1 Better estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling J. Persson M. Jewert N. Isaksson Norconsult AB, Sweden Norconsult AB, Sweden Fortum Generation AB, Sweden ABSTRACT The time aspect and the location of safe areas are fundamentals in emergency preparedness planning. Nationally-coordinated emergency preparedness plans regarding dam break flooding are made for all large rivers in Sweden. This is accomplished by performing numeric calculations for river systems, with focus on flood wave propagation time and flood inundation. Dam break calculations are made with conservative assumptions regarding model parameters in order to avoid underestimation of the flooding. Flood inundation maps are then generated for the river system. The maps are presented in a GIS-tool intended for use primarily by the national rescue service and the dam owners as common basis for the emergency preparedness planning. A meander is a bend in a sinusoidal watercourse. If a river has meanders, the water can take shortcuts during high flow and/or dam break flood waves. The shortcuts could possibly cause significant reduction of propagation times, which could be crucial for when and how necessary em scribed as a channel, by cross sections. It is difficult to predict where shortcuts may appear, why ergency measures should be done. Previous calculations have been only one-dimensional, i.e. the river is de it is difficult to pre-define the flow paths in a 1D-model. Using 2D-modelling the flow paths are not pre-defined and new paths can appear dynamically in the calculation. In the current project comparisons have been made between 1D and 2D results for the meandering river reach. Dam break calculations for two different dams have been made, where one of them is one of the largest rock-filled dams in Sweden. The distance along the river through the meander reach is about 85 kilometers and the straight distance is about 65 kilometers. In other words, if a flood wave takes all possible shortcuts across the meanders, the distance decreases about 20 kilometers. Quantitative results from these comparisons are presented in this paper, together with a discussion about their qualitative implications. 1/11

2 INTRODUCTION The national rescue services fight nature s forces in a daily basis. Fires, storms and heavy rainfall are some examples. Heavy rainfall can cause very high discharges along rivers e.g. severe damage on buildings and bridges etc. and may even cause casualties. A flood wave caused by a dam break can cause even worse consequences. Dam safety is therefore on top of the agenda for most dam owners. Dam break on dams that may cause very severe consequences must be prevented by all possible means. In case of a dam failure on a very large dam the consequences can be of such magnitude that they could be described as a national crisis. This implies many casualties and severe damage on central functions as power grid, transportations and industries, i.e. loss of massive economic values. Thus, it is of large importance that society is as well prepared as possible for such a disaster. It is of large importance knowing what flood wave propagation time and water levels to expect after a dam failure (dam break). If the current river system is complicated and/or irregular the propagation time can be difficult to calculate with acceptable accuracy using conventional analyzing methods. Nationally coordinated emergency preparedness plans for dam failure In Sweden, as well as many other countries, national coordinated emergency preparedness plans for dam failure are made primarily for all the large hydropower rivers. Along these rivers highconsequence dams are situated as well as populated places and/or large economic values such as transportations, industries etc. These plans should provide the rescue service the necessary information about the possible consequences of the dam failure, so e.g. people can be evacuated in time and in the right areas. The most important information is thus propagation time of a flood wave caused by a dam break and the flood inundation along the river. This information is provided by performing numeric calculations for the current river system combined with GIS analysis. In 2006 a pilot project regarding nationally coordinated emergency preparedness plans for dam failure, Pilot Ljusnan (Elforsk, 2006), was performed for river Ljusnan. This project has set the guidelines for how this kind of projects should be performed in Sweden. Papers describing the Swedish model for emergency preparedness planning have been presented in previous ICOLD meetings: in 2009 (Engström-Meyer et al, 2009) in Brasilia and in 2014 in Bali (Söderström et al, 2014). Conservative assumptions are made regarding the available discharge capacity of the spillways and regarding the development of the dam break, in order to avoid underestimation of the effects. During extreme floods the discharge capacity can be reduced for some reason; e.g. one of the spillways can be blocked by floating debris or the access road may be destroyed by heavy rain. The possible maximum dam breach area should not be underestimated. Combinations of unlikely events are formed to different scenarios and are simulated in the numeric calculations. Results from the calculations are then used for GIS analysis and flood-inundation maps are being made in pre-defined scales, following the standard of the nationally-coordinated emergency preparedness plans. Flood-inundation maps are made for scenarios without any dam breaks as well as dam break scenarios, in order to be able to visualize the margin effect of the dam break. Figure 1 shows a flood inundation map created in the project that will be presented in this paper. 2/11

