THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015
|
|
- Amberly Stone
- 5 years ago
- Views:
Transcription
1 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015
2 The Sanford Dam Earth Dam constructed in 1961 Drainage area of 6,381 acres (10 sq. miles) Length of 1584 feet Structural height of 30 feet Impounds 285 acres of water Maximum storage of 3,600 acre-feet Designated as a medium size dam Classified as High Hazard
3 What is a High Hazard dam? Class C (High Hazard) includes dams located where failure will likely cause loss of life or serious damage to homes, industrial and commercial buildings, important public utilities, primary highways, or major railroads.
4 Dam Hazards Classification Hazard Classification Description Quantitative Guidelines Low Intermediate Interruption of road service, low volume roads Less than 25 vehicles per day Economic damage Less than $30,000 Damage to highways, Interruption of service 25 to less than 250 vehicles per day Economic damage $30,000 to less than $200,000 Loss of human life* Probable loss of 1 or more human lives Economic damage More than $200,000 High *Probable loss of human life due to breached roadway or bridge on or below the dam. 250 or more vehicles per day
5 Statistics from NC Dam Safety Emergency Action Planning (EAP) Website Most dam failure fatalities are not the result of large dams. Most fatalities are the result of small dam failures. Dam failures resulting in fatalities: 86% of the fatalities have resulted from dams between 20 and 49 feet in height 47% of the fatalities have resulted from dams with a drainage area less than 2 square miles 75 % of the fatalities have resulted from dams with a drainage area less than 10 square miles 7 dams had less than 300 acre-feet of reservoir storage area This description fits many of North Carolina's dams
6 What our dam looks like today Crest elevation 39.0 ft.
7 Some definitions A 100-year flood a flood event that has a 1% probability of occurring in any given year. Probable Maximum Precipitation (PMP) "...the theoretical maximum precipitation for a given duration under modern meteorological conditions." The theoretically greatest depth of precipitation for a given duration that is physically possible over a particular drainage area at a certain time of year
8 NORTH CAROLINA DAM SAFETY LAWS AND REGULATIONS
9
10 Three main concerns 1. Worst case scenario The Dam is overtopped at elevation 39.0 ft. and we lose the impoundment with potential loss of life and property. 2. Excessive flooding We cannot keep pace with the watershed and flooding damages roads, property, and eliminates Route 87 as an evacuation route for communities south of BSL. 3. Creation of sink holes Current use of the gates to adjust lake levels in advance of storms helps to create or accelerate the formation of sink holes. The new spillway will maintain consistent levels during storms, without manual operation. No need to depress water by 2 feet!
11 What could happen after overtopping
12 Evacuation Routes 87, 211 and 133 Users: Oak Island Caswell Beach Southport St. James Boiling Spring Lakes Military Ocean Terminal Sunny Point Brunswick Nuclear Plant/ Duke Energy
13
14
15
16
17 Route 87 Our hurricane evacuation route! 2005, Tropical Storm Tammy 2005, Hurricane Ophelia 1999, Hurricane Floyd 1998, Hurricane Bonnie 1996, Hurricane Bertha 1996, Hurricane Fran Road Elevation 34.4 ft
18 Other key roads flood at this location Isolate Residents Prevent Emergency Services Response EMS facility is located on north side of Rt. 87 Examples: Boiling Spring Rd (SR1539) Fairway Dr. South Shore Dr. Elm Rd
19 Sinkholes have drained the lake
20 Impact on our community
21 How do we operate our existing gates? Existing gates in the outlet structure are manually operated to maintain consistent lake levels (not recommended). Repeated manual operation creates future risk of gate failures. Drain down rates limited to 1 ft./day by NC Dam Safety, to prevent slope impacts along the lake edge. Safety issue - equipment cannot be operated during rainfall due to lightning shock hazard. So we predict when to lower levels. New spillway open top will enable consistent water levels without manual operation! Outlet Control
22 New Spillway Top of Dam Existing Spillway Discharge Pipes
23
24 Four (4) new discharge pipes of 60 Diameter
