1 DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL Ricardo José Barbosa de SOUZA 1, Aurélio Alves de VASCONCELOS 2, Alberto Jorge C CAVALCANTI 3 Companhia Hidro Elétrica do São Francisco CHESF Rua Delmiro Gouveia 333, Bongi Recife PE CEP Brazil. 1, ricardob@chesf.gov.br;2, aurélio@chesf.gov.br;3, alberto@chesf.gov.br Abstract: THE Xingó Hydroelectric Project is located on the São Francisco River, between the states of Alagoas and Sergipe in the Northeast region of Brazil. The main dam is a concrete face rockfill embankment type (CFRD), with maximum height of 150 m. The upstream slab thickness varies between 0.30 m and 0.70 m and it was built with vertical contraction joints, 16 m apart, in two construction stages. The rockfill embankment was entirely built with gneissic and granitic rock made available by excavation for the foundation of the concrete structures. The performance of the dam during construction and operation was accompanied through monitoring instruments installed in three main sections. The reservoir impound began June 10, 1994 and reached its maximum normal water level on Nov. 15, To monitor the vertical and horizontal displacements of the rockfill embankment three sections were chosen, representing the right abutment, the highest section in the riverbed and the left abutment. Fifteen years after the reservoir impound The largest vertical displacement of the superficial marks occurred in the central section of the dam, having reached at the crest about 615 mm. Inspections detected a crack 20 m deep close to the plinth, a set of transversal fissures 26 m deep at the slab L6 with opening of up to 35 mm and crushing of the concrete in the upper portion at the joint L12/L13. This paper presents the dam performance during construction, reservoir impounding and operation stages. Key Words: Instrumentation, rockfill, CFRD, Xingó 1 Introduction The Xingó Hydroelectric Project is located in the Northeast region of Brazil, on the São Francisco River, between the states of Alagoas and Sergipe. The power plant has an installed capacity of 3,162 MW and the installations allow for future expansion of up to MW. The project belongs to CHESF - Companhia Hidro Elétrica do São Francisco. Engineering works, including preliminary, final and detailed design were carried out by Promon Engenharia Ltda. The main dam is a concrete face rockfill embankment type (CFRD), with maximum height of 150 m, crest length of 850 m and rockfill volume of 12,9000 m3. The upstream concrete slab has its thickness varying between 0.30 m and 0.70 m, vertical contraction joints at each 16.0 m, and it was executed in two stages, the first until el 70 m and second from el 70 m to el 138 m. The project includes, on the right bank, four m-diameter unlined diversion tunnels, a bottom outlet structure located in one of the tunnels for the purpose of maintaining a minimum downstream flow during the reservoir impounding ; a concrete gravity dam with ten water intakes; six 9.5mdiameter steel penstocks; a powerhouse with six 500 MW Francis units; a 500 kv switchyard; and four saddle dikes in the reservoir area. A surface spillway, with two sloping chutes and with 33,000 m 3 /s capacity, is located on the left bank. A general view of the project is presented in Figure 1. The regional geology includes a crystalline embasement, from the medium and lower pre-cambrian ages, consisting of a complex of igneous and metamorphic rocks. Intrusions of granite-like rocks occurred in the upper pre-cambrian. Gneissic rock, with schist or granitic structure varying from place to place, is the most dominant rock type. At the site, the river flows in a canyon, and the lateral

2 plateau is about 135m above the riverbed. The overburden at the abutments, constituted by coluvial and residual soils is up to 4.0m thick. The thickness of the weathered rock varies from place to place, achieving a maximum of 15.0m. Figure 1. General view The foundation of the dam is of gneissic rocks, with structure sometimes schistous, sometimes granitic. The plinth is 0.5 m thick and variable width ranging from 4.0 m to 7.7 m and fixed in unaltered rock through 32 mm anchors at each 1.7 m. The upstream concrete slab has its thickness varying between 0.30 m and 0.70 m, vertical contraction joints at each 16.0 m, and it was executed in two stages, the first until el 70 m and second from el 70 m to el 138 m. A general view of the project is presented in Figure 1. 2 Rockfill features The rockfill embankment was entirely built with gneissic and granitic rock made available by excavation from the foundation of the concrete structures. The rockfill was in general founded on rock, after removal of the small overburden layer, in both abutments. At the riverbed, some sand deposits were left in place, but sand removal was carried out in the 2 upstream and downstream regions of the embankment foundation. The construction of the dam was concluded in the first half of 1994 and the reservoir filling occurred from 10/June/94 to 15/Nov/94. The features and the zoning of the main dam are presented below and in Figure 2. Zone I, beneath the upstream concrete slab, has a variable width, from 6.0 m at the lowest foundation level to 4.0m at the crest. The width is doubled at the contact with both abutments. The material for Zone I was obtained by grizzling, 4" bars spacing, weathered rock available from the superficial portion of the rock excavations. The material is impermeable to semi permeable, with 35% to 60% in weight passing nº 4 sieve and 4% to 12% passing in the nº 200 sieve. It was compacted in 0.4 m layers with 6 passes of a 6-ton vibratory roller.

