WITNESS STATEMENT DANIEL MAN, P.ENG.

Size: px
Start display at page:

Download "WITNESS STATEMENT DANIEL MAN, P.ENG."

Transcription

1 WITNESS STATEMENT OF DANIEL MAN, P.ENG. Soil Engineers Ltd. 100 Nugget Avenue Toronto, Ontario M1S 3A7 Tel: (416) / Fax: (416) danielman@soilengineersltd.com In the matter of Proposed Residential Development Bronte Green Corporation 1401 Bronte Road Town of Oakville To be heard before The Ontario Municipal Board OMB Case Number: PL141318

2 1.0 QUALIFICATIONS 1.1 I am the president at Soil Engineers Ltd., a geotechnical engineering consultant primarily involved in geotechnical site investigations and engineering studies throughout southern Ontario. 1.2 I have over 35 years of experience in the geotechnical engineering field working on numerous projects and prepared a wide range of soil reports involving slope stability studies. 1.3 I obtained a Bachelor of Engineering Degree in Civil Engineering from McMaster University in 1978 and I am a registered Professional Engineer in Ontario. 1.4 My curriculum vitae is attached to this witness statement as Appendix A. 1.5 A copy of the Statement of Agreed Facts for the geotechnical specialists is attached as Appendix B. 1.6 A copy of my Acknowledgement of Expert Duty is attached as Appendix C. 2.0 RETAINER 2.1 Soil Engineers Ltd. was retained by Bronte Green Corporation on July 10, 2012, to prepare a geotechnical investigation and a slope stability study for a proposed residential development on the subject site. The slope stability study report was completed October 23, 2012, and the geotechnical investigation report was completed January EVIDENCE 3.1 A soil investigation report was prepared for the proposed residential development. Geotechnical recommendations were provided in the Soil Investigation Report dated January 2013 for the design and construction of the project. 3.2 A slope stability study was carried out in accordance with the Ontario Ministry of Natural Resources guidelines (Reference 5.4 and 5.5) to establish the Long-Term Stable Slope Line (LTSSL) for the valley slope associated with the south bank of Fourteen Mile Creek, located at the north limit of the site. The LTSSL along the south bank of Fourteen Mile Creek was established for the project and was detailed in the Slope Stability Study Report dated October 23, The LTSSL was to be incorporated into the determination of the development limits. 3.3 My evidence will address the above noted reports, the relevant geotechnical items in the Issues List, and items mentioned the geotechnical specialists Agreed Statement of Facts.

3 4.0 ISSUES AND OPINIONS 4.1 Issue 18(a) on the Issues List asks: Has a compliant geotechnical study been completed and provided? 4.2 Attached to this witness statement are copies of the slope stability report (October 2012, Appendix D ) and soil investigation report (January 2013, Appendix E ) prepared by Soil Engineers Limited. A total of 26 boreholes were drilled and 8 groundwater monitoring wells were installed in the project area to obtain subsurface soil and groundwater information to facilitate the preparation of the foregoing reports. I will speak to the contents of these reports in my evidence. 4.3 Paragraph 4 of the Expert s Agreed Statement states: The boreholes spacing as shown on Figure 5 of 'the Burnside Hydrogeological Study Report' exceeds the 100 m spacing as required by the "Geotechnical Principles for Stable Slopes" publication and no justification is provided. 4.4 While the borehole spacing did exceed the noted publication, it should be noted that the soil stratigraphy for the project site is quite consistent along the valley slope being studied and does not vary drastically. Further, the critical cross-sections analyzed in the slope stability study were all located within 100 m of the borehole locations. Based on this, it is my opinion that the subsurface profile used for the slope stability study is considered sufficient. 4.5 Paragraph 5 of the Expert s Agreed Statement states: Only augering and split spoon sampling was conducted to advance the boreholes into the shale bedrock underlying the overburden (as shown on the Log of Boreholes from the Soil Engineers Limited (2012) report) and hence there were no bedrock core samples obtained which would permit characterization of the bedrock. 4.6 It should be noted that auger samples were retrieved from the boreholes drilled into the bedrock and these samples confirm that the bedrock encountered on site is shale. Soil Engineers Ltd. has supervised numerous construction projects in the neighboring area, and shallow shale bedrock is known to occur in this region. Accordingly, it is my opinion that there is enough information to permit characterization of the bedrock as shale. 4.7 I will elaborate on the above in my evidence. It is my opinion that based on the above, compliant geotechnical studies have been completed and provided in support of the Bronte Green development proposal.