25 Endorsements Wilmington District, US Army Corps of Engineers There is real potential for the dam to be overtopped for storms just above the 100-year event threatening the integrity of the dam Progress Energy Brunswick Nuclear Plant We support and endorse Boiling Spring Lake s effort to increase Sanford Dam s spillway capacity, which is necessary to eliminate the blockage of Highway 87 Brunswick County Department of Energy Management Brunswick County Commissioners (in 2008)
26 What have we spent in the past? Prior Work Year Approximate Expenditures Install a grout curtain, recoat the inside of original 54" pipes, install pipe couplings, gate modifications and install subdrains Re-lining the original pipes with 40" inserts and grouting void spaces between 1978 $100,000 (estimated) 1989 $92,000 Adding pipe extensions, grouting, and toe drain installation 1991 $75,000 Reconstruction of the downstream face of the dam at the spillway 2001 $124,000 Install four (4) new hydrogates replaced at the existing spillway 2007 $110,000 Engineering Design services for the new Spillway 2013 $130,000 Approximate Total of These Efforts $630,000
27 Funding This Critical Project Partnership % Participation Estimated Contributions Boiling Spring Lakes 25% $500,000 (dedicated already) Brunswick County 25% - 50% $500,000 - $1,000,000 State of North Carolina?? Federal Agencies?? Estimated Project Cost (2013) $2,200,000
28 How do we proceed with funding? Spillway Project Schedule First year of project schedule in months Second year of project schedule in months Tasks 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th Final Design Review by NC Dam Safety ***** FEMA's CLOMR/LOMR Process ***************************** Advertisement for Construction Bids ****** Pre-Bid Meeting with Contractors ** Bid Review Period *** Contract Award and Notice to Proceed ** Construction Period *********approx. 10 months *********
29 Please partner with us!
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationEmergency Action Plan (EAP) Tata Pond Dam
For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification
More informationNorth Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015
North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 INTRODUCTION Emergency Action Plans (EAPs) are critical to reducing the risks
More informationBRUNSWICK COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1
North Carolina State Highway Patrol Coastal Evacuation Plan 1 Contact Information for Emergency Management Director and EOC Contact Address Telephone Number Brian Watts Building C 3325 Old Ocean Hwy. Bolivia,
More informationPresident s Day Weekend Storm Community Meeting and Workshop April 17, 2017
President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 Meeting outline 1. Progress update on the City of San Jose s recovery efforts 2. Water district presentation on: Weather situation
More informationProbable Maximum Precipitation Study
Probable Maximum Precipitation Study Virginia Floodplain Management Association Workshop Thursday, October 29, 2015 Robert T. Bennett, PE, RA, CFM DCR Dam Safety & Floodplain Management Definition (4VAC50-20-50.H)
More informationFRED BURR DAM FEASIBILITY STUDY
FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012
STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction
More informationATLANTIC INTRACOASTAL WATERWAY NORFOLK DISTRICT. Joel F. Scussel, Operations Support Section Dismal Swamp Canal July 27, 2017
ATLANTIC INTRACOASTAL WATERWAY 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 NORFOLK DISTRICT 110 135 120 252 174.59 112 92 56 62 102 130 102 56 48
More informationWHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?
WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.
More informationLimited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May
More information9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD
9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)
More informationFORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE
FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE 255 237 237 237 217 217 217 200 200 200 0 163 131 Bridging the Gap163Conference 255 0 132 255 0 163 122 The Dana on Mission Bay San Diego, CA January 28,
More information11/21/2014. Erosion and Sedimentation Control Planning and Design Workshop December 2, 2014
Erosion and Sedimentation Control Planning and Design Workshop December 2, 2014 1 A STATE PRIMARILY OF A SUBTROPICAL CLIMATE WEATHER PATTERNS COME PREDOMINATELY FROM THE WEST APPALACHIAN MTNS SHIELDS IT
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More informationFlooding Performance Indicator Summary. Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St.
