1 Measuring and Modeling Impacts of Tire Pressure on Road Erosion Randy B. Foltz and William J. Elliot 1 Abstract The sediment production from highway tire pressures, constant reduced tire pressures, and from central tire inflation tire pressures on loaded logging trucks operating on a marginal quality aggregate surfaced road were compared. Rainfall and runoff were measured for three winter seasons with logging truck traffic. Sediment production from the constant reduced tire pressure road sections averaged 45% less than from the highway tire pressure sections. An average savings of 80% was measured from the central tire inflation system tire pressure sections. These results were used to calibrate a physical-process based erosion model, WEPP. Once calibrated, the model was used to estimate the sediment reduction expected at two locations in the United States, one in Brazil, and one in Romania. Since the process that are responsible for the sediment reduction are not site specific and were modeled by WEPP, we feel confident that lowering tire pressures in logging trucks on unpaved roads can reduce the sediment loss from these road surfaces. The WEPP model can be helpful in estimating the sediment reduction. Introduction Unpaved forest roads are used to transport forest products. When these roads are allowed to become rutted, sediment production can increase from two to four times compared to freshly-graded roads (Foltz and Burroughs 1990; Foltz and Burroughs 1991). By controlling the tire pressure in heavy truck tires, the impact of sedimentation can be reduced. Tires with reduced pressure have been shown to develop more shallow, less well defined ruts, which have less concentrated flow and shorter flow paths. These factors result in less sediment eroded from the road. Two methods are available that reduce tire pressures in heavy trucks, Central Tire Inflation Systems (CTIS) and Constant Reduced Pressure (CRP). Central Tire Inflation Systems are a technology that have been used by the US Army and others since before World War II to improve vehicle mobility. The technology allows a vehicle driver to reduce tire pressure while in motion. The reduced tire pressure, when used with radial ply tires, results in a longer "footprint". This longer footprint reduces the vehicle pressures applied to the ground. The tire pressure is chosen depending upon vehicle weight, speed, tire type, and road surface, and can be varied while the vehicle is in motion. Modifications to the vehicle are required to install a CTIS. The system has been used on loaded and unloaded logging trucks, dump trucks, fire engines, transport vehicles, concrete trucks, busses, water trucks, and other heavy vehicles. 1 Research Engineer and Project Leader, US Department of Agriculture, US Forest Service, 1221 South Main St., Moscow, ID USA This paper was written and prepared by U.S. Government employees on official time and, therefore, is in the public domain and not subject to copyright.
2 2 With the Constant Reduced Pressure, the operator manually reduces the tire pressure in each of the vehicle tires and retains these reduced tire pressures during the entire hauling operation. No vehicle modifications are required. The minimum tire pressure depends on gross weight, maximum speed, and tire size and type. The tire pressure cannot be changed without stopping the vehicle. With CRP, tire pressures and therefore, ground contact pressures are not as low as with CTIS. Beginning in January of 1992, a three-year study was begun by the U.S. Forest Service in western Oregon to investigate the relationship of tire pressure, aggregate quality and sediment (Foltz 1996), and the development of ruts with traffic (Truebe and others 1995). This paper will discuss the tire pressure portion of the study. Methodology Test Site A crowned section of forest road, 2.25 km long by 4.27 m wide, on the Lowell District of the Willamette National Forest, Oregon in the northwestern U.S. was selected for the test. This area has wet winters with little snow cover at the 470 m elevation of the site. The long-term average precipitation for January to April is 480 mm. This road was chosen to meet the requirements of length, constant grade, and the ability to control non-test traffic. Three 61-meter long sections with a similar grade of 12% were selected. Each section was surfaced with 100 mm of 76-mm diameter aggregate on top of the existing mm thickness of 76-mm minus subgrade. The aggregate placed on the road sections was considered a marginal quality aggregate by the Willamette National Forest because it contained an excessive quantity of fines and the durability of the fines was low (Foltz and Truebe 1995). This aggregate was considered to be typical of lower quality aggregate often used by forests in lieu of higher quality, more expensive aggregate. Two runoff measurement collectors were located on each test section. One collected a portion of the runoff flowing laterally off both sides of the road crown, while a second collected runoff flowing longitudinally down the road. Continuous flow measurements were made. Sediment trapped in a 0.15 m 3 settling box was collected approximately every three weeks to determine mass and particle size analysis in the laboratory. Tire Pressures Each of the three test sections was dedicated to a single tire pressure system. One test section received only CTIS pressures. One test section received only CRP pressures, and the third test section received only highway pressures. Pressure changes were made between test sections. CTIS pressures were chosen based on the particular load and speed of the trucks. The CRP pressures were chosen based on the load and the criteria to run on paved roads at 88 km/h indefinitely. The highway pressures were representative of typical truck operations. Table 1 presents the tire pressures used for this test.
