2 Location The La Yesca Hydroelectric Project named Ing. Elías Ayub in honor of a former General Director of CFE, is part of the Santiago Hydrological System, 105 km northwest of the city of Guadalajara, within the limits of the states of Nayarit and Jalisco.

3 The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity). The construction was made by Ingenieros Civiles Asociados ICA

4 Hydrological System of the Santiago River La Yesca Proyect El Cajón Dam ( ) Aguamilpa Dam ( )

5 Layout of the Project Diversion tunnels Upstream cofferdam Concrete face rock fill dam Tailrace tunnel Downstream Cofferdam Underground powerhouse

6 Elements of the Project 1 Diversion tunnels, 2 Upstream cofferdam, 3 Downstream Cofferdam, 4 Concrete face rock fill dam, 5 Intake to Penstock, 6 Underground powerhouse, 7 Spillway, 8 Electric substation, 9 Bank of rock.

7 Q m 3 /s View diversion tunnel, february 4, 2010

8 400,000 m 3 excavation System of geological faults

9

10

11 Unstable block - Tunnel 1 Unstable block Monolith concrete Sliding by colapso fault

12 Unstable block - Tunnel 2 Monolith concrete Sliding by colapso fault

13 Geological Model

14 Geological Model

15 Construction of a concrete monolith.

16 Cut slope Descopete Stage Elevation (m. s. n. m.) Volume of material removed (m 3 )* I to ,00 II 535 to ,00 III 520 to , IV 500 to480 80, Total ,00 Total block volume to stabilize: , ,00 = ,10 m 3

17 A 12 rotation of the longitudinal axis of the dam. As a consequence, the location of the spillway was modified. OBRA DE EXCEDENCIAS OBRA DE EXCEDENCIAS CORTINA OBRA DE GENERACIÓN TÚNELES DE DESVÍO CORTINA ATAGUÍA PREATAGUÍA ORIGINAL OBRA DE TOMA PRESENT OBRA DE TOMA

18 Structural reinforcement diversion tunnels A B A' B'

19 Shear-Column

20 Spillway

21 Main dam section La Yesca dam is m high and 12,000,000 m 3 in dam body. EL. 580,50 NAMO 575,00 NAME EL. 577,00 Alluvial processing < m, 2 NAMINO 518,00 3H 3G EL. 469,00 1,85:1 2 CONCRETE FACE 1,4:1 1B 3B T 1:1 1,4:1 3C 4 1:1 Alluvial, 3B Transition (rock sound o alluvial), T Compacted rockfill sound, 3C Rock sound >1.00 m, 4 Lags free of clay materials and weathered bedrock, maximun size >0.80 m, 3G Lags free of clay materials and weathered bedrock, maximun size >0.40 m, 3H Sandy silt, 1B EL. 409,00 EL. 375,00

22 Properties of the Dam Obtained of rockfill test (before construction) Table 1: Parameters used in La Yesca analyses (project) Material Unit weight Poisson s Ratio E c E f ϕ 0 Δϕ g d (kn/m 3 ) Ν MPa MPa degrees Degrees 3B; gravel T; rockfill C; rockfill

23 Technical achievements and advanced experience The main target was to obtain a rockfill embankment with low deformability. We used sound rocks, well-graded grain size distribution curves, with the addition of 250 lts/m 3 of water for all materials.

24 Technical achievements and advanced experience In the 3B zone, the layer thickness was alluvial material of maximum 0.8m, 1m in T zone and 1.2 m in 3C zone. We used a heavy vibratory roller compactor (12.2 t of mass in the drum); these design aspects were implemented during construction and have led ton get a good performance of the embankment.

25 Due to the lack of information about the dynamic properties of the rockfill materials: shear modulus of rigidity (G) and the critical damping ratio (λ). These parameters were estimated based on the analytical expressions reported in the literature and adjusted in terms of the experience gained in materials with similar characteristics.

26 If information is available on history cases where both the excitation and the response of some dams has been recorded. Moduli of the materials and the damping factors can be estimated by solving the inverse problem (identification of parameters). This is not reported in technical papers.

