1 This electronic collection of documents is provided for the convenience of the user and is Not a ertified Document The documents contained herein were originally issued and sealed by the individuals whose names and license numbers appear on each page, on the dates appearing with their signature on that page. This file or an individual page shall not be considered a certified document.

2 0303 TIP PROJET: ND 83/ 86 TO SR 10 (DUNN RD) LOTION: TYPE O WORK: STTE O NORTH ROLIN BEGIN TIP PROJET -L- ST SMPSON OUNTY BRIDGE 325 DIVISION O HIGHWYS PLN OR PROPOSED HIGHWY EROSION ONTROL REPLE BRIDGE 325 OVER LITTLE OHRIE REEK OVERLOW ND BRIDGES 326 ND 327 OVER LITTLE OHRIE REEK ON SR 1409 (OLD SLEMBURG RD) GRDING, PVING, DRINGE, ND STRUTURES BRIDGE 326 -L- BRIDGE 327 SR 1409 OLD SLEMBURG ROD 4 END TIPPROJET -L- ST SLEMBURG STTE N.. STTE PROJET REERENE NO. SHEET NO. STTE PROJ. NO... PROJ. NO. DESRIPTION TOTL SHEETS EROSION ND SEDIMENT ONTROL MESURES Std. # Description Symbol Temporary Silt Ditch TSD Temporary Diversion Temporary Silt ence TD Special Sediment ontrol ence Temporary Berms and Slope Drains Silt Basin Type B Temporary Rock Silt heck Type Temporary Rock Silt heck Type-B Wattle/oir iber Wattle Wattle/oir iber Wattle with Polyacrylamide (PM) Temporary Rock Sediment Dam Type- Temporary Rock Sediment Dam Type-B Rock Pipe Inlet Sediment Trap Type- Rock Pipe Inlet Sediment Trap Type-B Stilling Basin Special Stilling Basin Rock Inlet Sediment Trap: Type Type B Type Temporary Rock Silt heck Type- with Matting and Polyacrylamide (PM) Skimmer Basin Tiered Skimmer Basin Infiltration Basin THIS PROJET ONTINS EROSION ONTROL PLNS OR LERING ND GRUBBING PHSE O ONSTRUTION. E-1 B EW W K:\RL_Roadway\ \Erosion ontrol\b4637_ero_tsh.dgn 3/31/2017 User: vance.blanton GRPHI SLE 50 0 PLNS 50 0 PROILE (HORIZONTL) PROILE (VERTIL) THESE EROSION ND SEDIMENT ONTROL PLNS OMPLY WITH THE REGULTIONS SET ORTH BY THE NG-000 GENERL ONSTRUTION PERMIT EETIVE UGUST 1, 2016 ND ISSUED BY THE NORTH ROLIN DEPRTMENT O ENVIRONMENT ND NTURL RESOURES DIVISION O WTER RESOURES. Prepared in the Office of: 421 YETTEVILLE STREET, SUITE 600 RLEIGH, N Designed by: 2017 VNE BLNTON 3708 NME LEVEL III ERTIITION NO. Reviewed in the Office of: RODSIDE ENVIRONMENTL UNIT 1 South Wilmington St. Raleigh, N STNDRD SPEIITIONS Reviewed by: WES HNDLER, EI Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design Unit - N.. Department of Transportation - Raleigh, N.., dated January 2012 and the latest revison thereto are applicable to this project and by reference hereby are considered a part of these plans Railroad Erosion ontrol Detail Temporary Silt ence Special Sediment ontrol ence Gravel onstruction Entrance Temporary Berms and Slope Drains Riser Basin Silt Basin Type B Temporary Silt Ditch Stilling Basin Temporary Diversion Special Stilling Basin Matting Installation Rock Inlet Sediment Trap Type Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type Temporary Rock Silt heck Type Temporary Rock Silt heck Type B Temporary Rock Sediment Dam Type Temporary Rock Sediment Dam Type B Rock Pipe Inlet Sediment Trap Type Rock Pipe Inlet Sediment Trap Type B oir iber Baffle Temporary Stream rossing

3 RIGHT-O-WY REV. 421 YETTEVILLE STREET, SUITE 600 RLEIGH, N PROJET REERENE NO. RODWY DESIGN E-2 HYDRULIS ONST. REV. OIR IBER WTTLE BRRIER DETIL NOTES: USE MINIMUM 18 IN. NOMINL DIMETER OIR IBER (OONUT) WTTLE ND LENGTH O 10 T. ROD GRDE ILL MTERIL EXVTE 2 TO 3 INH TRENH OR WTTLE TO BE PLED. DO NOT PLE WTTLES ON TOE O SLOPE. USE 2 T. WOODEN STKES WITH 2 IN. BY 2 IN. NOMINL ROSS SETION. INSTLL MINIMUM O 2 UPSLOPE STKES ND 4 DOWNSLOPE STKES T N NGLE TO WEDGE WTTLE TO GROUND. PROVIDE STPLES MDE O IN. DIMETER STEEL WIRE ORMED INTO U SHPE NOT LESS THN 12" IN LENGTH. INSTLL STPLES PPROXIMTELY EVERY 1 LINER OOT ON BOTH SIDES O WTTLE ND T EH END TO SEURE IT TO THE SOIL. WTTLE OR BREKS LONG LRGE SLOPES, USE MXIMUM SPING O 25 T. TOE O ILL ILL SLOPE ISOMETRI VIEW INSET 3/31/2017 K:\RL_Roadway\ \Erosion ontrol\b4637_ero_psh_2-3.dgn -16" 2 WOODEN STKE 4 T. 2 T. RONT VIEW 2" 1 18" WTTLE SEE INSET TOE O ILL 18" WTTLE 2"-3" TRENH UPSLOPE STKE DOWNSLOPE STKE TOP VIEW