3 Zone II, a transition for Zone I, has a constant width of 4.0m and is flared to 8.0m at the contact with the foundation. The material for Zone II is selected fine rockfill with a maximum diameter of 0.4m. The material has 35% to 70% in weight passing the 1" sieve and 3% to 8% passing the nº 200 sieve. It was compacted in 0.4m thick layers, with 6 passes of a 10-ton vibratory roller. Zone III corresponds to the upstream third and consisted of unaltered rockfill, compacted in 1.0m thick layers, with 4 passes of a 10-ton vibratory roller, applying150 liters of water per cubic meter of rockfill. The material presented up to 40% passing in the 25mm sieve and up to 3% passing in the # 200 sieve. Figure 2. Main section with rockfill zoning of the dam Zone IV, corresponding to the downstream portion, consisted of unselected rockfill, compacted in 2.0m thick layers, with 4 roller passes, without addition of water. Weathered rock, available from the upper portion of the spillway excavation, was used mainly in the left abutment and partially in the riverbed portion of the embankment. The material presented from 15% to 60% passing in the 25 mm sieve and 2% to 7% passing in the # 200 sieve. Figure 2 shows the geometry of the dam and the zoning of the rockfill. 3 Displacements monitoring design To monitor the vertical and horizontal displacements of the rockfill embankment three sections were chosen, representing the right abutment, the highest section in the riverbed and the left abutment, corresponding 3 to Stations 40+00, and The instrumentation of the upstream slab concentrated on the observation of the differential displacements between the slab and the plinth, the opening of the joints between slabs in the area of the abutments, and the observation of the temperatures and stresses. After the reservoir impound an additional instrumentation was installed to monitor the area where cracks were appeared in the slabs. Settlements of the rockfill embankment are being monitored through settlement hydraulic cells, of the Swedish box type. Additionally, two magnetic settlement gauges were installed on riverbed, one in Zone III, other in Zone IV with plates at each 4 m and 6 m respectively. The horizontal displacements are measured in the same positions of the

4 settlement cells, through multiple rod extensometers with KM horizontal stems. Superficially, the horizontal and vertical displacements are being measured through topographical marks in the top of the slab and slopes including marks in the instrumentation reading cabins. The global control of the seepage flow through the dam and foundation is made by a triangular flow meter, MV01, installed in the top of the downstream cofferdam. The Figures 3, 4 and 5 shows the instrumentation of the rockfill embankment in the right bank, in the riverbed (highest section) and in the left bank. Figure 3. Typical section and instrumentation plan on the right bank Figure 4. Typical section and instrumentation plan on the riverbed Figure 5. Typical section and instrumentation plan on the left bank 4

5 4 Monitoring instrumentation data 4.1 Construction Period The settlements measured during the construction period, in the highest section of the dam, Station 49, reached the values of 1700 mm in Zone III and 2900 mm in Zone IV. Considering such settlements recorded by instrumentation and performing a retroanalysis, the following average deformability moduli were obtained for the rockfill embankment, Souza et al [5]: Zone III - E = 32 Mpa Zone IV - E = 20 Mpa The maximum horizontal displacement observed in section 49, at the end of the construction period, was of 590 mm measured at the top and 530 mm measured inside the embankment. The following occurrences were verified during the construction of the dam, regarding the behavior of the rockfill embankment: At the beginning of the construction 2nd stage of the slab, between el 70 m and el 135 m, voids were observed, of the order of some centimeters, between the upstream slab and the rockfill embankment of Zone I, at el 70 m, top of the 1st stage. Those voids were filled with mortar and cement grout, before the construction of the slab, above el 70 m. Some superficial cracks were observed in the exposed face of Zone I, before the construction of the upstream slab second stage, between el 70 m and el 135 m, around el 115 m at the left abutment. Cracks were filled with fine sand applied with water and the slope face was recomposed with material from Zone I. 4.2 Reservoir impound and Operation Periods The reservoir impound started on June 10, 1994, with water level at el 40 m, increasing quickly to el 120 m on June 16 and to el 134 m on July 13, where it remained stable until November. The filling restarted on November 11 and the reservoir reached its maximum level at el 138 m on November 15, 1994 and since then it has been oscillating between 138 m and m. To monitor the behavior during the reservoir impound and operation periods, the displacements of the construction phase were reset. The displacements measurements of CFRD during the 15 years of operation, including the period of filling the reservoir, are presented in Figures 6 to Measurements analysis From the measurements analysis, fifteen years after the reservoir impound, we noted the following observations and occurrences: The largest vertical displacement of the superficial marks(surface benchmarks) occurred in the central section of the dam, station 49 - Figure 7, having reached at the crest about 615 mm at MS11 and 515 mm at the mark of the reading cabin CL-6 at El. 110 m; The maximum vertical displacement measured inside the rockfill by settlement cells was 550 mm, El. 110 m - CR18 - Station 49, and the maximum measured in Zone I was 520 mm, El. 85 m - CR14, Figure 7, central section of the dam; The maximum horizontal displacement was of 385 mm at MS22 at the crest, and internally it was of 310 mm at KM6P1 in the central section of the CFRD, Figure 10; During the first year of operation the behavior of the dam, in terms of displacements and seepage flow, was perfectly normal, being observed a tendency of stabilization of the measurements; 5

