the Proposed Project. The Geotechnical Engineering Investigation (the

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD

GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD ADDENDUM TO GEOTECHNICAL EXPLORATION REPORT PROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, 8001-8011 & 8015 BEVERLY BOULEVARD CITY OF LOS ANGELES, CALIFORNIA Prepared for: OPT Beverly, LLC 6400 South Fiddlers

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS Except where otherwise noted, the following Section is based on the Preliminary Geotechnical Investigation, Proposed Medical Office Buildings and Mixed-Use

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM C A U T I O N!! (THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM EQLique&Settle2. THE AUTHOR IS HEREBY RELEASED OF ANY LIABILITY FOR ANY INCORRECT USE OF THIS SAMPLE

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. 9 GEOLOGY AND SOILS INTRODUCTION This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. This chapter utilizes information from the following reports prepared

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS INTRODUCTION This section evaluates potential impacts related to geology, including seismicity, and soils associated with development of the proposed

More information

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following analysis is based on the Geotechnical Investigation Report, Proposed Mid-Rise Multi- Family Residential Development Project Wetherly

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE Policy No: DSP-OO3 Release Date: January 1, 2014 Effective Date: January 1, 2014 Revision Date: March 1, 2018 TITLE: The City Policy for Site Specific

More information

Soils. Technical English - I 10 th week

Soils. Technical English - I 10 th week Technical English - I 10 th week Soils Soil Mechanics is defined as the branch of engineering science which enables an engineer to know theoretically or experimentally the behavior of soil under the action

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS The following discussion is based upon information contained in the Hollywood Redevelopment Plan Amendment EIR and a letter prepared by Geotechnologies,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Mitigation of Liquefaction Potential Using Rammed Aggregate Piers

Mitigation of Liquefaction Potential Using Rammed Aggregate Piers ASCE 2011 557 Mitigation of Liquefaction Potential Using Rammed Aggregate Piers R.W. Rudolph, M. ASCE, G.E. 1, B. Serna, M. ASCE, P.E. 2, and T. Farrell, M. ASCE, G.E. 3 1 Principal Consultant, ENGEO,

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

September 7, 2017 (Revised November 1, 2017)

September 7, 2017 (Revised November 1, 2017) September 7, 2017 (Revised November 1, 2017) Project No. 10113.002 Environmental Advisors 2400 East Katella Avenue, Suite 800 Anaheim, California 92806 Attention: Subject: Mr. Greg McCafferty Response

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES 3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES This section summarizes the principal geotechnical conditions that occur in the project area. The potential impact that each condition

More information

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

Should you have any questions regarding this clarification, please contact the undersigned at or (925) October 8, 2015 Revised October 13, 2015 Contra Costa Community College District 500 Court Street Martinez, CA 94553 Attention: Ron Johnson Subject: Clarification of Grading Requirements Diablo Valley

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0 VC 605'-0 VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE INDEX TO PLANS SHEET. 2'-" VC 6'-" VC BB EB 1 1 1 1 1 TV - " TV CONDUITS (COX E 8 - " ELECTRIC CONDUITS (SDG & E T - " TELEPHONE CONDUITS 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET. 2.

More information

Class Principles of Foundation Engineering CEE430/530

Class Principles of Foundation Engineering CEE430/530 Class Principles of Foundation Engineering CEE430/530 1-1 General Information Lecturer: Scott A. Barnhill, P.E. Lecture Time: Thursday, 7:10 pm to 9:50 pm Classroom: Kaufmann, Room 224 Office Hour: I have

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Geotechnical Properties of Soil

Geotechnical Properties of Soil Geotechnical Properties of Soil 1 Soil Texture Particle size, shape and size distribution Coarse-textured (Gravel, Sand) Fine-textured (Silt, Clay) Visibility by the naked eye (0.05 mm is the approximate

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

SOUTHERN CALIFORNIA EDISON

SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA EDISON Geotechnical Investigation Triton 115/12 KV Substation City of Temecula Riverside County, California September 26, 2008 TDBU Civil/Geotechnical Engineering Group GEOTECHNICAL

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS C. GEOLOGY/SOILS The following section is a summary of the preliminary geotechnical consultation conducted for the Proposed Project. The Report of Geotechnical Engineering

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

PRELIMINARY GEOTECHNICAL EXPLORATION Additional MeadWestvaco Ridgeville Property 331 acres Dorchester County, South Carolina S&ME Project No. 1131-09-259A Prepared For: BP Barber & Associates Post Office

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Evaluation of Geotechnical Hazards

Evaluation of Geotechnical Hazards Evaluation of Geotechnical Hazards by Geoffrey R. Martin Appendix B: Evaluation of Geotechnical Hazards Describes Evaluation Procedures Soil Liquefaction Soil Settlement Surface Fault Rupture Flooding

More information

Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC

Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI-01-031 Federal Highway Administration Washington, DC Geotechnical Site Characterization July 2001 by Paul W. Mayne,

More information

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials 1.3 Scope of This Book 1.4 Historical Development of Geotechnical

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information