4 RIGHT-O-WY REV. 421 YETTEVILLE STREET, SUITE 600 RLEIGH, N PROJET REERENE NO. RODWY DESIGN E-2 HYDRULIS ONST. REV. SILT ENE OIR IBER WTTLE BREK DETIL NOTES: USE MINIMUM 12 IN. DIMETER OIR IBER (OONUT IBER) WTTLE ND LENGTH O 10 T. EXVTE 1 TO 2 INH TRENH OR WTTLE TO BE PLED. ROD GRDE DO NOT PLE WTTLE ON TOE O SLOPE. USE 2 T. WOODEN STKES WITH 2 IN. BY 2 IN. NOMINL ROSS SETION. ILL MTERIL INSTLL MINIMUM O 2 UPSLOPE STKES ND 4 DOWNSLOPE STKES T N NGLE TO WEDGE WTTLE TO GROUND. PROVIDE STPLES MDE O IN. DIMETER STEEL WIRE ORMED INTO U SHPE NOT LESS THN 12" IN LENGTH. INSTLL STPLES PPROXIMTELY EVERY 1 LINER OOT ON BOTH SIDES O WTTLE ND T EH END TO SEURE IT TO THE SOIL. WTTLE INSTLLTION N BE ON OUTSIDE O THE SILT ENE S DIRETED. SILT ENE WTTLE INSTLL TEMPORRY SILT ENE IN ORDNE WITH SETION 1605 O THE STNDRD SPEIITIONS. TOE O ILL INSET ISOMETRI VIEW 3/31/2017 K:\RL_Roadway\ \Erosion ontrol\b4637_ero_psh_2-3.dgn SILT ENE POST 10"-11" 9 T. 2 WOODEN STKE 4 T. 2 T. 12" WTTLE VIEW ROM SLOPE 2" 1 SILT ENE ILL SLOPE 1"-2" TRENH 12" WTTLE SILT ENE POST UPSLOPE STKE SEE INSET STPLE DOWNSLOPE STKE SIDE VIEW

5 PROJET REERENE NO. DIVISION OHIGHWYS 421 YETTEVILLE STREET, SUITE RODWY DESIGN E-3 HYDRULIS STTE O NORTH ROLIN RIGHT-O-WY REV. ONST. REV. RLEIGH, N SOIL STBILIZTION TIMERMES SITE DESRIPTION STBILIZTION TIME TIMERME EXEPTIONS PERIMETER DIKES, SWLES, DITHES ND SLOPES 7 DYS NONE HIGH QULITY WTER (HQW) ZONES 7 DYS NONE 3/31/2017 K:\RL_Roadway\ \Erosion ontrol\b4637_ero_psh_2-3.dgn SLOPES STEEPER THN 3:1 SLOPES 3:1 OR LTTER LL OTHER RES WITH SLOPES LTTER THN 4:1 7 DYS 14 DYS 14 DYS I SLOPES RE 10 OR LESS IN LENGTH ND RE NOT STEEPER THN 2:1, 14 DYS RE LLOWED. 7 DYS OR SLOPES GRETER THN 50 IN LENGTH. NONE, EXEPT OR PERIMETERS ND HQW ZONES.

6 /17/ PROJET REERENE NO. E-4/ ONST.4 R/W RODWY DESIGN HYDRULIS ND 83 POT Sta LIN WLTON HOWRD DB 1052 PG 7 PTRIK DUDLEY NEL ND WIE, DINE G. NEL DB 1780 PG BEGIN TIP PROJET -L- ST END TIPPROJET -L- ST POT Sta LITTLE OHIRE REEK 89 K:\RL_Roadway\ \Erosion ontrol\b4637_ero_psh_4.dgn 4/2/2017 _USER_ SR 1409 OLD SLEMBURG RD 17 BST NOTES: NY DEVITION ROM OPTIONSGIVEN WILL REQUIREPRIORPPROVLBY. DDITIONLEROSION ONTROLDEVIESMY NEED TO BEINSTLLED SDIRETED BY THE. SET=.17 BRDG #325 SET=.16 SET=.15 SET=.13 ON & TIMBER NOTE: UTILIZE TEMPORRY SEDIMENT BSIN OR SPEIL STILLING BSIN(S) S STILLING BSIN WHERE PPLIBLE. NOTE: PLE TEMPORRY ROK SEDIMENT DMS TYPE - B ND TEMPORRY ROK SILT HEKS TYPE - T DRINGE OUTLETS. ING R/W ING R/W SET=.82 BRDG #326 SET=.81 SET=.78 LERING ND GRUBBING ONSTRUTION SHEET 4 EROSION ONTROL OR SET=.80 ON & TIMBER RLPH L. LEONRD, JR. ND WIE, PTRII H. LEONRD DB 1748 PG ING R/W ING R/W 5 6 SET=. SET= BRDG # ON & TIMBER 86 LITTLE OHIRE REEK SET=. SET=. SR 1409 OLD SLEMBURG RD 17 BST JUDITH UNDERWOOD WTTS ND HUSBND, JMES NORMN WTTS DB 1040 PG 53 1