Flooding Performance Indicator Summary Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St. Lawrence River Technical Workgroup: Coastal TWG Research by: Baird
More informationSuwannee Satilla Basins Flood Control Issues, Opportunities and Assistance
Suwannee Satilla Basins Flood Control Issues, Opportunities and Assistance Georgia Silver Jackets Meeting Valdosta, GA April 11, 2013 Presentation Outline Basin overview Recent floods: 2009 100 year flood
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationNew Jersey Department of Transportation Extreme Weather Asset Management Pilot Study
New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation
More informationSTEUBEN COUNTY, NEW YORK. Hazard Analysis Report
STEUBEN COUNTY, NEW YORK Hazard Analysis Report Prepared by: April 1, 2014 Background On April 1, 2014 the Steuben County Office of Emergency Management conducted a hazard analysis using the automated
More informationPompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner
Pompton Lakes Dam Downstream Effects of the Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner ASFPM 2013: Overview Page 2 Overview Page 3 Overview Page 4 Overview Page 5 Overview - Historical Pompton
More informationAppendix E Guidance for Shallow Flooding Analyses and Mapping
Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationHAZUS-MH: Earthquake Event Report
HAZUS-MH: Earthquake Event Report Region Name: El Paso County Earthquake Scenario: El Paso County Random EQ Print Date: February 08, 2006 Disclaimer: The estimates of social and economic impacts contained
More informationWEST CATARACT CREEK DAM FINAL DESIGN REPORT
DAMsel In Distress Engineering 2112 S Huffer Ln Flagstaff, AZ 86011 (520) 981-9515 WEST CATARACT CREEK DAM FINAL DESIGN REPORT Prepared for: Dr. Charles Schlinger Mr. Mark Lamer TABLE OF CONTENTS Contents
More informationInterpretive Map Series 24
Oregon Department of Geology and Mineral Industries Interpretive Map Series 24 Geologic Hazards, and Hazard Maps, and Future Damage Estimates for Six Counties in the Mid/Southern Willamette Valley Including
More informationCASE STUDY BINGA, PHILIPPINES
SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume
More informationENGINEERING HYDROLOGY
ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationCCR Rule Annual Inspection Report (cont.) 2
The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that
More informationRoute 88 Effects on the Town of Westport. Life time observations. By: Claude A. Ledoux
Route 88 Effects on the Town of Westport. Life time observations By: Claude A. Ledoux. 1-28-2018 Two events of the last Century that had the greatest impact on the Town of Westport. 1 st. World War II.
More informationSEVERE WEATHER 101. Flood Basics
SEVERE WEATHER 101 Flood Basics What is flooding? Flooding is an overflowing of water onto land that is normally dry. Floods can happen during heavy rains, when ocean waves come on shore, when snow melts
More informationCASE STUDY BINGA, PHILIPPINES
SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower
More informationStudy 16.5 Probable Maximum Flood (PMF)
Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) October 22, 2014 Prepared by 10/22/2014 1 Study 16.5 Objectives Develop a site-specific PMP to be used for the derivation of the PMF
More informationUS Army Corps of Engineers BUILDING STRONG
Greater New Orleans Hurricane and Storm Damage Risk Reduction System Robert Rowlette Senior Senior Program Manager Task Force Hope U.S. Army Corps of Engineers April 19, 2012 US Army Corps of Engineers
More informationLouisiana s NIKE Approach to EAPs: Just Do It
Louisiana s NIKE Approach to EAPs: Presented to: Just Do It 2007 Louisiana Transportation Engineering Conference Navigating the Waves of Change Tuesday, February 13, 2007 Baton Rouge River Center Presented
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:
More informationSediment Trap. At multiple locations within the project site where sediment control is needed.
Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationHeavy Rain and Potential for Dangerous Flooding for northeast SC and southeast NC
US National Weather Service Wilmington NC @NWSWilmingtonNC http://weather.gov/ilm ***Life Threatening Flooding Possible*** Heavy Rain and Potential for Dangerous Flooding for northeast SC and southeast
More informationMiami-Dade County Overview
Miami-Dade County Overview 2,000 square miles World s busiest cruise port 2.6 million residents Second busiest US airport for international travelers Gateway to the Caribbean and Latin America Natural
More informationRucker Pond. Background
Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different
More information5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN
5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN To provide a strong foundation for mitigation strategies considered in Sections 6 and 9, County considered a full range of natural hazards that could impact
More informationBetween 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage
Ocean Park Alternative Drainage Route Analysis February, 2012 November 11 14, 2009 Between 6 am to 4 pm the next day approximately 7.5 inches fell Chesapeake Bay Bridge Tunnel NOAA Tide Gage Hurricane
More informationCommunity Discovery Data Questionnaire
Region III Community Discovery Data Questionnaire Thank you for taking the time to complete this questionnaire. It will provide important information to help FEMA understand flood risk issues in the Conococheague-Opequon
More informationFolsom Dam Water Control Manual Update
Folsom Dam Water Control Manual Update Public Workshop April 3, 2014 Location: Sterling Hotel Ballroom 1300 H Street, Sacramento US Army Corps of Engineers BUILDING STRONG WELCOME & INTRODUCTIONS 2 BUILDING
More informationTHE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND
Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas
More informationKENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT
KENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT Presentation Outline Development of the 2013 State Hazard Mitigation Plan Risk Assessment Determining risk assessment scale Census Data Aggregation Levels
More informationStorm Surge Analysis Update Meeting Cross City, Florida June 17, 2014
Big Bend Coastal Storm Surge Study Storm Surge Analysis Update Meeting Cross City, Florida June 17, 2014 Introductions Risk MAP Project Team FEMA Region IV Florida Division of Emergency Management (FDEM)
More informationCOMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION
INTRODUCTION Floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Flood effects can be local, impacting a neighborhood
More informationTHE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update
Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work
More informationBank Erosion and Morphology of the Kaskaskia River
Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity
More informationResults of the Sava River Model
Results of the Sava River Model Jamie G. James, P.E. Nashville District September 2010 US Army Corps of Engineers BUILDING STRONG Discussion Outline Study Goals Model Limitations HEC-RAS Model Results
More informationHurricanes. Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding.