3 3 Truck Traffic To simulate a timber harvest, loaded and unloaded CTIS equipped logging trucks were driven on the test loop. Prior to each season s truck traffic, the sections were graded to remove wheel ruts and provide a consistent starting condition. This paper will use the term load to mean the combination of one loaded logging truck passing a section and one unloaded logging truck passing in the opposite direction. The 22,450 kg of logs per truck represented 17.4 m 3. Rainfall Simulation At the conclusion of the 1993 test period, rainfall simulation using a CSU-type simulator was performed. A single storm with an intensity of 50 mm/hr and a duration of 30 minutes was applied to each road test section. The purpose of the simulation was to determine mathematical model parameters under more controlled conditions than the natural rainfall events. Modeling Methods We selected the Water Erosion Prediction Project (WEPP) model to predict erosion for the Oregon and other sites. WEPP is a physically based soil erosion model (Laflen and others 1991). It continuously models climate, soil water, and plant growth, on a daily time step. For each storm, the model predicts runoff, sediment detachment, sediment deposition, and sediment yield from the bottom of the hillslope. The Hillslope Version predicts the distribution of erosion along a hillslope profile, as well as the sediment yield, and eroded sediment size distribution in the runoff at the bottom of the hillslope. The results of the 1993 and 1994 field studies were both carefully studied, particularly the data from The runoff amounts to the gutters along the side of the plots and to the cross drain at the bottom of the plots were evaluated iteratively to determine a combination of hydraulic conductivity and length of road contributing to the respective collector. Estimates of hydraulic conductivity and soil erodibility were available from the rainfall simulation carried out a the end of 1993 test period, and from previous rainfall simulation studies (Elliot and others 1995). Site observations, videos, and photographs made during the rainfall simulation were also consulted to gain insight into the flow path behavior. Once initial estimates of the conductivity and path length for a treatment were estimated, the erodibility values were determined iteratively for each plot with results from both natural and simulated rainfall. The values were also compared to observations on previous road studies. From the results of this analysis, we developed typical input files for the WEPP model describing the flow path lengths, climate, and erodibility. We ran the model for 30 years of climate generated by the WEPP climate generator for a climate near the Oregon test site, for a range of water flow path lengths, 7, 15, and > 30 m, and road grades, 3%, 5%, and 12%, to estimate the benefits of reduced
4 4 tire pressures for different topographies. For the 7-m flow path length, the effect of soil properties on erosion were found. For flow path lengths greater than 7 m but less than 30 m, the 7-m results for the CTI treatment were increases proportionately, whereas the flow path lengths were increased to 15 and 30 m for the highway pressure treatment. For results greater than 30 m, the 30-m results can be proportionately increased to any length of road. The length used may be a function of local topography, or of spacing between road crossdrains. We then expanded the study to consider another climate in the southeastern U.S., as well as climates typical of Brazil, and Romania. Results and Discussion The precipitation, truck traffic, and equivalent timber haul for each year are summarized in Table 2. Precipitation ranged from 41% to 109% of seasonal average. In 1993, the precipitation of 521 mm included 249 mm of snow. During each of the other years, the snow fall was insignificant. Maximum daily precipitation and maximum 5-minute intensities were remarkably consistent. Sediment Production Table 3 shows the sediment production from each treatment. These values represent the amount of sediment eroded from the road surfaces. Virtually all of the eroded material, 96% to 99%, was less than 6 mm diameter. Silts and clays typically comprised 65 percent by weight of the sediment in the runoff. The sediment production and sediment yield in Table 3 were specific for the Oregon test site. As a first approximation to generalizing these results, the percent reduction of sediment from the CTIS test section compared to the highway pressure test section and the percent reduction of sediment from the CRP test section were determined (Table 4). These values represent the sediment benefit achieved from the use of a particular reduced tire pressure system. The observed value for the percent reduction when combining the three test periods for the CTIS section was 80%. The values ranged from 87% to 70% on a seasonal basis. The greatest improvement, 87%, occurred in the year with the greatest rainfall, and the least reduction in the driest year. The percent reduction, when the three test periods were combined for the CRP pressure section, was 45%, and ranged from 15% to 59%. The least improvement, 15%, occurred in the season with the least rainfall. Rut Depths Figure 1 presents a typical pre-traffic and post-traffic cross-sections for the 1994 test period. Truck traffic and precipitation on each test-section were identical. Reducing tire pressures showed a marked difference in the development of rutting. Using a peak-to-
5 5 peak measure of the depth of a rut, the highway tire pressure section resulted in a 133 mm deep rut compared to a 8 mm deep rut on the CTIS section and a 32 mm deep rut on the CRP section. We believe this degree of rutting was one of the major factors responsible for the differences in sediment production observed on each test section. The development of ruts consisted of an initial cross-slope flattening, leading to a deepening of the wheel path to form a rut. As the cross-slope of the road was flattened, the path length for water to flow from the road crown to the road edge was increased. Generally, the wheel track has reduced infiltration compared to the non-tracked portion and, therefore, more surface runoff. This combination of increased flow path length and increased runoff results in greater erosion, even though no ruts are visible. When a rut did form, the runoff was prevented from flowing across the road, was confined to the rut, and the concentrated flow caused additional erosion. Concentrated flow in the rut continued until the flow overtopped the rut or a cross drain was encountered. We have observed other sites where the rut channeled water for long distances and bypassed relief culverts or drains. Both cross-slope flattening and severe wheel rut formation were observed on the highway tire pressure road section. For the 1994 test season, the CTIS cross-slope change could not be detected. It was initially graded too flat, 2% cross-slope, resulting in a long flow path of 13 m both before and after traffic. A better choice of cross-slope would have been at least 