3 Figure 1: Flood inundation map created for emergency planning. The emergency plan projects are funded by the Swedish hydropower industry and by Swedish National Grid which is a state-owned public utility that has many different areas of work. Together with transmission of electricity from power stations to regional electric grids dam safety is an important task for the Swedish National Grid ( 2015). NUMERIC DAM BREAK CALCULATIONS In hydrodynamic modelling e.g. dam break flood analysis, a numeric program such as Mike 11 or HEC-RAS may be used as an analytic tool to estimate propagation times and inundation levels. In the current study Mike 11 were used. The hydrodynamic theory used by Mike 11 is described in the reference manuals (DHI, 2011). Conventional dam-break analyzing tool In the very most numeric dam break analysis being made, one-dimensional modelling is used for describing the river hydraulics. In the model s dam break module a number of dam break parameters are set in order to describe the dam break (breach size and time to develop etc.) often according to some guideline. One-dimensional (1D) modelling often is a fast, effective and sufficient tool for dam break analysis. One-dimensional implies that the river is described as a straight channel built-up from cross-sections and that the flow paths are thus pre-defined. This is often true for many river systems; i.e. a possible flood wave is likely to follow the main river course. In 1D-modelling the user must pre-define all possible new flow paths, in order to describe possible diversions of the river during extreme floods such as in case of a dam break. This is suitable if a major or complete diversion of the river is likely to occur. In a 1D- model an average velocity is calculated for every cross-section in the model and the direction of the flow is always perpendicular to the cross-sections, i.e. pre-defined. In some cases new possible flow paths are hard or even impossible to anticipate and the geometric extents of new flow paths does not necessarily have to be easy to define. A well-defined river could 3/11

4 e.g. flood into a fairly shallow flood plain where the flow direction is not obvious. In addition, an even more difficult problem in 1D-modelling occurs if the river is meandering, i.e. if the river has sinusoidal bends and it is possible for shortcuts through the bends during high flow. Then a different method is needed that does not pre-define the flow paths and that allows for an infinite number of new flow paths to be created dynamically in the simulation. This can be accomplished using multidimensional modelling (2D or 3D). In the current project 2D-modelling was used. Two-dimensional modelling as a part of the dam-break analysis 2D-modelling implies that the river bathymetry is represented by a three-dimensional space but the model grid is a horizontal two-dimensional grid (rectangular) or mesh (triangular). In the current project mesh was chosen, in order to be able to differentiate the mesh element sizes. When using grid it is not possible to have different grid cell sizes. A velocity is calculated for each mesh element and the direction of the velocity is the resultant of the x and y vectors in the horizontal plane. In a 3Dmodel the velocity vector can also vary in the z-direction (vertical). The magnitude of the velocity depends on the bed slope and on the bed level. Thus, in 1D-modelling the river bathymetry is represented by cross sections and in 2D-modelling it is represented by a number of mesh elements. This implies that in 2D-modelling the water velocity can vary across the river, as in a real river. A 2D-model makes no difference between the river and the bathymetry (terrain) around the river all is just a whole continuous bathymetry, i.e. the flow paths are an infinite number and are not pre-defined. However, it is possible to assign different characteristics to different terrain types. When using 2D-modelling in a dam break analysis the dam break parameters are still set in a 1Dmodel and the dam break hydrograph will be an input (inflow) to the 2D-model, since 2D-modelling programs usually do not have dam break modules. THE CURRENT PROJECT The project to be presented is called Coordinated emergency preparedness plan for river Klarälven, which was performed according to the methodology described in the introduction. The Finnish energy company Fortum owns almost all of the dams and power plants in the river system, why the project is funded by Fortum and Swedish National Grid. The river system The Klarälven river system is the lower part of a transnational waterway located in mid-sweden and the province of Värmland (near the Norwegian border). The source of the river is located in the border-land of Norway and Sweden and the middle stretch of the river runs through Norway (known as Klara, Trysilelva and Femundelva depending on what stretch referred to) and the complete river system has a total basin size of approximately km 2.The main river is about 460 km and finally reaches Lake Vänern which is Sweden s largest lake. The average discharge entering Vänern is approximately 165 m 3 /s. There are 41 dam facilities located along the river system, including tributaries. Figure 2 shows an overview of the river system. River Klarälven is known for its meandering reach which is protected by law from hydropower work. The meandering reach is a very popular for tourists, where kayaking is the most popular activity. 4/11

5 Figure 2: Left: overview of Sweden and the area of interest marked. Right: overview of the Klarälven river system and the meandering river reach marked. The two largest dams, Höljes and Letten, are located far upstream in the river system. In this paper conclusions are drawn only for the calculations regarding the Höljes dam. A dam failure there could possibly cause the most serious consequences compared to all of the other dams in the river system. Figure 3 shows the Höljes dam and a part of the meandering reach. About 40 km downstream of Höljes the meandering reach starts. From this point the river meanders quite heavily for about 85 km. If a flood wave takes every possible shortcut through the meander bends the distance can be reduced by about 20 km. Fortum decided that a 2D approach would be the most appropriate approach. Figure 3: Left: the Höljes dam, about 80 m high at most. Right: a part of the meandering reach. 5/11