27 Technical achievements and advanced experience CROWN El END OF CONSTRUCTION FLOW SHARFT PLINT EL V-23 V-1 V-2 V V-52 CONCRETE FACE V-53 V-54 V-55 V-56 V-59 V-60 V-61 V-24 V-25 V-26 V-27 V-28 V-82 V-83 V-84 V-85 V-86 V-87 V-88 V V-4 V-5 V-6 V-7 V-8 V-9 V-10 V-11 V-12 V-13 L T2-M10 L T2-M9 L T2-M L T2-M7 V-33 V L T2-M6 L T2-M B 175 MPa T 163 MPa 3C 66 MPa L T2-M L T2-M L T2-M2 El. 409,00 L T2-M MEASURING PIN PROFILE OF ROCK SOUND IC-6 ALLUVIAL PROFILE MEASURING PIN IC-8

28 Technical achievements and advanced experience END OF CONSTRUCTION The maximum settlement was 90cm, in material 3B. Field measurements made with hydraulic levels and as well as with vertical inclinometers lead to maximum values of about 95 cm that occurred at mid height of the embankment at material T (similar to 92 cm calculated in the design stage). The peak calculated settlements in zone 3C was 90cm.

29 Technical achievements and advanced experience. The set of results covering the different zones of the dam show that the maximum measured and calculated settlements are quite similar and it can then be concluded that the construction procedure of the embankment was reasonably well modeled.

30 Technical achievements and advanced experience FIRST FILLING APRIL-2012 TO DATE The settlements measured on the dam using water levels for the period from April 3, 2012 (initial impounding) to August 15, 2013 were: 9 cm in 3Bmaterial. 11 cm in the T material. 12 cm in the 3C material. The settlement value is much lower than the estimated with the behavior model.

31 Contours of settlements (cm) determined with hydraulic levels at La Yesca Dam (august 7, 2013) for first filling Water level in the dam at September 6, Sep-12 2

32 Properties of the Dam Table 2: Static and dynamic deformation moduli measured in the field in comparison with those assumed in the project (100% E 0 ) Material (g d ) field E s (g d ) projet (100%E 0 ) Project V s E d E d / E s No. kn/m 3 MPa kn/m 3 MPa (m/s) MPa 3B T C

33 Properties of the Dam It can be observed that the values of the unit weights reached in the field using the implemented compaction procedure were in all cases higher than those adopted for design.

34 Properties of the Dam Other wise, when comparing the deformation moduli measured with the hydraulic levels with those adopted by the project, differences of about 25% are encountered. Do we need a Triaxial camera in order to know better the rockfill parameters? Do we need this for dams with 250m or 300m high, or with strong earthquakes?

35 Technical achievements and advanced experience The maximum normal displacement measured in the concrete face were 8 cm to the center of the concrete face.

36 Instrumentation installed in the concrete face Inclinometers displacement inclined face installed concrete slabs L-15, L-21 and L-30 Displacement references installed in vertical concrete face, elevation masl

37 Technical achievements and advanced experience Monitoring stabilizer works, anchor-plugs and shear-columns, has shown a good behavior of these structures to date. However, should continue its monitoring to ensure that before a special event such as earthquake or drawdown water levels (for which they were designed) have the expected performance thereby ensuring the integrity of the dam.

38 Measuring instruments installed in the shearpiers Accumulated displacement gauges installed in shear-piers

39 01-abr abr may jun jul ago sep oct nov dic ene feb mar mar abr may jun jul ago sep-13 Pruebas del Desagüe de Fondo Deformación unitaria Cierre de compuerta T-2 Filtraciones en T-1 Entrada de agua al recinto Nivel de embalse en msnm ELEVATIONS IN masl Locating electrical extensometers at anchor-plug 1 MONOLITH LAGGING MATERIAL ANCHOR PLUG L= (+) Expansión (-) Compresión Strain gauges located on the lower bed tunnel anchor-plug 1 EXTUT1-1 EXTUT1-2 EXTUT1-3 EXTUT1-4 EXTUT1-5 EXTUT1-6 EXTUT1-7 EXTUT1-8 EXTUT1-9 EXTUT1-10 EXTUT1-11 EXTUT1-12 EXTUT1-13 EXTUT1-14 EXTUT1-15 Embalse Recinto

40 The characteristics of compressibility of the materials constituting La Yesca Dam, their geometry and the compaction procedures adopted in the field have been determinant in the magnitudes of the low settlements measured during the construction process and two years after the first filling.