4 5.0 REFERENCES 5.1 Soil Engineers Ltd., January 2013, A Soil Investigation for Proposed Residential Development, for Bronte Green Corporation, 1401 Bronte Road, Town of Oakville 5.2 Soil Engineers Ltd., October 23, 2012, Slope Stability Study Proposed Residential Development, for Bronte Green Corporation, 1401 Bronte Road, Town of Oakville 5.3 Beacon Environmental, October 2014, Phase 2 Environmental Impact Study, Merton (QEW/Bronte Road), Tertiary Planning Study, Town of Oakville 5.4 Ontario Ministry of Natural Resources, 2002, Technical Guide River & Stream Systems: Erosion Hazard Limit 5.5 Terraprobe Limited, 1998, Geotechnical Principles for Stable Slopes, for Ontario Ministry of Natural Resources Dated August 27, 2015 Daniel Man, P.Eng.

5 OMB CASE NO. PL WITNESS STATEMENT OF DANIEL MAN, P.ENG. Appendix A CURRICULUM VITAE

6

7

8 OMB CASE NO. PL WITNESS STATEMENT OF DANIEL MAN, P.ENG. Appendix B STATEMENT OF AGREED FACTS GEOTECHNICAL SPECIALISTS

9 BRONTE GREEN APPEAL STATEMENT OF AGREED FACTS GEOTECHNICAL SPECIALISTS Meeting Date: Friday July 17 th, 2015 Time: 9:00 am to 1:00 pm Location: Oakville Room, Oakville Town Hall Attendees: Daniel Man, P.Eng. Soil Engineers Limited (Representing the Proponent) Anne Poschmann, P.Eng. Golder Associates Ltd. (Representing Conservation Halton) Michael Patterson, P.Eng. Amec Foster Wheeler (Representing Town of Oakville) Arising from the Geotechnical Specialists meeting on July 17, 2015, the following is a summary of areas of agreement among the attendees: 1. There is a Soil Engineers Limited (2012) report presenting the slope stability assessment completed for the Saw Whet property which is referred in the Phase 2 Environmental Impact Study, Merton (QEW/Bronte Road), Tertiary Planning Study, Town of Oakville, Ontario report prepared by Beacon Environmental dated October 2014 ( the Beacon Environmental (October 2014) report ). The Soil Engineers Limited (2012) report has not been received and therefore has not been reviewed. 2. The Log of Boreholes for Boreholes 1 through 26 and the Borehole Location Plan from the Soil Engineers Limited (2012) report are included in Appendix B of the Hydrogeological Study, Merton Tertiary Planning Area, Town of Oakville, Ontario report prepared by R.J. Burnside & Associates Limited dated December 2013 (Revised October 2014) ( the Burnside Hydrogeological Study Report ). 3. The Technical Guide River and Stream Systems: Erosion Hazard Limit published by Ontario Ministry of Natural Resources dated 2002 ( The Guidelines ) is applicable for the establishment of the erosion hazard limit and the document titled Geotechnical Principles for Stable Slopes prepared by Terraprobe Limited and Aqua Solutions (June 1998) forms part of The Guidelines. 4. The boreholes spacing as shown on Figure 5 of the Burnside Hydrogeological Study Report exceeds the 100 m spacing as required by the Geotechnical Principles for Stable Slopes publication and no justification is provided. 5. Only augering and split spoon sampling was conducted to advance the boreholes into the shale bedrock underlying the overburden (as shown on the Log of Boreholes from the Soil Engineers Limited (2012) report) and hence there were no bedrock core samples obtained which would permit characterization of the bedrock. 6. Toe erosion rates as stated in the Beacon Environmental (October 2014) report are consistent with The Guidelines but are contingent on confirmation from the geomorphological studies that these values are not exceeded by 100 times the average annual recession rate.

10 OMB CASE NO. PL WITNESS STATEMENT OF DANIEL MAN, P.ENG. Appendix C ACKNOWLEDGEMENT OF EXPERT DUTY

11

12

13 October 23, 2012 Reference No S148 Page 1 of 7 Argo Bronte Green Corporation c/o David Schaeffer Engineering Ltd. 600 Alden Road, Suite 500 Markham, Ontario L3R 0E7 Attention: Mr. Mike Baldesarra Re: Slope Stability Study Proposed Residential Development Saw Whet Golf Course 1401 Bronte Road Town of Oakville Dear Sir: In accordance with your instructions, a slope stability study was carried out at the subject site for the valley slope located on the east side of the property where it abutts the west valley bank of Fourteen Mile Creek. The purpose of the slope study is to analyse the impact of the project on the stability of the valley bank. Detailed descriptions of the soil and groundwater conditions, along with the borehole logs, will be provided in the soil report which will be presented under separate cover. This letter/report/certification was prepared by Soil Engineers Ltd. for the account of the captioned clients and may be relied upon by regulatory agencies. The material in it reflects the writer s best judgment in light of the information available to it at the time of preparation. Any use which a third party makes of this letter/report/certification, or any reliance on or decisions to be made based upon it, are the responsibility of such third parties. Soil Engineers Ltd. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this letter/report/certification.