6 vertical displacement (mm) vertical displacement (mm) vertical displacement (mm) cr01 cr02 cr03 cr05 cl01 cl02 cl03 ms07 ms21 cr06 cr07 cr08 cr09 Figure 6. STATION 40 Vertical displacements cr 10 cr 11 cr 14 cl 04 cl 05 cl 06 ms 11 ms 22 cr 15 cr 17 cr 18 Figure 7. STATION 49 Vertical displacements cr19 cr20 cr21 cr22 cr23 cl07 cl08 ms16 ms19 ms24 Figure 8. STATION 62 Vertical displacements 6

7 Horizontal displacement (mm) Horizontal displacement (mm) KM1P1 KM1P2 KM1P3 KM2P1 KM2P2 cl01 cl02 cl03 MS07 MS21 KM1P4 KM2P3 KM3P1 KM3P Figure 9. STATION 40 Horizontal displacements MS22 KM4P1 KM4P2 KM4P3 KM4P4 KM5P1 KM5P2 KM5P3 KM6P1 KM6P2 cl04 cl05 cl06 MS11 Figure 10. STATION 49 Horizontal displacements Horizontal displacement (mm) KM7P1 KM7P2 KM7P3 KM8P1 KM8P2 CL07 CL08 MS16 MS19 MS24 Figure 11. STATION 62 Horizontal displacements 7

8 The specific vertical displacements, registered by the surface benchmarks, were practically the same in the three sections in November of 1995, one year after the filling of the reservoir. In November 2008 the increment of the vertical displacements in related to November 1995 was of 40% at Station 40, 49% at Station 49 and 90% at Station 62, see Table 1. These values indicate the influence of the rockfill wetting by the seepage flow at the left abutment that even affected the central section of the dam. Station. Table 1: Specific vertical displacements 1 year and 14 years after filling Specific Specific Vertical Vertical Height Vertical Vertical displacement displacement (m) displacement displacement Nov 1995 (mm) Nov 2008 (mm) Nov1995 (%) Nov2008 (%) RATIO 2008/199 5 (%) ,2451 0, , ,2567 0, , ,2988 0, ,29 6 Cracks in the upstream slab Between September and November of 1995, the instruments installed at Station 62 registered a fast intensification of the vertical displacements, with increase of speeds of up to ten times, Figure 12. The increase of the settlements speed coincides with the increase of the seepage flow and with the observation of damages in the slab. Station 62 - Vertical Displacements MS e CL - Flow MV cl07 cl08 ms16 ms19 ms24 MV01 Settlement (mm) Jun-94 2-Dec May Nov May Nov May Nov May Nov May-99 6-Nov-99 4-May Oct Apr Oct Apr-02 Flow (l/s) 21-Oct Apr Oct Apr Oct-04 8-Apr-05 5-Oct-05 3-Apr Sep Mar Sep-07 Figure 12: Total flow and vertical displacements, MS and CL Station 62 The intensification of the flow through the upper part of the left abutment would have drained the water towards the river channel and to downstream, due to the conformation of the foundation, causing rockfill wetting and the sudden increment of vertical and horizontal displacements. Divers, down to a depth of 40m, firstly performed the investigations of the upstream slab, at the left abutment area, in These inspections detected a crack 20 m deep close to the plinth in the base of slab L5, a set of transversal fissures 26 m deep at the slab L6 with opening of up to 35 mm and crushing of the concrete in the upper portion at the joint L12/L13, Figure 13. 8

