1 Storm Water Management Project Draft Islandwide Assessment of Erosion Potential at Storm Drain s on the Island of Oahu State of Hawaii Department of Transportation Highways Division MARCH 2007

2 SSWMP Draft Islandwide Assessment of Erosion Potential at Storm Drain s on the Island of Oahu Appendix I.3 March 2007

3 Table of Contents CHAPTER 1 - Introduction Background Objectives... 2 CHAPTER 2 - Methodology Field Operations Quantitative Criteria... 3 CHAPTER 3 - Summary of Results Summary of Results Remediation Measures Limitations... 9 CHAPTER 4 - References Appendix A Appendix B Appendix C Appendix D Field Operations - Inspector s Checklist Top 25 High Priority s Comprehensive Listing of Sites Sites - Site Reports (electronic files) Table of Figures Figure 3.1: High Priority s... 7 Table of Tables Table 3.1: Top 25 High Priority s... 6 Table 3.2: Top 25 High Priority s Site Characterization... 8 Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 1 March 2007

4 CHAPTER 1 - INTRODUCTION 1.1 Background The Erosion Control BMP Program includes the identification and evaluation of erosion at storm drain outfalls that discharge downslope of the roadbed. The following methodology was used to derive a prioritized listing: Perform field operations; Assess and evaluate conditions; and Develop quantitative criteria for evaluating erosion at storm drain outfalls. A detailed description of the methodology is provided in Chapter Objectives The objectives of this report include the following: To identify and prioritize storm drain outfalls on the island of Oahu that discharge downslope of the roadbed based upon water quality impacts as a priority; To develop and implement a program to prevent erosion at the storm drain system outfalls. Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 2 March 2007

5 CHAPTER 2 - METHODOLOGY 2.1 Field Operations Field operations were conducted between August 2005 and October The data collection efforts consisted of identifying and documenting storm drain outfalls along State highways. Field inspection priorities focused on assessing major outfalls, which are defined as culverts and pipes with an inside diameter of 36-inches or greater. The following activities were conducted at each outfall location: Visual inspections of outfall area by a crew of one or two persons, using GPS units to locate approximate outfall location. Collect the following information about outfall area (See Appendix A for inspector s checklist): size and type (material); Condition of outfall; Condition of outfall area; Condition of outfall runoff, Water flowing from outfall; Pollution around outfall area; Photographs; and Sketch of culvert/pipe configuration 2.2 Quantitative Criteria The high priority sites were selected by a combination of factors, including the observed erosion condition, watershed priority, receiving water body classification, overland flow distance to receiving water, culvert size, and soil condition (erodibility) at the outfall location. The ranking criteria (erosion values) are based on the following equation: Erosion Value = (erosion condition factor) x (watershed factor) x (water classification factor) x (distance to receiving water factor) x (culvert size factor) x (soil erodibility factor) Erosion Condition Factor Erosion conditions were assessed by the inspectors in the field and recorded in the Condition of Outlet Runoff section of the Field Operations Inspector s Checklist. This factor was divided into four categories. The highest tier consists of those outfalls that were observed to exhibit heavy or severe erosion. These locations were assigned a weight factor of 5. locations that showed evidence of mild or moderate erosion were assigned a weight factor of 2. Light erosion was assigned a weight factor of 1 and those areas were erosion was not evident was assigned a weight factor of zero. Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 3 March 2007

6 Factor Each watershed was categorized into one of four classifications to determine the watershed factor. Critical watersheds are defined as those which have been designated by the EPA as a Wasteload Allocation (WLA). This constitutes the highest tier of the prioritization ranking and is assigned the largest weight factor of 4. The five watersheds that comprise this group are Kawa, Waimanalo, Ala Wai, Kawainui, and Kaelepulu. The second tier consists of the high priority watersheds as defined in the Consent Decree, Appendix A (Civil Action No. CV ) and is assigned a weight factor of 3. High priority watersheds include Aiea, Halawa, Kalauao, Kalihi, Kaneohe, Kapakahi, Kaukonahua, Keaahala, Kiikii, Nuuanu, Paukauila, Poamoho, Waiawa, Waikele, Waimalu, and Waipio. The third tier consists of those watersheds that appear on EPA s 303(d) list of impaired waters based on turbidity or total suspended solids. This group is assigned a weight factor of 2 and includes Anahulu, Hanauma, Helemano, Honouliuli, Kaaawa, Kahaluu, Kahaluu Segment, Kahawainui, Kapalama, Kaupuni, Kawaiiki, Kawailoa, Koko Crater, Makaha, Makaiwa, Moanalua, and Opaeula. The bottom tier consists of all remaining watersheds and is assigned a weight factor of 1. Water Classification Factor The water classification of the receiving water body was also taken into consideration in the quantitative analysis. The first category, consisting of Class A waters and Pearl Harbor Estuary, is assigned a weight factor of 1. The second category, Class AA waters, marine conservation areas, and reserves, are assigned a weight factor of 1.2, or 20% greater than the first tier. s that outfall to Class AA waters and other sensitive areas include: Manini, Kaluakauila, Anahulu, Loko Ea, Kahana, Hakipuu, Waikane, Waianu, Waiahole, Kaalaea, Haiamoa, Waihee, Kahaluu, Ahuimanu, Kahaluu segment, Heeia, Keaahala, Kaneohe, Kawa, Puu Hawaiiloa, Hanauma, and Makapuu. All remaining watersheds are assumed to drain to Class A waters or Pearl Harbor Estuary. Distance to Receiving Water Factor The proximity of the outfall location to the receiving water body was also factored into the analysis to account for sediment that may settle out prior to reaching the final discharge location. This factor is based on the distance along the approximate flow path from the outfall to the receiving water body. Flow distances through pipes and lined channels were subtracted from this measurement since it is assumed that 100 percent sediment transfer would occur through these conveyances. For outfalls near the shoreline, the distance to stream factor was terminated along any visible sandy beach (from aerial photos), rather than to the point where it contacts the ocean. The receiving water was defined as (1) a blue line or water body on the USGS map, (2) a blue line as depicted in the State s streams GIS file (darstreams.shp), or (3) a water body, as shown in the City and County of Honolulu s water body shapefile (watbod.shp). Culvert Size Factor Prioritization of sites was also determined by culvert size. Culverts with inside diameters less than 36-inches are considered minor outfalls and are assigned a weight factor of 1. Those with inside diameters of 36-inches or larger are considered major outfalls and are assigned a weight factor of 2. Multiple barrel culverts less than 36-inches in diameter with an aggregate pipe cross sectional area greater than a single 36-inch diameter culvert are classified as major outfalls for Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 4 March 2007

7 analysis purposes. Since culvert size is an indication of the contributing drainage area, the larger drainage areas were afforded a higher weighting by this method. Soil Erodibility Factor The soil type in the vicinity of each outfall location was obtained from the City and County of Honolulu s GIS layers. A corresponding K value was determined for each soil type based on USDA NRCS publications. These values ranged between 0.02 and This erodibility factor quantifies the susceptibility of soil detachment by water and is commonly used to predict longterm average soil loss. For outfalls that exit directly into a concrete channel or other lined ditch, the soil erodibility factor was set to zero. Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 5 March 2007

8 CHAPTER 3 - SUMMARY OF RESULTS 3.1 Summary of Results A total of 1,189 outfalls were documented as of October 31, Each site was evaluated for erosion potential and ranked according to the calculated erosion value. Based on this analysis, a list of the top twenty-five islandwide erosional areas was compiled (Refer to Table 3.1). As illustrated in Figure 3.1, these high priority outfall locations are scattered across the island. It should be noted that this ranking of high priority outfalls is subject to change pending a more comprehensive, site-specific engineering analysis. Site Rank Site ID # Table 3.1: Top 25 High Priority s Route # Route Milepost Erosion Value Kalanianaole Hwy H-3 Interstate Route H Likelike Hwy Kailua Road H-3 Interstate Route H H-3 Interstate Route H H-3 Interstate Route H Farrington Hwy Kalanianaole Hwy Kamehameha Hwy Wilikina Drive H-1 Interstate Route H H-1 Interstate Route H Kamehameha Hwy Wilikina Drive H-2 Interstate Route H Kamehameha Hwy H-1 Interstate Route H H-2 Interstate Route H H-2 Interstate Route H H-2 Interstate Route H Farrington Hwy Farrington Hwy Farrington Hwy H-3 Interstate Route H Eight of the top twenty-five outfalls are located in the Windward area, where critical (WLA) watersheds and Class AA waters are prevalent. The general soil classification is of the Lolekaa-Waikane association, which comprises approximately 15 percent of the island. This association is characterized by well-drained, fine to moderately fine textured soils on uplands, Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 6 March 2007