7 0303 8/17/ PROJET REERENE NO. E-5/ ONST.4 R/W RODWY DESIGN HYDRULIS ND POT Sta Place Matting for Erosion ontrol on Slope as Work llows. Sta to Sta SR 1409 OLD SLEMBURG RD 17 BST TB2GI 401 TOP: 1.0 INV: TPER LT. ND RT. BEGIN TIP PROJET (LT ND RT) -L- ST REMOVE BRIDGE BRIDGE 325 LSS B RIP RP EST 5 SY GD SHOULDER BERM GUTTER ST TO ST INV: TB2GI 4 TOP: 1.0 INV: INV: SET=.17 BRDG #325 SET=.16 SET= SET=.13 ON & TIMBER SHOULDER BERM GUTTER ST TO ST (LT ND RT) ING R/W LSS B RIP RP EST 5 SY GD LSS II RIP RP TO SHOULDER (STRUTURES PY ITEM, TYP) ING R/W Place Matting for Erosion ontrol on Slope as Work llows. Sta. 13 to Sta TB2GI TOP:.9 INV:.5 LIN WLTON HOWRD TB2GI TOP:.9 INV:.9 DB 1052 PG INV: SET=.82 BRDG #326 SET=.81 SET=.78 SET=.80 + BRIDGE 326 LSS II RIP RP TO SHOULDER (STRUTURES PY ITEM, TYP) (STRUTURES ING PY R/WITEM, TYP) LITTLE OHIRE REEK 5 6 SET=. SET=. BRDG #327 LITTLE OHIRE REEK SET=. SET=. ON & TIMBER ON & TIMBER + ING R/W 408 TB2GI TOP: INV: REMOVE TIMBER VERTIL BUTMENTS DOWN TO ELEVTION.2 (1 BOVE NORML WTER SURE ELEVTION). REMOVE BRIDGE PPROXIMTE EXVTION EL=.2 (TYP OR BRIDGE 327) Place Matting for Erosion ontrol on Slope as Work llows. Sta. 15+ to Sta LSS II RIP RP TO SHOULDER +81 Little oharie reek BRIDGE 327 INV:.9 PTRIK DUDLEY NEL ND WIE, DINE G. NEL TB2GI TOP:.9 INV:.9 DB 1780 PG 62 END TIPPROJET -L- ST REMOVE BRIDGE ND TIMBER VERTIL BUTMENTS INV:.0 LSS B RIP RP EST 5 SY GD SHOULDER BERM GUTTER ST. 20 TO ST (LT ND RT) 50 TPER LT. ND RT. POT Sta Place Matting for Erosion ontrol on Slope as Work llows. Sta. 20 to Sta SR 1409 OLD SLEMBURG RD 17 BST K:\RL_Roadway\ \Erosion ontrol\b4637_ero_psh_5.dgn 4/2/2017 _USER_ Place Matting for Erosion ontrol on Slope as Work llows. Sta to Sta NOTES: NY DEVITION ROM OPTIONSGIVEN WILL REQUIREPRIORPPROVLBY. DDITIONLEROSION ONTROLDEVIESMY NEED TO BEINSTLLED SDIRETED BY THE. LSS B RIP RP EST 5 SY GD NOTE: UTILIZE TEMPORRY SEDIMENT BSIN OR SPEIL STILLING BSIN(S) S STILLING BSIN WHERE PPLIBLE. PPROXIMTE EXVTION EL=.5 (TYP OR BRIDGE 325) WTER SURE ELEVTION). INV:.7 REMOVE TIMBER VERTIL BUTMENTS DOWN TO ELEVTION.5 (1 BOVE NORML LSS B RIP RP EST 5 SY GD on Slope as Work llows. Place Matting for Erosion ontrol Sta. 15+ to Sta on Slope as Work llows. PPROXIMTE EXVTION Sta. 13 to Sta RLPH L. LEONRD, JR. ND WIE, PTRII H. LEONRD DB 1748 PG Place Matting for Erosion ontrol EL=.5 (TYP OR BRIDGE 326) REMOVE TIMBER VERTIL BUTMENTS DOWN TO ELEVTION.5 (1 BOVE NORML WTER SURE ELEVTION). +81 LSS B RIP RP EST 5 SY GD JUDITH UNDERWOOD WTTS ND HUSBND, JMES NORMN WTTS DB 1040 PG 53 Place Matting for Erosion ontrol on Slope as Work llows. Sta. 20 to Sta

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

THIS DRAWING DOES NOT APPLY TO CONNECTIONS TO LINED PIPE

THIS DRAWING DOES NOT APPLY TO CONNECTIONS TO LINED PIPE PLUG LL RNHES STD DOULE NOT ONNETED " Y " RNH 4" STD " T " SDDLE GROUND SURFE 18" SEE NOTE ONRETE ENSEMENT 5" 5" 5" 5" 0-45 SHORT 4" SEE NOTE SEE NOTE 4" 8 MIN EXISTING SEWER VRILE PLUG LL RNHES NOT ONNETED

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Sample Plan Sample Plan CONSTRUCTION PLAN DETAILS CHECKLIST CONSTRUCTION PLAN DETAILS NARRATIVE. References: General Information:

Sample Plan Sample Plan CONSTRUCTION PLAN DETAILS CHECKLIST CONSTRUCTION PLAN DETAILS NARRATIVE. References: General Information: Sample Plan Sample Plan CONSTRUCTION PLN DETILS --------- NRRTIVE CONSTRUCTION PLN DETILS --------- CHECKLIST References:. Detail applicable to work scope Design Scene: Chapter 3 - Details REVISION DTE

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

1. LOCATION AND VERTICAL SPACING OF BOLTED FIXED END SHIMS AS REQUIRED

1. LOCATION AND VERTICAL SPACING OF BOLTED FIXED END SHIMS AS REQUIRED REINFORCING IN EXISTING PNEL (TYP.). LOCTION ND VERTICL SPCING OF BOLTED FIXED END CONNECTIONS SHLL MTCH S FR S POSSIBLE WITH EXISTING CONNECTION ON THE DJCENT PNELS. EXISTING PLTE PLTE WITH /6" DI. HOLE

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement

Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement IVL 1101 Surveying - Mesuring Distne 1/5 Distne is one of the most si engineering mesurements Erly mesurements were mde in terms of the dimensions of the ody very old wooden rule - Royl Egyptin uit uits

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

DATE FRONT OF COACH BA BB 2 RELEASE REV D CA * * DRAINAGE SYSTEM INSTL PART NO DETAIL BD CODES/STDS-CSA/CMVSS 1B1 CODES/STANDARDS-USA