6 Combining one and two dimensional modelling The program Mike Flood provides a link between the 1D model (Mike 11) and the 2D model (Mike 21). This link can either be lateral, i.e. the main river is modelled in 1D and the areas around the river are modelled in 2D, or standard which implies that a continuous 2D model is used. Then 1D models can be linked to the 2D model in the upstream or downstream end or as tributaries, or even completely inside the 2D area. Figure 4 illustrates the two link types. In this project the standard link was chosen because it is the most straight-forward of the two types. Figure 4: Illustration of lateral (upper) vs standard link (lower) in Mike Flood (DHI). The hydrodynamic theory used in the Mike programs is described in the reference manuals (DHI, 2011) Figure 5 illustrates the mesh from the 2D model and the colors display the level of the bathymetry, which implies that the river is located in a valley. A very high flood (more than 100 years return period) has no choice but to follow this long valley that stretches along the whole meandering reach; there is no alternative flow path. 6/11

7 Figure 5: A minor part of the meandering river reach, modelled in 2D. In this project the dam break flood from Höljes dam is routed through the upstream 1D model and then into the 2D model along the meandering river reach and finally into the downstream 1D model via two standard links. Parallel to this configuration with a combination of 1D and 2D models a separate 1D model covering the whole river system including the meandering reach was set up as a comparative model. COMPARISON BETWEEN 1D AND 2D RESULTS In order to evaluate the possible benefit of using a two-dimensional model as a part of the dam break analysis and emergency planning a comparison to the one-dimensional model for the same reach is necessary. The most important parameter to be compared is in this case the flood wave propagation time. If the propagation times are shown to be significantly shorter, that is important data in emergency planning. The consequence of shorter propagation time is that the villages along the meandering reach needs to be evacuated earlier than expected from previous investigations. Figure 6 and figure 7 illustrates a comparison between the 1D model and the 2D model for a location within the meandering reach of Klarälven. The diagrams show the hydrograph from the dam break flood wave from Höljes dam, expressed in percent of the maximum dam break discharge, routed about 50 km from the dam into the meandering reach. The current scenario shown is the probable maximum flood hydrograph (PMF) as an inflow to the Höljes reservoir and a dam break discharge adding to it. 7/11

8 Mike 21 Mike Discharge [% of initial discharge from dam break] Time [yyyy-mm-dd hh:mm] Figure 6: Diagram illustrating results from Mike 11 and Mike 21 discharge at a location in the downstream regions within the meandering reach, expressed in percent of the maximum dam break discharge. 40 Mike 21 Mike 11 Discharge [% of initial discharge from dam break] Time [yyyy-mm-dd hh:mm] Figure 7: Diagram illustrating results from Mike 11 and Mike 21 discharge at a location in the downstream regions within the meandering reach, expressed in percent of the maximum dam break discharge. Zoomed-in to a smaller time period compared to figure 6. Also the maximum water level is important output, as well as the maximum water depth, which is a function of the water level. These parameters are needed to be able to locate safe areas for evacuation of people, routes that may be taken in rescue operations etc. Figure 8 shows that in addition to a reduced time to reach safe areas the area itself along the river becomes smaller depending on The higher water levels predicted by the 2D calculation. 8/11

9 The diagrams illustrate that the hydrograph is more damped in the one-dimensional model, probably due to the significant difference in travelling distance for the flood wave. The propagation time in 2D is between 6 and 8 hours shorter compared to 1D, depending on how the propagation time is defined. The time when the flood wave arrives can be defined in many different ways. One definition could be when the water level has risen e.g. 10 % above the initial water level and another one could be when the maximum water level occurs. The diagram in figure 8 illustrates the calculated water depth in 1D and in 2D. The calculated depth is about 0.5 m higher in the 2D model, due to that the water level in the large area being flooded is not so easily raised despite a quite higher discharge in 2D. 12 Mike 21 Mike Water depth [m] : : : :00 Time [yyyy-mm-dd hh:mm] Figure 8: Diagram illustrating results from Mike 11 and Mike 21 - water depth at a location in the downstream region within the meandering reach. 12 Mike 21 Mike Water depth [m] : : : : : :00 Time [yyyy-mm-dd hh:mm] Figure 9: Diagram illustrating results from Mike 11 and Mike 21 water depth at a location in the downstream regions within the meandering reach, zoomed-in to a smaller time period compared to figure 8. 9/11