41 BNC-3 L1-M13 L1-M12 L1-M11 L1-M10 L1-M9 L1-M8 L1-M7 L1-M6 L1-M5 L1-M4 L1-M3 L1-M2 L1-M1 BNC-2 Asentamiento acumulado en cm BNC-3 L1-M13 L1-M12 L1-M11 L1-M10 L1-M9 L1-M8 L1-M7 L1-M6 Asentamiento acumulado e Settlements concrete -3 face -4 October 4, abr abr may jun jul nov dic ene ene feb may jun jul ago ago-13 Pr -5-6 Asentam El J 04-abr abr may jun jul ago sep oct nov dic ene ene feb feb mar abr may jun jul ago ago sep sep oct-13 Proyecto Hidroeléctrico La Yesca, Jal.

42 01-abr abr abr may may jun jun jul jul ago ago sep sep sep oct oct nov nov dic dic ene ene feb feb mar mar mar abr abr may may jun jun jul jul ago ago sep sep sep oct-13 Asentamiento acumulado en cm 01-abr abr abr may may jun jun jul jul ago ago sep sep sep oct oct nov nov dic dic ene ene feb feb mar mar mar abr abr may may jun jun jul jul ago ago sep sep sep oct-13 Asentamiento acumulado en cm Settlements Trend vs time, Topographical references, Face Rock-Fill. Transversal Line LT1 October 3, 2013 BNC-3 LT1-M1 LT1-M2 LT1-M3 PBC-5 LT1-M4 LT1-M5 PBC-4 LT1-M6 IC-5 PB-IC5 LT1-M7 LT1-M8 LT1-M9 PBC-3 LT1-M10 LT1-M11 Proyecto Hidroeléctrico La Yesca, Jal. Tendencia de Asentamientos vs Tiempo en referencias topográficas de cortina, Cara Enrocamiento Línea Transversal LT1 Elaboró: JASM Instrumento utilizado: Revisó: MMH Nivel automático NAK-2 Fecha de Elaboración: 03-oct-13 BNC-3 LT1-M1 LT1-M2 LT1-M3 PBC-5 LT1-M4 LT1-M5 PBC-4 LT1-M6 IC-5 PB-IC5 LT1-M7 LT1-M8 LT1-M9 PBC-3 LT1-M10 LT1-M11 Proyecto Hidroeléctrico La Yesca, Jal.

43 Water level reservoir Precipitation and spending leak By the desplacement of the longitudinal axis of the dam, the galeries lekage 320 l/s The body of the dam, has a lekage of 220 l/s

44 LEAK PHENOMENON From November 2012 to end of July 2013 the water level fluctuated between elevations 530 and 540 m. During this time, the leaks in the gallery at the bottom of the dam and drainage galleries were maintained with relatively small discharge; total discharge of the almost 80 l/s.

45 The lack of coverage and quality of the rock in this area could explain the fact that when the reservoir reached elevation 540 m, appeared on the gallery covering GD-2, near tympanum, two fissures. These contributed significant leaks in the order 45 l/s. As a remedial measure, a concrete plugs 30 m long was constructed, leaving a length of 15 m accessible for injections seal from the inside.

46

47 STUDIES OF LEAKS AND MONITORING Leakage monitoring is carried out on both sides of the dam. The leaks of the various branches of the injection and drainage galleries, of the slopes and the powerhouse are measured separately, in order to identify their origin and thus identify the areas of greatest contribution. Seepage of the body dam is captured in the gallery at the bottom and measured continuously in an outer triangular spillway.

48 It is relevant in the evolution of the leaks, that during emptying at equal elevations, the discharges recorded at the bottom of the dam and in right margin galleries are higher than those recorded during the first filling. This may be associated with an unblocking of important waterways, due to washing of fine material from some discontinuities of the massif

49 FIELD WORK AND REMEDIAL MEASURES From the reservoir, brine tests were performed to verify whether there were preferential flows to the galleries of right bank or to the filtrations gallery. Residues of brine were detected in the Gallery GD-2 and the leaks registered at the foot of the dam. This fact revealed a communication directly between the reservoir at the elevation 490, and the embankment of the dam.

50 Reinforcement sealing plane through the galleries injection and drainage. a) Longitudinal section; b) Cross Section.

51 The dam and the concrete face shows an excellent behaviour up to now, with less than 20 cm of maximum settlement in the rockfill embankment during two years under operation. The instruments in the concrete face joints have less than 15 mm in opening or settlement as result of the good rockfill behaviour. The phenomenon of leaks that has taken place on the dam and drainage galleries of grouting and after the filling of the reservoir has been controlled almost entirely by implementing of a series of fieldwork, some already executed and others are going to execute.

