Zink Pool Proposed Elevation - 620

Size: px
Start display at page:

Download "Zink Pool Proposed Elevation - 620"

Transcription

1

2 E T E2 W RHER T T W T E3 T E4 E5 W 2 T T T E6 W 4 T W 3 T T E7 T W 5 T W6 E8 T E9 W 7 T W 9 T E MIN T W 2 T T E T W T W 8 T T E 2 T T E 3 T W T W 3 T W 4 T Zink Pool Proposed Elevation - 62 E 5 T 44 W 5 T IH 2 E 4 T W 6 T E 6 T E 7 T W 7 T W 8 T E 8 T W 9 T E 9 T W 2 T E 2 T E 2 T W 2 T E 22 T Zink Pool urrent Elevation - 67 W 22 T W 23 T E 24 T E 25 T E 26 T W 24 T W 25 T W 26 T W 27 T W 28 T E 3 T W 29 T W 3 T E 3 T W 3 T W 35 T W 33 T E 34 T

3 The Gathering Place Zink Lake River Parks West ank Trail ig Water Wave Recreational Flume Zink Pedestrian ridge Zink Low Water Dam Viewing rea Recreation Island Zink Low Water Dam Overall Plan PRIL 25 Water ccess

4

5 MIN T W 5 T W 4 T W 3 T W 7 T W 6 T W 8 T W 9 T E 7 T E 9 T E T E T E 8 T IH 244 W 2 T W T W 3 T W 5 T W 4 T E 2 T E 3 T E 5 T W 6 T E 6 T E 7 T W 7 T W 8 T E 8 T W 9 T E 9 T E 2 T W 2 T W 22 T E 22 T E 2 T E 24 T W 23 T E 25 T W 26 T W 24 T W 25 T E 26 T E 27 T E 28 T E 29 T E 3 T W 3 T Zink ank tabilization andidate Treatment reas Treatment Type E 3 T, 2, Feet Outfall Locations o Treatment elow Pool Treatment 2 dequate Riprap - 2 Feet above Pool E 35 T E 34 T

6 EXITING GROUND FREEORD NORML POOL T H RIPRP T RIPRP EXITING NORML POOL FREEORD GROUND L h 2 h X h Z REVETMENT RIPRP WITH LUNHLE TONE TOE LONGITUDINL PEKED TONE TOE TRETMENT NT 3 TRETMENT NT NOTE: EXITING GROUND T NORML POOL FREEORD X. LL TRH ND WOODY DERI HOULD E REMOVED FROM NK FE ND TOE WITHIN THE RNGE OF X ND THE FOOTPRINT OF TRETMENT PRIOR TO INTLLING RIPRP. 2. DIMENION X I FUNTION OF THE TRETMENT LOTION / TTION LONG THE RIVER. FOR OTHER TRETMENT DIMENION UED FOR OT-ETIMTING PURPOE, REFER TO THE "NK TRETMENT DIMENION" TLE ELOW. NK TRETMENT DIMENION RIPRP OMMON DIMENION FOR LL TRETMENT VERTIL FREEORD 2. RIPRP MEDIN DIMETER, D5.5 TRETMENT THIKNE (T) 3. FT FT FT h X TRETMENT TONE TOE THIKNE (Z) TONE TOE LENGTH (L) TONE TOE LOPE (H) FT FT FT/FT TRETMENT 2 WEDGE LOPE (H) 3. FT/FT TRETMENT 3 PEK TONE TOE LOPE, NK IDE (H) PEK TONE TOE LOPE, RIVER IDE (H2) FT/FT FT/FT TONE TOE WEDGE 2 TRETMENT NT FIGURE NK TILIZTION TRETMENT RKN RIVER LOW WTER DM ITY OF TUL, OKLHOM FILENME: F-_65797.dgn PLOT :25\4\22 PLOT TIME: 4:22:24 PM

7

8

9 c H2M HI LL 24. LL RI GHT REERVED. 2 NEW LI N Z K3 DR Z K3 NO. NEW EH T TUL OUNTY REUE OF DOUM ENT: RKN RI VER LOW W TER DM TKE OUT POOL OKLHOM Z K - -3 DGN K W HI TTI ER NEW EH T ENTRNE POOL RELOTE. PLN DEPIT REQUIRED HNGE T ET NK TO OMO THE GTHERING PLE PROJET. I VI L PLN ET NK ND I LND ZI NK DM ILND NOTE: THI DOUM ENT,ND THE I DE ND DEI GN I NORPORTED HEREI N, N I NTRUM ENT OF PROFEI ONL ERVI E,I THE PROPERTY OF H2M HI LL ND I NOT TO E UED,I N W HOLE OR I N PRT,FOR NY OTHER PROJET W I THOUT THE W RI TTEN UTHORI ZTI ON OF H2M HI LL. HK REVI I ON Y PROJET. 3. YELLOW ONTOUR REPREENT THE ZINK DM PRELIMINRY DEIGN. VERIFY LE R I ONE INH ON ORIGINL DRWING. PLN - ET NK ND ILND "=6' " PROJ DWG HEET $PWURL $PWPTH FILENME:ZK--_65797.dgn PLOT :25\4\22 ZK-- of PLOT TIME: 3:3:3 PM HEM TI DEI GN 2. RED ONTOUR REPREENT THE GTHERING PLE D

10 H2M HILL 24. LL RIGHT REERVED. c NEW LIN K W HITTIER ZINK DM IVIL PLN - ET Y RKN RIVER LOW W TER DM TUL OUNTY NO. REVIION OKLHOM DGN DR HK THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF REUE OF DOUMENT: H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2M HILL. D VERIFY LE R I ONE INH ON ORIGINL DRWING. " PROJ DWG ZK-- HEET of HEM TI DEIGN $PWURL $PWPTH FILENME: ZK--_65797.dgn PLOT : 25\4\22 PLOT TIME: 3:24:9 PM

11 H2M HILL 24. LL RIGHT REERVED. c NEW LIN K W HITTIER ZINK DM IVIL ETION Y RKN RIVER LOW W TER DM TUL OUNTY NO. REVIION OKLHOM DGN DR HK THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF REUE OF DOUMENT: H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2M HILL. D VERIFY LE R I ONE INH ON ORIGINL DRWING. " PROJ DWG ZK--3 HEET of HEM TI DEIGN $PWURL $PWPTH FILENME: ZK--3_65797.dgn PLOT : 25\4\22 PLOT TIME: 3:34:45 PM

12 4+ W D EE PRTIL PLN WET EE PRTIL PLN ET of 33 FILENME: -_ dgn PLOT : 22\5\25 PLOT TIME: 2:2:44 PM HEM TI DEIGN ZINK DM MODIFITION TRUTURL PLN - OVERLL PLN - OVERLL "=5 - N K W HITTIER KJ DVI L FIRTH REUE OF DOUMENT: THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2MHILL. ML FLEMING H2M HILL 22. LL RIGHT REERVED PROJ DWG HEET VERIFY LE R I ONE INH ON ORIGINL DRWING. " RKN RIVER LOW W TER DM ITY OF TUL TUL OUNTY OKLHOM 3+ W 2+ W + W + W 9+ W 8+ W 7+ W 6+ W 5+ W 4+ W 3+ W 2+ W + W NO. REVIION DGN DR HK Y c PRELIMINRY NOT FOR ONTRUTION KEY PLN JUNE 22 N

13 4+ W D of 33 HEM TI DEIGN ZINK DM MODIFITION PLN - WET "=25 FILENME: -_ dgn PLOT : 22\5\25 PLOT TIME: 2:22:2 PM TRUTURL PLN - OVERLL N MTHLINE EE DRW ING W 2+ W + W + W 9+ W 8+ W 7+ W K W HITTIER 5 -" D -32 E -33 F -33 G -34 F -33 G -34 KJ DVI 6 -" -" 2 -" EXT PIER 48 -" FIXED RET () x 48 GTE 2-6" 2 -" 96 -" 2 -" 4 -" 2 -" RET FIXED (2) x 48 GTE (7) 3 x 2 GTE (2) x 48 GTE (6) 3 x 2 GTE (2) x 48 GTE T.O. EXT PRON EL 65. T.O. EXT PRON EL " 2 -" 2 -" 2 -" 96 -" - REUE OF DOUMENT: L FIRTH THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2MHILL. ML FLEMING H2M HILL 22. LL RIGHT REERVED PROJ DWG HEET VERIFY LE R I ONE INH ON ORIGINL DRWING. " RKN RIVER LOW W TER DM ITY OF TUL TUL OUNTY OKLHOM NO. DGN DR REVIION HK Y c PRELIMINRY NOT FOR ONTRUTION KEY PLN JUNE 22 N