14 Argo Bronte Green Corporation Reference No S148 c/o David Schaeffer Engineering Ltd. Page 2 of 7 October 23, 2012 Slope Stability Analyses A slope stability assessment has been carried out for the slope located along the east limits of the property, which is the west bank of Fourteen Mile Creek. The assessment is based on information obtained from both boreholes and cross-sections. At the locations for the slope study, the investigation has disclosed that beneath a veneer of topsoil and a layer of earth fill at one location, a stratum of stiff to hard silty clay till overlies strata of very dense silty sand till and fine to coarse sand with rock fragments which bed onto shale bedrock. Visual inspection of the slope at the time of report preparation revealed that it is wooded, with a thick ground cover of leaves. At localized steep areas, surface sloughing was visible and the ground surface was bare. Active erosion was noted along the entire creek bank and deep-seated failure was noted, especially where the gradient of the slope was observed to be steeper than 1 vertical:1 horizontal, and where the watercourse was located directly at the bottom of slope; these were noticed along the slope in the south portion of the property. Twelve cross-sections, Cross-Sections A-A to L-L, inclusive, were selected for analysis to provide a comprehensive overview of the slope profile and condition. The locations of the cross-sections are shown on Drawing Nos. 1A and 1B. The surface profile of each cross-section is interpreted from the contour lines on the topographic plan provided by David Schaeffer Engineering Limited. The subsurface profile is interpreted from the Boreholes Logs, which will be provided in the forthcoming soil report.

15 Argo Bronte Green Corporation Reference No S148 c/o David Schaeffer Engineering Ltd. Page 3 of 7 October 23, 2012 The slope has an overall height of 5.0± to 9.0± m, measured from the bottom of slope to the existing top of slope, with gradients ranging from 1 vertical:0.25± to 3.0± horizontal. The cross-sections of the existing slopes are shown on Drawing Nos. 2 to 13, inclusive. The groundwater, where encountered has been modeled to taper towards Fourteen Mile Creek, slightly below the toe of slope, as per on site observations. The slope stability was analysed using force-moment-equilibrium criteria of the Bishop Method and the soil strength parameters given in the following table. Soil Strength Parameters Soil Type Unit Weight (kn/m 3 ) Effective Cohesion (kpa) Effective Internal Friction Angle (Φ) Earth Fill Silty Clay Till Silty Sand Till Fine to Coarse Sand and Rock Fragments Shale Bedrock Impenetrable The results of the analyses indicate that the factor of safety (FOS) for the existing slope at the locations of Cross-Sections A-A, C-C, D-D, F-F, H-H and K-K ranges from to 2.894, which exceeds the Ontario Ministry of Natural Resources (OMNR) guideline requirements for active land use (minimum FOS 1.5). Furthermore, the distance from the creek to the bottom of slope exceeds a toe erosion allowance of 8.0 m at these cross-sections, except at Cross-Section K-K. As such, the existing slope at

16 Argo Bronte Green Corporation Reference No S148 c/o David Schaeffer Engineering Ltd. Page 4 of 7 October 23, 2012 these locations, which the exception of Cross-Section K-K, is considered to be geotechnically stable for the proposed residential usage. However, at Cross-Sections B-B, E-E, G-G, I-I, J-J and L-L, the FOS for the bank ranges from to 1.499, which fails to meet the minimum guideline requirement. As such, the slope is considered to be geotechnically unstable. Geotechnically stable gradients ranging from 1 vertical:1.1 to 1.9 horizontal are recommended, depending on the soil conditions as identified by the borehole investigation. Due to the occurrence of shale bedrock near Cross-Sections H-H to L-L, a steeper gradient is acceptable at these locations provided that the slope meets the required toe erosion allowance and minimum FOS. The watercourse is located at the immediate bottom of slope at Cross- Section K-K, and the bank at this location further analysed given a toe erosion allowance. The remodelled slope at Cross-Sections B-B, E-E, G-G, I-I, J-J, K-K and L-L yields a FOS ranging from to 2.552, which satisfies the OMNR requirements. The remodelled cross-sections are presented on Drawing Nos. 14 to 20, inclusive. A summary of the resulting factors of safety against deep-seated failure are given in the following table. Factors of Safety Factor of Safety Cross-Section Existing Slope Long-Term Stable Slope A-A * - B-B C-C * -