9 Figure 13: Location of damages at the left abutment slabs In a second stage the underwater inspection with divers and robot identified several points of suction in the cracks of the slab. Three crack treatment campaigns were accomplished in these places through the placing of fine silty sand in 30-kg bags applied with the aid of divers. The sand, with granulometry of 99.8% #1.2 mm; 99.5% #0.6 mm; 90.4% #0.3 mm; 26.1 #0.15 mm, in terms of percentage that passes through sieve was thrown directly on the cracks, until clogging and stopping the suction. The cracks in the slabs are in the same area where the surface cracks happened in Zone I at the end of the construction period. The causes are associated essentially to the protuberance of the rock massive in the upstream side creating a strong unevenness between Zones III and IV areas of the dam. The treatment with placing of silty sand directly on the points of suction of the slab was effective in the reduction of the flow. In consequence a reduction was observed in the rates of the measured displacements at the left abutment. 7 Conclusions The main conclusions regarding the performance of the concrete face rockfill dam are: The sudden increase in the vertical displacements, starting from September 1995, was probably caused by the infiltrations through the cracks in slabs L4 / L5 and L6, resulting in the wetting of the rockfill of Zone IV of the dam, especially at the left abutment; 9 The specific vertical displacements ranged from 0.34% to 0.56% in November 2008 and still do not show a trend of stabilization; The long term slow deformation of the rockfill embankment varied ranged from 40% to 90% since November 1995 up to November 2008; The follow-up through the instrumentation of the dam was crucial to detect and correct the problems; The cracks in the slabs of the left abutment are associated with the foundation topography, with the plinth much more elevated in relation to the downstream toe of the dam; The treatment with silty sand was effective in the reduction of the flow through the slab cracks. In consequence a reduction was observed in the rates of the measured displacements at the left abutment; 8 Acknowledgements The authors wish to thank Companhia Hidro Elétrica do São Francisco - CHESF for their support and the authorization to publish the data presented in this work. Bibliography [1] Eigenheer, L.P, Vasconcelos, A.A., Souza, R.J.B. Cavalcanti, A.J.C.T. (2000) Xingó concrete face rockfill dam, XX ICOLD International Congress on Large Dams, Beijing - China. [2] Souza, R.J.B., Cavalcanti, A.J.C.T., Vasconcelos, A.A., Silva, P. N., (2007) Performance of the Xingó concrete face rockfill

10 dam, III Symposium on CFRD Dams honoring J. Barry Cooke, Florianópolis SC- Brazil. [3] Souza, R.J.B., Silva, S.A., Silveira, J.F.A. (1999) Xingó concrete face rockfill dam behavior of the dam on the left abutment, II Symposium on CFRD, Florianópolis SC- Brazil. 10

The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity).

The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity). Location The La Yesca Hydroelectric Project named Ing. Elías Ayub in honor of a former General Director of CFE, is part of the Santiago Hydrological System, 105 km northwest of the city of Guadalajara,

More information

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING 6 TH INTERNATIONAL CONFERENCE ON DAM ENGINEERING C.Pina, E.Portela, J.Gomes (ed.) Lisbon, Portugal, February 15-17, 2011 NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING S. Moll *,

More information

PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC

PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC J.-M. Konrad 1, M. Shen 1, R. Ladet 2 1. Dept. of Civil Engineering UniversitŽ Laval,QuŽbec, Canada, G1K 7P4 2. Hydro-QuŽbec,

More information

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING EMILIO MARTINEZ Senior Hydraulic Engineer, Department of Hydraulic, CVG EDELCA Hid. Macagua I, Apartado 28

More information

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams D. Silva Matos & José Paixão EDP - Gestão da Produção de Energia, S.A., Porto J.V. Lemos & N. Azevedo Laboratório Nacional de Engenharia Civil, Lisboa

More information

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Haibo Wang, Deyu Li & Huichen Yang China Institute of Water Resources and Hydropower Research, Beijing, China SUMMARY: Seismic analyses of

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet. Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam

Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam Jian-ming Zhao, Jinsheng Jia, Yanfeng Wen China Institute of Water Resources and

More information

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization J. David Rogers Dams Symposium Association of Engineering Geologists Annual Meeting Las Vegas, Nevada September 22, 2005 The

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS

SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS D.S. Kim Korea Institute of Science and Technology (KAIST), Professor M.K. Kim HYUNDAI ENGINEERING Co., LTD. S.H. Kim Korea

More information

THE ITAPEBI HYDROELECTRIC DEVELOPMENT IN THE JEQUITINHONHA RIVER

THE ITAPEBI HYDROELECTRIC DEVELOPMENT IN THE JEQUITINHONHA RIVER THE ITAPEBI HYDROELECTRIC DEVELOPMENT IN THE JEQUITINHONHA RIVER Author: Silvano Custódio Albertoni THE ITAPEBI HYDROELECTRIC DEVELOPMENT IN THE JEQUITINHONHA RIVER 1. INTRODUCTION The Itapebi HPP is located

More information

Practical aspects of dam break analysis

Practical aspects of dam break analysis Practical aspects of dam break analysis Louis C Hattingh Hattingh Anderson Associates CC Dam break analysis It is a model You need to understand what you model & have an idea of the answers that you expect