10 DISCUSSION AND CONCLUSIONS Neglecting the effects of meandering along rivers may lead to significant overestimation of the time available for warning and evacuation. One important result from the presented project is that significantly shorter flood wave propagation times was obtained by using 2D modelling instead of 1D modelling, for a meandering river reach. The dam break flood wave is more dampened in the 1D model than in the 2D model, due to about 20 km longer distance for the flood wave. The terrain surrounding the meandering river is a long valley without sharp bends, which implies that the dampening effect is modest compared to in 1D. The long valley could be described as large-scale almost straight river bed. If the surrounding terrain instead should have been more heterogeneous both in direction and in level, i.e. more flat and maybe even with more alternative flow paths, it is possible that the difference in propagation time would have been smaller between the models. When considering 2D modelling it is of great importance to study in beforehand what resolution of the mesh (or grid) that is appropriate for the purpose and goal of the actual river reach. The resolution that is considered minimum still may cause simulation times that are hard to handle, especially if the model area is big. At worst the number of required mesh elements (or grid cells) can be more than the program limit. In the presented project the model area was indeed big and thus the simulation times were long but manageable. An interesting additional study from this project would be a comparison between results from one Mike Flood configuration with at lateral link and from the one described in this paper, i.e. with a standard link. One phenomenon in the real world that a 2D model cannot handle is if the water splitup in layers when reaching the flood plain. This is an effect that needs to be described with a threedimensional model. Although 3D modelling theoretically may be the most suitable option, it is not realistic for a model of this size due to extensive computational time. ACKNOWLEDGEMENTS The authors wish to thank Fortum and Swedish National Grid for funding the work presented in this paper. In addition, the authors especially like to thank Fortum for thinking outside the box at an early stage by suggesting 2D modelling as a tool for the analysis. It was a very clear-sighted thinking from Fortum to really think through what was the most appropriate approach when about analyze this particular river system. Although 2D modelling involves a higher cost than 1D modelling Fortum still considered it to be of great importance to the project. REFERENCES 1. Elforsk (2006). Dammsäkerhet. Beredskapsplanering för dammbrott Ett pilotprojekt i Ljusnan, Sweden. 2. Engström Meyer A. et al. (2009). Coordinated emergency preparedness planning in Swedish rivers. ICOLD congress, Brasilia. 3. Söderström A. et al. (2014). Coordinated Emergency Preparedness Planning in Sweden. A follow up on coordinated emergency preparedness planning in Swedish rivers. ICOLD congress, Bali. 10/11

11 4. (2015, official homepage of Swedish National Grid) 5. DHI (2011). Mike 11 - A Modelling System for Rivers and Channels, Reference Manual 6. DHI (2011). Mike 21 Flow Model Hydrodynamic Module, Scientific Documentation 7. DHI (2011). Mike Flood, 1D-2D Modelling, User manual 11/11

HYDRAULIC MODELLING OF NENJIANG RIVER FLOODPLAIN IN NORTHEAST CHINA

HYDRAULIC MODELLING OF NENJIANG RIVER FLOODPLAIN IN NORTHEAST CHINA HYDRAULIC MODELLING OF NENJIANG RIVER FLOODPLAIN IN NORTHEAST CHINA Xiao Fei MEE08181 Supervisor: A.W. Jayawardena ABSTRACT In 1998, the worst flood recorded for over 200 years hit the Songhua River Basin

More information

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1 A Simple Procedure for Estimating Loss of Life from Dam Failure Wayne J. Graham, P.E. 1 INTRODUCTION Evaluating the consequences resulting from a dam failure is an important and integral part of any dam

More information

Predictions on arrival times of water of the St. Francis dam break flood using ANUGA

Predictions on arrival times of water of the St. Francis dam break flood using ANUGA 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 Predictions on arrival times of water of the St. Francis dam break flood using

More information

Physical landscapes River landscapes in the UK

Physical landscapes River landscapes in the UK Physical landscapes River landscapes in the UK The shape of river valleys change s as rivers flow downstream - PROCESSES Erosion Abrasion or corrasion Attrition Hydraulic Action Solution or corrosion Deposition

More information

GEOL 1121 Earth Processes and Environments

GEOL 1121 Earth Processes and Environments GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,

More information

Figure 1. Which part of the river is labelled in Figure 1? a) Mouth b) Source c) Lower course d) channel

Figure 1. Which part of the river is labelled in Figure 1? a) Mouth b) Source c) Lower course d) channel Rivers 1. Study Figure 1 showing the long profile of a river Figure 1 A Which part of the river is labelled in Figure 1? a) Mouth b) Source c) Lower course d) channel (1 mark) 2. Complete the sentences

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

Flood modelling and impact of debris flow in the Madarsoo River, Iran

Flood modelling and impact of debris flow in the Madarsoo River, Iran Monitoring, Simulation, Prevention and Remediation of Dense and Debris Flows 69 Flood modelling and impact of debris flow in the Madarsoo River, Iran S. Tjerry 1, O. Z. Jessen 2, K. Morishita 3 & H. G.

More information

What Are Disasters? The Rescue Kids Trio!