DATE FRONT OF COACH BA BB 2 RELEASE REV D CA * * DRAINAGE SYSTEM INSTL PART NO DETAIL BD CODES/STDS-CSA/CMVSS 1B1 CODES/STANDARDS-USA RELESE ZONE TE ISION REOR WG 90 TE FTR-ORIG ETIL FRONT OF OH 9. SEE RWING 00 FOR INSTLLTION OF GROMMETS.. SEURE RINGE PIPES TO INET USING WIRE TIE 00-0-000, N SREW 000G-0-U T INTERVLS OF T OF T MORE THN

More information

P R O J E C T D A T A PROJECT DESCRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES

P R O J E C T D A T A PROJECT DESCRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES P R O J E T D T PROJET DESRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES PROJET DDRESS:., LOS LTOS, PROJET OWNERS: JERRY SHEN & JENNIFER YEH PN: 331-0-099 ZONING: R1E-20-N1

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

GRANT COUNTY PORT DISTRICT NO. 1 GRANT COUNTY

GRANT COUNTY PORT DISTRICT NO. 1 GRANT COUNTY GRNT COUNTY PORT DISTRICT NO. GRNT COUNTY WSHINGTON PORT COMMISSIONERS Curt. Morris President rian. Kuest Secretary Patric F. Connelly Vice President 80 IRON HORSE COURT YKIM, WSHINGTON 9890 (509) 45-48

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

DATE CA 265 CODES/STANDARDS-CSA/CMVSS 2 RELEASE REV DRAINAGE SYSTEM INSTL B1 CODES/STANDARDS USA 11 ADD TEFLON TAPE

DATE CA 265 CODES/STANDARDS-CSA/CMVSS 2 RELEASE REV DRAINAGE SYSTEM INSTL B1 CODES/STANDARDS USA 11 ADD TEFLON TAPE RELESE ZONE TE ISION REOR TE FTR-ORIG OES/STNRS-S/MVSS TEFLON TPE 000-0-000. 0 PPLY PRIMER -0-000 N EMENT -0-000 ETWEEN ELOW N FLEX PIPE. 9. SEE RWING 00 FOR INSTLLTION OF GROMMETS.. SEURE RINGE PIPES

More information

3-Way Mixing and Sequencing Globe Valves, Flared (5/8 in. O.D.) with Electric, Hydraulic, and Pneumatic Actuators

3-Way Mixing and Sequencing Globe Valves, Flared (5/8 in. O.D.) with Electric, Hydraulic, and Pneumatic Actuators lectric, Hydrulic, nd Pneumtic ctutors TL 1. Select Vlve ody including P ode (Vlve Size, v Rting, Port ode) or select Vlve ssemly correct (refer to Tle 3 nd Tle 3 lso) less ctutor ode (XXX) including the

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

OVERALL PROJECT MAP SH 5 OF 13 SH 4 OF 13 SH 3 OF 13 SH 13 OF 13 SH 6 OF 13 SH 2 OF 13 SH 10 OF 13 SH 7 OF 13 SH 1 OF 13 OF 13 SH 8 OF 13 SH 9 OF 13

OVERALL PROJECT MAP SH 5 OF 13 SH 4 OF 13 SH 3 OF 13 SH 13 OF 13 SH 6 OF 13 SH 2 OF 13 SH 10 OF 13 SH 7 OF 13 SH 1 OF 13 OF 13 SH 8 OF 13 SH 9 OF 13 214+ 215+ 217+ 218+ 233+ 237+ 238+ 236+ 235+ 234+ 6+ 61+ 62+ 63+ 64+ 65+ 66+ 67+ 68+ 69+ 7+ 71+ 72+ 73+ 74+ 79+ 8+ 87+ 17+ 19+ 21+ 116+ 117+ + 118+ 119+ 12+ 121+ 122+ 123+ 124+ 125+ 81+ 86+ 88+ 87+ 98+

More information

Sediment and Erosion Control Techniques on Stream Restoration Projects

Sediment and Erosion Control Techniques on Stream Restoration Projects Sediment and Erosion Control Techniques on Stream Restoration Projects D. R. Clinton, G. D. Jennings, R. A. McLaughlin, D. A. Bidelspach 1 ABSTRACT Erosion control, sediment loss and turbidity control

More information

Activities. 4.1 Pythagoras' Theorem 4.2 Spirals 4.3 Clinometers 4.4 Radar 4.5 Posting Parcels 4.6 Interlocking Pipes 4.7 Sine Rule Notes and Solutions

Activities. 4.1 Pythagoras' Theorem 4.2 Spirals 4.3 Clinometers 4.4 Radar 4.5 Posting Parcels 4.6 Interlocking Pipes 4.7 Sine Rule Notes and Solutions MEP: Demonstrtion Projet UNIT 4: Trigonometry UNIT 4 Trigonometry tivities tivities 4. Pythgors' Theorem 4.2 Spirls 4.3 linometers 4.4 Rdr 4.5 Posting Prels 4.6 Interloking Pipes 4.7 Sine Rule Notes nd

More information

Similar Right Triangles

Similar Right Triangles Geometry V1.noteook Ferury 09, 2012 Similr Right Tringles Cn I identify similr tringles in right tringle with the ltitude? Cn I identify the proportions in right tringles? Cn I use the geometri mens theorems

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Project Location NTS

Project Location NTS Project Location I- Express Lanes Southern Terminus Extension Project Project # 00-969-720, 1, P1, R201 Stafford ounty Unnamed tributaries to Aquia reek and Austin Run NTS PT 3198+.72 EXTSB RAMP EXTNB

More information

END S.P SEGMENT 2 STA END S.P SEGMENT 1 RETAINING WALL NO. 1 SEE RETAINING WALL PLAN

END S.P SEGMENT 2 STA END S.P SEGMENT 1 RETAINING WALL NO. 1 SEE RETAINING WALL PLAN 0 FLOODWY Segments & Segment - lternate EGIN S.P. -00-00 SEGMENT ST 000.00 SPRING STREET GREENVLE VENUE 0 0 0 0 > TRIL SEGMENT PROGRESSIVE RILROD ST 87.6 = ST 0.06 RIDGE NO. 66 0 0 UP RILROD 0800000 800

More information

1B1 CODES/STANDARDS USA 11 GLUE FITTING AFTER CABINET IS INSTALLED.