17 Argo Bronte Green Corporation Reference No S148 c/o David Schaeffer Engineering Ltd. Page 5 of 7 October 23, 2012 (Cont d) D-D * - E-E F-F * - G-G H-H * - I-I J-J K-K ** L-L * The slope at the corresponding sections is considered stable. **The existing slope was adjusted to allow for a 5.0 m toe erosion allowance. In the presence of a watercourse feature at the toe of creek bank (slope) with little to no floodplain, an erosion setback of 5.0 m and 8.0 m will be required where the soils at the base of the slope consist of shale bedrock and hard/very dense tills, respectively. The resulting Long-Term Stable Slope Line (LTSSL), incorporating the specified stable gradient component and toe erosion setback, is established on Drawing Nos. 1A and 1B. Lastly, a development setback for man-made and environmental degradation of the slope will be required. This is subject to the discretion of the Halton Region Conservation Authority. In order to prevent the occurrence of localized surface slides and to enhance the stability of the slope, the following geotechnical constraints should be stipulated:

18 Argo Bronte Green Corporation Reference No S148 c/o David Schaeffer Engineering Ltd. Page 6 of 7 October 23, The prevailing vegetative cover must be maintained, since its extraction would deprive the slope of the rooting system that acts as reinforcement against soil erosion by weathering. If for any reason the vegetation cover is stripped, it must be reinstated to its original, or better than its original, protective condition. 2. The leafy topsoil cover on the slope face should not be disturbed, since this provides an insulation and screen against frost wedging and rainwash erosion. 3. Grading of the land adjacent to the slope must be such that concentrated runoff is not allowed to drain onto the slope face. Landscaping features, which may cause runoff to pond at the top of the slope, such as infiltration trenches, as well as frequent lawn watering which will saturate the crown of the slope, must not be permitted. 4. Where development is carried out near the top of the slope, there are other factors to be considered related to possible human environmental abuse. These include soil saturation from frequent watering to maintain of landscaping features, stripping of topsoil or vegetation, and dumping of loose fill and material storage close to the top of slope; none of these should be permitted. All of the above recommendations are subject to the approval of the Halton Region Conservation Authority.

19

20

21

22 Minimum Factor of Safety = property line/ boundary existing top of slope and Long-Term Stable Slope Line BH 1 (o/s 17.8 m) existing slope profile (geotechnically stable gradient) Elevation (m) Silty Clay Till existing bottom of slope Fourteen Mile Creek Silty Sand Till Distance (m) Cross-Section A-A (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

23 property line/ boundary Minimum Factor of Safety = existing top of slope BH-MW 2 (o/s 18.7 m and 24 m ) existing slope profile Elevation (m) Silty Clay Till Silty Sand Till Silty Clay Till existing bottom of slope Fourteen Mile Creek (o/s 16.5 m) groundwater level during investigation Fine to Coarse Sand Distance (m) Cross-Section B-B (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

24 Minimum Factor of Safety = Elevation (m) BH-MW 5 (o/s 25 m and 50.5 m ) Silty Clay Till existing top of slope and Long-Term Stable Slope Line existing slope profile (geotechnically stable gradient) existing bottom of slope Fourteen Mile Creek (o/s 57 m) groundwater level during investigation Fine to Coarse Sand and Rock Fragments Distance (m) Cross-Section C-C (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

25 Minimum Factor of Safety = existing top of slope and Long-Term Stable Slope Line Elevation (m) BH-MW 5 (o/s 13.8 m and 58.8 m ) Silty Clay Till property line/ boundary 3 1 existing slope profile (geotechnically stable gradient) existing bottom of slope Fourteen Mile Creek (o/s 6 m) groundwater level during investigation Fine to Coarse Sand and Rock Fragments Distance (m) Cross-Section D-D (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

26 Minimum Factor of Safety = existing top of slope BH-MW 6D (o/s 26.9 m ) property line/ boundary existing slope profile Elevation (m) groundwater level during investigation Silty Clay Till Silty Sand Till existing bottom of slope Fourteen Mile Creek Fine to Coarse Sand Distance (m) Cross-Section E-E (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

27 Minimum Factor of Safety = existing top of slope and Long-Term Stable Slope Line 133 Elevation (m) BH 9 (o/s 30.2 m ) Silty Clay Till Fine to Coarse Sand property line/ boundary existing slope profile (geotechnically stable gradient) existing bottom of slope Fourteen Mile Creek groundwater level during investigation Silty Sand Till Distance (m) Cross-Section F-F (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

28 Minimum Factor of Safety = BH 9 (o/s 112 m) property line/ boundary existing top of slope Elevation (m) Silty Clay Till Fine to Coarse Sand existing slope profile existing bottom of slope Fourteen Mile Creek (o/s 15.3 m) Silty Sand Till groundwater level during investigation Distance (m) Cross-Section G-G (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

29 Minimum Factor of Safety = existing top of slope and Long-Term Stable Slope Line 132 Elevation (m) Silty Clay Till BH 10 (o/s 76.8 m) property line/ boundary existing slope profile (geotechnically stable gradient) existing bottom of slope Shale Bedrock Distance (m) Cross-Section H-H (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