14 D of 33 HEM TI DEIGN PLN - ET "=25 FILENME: -2_ dgn PLOT : 22\5\25 PLOT TIME: 2:22:59 PM N MTHLINE EE DRW ING " ZINK DM MODIFITION TRUTURL PLN - OVERLL 7+ W 6+ W 5+ W 4+ W 3+ W 2+ W 2 -" 4 -" F " 48 -" (7) 3 x 2 GTE () x 48 GTE () 8 x 48 GTE FIXED RET FIXED RET G " 4 -" H " EXT PIER 5 -" J " EXT PIER 5 -" K " K W HITTIER L REUE OF DOUMENT: KJ DVI M -36 L FIRTH THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2MHILL. 6 -" +/- N -36 M -36 M -36 IM 2-6" 2 -" 2 -" ML FLEMING 73-7" +/- H2M HILL 22. LL RIGHT REERVED PROJ DWG HEET VERIFY LE R I ONE INH ON ORIGINL DRWING. " RKN RIVER LOW W TER DM ITY OF TUL TUL OUNTY OKLHOM NO. DGN DR REVIION HK Y c PRELIMINRY NOT FOR ONTRUTION KEY PLN JUNE 22 N

15 D FILENME: -3_ dgn PLOT : 22\5\25 PLOT TIME: 2:23:4 PM of 33 HEM TI DEIGN ZINK DM MODIFITION TRUTURL ETION EL 6. +/- /4"= -" -22 FIXED RET T WET ULE GTE (T.O. EXT PRON EL 65.) /4"= -" -22 K W HITTIER EL 65. +/- KJ DVI EL 62. EL 66. EL 62. +/- ML FLEMING NEW REINFORED ONRETE 2-6" 5 -" 7-6" 8 -" 2 -" 7 -" 7 -" EL " EXITING T WET ULE GTE XI OF EXT DM 7 -" EL " EL " EL 67. EL " EXITING PRON -6" TYP XI OF EXT DM 28 -" DEMOLIH EXITING 4 -" -" 2-6" NEW ONRETE OR GROUTED TONE EL " NEW REINFORED ONRETE EL 6. EL 68. EL 68. EL 6. +/- EL " 2 -" EXITING OGEE WIER 25 -" EXITING PRON WVEHPER GTE (T.O. EXT PRON EL 65.) 6 -" " 2 -" 2" DI IR LINE FROM NEW OMPLREOR UILDING TO GTE 2" DI IR LINE FROM NEW OMPLREOR UILDING TO GTE REUE OF DOUMENT: L FIRTH THI DOUMENT, ND THE IDE ND DEIGN INORPORTED HEREIN, N INTRUMENT OF PROFEIONL ERVIE, I THE PROPERTY OF H2M HILL ND I NOT TO E UED, IN W HOLE OR IN PRT, FOR NY OTHER PROJET W ITHOUT THE W RITTEN UTHORIZTION OF H2MHILL. H2M HILL 22. LL RIGHT REERVED PROJ DWG HEET VERIFY LE R I ONE INH ON ORIGINL DRWING. " RKN RIVER LOW W TER DM ITY OF TUL TUL OUNTY OKLHOM NO. DGN DR REVIION HK Y c PRELIMINRY NOT FOR ONTRUTION JUNE 22

16 F-3 F-3 D IM. F-3 TKEOUT EH IM. F-3 PRELIMINRY NOT FOR ONTRUTION MODERTE NK RMORING F-3 EXIT. PEDETRIN RIDGE HEVY NK RMORING PUT-IN EH " UNDERDRIN WITH ONNETING LTERL T 5' ±. LENOUT NOT HOWN. 2+ EXVTED EDROK URFE I PERMITTED IN THE LOWER REGION OF THE RERETIONL FLUME, PROVIDED THT ETHETI, GRDE ONTROL ND MOOTHNE RE EPTLE TO RHITET/ENGINEER. + HEVY NK RMORING MODERTE NK RMORING UT-OFF WLL (TYP.) PPROX. LOTION HOWN EDGE OF VIEWING ILND NOTE: HEVY NK RMORING MY INLUDE GROUTED OULDER, MORTRED HLE, ND 2" MIN. ONRETE. MODERTE NK RMORING MY INLUDE URIED RIPRP ND ONRETE PTH. EE PULI RERETION E DRWING FOR PEIFI URFE TRETMENT OVE 5 F WTER URFE. PROPOED ONTOUR FOR RERETIONL FLUME HNNEL TO E HOWN IN FINL DEIGN. LEGEND PRINTED T HLF-LE PRELIMINRY F-3 FOR GENERL ONFIGURTION ND PRELIMINRY OTING. DIMENION ND ELEVTION TO E ETLIHED DURING MODELING ND FINL DEIGN. ELEVTION ZINK LKE EL. 62± WVEHPER ENTRNE GTE PROPOED INVERT EXITING DM TRT POOL EXITING HEET WTERFLL TRUTURE FULL-HEIGHT GTE EONDRY ONTROL WEIR 65 6 RERETIONL FLUME PLN LE: " = 4' INTERMEDITE POOL TILWTER ILL 5 F WTER URFE F WTER URFE OPTIONL WVEHPER GTE RPID % HYDRULI LOPE EXITING GRDE RERETIONL FLUME PROFILE LE: HORIZ. " = 4' VERT. " = 4' UT-OFF WLL (TYP.) RPID % HYDRULI LOPE FUX ROK MOOTH ONRETE HEVILY RMORED NK MODERTELY RMORED NK OPTIONL WVEHPER GTE TKE-OUT POOL PROPOED MJOR ONTOUR PROPOED MINOR ONTOUR EXITING MJOR ONTOUR EXITING MINOR ONTOUR PPROXIMTE 5 F WTER URFE UT-OFF WLL PROJET LIMIT UNDERDRIN DIHRGE RIFFLE.75% HYDRULI LOPE TILWTER T 2, F T 2, F T 6, F T 3, F T, F RERETIONL FLUME PLN ND PROFILE

17 W-3 22'-8" 7'-" W-3 3'-8" 2'-" PRELIMINRY NOT FOR ONTRUTION DIRETION OF FLOW TUTOR VULT WHITEWTER ILL WVEHPER ETIONL PLN /4" = '-" INTERNL R RK 2" H 8 TL PIPE E RUNG EXTERNL R RK 8'-6" 48'± '-6" 6'-" NOTE: GTE NOT HOWN FOR LRITY, HYDRULI YLINDER WILL E HOWN T FINL DEIGN. GTE IN LOWERED POITION FIXED METL PLTE DIRETION OF FLOW W-3 ONRETE KNOKOUT WLL TEEL DEK PLN /4" = '-" '-6" 6'-" '-" E HTH (TYP.) EURED ND REMOVLE OLID TEEL PLTE (TYP.) REMOVLE INTERMEDITE UPPORT EM (TYP.) UPPER METL GTE DEK PLTE LOWER METL GTE DEK PLTE EXTERNL R RK NOTE: PRINTED T HLF-LE PLN ND ETION VIEW HOWN I FOR RIVER WET. RIVER ET I IMILR. LL ELETRIL EQUIPMENT LOTED T NK, OVE -YR FLOOD ELEVTION. PTENT PPLY. PRELIMINRY FOR GENERL ONFIGURTION ND PRELIMINRY OTING. DIMENION ND ELEVTION TO E ETLIHED DURING MODELING ND FINL DEIGN. WVEHPER GTE PLN