What Are Disasters? The Rescue Kids Trio! The Rescue Kids Trio! What Are Disasters? This manual was made possible through funding by the Council of Local Authorities for International Relations. Disasters and emergency preparedness Emergency preparedness

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

Chapter 3.8: Energy Dissipators. By Dr. Nuray Denli Tokyay

Chapter 3.8: Energy Dissipators. By Dr. Nuray Denli Tokyay Chapter 3.8: Energy Dissipators By Dr. Nuray Denli Tokyay 3.1 Introduction A stilling basin is a short length of paved channel placed at the foot of a spillway or any other source of supercritical flow

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey. Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey. Fuad Hajibayov *1, Basak Demires Ozkul 1, Fatih Terzi 1 1 Istanbul

More information

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION INTRODUCTION Floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Flood effects can be local, impacting a neighborhood

More information

Managing Floods at Boscastle. Learning Objective: Examine the benefits of managing floods

Managing Floods at Boscastle. Learning Objective: Examine the benefits of managing floods Managing Floods at Boscastle Learning Objective: Examine the benefits of managing floods Learning Outcomes: Describe how Boscastle has been affected by flooding Explain strategies to reduce the risk Evaluate

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

Determination of flood risks in the yeniçiftlik stream basin by using remote sensing and GIS techniques

Determination of flood risks in the yeniçiftlik stream basin by using remote sensing and GIS techniques Determination of flood risks in the yeniçiftlik stream basin by using remote sensing and GIS techniques İrfan Akar University of Atatürk, Institute of Social Sciences, Erzurum, Turkey D. Maktav & C. Uysal

More information

Chapter 11. Rivers: Shaping our landscape

Chapter 11. Rivers: Shaping our landscape Chapter 11 Rivers: Shaping our landscape Learning outcomes In this presentation you will learn: Common terms associated with rivers About the three stages of a river About the processes of river erosion

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

HYDRAULIC SIMULATION OF FLASH FLOOD AS TRIGGERED BY NATURAL DAM BREAK

HYDRAULIC SIMULATION OF FLASH FLOOD AS TRIGGERED BY NATURAL DAM BREAK Civil Engineering Forum Volume XXII/1 - January 2013 HYDRAULIC SIMULATION OF FLASH FLOOD AS TRIGGERED BY NATURAL DAM BREAK Yanuar Tri Kurniawan Directorate General of Water Resources, Ministry of Public

More information

HEC-RAS v5.0: 2-D applications

HEC-RAS v5.0: 2-D applications HEC-RAS v5.0: 2-D applications Tom Molls, Will Sicke, Holly Canada, Mike Konieczki, Ric McCallan David Ford Consulting Engineers, Inc. Sacramento, CA September 10, 2015: Palm Springs FMA conference What

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

Leveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015

Leveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015 Leveraging new models and data to improve flood stage forecast Improving Flood Stage Forecasting in the Feather River Watershed September 11 th 2015 Mitch Russo, P.E. (DWR) Ashok Bathulla, P.E., CFM (GEI)

More information

State of the Art Two- Dimensional Hydraulic Modeling Tools Model Benchmark Testing

State of the Art Two- Dimensional Hydraulic Modeling Tools Model Benchmark Testing State of the Art Two- Dimensional Hydraulic Modeling Tools Model Benchmark Testing September 2015 Presented by: Murari Paudel, Cody Milligan, Soledad Roman, Phillip Ryan Presentation Overview Study Purpose

More information

Progress Report. Flood Hazard Mapping in Thailand

Progress Report. Flood Hazard Mapping in Thailand Progress Report Flood Hazard Mapping in Thailand Prepared By: Mr. PAITOON NAKTAE Chief of Safety Standard sub-beuro Disaster Prevention beuro Department of Disaster Prevention and Mitigation THAILAND E-mail:

More information

THE 3D SIMULATION INFORMATION SYSTEM FOR ASSESSING THE FLOODING LOST IN KEELUNG RIVER BASIN

THE 3D SIMULATION INFORMATION SYSTEM FOR ASSESSING THE FLOODING LOST IN KEELUNG RIVER BASIN THE 3D SIMULATION INFORMATION SYSTEM FOR ASSESSING THE FLOODING LOST IN KEELUNG RIVER BASIN Kuo-Chung Wen *, Tsung-Hsing Huang ** * Associate Professor, Chinese Culture University, Taipei **Master, Chinese

More information

Earth Science Chapter 6 Section 2 Review

Earth Science Chapter 6 Section 2 Review Name: Class: Date: Earth Science Chapter 6 Section Review Multiple Choice Identify the choice that best completes the statement or answers the question. 1. Most streams carry the largest part of their

More information

Flooding and it s solutions

Flooding and it s solutions Flooding and it s solutions Describe this hydrograph in 35 words What is a flood? What is a flood? A period of of high discharge, where the river overflows its banks Why is this a problem? What are some

More information

D. MATHEMATICAL MODEL AND SIMULATION

D. MATHEMATICAL MODEL AND SIMULATION D. MATHEMATICAL MODEL AND SIMULATION D - i TABLE OF CONTENTS D.1 Objective of Model Development... D - 1 D.2 Selection of Software... D - 1 D.3 General Steps of Simulation by MOUSE... D - 1 D.4 Cases of

More information

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France) FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 1 FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 2 FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 3 Christophe