30 Minimum Factor of Safety = BH-MW 25 (o/s 17.3 m) property line/ boundary existing top of slope Earth Fill existing slope profile 124 Elevation (m) Silty Clay Till existing bottom of slope Fourteen Mile Creek (o/s 58 m) Shale Bedrock Distance (m) Cross-Section I-I (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

31 Minimum Factor of Safety = existing top of slope 129 Elevation (m) BH 26 (o/s 75.3 m and 6.7 m ) Silty Clay Till property line/ boundary existing slope profile existing bottom of slope Fourteen Mile Creek (o/s 21.6 m) Shale Bedrock Distance (m) Cross-Section J-J (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

32 Minimum Factor of Safety = existing top of slope BH 26 (o/s 24.7 m and 10.9 m ) property line/ boundary existing slope profile Elevation (m) Silty Clay Till Shale Bedrock H:1V slope existing bottom of slope Fourteen Mile Creek Distance (m) Cross-Section K-K (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

33 Minimum Factor of Safety = existing top of slope BH 26 (o/s 15 m and 21.4 m ) property line/ boundary Elevation (m) Silty Clay Till existing slope profile existing bottom of slope Shale Bedrock Distance (m) Cross-Section L-L (Existing Slope) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

34 Long-Term Stable Slope Line Minimum Factor of Safety = Elevation (m) BH-MW 2 (o/s 18.7 m and 24 m ) property line/ boundary Silty Clay Till Silty Sand Till Silty Clay Till existing top of slope geotechnically stable gradient existing slope profile existing bottom of slope Fourteen Mile Creek (o/s 16.5 m) groundwater level during investigation Fine to Coarse Sand Distance (m) Cross-Section B-B (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

35 Minimum Factor of Safety = property line/ boundary BH-MW 6D (o/s 26.9 m ) Long-Term Stable Slope Line existing top of slope geotechnically stable gradient existing slope profile Elevation (m) groundwater level during investigation Silty Clay Till Silty Sand Till m erosion setback existing bottom of slope Fourteen Mile Creek Fine to Coarse Sand Distance (m) Cross-Section E-E (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

36 Minimum Factor of Safety = BH 9 (o/s 112 m) property line/ boundary existing top of slope and Long-Term Stable Slope Line geotechnically stable gradient Elevation (m) Silty Clay Till Fine to Coarse Sand existing slope profile existing bottom of slope Fourteen Mile Creek (o/s 15.3 m) Silty Sand Till groundwater level during investigation Distance (m) Cross-Section G-G (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

37 Minimum Factor of Safety = BH-MW 25 (o/s 17.3 m) Long-Term Stable Slope Line Earth Fill property line/ boundary existing top of slope geotechnically stable gradient Elevation (m) Silty Clay Till existing slope profile existing bottom of slope Fourteen Mile Creek (o/s 58 m) Shale Bedrock Distance (m) Cross-Section I-I (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

38 Minimum Factor of Safety = Long-Term Stable Slope Line 129 Elevation (m) BH 26 (o/s 75.3 m and 6.7 m ) Silty Clay Till property line/ boundary 2 existing top of slope existing slope profile existing bottom of slope geotechnically stable gradient Fourteen Mile Creek (o/s 21.6 m) Shale Bedrock Distance (m) Cross-Section J-J (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

39 Minimum Factor of Safety = BH 26 (o/s 24.7 m and 10.9 m ) property line/ boundary Long-Term Stable Slope Line existing top of slope geotechnically stable gradient existing slope profile Elevation (m) Silty Clay Till Shale Bedrock m erosion setback 0.25H:1V slope existing bottom of slope Fourteen Mile Creek Distance (m) Cross-Section K-K (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

40 Minimum Factor of Safety = Long-Term Stable Slope Line BH 26 (o/s 15 m and 21.4 m ) property line/ boundary existing top of slope geotechnically stable gradient Elevation (m) Silty Clay Till existing slope profile existing bottom of slope Shale Bedrock Distance (m) Cross-Section L-L (Geotechnically Stable Gradient) Ref No.: Date: Drawing No.: Scale S148 October H: 1:200 V: 1:200