18 FIXED HEIGHT DM GROUTED ROK RET OF FULL HEIGHT GTE - UPRIGHT POITION UTMENT EL = 62.5'± PRELIMINRY NOT FOR ONTRUTION GTE LDDER FULL HEIGHT GTE INVERT EL = 64'± HYDRULI GTE TUTOR TOP OF INTERNL FETY REEN L DEK UPPORT WLL (TYP.) EL = 6'± EL = 68'± EL = 65'± EL = 62.5'± '-" 7'-2" '-" EL = 598'± INTERMEDITE UPPORT WLL (TYP.) ' 6'.5' 48'± 8.5' W-2 ETION /4" = '-" NOTE: DEK PLTE ND MID GTE PIPE NOT HOWN FOR LRITY..5'± 2.5'± FULL HEIGHT GTE FIXED HEIGHT DM (EHIND UTMENT) EL. 6'± EL. 68'± INTERNL R RK 2" Ø HED 8 PIPE L EL. 598'± L 2" Ø HED 8 PIPE EL. 67'± EL. 65'± RIED POITION GTE TYPE 2 (LOWERED POITION) TUTOR VULT (EHIND UTMENT) EXTERNL R RK REMOVLE RK ND PLTE WVEHPER GTE ETION EXITING EDROK EL. 595'± PRINTED T HLF-LE T INTERMEDITE GTE UPPORT WLL W-2 ETION /4" = '-" NOTE: PTENT PPLY PRELIMINRY FOR GENERL ONFIGURTION ND PRELIMINRY OTING. DIMENION ND ELEVTION TO E ETLIHED DURING MODELING ND FINL DEIGN.

Location: 229 T y S n - Hμ Néi Code: Eurocode 4 Member: Beams Category: Podium

Location: 229 T y S n - Hμ Néi Code: Eurocode 4 Member: Beams Category: Podium Projet: ipe Toer Lotion: 9 T S n - Hμ Néi Code: Euroode 4 ember: Bem Ctegor: Podium I - DESIGN DT 1. teril: 1.1 Conrete Compoite bem Conrete grde: 400 (TCVN 5574-1991 C5/30 (Euroode 4) Chrteriti ompreion

More information

THIS DRAWING DOES NOT APPLY TO CONNECTIONS TO LINED PIPE

THIS DRAWING DOES NOT APPLY TO CONNECTIONS TO LINED PIPE PLUG LL RNHES STD DOULE NOT ONNETED " Y " RNH 4" STD " T " SDDLE GROUND SURFE 18" SEE NOTE ONRETE ENSEMENT 5" 5" 5" 5" 0-45 SHORT 4" SEE NOTE SEE NOTE 4" 8 MIN EXISTING SEWER VRILE PLUG LL RNHES NOT ONNETED

More information

This electronic collection of documents is provided for the convenience of the user and is Not a Certified Document

This electronic collection of documents is provided for the convenience of the user and is Not a Certified Document This electronic collection of documents is provided for the convenience of the user and is Not a ertified Document The documents contained herein were originally issued and sealed by the individuals whose

More information

CSCI565 - Compiler Design

CSCI565 - Compiler Design CSCI565 - Compiler Deign Spring 6 Due Dte: Fe. 5, 6 t : PM in Cl Prolem [ point]: Regulr Expreion nd Finite Automt Develop regulr expreion (RE) tht detet the longet tring over the lphet {-} with the following

More information

Bi-quad filters realization on AIC Codecs

Bi-quad filters realization on AIC Codecs pplition Report pril Bi-qud filter reliztion on IC Code HP Softwre BSTRCT Thi pplition report provide informtion regrding filter eqution nd o-effiient formt repreenttion tht n e ued to relize digitl filter

More information

(SOME SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECT) I INCHES INNER DIAMETER IN ID K KILOWATT KILOWATT HOUR KW KWH

(SOME SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECT) I INCHES INNER DIAMETER IN ID K KILOWATT KILOWATT HOUR KW KWH YMOL LEGEN (OME YMOL N REVITION MY NOT E UE ON THI PROJET) OUTLINE PEIFITION GENERL PROJET NOTE GENERL PIPING LEL x M00 M003 V G PIPING YMOL LL VLVE UTTERFLY VLVE HEK VLVE IPHRGM VLVE GTE VLVE GTE VLVE

More information

PLAN Scale: 1:400 [A3] ELEVATION Scale: 1:400 [A3]

PLAN Scale: 1:400 [A3] ELEVATION Scale: 1:400 [A3] 44 3. T T T 36 263 NTILEVER PILE 6. WKINO RIVER TENNE ESS PTHWY PERMNENT WORKS EXLUSION ZONE T T T T T T T T T 6.5 NTILEVER PILE 2 263 EXISTING FRM ESS TRK 35. T T T T T 32.5 38 NEW PLYMOUTH SL TRNSITION

More information

Sample Plan Sample Plan CONSTRUCTION PLAN DETAILS CHECKLIST CONSTRUCTION PLAN DETAILS NARRATIVE. References: General Information:

Sample Plan Sample Plan CONSTRUCTION PLAN DETAILS CHECKLIST CONSTRUCTION PLAN DETAILS NARRATIVE. References: General Information: Sample Plan Sample Plan CONSTRUCTION PLN DETILS --------- NRRTIVE CONSTRUCTION PLN DETILS --------- CHECKLIST References:. Detail applicable to work scope Design Scene: Chapter 3 - Details REVISION DTE

More information

The Ellipse. is larger than the other.

The Ellipse. is larger than the other. The Ellipse Appolonius of Perg (5 B.C.) disovered tht interseting right irulr one ll the w through with plne slnted ut is not perpendiulr to the is, the intersetion provides resulting urve (oni setion)

More information

4. UNBALANCED 3 FAULTS

4. UNBALANCED 3 FAULTS 4. UNBALANCED AULTS So fr: we hve tudied lned fult ut unlned fult re more ommon. Need: to nlye unlned ytem. Could: nlye three-wire ytem V n V n V n Mot ommon fult type = ingle-phe to ground i.e. write

More information

Exercise 3 Logic Control

Exercise 3 Logic Control Exerise 3 Logi Control OBJECTIVE The ojetive of this exerise is giving n introdution to pplition of Logi Control System (LCS). Tody, LCS is implemented through Progrmmle Logi Controller (PLC) whih is lled

More information

April 8, 2017 Math 9. Geometry. Solving vector problems. Problem. Prove that if vectors and satisfy, then.

April 8, 2017 Math 9. Geometry. Solving vector problems. Problem. Prove that if vectors and satisfy, then. pril 8, 2017 Mth 9 Geometry Solving vetor prolems Prolem Prove tht if vetors nd stisfy, then Solution 1 onsider the vetor ddition prllelogrm shown in the Figure Sine its digonls hve equl length,, the prllelogrm

More information

LEGEND GENERAL LAYOUT SHEET C.S.A.H. 2 / HENNEPIN COUNTY PROJECT 1656 S.A.P REMOVAL PLAN CONSTRUCTION PLAN

LEGEND GENERAL LAYOUT SHEET C.S.A.H. 2 / HENNEPIN COUNTY PROJECT 1656 S.A.P REMOVAL PLAN CONSTRUCTION PLAN LEGEND XX REMOVL PLN XX ONTRUTION PLN LE 0 0 BEGIN ENNEPIN OUNTY PROJET NO. P 0-0-00 PENN VE. 0 0 (G LEN W O O D VE) 8 9 0 T (O LO N M EM O RI L W Y) PENN VE. PENN VE. PENN VE. W TORNE VE W. ETNUT VE W.