More information

SUSTAINABLE SEDIMENT MANAGEMENT

SUSTAINABLE SEDIMENT MANAGEMENT SUSTAINABLE SEDIMENT MANAGEMENT Shaping our world A company of OUR EXPERTISE Sediments can make or break a Project Numerous examples of dams and reservoirs can be found throughout the world whose live

More information

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner Pompton Lakes Dam Downstream Effects of the Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner ASFPM 2013: Overview Page 2 Overview Page 3 Overview Page 4 Overview Page 5 Overview - Historical Pompton

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Analysis of the Cause for the Collapse of a Temporary Bridge Using Numerical Simulation

Analysis of the Cause for the Collapse of a Temporary Bridge Using Numerical Simulation Engineering, 2013, 5, 997-1005 Published Online December 2013 (http://www.scirp.org/journal/eng) http://dx.doi.org/10.4236/eng.2013.512121 Analysis of the Cause for the Collapse of a Temporary Bridge Using

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

HYDRAULIC SIMULATION OF THE THIELLE

HYDRAULIC SIMULATION OF THE THIELLE HYDRAULIC SIMULATION OF THE THIELLE EXTREME FLOOD EVENT AND CONSEQUENCES OF FAILURE DIKE Quentin Theiler q.theiler@sdplus.ch sd ingénierie dénériaz et pralong sion sa 25.01.2017 1 Location of the project

More information

9. Flood Routing. chapter Two

9. Flood Routing. chapter Two 9. Flood Routing Flow routing is a mathematical procedure for predicting the changing magnitude, speed, and shape of a flood wave as a function of time at one or more points along a watercourse (waterway

More information

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir ISSN 2320-9100 11 International Journal of Advance Research, IJOAR.org Volume 1, Issue 8,August 2013, Online: ISSN 2320-9100 MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq

More information

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

3/3/2013. The hydro cycle water returns from the sea. All toilet to tap. Introduction to Environmental Geology, 5e Introduction to Environmental Geology, 5e Running Water: summary in haiku form Edward A. Keller Chapter 9 Rivers and Flooding Lecture Presentation prepared by X. Mara Chen, Salisbury University The hydro

More information

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS ROMAN P., I. 1, OROS C., R. 2 ABSTRACT. A simple GIS method for obtaining flooded areas. This paper presents a method for obtaining flooded areas near to

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the By Cassandra Fagan 5, December 2014 http://ubcwatershedstudy.ursokr.com/images/ Contents Introduction... 3 Figure 1: 24-hour rainfall

More information

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS Md. Aminul Islam MEE07178 Supervisor: Prof. Kuniyoshi TAKEUCHI ABSTRACT Dhaka-Narayanganj-Demra (DND) Project is

More information

WMO/WWRP FDP: INCA CE

WMO/WWRP FDP: INCA CE WMO/WWRP FDP: INCA CE Yong Wang ZAMG, Austria This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF INCA CE: implementation over Central Europe A Nowcasting Initiative

More information

CONSIDERATIONS ON URBAN AREAS AND FLOATING DEBRIS IN DAM -BREAK FLOOD MODELLING. Peter Reiter *)

CONSIDERATIONS ON URBAN AREAS AND FLOATING DEBRIS IN DAM -BREAK FLOOD MODELLING. Peter Reiter *) 1 CONSIDERATIONS ON URBAN AREAS AND FLOATING DEBRIS IN DAM -BREAK FLOOD MODELLING. Peter Reiter *) 1. SUMMARY Every model is a story, describing real-life and more or less significant simplifications are

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

INTRODUCTION TO HEC-HMS

INTRODUCTION TO HEC-HMS INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),

More information

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 INTRODUCTION Emergency Action Plans (EAPs) are critical to reducing the risks

More information

Results of the Sava River Model

Results of the Sava River Model Results of the Sava River Model Jamie G. James, P.E. Nashville District September 2010 US Army Corps of Engineers BUILDING STRONG Discussion Outline Study Goals Model Limitations HEC-RAS Model Results

More information

Sediment Disasters and Mass Movement (SD&M 2 ) NATIONAL DISASTER MANAGEMENT RESEARCH INSTITUTE

Sediment Disasters and Mass Movement (SD&M 2 ) NATIONAL DISASTER MANAGEMENT RESEARCH INSTITUTE Sediment Disasters and Mass Movement (SD&M 2 ) Contents Outline of SD&M 2 Major outcomes Issues and conclusions Prologue Mass movement in Ulsan, Korea by Typhoon CHABA on Oct. 5. Outline of SD&M 2 Activities

More information

The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin)

The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin) Current World Environment Vol. 10(Special Issue 1), 842-851 (2015) The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin) Arman

More information

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS

CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS CONCEPTUAL AND TECHNICAL CHALLENGES IN DEFINING FLOOD PLANNING AREAS IN URBAN CATCHMENTS C Ryan 1, D Tetley 2, C Kinsey 3 1 & 2 Catchment Simulation Solutions, NSW 3 Co-ordinator Stormwater and Structural

More information

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE Floods Floods Introduce this topic by explaining that floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Display

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River September 2015 0 Table of Contents 1. Introduction... 2 2. Data collection... 3 2.1 Additional data...