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1 Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

The Seismic Performance of Tousheh Dam During the Chi-Chi Earthquake

The Seismic Performance of Tousheh Dam During the Chi-Chi Earthquake ( C023) Proceedings of 9 th Conference on Current Researches in Geotechnical Engineering, Shihman Reservoir, Tai-Yuan, Taiwan, R.O.C. August 30-3 and September, 200 92 () (the semi-analysis-testing method)(2)

More information

Teton Dam Failure A Review of the Technical Factors Contributing to the Failure

Teton Dam Failure A Review of the Technical Factors Contributing to the Failure Teton Dam Failure A Review of the Technical Factors Contributing to the Failure Outline of Presentation Location, Background and Project Statistics Technical Causes of Failure to be Discussed Geology

More information

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM Esen Yalım KARADUMAN BAR-SU Eng. & Conc. Inc. Ankara Turkey

More information

PRACTICAL EVALUATION OF LUGEON S AND PAUTRE S CRITERIA FOR LEAKAGES THROUGH CONCRETE DAMS

PRACTICAL EVALUATION OF LUGEON S AND PAUTRE S CRITERIA FOR LEAKAGES THROUGH CONCRETE DAMS PRACTICAL EVALUATION OF LUGEON S AND PAUTRE S CRITERIA FOR LEAKAGES THROUGH CONCRETE DAMS João Francisco SILVEIRA Technical Director, SBB Engenharia Ltda. BRAZIL 1. INTRODUCTION One of the difficulties

More information

Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu

Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu State Key Laboratory of Hydroscience and Engineering, TsinghuaUniversity, Beijing 100084, China

More information

APPENDIX I. Deformation Analysis of the Left Abutment

APPENDIX I. Deformation Analysis of the Left Abutment APPENDIX I Deformation Analysis of the Left Abutment August 25, 2016 Appendix I Deformation Analysis of the Left Abutment TABLE OF CONTENTS I1 INTRODUCTION... 1 I2 MODEL DEVELOPMENT... 2 I2.1 General...

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS Antonio Fernandez, Ph.D. 1 ABSTRACT Paul C. Rizzo Associates,

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Michael McKay 1 and Francisco Lopez 2 1 Dams Engineer, GHD Pty 2 Principal Dams/Structural Engineer, GHD Pty

More information

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY.

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. By Er. S. Muthu Parvatha Vardhini, Asst. Executive Engineer, (Designs) Water Resources

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Time-dependent deformation in high concrete-faced rockfill dam and separation between concrete face slab and cushion layer

Time-dependent deformation in high concrete-faced rockfill dam and separation between concrete face slab and cushion layer Computers and Geotechnics 31 (2004) 559 573 www.elsevier.com/locate/compgeo Time-dependent deformation in high concrete-faced rockfill dam and separation between concrete face slab and cushion layer Bingyin

More information

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method E. Yıldız & A.F. Gürdil Temelsu International Engineering Services Inc., Ankara, Turkey SUMMARY: Time history analyses conducted

More information

Session 3 - Case histories KARIBA DAM

Session 3 - Case histories KARIBA DAM ICOLD COMMITTEE ON CONCRETE DAMS SPANISH COMMITTEE ON CONCRETE FOR DAMS INTERNATIONAL JOURNAL ON HYDROPOWER & DAMS WORKSHOP October 18 & 19, 2007 Granada, Spain CHEMICAL EXPANSION OF CONCRETE IN DAMS &

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

(Refer Slide Time: 02:10)

(Refer Slide Time: 02:10) Soil Mechanics Prof. B.V.S. Viswanathan Department of Civil Engineering Indian Institute of Technology, Bombay Lecture 24 Flow of water through soils-v Welcome to lecture five of flow of water through

More information

Instructor : Dr. Jehad Hamad. Chapter (7)

Instructor : Dr. Jehad Hamad. Chapter (7) Instructor : Dr. Jehad Hamad Chapter (7) 2017-2016 Soil Properties Physical Properties Mechanical Properties Gradation and Structure Compressibility Soil-Water Relationships Shear Strength Bearing Capacity

More information

b) EFFECTIVE STRESS (c) SEEPAGE

b) EFFECTIVE STRESS (c) SEEPAGE b) EFFECTIVE STRESS B1. A fine sand layer of 5 m thickness lies on a 5 m clay deposit. The water table is at the ground surface. Below the clay is a rock formation. Piezometers installed in the rock show

More information

Wikipedia.org BUILDING STONES. Chapter 4. Materials of Construction-Building Stones 1