More information

Forces on curved surfaces Buoyant force Stability of floating and submerged bodies

Forces on curved surfaces Buoyant force Stability of floating and submerged bodies Stti Surfe ores Stti Surfe ores 8m wter hinge? 4 m ores on plne res ores on urved surfes Buont fore Stbilit of floting nd submerged bodies ores on Plne res Two tpes of problems Horizontl surfes (pressure

More information

Project 6: Minigoals Towards Simplifying and Rewriting Expressions

Project 6: Minigoals Towards Simplifying and Rewriting Expressions MAT 51 Wldis Projet 6: Minigols Towrds Simplifying nd Rewriting Expressions The distriutive property nd like terms You hve proly lerned in previous lsses out dding like terms ut one prolem with the wy

More information

P R O J E C T D A T A PROJECT DESCRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES

P R O J E C T D A T A PROJECT DESCRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES P R O J E T D T PROJET DESRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES PROJET DDRESS:., LOS LTOS, PROJET OWNERS: JERRY SHEN & JENNIFER YEH PN: 331-0-099 ZONING: R1E-20-N1

More information

PHYSICS 211 MIDTERM I 22 October 2003

PHYSICS 211 MIDTERM I 22 October 2003 PHYSICS MIDTERM I October 3 Exm i cloed book, cloed note. Ue onl our formul heet. Write ll work nd nwer in exm booklet. The bck of pge will not be grded unle ou o requet on the front of the pge. Show ll

More information

Maintaining Mathematical Proficiency

Maintaining Mathematical Proficiency Nme Dte hpter 9 Mintining Mthemtil Profiieny Simplify the epression. 1. 500. 189 3. 5 4. 4 3 5. 11 5 6. 8 Solve the proportion. 9 3 14 7. = 8. = 9. 1 7 5 4 = 4 10. 0 6 = 11. 7 4 10 = 1. 5 9 15 3 = 5 +

More information

20-JUNE-14 SCHEMATIC HSC REV. DRAWING NO.

20-JUNE-14 SCHEMATIC HSC REV. DRAWING NO. THI RWING I THE PROPERTY OF NLOG EVIE IN. IT I NOT TO E REPROUE OR OPIE, IN WHOLE OR IN PRT, OR UE IN FURNIHING INFORMTION TO OTHER, OR FOR NY OTHER PURPOE ETRIMTL TO THE INTERET OF NLOG EVIE. THE EQUIPMT

More information

FOUR SCORE, LLC 144 STURBRIDGE ROAD CHARLTON, MA, PROJECT: PROJECT TEAM MECHANICAL

FOUR SCORE, LLC 144 STURBRIDGE ROAD CHARLTON, MA, PROJECT: PROJECT TEAM MECHANICAL matthew@ 40.25.0749 c rebecca@ 40.25.0869 c HRLTON, M, 020 PROJET TEM OPE ONER: THE OPE I GENERLLY EFINE THE INTERIOR REONFIGURTION OF ITING INGLE TORY INUTRIL PE INTO ULTIVTION FILITY. INIENTL ETERIOR

More information

PYTHAGORAS THEOREM,TRIGONOMETRY,BEARINGS AND THREE DIMENSIONAL PROBLEMS

PYTHAGORAS THEOREM,TRIGONOMETRY,BEARINGS AND THREE DIMENSIONAL PROBLEMS PYTHGORS THEOREM,TRIGONOMETRY,ERINGS ND THREE DIMENSIONL PROLEMS 1.1 PYTHGORS THEOREM: 1. The Pythgors Theorem sttes tht the squre of the hypotenuse is equl to the sum of the squres of the other two sides

More information

3-Way Mixing and Sequencing Globe Valves, Flared (5/8 in. O.D.) with Electric, Hydraulic, and Pneumatic Actuators

3-Way Mixing and Sequencing Globe Valves, Flared (5/8 in. O.D.) with Electric, Hydraulic, and Pneumatic Actuators lectric, Hydrulic, nd Pneumtic ctutors TL 1. Select Vlve ody including P ode (Vlve Size, v Rting, Port ode) or select Vlve ssemly correct (refer to Tle 3 nd Tle 3 lso) less ctutor ode (XXX) including the

More information

a) Read over steps (1)- (4) below and sketch the path of the cycle on a P V plot on the graph below. Label all appropriate points.

a) Read over steps (1)- (4) below and sketch the path of the cycle on a P V plot on the graph below. Label all appropriate points. Prole 3: Crnot Cyle of n Idel Gs In this prole, the strting pressure P nd volue of n idel gs in stte, re given he rtio R = / > of the volues of the sttes nd is given Finlly onstnt γ = 5/3 is given You

More information

R-107-H SUPERELEVATION AND PAVEMENT CROWNS MICHIGAN DEPARTMENT OF TRANSPORTATION SUPERELEVATED FINISHED SECTION LEGEND HIGH SIDE SHOULDER CHART RAMPS

R-107-H SUPERELEVATION AND PAVEMENT CROWNS MICHIGAN DEPARTMENT OF TRANSPORTATION SUPERELEVATED FINISHED SECTION LEGEND HIGH SIDE SHOULDER CHART RAMPS PLNE OF UPERELEVTION HOULER LOPE EQUL THE RTE OF UPERELEVTION OR THE NORML HOULER LOPE HIHEVER I GRETER ITH EPTH ON INIE OF URVE EQUL NORML ITH EPTH PLU ITH OF PVEMENT N HOULER INIE THE POINT OF ROTTION

More information

Activities. 4.1 Pythagoras' Theorem 4.2 Spirals 4.3 Clinometers 4.4 Radar 4.5 Posting Parcels 4.6 Interlocking Pipes 4.7 Sine Rule Notes and Solutions

Activities. 4.1 Pythagoras' Theorem 4.2 Spirals 4.3 Clinometers 4.4 Radar 4.5 Posting Parcels 4.6 Interlocking Pipes 4.7 Sine Rule Notes and Solutions MEP: Demonstrtion Projet UNIT 4: Trigonometry UNIT 4 Trigonometry tivities tivities 4. Pythgors' Theorem 4.2 Spirls 4.3 linometers 4.4 Rdr 4.5 Posting Prels 4.6 Interloking Pipes 4.7 Sine Rule Notes nd

More information

Vector Integration. Line integral: Let F ( x y,

Vector Integration. Line integral: Let F ( x y, Vetor Integrtion Thi hpter tret integrtion in vetor field. It i the mthemti tht engineer nd phiit ue to deribe fluid flow, deign underwter trnmiion ble, eplin the flow of het in tr, nd put tellite in orbit.

More information

Standard Trigonometric Functions

Standard Trigonometric Functions CRASH KINEMATICS For ngle A: opposite sine A = = hypotenuse djent osine A = = hypotenuse opposite tngent A = = djent For ngle B: opposite sine B = = hypotenuse djent osine B = = hypotenuse opposite tngent

More information

STRUNET CONCRETE DESIGN AIDS

STRUNET CONCRETE DESIGN AIDS Introtion to Conrete Bem Deign Flow Chrt The onrete em eign low hrt re the ollowing jet: For retnglr em with given imenion: Anlzing the em etion to etere it moment trength n th eining the em etion to e

More information

VTU NOTES QUESTION PAPERS NEWS RESULTS FORUMS Vector Integration

VTU NOTES QUESTION PAPERS NEWS RESULTS FORUMS Vector Integration www.boopr.om VTU NOTES QUESTION PAPERS NEWS RESULTS FORUMS Vetor Integrtion Thi hpter tret integrtion in vetor field. It i the mthemti tht engineer nd phiit ue to deribe fluid flow, deign underwter trnmiion

More information

DEPARTMENT OF WATER ENVIRONMENT PROTECTION ONONDAGA COUNTY, NEW YORK

DEPARTMENT OF WATER ENVIRONMENT PROTECTION ONONDAGA COUNTY, NEW YORK EPRTMENT OF WTER ENVIRONMENT PROTETION ONONG OUNTY, NEW YORK FERURY 0 OK ORHR WSTEWTER TRETMENT PLNT LGOON LENING N REHILITTION PROJET ONTRT NO. GENERL ONONG OUNTY RWING INE SHT. NO. ESRIPTION NEW YORK

More information

Similar Right Triangles

Similar Right Triangles Geometry V1.noteook Ferury 09, 2012 Similr Right Tringles Cn I identify similr tringles in right tringle with the ltitude? Cn I identify the proportions in right tringles? Cn I use the geometri mens theorems

More information

END S.P SEGMENT 2 STA END S.P SEGMENT 1 RETAINING WALL NO. 1 SEE RETAINING WALL PLAN

END S.P SEGMENT 2 STA END S.P SEGMENT 1 RETAINING WALL NO. 1 SEE RETAINING WALL PLAN 0 FLOODWY Segments & Segment - lternate EGIN S.P. -00-00 SEGMENT ST 000.00 SPRING STREET GREENVLE VENUE 0 0 0 0 > TRIL SEGMENT PROGRESSIVE RILROD ST 87.6 = ST 0.06 RIDGE NO. 66 0 0 UP RILROD 0800000 800

More information

Sequence Cartridge Valves

Sequence Cartridge Valves Sequene Vlves Type Pge Pilot Operted, lned Piston Diret ting with Reverse Flow Chek 7 Kik-down, Pilot Operted, lned Piston ir Controlled, Pilot Operted, lned Piston 9 Diret ting without Reverse Flow Chek

More information

STRATA PLAN OF LOT ONE, DISTRICT LOT 24505, SIMILKAMEEN DIVISION, YALE DISTRICT, PLAN EPP4206. OSOYOOS LAKE BLOCK REM. PARK D.L.