4%. The CRP section flattened from an initial 5.6% to 2.2% for a flow path increase from 5.1 m to 10.7 m, over twice the initial path length. The highway test section flow path increased from the initial 4.2 m to the entire length of the section, 61 m, because of the severe rutting. A second factor contributing to the increased sediment production on the highway pressure treatment was the degree of aggregate crushing. This crushing maintained a ready supply of fine particles available for transport by the runoff. Alternatively the lower tire pressures did less crushing of the marginal aggregate and did not provide as large a sediment supply. The initial particle size distribution for each test segment was taken before traffic in Another particle size distribution was taken again at the end of the 1993 test after two seasons of traffic. This permitted a mass balance for the particle sizes less than mm to be performed. The mass balance was solved for the amount of fines generated due to crushing. The traffic on the CTIS section generated 46% fewer fines than the highway test section, 1076 kg compared to 1986 kg. The corresponding value for the CRP section was 24%, 1505 kg compared to 1986 kg. These values were further evidence that the lower tire pressures had less impact on the aggregate. Rut Development Figure 2 shows how the rut depths increased with truck traffic during the 1993 test period. The CTIS section showed little change of depth with traffic. The CRP section deepened only slightly with traffic. Both of these are in contrast to the highway pressure
6 6 treatment, which developed a deep rut of 89 mm. Half of the increase in rut depth on the highway section occurred after only 15% of the total truck traffic. Figures 1 and 2 reflect the differences in road maintenance requirements among the three tire pressure treatments. The highway tire pressure section would have required maintenance two to four times to remove the deep ruts. Both of the two lowered tire pressure sections would not have required any road maintenance. WEPP Modeling The WEPP model provided an improved estimate of the effects of lowered tire pressures on sediment production. The infiltration and erosion parameters determined from the Oregon study are presented in Table 5. Our analysis showed that the differences in erosion on the two treatments were more influenced by flow path length and conductivity than by soil erodibility properties. For the CTIS section, we estimated flow path lengths of 7 m compared to a 30 m flow path on the highway section. The modeling effort showed us that we needed different flow path lengths for the tire pressure treatments and our field measurements confirmed that we did indeed have those flow path differences. The 3-year average soil losses observed on the site were 177 kg and 893 kg for the CTI and highway treatments respectively, compared to the 30-year average annual WEPP-predicted losses of 225 kg and 1181 kg. The WEPP averages were well within the range of observed losses, especially considering that the measured losses were for only the winter months (Table 3). Road length and steepness modeling - The results of the computer simulation comparing the effects of road length and steepness are presented in Table 6. The field plot length was 61 m long, and the observed reduction in soil loss averaged 80%. In the simulation results, the predicted reduction was 81%, showing the ability of the WEPP model to compare different topographic scenarios. The greatest sediment benefit of the lowered tire pressures is to be found at the steeper road grades. In these conditions, other benefits of lowered tire pressures, such as ability to pull steep, wet grades unassisted, are also more profound (Keller 1992). One of the major findings of the WEPP calibration aspect of this study was the major role that flow path geometry plays in road erosion. This role has led us to focus one aspect of our research on better understanding flow path relationships and flow path properties. Such an understanding of flow geometries is of great benefit in addressing such issues as insloping versus outsloping roads, in evaluating appropriate spacing of road cross-drains, and in better understanding the relationship between road physical properties and the impact of the road on the surrounding environment. Affect of Climate on Sediment Reduction
7 7 A second set of runs were carried out to compare the benefits of CTI pressures for climates from different areas of the world, including the Oregon climate, a climate from the southeastern U.S., a climate from Brazil, and a climate from Sinaia, Romania. The topography was assumed to be similar to the research plots, so Table 7 allows the comparison of different climates on the effectiveness of CTI tire pressures to reduce erosion. The differences in Table 7 show the effect of climate only. It is likely that the soils chosen for Brazil were more permeable, which would result in less benefit from CTI. A greater percent of the runoff in the Romanian climate was from snowmelt than from any of the other climates, which is generally at a lower rate than from rainfall. This may account for the generally higher predicted runoff amounts but lower sediment reduction benefits. Table 7 demonstrates that CTIS is beneficial in all climates for sediment reduction. Management Opportunities The results of the three year study had several management opportunities for forest road management. One was that tire pressures in logging trucks had an impact on sediment production. Simply reducing the tire pressure from 620 kpa to 480 kpa resulted in a 45% reduction in sediment loss from the road surface. This level of sediment reduction could be achieved without modifications to existing vehicles. The benefit of CRP is that no modifications are needed to the truck. The use of Central Tire Inflation System vehicles reduced sediment production by 80%. Although there is a cost of equipping vehicles with CTIS, the ability to reduce sediment production could mean the difference between operating in sensitive areas and not operating. The WEPP model demonstrated the ability to model the effects of lowered tire pressures on different road grades and different climates. The use of this model, or the Variable Tire Pressure (VTP) 1.00 program (USDA 1996), would allow tailored estimates of the sediment reduction attributable to lowered tire pressures. A second benefit of lowered tire pressures was less frequent road maintenance. This reduced maintenance frequency would be an additional cost advantage for both lower tire pressure systems. Summary and Conclusions A three year test of the effect of tire pressure on sediment production demonstrated that reducing the tire pressure in logging trucks results in less sediment from the road surface. Depending upon the amount of tire pressure reduction and the road grade, up to 80% reduction in sediment could be expected. Both the field results and the physical-process based model indicated that steeper slopes and longer flow paths would experience the largest sediment reduction.