9 fans, and terraces. They formed in old alluvium and material weathered from basic igneous rock. These soils range from nearly level to very steep. Figure 3.1: High Priority s Eleven of the top twenty-five sites are located in central Oahu. The soil in this area is identified by the Helemano-Wahiawa association, which comprises approximately 18 percent of the island. This association consists of well-drained, moderately fine textured and fine textured soils on uplands which formed in material weathered from basalt. These soils are generally nearly level to moderately sloping. Five sites are located within Lualualei-Fill land-ewa association soil types. These areas consist of well-drained, fine textured and moderately fine textured soils on fans and in drainageways on the southern and western coastal plains. They formed in alluvium and are nearly level to moderately sloping. This association comprises approximately 14 percent of the island. The final site, located in Waialua, is within the Kaena-Waialua association, which occurs as a narrow band along the northern and eastern coastline on the island of Oahu. They formed in alluvium and vary widely in texture and drainage. The deep, mainly nearly level and gently sloping soils consist of poorly drained to excessively drained soils that have a fine-textured to Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 7 March 2007

10 coarse-textured subsoil or underlying material. They occur on coastal plains, talus slopes, and in drainageways. This association comprises approximately 10 percent of the island. Additional information on the Top 25 sites is provided in Table 3.2, and individual site reports for the Top 25 sites are included in Appendix B. A comprehensive list of all outfalls evaluated in the study as of October 31, 2006 is provided in Appendix C. A data disk containing electronic files of the site reports for all documented locations will be included in Appendix D in the final version. Site Rank Site ID # Table 3.2: Top 25 High Priority s Site Characterization Culvert Erosion Condition Soil Type Water Class Kaelepulu 48" CMP Heavy/Severe PYF A Kawainui 36" CMP Heavy/Severe PYF A Kalihi 4'x3' Conc. Channel Heavy/Severe KaB A Kawainui 48" RCP Heavy/Severe PkB A Kawainui 144" Sectional Plate Heavy/Severe KlaB A Kawainui 84" CMP (Buried) Heavy/Severe KlaB A Kawainui 36" CMP Heavy/Severe KlaB A Makaiwa 2-42" CMP Heavy/Severe HxA A Kaelepulu 30" CMP Heavy/Severe PYF A Waikele 9'x10' Box Culvert Heavy/Severe HLMG Estuary/A Kaukonahua 8'x8' Box Culvert Heavy/Severe HLMG A Halawa 6'x1'-6" CRM Spillway Heavy/Severe KlaB Estuary/A Aiea 42" CMP Heavy/Severe HnB Estuary/A Kaukonahua 66" CMP Heavy/Severe HLMG A Kaukonahua 36" RCP Heavy/Severe KyA A Waiawa 14' x 3' Swale Heavy/Severe KlA Estuary/A Kaukonahua 36" RCP Heavy/Severe HLMG A Waimalu 4'x2' Conc. Spillway Heavy/Severe HnB Estuary/A Waiawa 36" CMP Heavy/Severe HLMG Estuary/A 20 6 Waiawa 36" RCP Heavy/Severe HLMG Estuary/A Waiawa 36" CMP Heavy/Severe HLMG Estuary/A Makaiwa 2-120" CMP Heavy/Severe LvB A Makaiwa 2-108" CMP Heavy/Severe LvB A Kaukonahua 17'x5' Box Culvert Heavy/Severe KlA A Kaneohe 60" RCP Heavy/Severe HoB Reserve 3.2 Remediation Measures An outfall program consisting of assessment, prioritization, and implementation of remediation measures will be submitted and implemented per MS4 Permit requirements in late March assessments will continue with the completion of major outfall assessments by March 30, locations with observed erosional conditions will require the installation of velocity dissipaters or other BMP measures to reduce the risk of continued erosion at these locations. A PS&E process similar to the process used for the FY06 high priority erosional Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 8 March 2007

11 areas will be used to develop remediation methods for the prioritized outfalls. Implementation details, such as annual outfall BMP funding, have not been determined at the time of this report's completion. 3.3 Limitations The findings presented in this report are based upon information obtained from visual field inspections and as-built information. The degree of erosive conditions observed on the date of the most recent field survey is subject to change. The nature and extent of these variations may not be evident until subsequent field visits. If such variations occur, re-evaluation of the sites may be required. Additional limitations of this report include the following: s included in this analysis are limited to those sites which have been physically located in the field and surveyed by the inspectors as of October 31, The final version will include a comprehensive listing of all outfalls which traverse the State highway system or outfall into the State right-of-way to the maximum extend practicable; and The analysis is dependent on the site conditions on the day of the survey and does not take into account the contributing drainage area, slope of the culvert, or exiting velocity of the flow. Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 9 March 2007

12 CHAPTER 4 - REFERENCES City and County of Honolulu GIS Data State of Hawaii, Department of Health, Office of Environmental Planning, Water Quality Standards Map of the Island of Oahu, October State of Hawaii, Department of Transportation, As-Built Drawings. State of Hawaii, Department of Transportation GIS Data, Nov State of Hawaii, Department of Transportation, Highways Division (DOT-HWYS), Authorization To Discharge Under The National Pollutant Discharge Elimination System Permit No. HI S000001, February 28, State of Hawaii, Department of Transportation, Highways Division, Plan for the Completion of the 10 Erosion Control Projects at the Sites Listed in Consent Decree, Appendix D, July State of Hawaii, Office of Planning, GIS Data. U.S. Department of Agriculture, Natural Resources Conservation Service, Soils Report for K Factor Whole Dominant Soil, Distributed 11/21/01. U.S. Department of Agriculture, Soil Conservation Service in cooperation with the University of Hawaii Agricultural Experiment Station. General Soil Map, Oahu Island, Hawaii, January U.S. District Court For The District Of Hawaii, Civil Action No. CV HG-KSG Consent Decree With Appendices A G, January 30, 2006.U.S. Geological Survey Aerial Photography, Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page 10 March 2007

13 APPENDIX A Field Operations Inspector s Checklist Note: The terms outlet and outfall are used interchangeably on this form. Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page A.1 March 2007

14 APPENDIX B Top 25 High Priority s Individual Site Reports Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page B.1 March 2007

15 ALF Legend Stream Right-of-Way Location HnB JaC Soil Type 72 AeE Kaelepulu PYF PYD Feet AeE Waimanalo Route 72 Kalanianaole Highway Approx. MP: 1.92 : 48" CMP Erosion Condition: Heavy/Severe : Kaelepulu Soil Type: PYF Route 72 Kalanianaole Hwy R72 MP1.92

16 Legend Stream Kawa Right-of-Way Location JaC Soil Type ALF PYF 65 H-3 AeE H-3 Kawainui PYF KlaB Ph Feet MZ Interstate Route H-3 Approx. MP: : 36" CMP Erosion Condition: Heavy/Severe : Kawainui Soil Type: PYF Interstate Route H RH3 MP13.09

17 Legend Stream EaC Right-of-Way Location JaC Soil Type KlC Kalihi KaB 63 MlA Feet KaeB rrk Route 63 Likelike Highway Approx. MP: 1.65 : 4'x3' Concrete Channel Erosion Condition: Heavy/Severe : Kalihi Soil Type: KaB Route 63 Likelike Hwy R63 MP1.65

18 Legend Stream Right-of-Way Location rsy JaC Soil Type Kaelepulu Kawainui PkB Feet Route61KailuaRoad Approx. MP: 9.9 : 48" RCP Erosion Condition: Heavy/Severe : Kawainui Soil Type: PkB Route61KailuaRd R61 MP9.90

19 Legend Stream Right-of-Way Location JaC Soil Type ALF H-3 Kawainui KlaB QUARRY H-3 rsy KgC Feet ALF Interstate Route H-3 Approx. MP: : 144" Sectional Plate Erosion Condition: Heavy/Severe : Kawainui Soil Type: KlaB Interstate Route H RH3 MP12.19

20 Legend Stream Right-of-Way Location JaC Soil Type KlaB H-3 H-3 ALF Kawainui rsy QUARRY Feet Interstate Route H-3 Approx. MP: 12.4 : 84" CMP (Buried) Erosion Condition: Heavy/Severe : Kawainui Soil Type: KlaB Interstate Route H RH3 MP12.4

21 HLMG Legend Stream Right-of-Way Location JaC Soil Type ALF Kawainui KlaB H-3 H-3 rsy QUARRY Feet KgC Interstate Route H-3 Approx. MP: 12.2 : 36" CMP Erosion Condition: Heavy/Severe : Kawainui Soil Type: KlaB Interstate Route H RH3 MP12.2

22 Legend Stream Right-of-Way LvB Location JaC Soil Type 93 Makaiwa HxA EmB Feet Route 93 Farrington Highway Approx. MP: 0.34 : 2-42" RCP Erosion Condition: Heavy/Severe : Makaiwa Soil Type: HxA Route93FarringtonHwy R93 MP0.34

23 ALF Legend Stream Right-of-Way Location PYE JaC Soil Type ALF Kaelepulu 72 PYF KlaB ALF Feet Route 72 Kalanianaole Highway Approx. MP: 1.16 : 30" CMP Erosion Condition: Heavy/Severe : Kaelepulu Soil Type: PYF Route 72 Kalanianaole Hwy R72 MP1.16