STRATA PLAN OF LOT ONE, DISTRICT LOT 24505, SIMILKAMEEN DIVISION, YALE DISTRICT, PLAN EPP4206. OSOYOOS LAKE BLOCK REM. PARK D.L. TRT OF OT O, TRT OT 4, MKM VO, Y TRT, 46 83 TOW OF OOYOO 1 1 4 by 6mm in height size when plotte t sle of 1: V R: & 7 RK ooyoo, OOYOO K TO M OF VOMT WTRM RK RORT R T TR RM OK 76 i : R M R MR V J MH MW

More information

SCHEMATIC REV. DRAWING NO RELAY CONTROL CHART A A DE N V C L O REVISIONS

SCHEMATIC REV. DRAWING NO RELAY CONTROL CHART A A DE N V C L O REVISIONS THI RWIN I THE PROPERTY OF NLO EVIE IN. IT I NOT TO E REPROUE OR OPIE, IN WHOLE OR IN PRT, OR UE IN FURNIHIN INFORMTN TO OTHER, OR FOR NY OTHER PURPOE ETRIMENTL TO THE INTERET OF NLO EVIE. THE EQUIPMENT

More information

NON-DETERMINISTIC FSA

NON-DETERMINISTIC FSA Tw o types of non-determinism: NON-DETERMINISTIC FS () Multiple strt-sttes; strt-sttes S Q. The lnguge L(M) ={x:x tkes M from some strt-stte to some finl-stte nd ll of x is proessed}. The string x = is

More information

Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement

Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement. Distance Measurement IVL 1101 Surveying - Mesuring Distne 1/5 Distne is one of the most si engineering mesurements Erly mesurements were mde in terms of the dimensions of the ody very old wooden rule - Royl Egyptin uit uits

More information

MATH Final Review

MATH Final Review MATH 1591 - Finl Review November 20, 2005 1 Evlution of Limits 1. the ε δ definition of limit. 2. properties of limits. 3. how to use the diret substitution to find limit. 4. how to use the dividing out

More information

HSS14X4X.500 STRINGER (LLV) MODER PROFILE ( STEP STONE ) FACE OF WALL CLOSER BENT C6X8.2 CLOSER BENT C6X8.2 MODER PROFILE ( STEP STONE )

HSS14X4X.500 STRINGER (LLV) MODER PROFILE ( STEP STONE ) FACE OF WALL CLOSER BENT C6X8.2 CLOSER BENT C6X8.2 MODER PROFILE ( STEP STONE ) LXX1 X'# () L3XX1 X'#7 W 3 I. HILTI KTZ 1 SING LINE 1 1 1 3 1 1 EME 1'#1 1 ETIL ( REF.: 1S5. ) PL1 "XX'#55 8 X8. 9 I. 35 1 SING LINE LXX1 X'# () 11 1 ETIL ( REF.: S5. ) 1 EL. SEE PLN ( T.O. LNING ) 5 (HEER

More information

RUNNYMEDE - MYERS PARK

RUNNYMEDE - MYERS PARK 596 RUNNYMEE LNE SELWYN VENUE WINSOR VE MIHEL KER PL VIINITY MP NOT TO SLE LNSPE RHITETURE IVIL ENGINEERING TRNSPORTTION PLNNING O P W 2459 Wilkinson lvd, Ste 200 harlotte, N 28208 704.343.0608 www.drgrp.com

More information

TOPPER SAMPLE PAPER - 5 CLASS XI MATHEMATICS. Questions. Time Allowed : 3 Hrs Maximum Marks: 100

TOPPER SAMPLE PAPER - 5 CLASS XI MATHEMATICS. Questions. Time Allowed : 3 Hrs Maximum Marks: 100 TOPPER SAMPLE PAPER - 5 CLASS XI MATHEMATICS Questions Time Allowed : 3 Hrs Mximum Mrks: 100 1. All questions re compulsory.. The question pper consist of 9 questions divided into three sections A, B nd

More information

1 PYTHAGORAS THEOREM 1. Given a right angled triangle, the square of the hypotenuse is equal to the sum of the squares of the other two sides.

1 PYTHAGORAS THEOREM 1. Given a right angled triangle, the square of the hypotenuse is equal to the sum of the squares of the other two sides. 1 PYTHAGORAS THEOREM 1 1 Pythgors Theorem In this setion we will present geometri proof of the fmous theorem of Pythgors. Given right ngled tringle, the squre of the hypotenuse is equl to the sum of the

More information

1 OF / Nov-2017

1 OF / Nov-2017 X OX ETIL GROMMET-EGE LINER 0-0-000 SEL-TRIM,EGE 0-0-000 (0 MM) () PLTE-WLL, TRIPLE OX HORIZ 9-0-HT LMP 09-0-000 INET SM- OVH,OOR ONNER-F,90 RIGHT NGLE 9-0-000 () MOULE-INTERFE, IR IMPT 90-09-000 WIRE

More information

A D D E N D U M N o. 2. The following additions, clarifications, deletions and/or changes shall be made to the SPECIFICATIONS:

A D D E N D U M N o. 2. The following additions, clarifications, deletions and/or changes shall be made to the SPECIFICATIONS: Phone: (0) 0-0 Fax: (0) 0-0 Moorhead rea Public chools New Elementary chool Moorhead, Minnesota Project No. -0 id ate & Time: Thursday, pril, 0 at :0pm pril, 0 E N U M N o. The following additions, clarifications,

More information

NB POLICE STATION HEADQUARTERS

NB POLICE STATION HEADQUARTERS N OLIE TTION HEDQURTER LLY ORT DDITION YMOL: DRWING LIT: LOTION LN FE RIK OUTIL TILE LUMINUM R / RONZE OWNER GL (ELEVTION INDITION) HEET METL (ELEVTION INDITION) GLZED RIK HINGLE / IDING (ELEVTION INDITION)

More information

crown/cap crest α b core/base bedding and/or filter

crown/cap crest α b core/base bedding and/or filter 08a uary of ule Mound Breakwater Deign Equation B oean ide rown/ap ret aror layer, W ay/haror ide DW h firt underlayer h WL toe h t ore/ae eond underlayer B t edding and/or filter Deign Conept/ Proedure

More information

AP Physics Vectors 101

AP Physics Vectors 101 P Phyi Vetor 101 Good Stuff on Vetor: We ve riefly entioned vetor nd lr. The tie h now oe to undertke thorough tudy of the thing. Of the two, lr re the eiet to undertnd nd del with. See, when you del with

More information

Designing Information Devices and Systems I Spring 2018 Homework 7

Designing Information Devices and Systems I Spring 2018 Homework 7 EECS 16A Designing Informtion Devices nd Systems I Spring 2018 omework 7 This homework is due Mrch 12, 2018, t 23:59. Self-grdes re due Mrch 15, 2018, t 23:59. Sumission Formt Your homework sumission should

More information

1 OF / Jul-2018

1 OF / Jul-2018 X OX ETIL GROMMET-EGE LER 0-0-000 SEL-TRIM,EGE 0-0-000 (0 MM) () PLTE-WLL, TRIPLE OX HORIZ 9-0-HT LMP 09-0-000 ET SM- OVH,OOR ONNER-F,90 RIGHT NGLE 9-0-000 () MOULE-TERFE, IR IMPT 90-09-000 WIRE SM-EXTENSION,-P

More information

A01 REVISIONS DWG-CONV, DC-DC, 24VI, 5.1VO RELEASE RLS 7/18/01. Supplier Change Restrictions

A01 REVISIONS DWG-CONV, DC-DC, 24VI, 5.1VO RELEASE RLS 7/18/01. Supplier Change Restrictions REVISIONS WG REV EN NO ESRIPTION PP 0 9398 RELESE RLS 7/8/0 Supplier hange Restrictions FTER NOTIFITION PPROVL Y INTRONIS, IN. THE SUPPLIER S PRT, THE SUPPLIER SHLL NOTIFY INTRONIS OMPONENT ENGINEERING

More information

CS12N: The Coming Revolution in Computer Architecture Laboratory 2 Preparation

CS12N: The Coming Revolution in Computer Architecture Laboratory 2 Preparation CS2N: The Coming Revolution in Computer Architecture Lortory 2 Preprtion Ojectives:. Understnd the principle of sttic CMOS gte circuits 2. Build simple logic gtes from MOS trnsistors 3. Evlute these gtes

More information

Calculating Tank Wetted Area Saving time, increasing accuracy

Calculating Tank Wetted Area Saving time, increasing accuracy Clulting Tnk Wetted Are ving time, inresing ur B n Jones, P.., P.E. C lulting wetted re in rtillfilled orizontl or vertil lindril or ellitil tnk n e omlited, deending on fluid eigt nd te se of te eds (ends)

More information

( ) Same as above but m = f x = f x - symmetric to y-axis. find where f ( x) Relative: Find where f ( x) x a + lim exists ( lim f exists.