1B1 CODES/STANDARDS USA 11 GLUE FITTING AFTER CABINET IS INSTALLED. RELESE TE WG 09 ZONE ISION REOR TE FTR-ORIG E G REQUIRES GLLONS RV NTIFREEZE 9-0-000 PER TOLIET. FOLLOW TEM TOLIET WINTERIZTION PROEURE. S WSHER/RYER STKE OES/STNRS US GLUE FITTING FTER INET IS INSTLLE.

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

REV 1 DWG NO 2 RELEASE * * 21M WASHER/DRYER PREP 21S WASHER & DRYER-PAIR 9. SEE DRAWING FOR INSTALLATION OF GROMMETS.

REV 1 DWG NO 2 RELEASE * * 21M WASHER/DRYER PREP 21S WASHER & DRYER-PAIR 9. SEE DRAWING FOR INSTALLATION OF GROMMETS. RELESE TE WG 9 ZONE ISION REOR TE FTR-ORIG M WSHER/RYER PREP S WSHER & RYER-PIR 9. SEE RWING 00 FOR INSTLLTION OF GROMMETS.. SEURE RINGE PIPES TO INET USING WIRE TIE 00-0-000, N SREW 000G-0-U T INTERVLS

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

SITE 4 10 SEE DETAIL J NAD 83/ 2001 PERMIT DRAWING SHEET OF

SITE 4 10 SEE DETAIL J NAD 83/ 2001 PERMIT DRAWING SHEET OF 8/17/ 15 PROJT RRN NO. R-43 R/W HT NO. ROADWAY DIGN HT NO. 7A HYDRAULI T TH 6 ON HW 18" RP T NAD / INOMPLT PLAN DO NOT U OR R/W AQUIITION PRLIMINARY PLAN DO NOT U OR ONTRUTION N HWY1 T HT O " RP T TH 7

More information

C (6) DOORS TYPICAL, ALL SAME SIZE ENCLOSURE, CUSTOM 6 DOOR REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED 0.01 RELEASE FOR QUOTE 11/16/12 PH

C (6) DOORS TYPICAL, ALL SAME SIZE ENCLOSURE, CUSTOM 6 DOOR REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED 0.01 RELEASE FOR QUOTE 11/16/12 PH REVISION HISTORY ZONE REV ESRIPTION TE PPROVE 0.0 RELESE FOR QUOTE /6/2 PH 0.02 E ITONL ETL FOR PGO HOO, SE N OORS. RELESE FOR PROUTION 2/4/3 PH 0.03 INRESE OVERLL OF ENLOUSRE 2/8/3 PH 0.04 REVISE OOR

More information

OLIVE CREEK PLACE MIXED USE COMMUNITY

OLIVE CREEK PLACE MIXED USE COMMUNITY M E T R O D E S I G N RHITETURE. PLNNING. INTERIORS 230 S SOM VE SUITE 00 MPELL, 500 (40)7-07 phone (40)7-072 fax METRO GRO. c OLIVE REEK PLE MIXED USE OMMUNITY 465 IG SIN WY NOTES PROJET INFORMTION PROPERTY

More information

North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Land Quality Section

North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director City of Greenville Attention: Scott Godefroy 1500 Beatty Street Greenville, NC 27834 North Carolina Department of Environment and Natural Resources Division Energy, Mineral,

More information

RELEASE E B 1 DWG NO C FRONT * * COACH 21S WASHER & DRYER-PAIR 21M WASHER/DRYER PREP 1B1 CODES/STANDARDS-USA

RELEASE E B 1 DWG NO C FRONT * * COACH 21S WASHER & DRYER-PAIR 21M WASHER/DRYER PREP 1B1 CODES/STANDARDS-USA RELESE TE WG 9 ZONE ISION REOR TE FTR-ORIG FRONT OF OH E E J S WSHER & RYER-PIR M WSHER/RYER PREP 0 USE SMOOTH PLUMERS PUTTY 9-0-000 TO SEL STRINER (0. PER STRINER). 9 PPLY PRIMER -0-000 N EMENT -0-000

More information

DATE BA BB 2 RELEASE REV * * DRAINAGE SYSTEM INSTL TOILET-MACERATOR MODEL CHT R42HD CHT

DATE BA BB 2 RELEASE REV * * DRAINAGE SYSTEM INSTL TOILET-MACERATOR MODEL CHT R42HD CHT WG -0 TOILET-MERTOR 00-0-HT MOEL RH RELESE ZONE TE ISION REOR WG TE FTR-ORIG -0 00-0-HT RHL 9P 9P S TILGTE PKGE TILGTE PKGE WITHOUT WSHER/RYER STKE OES/STNRS US OES/STS-S,MVSS E WSHER RYER M WSHER/RYER

More information

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES City of Moncton Engineering and Environmental Services Revised March 2011 TABLE OF CONTENTS INTRODUCTION... 2 THE EROSION AND SEDIMENT CONTROL