Hurricanes Hurricanes Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding. Hurricanes also known as: cyclone (Indian Ocean) or typhoon
More informationAttachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins
Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving
More informationLocal Flood Hazards. Click here for Real-time River Information
Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationVIRGINIA ELECTRIC AND POWER COMPANY CHESTERFIELD POWER STATION LOWER ASH POND CHESTERFIELD COUNTY, VIRGINIA
Prepared for Dominion 5000 Dominion Boulevard Glen Allen, Virginia 23060 EMERGENCY ACTION PLAN VIRGINIA ELECTRIC AND POWER COMPANY CHESTERFIELD POWER STATION LOWER ASH POND CHESTERFIELD COUNTY, VIRGINIA
More informationUPPER COSUMNES RIVER FLOOD MAPPING
UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe
More informationFHWA - HIGHWAY HYDROLOGY
The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444
More informationARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS
ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example
More informationHurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT
Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy
More informationModeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu
Modeling Great Britain s Flood Defenses AIRCurrents Editor s note: AIR launched its Inland Flood Model for Great Britain in December 2008. The hazard module captures the physical processes of rainfall-runoff
More informationDelaware River Flood Advisory Committee
Delaware River Flood Advisory Committee A Partnership to Support Flood Mitigation Alan Tamm Pennsylvania Emergency Management Agency Bureau of Recovery and Mitigation atamm@state.pa.us Peter Gabrielsen
More informationHurricane KATRINA Lessons Learned for Managing Risk
Hurricane KATRINA Lessons Learned for Managing Risk Steven L. Stockton, P.E. Deputy Director of Civil Works U.S. Army Corps of Engineers What Happened? Storm Path from August 23 to 31, 2005 Mon. August
More informationOperational water balance model for Siilinjärvi mine
Operational water balance model for Siilinjärvi mine Vesa Kolhinen, Tiia Vento, Juho Jakkila, Markus Huttunen, Marie Korppoo, Bertel Vehviläinen Finnish Environment Institute (SYKE) Freshwater Centre/Watershed
More informationAPPENDIX B HYDROLOGY
APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF
More informationStudy 16.5 Probable Maximum Flood (PMF)
Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) March 30, 2016 Prepared by 3/30/2016 1 Study 16.5 Status ISR documents (ISR Part D Overview): Status: Initial Study Report: Parts A,
More informationINTRODUCTION TO HEC-HMS
INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),
More informationPhases of Disaster Response. John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler
Phases of Disaster Response John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler BP Oil Spill One of the worst man made disasters in human history The BP oil spill occurred in April of 2010 when the Deepwater
More informationBaldwin County, Alabama
2015 Baldwin County, Alabama Multi-Hazard Mitigation Plan I. Comprehensive Plan A multi-jurisdiction plan City of Bay Minette City of Daphne Town of Elberta City of Fairhope City of Foley City of Gulf
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationLOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationResponse Case Study: April 2014 Historic Flood Event. Severe Weather April 29 30, 2014
Response Case Study: April 2014 Historic Flood Event NOAA s Regional Preparedness Training (NRPT) Natural Disaster Causing Technology Disasters in Mobile Bay Area Kimberly Albins Gulf of Mexico Regional
More informationFlood Scenario Worksheet
Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical
More informationUSING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS
USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS ASHLEY EVANS While the state of Texas is well-known for flooding, the Guadalupe River Basin is one of
More informationGround Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303)
Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts Protecting Groundwater Sources from Flood Borne Contamination Ben Binder (303) 860-0600 Digital Design Group, Inc. The Problem Houston
More informationStage Discharge Tabulation for Only Orifice Flow
Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6