52 It has been defined very precisely the area of strong contributions and have implemented the necessary corrective measures. To date (November 2014), with an elevation reservoir of m (17m above the NAMO); however, is necessary to ensure that in future such leaks will remain at acceptable values for the project.

53

54 CONCLUSSION FOR US, ONE OF THE MAIN CONCLUSSION IS THAT CONCRETE FACE ROCKFILL DAMS MUST BE HOMOGENUSLY COMPACTED, ALL THE MATERIALS.

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL

DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL Ricardo José Barbosa de SOUZA 1, Aurélio Alves de VASCONCELOS 2, Alberto Jorge C CAVALCANTI 3 Companhia Hidro Elétrica do São Francisco CHESF

More information

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING 6 TH INTERNATIONAL CONFERENCE ON DAM ENGINEERING C.Pina, E.Portela, J.Gomes (ed.) Lisbon, Portugal, February 15-17, 2011 NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING S. Moll *,

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method E. Yıldız & A.F. Gürdil Temelsu International Engineering Services Inc., Ankara, Turkey SUMMARY: Time history analyses conducted

More information

Instructor : Dr. Jehad Hamad. Chapter (7)

Instructor : Dr. Jehad Hamad. Chapter (7) Instructor : Dr. Jehad Hamad Chapter (7) 2017-2016 Soil Properties Physical Properties Mechanical Properties Gradation and Structure Compressibility Soil-Water Relationships Shear Strength Bearing Capacity

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

Session 3 - Case histories KARIBA DAM

Session 3 - Case histories KARIBA DAM ICOLD COMMITTEE ON CONCRETE DAMS SPANISH COMMITTEE ON CONCRETE FOR DAMS INTERNATIONAL JOURNAL ON HYDROPOWER & DAMS WORKSHOP October 18 & 19, 2007 Granada, Spain CHEMICAL EXPANSION OF CONCRETE IN DAMS &

More information

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack Evaluation of the behaviour of an arch-gravity dam featuring a pre-existing crack Dr Aïssa Mellal, Civil Engineer STUCKY SA, Switzerland NUMERICS IN GEOTECHNICS AND STRUCTURES - ZSoil Days - 1-2 September

More information

Drilled Shafts for Bridge Foundation Stability Improvement Ohio 833 Bridge over the Ohio River An Update

Drilled Shafts for Bridge Foundation Stability Improvement Ohio 833 Bridge over the Ohio River An Update Drilled Shafts for Bridge Foundation Stability Improvement Ohio 833 Bridge over the Ohio River An Update Meigs County, Ohio Mason County, West Virginia By Stan Harris, P.E. and Eric Kistner, P.E. FMSM

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

DISTRIBUTION of WATER RESOURCES

DISTRIBUTION of WATER RESOURCES DAM GEOLOGY DISTRIBUTION of WATER RESOURCES Definition A dam is a structure which prevents the flow of water and accumulates it in a reservoir Karakaya Dam/Diyarbakır Atatürk Dam/Şanlıurfa Needs for Dam

More information

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Michael McKay 1 and Francisco Lopez 2 1 Dams Engineer, GHD Pty 2 Principal Dams/Structural Engineer, GHD Pty

More information

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Haibo Wang, Deyu Li & Huichen Yang China Institute of Water Resources and Hydropower Research, Beijing, China SUMMARY: Seismic analyses of

More information

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization J. David Rogers Dams Symposium Association of Engineering Geologists Annual Meeting Las Vegas, Nevada September 22, 2005 The

More information

Phase II Report: Project Definition Options. Dam Safety

Phase II Report: Project Definition Options. Dam Safety OSHPC BARKI TOJIK Phase II Report: Project Definition Options Dam Safety Part 1: Basic data & Dam Design DAM Safety 2 Geology / Geotechnics...: Tectonics / Seismicity : DAM Design - Dam Location - Type