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127 BH. No. 1 MW2 3 4 MW5 MW6D MW6S 7 8 Topsoil/Topsoil Fill (cm) Elevation (m) El. (m) 133 W N W N W N W N W N W N W N W N W N /15 cm 50/15 cm /NP 55/15 cm 50/7.6 cm /15 cm 50/15 cm 60/15 cm 50/15 cm 50/5.1 cm 55/15 cm 50/15 cm 18 50/15 cm 50/15 cm 50/13 cm 50/10 cm 50/15 cm /5.1 cm 50/15 cm 50/10 cm 50/5.1 cm 50/15 cm /15 cm 50/15 cm 50/15 cm 60/15 cm /13 cm 50/13 cm 50/13 cm BOREHOLE FOR SHALLOW NESTED WELL INSTALLATION ONLY (NO SAMPLING) /15 cm 50/50 cm 22 50/15 cm 50/NP 55 50/15 cm 60/15 cm 50/NP /15 cm /5.1 cm LEGEND 50/15 cm TOPSOIL/TOPSOIL FILL SAND/GRAVEL FILL EARTH FILL 50/10 cm SILTY CLAY SILTY CLAY TILL SILTY SAND TILL SILTY FINE SAND FINE TO COARSE SAND FINE TO COARSE SAND AND ROCK FRAGMENTS SHALE BEDROCK SANDY SILT WATER LEVEL CAVE-IN SUBSURFACE PROFILE SOIL ENGINEERS Scale: Horiz.: N.T.S. Ref. No.: 1207-S148 LTD. Vert.: 1:100 Drawing No. 2

128 BH. No MW MW17 Topsoil/Topsoil Fill (cm) Elevation (m) El. (m) 133 W N W N W N W N W N W N W N W N W N /15 cm 50/15 cm 50/15 cm 50/15 cm /15 cm 50/15 cm 50/NP 50/NP 25 50/15 cm 50/15 cm 70/5.1 cm 50/NP 50/1.3 cm /7.6 cm 70/5.1 cm 50/NP 50/NP /7.6 cm 100/2.5 cm 50/NP /15 cm 50/2.5 cm 50/NP 50/NP /15 cm 50/NP 14 50/15 cm 50/15 cm 50/NP 50/NP 24 50/15 cm /15 cm LEGEND TOPSOIL/TOPSOIL FILL SAND/GRAVEL FILL EARTH FILL SILTY CLAY SILTY CLAY TILL SILTY SAND TILL SILTY FINE SAND FINE TO COARSE SAND FINE TO COARSE SAND AND ROCK FRAGMENTS SHALE BEDROCK SANDY SILT WATER LEVEL CAVE-IN SUBSURFACE PROFILE SOIL ENGINEERS Scale: Horiz.: N.T.S. Ref. No.: 1207-S148 LTD. Vert.: 1:100 Drawing No. 3

129 BH. No. 18 MW19 20 MW MW25 26 Topsoil/Topsoil Fill (cm) Elevation (m) El. (m) 133 W N W N W N W N W N W N W N W N W N /15 cm 50/0.01 cm 50/NP /15 cm 50/NP /15 cm 50/7.6 cm 50/5.1 cm 50/NP /15 cm 65 50/15 cm 50/NP /15 cm /7.6 cm 50/15 cm 70/15 cm /15 cm /15 cm 50/15 cm /15 cm 50/15 cm 50/7.6 cm /NP 50/NP LEGEND 50/NP 50/NP TOPSOIL/TOPSOIL FILL SAND/GRAVEL FILL EARTH FILL 50/NP SILTY CLAY SILTY CLAY TILL SILTY SAND TILL SILTY FINE SAND FINE TO COARSE SAND FINE TO COARSE SAND AND ROCK FRAGMENTS SHALE BEDROCK SANDY SILT WATER LEVEL CAVE-IN SUBSURFACE PROFILE SOIL ENGINEERS Scale: Horiz.: N.T.S. Ref. No.: 1207-S148 LTD. Vert.: 1:100 Drawing No. 4

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

September 18, 2017 Project No.: 5077

September 18, 2017 Project No.: 5077 #109 3011 Underhill Avenue Burnaby, BC V5A 3C2 Phone: (604) 421-3288 Email: info@terrangeo.com September 18, 2017 Project No.: 5077 Kevin Brooks City of Campbell River 301 St. Ann s Road Campbell River,

More information

REFERENCE NO S135 NOVEMBER 2015

REFERENCE NO S135 NOVEMBER 2015 A REPORT TO DUNPAR DEVELOPMENTS INC. A SOIL INVESTIGATION FOR PROPOSED RESIDENTIAL DEVELOPMENT 020, 024, 032, 042, 048 AND 052 6 TH LINE, TOWN OF OAKVILLE REFERENCE NO. 505-S35 NOVEMBER 205 DISTRIBUTION

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing DEVELOPMENT SETBACK AND SLOPE STABILITY REQUIREMENTS RESIDENTIAL DEVELOPMENT 70 PIONEER TRAIL

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

10/8/ W01. Daniel Catiglione First Gulf Corporation 3751 Victoria Park Avenue Toronto, ON M1W 3Z4

10/8/ W01. Daniel Catiglione First Gulf Corporation 3751 Victoria Park Avenue Toronto, ON M1W 3Z4 10/8/2014 Daniel Catiglione First Gulf Corporation 3751 Victoria Park Avenue Toronto, ON M1W 3Z4 Dear Sir, Subject: Lower Morrison Creek Meander Belt Width Assessment MMM was retained by First Gulf Corporation