8 8 The mechanism by which the reduction in sediment occurs is the prevention of surface rutting and concentrated flow. Since ruts and concentrated flow are not site specific, the existence of the benefits of lowered tire pressures are not site specific. Only the magnitude of the benefits are site specific. The WEPP model was able to predict the observed sediment reductions and we feel confident that it can be used to closely estimate the magnitude at other locations world-wide. Acknowledgments The authors would like to acknowledge the financial and technical support and the loan of a logging truck from the USDA Forest Service San Dimas Technology and Development Center. The assistance of the Willamette National Forest notably Larry Tennis of the Lowell Ranger District and Mark Truebe and Gary Evans of the supervisor's office was appreciated. A special acknowledgment to Ben Kopyscianski of the Intermountain Research Station who led the individuals who collected samples and maintained equipment in the cold and rain of three Oregon winters. References Elliot, W. J.; Foltz, R. B.; Luce, C. H Validation of Water Erosion Prediction Project (WEPP) model for Low-Volume Forest Roads. Proceedings of the Sixth International Conference on Low-Volume Roads, v1, pp Transportation Research Board, National Research Council, Washington, DC. Foltz, R. B Traffic and No-traffic on an Aggregate Surfaced Road: Sediment Production Differences. Presented at the IUFRO Seminar on Environmentally Sound Forest Roads and Wood Transport, Sinaia, Romana. Foltz, R. B.; Burroughs, E. R., Jr Sediment Production from Forest Roads with Wheel Ruts. Proceedings from Watershed Planning and Analysis in Action, American Society of Civil Engineers, Durango, CO. Foltz, R. B.; Burroughs, E. R., Jr A Test of Normal Tire Pressure and Reduced Tire Pressure on Forest Roads: Sedimentation Effects. Proceedings from Forestry and Environment...Engineering Solutions, Forest Engineering Group, American Society of Agricultural Engineers, New Orleans, LA. Foltz, R. B.; Truebe, M. A Effect of Aggregate Quality on Sediment Production from a Forest Road. Proceedings of the Sixth International Conference on Low-Volume Roads, v1, p Transportation Research Board, National Research Council, Washington, DC. Keller, R. R The Results of Operational Testing of Central Tire Inflation Systems Proves the Benefits of Low Tire Pressure in Logging Operations, Proceedings Eighth Pacific Northwest Skyline Symposium, p
9 9 Laflen, J. M.; Lane, L. J.; Foster, G. R WEPP a New Generation of Erosion Prediction Technology. Journal of Soil and Water Conservation, 46(1): Truebe, M. A.; Evans, G. L.; Bolander, P Lowell Test Road: Helping Improve Road Surface Design. In Sixth International Conference on Low-Volume Roads, v2, p Transportation Research Board, National Research Council, Washington, DC. USDA Variable Tire Pressure (VTP) 1.00 Computer software. U. S. Forest Service, San Dimas Technology and Development Center, San Dimas, CA,
10 12 Table 1: Tire Pressure Treatments Used for the Lowell, Oregon Test. Unloaded Truck Loaded Truck Tire Pressure System Steering Axle (kpa) Other Axles (kpa) Steering Axle (kpa) Other Axles (kpa) Central Tire Inflation System Constant Reduced Pressure Highway Tire Pressure Table 2: Precipitation and Traffic Summary for the Lowell, Oregon Test. Year Depth (mm) Precipitation Maximum Precipitation Traffic Seasonal Average (%) Daily (mm) 5-min. Intensity (mm/hr) Loads Timber Haul (m 3 ) , , ,600 Table 3: Sediment Production from 61 m long Road Sections Lowell, Oregon. Tire Pressure Mass Sediment (kg) Total Central Tire Inflation System Constant Reduced Pressure Highway Tire Pressure
11 13 Table 4: Sediment Reduction Due to the Use of Lowered Tire Pressures, Lowell, Oregon. Tire Pressure Sediment Reduction (%) Average Central Tire Inflation System Constant Reduced Pressure Sedimenthighway - Sedimenti SRi = * 100 Sedimenthighway Table 5: WEPP Erodibility Values for Two Tire Pressures on a Road With Marginal Quality Aggregate. Conductivity Flow Path Length Erodibility Rill Critical Shear Treatment Rut (mm/h) Shoulder (mm/h) (m) Interrill (kg m/s 4 ) Rill (s/m) (kpa) CTIS ,000, x Highway ,000, x Table 6: Percent Reduction in Sediment by Employing CTIS Tire Pressures Rather than Highway Tire Pressures. Flow Path Length (m) Slope (%) 7 15 > % 53% 78% 5 6% 57% 79% 12 12% 61% 81%
12 14 Table 7: Rainfall, Runoff, and Percent Reduction in Predicted Sediment Loss for a Road Segment with a Length of 61 m and a Uniform Gradient of 12%. Average Rainfall Runoff Site (mm) CTIS (mm) Highway (mm) Sediment Reduction (%) Corvallis, OR, USA Collowee, N.C., USA Campinas, Brazil Sinaia, Romania (a) Elevation (m) (b) Rut Depth (mm) Highway Tire Pressure Before Traffic (c) 20 CRP Tire Pressure After Traffic Station (m) CTIS Tire Pressure Truck Traffic (loads)
13 This paper was published as: Foltz, R.B.; Elliot, W.J Measuring and modeling impacts of tire pressures on road erosion. Presented at the FAO Seminar on Environmentally Sound Forest Roads, June 1996, Sinaia, Romania. 14 p. Keywords: 1999e Moscow Forestry Sciences Laboratory Rocky Mountain Research Station USDA Forest Service 1221 South Main Street Moscow, ID
Effect of Aggregate Quality on Sediment Production from a Forest Road
Effect of Aggregate Quality on Sediment Production from a Forest Road Randy B. Foltz, USDA Forest Service, Moscow, Idaho Mark A. Truebe, USDA Forest Service, Eugene, Oregon Aggregate is placed on forest