More information

Waipatiki Catchment Flood Hazard Analysis. June 2008 AM 08/04 HBRC Plan Number 4029

Waipatiki Catchment Flood Hazard Analysis. June 2008 AM 08/04 HBRC Plan Number 4029 Waipatiki Catchment Flood Hazard Analysis June 2008 AM 08/04 HBRC Plan Number 4029 Asset Management Group Technical Report ISSN 1174 3085 Engineering Section Waipatiki Catchment: Flood Hazard Analysis

More information

An overview of the applications for early warning and mapping of the flood events in New Brunswick

An overview of the applications for early warning and mapping of the flood events in New Brunswick Flood Recovery, Innovation and Reponse IV 239 An overview of the applications for early warning and mapping of the flood events in New Brunswick D. Mioc 1, E. McGillivray 2, F. Anton 1, M. Mezouaghi 2,

More information

SEISMIC RISK ASSESSMENT IN ARMENIA

SEISMIC RISK ASSESSMENT IN ARMENIA SEISMIC RISK ASSESSMENT IN ARMENIA Hovhannes Khangeldyan Head of National Crisis Management Center Rescue Service Ministry of Emergency Situations of the Republic of Armenia Tokyo, 2016 ARMENIA: GEOGRAPHICAL

More information

ISSN Vol.03,Issue.10 May-2014, Pages:

ISSN Vol.03,Issue.10 May-2014, Pages: www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.10 May-2014, Pages:2187-2191 YIN YIN HTWE 1, AYE AYE THANT 2 1 Dept of Civil Engineering, Mandalay Technological University, Mandalay, Myanmar,

More information

FLOOD/SCS EVENT, APRIL 28 MAY 4

FLOOD/SCS EVENT, APRIL 28 MAY 4 REPORT DATE: May 4, 2017 EVENT DATE: April 28-May 4, 2017 FLOOD/SCS EVENT, APRIL 28 MAY 4 Event Summary General Significant Flood Outlook. SOURCE: National Weather Service. A significant severe thunderstorm

More information

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

Controlling Processes That Change Land

Controlling Processes That Change Land 1 Name Date Controlling Processes That Change Land People try to control some of the processes that change land. To do this, people apply technology- the use of science to solve problems in everyday life.

More information

FLOOD REPORT FOR MANITOBA. April 11, :00 am

FLOOD REPORT FOR MANITOBA. April 11, :00 am FLOOD REPORT FOR MANITOBA April 11, 2017 9:00 am Overland flooding and tributary flows are subsiding across much of southern Manitoba. Flows on northern rivers are ice covered and are responding to runoff.

More information

6.4 Sensitivity Tests

6.4 Sensitivity Tests 6.4 Sensitivity Tests 6.4.1 Sensitivity of Floodplain Inundation to Width of Dry Culvert The preliminary design for the Expressway based on consideration of possible future climate effects to 2090 assumed

More information

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION "Workshop On Land Use Planning And Water Management, With Focus On Flood Risk Management Oslo, Norway. Wednesday 31 January and Thursday 1 February 2007 APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin Mike Langland and Ed Koerkle Topics Background / Project Objectives Data Selection - Sediment and Geometric

More information

Streams. Water. Hydrologic Cycle. Geol 104: Streams

Streams. Water. Hydrologic Cycle. Geol 104: Streams Streams Why study streams? Running water is the most important geologic agent in erosion, transportation and deposition of sediments. Water The unique physical and chemical properties of water make it

More information

Disaster RISK Management : Bhutanese Scenario

Disaster RISK Management : Bhutanese Scenario Disaster RISK Management : Bhutanese Scenario Expert Group Meeting (EGM) on Geo-referenced Information Systems for Disaster Risk Management (Geo-DRM) and sustaining the Community of Practice (COP), Bangkok,

More information

1.060 Engineering Mechanics II Spring Problem Set 8

1.060 Engineering Mechanics II Spring Problem Set 8 1.060 Engineering Mechanics II Spring 2006 Due on Monday, May 1st Problem Set 8 Important note: Please start a new sheet of paper for each problem in the problem set. Write the names of the group members

More information

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Oslo Symposium, August 1992). IAHS Publ. no. 210, 1992. 269 Monitoring of suspended sediment concentration in discharge

More information

Integrating Nowcastingwith crisis management and risk prevention in a transnational framework (INCA-CE)

Integrating Nowcastingwith crisis management and risk prevention in a transnational framework (INCA-CE) Integrating Nowcastingwith crisis management and risk prevention in a transnational framework (INCA-CE) Yong Wang ZAMG, Austria This project is implemented through the CENTRAL EUROPE Programme co-financed