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

MAYFIELD WEST, PHASE 2 SECONDARY PLAN COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY AND MANAGEMENT PLAN PART A: EXISTING CONDITIONS AND CHARACTERIZATION

MAYFIELD WEST, PHASE 2 SECONDARY PLAN COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY AND MANAGEMENT PLAN PART A: EXISTING CONDITIONS AND CHARACTERIZATION MAYFIELD WEST, PHASE 2 SECONDARY PLAN COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY AND MANAGEMENT PLAN PART A: EXISTING CONDITIONS AND CHARACTERIZATION DRAFT REPORT TOWN OF CALEDON Submitted by: AMEC Earth

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

WITNESS STATEMENT. John Parish, P.Geo. ONTARIO MUNICIPAL BOARD. Case No. PL File No. PL Prepared for:

WITNESS STATEMENT. John Parish, P.Geo. ONTARIO MUNICIPAL BOARD. Case No. PL File No. PL Prepared for: WITNESS STATEMENT OF John Parish, P.Geo. ONTARIO MUNICIPAL BOARD Case No. PL141318 File No. PL141320 Prepared for: Bronte Green Corporation ( Bronte Green ) Prepared by: John Parish, P.Geo. Matrix Solutions

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California May 7, 2015 May 7, 2015 Project No. GT13-16 Prepared for: CEMEX 5180 Golden Foothills, Parkway El Dorado Hills, California 95762 7400 Shoreline Drive, Ste. 6 Stockton, California 95219 Tel: 209-472-1822

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

Edward R. Sajecki Commissioner of Planning and Building. Conservation Authority Regulations and Mapping

Edward R. Sajecki Commissioner of Planning and Building. Conservation Authority Regulations and Mapping Corporate Report Clerk s Files Originator s Files EC.19.CON DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: April 3, 2006 Edward R. Sajecki Commissioner of

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED IN THE MATTER of the Housing Accords and Special Housing Areas Act 2013 ("HASHAA") AND IN THE MATTER of Proposed Qualifying Development Application ("QD2") for 125 Murphys Road, Flat Bush BETWEEN Murphys

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate. Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting

More information

Internal C Unit Dilatanc y

Internal C Unit Dilatanc y 2 Grimsby Sub was not at any time definitively established. The preliminary analysis provided by Thurber Engineering Ltd indicates the slope should be stable with a factor of safety of 1.23 for a deep

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

Prediction of subsoil subsidence caused by opencast mining

Prediction of subsoil subsidence caused by opencast mining Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). IAHS Publ. no. 234, 1995. 167 Prediction of subsoil subsidence caused by opencast mining

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

Need of Proper Development in Hilly Urban Areas to Avoid

Need of Proper Development in Hilly Urban Areas to Avoid Need of Proper Development in Hilly Urban Areas to Avoid Landslide Hazard Dr. Arvind Phukan, P.E. Cosultant/Former Professor of Civil Engineering University of Alaska, Anchorage, USA RI District Governor

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix 18 12/10/2018 AGENDA ITEM 6 APPENDIX 18 2018/0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN Dalwhinnie Quarry Ground

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Track design and management

Track design and management 1 Track design and management Peter Fogarty, Certified Professional Soil Scientist NSW Soil Knowledge Network Cooma, June 18, 2018 Acknowledgements Antia Brademann, Cooma Waterwatch, Organiser Jo Powells,

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY

More information

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada Paper prepared for presentation at the Slope and Embankment Engineering for

More information

Soil Sampling Results Former Truck Maintenance Garage

Soil Sampling Results Former Truck Maintenance Garage Soil Sampling Results Former Truck Maintenance Garage Maine Yankee Decommissioning Project Corrective Measures Study May 2004 Prepared for: Maine Yankee 321 Old Ferry Road, Bailey Point Wiscasset, ME 04578

More information

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence Power, P.M. & Jacka, M. (2013) the Canterbury earthquake sequence Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Comparison between predicted liquefaction induced settlement and ground

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Nipigon River Landslide, Ontario, Canada

Nipigon River Landslide, Ontario, Canada Nipigon River Landslide, Ontario, Canada A. Abdelaziz, S. Besner, R. Boger, B. Fu, J. Deng, and A. Farina Presenter: Jian Deng, Ph.D, P.Eng Centre of Excellence for Sustainable Mining and Exploration,

More information

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay 19 Module 5: Lecture -1 on Stability of Slopes Contents Stability analysis of a slope and finding critical slip surface; Sudden Draw down condition, effective stress and total stress analysis; Seismic

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015 SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Saving on the Geotechnical Investigation A False Economy