Wikipedia.org BUILDING STONES. Chapter 4. Materials of Construction-Building Stones 1 Wikipedia.org BUILDING STONES Chapter 4 Materials of Construction-Building Stones 1 What is Stone? Stone is a concretion of mineral matter. Used either as a; Construction material, Manufacture of other

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

Dam Safety Aspects of Reservoir-Triggered Seismicity

Dam Safety Aspects of Reservoir-Triggered Seismicity Dam Safety Aspects of Reservoir-Triggered Seismicity Dr. Martin Wieland Chairman, Committee on Seismic Aspects of Dam Design, International Commission on Large Dams (ICOLD) Poyry Energy Ltd., Zurich, Switzerland

More information

The 2011 Tohoku earthquake and dams

The 2011 Tohoku earthquake and dams The 2011 Tohoku earthquake and dams N. Matsumoto & T. Sasaki Japan Dam Engineering Center, Japan T. Ohmachi Tokyo Institute of Technology, Japan ABSTRACT: The magnitude 9.0 Tohoku earthquake occurred on

More information

Performances of Rockfill Dams During Recent Large Earthquakes

Performances of Rockfill Dams During Recent Large Earthquakes Missouri University of Science and Technology Scholars' Mine International Conferences on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics 2010 - Fifth International Conference

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education

More information

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Yong-Beom Lee, Jorge Castillo Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting

More information

THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT

THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT Authors: Miguel Zerbini de Faria, Paulo Eduardo de Almeida Godoy, Francisco Cordero Donha Filho, Alceu Reusing THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT

More information

International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February ISSN

International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February ISSN P P International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February-2017 1053 Effect of Impervious Core on Seepage through Zoned Earth Dam (Case Study: Khassa Chai Dam) Abstract

More information

BKS Palace Consortium conducted the geotechnical investigation for the proposed pumped storage scheme (PSS) in the Steelpoort area.

BKS Palace Consortium conducted the geotechnical investigation for the proposed pumped storage scheme (PSS) in the Steelpoort area. 6. GEOLOGY 6.1 Introduction The high-lying Nebo Plateau to the west of the Steelpoort Valley comprises gently undulating terrain at elevations of around 1700m at the upper reservoir site. To the east,

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2 Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method S. Soleymani 1, A. Akhtarpur 2 1 Group of Dam Construction, Toossab Company, P.O. Box 917751569, Mashhad City, Iran, PH (+98) 511-7684091;

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). J. Baztán and A. Martín Gas Natural Fenosa Engineering, S.L.U, Madrid, Spain. J. M. Galera and D. Santos Subterra Ingeniería

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

Moglicë HPP - Albania. Jorge Terron

Moglicë HPP - Albania. Jorge Terron Moglicë HPP - Albania Jorge Terron DEVOLL MOGLICË PROJECT Background Location Project Summary Sweco duties Plant overview Geology Cavern complex Layout Site investigations Rock mass characterization Geology

More information

1 INTRODUCTION 1.1 General

1 INTRODUCTION 1.1 General #701 475 Howe Street Vancouver, British Columbia V6C 2B3 August 1, 2014 Robin McCall Wolverine Mine Environmental Superintendent Dear Mr. McCall: 1 INTRODUCTION 1.1 General This letter report presents

More information

Modelling the Construction of a High Embankment Dam

Modelling the Construction of a High Embankment Dam KSCE Journal of Civil Engineering (2014) 18(1):93-102 Copyright c2014 Korean Society of Civil Engineers DOI 10.1007/s12205-014-0180-4 TECHNICAL NOTE Geotechnical Engineering pissn 1226-7988, eissn 1976-3808

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

CHAPTER 5 EVIDENCES AND PARAMETERS AFFECTING DEBRIS FLOW-FLOOD PROCESSES IN NAM KO YAI SUB-CATCHMENT

CHAPTER 5 EVIDENCES AND PARAMETERS AFFECTING DEBRIS FLOW-FLOOD PROCESSES IN NAM KO YAI SUB-CATCHMENT CHAPTER 5 EVIDENCES AND PARAMETERS AFFECTING DEBRIS FLOW-FLOOD PROCESSES IN NAM KO YAI SUB-CATCHMENT In this chapter, evidences of geotechnical properties of rocks and soils, as well as evidence of the

More information

VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS

VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS Anna SZOSTAK-CHRZANOWSKI, Canada, Michel MASSIERA, Canada, Adam CHRZANOWSKI, Canada, Fabien LE HOAN,

More information

ICOLD TCDS - Technical Committe on Dam Surveillance

ICOLD TCDS - Technical Committe on Dam Surveillance Click to edit Master title ICOLD TCDS - Technical Committe on Dam Surveillance Sam Johansson TCDS Foundation SwedCold, 2017-10-09 1 Click TCDS to - edit Master title Technical Committe on Dam Surveillance

More information

1.060 Engineering Mechanics II Spring Problem Set 8

1.060 Engineering Mechanics II Spring Problem Set 8 1.060 Engineering Mechanics II Spring 2006 Due on Monday, May 1st Problem Set 8 Important note: Please start a new sheet of paper for each problem in the problem set. Write the names of the group members

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton. 1.

Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton. 1. Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton 1.0 Introduction RCC Dams, normally designed as traditional gravity structures similar

More information

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6)

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6) Geology 229 Engineering Geology Lecture 7 Rocks and Concrete as Engineering Material (West, Ch. 6) Outline of this Lecture 1. Rock mass properties Weakness planes control rock mass strength; Rock textures;

More information

Jurnal Teknologi EFFECTS OF UPSTREAM SLOPE OF CLAY CORE AND HEIGHT OF THE ROCK FILL DAMS AGAINST HYDRAULIC FRACTURING. Full Paper

Jurnal Teknologi EFFECTS OF UPSTREAM SLOPE OF CLAY CORE AND HEIGHT OF THE ROCK FILL DAMS AGAINST HYDRAULIC FRACTURING. Full Paper Jurnal Teknologi EFFECTS OF UPSTREAM SLOPE OF CLAY CORE AND HEIGHT OF THE ROCK FILL DAMS AGAINST HYDRAULIC FRACTURING Didiek Djarwadi a*, Kabul Basah Suryolelono b, Bambang Suhendro b, Hari Christady Hardiyatmo

More information

FRED BURR DAM FEASIBILITY STUDY

FRED BURR DAM FEASIBILITY STUDY FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

Effects of climate change on landslide frequencies in landslide prone districts in Sri Lanka; Overview

Effects of climate change on landslide frequencies in landslide prone districts in Sri Lanka; Overview Effects of climate change on landslide frequencies in landslide prone districts in Sri Lanka; Overview T. D. Rathnaweera 1)., M. P. Palihawadana 2)., H. L. L. Rangana 3). and Dr. U. P. Nawagamuwa 4). Abstract

More information

Phase II Report: Project Definition Options. Dam Safety

Phase II Report: Project Definition Options. Dam Safety OSHPC BARKI TOJIK Phase II Report: Project Definition Options Dam Safety Part 1: Basic data & Dam Design DAM Safety 2 Geology / Geotechnics...: Tectonics / Seismicity : DAM Design - Dam Location - Type

More information

ENVIRONMENTAL EFFECTS OF EARLY AGE AND LONG TERM RESPONSE OF PCC PAVEMENT

ENVIRONMENTAL EFFECTS OF EARLY AGE AND LONG TERM RESPONSE OF PCC PAVEMENT ENVIRONMENTAL EFFECTS OF EARLY AGE AND LONG TERM RESPONSE OF PCC PAVEMENT Luis Julian Bendana, Engineering Res Specialist I New York State DOT Jason Wise, Graduate Student Ohio University ABSTRACT Early

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

Sedimentation in the Nile River

Sedimentation in the Nile River Advanced Training Workshop on Reservoir Sedimentation Sedimentation in the Nile River Prof. Dr. Abdalla Abdelsalam Ahmed 10-16 Oct. 2007, IRTCES, Beijing, China CWR,Sudan 1 Water is essential for mankind

More information

Climate effects on landslides

Climate effects on landslides GEORAMP ONE DAY SYMPOSIUM Climate effects on landslides E. E. Alonso, M. Sondón, N. M. Pinyol Universitat Politècnica de Catalunya October 14th, 2016. UPC, Barcelona Infiltration (evaporation) and slope

More information

High-Precision Strength Evaluation of Rock Materials and Stability Analysis for Rockfill Dams

High-Precision Strength Evaluation of Rock Materials and Stability Analysis for Rockfill Dams 1st International Symposium on Rockfill Dams High-Precision Strength Evaluation of Rock Materials and Stability Analysis for Rockfill Dams Hiroki SAKAMOTO Research Engineer Public Works Research Institute,

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown.

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown. Name 1. In the cross section of the hill shown below, which rock units are probably most resistant to weathering? 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

CONSTRUCTION OF A DATA BASE SYSTEM FOR IRRIGATION DAMS

CONSTRUCTION OF A DATA BASE SYSTEM FOR IRRIGATION DAMS CONSTRUCTION OF A DATA BASE SYSTEM FOR IRRIGATION DAMS TANI SHIGERU 1 SUMMARY The Hyogo-Ken Nambu Earthquake damaged many earthen structures. The Japanese Society of Civil Engineers stated that databases

More information

STEVENS CREEK DAM SEISMIC STABILITY EVALUATIONS OF CHESBRO, LENIHAN, STEVENS CREEK, AND UVAS DAMS (SSE2) PHASE A: STEVENS CREEK AND LENIHAN DAMS