More informationRecent findings related to measuring and modeling forest road erosion
18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 Recent findings related to measuring and modeling forest road erosion W. J. Elliot 1, R. B. Foltz 1
More informationX-DRAIN AND XDS: A SIMPLIFIED ROAD EROSION PREDICTION METHOD
X-DRAIN AND XDS: A SIMPLIFIED ROAD EROSION PREDICTION METHOD by W. J. Elliot D. E. Hall S. R. Graves Project Leader Computer Specialist Geologist Rocky Mountain Research Station, USDA Forest Service 1221
More informationLinking the WEPP Model to Stability Models
Paper No. 002150. An ASAE Meeting Presentation Linking the WEPP Model to Stability Models by W. J. Elliot S. A. Lewis Project Leader Civil Engineer Soil and Water Engineering, Rocky Mountain Research Station
More informationAdapting WEPP (Water Erosion Prediction Project) for Forest Watershed Erosion Modeling
Adapting WEPP (Water Erosion Prediction Project) for Forest Watershed Erosion Modeling Joan Q. Wu Arthur C. Xu William J. Elliot Department of Biological Systems Engineering Rocky Mountain Research Station
More informationEFFECTS OF TRAFFIC AND DITCH MAINTENANCE ON FOREST ROAD SEDIMENT PRODUCTION
EFFECTS OF TRAFFIC AND DITCH MAINTENANCE ON FOREST ROAD SEDIMENT PRODUCTION Charles H. Luce, Research Hydrologist, and Thomas A. Black, Hydrologist, USDA Forest Service, Rocky Mountain Research Station,
More informationPREDICTING BACKGROUND AND RISK-BASED SEDIMENTATION FOR FOREST WATERSHED TMDLS
This is not a peer-reviewed article. Watershed Management to Meet Water Quality Standards and TMDLS (Total Maximum Daily Load) Proceedings of the Fourth Conference 10-14 March 2007 (San Antonio, Texas
More informationGPS-ASSISTED ROAD SURVEYS AND GIS-BASED ROAD EROSION MODELING USING THE WEPP MODEL
Paper No. PNW-03-109 An ASAE Meeting Presentation This is not a peer-reviewed paper. GPS-ASSISTED ROAD SURVEYS AND GIS-BASED ROAD EROSION MODELING USING THE WEPP MODEL Erin S. Brooks 1, Jan Boll 2, and
More informationValidation of the Weather Generator CLIGEN with Precipitation Data from Uganda. W. J. Elliot C. D. Arnold 1
Validation of the Weather Generator CLIGEN with Precipitation Data from Uganda W. J. Elliot C. D. Arnold 1 9/19/00 ABSTRACT. Precipitation records from highland and central plains sites in Uganda were
More informationLocally Available Aggregate and Sediment Production
Transportation Research Record 1819 185 Paper No. LVR8-1050 Locally Available Aggregate and Sediment Production Randy B. Foltz and Mark Truebe Selection of suitable locally available materials to build
More informationGreat Lakes Online Watershed Interface W. Elliot, Research Engineer USDA Forest Service Rocky Mountain Research Station, Moscow, ID March, 2016
Great Lakes Online Watershed Interface W. Elliot, Research Engineer USDA Forest Service Rocky Mountain Research Station, Moscow, ID March, 2016 Guidelines for using the Web WEPP Watershed Tool to Support
More informationMEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA
MEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA Prepared by Eric Larsen, Ph.D. Mark Rains, Ph.D. October 2006 INTRODUCTION
More informationKINEROS2/AGWA. Fig. 1. Schematic view (Woolhiser et al., 1990).
KINEROS2/AGWA Introduction Kineros2 (KINematic runoff and EROSion) (K2) model was originated at the USDA-ARS in late 1960s and released until 1990 (Smith et al., 1995; Woolhiser et al., 1990). The spatial
More informationErosion Risk Management Tool (ERMiT) User Manual
United States Department of Agriculture Forest Service Rocky Mountain Research Station General Technical Report RMRS-GTR-188 April 2007 Erosion Risk Management Tool (ERMiT) User Manual (version 2006.01.18)
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationConservation Planning evaluate land management alternatives to reduce soil erosion to acceptable levels. Resource Inventories estimate current and
Conservation Planning evaluate land management alternatives to reduce soil erosion to acceptable levels. Resource Inventories estimate current and projected erosion levels and their impact on natural resource
More informationUpdating Slope Topography During Erosion Simulations with the Water Erosion Prediction Project
This paper was peer-reviewed for scientific content. Pages 882-887. In: D.E. Stott, R.H. Mohtar and G.C. Steinhardt (eds). 2001. Sustaining the Global Farm. Selected papers from the 10th International
More informationFROST HEAVE. GROUND FREEZING and FROST HEAVE
FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops
More informationLOCATING DITCH RELIEF CULVERTS TO REDUCE SEDIMENT DELIVERY TO STREAMS - AN INTERACTIVE DESIGN TOOL
LOCATING DITCH RELIEF CULVERTS TO REDUCE SEDIMENT DELIVERY TO STREAMS - AN INTERACTIVE DESIGN TOOL Peter Schiess, Finn Krogstad and Florentiu Damian Paper presented at the Joint Conference of IUFRO 3.06
More informationThe X-DRAIN Cross Drain Spacing and Sediment Yield Model
D E P A RTMENT OF AGRICUL E TU R United States Department of Agriculture Forest Service Technology & Development Program 7700 Transportation System 2500 Watershed and Air Management June 1998 9877 1801
More informationW. Elliot, PE, PhD USDA Forest Service, Rocky Mountain Research Station Moscow, Idaho Version: April, 2017 WEPP PEP The Water Erosion Prediction Project (WEPP) Post Fire Erosion Predictor (PEP) is an online
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module-5 LECTURE-
More informationThe following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003.
Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: April 8, 2003 Subject: April 1, 2003 Western Snowpack Conditions and
More informationWhich map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)
1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions
More informationStorm Sewer Design [2]
Class 5 [1] Storm Sewer Design 9. Check Q < Qf and Vmax > vf > Vmin. Vmin is normally specified to avoid sedimentation. This will normally be 1.0 m/s at pipe full condition. (BS EN 752 suggests that for
More informationFlood Risk Assessment
Flood Risk Assessment February 14, 2008 Larry Schick Army Corps of Engineers Seattle District Meteorologist General Assessment As promised, La Nina caused an active winter with above to much above normal
More informationValidation of the FS WEPP Interfaces for Forest Roads and Disturbances
Paper Number: 01-8009 An ASAE Meeting Presentation Validation of the FS WEPP Interfaces for Forest Roads and Disturbances William J. Elliot, Project Leader USDA Forest Service, Rocky Mountain Research
More informationHAUL ROUTING: AN OVERLOOKED FACTOR IN ENVIRONMENTALLY DRIVEN ROAD DECOMMISSIONING
HAUL ROUTING: AN OVERLOOKED FACTOR IN ENVIRONMENTALLY DRIVEN ROAD DECOMMISSIONING Finn Krogstad and Peter Schiess Doctoral Candidate and MCMC Professor of Forest Engineering, respectively, College of Forest
More informationModeling soil erosion by water on agricultural land in Cenei, Timiş County, Romania
Modeling soil erosion by water on agricultural land in Cenei, Timiş County, Romania GEORGE NARCIS PELEA, IOANA ALINA COSTESCU, ERIKA BEILICCI, TEODOR EUGEN MAN, ROBERT BEILICCI Faculty of Civil Engineering,
More informationBlack Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration
More information3. The map below shows an eastern portion of North America. Points A and B represent locations on the eastern shoreline.
1. Most tornadoes in the Northern Hemisphere are best described as violently rotating columns of air surrounded by A) clockwise surface winds moving toward the columns B) clockwise surface winds moving
More informationEffects of forest cover and environmental variables on snow accumulation and melt
Effects of forest cover and environmental variables on snow accumulation and melt Mariana Dobre, William J. Elliot, Joan Q. Wu, Timothy E. Link, Ina S. Miller Abstract The goal of this study was to assess
More informationStream Simulation: A Simple Example
Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic
More informationRoger Andy Gaines, Research Civil Engineer, PhD, P.E.
Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Research Civil Engineer/Regional Technical Specialist Memphis District August 24, 2010 Objectives Where we have been (recap of situation and what s
More informationStorm and Runoff Calculation Standard Review Snowmelt and Climate Change
Storm and Runoff Calculation Standard Review Snowmelt and Climate Change Presented by Don Moss, M.Eng., P.Eng. and Jim Hartman, P.Eng. Greenland International Consulting Ltd. Map from Google Maps TOBM
More informationCITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY
CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationROAD DUST SUPPRESSSANTS RESEARCH RESULTS
ROAD DUST SUPPRESSSANTS RESEARCH RESULTS Thomas G. Sanders 1 and Jonathan Q. Addo 2 1 Department of Civil and Environmental Engineering, Colorado State University, Fort Collins, CO 80525. 2 Project Engineer,
More informationEffect of tire type on strains occurring in asphalt concrete layers
Effect of tire type on strains occurring in asphalt concrete layers Grellet D., Doré G., & Bilodeau J.-P. Department of Civil Engineering, Laval University, Québec, Canada ABSTRACT: The three main causes
More informationIMPACTS OF LANDSLIDES ON AN ECOSYSTEM
IMPACTS OF LANDSLIDES ON AN ECOSYSTEM by W. J. Elliot T. E. Koler J. C. Cloyd M. Philbin Project Leader Research Geologist Engr. Geologist District Hydrologist Intermountain Research Station Siuslaw National
More informationTable 13 Maximum dewpoint temperature (degrees Celsius), primary meteorological station, H. J. Andrews Experimental Forest, 5/10/72 through 12/31/84
Table 13 Maximum dewpoint temperature (degrees Celsius), primary meteorological station, H. J. Andrews Experimental Forest, 5/10/72 through 12/31/84 Table 14 Mean nighttime dewpoint temperature (degrees
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationGEOL 1121 Earth Processes and Environments
GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,
More informationCase Study 2: Twenty-mile Creek Rock Fords
Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek
More informationConstruction Exits Rock pads
Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor
More informationA probabilistic approach to modeling postfire erosion after the 2009 Australian bushfires
18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 A probabilistic approach to modeling postfire erosion after the 2009 Australian bushfires P.R. Robichaud
More informationEvaluating Hydroplaning Potential of Rutted Highway Pavements
Evaluating Hydroplaning Potential of Rutted Highway Pavements Longjia CHU a, Tien F. FWA b, Ghim P. ONG c a Department of Civil & Environmental Engineering, National University of Singapore, 119260, Singapore;
More informationCulway Weigh-In-Motion (WIM) Compensating for Calibration Drift Preliminary Report
Department of Transport, Energy and Infrastructure Transport Information Management Section Culway Weigh-In-Motion (WIM) Compensating for Calibration Drift Preliminary Report CARL CARUANA Traffic Registrar
More informationConstruction Exits Vibration grids
Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]
More informationField Indicators of Inlet Controlled Road Stream Crossing Capacity
D E P A RTMENT OF AGRICUL E TU R United States Department of Agriculture Forest Service Technology & Development Program 7700 Transportation System 2500 Watershed and Air Management October 1997 9777 1807
More informationSessom Creek Sand Bar Removal HCP Task 5.4.6
Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of
More informationDevelopment of a GIS Interface for WEPP Model Application to Great Lakes Forested Watersheds
Development of a GIS Interface for WEPP Model Application to Great Lakes Forested Watersheds J.R. Frankenberger 1, S. Dun 2, D.C. Flanagan 1, J.Q. Wu 2, W.J. Elliot 3 1 USDA-ARS, West Lafayette, IN 2 Washington
More informationADAPTING WEPP (WATER EROSION PREDICTION PROJECT) FOR FOREST WATERSHED EROSION MODELING SHUHUI DUN
ADAPTING WEPP (WATER EROSION PREDICTION PROJECT) FOR FOREST WATERSHED EROSION MODELING By SHUHUI DUN A thesis submitted in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE IN
More informationHillslope Erosion Rates in the Oak Savannas of the Southwestern Borderlands Region
Hillslope Erosion Rates in the Oak Savannas of the Southwestern Borderlands Region Item type Authors Publisher Journal Rights text; Proceedings Kauffman, Arron T.; Stropki, Cody L.; Ffolliott, Peter F.;
More informationRiver Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.