Saving on the Geotechnical Investigation A False Economy Saving on the Geotechnical Investigation A False Economy G. S. Young 1, BE, MEngSc, FIEAust and W. Ellis 2. 1 Douglas Partners Pty Ltd, 96 Hermitage Road, West Ryde, NSW 2114 PH (02) 9809 0666; email:

More information

R.J. Burnside & Associates Limited telephone fax web Via:

R.J. Burnside & Associates Limited telephone fax web Via: R.J. Burnside & Associates Limited 292 Speedvale Avenue West Unit 20 Guelph ON N1H 1C4 CANADA telephone (519) 823-4995 fax (519) 836-5477 web www.rjburnside.com November 13, 2014 Via: Email Ms. Nancy Shoemaker

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009 SIXTEEN MILE CREEK TRIBUTARIES THE CATHOLIC CEMETERIES OF THE DIOCESE OF HAMILTON -MEANDER BELT WIDTH ASSESSMENT - Report to: Attention: From: Director of Cemeteries Catholic Cemeteries of the Diocese

More information

POTENTIAL EFFECTS OF EARTHQUAKE SHAKING ON THE PROPOSED CRRRC LANDFILL

POTENTIAL EFFECTS OF EARTHQUAKE SHAKING ON THE PROPOSED CRRRC LANDFILL TECHNICAL MEMORANDUM DATE September 26, 2016 PROJECT No. 1211250045/14000 TO Andrew Evers Ministry of Environment and Climate Change FROM Alan Hull, Paul Smolkin POTENTIAL EFFECTS OF EARTHQUAKE SHAKING

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

Submitted to: Taggart Realty Management 225 Metcalfe Street, Suite 708 Ottawa, Ontario K2P 1P9

Submitted to: Taggart Realty Management 225 Metcalfe Street, Suite 708 Ottawa, Ontario K2P 1P9 REPORT ON Preliminary Geotechnical Assessment Proposed Development Hunt Club Road and Riverside Drive Ottawa, Ontario Submitted to: Taggart Realty Management 225 Metcalfe Street, Suite 708 Ottawa, Ontario

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Slope Stability Model of the Questa Rock Pile Phase 2

Slope Stability Model of the Questa Rock Pile Phase 2 2 Proceedings Tailings and Mine Waste 2011 Slope Stability Model of the Questa Rock Pile Phase 2 Murray Fredlund SoilVision Systems Ltd., Saskatoon, Canada Haihua Lu SoilVision Systems Ltd., Saskatoon,

More information

C) D) 3. Which graph best represents the relationship between soil particle size and the rate at which water infiltrates permeable soil?

C) D) 3. Which graph best represents the relationship between soil particle size and the rate at which water infiltrates permeable soil? 1. Which earth material covering the surface of a landfill would permit the least amount of rainwater to infiltrate the surface? A) silt B) clay C) sand D) pebbles 2. Which graph best represents the relationship

More information

GEOTECHNICAL INVESTIGATION AND SLOPE STABILITY ASSESSMENT PROPOSED SPEEDVALE BRIDGE UNDERPASS AND MULTI-USE TRAIL LINKAGE GUELPH, ONTARIO

GEOTECHNICAL INVESTIGATION AND SLOPE STABILITY ASSESSMENT PROPOSED SPEEDVALE BRIDGE UNDERPASS AND MULTI-USE TRAIL LINKAGE GUELPH, ONTARIO GEOTECHNICAL INVESTIGATION AND SLOPE STABILITY AEMENT PROPOSED SPEEDVALE BRIDGE UNDERPA AND MULTI-USE TRAIL LINKAGE GUELPH, ONTARIO Submitted to: The City of Guelph 1 Carden Street Guelph, Ontario, N1H

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Effects of Slope Stability Evaluation on Highway Bridge Design

Effects of Slope Stability Evaluation on Highway Bridge Design Effects of Slope Stability Evaluation on Highway Bridge Design Shanzhi Shu, PhD PE KCI Technologies INC Les C. Banas, PE Kiewit Infrastructure Engineers Samuel D. Palmer, PE Terracon Consultants Inc. Introduction

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

Landslide FE Stability Analysis

Landslide FE Stability Analysis Landslide FE Stability Analysis L. Kellezi Dept. of Geotechnical Engineering, GEO-Danish Geotechnical Institute, Denmark S. Allkja Altea & Geostudio 2000, Albania P. B. Hansen Dept. of Geotechnical Engineering,

More information

4.5 GEOLOGY AND SOILS

4.5 GEOLOGY AND SOILS 4.5 GEOLOGY AND SOILS This section addresses the project site geology and soils and analyzes potential changes that would result from development of the Wye Specific Plan project. 4.5.1 Environmental Setting

More information

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Smart Property Advisors Ltd. 802-500 Laurier Avenue West Ottawa, ON NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Prepared by: SMART PROPERTY ADVISORS LTD. 802 500

More information