STEVENS CREEK DAM SEISMIC STABILITY EVALUATIONS OF CHESBRO, LENIHAN, STEVENS CREEK, AND UVAS DAMS (SSE2) PHASE A: STEVENS CREEK AND LENIHAN DAMS SEISMIC STABILITY EVALUATIONS OF CHESBRO, LENIHAN, STEVENS CREEK, AND UVAS DAMS (SSE2) PHASE A: STEVENS CREEK AND LENIHAN DAMS STEVENS CREEK DAM COMPILATION REPORT (REPORT No. SSE2A-SC) Prepared for SANTA

More information

Rogun Hydropower Project

Rogun Hydropower Project Rogun Hydropower Project Dam site Geological investigations in the Downstream Right Bank Ascencio Lara Coyne et Bellier Almaty, 11-12 February 2013 Objectives of the presentation As the stability conditions

More information

QUESTION BANK DEPARTMENT: CIVIL SUBJECT CODE / Name: CE 2251 / SOIL MECHANICS SEMESTER: IV UNIT 1- INTRODUCTION PART - A (2 marks) 1. Distinguish between Residual and Transported soil. (AUC May/June 2012)

More information

Rock Scour: Past, Present and Future. George W. Annandale, D.Ing, P.E. Engineering and Hydrosystems Inc. Denver, Colorado

Rock Scour: Past, Present and Future. George W. Annandale, D.Ing, P.E. Engineering and Hydrosystems Inc. Denver, Colorado Rock Scour: Past, Present and Future George W. Annandale, D.Ing, P.E. Engineering and Hydrosystems Inc. Denver, Colorado Outline Rock Scour Process Jet Hydraulics Scour Resistance of Rock Methods of Analysis

More information

Changes in soil deformation and shear strength by internal erosion

Changes in soil deformation and shear strength by internal erosion Changes in soil deformation and shear strength by internal erosion C. Chen & L. M. Zhang The Hong Kong University of Science and Technology, Hong Kong, China D. S. Chang AECOM Asia Company Ltd., Hong Kong,

More information

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack Evaluation of the behaviour of an arch-gravity dam featuring a pre-existing crack Dr Aïssa Mellal, Civil Engineer STUCKY SA, Switzerland NUMERICS IN GEOTECHNICS AND STRUCTURES - ZSoil Days - 1-2 September

More information

RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE STUDY OF A DAM FAILURE IN VIETNAM

RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE STUDY OF A DAM FAILURE IN VIETNAM Geotec., Const. Mat. & Env., DOI: https://doi.org/10.21660/2018.41.57454 ISSN: 2186-2982 (Print), 2186-2990 (Online), Japan RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE

More information

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA Vegetation effects on river hydraulics Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA jjdevries@ford-consulting.com SAC05 D2P31 RM 99.0L VIEW UPSTREAM AT UPSTREAM END DWR

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin 2

Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin 2 Malaysian Journal of Civil Engineering 29 Special Issue (1):100-117 (2017) EROSION CHARACTERISTICS OF A MEDIUM SAND BREACHED EMBANKMENT Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin

More information

DISTRIBUTION of WATER RESOURCES

DISTRIBUTION of WATER RESOURCES DAM GEOLOGY DISTRIBUTION of WATER RESOURCES Definition A dam is a structure which prevents the flow of water and accumulates it in a reservoir Karakaya Dam/Diyarbakır Atatürk Dam/Şanlıurfa Needs for Dam

More information

SETTLEMENTS OF AN EMBANKMENT FOUNDED ON A SOFT SOIL

SETTLEMENTS OF AN EMBANKMENT FOUNDED ON A SOFT SOIL Proceedings, 11 th FIG Symposium on Deformation Measurements, Santorini, Greece, 23. SETTLEMENTS OF AN EMBANKMENT FOUNDED ON A SOFT SOIL Pavel Zvanut ZAG - Slovenian National Building and Civil Engineering

More information

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary 2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary October 2013 Introduction Manitoba experienced unprecedented flooding in 2011. While flooding was

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

November 20, 2003 Project

November 20, 2003 Project November 20, 2003 Project 032810 1021 Main Street Winchester, MA 01890-1970 781.721.4000 781.721.4073 fax Mr. Bobby Van Cleave Geotechnical Engineer Little Rock District Federal Building, 7th Floor 700

More information

Chapter 7 Permeability and Seepage

Chapter 7 Permeability and Seepage Permeability and Seepage - N. Sivakugan (2005) 1 7.1 INTRODUCTION Chapter 7 Permeability and Seepage Permeability, as the name implies (ability to permeate), is a measure of how easily a fluid can flow

More information

Managing Our Water Retention Systems

Managing Our Water Retention Systems Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information