24 Legend Stream Right-of-Way Location JaC Soil Type HLMG HeA Waikele HLMG Feet Route99KamehamehaHighway Approx. MP: : 9'x10' Box Culvert Erosion Condition: Heavy/Severe : Waikele Soil Type: HLMG Route99KamehamehaHwy R99 MP11.81

25 Legend Stream Right-of-WayKyB Location WaB JaC Soil Type KyA Kaukonahua 99 KuD KyA HLMG KuB FL Feet KuB Route 99 Wilikina Drive Approx. MP: 7.7 : 8'x8' Box Culvert Erosion Condition: Heavy/Severe : Kaukonahua Soil Type: HLMG Route99WilikinaDr R99 MP7.70

26 Legend Stream Right-of-Way Location HxA JaC Soil Type H-1 KlA Halawa H-1 rrk HnB LaA Feet Interstate Route H-1 Approx. MP: : 6'x1'-6" CRM Spillway Erosion Condition: Heavy/Severe : Halawa Soil Type: KlA Interstate Route H RH1 MP13.54

27 Legend Stream Right-of-Way Location WzA JaC Soil Type H-1 WzC Aiea H-1 HnB EaB rrk WzB Feet WzA Interstate Route H-1 Approx. MP: : 42" CMP Erosion Condition: Heavy/Severe : Aiea Soil Type: HnB Interstate Route H RH1 MP12.84

28 Legend Stream Right-of-Way Location JaC Soil Type WaA 80 Kaukonahua HLMG W HLMG 99 WaA Feet Route 80 Kamehameha Highway Approx. MP: 0.1 : 66" CMP Erosion Condition: Heavy/Severe : Kaukonahua Soil Type: HLMG Route80KamehamehaHwy R80 MP0.10

29 Legend Stream Right-of-Way Location HLMG JaC Soil Type HLMG W Kaukonahua KyA HLMG Feet MoB Route 99 Wilikina Drive Approx. MP: 8.78 : 36" RCP Erosion Condition: Heavy/Severe : Kaukonahua Soil Type: KyA Route99WilikinaDr R99 MP8.78

30 Legend MuB Stream Right-of-Way Location HLMG JaC Soil Type MuB rrk EaC EaB Waiawa H-2 H-2 EaB KlA EaC WzB WzA Feet Interstate Route H-2 Approx. MP: 0.4 : 14'x3' Concrete Channel Erosion Condition: Heavy/Severe : Waiawa Soil Type: KlA Interstate Route H RH2 MP0.4

31 Legend Stream Right-of-Way Location WaA WaB JaC Soil Type WaC W HLMG HLMG 80 Kaukonahua WaA Feet Route80KamehamehaHighway Approx. MP: 0.56 : 36" RCP Erosion Condition: Heavy/Severe : Kaukonahua Soil Type: HLMG Route80KamehamehaHwy R80 MP0.56

32 Legend Stream Right-of-Way Location HLMG JaC Soil Type H-1 MuB HLMG MuC H-1 rrk Waimalu HnB MuB WzC WzA Feet Ph Interstate Route H-1 Approx. MP: 11.1 : 4'x2' Concrete Spillway Erosion Condition: Heavy/Severe : Waimalu Soil Type: HnB Interstate Route H RH1 MP11.10

33 Legend Stream Right-of-Way Location JaC Soil Type Waikele HLMG H-2 WaA H-2 Waiawa Feet MpD2 Interstate Route H-2 Approx. MP: 2.59 : 36" CMP Erosion Condition: Heavy/Severe : Waiawa Soil Type: HLMG Interstate Route H RH2 MP2.59

34 Legend Stream WaA Right-of-Way Location JaC Soil Type MpD2 Waiawa LaB H-2 H-2 HLMG MpD WaB MuB Feet Interstate Route H-2 Approx. MP: 2.22 : 36" RCP Erosion Condition: Heavy/Severe : Waiawa Soil Type: HLMG Interstate Route H RH2 MP2.22

35 Legend Stream Right-of-Way Location MpB JaC Soil Type WaA H-2 Waiawa H-2 HLMG WaC MpD Feet Interstate Route H-2 Approx. MP: 3.06 : 36" CMP Erosion Condition: Heavy/Severe : Waiawa Soil Type: HLMG Interstate Route H RH2 MP3.06

36 Legend Stream Right-of-Way Location LPE EwC JaC Soil Type LvB HxB LuB Makaiwa 93 LPE Feet Route 93 Farrington Highway Approx. MP: 0.78 : 2-120" CMP Erosion Condition: Heavy/Severe : Makaiwa Soil Type: LvB Route93FarringtonHighway 0100 R93 MP0.78

37 Legend Stream Right-of-Way Location LPE EwC JaC Soil Type LvB HxB LuB Makaiwa 93 LPE Feet Route 93 Farrington Highway Approx. MP: 0.77 : 2-108" CMP Erosion Condition: Heavy/Severe : Makaiwa Soil Type: LvB Route93FarringtonHighway 0101 R93 MP0.77

38 WkA Legend Stream Right-of-Way Location W Poamoho JaC Soil Type HeA Kaukonahua KlA 930 WzA Feet Route 930 Farrington Highway Approx. MP: 6.34 : 17'x5' Box Culvert Erosion Condition: Heavy/Severe : Kaukonahua Soil Type: KlA Route 930 Farrington Highway 0486 R930 MP6.34

39 Legend Stream Right-of-Way Location JaC Soil Type LoB H-3 LoC H-3 HoB Kaneohe LoC LoE LoF Feet LoE Interstate Route H-3 Approx. MP: 9.4 : 60" RCP Erosion Condition: Heavy/Severe : Kaneohe Soil Type: HoB Interstate Route H RH3 MP9.4

40 APPENDIX C Comprehensive Listing of Sites As of October 31, 2006 Draft Islandwide Assessment of Erosion Potential at Storm Drain s On the Island of Oahu Page C.1 March 2007