( ) Same as above but m = f x = f x - symmetric to y-axis. find where f ( x) Relative: Find where f ( x) x a + lim exists ( lim f exists. AP Clculus Finl Review Sheet solutions When you see the words This is wht you think of doing Find the zeros Set function =, fctor or use qudrtic eqution if qudrtic, grph to find zeros on clcultor Find

More information

GM1 Consolidation Worksheet

GM1 Consolidation Worksheet Cmridge Essentils Mthemtis Core 8 GM1 Consolidtion Worksheet GM1 Consolidtion Worksheet 1 Clulte the size of eh ngle mrked y letter. Give resons for your nswers. or exmple, ngles on stright line dd up

More information

, MATHS H.O.D.: SUHAG R.KARIYA, BHOPAL, CONIC SECTION PART 8 OF

, MATHS H.O.D.: SUHAG R.KARIYA, BHOPAL, CONIC SECTION PART 8 OF DOWNLOAD FREE FROM www.tekoclsses.com, PH.: 0 903 903 7779, 98930 5888 Some questions (Assertion Reson tpe) re given elow. Ech question contins Sttement (Assertion) nd Sttement (Reson). Ech question hs

More information

Physics 111. Lecture 11 (Walker: 6.1-2) Friction Forces. Frictional Forces. Microscopic Friction. Friction vs. Area

Physics 111. Lecture 11 (Walker: 6.1-2) Friction Forces. Frictional Forces. Microscopic Friction. Friction vs. Area Phyi 111 Leture 11 (Wler: 6.1-2) rition ore ritionl ore rition h it bi in urfe tht re not ompletely mooth: September 25, 2009 Leture 11 1/28 Leture 11 2/28 Surfe Roughne Miroopi rition Adheion rition v.

More information

Manual Control. Class 11-3RV, SMF, MMS. Wiring Diagrams 8/130. Signaling Contact for Class 11-3RV. Typical Wiring Diagrams Class SMF.

Manual Control. Class 11-3RV, SMF, MMS. Wiring Diagrams 8/130. Signaling Contact for Class 11-3RV. Typical Wiring Diagrams Class SMF. Manual ontrol lass - RV, MF, MM lass - RV ignaling ontact for lass - RV Typical lass MF RV9-M Typical MM Reversing Manual tarter and Manual Motor tarting witches -peed Manual Motor tarting witches FD REV

More information

Ellipses. The second type of conic is called an ellipse.

Ellipses. The second type of conic is called an ellipse. Ellipses The seond type of oni is lled n ellipse. Definition of Ellipse An ellipse is the set of ll points (, y) in plne, the sum of whose distnes from two distint fied points (foi) is onstnt. (, y) d

More information

/ 3, then (A) 3(a 2 m 2 + b 2 ) = 4c 2 (B) 3(a 2 + b 2 m 2 ) = 4c 2 (C) a 2 m 2 + b 2 = 4c 2 (D) a 2 + b 2 m 2 = 4c 2

/ 3, then (A) 3(a 2 m 2 + b 2 ) = 4c 2 (B) 3(a 2 + b 2 m 2 ) = 4c 2 (C) a 2 m 2 + b 2 = 4c 2 (D) a 2 + b 2 m 2 = 4c 2 SET I. If the locus of the point of intersection of perpendiculr tngents to the ellipse x circle with centre t (0, 0), then the rdius of the circle would e + / ( ) is. There re exctl two points on the

More information

Thin and Thick Cylinders and Spheres

Thin and Thick Cylinders and Spheres CHAPTR 8 Thin nd Thick Cylinders nd Spheres Prolem. A shell.5 m long nd m dimeter, is sujected to n internl pressure of. N/mm. If the thickness of the shell is 0 mm find the circumferentil nd longitudinl

More information

Dorf, R.C., Wan, Z. T- Equivalent Networks The Electrical Engineering Handbook Ed. Richard C. Dorf Boca Raton: CRC Press LLC, 2000

Dorf, R.C., Wan, Z. T- Equivalent Networks The Electrical Engineering Handbook Ed. Richard C. Dorf Boca Raton: CRC Press LLC, 2000 orf, R.C., Wn,. T- Equivlent Networks The Eletril Engineering Hndook Ed. Rihrd C. orf Bo Rton: CRC Press LLC, 000 9 T P Equivlent Networks hen Wn University of Cliforni, vis Rihrd C. orf University of

More information

ELECTRICAL INSTALLATION CERTIFICATE (REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - BS 7671 [IEE WIRING REGULATIONS])

ELECTRICAL INSTALLATION CERTIFICATE (REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - BS 7671 [IEE WIRING REGULATIONS]) I ertifiate No: ELETRIL INTLLTION ERTIFE (REUIREMENT FOR ELETRIL INTLLTION B [IEE WIRING REGULTION]) DETIL OF THE LIENT lient Yewtree.om Detail: Yewtree Houe Edge INTLLTION DDRE Intallation ddre: heltenham

More information

A-A DIM D PLC CONTACT PLATING: NOBLE METAL PLATING ON CONTACT FUNCTIONAL AREA OF POWER AND SIGNAL CONTACTS

A-A DIM D PLC CONTACT PLATING: NOBLE METAL PLATING ON CONTACT FUNCTIONAL AREA OF POWER AND SIGNAL CONTACTS 7 3 THIS RWING IS UNPULISHE. OPYRIGHT Y RELESE FOR PULITION LL RIGHTS RESERVE. LO IST P LTR ESRIPTION TE WN PV G NEW SH NUMER 1 11UG1 L SZ IM.0.130 2 PL 1 2 "MP", PRT NUMER N TE OE TO E MRKE IN RE SHOWN

More information

Formula for Trapezoid estimate using Left and Right estimates: Trap( n) If the graph of f is decreasing on [a, b], then f ( x ) dx

Formula for Trapezoid estimate using Left and Right estimates: Trap( n) If the graph of f is decreasing on [a, b], then f ( x ) dx Fill in the Blnks for the Big Topis in Chpter 5: The Definite Integrl Estimting n integrl using Riemnn sum:. The Left rule uses the left endpoint of eh suintervl.. The Right rule uses the right endpoint

More information

TAIL LENGTH # TYP.087 TYP.087 TYP.084 TYP LP CONFIGURATION TAIL DIMENSIONS

TAIL LENGTH # TYP.087 TYP.087 TYP.084 TYP LP CONFIGURATION TAIL DIMENSIONS 3 THIS RWING IS UNPULISHE. OPYRIGHT Y RELESE FOR PULITION LL RIGHTS RESERVE. LO IST P LTR ESRIPTION TE WN PV E NEW SH NUMER MY13 Z SZ E E NEW SH NUMER 22 2FE1 Z SZ E1 NEW SH NUMER 23 MR1 Z SZ E2 REV PER