More information

City of Rockwall PD-70 PD-5. Feet P STONE CREEK PHASE 7 FINAL PLAT - LOCATION MAP = HANOVER YORK FEATHERSTONE HARVARD

City of Rockwall PD-70 PD-5. Feet P STONE CREEK PHASE 7 FINAL PLAT - LOCATION MAP = HANOVER YORK FEATHERSTONE HARVARD Feet 0 0 0 0 0 HNOVER YORK P0-00 - SONE REEK PHSE FINL PL - LOION MP = FEHERSONE HRVRD PD-0 QUIL RUN REGL LUFF IRELND UDOON OVEY MEMORIL PD- RINY SVNH ity of Rockwall Planning & Zoning Department S. Goliad

More information

Chapter 6 Continuous Random Variables and Distributions

Chapter 6 Continuous Random Variables and Distributions Chpter 6 Continuous Rndom Vriles nd Distriutions Mny economic nd usiness mesures such s sles investment consumption nd cost cn hve the continuous numericl vlues so tht they cn not e represented y discrete

More information

Sequence Cartridge Valves

Sequence Cartridge Valves Sequene Vlves Type Pge Pilot Operted, lned Piston Diret ting with Reverse Flow Chek 7 Kik-down, Pilot Operted, lned Piston ir Controlled, Pilot Operted, lned Piston 9 Diret ting without Reverse Flow Chek

More information

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX:

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX: Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA 15601 724-837-5271 Tech. FAX: 724-837-4127 www.wcdpa.com 0 Typical Best Management Practices TABLE OF CONTENTS Mission,

More information

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED RELESE TE WG ZONE ISION REOR TE FTR-ORIG REQUIRES GLLONS RV NTIFREEZE 9-0-000 PER TOLIET. FOLLOW TEM TOLIET WINTERIZTION PROEURE. GLUE FITTING FTER INET IS INSTLLE. 0 PPLY PRIMER -0-000 N EMENT -0-000

More information

Local Conditions-NE Minnesota

Local Conditions-NE Minnesota Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

Sample Plan. Sample Plan ALIGNMENT PLAN AND TABULATION NARRATIVE ALIGNMENT PLAN AND TABULATION CHECKLIST.

Sample Plan. Sample Plan ALIGNMENT PLAN AND TABULATION NARRATIVE ALIGNMENT PLAN AND TABULATION CHECKLIST. Sample Plan Sample Plan AND TABULATION --------- NARRATIVE AND TABULATION --------- HEKLIST. Alignment point numbers and/or curve names REVISION DATE 0/05/2 References: Design Scene: hapter 7 - Alignment

More information

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL 21S WASHER/DRYER STACKED

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL 21S WASHER/DRYER STACKED RELESE ZONE TE ISION REOR 90 TE FTR-ORIG REQUIRES GLLONS RV NTIFREEZE 9-0-000 PER TOLIET. FOLLOW TEM TOLIET WINTERIZTION PROEURE. GLUE FITTING FTER INET IS INSTLLE. 0 PPLY PRIMER -0-000 N EMENT -0-000

More information

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED RELESE TE WG ZONE ISION REOR TE FTR-ORIG REQUIRES GLLONS RV NTIFREEZE 9-0-000 PER TOLIET. FOLLOW TEM TOLIET WINTERIZTION PROEURE. GLUE FITTING FTER INET IS INSTLLE. 0 PPLY PRIMER -0-000 N EMENT -0-000

More information

214 DISHWASHER DRAWER STYLE 10 APPLY PRIMER AND CEMENT BETWEEN ELBOW AND FLEX PIPE.

214 DISHWASHER DRAWER STYLE 10 APPLY PRIMER AND CEMENT BETWEEN ELBOW AND FLEX PIPE. RELESE TE WG 09 ZONE ISION REOR TE FTR-ORIG S WSHER/RYER STKE OES/STNRS US OES/STS-S,MVSS E WSHER RYER M WSHER/RYER PREP ISHWSHER RWER STYLE 0 PPLY PRIMER -0-000 N EMENT -0-000 ETWEEN ELOW N FLEX PIPE.

More information

FIN. WALL CONCRETE SOLID MASONRY GENERAL NOTES: 1. SEALS LOCATION SHOULD BE TAKEN FROM CONTRACT DRAWINGS.

FIN. WALL CONCRETE SOLID MASONRY GENERAL NOTES: 1. SEALS LOCATION SHOULD BE TAKEN FROM CONTRACT DRAWINGS. NHOR BOLTS DRILL (3) - 1 [38mm] ROUND HOLES. MOUNT SEL ON SOLID MSONRY OR ONRETE. NHOR WITH NON-SHRINK MORTR. 2'- [762mm] THREDED BRONZE STUDS, SREW INTO SOLID METL PORTION T BK OF SEL. SEL SIZE "" NHOR

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

Design Data 1M. Highway Live Loads on Concrete Pipe

Design Data 1M. Highway Live Loads on Concrete Pipe Design Dt 1M Highwy Live Lods on Concrete Pipe Foreword Thick, high-strength pvements designed for hevy truck trffic substntilly reduce the pressure trnsmitted through wheel to the subgrde nd consequently,

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

University of Texas MD Anderson Cancer Center Department of Biostatistics. Inequality Calculator, Version 3.0 November 25, 2013 User s Guide

University of Texas MD Anderson Cancer Center Department of Biostatistics. Inequality Calculator, Version 3.0 November 25, 2013 User s Guide University of Texs MD Anderson Cncer Center Deprtment of Biosttistics Inequlity Clcultor, Version 3.0 November 5, 013 User s Guide 0. Overview The purpose of the softwre is to clculte the probbility tht

More information

Sample Problems for the Final of Math 121, Fall, 2005

Sample Problems for the Final of Math 121, Fall, 2005 Smple Problems for the Finl of Mth, Fll, 5 The following is collection of vrious types of smple problems covering sections.8,.,.5, nd.8 6.5 of the text which constitute only prt of the common Mth Finl.

More information

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL SEE DRAWING FOR INSTALLATION OF GROMMETS.