41 APPENDIX C Site ID Route Mile Erosion Soil Dist. to Stream Water Class Erosion Weather Post Dist. Culvert Factor Condition Condition Factor Name Factor Type Factor Factor Class Factor Value (ft) 211 Interstate Route H Sunny 60" RCP 2 Steady Light Flow Heavy/Severe 5 Waialaenui 1 KlaB A Interstate Route H Overcast No Rain 6'x1'-6" CRM Spillway 2 No Water Heavy/Severe 5 Halawa 3 KlA Estuary Interstate Route H Overcast No Rain 60" CMP 2 No Water Heavy/Severe 5 Kaloi 1 rsy A Interstate Route H Overcast No Rain 96" CMP 2 No Water Heavy/Severe 5 Kaloi 1 EwC A Interstate Route H Overcast No Rain 24" CMP 1 No Water Heavy/Severe 5 Kaloi 1 EwC A Interstate Route H Overcast No Rain 24" CMP 1 No Water Heavy/Severe 5 Kaloi 1 KlbC A Interstate Route H Sunny 72" CMP 2 No Water Heavy/Severe 5 Kaloi 1 rsy A Interstate Route H Overcast No Rain 4'x2' Conc. Spillway 2 Heavy/Severe 5 Waimalu 3 HnB Estuary Interstate Route H Overcast No Rain 42" CMP 2 No Water Heavy/Severe 5 Aiea 3 HnB Estuary Interstate Route H Sunny 2'x1' Conc. Channel 1 No Water Heavy/Severe 5 Honouliuli 2 HLMG Estuary Interstate Route H Sunny 2'x2' Conc. Channel 1 No Water Heavy/Severe 5 Kalauao 3 LaC Estuary Interstate Route H Sunny 24" HDPE 1 No Water Heavy/Severe 5 Kalauao 3 LaC Estuary Interstate Route H Sunny 30" CMP 1 No Water Heavy/Severe 5 Kapakahi 3 MuD Estuary Interstate Route H Overcast No Rain 24" CMP 1 No Water Mild/Moderate 2 Honouliuli 2 EaB Estuary Interstate Route H Overcast No Rain 24" CMP 1 No Water Mild/Moderate 2 Honouliuli 2 HLMG Estuary Interstate Route H Overcast No Rain 48" RCP 2 Standing Water Mild/Moderate 2 Halawa 3 HxA Estuary Interstate Route H Overcast No Rain 54" RCP 2 Standing Water Mild/Moderate 2 Halawa 3 HxA Estuary Interstate Route H Sunny 24" CMP 1 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Sunny 84" CMP 2 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Sunny 24" CMP 1 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Light Rain 48" CMP 2 No Water Mild/Moderate 2 Kaloi 1 WkA A Interstate Route H Overcast No Rain 3'x4' Conc. Channel 2 No Water Mild/Moderate 2 Kaloi 1 EwC A Interstate Route H Overcast No Rain 2-10'x10' Box Culvert 2 No Water Mild/Moderate 2 Kaloi 1 KlB A Interstate Route H Overcast No Rain 8'x2' Ditch 2 No Water Mild/Moderate 2 Kaloi 1 EaB A Interstate Route H Overcast No Rain 24" CMP 1 No Water Mild/Moderate 2 Honouliuli 2 EaB Estuary Interstate Route H Sunny 24" CMP 1 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Sunny 24" CMP 1 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Sunny 42" CMP 2 No Water Mild/Moderate 2 Kaloi 1 rsy A Interstate Route H Overcast No Rain 24" CMP 1 Mild/Moderate 2 Kalauao 3 LaC Estuary Interstate Route H Overcast No Rain 4'x2' Conc. Channel 2 Mild/Moderate 2 Kalauao 3 HnB Estuary Interstate Route H Overcast No Rain 112" CMP 2 Mild/Moderate 2 Kalauao 3 HnB Estuary Interstate Route H Overcast No Rain 24" CMP 1 Mild/Moderate 2 Kalauao 3 HnB Estuary Interstate Route H Overcast No Rain 10'X6' Box Culvert 2 Mild/Moderate 2 Halawa 3 HnB Estuary Interstate Route H Overcast No Rain 66" RCP 2 Mild/Moderate 2 Halawa 3 HnB Estuary Interstate Route H Overcast No Rain 40'x10' Conc. Channel 2 Steady Light Flow Mild/Moderate 2 Aiea 3 HnB Estuary Interstate Route H Sunny 7'x5' Conc. Channel 2 No Water Mild/Moderate 2 Halawa 3 KTKE Estuary Interstate Route H Sunny 6'x4' Swale 2 No Water Mild/Moderate 2 Honouliuli 2 MuB Estuary Interstate Route H Light Rain 36" RCP 2 No Water Mild/Moderate 2 Kaloi 1 EaB A Interstate Route H Overcast No Rain 24" RCP 1 No Water Mild/Moderate 2 Kaloi 1 EaB A Interstate Route H Sunny 18" CMP 1 No Water Mild/Moderate 2 Kaloi 1 EaB A Interstate Route H Sunny 27" CMP 1 No Water Mild/Moderate 2 Kapakahi 3 WzB Estuary Interstate Route H Sunny 24" RCP 1 No Water Mild/Moderate 2 Waimalu 3 MuB Estuary Interstate Route H Overcast No Rain 24" HDPE 1 No Water Mild/Moderate 2 Waikele 3 MuC Estuary Interstate Route H Sunny 36" CMP 2 No Water Mild/Moderate 2 Kapakahi 3 WzB Estuary Interstate Route H Sunny 36" RCP 2 No Water Mild/Moderate 2 Kapakahi 3 WzB Estuary Interstate Route H Sunny 2'x1'-6" Conc. Channel 1 No Water Mild/Moderate 2 Kapakahi 3 MuD Estuary Interstate Route H " CMP 1 Light 1 Waimalu 3 HnB Estuary Interstate Route H Overcast No Rain 42" CMP 2 No Water Light 1 Kaloi 1 rsy A Interstate Route H Sunny 24" CMP 1 No Water Light 1 Waimalu 3 HnB Estuary Interstate Route H Sunny 18" RCP 1 No Water Light 1 Kaloi 1 HxA A Interstate Route H Sunny 24" RCP 1 No Water Light 1 Kaloi 1 KlA A Interstate Route H Sunny 108" CMP 2 No Water Light 1 Kaloi 1 KlaB A Interstate Route H Sunny 24" HDPE 1 No Water Light 1 Kaloi 1 KlaB A Interstate Route H Sunny 24" CMP 1 No Water Light 1 Kaloi 1 rsy A Interstate Route H Sunny 24" CMP 1 No Water Light 1 Manoa-Palolo 1 KlA AA Interstate Route H Sunny 24" CMP 1 No Water Light 1 Manoa-Palolo 1 MlA AA Interstate Route H Sunny 24" CMP 1 No Water Light 1 Manoa-Palolo 1 KlA AA Interstate Route H Sunny 24" RCP 1 Standing Water Light 1 Halawa 3 MdB Estuary Interstate Route H Sunny 24" CMP 1 No Water Light 1 Honouliuli 2 HLMG Estuary Interstate Route H Sunny 24" HDPE 1 No Water Light 1 Waimalu 3 HnB Estuary Interstate Route H Sunny 24" HDPE 1 No Water Light 1 Waimalu 3 rrk Estuary Interstate Route H Sunny 24" HDPE 1 No Water Light 1 Waimalu 3 HnB Estuary Page C.2 of C.20

42 APPENDIX C Site ID Route Mile Erosion Soil Dist. to Stream Water Class Erosion Weather Post Dist. Culvert Factor Condition Condition Factor Name Factor Type Factor Factor Class Factor Value (ft) 1205 Interstate Route H Sunny 24" CMP 1 No Water Light 1 Waikele 3 MuB Estuary Interstate Route H Sunny 30" CMP 1 No Water Light 1 Waikele 3 MuC Estuary Interstate Route H Sunny 36" HDPE 2 No Water Light 1 Waikele 3 MuC Estuary Interstate Route H Sunny 30" RCP 1 No Water Light 1 Kaloi 1 HxA A Interstate Route H Sunny 4'x2' Box Culvert 2 No Water Light 1 Kaloi 1 EaB A Interstate Route H Sunny 36" RCP 2 No Water Light 1 Kaloi 1 EaB A Interstate Route H Sunny 24" RCP 1 No Water Light 1 Kapakahi 3 WzB Estuary Interstate Route H Sunny 24" RCP 1 No Water Light 1 Waimalu 3 MuB Estuary Interstate Route H Sunny 2'x1' Conc. Channel 1 No Water Light 1 Kapakahi 3 WzB Estuary Interstate Route H " Sectional Plate 2 None 0 Waimalu 3 HnB Estuary Interstate Route H " CMP 1 None 0 Kalauao 3 LaC Estuary Interstate Route H Sunny 42" RCP 2 No Water None 0 Makiki 1 MkA AA Interstate Route H Sunny 7'x4' Box Culvert 2 Steady Light Flow None 0 Manoa-Palolo 1 KlA AA Interstate Route H Sunny 8'x4' Box Culvert 2 Standing Water None 0 Waialaenui 1 EwC A Interstate Route H Sunny 36" RCP 2 Steady Light Flow None 0 Nuuanu 3 KaB A Interstate Route H Sunny 10'-8"x4' Box Culvert 2 Steady Light Flow None 0 Nuuanu 3 KaB A Interstate Route H Sunny 36" CMP 2 No Water None 0 Aiea 3 WzC Estuary Interstate Route H Sunny 120" CMP 2 No Water None 0 Aiea 3 WzC Estuary Interstate Route H Overcast No Rain 2-84" CMP 2 Steady Light Flow None 0 Kapakahi 3 WzA Estuary Interstate Route H Overcast No Rain 2-48" CMP 2 Steady Light Flow None 0 Kapakahi 3 WzA Estuary Interstate Route H Overcast No Rain 7'x4' Box Culvert 2 Steady Light Flow None 0 Kapalama 2 HnA A Interstate Route H Overcast No Rain 6'x4' Box Culvert 2 Steady Mild Flow None 0 Kapalama 2 HnA A Interstate Route H Light Rain 36" RCP 2 Steady Light Flow None 0 Halawa 3 KlA Estuary Interstate Route H Heavy Rain 24" RCP 1 No Water None 0 Halawa 3 KlA Estuary Interstate Route H Heavy Rain 6'x1'-6" Conc. Channel 2 Standing Water None 0 Halawa 3 KlA Estuary Interstate Route H Sunny 36" CMP 2 Heavy Flow None 0 Waikele 3 HeA Estuary Interstate Route H Sunny 36" CMP 2 Heavy Flow None 0 Waikele 3 HeA Estuary Interstate Route H Sunny 30" CMP 1 Heavy Flow None 0 Waikele 3 HeA Estuary Interstate Route H Sunny 6'x3' Box Culvert 2 No Water None 0 Kaloi 1 EaB A Interstate Route H Sunny 120" CMP 2 No Water None 0 Kaloi 1 rsy A Interstate Route H Sunny 54" RCP 2 Steady Mild Flow None 0 Waimalu 3 Ph Estuary Interstate Route H Sunny 30" RCP 1 Steady Light Flow None 0 Kaloi 1 HxA A Interstate Route H Sunny 48" RCP 2 Steady Light Flow None 0 Kaloi 1 HxA A Interstate Route H Sunny 24" RCP 1 No Water None 0 Kaloi 1 EaB A Interstate Route H Sunny 24" RCP 1 Steady Light Flow None 0 Kaloi 1 MnC A Interstate Route H Sunny 8'x3' Box Culvert 2 No Water None 0 Kaloi 1 EaB A Interstate Route H Sunny 24" RCP 1 No Water None 0 Kaloi 1 WlB A Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kaloi 1 KlaB A Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kaloi 1 MuD A Interstate Route H Sunny 30'x10' Box Culvert 2 Steady Light Flow None 0 Kaloi 1 KlaB A Interstate Route H Overcast No Rain 24" CMP 1 None 0 Waimalu 3 HLMG Estuary Interstate Route H Overcast No Rain 24" CMP 1 None 0 Waimalu 3 HnB Estuary Interstate Route H Overcast No Rain 108" CMP 2 None 0 Halawa 3 MdB Estuary Interstate Route H Sunny 30" CMP 1 No Water None 0 Kalihi 3 MlA A Interstate Route H Sunny 42" CMP 2 Steady Light Flow None 0 Kalihi 3 MlA A Interstate Route H Sunny 24" CMP 1 No Water None 0 Kalihi 3 MlA A Interstate Route H Sunny 24" CMP 1 No Water None 0 Kapalama 2 HnA A Interstate Route H Sunny 27" CMP 1 No Water None 0 Kapalama 2 HnA A Interstate Route H Sunny 18" CMP 1 No Water None 0 Kapalama 2 HnA A Interstate Route H Sunny 30" CMP 1 No Water None 0 Kapalama 2 HnA A Interstate Route H Sunny 42" RCP 2 No Water None 0 Ala Wai 4 MkA A Interstate Route H Sunny 8'x3' Box Culvert 2 Steady Mild Flow None 0 Ala Wai 4 MkA A Interstate Route H Sunny 12" RCP 1 No Water None 0 Waimalu 3 Ph Estuary Interstate Route H Sunny 12" RCP 1 No Water None 0 Waimalu 3 Ph Estuary Interstate Route H Sunny 24" RCP 1 No Water None 0 Waimalu 3 Ph Estuary Interstate Route H Overcast No Rain 30" CMP 1 No Water None 0 Aiea 3 HnB Estuary Interstate Route H Overcast No Rain 30" CMP 1 No Water None 0 Aiea 3 HnB Estuary Interstate Route H Sunny 6'x2' Conc. Channel 2 No Water None 0 Honouliuli 2 HLMG Estuary Interstate Route H Sunny 30" CMP 1 No Water None 0 Honouliuli 2 KyA Estuary Interstate Route H Overcast No Rain 48" RCP 2 Steady Light Flow None 0 Kapalama 2 HnA A Interstate Route H Sunny 1 No Water None 0 Kaloi 1 WkA A Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kaloi 1 KlaB A Page C.3 of C.20