More information

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA Muthubanda Appuhamige Sanath Susila GUNASENA (MEE13632) Supervisors: Dr. Mamoru Miyamoto, Dr. Duminda

More information

FLOOD INUNDATION MAPPING BY GIS AND A HYDRAULIC MODEL (HEC RAS): A CASE STUDY OF AKARCAY BOLVADIN SUBBASIN, IN TURKEY

FLOOD INUNDATION MAPPING BY GIS AND A HYDRAULIC MODEL (HEC RAS): A CASE STUDY OF AKARCAY BOLVADIN SUBBASIN, IN TURKEY Acta Geobalcanica Volume 2 Issue 2 2016 pp. 111-118 DOI: https://doi.org/10.18509/agb.2016.12 UDC:528.94:556.16.047]:004.455(560) COBISS: FLOOD INUNDATION MAPPING BY GIS AND A HYDRAULIC MODEL (HEC RAS):

More information

The production and use of a hydrographic flow-direction network of surface waters. Rickard HALLENGREN, Håkan OLSSON and Erik SISELL, Sweden

The production and use of a hydrographic flow-direction network of surface waters. Rickard HALLENGREN, Håkan OLSSON and Erik SISELL, Sweden The production and use of a hydrographic flow-direction network of surface waters Rickard HALLENGREN, Håkan OLSSON and Erik SISELL, Sweden Key words: hydrographic, flow-direction network, surface waters

More information

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu Modeling Great Britain s Flood Defenses AIRCurrents Editor s note: AIR launched its Inland Flood Model for Great Britain in December 2008. The hazard module captures the physical processes of rainfall-runoff

More information

Rebuilding Flood-Conscious Society

Rebuilding Flood-Conscious Society A zone where strong flood flow or river bank erosion by levee breach are anticipated, which likely to occur collapsing/washing away of house. Set up the joint councils by relative stakeholders(river managers,

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Floodplain modeling Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Scientific Staff: Dr Carmen Maftei, Professor, Civil Engineering Dept. Dr Konstantinos

More information

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Module No. # 04 Gradually Varied Flow Lecture No. # 07 Rapidly Varied Flow: Hydraulic Jump

More information

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH Muhammad MASOOD MEE07180 Supervisor: Prof. Kuniyoshi TAKEUCHI ABSTRACT An inundation simulation has been done for the mid-eastern

More information

Comparing HEC-RAS v5.0 2-D Results with Verification Datasets

Comparing HEC-RAS v5.0 2-D Results with Verification Datasets Comparing HEC-RAS v5.0 2-D Results with Verification Datasets Tom Molls 1, Gary Brunner 2, & Alejandro Sanchez 2 1. David Ford Consulting Engineers, Inc., Sacramento, CA 2. USACE Hydrologic Engineering

More information

Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes

Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes Dr. P. D. Dahe * Department of Civil Engineering, SGGSIE&T, Vishnupuri, Nanded (Maharashtra) S. B. Kharode Department of Civil

More information

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

Emergency Action Plan (EAP) Tata Pond Dam

Emergency Action Plan (EAP) Tata Pond Dam For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification

More information

INTRODUCTION. Climate

INTRODUCTION. Climate INTRODUCTION Climate Landslides are serious natural disasters in many parts of the world. Since the past 30 years, rainfall triggered landslides and debris flows had been one of the natural disasters of

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

Lessons Learned and Shared

Lessons Learned and Shared Lessons Learned and Shared Plan for the worst. Hope for the best. Remember that hope is not a strategy. Agnes 8 Lessons 1. Identify Susceptible Communities 2. Develop a Plan 3. Threat Recognition 4. Review

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

Assessment of the Hood River Delta Hood River, Oregon

Assessment of the Hood River Delta Hood River, Oregon Assessment of the Hood River Delta Hood River, Oregon Pacific Northwest Waterways Association Annual Meeting October 13, 2010 Michael McElwee, Executive Director Port of Hood River Overview U.S. Army Corps

More information

Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood

More information

Tool 2.1.4: Inundation modelling of present day and future floods

Tool 2.1.4: Inundation modelling of present day and future floods Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 2.1.4: Inundation modelling of present day and future floods Authors M. Duncan 1 and G. Smart 1 Affiliation 1 NIWA,

More information

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA.

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA. Page 1 of 20 Hydrologic Forecast Centre Manitoba Infrastructure Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA February 28, 2019 Overview The February Outlook Report prepared by the Hydrologic

More information

Dam Break Analysis Using HEC-RAS and HEC-GeoRAS A Case Study of Ajwa Reservoir

Dam Break Analysis Using HEC-RAS and HEC-GeoRAS A Case Study of Ajwa Reservoir Journal of Water Resources and Ocean Science 2016; 5(6): 108-113 http://www.sciencepublishinggroup.com/j/wros doi: 10.11648/j.wros.20160506.15 ISSN: 2328-7969 (Print); ISSN: 2328-7993 (Online) Case Report

More information