River Response River Response Sediment Water Wood Confinement Valley slope Channel morphology Bank material Flow obstructions Riparian vegetation climate catchment vegetation hydrological regime channel
More informationSediment Deposition LET THE RIVER RUN T E A C H E R. Activity Overview. Activity at a Glance. Time Required. Level of Complexity.
Activity at a Glance Grade: 6 9 Subject: Science Category: Physical Science, Earth Science Topic: Deposition, River Systems Time Required Two 45-minute periods Level of Complexity Medium Materials* TI-73
More informationInvestigation IV: Seasonal Precipitation and Seasonal Surface Runoff in the US
Investigation IV: Seasonal Precipitation and Seasonal Surface Runoff in the US Purpose Students will consider the seasonality of precipitation and surface runoff and think about how the time of year can
More informationEffect of Environmental Factors on Free-Flow Speed
Effect of Environmental Factors on Free-Flow Speed MICHAEL KYTE ZAHER KHATIB University of Idaho, USA PATRICK SHANNON Boise State University, USA FRED KITCHENER Meyer Mohaddes Associates, USA ABSTRACT
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationErosion and Sedimentation Basics
Erosion and Sedimentation Basics Coastal San Luis Resource Conservation District G.W. Bates, PE, CPESC Outline: 1. Terms & Concepts 2. Causes of Erosion 3. The Erosion/Sedimentation Process 4. Erosion
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationLake Tahoe Watershed Model. Lessons Learned through the Model Development Process
Lake Tahoe Watershed Model Lessons Learned through the Model Development Process Presentation Outline Discussion of Project Objectives Model Configuration/Special Considerations Data and Research Integration
More informationMAINTENANCE AND REHABILITATION OF LOW COST SURFACE DRESSING FOR LOW VOLUME ROADS EXPERIMENTAL ROAD SITES
1 MAINTENANCE AND REHABILITATION OF LOW COST SURFACE DRESSING FOR LOW VOLUME ROADS EXPERIMENTAL ROAD SITES Pétur Pétursson, Icelandic Building Research Institute Reykjavik, Iceland e-mail: petur.p@rabygg.is
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationAdvanced Hydraulics Prof. Dr. Suresh A Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati
Advanced Hydraulics Prof. Dr. Suresh A Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 2 Uniform Flows Lecture - 6 Design of Channels for Uniform Flow (Refer Slide
More informationAPPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013
APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in
More informationImpact of Existing Pavement on Jointed Plain Concrete Overlay Design and Performance
Impact of Existing Pavement on Jointed Plain Concrete Overlay Design and Performance Michael I. Darter, Jag Mallela, and Leslie Titus-Glover 1 ABSTRACT Concrete overlays are increasingly being constructed
More informationTemplate for Sediment and Erosion Control Plan General Instructions. Section Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationInstructions for Running the FVS-WRENSS Water Yield Post-processor
Instructions for Running the FVS-WRENSS Water Yield Post-processor Overview The FVS-WRENSS post processor uses the stand attributes and vegetative data from the Forest Vegetation Simulator (Dixon, 2002)
More informationPotential Impacts of Climate Change on Soil Erosion Vulnerability Across the Conterminous U.S.
Potential Impacts of Climate Change on Soil Erosion Vulnerability Across the Conterminous U.S. Catalina Segura 1, Ge Sun 2, Steve McNulty 2, and Yang Zhang 1 1 2 1 Soil Erosion Natural process by which
More informationMarch 1, 2003 Western Snowpack Conditions and Water Supply Forecasts
Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: March 17, 2003 Subject: March 1, 2003 Western Snowpack Conditions and
More informationAnalysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method
Analysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method Introduction (from http://www.neng.usu.edu/cee/faculty/dtarb/graip/#over): The Geomorphologic Road Analysis and Inventory
More informationErosion Surface Water. moving, transporting, and depositing sediment.
+ Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration
More informationAssessment of Concave and Linear Hillslopes for Post-Mining Landscapes 1
Assessment of Concave and Hillslopes for Post-Mining Landscapes 1 Sumith Priyashantha 2, Brian Ayres 3, Mike O Kane 4, and Mike Fawcett 5 2 O Kane Consultants Inc., 2312 Arlington Avenue, Saskatoon, SK,
More informationSOUTH MOUNTAIN WEATHER STATION: REPORT FOR QUARTER 2 (APRIL JUNE) 2011
SOUTH MOUNTAIN WEATHER STATION: REPORT FOR QUARTER 2 (APRIL JUNE) 2011 Prepared for ESTANCIA BASIN WATERSHED HEALTH, RESTORATION AND MONITORING STEERING COMMITTEE c/o CLAUNCH-PINTO SOIL AND WATER CONSERVATION
More informationDrivers % Winter Maintenance Report 30,517 46, , Statewide Snowfall Average. Truck Stations. Full-time Backup.
2016-17 Winter Maintenance Report At A Glance 30,517 Snow and Ice Lane Miles 54 Statewide Snowfall Average 150 Truck Stations Total Cost of Winter $ 97 Million 87% Frequency Achieving Bare Lanes 1,779
More information3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e
Introduction to Environmental Geology, 5e Running Water: summary in haiku form Edward A. Keller Chapter 9 Rivers and Flooding Lecture Presentation prepared by X. Mara Chen, Salisbury University The hydro
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationChapter 1. OVERVIEW OF THE WEPP EROSION PREDICTION MODEL
1.1 Chapter 1. OVERVIEW OF THE WEPP EROSION PREDICTION MODEL D.C. Flanagan, J.C. Ascough II, A.D. Nicks, M.A. Nearing and J.M. Laflen 1.1 Introduction The USDA - Water Erosion Prediction Project (WEPP)
More informationSediment Trap. At multiple locations within the project site where sediment control is needed.
Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationWatershed Application of WEPP and Geospatial Interfaces. Dennis C. Flanagan
Watershed Application of WEPP and Geospatial Interfaces Dennis C. Flanagan Research Agricultural Engineer USDA-Agricultural Research Service Adjunct Professor Purdue Univ., Dept. of Agric. & Biol. Eng.
More informationModule 4: Overview of the Fundamentals of Runoff and Erosion
Module 4: Overview of the Fundamentals of Runoff and Erosion Module 4a Goal Once we can better understand the forces which cause erosion and runoff, only then can we begin to minimize the negative results.
More informationSwift Creek Sediment Management Action Plan (SCSMAP)
Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 2 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationMECHANISTIC-EMPIRICAL LOAD EQUIVALENCIES USING WEIGH IN MOTION
MECHANISTIC-EMPIRICAL LOAD EQUIVALENCIES USING WEIGH IN MOTION Prepared By: Curtis Berthelot Ph.D., P.Eng. Dept. of Civil Engineering University of Saskatchewan Tanya Loewen Dept. of Civil Engineering
More informationOregon Water Conditions Report May 1, 2017
Oregon Water Conditions Report May 1, 2017 Mountain snowpack in the higher elevations has continued to increase over the last two weeks. Statewide, most low and mid elevation snow has melted so the basin
More informationWatershed Processes and Modeling
Watershed Processes and Modeling Pierre Y. Julien Hyeonsik Kim Department of Civil Engineering Colorado State University Fort Collins, Colorado Kuala Lumpur - May Objectives Brief overview of Watershed
More informationUGRC 144 Science and Technology in Our Lives/Geohazards
UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education
More informationA Guideline for Training Patrol Staff Ontario Good Roads Association
A Guideline for Training Patrol Staff Ontario Good Roads Association A Guideline for Training Patrol Staff Rationale A patroller is required to observe both weather and road conditions either in the field
More informationDesign and Construction
Design and Construction Stream Simulation With power point slides shamelessly stolen from: Forest Service AOP Training Course Bob Gubernick Paul Anderson John Kattell USDA Forest Service Interim Directive
More informationUsing WEPP Technology to Predict Erosion and Runoff Following Wildfire
An ASABE Meeting Presentation Paper Number: 068011 Using WEPP Technology to Predict Erosion and Runoff Following Wildfire William J. Elliot, PE, PhD, Project Leader (welliot@fs.fed.us) Ina Sue Miller,
More information2010/2011 Winter Weather Summary
2010/2011 Winter Weather Summary Number of Days of Snow Alerts* Precipitation Snow Rain October 0 6 Trace.91 inches November 0 16 1.1 inches.47 inches December 2 20 17.9 inches 1.54 inches 7.5" first alert
More informationCASE STUDY NATHPA JHAKRI, INDIA
SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass
More informationHow Can DOT Operations and Maintenance Prepare for Extreme Weather Events?
How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four
More informationWatershed Conservation Management Planning Using the Integrated Field & Channel Technology of AnnAGNPS & CONCEPTS
Watershed Conservation Management Planning Using the Integrated Field & Channel Technology of AnnAGNPS & CONCEPTS Eddy Langendoen Ron Bingner USDA-ARS National Sedimentation Laboratory, Oxford, Mississippi
More informationHUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM. Dust Control Guidelines
HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM Dust Page 1 of 10 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS OF TERMINOLOGY... 3 3.0 METHODS OF DUST CONTROL...
More informationTechnical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:
Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management
More informationB-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling
Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications
More informationVariability Across Space
Variability and Vulnerability of Western US Snowpack Potential impacts of Climactic Change Mark Losleben, Kurt Chowanski Mountain Research Station, University of Colorado Introduction The Western United
More information