43 APPENDIX C Site ID Route Mile Erosion Soil Dist. to Stream Water Class Erosion Weather Post Dist. Culvert Factor Condition Condition Factor Name Factor Type Factor Factor Class Factor Value (ft) 955 Interstate Route H Sunny 4'x3' CRM Channel 2 No Water None 0 Kaloi 1 KlaB A Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kaloi 1 KlaB A Interstate Route H Sunny 4'x3' CRM Channel 2 No Water None 0 Kaloi 1 KlaB A Interstate Route H Sunny 2-7'x7' Box Culvert 2 Standing Water None 0 Manuwai 1 MnC A Interstate Route H Sunny 8'x5' Box Culvert 2 Steady Light Flow None 0 Ala Wai 4 MkA A Interstate Route H Sunny 54" CMP 2 Steady Light Flow None 0 Ala Wai 4 MkA A Interstate Route H Sunny 24" CMP 1 No Water None 0 Halawa 3 MdB Estuary Interstate Route H Sunny 1 No Water None 0 Halawa 3 MdB Estuary Interstate Route H Sunny 102" CMP 2 No Water None 0 Halawa 3 rrk Estuary Interstate Route H Sunny 2'x2' Conc. Channel 1 Steady Mild Flow None 0 Kalauao 3 LaC Estuary Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kalauao 3 LaC Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Honouliuli 2 HLMG Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Honouliuli 2 HLMG Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Waimalu 3 MuB Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Waimalu 3 MuB Estuary Interstate Route H Sunny 24" HDPE 1 No Water None 0 Waimalu 3 HnB Estuary Interstate Route H Sunny 9'x6'-6" Box Culvert 2 Steady Light Flow None 0 Waimalu 3 MuC Estuary Interstate Route H Sunny 24" RCP 1 No Water None 0 Waimalu 3 MuC Estuary Interstate Route H Overcast No Rain 18" CMP 1 Standing Water None 0 Kaloi 1 EaB A Interstate Route H Overcast No Rain 48" CMP 2 No Water None 0 Waiawa 3 WzB Estuary Interstate Route H Sunny 21" RCP 1 No Water None 0 Kaloi 1 EaB A Interstate Route H Sunny 4'x2' Box Culvert 2 No Water None 0 Kaloi 1 EaB A Interstate Route H Sunny 24" RCP 1 No Water None 0 Kaloi 1 MuB A Interstate Route H Sunny 24" RCP 1 No Water None 0 Kaloi 1 MuB A Interstate Route H Sunny 24" HDPE 1 No Water None 0 Kaloi 1 KlaB A Interstate Route H Sunny 8'x4' Box Culvert 2 No Water None 0 Kaloi 1 EwA A Interstate Route H Sunny 4'x2' Box Culvert 2 No Water None 0 Kaloi 1 HxA A Interstate Route H Sunny 30" RCP 1 No Water None 0 Kaloi 1 HxA A Interstate Route H Overcast No Rain 27" RCP 1 No Water None 0 Waikele 3 MuC Estuary Interstate Route H Sunny 24" RCP 1 No Water None 0 Waimalu 3 MuC Estuary Interstate Route H Light Rain 72" SRMP 2 No Water None 0 Waikele 3 MuC Estuary Interstate Route H Overcast No Rain 3-168" SRMP 2 No Water None 0 Waikele 3 MuC Estuary Interstate Route H Overcast No Rain 24" HDPE 1 No Water None 0 Waikele 3 MuC Estuary Interstate Route H Sunny 5'x5' Conc. Channel 2 Steady Light Flow None 0 Halawa 3 MdB Estuary Interstate Route H Sunny 36" CMP 2 Standing Water None 0 Halawa 3 KlA Estuary Interstate Route H Overcast No Rain 30" RCP 1 Steady Light Flow None 0 Manuwai 1 MdB A Interstate Route H Overcast No Rain 42" CMP 2 No Water None 0 Manuwai 1 MdB A Interstate Route H Overcast No Rain 27" CMP 1 No Water None 0 Manuwai 1 MdB A Interstate Route H Overcast No Rain 24" CMP 1 No Water None 0 Manuwai 1 MdB A Interstate Route H Sunny 60" RCP 2 No Water None 0 Waikele 3 MuC Estuary Interstate Route H Sunny 7'x1'-6" Conc. Channel 2 No Water None 0 Kapakahi 3 WzB Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Kapakahi 3 WzB Estuary Interstate Route H Sunny 10'x6' Conc. Channel 2 Steady Light Flow None 0 Kapakahi 3 WzB Estuary Interstate Route H Sunny 48" CMP 2 Steady Light Flow None 0 Kapakahi 3 WzB Estuary Interstate Route H " Pipe 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H " CMP 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H " RCP 2 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Overcast No Rain 36" CMP 2 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Sunny 2'x2' Conc. Spillway 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Sunny 24" CMP 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Heavy Rain 24" CMP 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Heavy Rain 36" CMP 2 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Heavy Rain 24" CMP 1 Heavy/Severe 5 Waiawa 3 HLMG Estuary Interstate Route H Sunny 14'x3' Conc. Channel 2 No Water Heavy/Severe 5 Waiawa 3 KlA Estuary Interstate Route H Sunny 30" CMP 1 No Water Heavy/Severe 5 Waiawa 3 KlA Estuary Interstate Route H " CMP 2 Mild/Moderate 2 Waiawa 3 HLMG Estuary Interstate Route H Wet But Not Raining 3-60" CMP 2 No Water Mild/Moderate 2 Waiawa 3 MuB Estuary Interstate Route H Wet But Not Raining 30" RCP 1 No Water Mild/Moderate 2 Kaukonahua 3 HLMG A Interstate Route H Overcast No Rain 24" CMP 1 No Water Mild/Moderate 2 Waiawa 3 HLMG Estuary Interstate Route H Overcast No Rain 24" CMP 1 No Water Mild/Moderate 2 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 2'x2' Conc. Channel 1 No Water Mild/Moderate 2 Waikele 3 HLMG Estuary Interstate Route H Light Rain 30" CMP 1 Standing Water Mild/Moderate 2 Waiawa 3 WaB Estuary Page C.4 of C.20