More information

NUMERICAL MODELING OF A CFRD

NUMERICAL MODELING OF A CFRD ICOLD Committee on Seismic Aspects of Dam Design NUMERICAL MODELING OF A CFRD CAMILO MARULANDA Ph.D TREND IN HEIGHT OF CFRD DAMS WITH TIME Height [m] 240 200 160 120 80 40 1 2 3 4 5 6 7 8 9 10 11 A 12

More information

Dam Management in Mexico

Dam Management in Mexico National Water Commission Dam Management in Mexico Cajon de Peña Dam, Jalisco State May 29, 2017 During extraordinary hydrometeorological events, it is important for the safety of dams, population and

More information

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2 Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method S. Soleymani 1, A. Akhtarpur 2 1 Group of Dam Construction, Toossab Company, P.O. Box 917751569, Mashhad City, Iran, PH (+98) 511-7684091;

More information

GEOMECHANICAL MODELING OF THE STEINERNASE LANDSLIDE Alessio Ferrari, Lyesse Laloui and Christophe Bonnard

GEOMECHANICAL MODELING OF THE STEINERNASE LANDSLIDE Alessio Ferrari, Lyesse Laloui and Christophe Bonnard GEOMECHANICAL MODELING OF THE STEINERNASE LANDSLIDE Alessio Ferrari, Lyesse Laloui and Christophe Bonnard Ecole Polytechnique Fédérale de Lausanne Steinernase, 13 May 8 CONTENTS Main features Analysis

More information

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING EMILIO MARTINEZ Senior Hydraulic Engineer, Department of Hydraulic, CVG EDELCA Hid. Macagua I, Apartado 28

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

Siva Bharatha Murthy. T Page 4.31

Siva Bharatha Murthy. T Page 4.31 Importance of Geological Structures: The physical properties of rocks, mineral and other materials of civil engineering, like textures, grain size are very important for a civil engineer. Similarly the

More information

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM Esen Yalım KARADUMAN BAR-SU Eng. & Conc. Inc. Ankara Turkey

More information

Introduction to Geotechnical Engineering. ground

Introduction to Geotechnical Engineering. ground Introduction to Geotechnical Engineering ground 1 Typical Geotechnical Project Geo-Laboratory ~ for testing soil properties Design Office ~ for design & analysis construction site 2 Shallow Foundations

More information

Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam

Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam Todd N. Loar, CEG Senior Geological Engineer USACE Risk Management Center AAARRR!!!... Peck, Peck, Terzaghi, Goodman,

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Yong-Beom Lee, Jorge Castillo Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam

Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam Jian-ming Zhao, Jinsheng Jia, Yanfeng Wen China Institute of Water Resources and

More information

ASSESSMENT OF STRESS DISTRIBUTION IN DARAB'S ROODBAL EMBANKMEND DAM USING COMMERCIAL CODE FLAC

ASSESSMENT OF STRESS DISTRIBUTION IN DARAB'S ROODBAL EMBANKMEND DAM USING COMMERCIAL CODE FLAC Cumhuriyet Üniversitesi Fen Fakültesi Fen Bilimleri Dergisi (CFD), Cilt:36, No: 4 Özel Sayı (2015) ISSN: 1300-1949 Cumhuriyet University Faculty of Science Science Journal (CSJ), Vol. 36, No: 4 Special

More information

NUMERICAL ANALYSIS OF CONCRETE FACED ROCKFILL DAMS DURING EARTHQUAKES

NUMERICAL ANALYSIS OF CONCRETE FACED ROCKFILL DAMS DURING EARTHQUAKES Paper No. NASTU NUMERICAL ANALYSIS OF CONCRETE FACED ROCKFILL DAMS DURING EARTHQUAKES Sinan TURKMEN 1, Kutay OZAYDIN 2, Mehmet BERILGEN 3, Havvanur KILIC 4 ABSTRACT In this study, the seismic behavior

More information

The Seismic Performance of Tousheh Dam During the Chi-Chi Earthquake

The Seismic Performance of Tousheh Dam During the Chi-Chi Earthquake ( C023) Proceedings of 9 th Conference on Current Researches in Geotechnical Engineering, Shihman Reservoir, Tai-Yuan, Taiwan, R.O.C. August 30-3 and September, 200 92 () (the semi-analysis-testing method)(2)

More information

CHAMBER OF VALVES IN THE ARENOSO RESERVOIR

CHAMBER OF VALVES IN THE ARENOSO RESERVOIR CHAMBER OF VALVES IN THE ARENOSO RESERVOIR Prof. Dr. Carlos Jurado Cabañes Polytechnic University of Madrid Escuela de Ingeniería Técnica de Obras Públicas Dept. of Civil Engineering Ingecal Ingenieros