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL SEE DRAWING FOR INSTALLATION OF GROMMETS. RELESE ZONE TE ISION REOR WG 99 TE FTR-ORIG G G 9. SEE RWING 00 FOR INSTLLTION OF GROMMETS.. SEURE RINGE PIPES TO INET USING WIRE TIE 00-0-000, N SREW 000G-0-U T INTERVLS OF T OF T MORE THN FEET PRT. OPYRIGHT

More information

DRAFT DRAFT DRAFT DRAFT DRAFT SEDIMENT CONTROLS Method Application Description BMP Sediment fencing Flat Ground Y Anywhere low flow runoff is Sloping Ground Y Geotextile fabric, buried at the bottom

More information

Applications of Bernoulli s theorem. Lecture - 7

Applications of Bernoulli s theorem. Lecture - 7 Applictions of Bernoulli s theorem Lecture - 7 Prcticl Applictions of Bernoulli s Theorem The Bernoulli eqution cn be pplied to gret mny situtions not just the pipe flow we hve been considering up to now.

More information

Kiel Probes. General Information

Kiel Probes. General Information Kiel s Generl Informtion Aerodynmic Properties Kiel probes re used to mesure totl pressure in fluid strem were te direction of flow is unknown or vries wit operting conditions. Teir correction fctor is

More information

Zink Pool Proposed Elevation - 620

Zink Pool Proposed Elevation - 620 E T E2 W RHER T T W T E3 T E4 E5 W 2 T T T E6 W 4 T W 3 T T E7 T W 5 T W6 E8 T E9 W 7 T W 9 T E MIN T W 2 T T E T W T W 8 T T E 2 T T E 3 T W T W 3 T W 4 T Zink Pool Proposed Elevation - 62 E 5 T 44 W

More information

Solutions to Supplementary Problems

Solutions to Supplementary Problems Solutions to Supplementry Problems Chpter 8 Solution 8.1 Step 1: Clculte the line of ction ( x ) of the totl weight ( W ).67 m W = 5 kn W 1 = 16 kn 3.5 m m W 3 = 144 kn Q 4m Figure 8.10 Tking moments bout

More information

- 5 - TEST 2. This test is on the final sections of this session's syllabus and. should be attempted by all students.

- 5 - TEST 2. This test is on the final sections of this session's syllabus and. should be attempted by all students. - 5 - TEST 2 This test is on the finl sections of this session's syllbus nd should be ttempted by ll students. Anything written here will not be mrked. - 6 - QUESTION 1 [Mrks 22] A thin non-conducting

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

PYTHAGORAS THEOREM WHAT S IN CHAPTER 1? IN THIS CHAPTER YOU WILL:

PYTHAGORAS THEOREM WHAT S IN CHAPTER 1? IN THIS CHAPTER YOU WILL: PYTHAGORAS THEOREM 1 WHAT S IN CHAPTER 1? 1 01 Squres, squre roots nd surds 1 02 Pythgors theorem 1 03 Finding the hypotenuse 1 04 Finding shorter side 1 05 Mixed prolems 1 06 Testing for right-ngled tringles

More information

SUMMARY OF QUANTITIES AND GENERAL NOTES KANE COUNTY DIVISION OF TRANSPORTATION DATE SHEETS NO. 23 CONTRACT NO. ILLINOIS FED. AID PROJECT TOTAL SHEET

SUMMARY OF QUANTITIES AND GENERAL NOTES KANE COUNTY DIVISION OF TRANSPORTATION DATE SHEETS NO. 23 CONTRACT NO. ILLINOIS FED. AID PROJECT TOTAL SHEET Pgeneral notes. dgn PLOT SCLE =. / in. PLOT = // DESIGNED SUMMRY OF QUNTITIES ND GENERL NOTES BR SN & SN SCLE: N/ OF FED. ROD DIST. CONTRCT EXISTING LEGEND EXISTING HM PVEMENT (" & VR.) B EXISTING GGREGTE

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

DATE 2 RELEASE REV * * DRAINAGE SYSTEM INSTL USE SMOOTH PLUMBERS PUTTY TO SEAL STRAINER (0.

DATE 2 RELEASE REV * * DRAINAGE SYSTEM INSTL USE SMOOTH PLUMBERS PUTTY TO SEAL STRAINER (0. RELESE ZONE TE ISION REOR 90 TE FTR-ORIG OES/STNRS-S/MVSS OES/STNRS US 9 USE SMOOTH PLUMERS PUTTY 9-0-000 TO SEL STRINER (0. PER STRINERS) NIPPLE TO E TRIMME TO LENGTH ON INSTLL. OPYRIGHT 0 WINNEGO INUSTRIES,

More information

By esolution of ommonwealth Transportation LIMITED ESS HIGHWY POJET MNGE: TIMOTHY HTZELL, P.E. (73) 259-2749 (NOV District) SUVEYED BY, DTE: PEISION MESUEMENTS, IN., 9/25 (84) 34-5229 DESIGN BY: HNTB OPOTION

More information

Forces on curved surfaces Buoyant force Stability of floating and submerged bodies

Forces on curved surfaces Buoyant force Stability of floating and submerged bodies Stti Surfe ores Stti Surfe ores 8m wter hinge? 4 m ores on plne res ores on urved surfes Buont fore Stbilit of floting nd submerged bodies ores on Plne res Two tpes of problems Horizontl surfes (pressure

More information

EMI SPRINGS OUTER LIGHT PIPES , SCALE 5:1 REVERSED OUTER LIGHT PIPES , SCALE 5:1

EMI SPRINGS OUTER LIGHT PIPES , SCALE 5:1 REVERSED OUTER LIGHT PIPES , SCALE 5:1 THIS RWING IS UNPULISHE. OPYRIGHT Y RELESE FOR PULITION LL RIGHTS RESERVE. LO IST P LTR ESRIPTION TE WN PV RELESE PER EO1400878 13JUN14 JV PR REVISE PER EO1010819 10UG1 PP SH GE SSEMLY GSKET FLNGE EMI