44 APPENDIX C Site ID Route Mile Erosion Soil Dist. to Stream Water Class Erosion Weather Post Dist. Culvert Factor Condition Condition Factor Name Factor Type Factor Factor Class Factor Value (ft) 570 Interstate Route H Overcast No Rain 36" RCP 2 No Water Mild/Moderate 2 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 24" CMP 1 Mild/Moderate 2 Waiawa 3 WaC Estuary Interstate Route H Overcast No Rain 2'x1' Conc. Spillway 1 Mild/Moderate 2 Waiawa 3 WaA Estuary Interstate Route H Overcast No Rain 36" CMP 2 Mild/Moderate 2 Waiawa 3 HLMG Estuary Interstate Route H Light Rain 24" CMP 1 no flow Mild/Moderate 2 Waiawa 3 MpB Estuary Interstate Route H Sunny 2-42" CMP 2 No Water Mild/Moderate 2 Waiawa 3 EaB Estuary Interstate Route H Sunny 24" CMP 1 No Water Mild/Moderate 2 Waiawa 3 EaB Estuary Interstate Route H Sunny 48" CMP 2 No Water Mild/Moderate 2 Waiawa 3 KlA Estuary Interstate Route H Light Rain 30" RCP 1 No Water Light 1 Kaukonahua 3 HLMG A Interstate Route H Heavy Rain 24" CMP 1 Light 1 Waiawa 3 MpB Estuary Interstate Route H Sunny 60" CMP 2 Light 1 Waiawa 3 rrk Estuary Interstate Route H " Pipe 2 None 0 Waiawa 3 HLMG Estuary Interstate Route H " Pipe 1 None 0 Waiawa 3 HLMG Estuary Interstate Route H " CMP 2 None 0 Waikele 3 HLMG Estuary Interstate Route H Wet But Not Raining 24" CMP 1 Standing Water None 0 Waikele 3 WaA Estuary Interstate Route H Wet But Not Raining 3'x3' Conc. Channel 2 Steady Light Flow None 0 Waikele 3 WaA Estuary Interstate Route H Wet But Not Raining 24" RCP 1 No Water None 0 Waikele 3 WaA Estuary Interstate Route H Overcast No Rain 24" CMP 1 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 24" RCP 1 No Water None 0 Waikele 3 WaA Estuary Interstate Route H Overcast No Rain 36" CMP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 30" CMP 1 No Water None 0 Waikele 3 WaB Estuary Interstate Route H Overcast No Rain 7'x1'-6" Conc. Channel 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 9'x2'-6" Conc. Channel 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 36" RCP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 140" CMP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 24" RCP 1 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 36" RCP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 36" CMP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 48" CMP 2 No Water None 0 Waikele 3 HLMG Estuary Interstate Route H Overcast No Rain 8'x2' Conc. Spillway 2 None 0 Waiawa 3 WaA Estuary Interstate Route H Overcast No Rain 24" CMP 1 None 0 Waiawa 3 WaA Estuary Interstate Route H Overcast No Rain 24" CMP 1 None 0 Waiawa 3 HLMG Estuary Interstate Route H Sunny 24" CMP 1 None 0 Waiawa 3 MuB Estuary Interstate Route H Sunny 24" CMP 1 None 0 Waiawa 3 MuB Estuary Interstate Route H Sunny 7' Wide Conc. Gutter 2 None 0 Waiawa 3 MpD Estuary Interstate Route H Sunny 30" CMP 1 No Water None 0 Waikele 3 WaA Estuary Interstate Route H Sunny 24" RCP 1 No Water None 0 Waikele 3 WaA Estuary Interstate Route H Sunny 54" CMP 2 No Water None 0 Waiawa 3 WzB Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Waiawa 3 WzB Estuary Interstate Route H Sunny 24" CMP 1 No Water None 0 Waiawa 3 KlA Estuary Interstate Route H Sunny 24" RCP 1 No Water None 0 Waiawa 3 KlA Estuary Interstate Route H Wet But Not Raining 42" RCP 2 Standing Water Heavy/Severe 5 Kaneohe 3 LoF Reserve Interstate Route H Wet But Not Raining 60" RCP 2 Standing Water Heavy/Severe 5 Kaneohe 3 HoB Reserve Interstate Route H Wet But Not Raining 30" CMP 1 Standing Water Heavy/Severe 5 Kaneohe 3 HoB Reserve Interstate Route H Sunny 72" RCP 2 No Water Heavy/Severe 5 Kaneohe 3 LoD AA Interstate Route H Sunny 36" CMP 2 No Water Heavy/Severe 5 Kawainui 4 KlaB A Interstate Route H Sunny 84" CMP (Buried) 2 No Water Heavy/Severe 5 Kawainui 4 KlaB A Interstate Route H Sunny 4'x2' Conc. Spillway 2 No Water Heavy/Severe 5 Puu Hawaiiloa 1 rsy AA Interstate Route H Sunny 36" CMP 2 No Water Heavy/Severe 5 Kawainui 4 PYF A Interstate Route H Sunny 42" CMP 2 No Water Heavy/Severe 5 Puu Hawaiiloa 1 KtC AA Interstate Route H Sunny 24" CMP 1 Standing Water Heavy/Severe 5 Kawainui 4 KlaB A Interstate Route H Overcast No Rain 24" CMP 1 No Water Heavy/Severe 5 Kawainui 4 KlaB A Interstate Route H Sunny 24" CMP 1 No Water Heavy/Severe 5 Puu Hawaiiloa 1 PYE AA Interstate Route H Sunny 2'x2' Swale 1 No Water Heavy/Severe 5 Puu Hawaiiloa 1 ALF AA Interstate Route H Sunny 144" Sectional Plate 2 Steady Light Flow Heavy/Severe 5 Kawainui 4 KlaB A Interstate Route H Overcast No Rain 24" CMP 1 No Water Heavy/Severe 5 Puu Hawaiiloa 1 KtC AA Interstate Route H Overcast No Rain 7'x2'-6" Swale 2 No Water Heavy/Severe 5 Puu Hawaiiloa 1 KtC AA Interstate Route H Overcast No Rain 36" CMP 2 No Water Heavy/Severe 5 Puu Hawaiiloa 1 KlaB AA Interstate Route H Overcast No Rain 30" RCP 1 No Water Heavy/Severe 5 Kaneohe 3 LoE Reserve Interstate Route H Wet But Not Raining 9'x8' Box Culvert 2 No Water Mild/Moderate 2 Kaneohe 3 HnB Reserve Interstate Route H Wet But Not Raining 84" CMP 2 Standing Water Mild/Moderate 2 Kaneohe 3 LoF Reserve Interstate Route H Wet But Not Raining 60" CMP 2 No Water Mild/Moderate 2 Kaneohe 3 LoE Reserve Page C.5 of C.20

CITY AND COUNTY OF HONOLULU, HAWAII

CITY AND COUNTY OF HONOLULU, HAWAII VOLUME 2 OF 4 CITY AND COUNTY OF HONOLULU, HAWAII Community Name CITY AND COUNTY OF HONOLULU Community Number 150001 City and County of Honolulu REVISED November 5, 2014 Federal Emergency Management Agency

More information

Custom Soil Resource Report for Forrest County, Mississippi

Custom Soil Resource Report for Forrest County, Mississippi United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey 475910 476000 476090 476180 476270 476360 105 16' 21'' W 476450 476540 476630 476720 476810 4453350 4453440 4453260 4453350 4453170 4453260 4453080 4453170 4453080 475820 475910 4452990 476000 476090 476180

More information

Soil Map Polk County, Florida

Soil Map Polk County, Florida Soil Map Polk County, Florida 28 9' 21'' 28 8' 23'' 3113000 3113200 3113400 3113600 3113800 3114000 3114200 3114400 3114600 81 51' 19'' 81 51' 19'' 416000 416000 ± 416200 416200 68 416400 68 416400 7 13

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Department of Education WSF Allocation Summary for FY10-11 OFFICIAL ENROLLMENT based on FINAL Appropriation and OFFICIAL Enrollment

Department of Education WSF Allocation Summary for FY10-11 OFFICIAL ENROLLMENT based on FINAL Appropriation and OFFICIAL Enrollment WSF Allocation Summary for FY0- OFFICIAL ENROLLMENT () (2) (3) (4) (5) (6) (7) (8) (9) (0) FY 0- WSF Calculation based on Official Enrollment FY0- FY 0- WSF OEC ALLOC 0 06 FARRINGTON HIGH H 9,80,534 0

More information

Appendix 2b. NRCS Soil Survey

Appendix 2b. NRCS Soil Survey Appendix 2b NRCS Soil Survey 118 19' 25'' W Nonirrigated Capability Class Antelope Valley Area, California (Del Sur Solar Site) 118 17' 28'' W 378900 379200 379500 379800 380100 380400 380700 381000 381300

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 121 52' 18'' W Irrigated Capability Class Sutter County, California () 121 51' 49'' W 597600 597700 597800 597900 598000 598100 598200 39 6' 27'' N 39 6' 27'' N 39 5' 57'' N 4328400 4328500 4328600 4328700

More information

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007 KANSAS GEOLOGICAL SURVEY Open File Report 2007-22 LAND SUBSIDENCE KIOWA COUNTY, KANSAS Prepared by Michael T. Dealy L.G., Manager, Wichita Operations SITE LOCATION The site was approximately four miles

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 122 14' 27'' W () 122 13' 37'' W 40 8' 40'' N 564700 564800 564900 565000 565100 565200 565300 565400 565500 565600 565700 565800 40 8' 40'' N 4443400 4443500 4443600 4443700 4443800 4443900 4444000 4443400

More information

Custom Soil Resource Report for Victoria County, Texas

Custom Soil Resource Report for Victoria County, Texas United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA. Presented By:

Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA. Presented By: Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA Presented By: Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA Location: This property is located at 5663 Dally Road

More information

2012 Rainfall, Runoff, Water Level & Temperature Beebe Lake Wright County, MN (# )

2012 Rainfall, Runoff, Water Level & Temperature Beebe Lake Wright County, MN (# ) www.fixmylake.com 18029 83 rd Avenue North Maple Grove, MN 55311 mail@freshwatersci.com (651) 336-8696 2012 Rainfall, Runoff, Water Level & Temperature Beebe Lake Wright County, MN (#86-0023) Prepared

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

BUNCOMBE COUNTY NORTH CAROLINA

BUNCOMBE COUNTY NORTH CAROLINA PROJECT SITE ² 0 0. 75 1. 5 LOCATION MAP MARCH 2018 2. 25 3 Mil es AID: PROJECT # 2018-01122 18.05301 Sheet 1 of 7 Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri

More information

Huron Creek Watershed 2005 Land Use Map

Huron Creek Watershed 2005 Land Use Map Huron Creek Watershed 2005 Land Use Map Created By: Linda Kersten, 12/20/06 Created For: MTU Introduction to GIS Class (FW 5550) The Huron Creek Watershed Advisory Committee Michigan Technological University,

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Appendix D. Sediment Texture and Other Soil Data

Appendix D. Sediment Texture and Other Soil Data 5 6 7 8 Appendix D. Sediment Texture and Other Soil Data This appendix describes the sediment texture of the aquifer system in the Restoration Area. The contents of this appendix describe the: Importance

More information

Producing Chandler Walnut Orchard

Producing Chandler Walnut Orchard AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Producing Chandler Walnut Orchard West Sacramento Avenue - Chico, CA AG-LAND INVESTMENT BROKERS 275 Sale Lane

More information

Date of Report: EPA agreement number: Center Name and Institution of Ctr. Director: Identifier used by Center for Project: Title of Project:

Date of Report: EPA agreement number: Center Name and Institution of Ctr. Director: Identifier used by Center for Project: Title of Project: Date of Report: March 31, 2003 EPA agreement number: R829515C003 Center Name and Institution of Ctr. Director: Rocky Mountain Regional Hazardous Substance Research Center, Colorado State University, Fort

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Potential Restorable Wetlands (PRWs):

Potential Restorable Wetlands (PRWs): ASWM Webinar Sept. 17, 2014 Potential Restorable Wetlands (PRWs): Working definition: wetland hydrology and soils minus presently mapped wetlands for the re-establishment of wetlands Hydric Soil Query

More information

TOTAL SPED K-12 PRE-K SPED K

TOTAL SPED K-12 PRE-K SPED K 3 Department of Education SY201-2018 Summary of PROJECTED Demographics for WSF Financial Plan Calculation A B D EF G K O P S X Y ZA AB AF AJ AK AN AS AT AU AA AX AY AZ BA BB BC BB BG BH BI BJ BK B 201-18

More information

Hydric Rating by Map Unit Harrison County, Mississippi. Web Soil Survey National Cooperative Soil Survey

Hydric Rating by Map Unit Harrison County, Mississippi. Web Soil Survey National Cooperative Soil Survey 89 9' 7'' W 89 8' 38'' W 30 34' 13'' N 30 33' 57'' N 3383480 3383560 3383640 3383720 3383800 3383880 3383960 293640 293720 293800 293880 293960 294040 294120 294200 294280 294360 3383480 3383560 3383640

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

SCHOOL YEAR OFFICAL

SCHOOL YEAR OFFICAL 8 9 10 11 12 13 1 1 1 1 18 19 20 21 22 23 2 2 2 2 28 29 30 31 32 33 3 3 3 3 38 39 0 1 2 3 8 9 0 1 2 3 8 9 0 1 2 3 A B D EF G K O P S X Y ZA AB AF AJ AK AN AS AT AU AA AX AY AZ BA BB BC BB BG BH BI BJ BK

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May

More information

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr. May 22, 2008 Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR 72032 RE: Royal Oaks Vista Subdivision Site AFIN: 12-00272 NPDES Permit No.: ARR150472 Dear Mr. Tyler: On March 26, 2008, I performed

More information

SCHOOL YEAR OFFICAL

SCHOOL YEAR OFFICAL 8 9 10 11 12 13 1 1 1 1 18 19 20 21 22 23 2 2 2 2 28 29 30 31 32 33 3 3 3 3 38 39 0 1 2 3 8 9 0 1 2 3 8 9 0 1 2 3 A B D EF G K O P S X Y ZA AB AF AJ AK AN AS AT AU AA AX AY AZ BA BB BC BB BG BH BI BJ BK

More information

Hydric Rating by Map Unit Harrison County, Mississippi

Hydric Rating by Map Unit Harrison County, Mississippi 89 6' 12'' W 89 5' 54'' W 30 28' 47'' N 30 28' 26'' N 3373210 3373290 3373370 3373450 3373530 3373610 3373690 3373770 3373850 298080 298160 298240 298320 298400 298480 298560 30 28' 47'' N Soil Map may

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Watershed concepts for community environmental planning

Watershed concepts for community environmental planning Purpose and Objectives Watershed concepts for community environmental planning Dale Bruns, Wilkes University USDA Rural GIS Consortium May 2007 Provide background on basic concepts in watershed, stream,

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 252500 252600 252700 252800 252900 253000 253100 83 47' 15'' W 83 47' 49'' W Nonirrigated Capability Class Jackson and Owsley Counties, Kentucky (Peggy Wilson Booneville Property - ) 253200 253300 37 25'

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona Item Type Reports (Electronic) Authors Deveney, Matthew R. Publisher The University of Arizona. Rights Copyright is held

More information

Hydric Rating by Map Unit Ocean County, New Jersey (Larsen & N New Prospect Jackson Twp., NJ)

Hydric Rating by Map Unit Ocean County, New Jersey (Larsen & N New Prospect Jackson Twp., NJ) 74 16' 14'' W Hydric Rating by Map Unit Ocean County, New Jersey ( ) 74 15' 50'' W 40 9' 17'' N 40 8' 53'' N 4444460 4444550 4444640 4444730 4444820 4444910 4445000 4445090 4445180 562120 562210 562300

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Little Swan Lake Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Agenda Little Swan Lake Dam Inspection Theoretical Little Swan Lake Siltation Rate Calculations

More information

Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57''

Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57'' Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57'' 3370400 3370500 3370600 3370700 3370800 3370900 3371000 3371100 3371200 89 2' 40'' 89 2' 41'' 303700 303700 303800 303800

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Soil Taxonomy Classification Jackson County, Florida (Chipola River) Web Soil Survey National Cooperative Soil Survey

Soil Taxonomy Classification Jackson County, Florida (Chipola River) Web Soil Survey National Cooperative Soil Survey 85 10' 20'' W Soil Taxonomy Classification Jackson County, Florida () 85 9' 8'' W 30 37' 42'' N 30 37' 42'' N 30 37' 2'' N 30 37' 2'' N 85 10' 20'' W N Map Scale: 1:8,740 if printed on A landscape (11"

More information

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Introduction Abstract: The use of ArcMap to calculate soil areas for storm water

More information

Soil Taxonomy Classification Washington County, Florida (Pine Log 631A)

Soil Taxonomy Classification Washington County, Florida (Pine Log 631A) 85 54' 36'' W Soil Taxonomy Classification Washington County, Florida () 85 53' 22'' W 30 25' 42'' N 30 25' 42'' N 30 24' 17'' N 30 24' 17'' N 85 54' 36'' W N Map Scale: 1:12,700 if printed on A portrait

More information

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway

More information

² 2015 Program Year. Farm Tract McLeod County, Minnesota 1:4, NHEL NHEL

² 2015 Program Year. Farm Tract McLeod County, Minnesota 1:4, NHEL NHEL United States Department of Agriculture McLeod County, Minnesota Farm 5125 #* 2 3.65 NHEL Tract 2762 1 33.19 NHEL ² 2015 Program Year Map Created November 06, 2014 Common Land Unit Cropland Non-cropland

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

HAWAII REGIONAL SEDIMENT MANAGEMENT

HAWAII REGIONAL SEDIMENT MANAGEMENT HAWAII REGIONAL SEDIMENT MANAGEMENT KAUAI Workshop January 20, 2011 Kauai Veteran s Center Kihei, HI of Engineers, Honolulu District AGENDA 1300-1310 Welcome and Introductions Conger Conant 1310-1330 Regional

More information

Custom Soil Resource Report Soil Map

Custom Soil Resource Report Soil Map 121 3' 56'' W Custom Soil Resource Report Soil Map 121 2' 49'' W 45 16' 39'' N 5013800 5014000 5014200 5014400 5014600 5014800 5015000 5015200 5015400 5015600 651800 652000 652200 652400 652600 652800

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Exhibit RMP-4. Foote Creek Geology and Topography