More information

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ENGINEERING GEOLOGY AND ROCK ENGINEERING 1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:

More information

Application of advanced bounding surface plasticity model in static and seismic analyses of Zipingpu Dam

Application of advanced bounding surface plasticity model in static and seismic analyses of Zipingpu Dam University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2016 Application of advanced bounding surface plasticity

More information

RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE STUDY OF A DAM FAILURE IN VIETNAM

RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE STUDY OF A DAM FAILURE IN VIETNAM Geotec., Const. Mat. & Env., DOI: https://doi.org/10.21660/2018.41.57454 ISSN: 2186-2982 (Print), 2186-2990 (Online), Japan RESEARCH ON CAUSE OF DAM FAILURE FROM VIEWPOINT OF HYDRAULIC FRACTURING CASE

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC

PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC J.-M. Konrad 1, M. Shen 1, R. Ladet 2 1. Dept. of Civil Engineering UniversitŽ Laval,QuŽbec, Canada, G1K 7P4 2. Hydro-QuŽbec,

More information

Problems of building and designing on semi-rocky soils

Problems of building and designing on semi-rocky soils Problems of building and designing on semi-rocky soils D. Sursanov 1 and E. Sytchkina Construction industry Department, Perm Technical University, Perm, Russia ABSTRACT Building and designing on semi-rocky

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam

Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam Soheil RAZAVI DARBAR', Hiroyuki WATANABE' *Ph.D. Candidate, Earthquake Engineering Laboratory, Department

More information

SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS

SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS SEISMIC BEHAVIORS OF EARTH-CORE, CONCRETE-FACED- ROCK-FILL, AND COMPOSITE DAMS D.S. Kim Korea Institute of Science and Technology (KAIST), Professor M.K. Kim HYUNDAI ENGINEERING Co., LTD. S.H. Kim Korea

More information

International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February ISSN

International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February ISSN P P International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February-2017 1053 Effect of Impervious Core on Seepage through Zoned Earth Dam (Case Study: Khassa Chai Dam) Abstract

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

Moglicë HPP - Albania. Jorge Terron

Moglicë HPP - Albania. Jorge Terron Moglicë HPP - Albania Jorge Terron DEVOLL MOGLICË PROJECT Background Location Project Summary Sweco duties Plant overview Geology Cavern complex Layout Site investigations Rock mass characterization Geology

More information

Geotechnical Engineering and Dams

Geotechnical Engineering and Dams Geotechnical Engineering and Dams Solving Geotechnical Challenges for Hydropower and Water Resources Projects Geological and geotechnical challenges are often very demanding when planning hydraulic structures.

More information

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams D. Silva Matos & José Paixão EDP - Gestão da Produção de Energia, S.A., Porto J.V. Lemos & N. Azevedo Laboratório Nacional de Engenharia Civil, Lisboa

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

THEME A. Analysis of the elastic behaviour of La Aceña arch-gravity dam

THEME A. Analysis of the elastic behaviour of La Aceña arch-gravity dam THEME A Analysis of the elastic behaviour of La Aceña arch-gravity dam Gjorgi KOKALANOV, Professor, Faculty of Civil Eng., Skopje, Republic of Macedonia Ljubomir TANČEV, Professor, Faculty of Civil Eng.,

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

BKS Palace Consortium conducted the geotechnical investigation for the proposed pumped storage scheme (PSS) in the Steelpoort area.

BKS Palace Consortium conducted the geotechnical investigation for the proposed pumped storage scheme (PSS) in the Steelpoort area. 6. GEOLOGY 6.1 Introduction The high-lying Nebo Plateau to the west of the Steelpoort Valley comprises gently undulating terrain at elevations of around 1700m at the upper reservoir site. To the east,

More information

Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass

Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass Muneyoshi Numada Research Associate, Institute of Industrial Science, The University of Tokyo, Japan Kazuo

More information

Practical aspects of dam break analysis

Practical aspects of dam break analysis Practical aspects of dam break analysis Louis C Hattingh Hattingh Anderson Associates CC Dam break analysis It is a model You need to understand what you model & have an idea of the answers that you expect