More information

DE-TYPE SHUNTING LOCO MOTOR OF THE DUTCH RAILWAYS SERIES

DE-TYPE SHUNTING LOCO MOTOR OF THE DUTCH RAILWAYS SERIES THIS DRWING REMINS THE PROPERTY OF JDW DRUGHTING SERVIES J..M.DE WL, RIGHTWELL STREET PPKUR NEW ZELND (09)9 IF IN DOUT SK DE-TYPE SHUNTING LOO MOTOR OF THE DUTH RILWYS SERIES 0-. THE FOLLOWING INFORMTION

More information

AP Calculus AB Unit 4 Assessment

AP Calculus AB Unit 4 Assessment Clss: Dte: 0-04 AP Clulus AB Unit 4 Assessment Multiple Choie Identify the hoie tht best ompletes the sttement or nswers the question. A lultor my NOT be used on this prt of the exm. (6 minutes). The slope

More information

ES-TA-3..1 Six- and Ten-Input E-Stop Safety Modules with DeviceNet

ES-TA-3..1 Six- and Ten-Input E-Stop Safety Modules with DeviceNet Emergeny Stop Sfety Moules Moel Seletion ES-TA-3..1 Six- n Ten-Input E-Stop Sfety Moules with DevieNet Sfety Moules s up to ten normlly lose emergeny stop swith iruits for ontt filure or wiring fult Diverse-reunnt

More information

Trigonometry Revision Sheet Q5 of Paper 2

Trigonometry Revision Sheet Q5 of Paper 2 Trigonometry Revision Sheet Q of Pper The Bsis - The Trigonometry setion is ll out tringles. We will normlly e given some of the sides or ngles of tringle nd we use formule nd rules to find the others.

More information

RELEASE 1 DWG NO 10 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS, BEFORE APPLYING THE HEATING PAD.

RELEASE 1 DWG NO 10 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS, BEFORE APPLYING THE HEATING PAD. RELESE TE 99 ZONE ISION REOR TE FTR-ORIG 9 0 J RINGE SYSTEM-HETE-W/O 0 PREP THE SURFE PER MNUFTURERS INSTRUTIONS, EFORE PPLYING THE HETING P. 9 T RINGE SYSTEM-HETE TOILET 9 WTERLESS P-TRP MUST E INSTLLE

More information

ERP PLANS FOR CREATIVE COMMONS PART OF SECTION 12, TOWNSHIP 51 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA SHEET INDEX

ERP PLANS FOR CREATIVE COMMONS PART OF SECTION 12, TOWNSHIP 51 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA SHEET INDEX PRT O SECTION, TOWNSHIP SOUTH, RNGE EST COLLIER COUNTY, LORID CIVIL & NORTH CR- COLLIER LVD. DNIELS PKWY TMIMI TRIL E. U.S. PROJECT LOCTION SHEET INDEX COVER SHEET RIL ND CLERING PLN MSTER DRINGE PLN CROSS

More information

MATH 115: Review for Chapter 7

MATH 115: Review for Chapter 7 MATH 5: Review for Chpter 7 Cn you stte the generl form equtions for the circle, prbol, ellipse, nd hyperbol? () Stte the stndrd form eqution for the circle. () Stte the stndrd form eqution for the prbol

More information

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.

More information

Instructions to students: Use your Text Book and attempt these questions.

Instructions to students: Use your Text Book and attempt these questions. Instrutions to students: Use your Text Book nd ttempt these questions. Due Dte: 16-09-2018 Unit 2 Chpter 8 Test Slrs nd vetors Totl mrks 50 Nme: Clss: Dte: Setion A Selet the est nswer for eh question.

More information

REV 1 DWG NO 2 RELEASE * * 12 CUT PART TO 90mm. 11 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS BEFORE APPLYING THE HEATING PAD.

REV 1 DWG NO 2 RELEASE * * 12 CUT PART TO 90mm. 11 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS BEFORE APPLYING THE HEATING PAD. RELESE TE WG 0 ZONE ISION REOR TE FTR-ORIG UT PRT TO 90mm. PREP THE SURFE PER MNUFTURERS INSTRUTIONS EFORE PPLYING THE HETING P. GRET LSKN RENTL PKGE OES/STNRS-S/MVSS 0 SEE WIRING INSTL-OY FOR ELETRIL

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

6.2 CONCEPTS FOR ADVANCED MATHEMATICS, C2 (4752) AS

6.2 CONCEPTS FOR ADVANCED MATHEMATICS, C2 (4752) AS 6. CONCEPTS FOR ADVANCED MATHEMATICS, C (475) AS Objectives To introduce students to number of topics which re fundmentl to the dvnced study of mthemtics. Assessment Emintion (7 mrks) 1 hour 30 minutes.

More information

PlowGuard - Plow Balance System. Patent No. 6,467,553 PART NUMBER: SG REV: C DATE: 07/03/14. List of Included Documents

PlowGuard - Plow Balance System. Patent No. 6,467,553 PART NUMBER: SG REV: C DATE: 07/03/14. List of Included Documents PlowGuard - Plow alance System escription List of Included ocuments rawing Numbers Patent No.,7, Initial Setup/djustment Procedure Plow alance Valve ½ load sense Plow alance Valve full load sense ustom

More information

RUNNYMEDE - MYERS PARK

RUNNYMEDE - MYERS PARK 596 RUNNYMEE LNE SELWYN VENUE WINSOR VE MIHEL KER PL VIINITY MP NOT TO SLE LNSPE RHITETURE IVIL ENGINEERING TRNSPORTTION PLNNING O P W 2459 Wilkinson lvd, Ste 200 harlotte, N 28208 704.343.0608 www.drgrp.com

More information