Exhibit RMP-4. Foote Creek Geology and Topography Exhibit RMP-4 Foote Creek Geology and Topography Memorandum To: From: CC: Travis Brown, PacifiCorp Daria Drago, P.E., PMP Dr. Deb Luchsinger Date: January 9, 2019 Re: Foote Creek Rim 1 - Geologic Conditions

More information

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation

More information

RANCHO de DOS PALMAS DAVIS, California, AC +/-

RANCHO de DOS PALMAS DAVIS, California, AC +/- RANCHO de DOS PALMAS DAVIS, California, 507.28 AC +/- Boundary Transmission Line Pond / Tank Well SCOTT STONE P: (530) 662-4094 sastone57@gmail.com 37874 County Road 28, Woodland, Ca. 95695 The information

More information

Department of Education SY12-13 Summary of PROJECTED Demographics for WSF Financial Plan Calculation

Department of Education SY12-13 Summary of PROJECTED Demographics for WSF Financial Plan Calculation A B D EF G K O P S X Y ZA AB AF AJ AK AN AS AT AU AA AX AY AZ BA BB BC BB BG BH BI BJ BK B 2012-13 YEAR PROJECTED ENROLLMENT COUNTS (1) (2) () () (11) (1) (1) (19) (2) (2) (28) (32) (3) (3) (0) () () ()

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

Illinois State Water Survey Division

Illinois State Water Survey Division Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Department of Education SY08-09 Summary of Demographics for WSF

Department of Education SY08-09 Summary of Demographics for WSF 6 7 8 9 0 2 6 7 8 9 20 2 22 2 2 2 26 27 28 29 0 2 6 7 8 9 0 2 6 7 8 9 0 2 6 7 8 9 60 6 62 6 A B C D H S T UV Z AA AB AC AA AF AG AH AI AJ AK AA AO AP AQ AR AS AA 2008-09 YEAR PROJECTED MENT COUNTS GEN

More information

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West

More information

Department of Education SY09-10 Summary of PROJECTED Demographics for WSF Financial Plan Calculation

Department of Education SY09-10 Summary of PROJECTED Demographics for WSF Financial Plan Calculation Department of Education 3 A B C DE F G K O P S X Y ZA AB AC AG AK AL AO AT AU AV AA AY AZ BA BB BC BD BB BH BI BJ BK BL B 2009-10 YEAR OFFICIAL ENROLLMENT COUNTS GEN ED ENROLL * SPED ENROLL ENROLLMENT

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Classification of Erosion Susceptibility

Classification of Erosion Susceptibility GEO327G: GIS & GPS Applications in Earth Sciences Classification of Erosion Susceptibility Denali National Park, Alaska Zehao Xue 12 3 2015 2 TABLE OF CONTENTS 1 Abstract... 3 2 Introduction... 3 2.1 Universal

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Carrick Road $798,000

Carrick Road $798,000 1955-2020 Carrick Road 165.76± acres Fayette/Scott Counties $798,000 Offered Exclusively By: Zach Davis Principal Broker +1.859.576.8195 www.kirkfarms.com zach@kirkfarms.com Measuring an appx. 165+/- acres,

More information

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Oslo Symposium, August 1992). IAHS Publ. no. 210, 1992. 269 Monitoring of suspended sediment concentration in discharge

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

Department of Education SY08-09 Summary of Demographics for WSF

Department of Education SY08-09 Summary of Demographics for WSF 8 9 10 11 12 1 1 1 1 1 18 19 20 21 22 2 2 2 2 2 28 29 0 1 2 8 9 0 1 2 8 9 0 1 2 8 9 0 1 2 A B C DE F G K O P S X Y ZA AB AC AG AK AL AO AT AU AV AA AY AZ BA BB BC BD BB BH BI BJ BK BL BB BW BX BY BZ 2008-09

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

A More Comprehensive Vulnerability Assessment: Flood Damage in Virginia Beach

A More Comprehensive Vulnerability Assessment: Flood Damage in Virginia Beach A More Comprehensive Vulnerability Assessment: Flood Damage in Virginia Beach By Raj Shah GIS in Water Resources Fall 2017 Introduction One of the most obvious effects of flooding events is death. Humans

More information

On-Site Soils Investigation. Buttermilk Way Storm water Treatment Project Buzzards Bay. MA. February 28 th, 2012

On-Site Soils Investigation. Buttermilk Way Storm water Treatment Project Buzzards Bay. MA. February 28 th, 2012 1 On-Site Soils Investigation Buttermilk Way Storm water Treatment Project Buzzards Bay. MA February 28 th, 2012 Glenn Stanisewski, Resource Soil Scientist, USDA-NRCS, West Wareham, MA Introduction: The

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

Earth Science Chapter 9. Day 6 - Finish Capillary Action Lab - Quiz over Notes - Review Worksheets over Sections 9.2 and 9.3

Earth Science Chapter 9. Day 6 - Finish Capillary Action Lab - Quiz over Notes - Review Worksheets over Sections 9.2 and 9.3 Earth Science Chapter 9 Day 1 Day 2 Day 3 Read Section 9.1 Surface Water Chapter 9 Term Sheet Notes over Section 9.1 Surface Water Section 9.1 Review Worksheets Quiz over Section 9.1 Notes Virtual Lab

More information

Understanding the effects of roads in upland settings on hydrology, geomorphology and water quality

Understanding the effects of roads in upland settings on hydrology, geomorphology and water quality Understanding the effects of roads in upland settings on hydrology, geomorphology and water quality Beverley Wemple Department of Geography and Rubenstein School of Environment & Natural Resources The

More information

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007 Photo E003 0+000 Viewing looking upslope at Site 4 from highway. Conditions unchanged from 2006. Photo E018 0+000 Localized erosion within road fill on upslope side of highway. Photo E022 0+250 Looking

More information

Community Erosion Assessment Napakiak, Alaska 15 January 2008

Community Erosion Assessment Napakiak, Alaska 15 January 2008 1. Community: Napakiak, Alaska Community Erosion Assessment Napakiak, Alaska 15 January 2008 Figure 1: Napakiak Location & Vicinity Map 2. Community Profile Summary: Napakiak is a 2 nd class city of 378

More information

Highland Lake Bathymetric Survey

Highland Lake Bathymetric Survey Highland Lake Bathymetric Survey Final Report, Prepared For: The Town of Highland Lake 612 Lakeshore Drive Oneonta, AL 35121 Prepared By: Tetra Tech 2110 Powers Ferry Road SE Suite 202 Atlanta, GA 30339

More information

Using the Web Soil Survey Resilience and Resistance Score Sheet Soils Report

Using the Web Soil Survey Resilience and Resistance Score Sheet Soils Report Using the Resilience and Resistance Score Sheet Soils Report 1. Go to http://websoilsurvey.nrcs.usda.gov/app/ and click on the Start WSS button. 2. Create an Area of Interest (AOI) using any of the available

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

Modeling Upland and Channel Sources of Sediment in the Le Sueur River Watershed, Minnesota

Modeling Upland and Channel Sources of Sediment in the Le Sueur River Watershed, Minnesota Modeling Upland and Channel Sources of Sediment in the Le Sueur River Watershed, Minnesota Solomon Folle and David Mulla Department of Soil, Water and Climate University of Minnesota August 6, 2009 5 th

More information

Development of Improved Stream Mapping for NC

Development of Improved Stream Mapping for NC Development of Improved Stream Mapping for NC Presentation for Soil Science Society of North Carolina NC Division of Water Quality January 21, 2009 What are stream maps used for? Riparian buffer rules

More information

MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL

MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL Report No. K-TRAN: KU-03-1 FINAL REPORT MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL C. Bryan Young The University of Kansas Lawrence, Kansas JULY 2006 K-TRAN A COOPERATIVE TRANSPORTATION

More information

Wright County, MN. Overview. Legend

Wright County, MN. Overview. Legend Wright County, MN Overview 461 ft Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Subdivisions Parcels Water 2' Contours 842; 844; 846; 848;

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

Sacramento River Bank Protection Project

Sacramento River Bank Protection Project 2005 - FIELD RECONNAISSANCE REPORT OF BANK EROSION SITES - SACRAMENTO RIVER FLOOD CONTROL LEVEES AND TRIBUTARIES Sacramento River Bank Protection Project Project No. 32-0530.10, Task 3 Prepared for: U.S.

More information

Fairfield Hill Road Winnsboro, South Carolina

Fairfield Hill Road Winnsboro, South Carolina Fairfield Hill Road Winnsboro, South Carolina Tom Milliken +1 803 331 6999 tmilliken@naiavant.com Tombo Milliken +1 803 206 8384 tombo.milliken@naiavant.com THE INFORMATION CONTAINED HEREIN HAS BEEN GIVEN

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Expanding the GSATS Model Area into

Expanding the GSATS Model Area into Appendix A Expanding the GSATS Model Area into North Carolina Jluy, 2011 Table of Contents LONG-RANGE TRANSPORTATION PLAN UPDATE 1. Introduction... 1 1.1 Background... 1 1.2 Existing Northern Extent of

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information