More information

DE-TYPE SHUNTING LOCO MOTOR OF THE DUTCH RAILWAYS SERIES

DE-TYPE SHUNTING LOCO MOTOR OF THE DUTCH RAILWAYS SERIES THIS DRWING REMINS THE PROPERTY OF JDW DRUGHTING SERVIES J..M.DE WL, RIGHTWELL STREET PPKUR NEW ZELND (09)9 IF IN DOUT SK DE-TYPE SHUNTING LOO MOTOR OF THE DUTH RILWYS SERIES 0-. THE FOLLOWING INFORMTION

More information

DISCHARGE MEASUREMENT IN TRAPEZOIDAL LINED CANALS UTILIZING HORIZONTAL AND VERTICAL TRANSITIONS

DISCHARGE MEASUREMENT IN TRAPEZOIDAL LINED CANALS UTILIZING HORIZONTAL AND VERTICAL TRANSITIONS Ninth International Water Tehnology Conferene, IWTC9 005, Sharm El-Sheikh, Egypt 63 DISCHARGE MEASUREMENT IN TRAPEZOIDAL LINED CANALS UTILIZING HORIZONTAL AND VERTICAL TRANSITIONS Haan Ibrahim Mohamed

More information

MATH 115: Review for Chapter 7

MATH 115: Review for Chapter 7 MATH 5: Review for Chpter 7 Cn you stte the generl form equtions for the circle, prbol, ellipse, nd hyperbol? () Stte the stndrd form eqution for the circle. () Stte the stndrd form eqution for the prbol

More information

Figure 1. The left-handed and right-handed trefoils

Figure 1. The left-handed and right-handed trefoils The Knot Group A knot is n emedding of the irle into R 3 (or S 3 ), k : S 1 R 3. We shll ssume our knots re tme, mening the emedding n e extended to solid torus, K : S 1 D 2 R 3. The imge is lled tuulr

More information

WELL SCHEDULE. 13FF22 Lville Suwanee Road SITE NAME OTHER IDENTIFIER WELL NUMBER. Comments:

WELL SCHEDULE. 13FF22 Lville Suwanee Road SITE NAME OTHER IDENTIFIER WELL NUMBER. Comments: 1 of 5 WELL SCHEDULE Lville Suwnee Rod 33564684171 SITE NAME OTHER IDENTIFIER WELL NUMBER 33 56' 45.88'' Ltitude City of Lwrenceville OWNER WELL CONSTRUCTION DESCRIPTION Longitude -84 1.' 7.44'' Ground

More information

PYTHAGORAS THEOREM WHAT S IN CHAPTER 1? IN THIS CHAPTER YOU WILL:

PYTHAGORAS THEOREM WHAT S IN CHAPTER 1? IN THIS CHAPTER YOU WILL: PYTHAGORAS THEOREM 1 WHAT S IN CHAPTER 1? 1 01 Squres, squre roots nd surds 1 02 Pythgors theorem 1 03 Finding the hypotenuse 1 04 Finding shorter side 1 05 Mixed prolems 1 06 Testing for right-ngled tringles

More information

COMSACO INC. NORFOLK, VA 23502

COMSACO INC. NORFOLK, VA 23502 YMOL 9. / 9. / 9. / 9. YMOL 9. / 9. OT:. THI RIG VLOP ROM MIL--/ MIL-TL-H, TYP II, L ITH VITIO OLLO:. UPO RULT O HOK TTIG, HOK MOUT (ITM, HT ) HV IR ROM 0.0 THIK TO 0.090 THIK LLO Y MIL-TL-H, PRGRPH...

More information

CARLETON UNIVERSITY. 1.0 Problems and Most Solutions, Sect B, 2005

CARLETON UNIVERSITY. 1.0 Problems and Most Solutions, Sect B, 2005 RLETON UNIVERSIT eprtment of Eletronis ELE 2607 Swithing iruits erury 28, 05; 0 pm.0 Prolems n Most Solutions, Set, 2005 Jn. 2, #8 n #0; Simplify, Prove Prolem. #8 Simplify + + + Reue to four letters (literls).

More information

Software Verification

Software Verification Sotware Veriiation EXAMPLE CSA A23.3-04 RC-BM-00 Flexural and Shear Beam Deign PROBLEM DESCRIPTION The purpoe o thi example i to veri lab lexural deign in. The load level i adjuted or the ae orreponding

More information

Chapter 6. Section 6.1. Chapter 6 Opener. Big Ideas Math Blue Worked-Out Solutions. 6.1 Activity (pp ) Try It Yourself (p.

Chapter 6. Section 6.1. Chapter 6 Opener. Big Ideas Math Blue Worked-Out Solutions. 6.1 Activity (pp ) Try It Yourself (p. Chpter 6 Opener Try It Yourelf (p. 9). Becue 0 i equl to,.0 i equl to.. 0 So,.0.. i le thn. Becue 8 So,.

More information

CONTROL SYSTEMS LABORATORY ECE311 LAB 3: Control Design Using the Root Locus

CONTROL SYSTEMS LABORATORY ECE311 LAB 3: Control Design Using the Root Locus CONTROL SYSTEMS LABORATORY ECE311 LAB 3: Control Deign Uing the Root Locu 1 Purpoe The purpoe of thi lbortory i to deign cruie control ytem for cr uing the root locu. 2 Introduction Diturbnce D( ) = d

More information

Appendix C Partial discharges. 1. Relationship Between Measured and Actual Discharge Quantities

Appendix C Partial discharges. 1. Relationship Between Measured and Actual Discharge Quantities Appendi Prtil dishrges. Reltionship Between Mesured nd Atul Dishrge Quntities A dishrging smple my e simply represented y the euilent iruit in Figure. The pplied lternting oltge V is inresed until the

More information

C (6) DOORS TYPICAL, ALL SAME SIZE ENCLOSURE, CUSTOM 6 DOOR REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED 0.01 RELEASE FOR QUOTE 11/16/12 PH

C (6) DOORS TYPICAL, ALL SAME SIZE ENCLOSURE, CUSTOM 6 DOOR REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED 0.01 RELEASE FOR QUOTE 11/16/12 PH REVISION HISTORY ZONE REV ESRIPTION TE PPROVE 0.0 RELESE FOR QUOTE /6/2 PH 0.02 E ITONL ETL FOR PGO HOO, SE N OORS. RELESE FOR PROUTION 2/4/3 PH 0.03 INRESE OVERLL OF ENLOUSRE 2/8/3 PH 0.04 REVISE OOR

More information

Minnesota State University, Mankato 44 th Annual High School Mathematics Contest April 12, 2017

Minnesota State University, Mankato 44 th Annual High School Mathematics Contest April 12, 2017 Minnesot Stte University, Mnkto 44 th Annul High School Mthemtics Contest April, 07. A 5 ft. ldder is plced ginst verticl wll of uilding. The foot of the ldder rests on the floor nd is 7 ft. from the wll.

More information

Mathematics. Area under Curve.

Mathematics. Area under Curve. Mthemtics Are under Curve www.testprepkrt.com Tle of Content 1. Introduction.. Procedure of Curve Sketching. 3. Sketching of Some common Curves. 4. Are of Bounded Regions. 5. Sign convention for finding

More information

FINAL CONSTRUCTION PLANS FOR COUNTRY HILLS OFFICE CAMPUS LOT 4A

FINAL CONSTRUCTION PLANS FOR COUNTRY HILLS OFFICE CAMPUS LOT 4A FINL ONTRUTION PLN FOR OUNTRY HILL OFFIE MPU LOT GENY ONTT LIT ENTUR HELTH () 67-98 88 INVERNE R W # TTN: OTT ROOK ENGLEWOO, OLORO 8 ERMN 7TH TREET () 8- ENVER, OLORO 8 TTN: ERIK HNEN ITY OF THORNTON ()

More information

Compiler Design. Fall Lexical Analysis. Sample Exercises and Solutions. Prof. Pedro C. Diniz

Compiler Design. Fall Lexical Analysis. Sample Exercises and Solutions. Prof. Pedro C. Diniz Univerity of Southern Cliforni Computer Siene Deprtment Compiler Deign Fll 6 Lexil Anlyi Smple Exerie nd Solution Prof. Pedro C. Dini USC / Informtion Siene Intitute 4676 Admirlty Wy, Suite Mrin del Rey,

More information

( ) 1. 1) Let f( x ) = 10 5x. Find and simplify f( 2) and then state the domain of f(x).