More informationApplication #: TEXT
TOWN OF FORT MYERS BEACH 2008 PROPOSED COMPREHENSIVE PLAN AMENDMENTS Application #: 2008-13-TEXT Description: Modify the Coastal Management and Future Land Use Elements to reflect the state s new definition
More informationManaging an Extreme Weather Event of Prolonged Duration May 22, 2013
Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationIssue 44: Phase II & III H&H Issues Date: 07/03/2006 Page 1
Background Phase I of the NCFMP studies have primarily focused on the coastal plain and sandhills physiographic regions in of the State. Phase II and III study areas will focus on the piedmont, foothills,
More informationNatural and Human Influences on Flood Zones in Wake County. Georgia Ditmore
Natural and Human Influences on Flood Zones in Wake County Georgia Ditmore Prepared for GEOG 591 December 5, 2014 2 Table of Contents Introduction.3 Objectives...5 Methods...6 Conclusion.11 References
More informationNC Emergency Management A View from the Counties
NC Emergency Management A View from the Counties Amy Bason, NCACC Rocky Hyder, Henderson County Jeff Batten, Durham County Norman Bryson, Onslow County PARTNERSHIP Emergency Management efforts require
More informationFloodplain Mapping & Flood Warning Applications in North Carolina
Floodplain Mapping & Flood Warning Applications in North Carolina Marc Stanard, IT Project Manager Ken Ashe, Assistant Director David Herlong, Flood Warning Program Manager NC Crime Control & Public Safety
More informationWATER MANAGEMENT REPORT FOR PAGE ESTATES
WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationDiscovery Data Questionnaire
Region III Discovery Data Questionnaire Thank you for taking the time to complete this Discovery Data questionnaire. It will provide important information to help FEMA better understand flood risk issues
More informationPhillips Ditch Drainage Study
Phillips Ditch Drainage Study By: David L. McCormick, PE, D. WRE McCormick Engineering, LLC For: St. Joseph County, Indiana Revision Date: March 29, 2017 Table of Contents 1. INTRODUCTION... 1 1.1. Review
More informationCoastal Flood Risk Study Project for Northeast Florida Study Area
Coastal Flood Risk Study Project for Northeast Florida Study Area Duval County, Florida Flood Risk Review Meeting September 22, 2015 Introductions Risk MAP Project Team FEMA Region IV BakerAECOM, FEMA
More informationAppendix C. Pleasure Lake Emergency Action Plan
Appendix C Pleasure Lake Emergency Action Plan EMERGENCY ACTION PLAN PLEASURE LAKE DAM NYS ID DAM NO. 163-1597 NAT DAM ID NO. NY00345 SULLIVAN COUNTY NEW YORK SUBMITTED TO: FALLSBURG FISHING AND BOATING
More informationRed River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood
More informationBetter estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling
Better estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling J. Persson M. Jewert N. Isaksson Norconsult AB, Sweden Norconsult AB, Sweden Fortum Generation AB, Sweden ABSTRACT
More informationCity of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT
City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How
More informationDraft for Discussion 11/11/2016
Coastal Risk Consulting (CRC) Climate Vulnerability Assessment for Village of Key Biscayne Deliverable 1.1 in Statement of Work. Preliminary Vulnerability Assessment Identifying Flood Hotspots Introduction...
More informationWeather Information for Surface Transportation (WIST): Update on Weather Impacts and WIST Progress
Weather Information for Surface Transportation (WIST): Update on Weather Impacts and WIST Progress Samuel P. Williamson Office of the Federal Coordinator for Meteorological Services and Supporting Research
More informationA Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1
A Simple Procedure for Estimating Loss of Life from Dam Failure Wayne J. Graham, P.E. 1 INTRODUCTION Evaluating the consequences resulting from a dam failure is an important and integral part of any dam
More informationRed River Levee Panel
Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationAssumption Parish Hazard Mitigation Plan Update Public Meeting. September 1, 2015 Napoleonville, LA
Assumption Parish Hazard Mitigation Plan Update Public Meeting September 1, 2015 Napoleonville, LA Agenda Hazard Mitigation Planning Process SDMI Staff Risk Assessment SDMI Staff Update on Previous/Current
More information