( ) 1. 1) Let f( x ) = 10 5x. Find and simplify f( 2) and then state the domain of f(x). Mth 15 Fettermn/DeSmet Gustfson/Finl Em Review 1) Let f( ) = 10 5. Find nd simplif f( ) nd then stte the domin of f(). ) Let f( ) = +. Find nd simplif f(1) nd then stte the domin of f(). ) Let f( ) = 8.

More information

Finite Automata-cont d

Finite Automata-cont d Automt Theory nd Forml Lnguges Professor Leslie Lnder Lecture # 6 Finite Automt-cont d The Pumping Lemm WEB SITE: http://ingwe.inghmton.edu/ ~lnder/cs573.html Septemer 18, 2000 Exmple 1 Consider L = {ww

More information

REV 1 DWG NO 2 RELEASE * * 12 CUT PART TO 90mm. 11 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS BEFORE APPLYING THE HEATING PAD.

REV 1 DWG NO 2 RELEASE * * 12 CUT PART TO 90mm. 11 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS BEFORE APPLYING THE HEATING PAD. RELESE TE WG 0 ZONE ISION REOR TE FTR-ORIG UT PRT TO 90mm. PREP THE SURFE PER MNUFTURERS INSTRUTIONS EFORE PPLYING THE HETING P. GRET LSKN RENTL PKGE OES/STNRS-S/MVSS 0 SEE WIRING INSTL-OY FOR ELETRIL

More information

RCP-2 (DET AC) RIGHT COMPONENT SEAL-TRIM,EDGE (60 MM) (2) TAPE-FOAM (250 MM) (2)

RCP-2 (DET AC) RIGHT COMPONENT SEAL-TRIM,EDGE (60 MM) (2) TAPE-FOAM (250 MM) (2) RP- LEFT, RP- (ET ) RIGHT OMPONENT ONTROLLER-POWER -0-000 OX 00-0-000 00-0-000 G-0-U () ONNER 0-0-000 () TUING-VINYL 0-0-000 (0MM) ETIL SEL-TRIM,EGE 0-0-000 (0 MM) () TRNSMITTER-IR 90--000 RP- (ET ) TPE-FOM

More information

FIN. WALL CONCRETE SOLID MASONRY GENERAL NOTES: 1. SEALS LOCATION SHOULD BE TAKEN FROM CONTRACT DRAWINGS.

FIN. WALL CONCRETE SOLID MASONRY GENERAL NOTES: 1. SEALS LOCATION SHOULD BE TAKEN FROM CONTRACT DRAWINGS. NHOR BOLTS DRILL (3) - 1 [38mm] ROUND HOLES. MOUNT SEL ON SOLID MSONRY OR ONRETE. NHOR WITH NON-SHRINK MORTR. 2'- [762mm] THREDED BRONZE STUDS, SREW INTO SOLID METL PORTION T BK OF SEL. SEL SIZE "" NHOR

More information

ANALYSIS AND MODELLING OF RAINFALL EVENTS

ANALYSIS AND MODELLING OF RAINFALL EVENTS Proeedings of the 14 th Interntionl Conferene on Environmentl Siene nd Tehnology Athens, Greee, 3-5 Septemer 215 ANALYSIS AND MODELLING OF RAINFALL EVENTS IOANNIDIS K., KARAGRIGORIOU A. nd LEKKAS D.F.

More information

DA ISSUE THIS DRAWING IS NOT FOR CONSTRUCTION

DA ISSUE THIS DRAWING IS NOT FOR CONSTRUCTION THIS DRWING IS NOT SL EXTENDED TO ROOF LINE 70 TEXTURED FCDE - 2 OPTION 1-2 ED ELEVTION LUNDRY THROOM GRGE ED 2 1 OPTION 1-2 ED FLOOR PLN TO E TRNSPORTLE 3 OPTION 1-2 ED PERSPECTIVE RE SCHEDULE INTERNL

More information

Plane Surveying Levelling

Plane Surveying Levelling Deprtment of Civil Engineering, UC Introduction: Levelling is mens y which surveyors cn determine the elevtion of points, using other known points s references. Levelling is perhps the most sic of surveying

More information

M Line Card Redundancy with Y-Cab l es Seamless Line Card Failover Solu t ion f or Line Card H ardw or Sof t w are Failu res are Leverages hardware Y-

M Line Card Redundancy with Y-Cab l es Seamless Line Card Failover Solu t ion f or Line Card H ardw or Sof t w are Failu res are Leverages hardware Y- Line Card Redundancy with Y-Cab l es Technical Overview 1 M Line Card Redundancy with Y-Cab l es Seamless Line Card Failover Solu t ion f or Line Card H ardw or Sof t w are Failu res are Leverages hardware

More information

m A 1 1 A ! and AC 6

m A 1 1 A ! and AC 6 REVIEW SET A Using sle of m represents units, sketh vetor to represent: NON-CALCULATOR n eroplne tking off t n ngle of 8 ± to runw with speed of 6 ms displement of m in north-esterl diretion. Simplif:

More information

To determine the biasing conditions needed to obtain a specific gain each stage must be considered.

To determine the biasing conditions needed to obtain a specific gain each stage must be considered. PHYSIS 56 Experiment 9: ommon Emitter Amplifier A. Introdution A ommon-emitter oltage amplifier will be tudied in thi experiment. You will inetigate the fator that ontrol the midfrequeny gain and the low-and

More information

Instructions. An 8.5 x 11 Cheat Sheet may also be used as an aid for this test. MUST be original handwriting.

Instructions. An 8.5 x 11 Cheat Sheet may also be used as an aid for this test. MUST be original handwriting. ID: B CSE 2021 Computer Orgniztion Midterm Test (Fll 2009) Instrutions This is losed ook, 80 minutes exm. The MIPS referene sheet my e used s n id for this test. An 8.5 x 11 Chet Sheet my lso e used s

More information

Solutions Problem Set 2. Problem (a) Let M denote the DFA constructed by swapping the accept and non-accepting state in M.

Solutions Problem Set 2. Problem (a) Let M denote the DFA constructed by swapping the accept and non-accepting state in M. Solution Prolem Set 2 Prolem.4 () Let M denote the DFA contructed y wpping the ccept nd non-ccepting tte in M. For ny tring w B, w will e ccepted y M, tht i, fter conuming the tring w, M will e in n ccepting

More information

I 3 2 = I I 4 = 2A

I 3 2 = I I 4 = 2A ECE 210 Eletril Ciruit Anlysis University of llinois t Chigo 2.13 We re ske to use KCL to fin urrents 1 4. The key point in pplying KCL in this prolem is to strt with noe where only one of the urrents

More information

CEE 142L Reinforced Concrete Structures Laboratory

CEE 142L Reinforced Concrete Structures Laboratory CEE 14L Reinfored Conrete Struture Lbortory Slender Column Experiment CEE 14L Slender Column Experiment Spring The olumn experiment i deigned to exmine the influene of lenderne on the xil lod pity of the

More information

1. LOCATION AND VERTICAL SPACING OF BOLTED FIXED END SHIMS AS REQUIRED

1. LOCATION AND VERTICAL SPACING OF BOLTED FIXED END SHIMS AS REQUIRED REINFORCING IN EXISTING PNEL (TYP.). LOCTION ND VERTICL SPCING OF BOLTED FIXED END CONNECTIONS SHLL MTCH S FR S POSSIBLE WITH EXISTING CONNECTION ON THE DJCENT PNELS. EXISTING PLTE PLTE WITH /6" DI. HOLE

More information

Trigonometry Revision Sheet Q5 of Paper 2

Trigonometry Revision Sheet Q5 of Paper 2 Trigonometry Revision Sheet Q of Pper The Bsis - The Trigonometry setion is ll out tringles. We will normlly e given some of the sides or ngles of tringle nd we use formule nd rules to find the others.

More information

Mechanical Systems Part A: State-Space Systems Lecture AL10. State estimation Compensator design

Mechanical Systems Part A: State-Space Systems Lecture AL10. State estimation Compensator design : 46-4 Mechnicl Stem Prt : Stte-Spce Stem ectre Stte etimtion ompentor deign combintion of control l nd etimtor eprtion principle Stte etimtion We re ble to plce the P rbitrril b feeding bck ll the tte:

More information