More information

THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT

THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT Authors: Miguel Zerbini de Faria, Paulo Eduardo de Almeida Godoy, Francisco Cordero Donha Filho, Alceu Reusing THE FOZ DO CHAPECÓ HYDROELECTRIC POWER PLANT

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

Simulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1)

Simulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1) Simulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1) Prepared for Inter-Fluve 362 Atwood Ave., Suite 3 Madison, WI 53714 www.interfluve.com

More information

2D & 3D Nonlinear Dynamic Analysis of an Asphaltic Concrete Core Rockfill Dam (a Case Study)

2D & 3D Nonlinear Dynamic Analysis of an Asphaltic Concrete Core Rockfill Dam (a Case Study) 1 2D & 3D Nonlinear Dynamic Analysis of an Asphaltic Concrete Core Rockfill Dam (a Case Study) A. Akhtarpour Ph.D., Maharab Consulting Engineers Co., Mashhad, Iran. A_akhtarpur@aut.ac.ir A. Khodaii Ph.D.,

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Internal C Unit Dilatanc y

Internal C Unit Dilatanc y 2 Grimsby Sub was not at any time definitively established. The preliminary analysis provided by Thurber Engineering Ltd indicates the slope should be stable with a factor of safety of 1.23 for a deep

More information

Comparison of 2D vs. 3D Modeling Approaches for the Analyses of Concrete Faced Rockfill Dams

Comparison of 2D vs. 3D Modeling Approaches for the Analyses of Concrete Faced Rockfill Dams Comparison of 2D vs. 3D Modeling Approaches for the Analyses of Concrete Faced Rockfill Dams H. F. Özel & Y. Arici Dept. of Civil Engineering, Structural Mechanics Laboratory,K2-303, Middle East Technical

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

Seismic Stability of Tailings Dams, an Overview

Seismic Stability of Tailings Dams, an Overview Seismic Stability of Tailings Dams, an Overview BY Gonzalo Castro, Ph.D., P.E. Principal International Workshop on Seismic Stability of Tailings Dams Case Western Reserve University, November 2003 Small

More information

Dynamic Testing and Numerical Correlation Studies for Folsom Dam

Dynamic Testing and Numerical Correlation Studies for Folsom Dam Dynamic Testing and Numerical Correlation Studies for Folsom Dam Ziyad Duron (Harvey Mudd College) Enrique E. Matheu (USACE Engineer Research and Development Center) Vincent P. Chiarito (USACE Engineer

More information

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS Antonio Fernandez, Ph.D. 1 ABSTRACT Paul C. Rizzo Associates,

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

Evaluation of dynamic behavior of culverts and embankments through centrifuge model tests and a numerical analysis

Evaluation of dynamic behavior of culverts and embankments through centrifuge model tests and a numerical analysis Computer Methods and Recent Advances in Geomechanics Oka, Murakami, Uzuoka & Kimoto (Eds.) 2015 Taylor & Francis Group, London, ISBN 978-1-138-00148-0 Evaluation of dynamic behavior of culverts and embankments

More information

INELASTIC RESPONSES OF LONG BRIDGES TO ASYNCHRONOUS SEISMIC INPUTS

INELASTIC RESPONSES OF LONG BRIDGES TO ASYNCHRONOUS SEISMIC INPUTS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 638 INELASTIC RESPONSES OF LONG BRIDGES TO ASYNCHRONOUS SEISMIC INPUTS Jiachen WANG 1, Athol CARR 1, Nigel

More information

Application of rockfill dynamical characteristic statistic curve in mid-small scale concrete face dam dynamic analysis

Application of rockfill dynamical characteristic statistic curve in mid-small scale concrete face dam dynamic analysis Application of rockfill dynamical characteristic statistic curve in mid-small scale concrete face dam dynamic analysis Yu.Feng. Jia, Shi.Chun. Chi State Key Laboratory of the Coastal and Offshore Engineering,

More information

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading Jorge Castillo, Yong-Beom Lee Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting Inc., USA ABSTRACT

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir

More information

Modelling the Construction of a High Embankment Dam

Modelling the Construction of a High Embankment Dam KSCE Journal of Civil Engineering (2014) 18(1):93-102 Copyright c2014 Korean Society of Civil Engineers DOI 10.1007/s12205-014-0180-4 TECHNICAL NOTE Geotechnical Engineering pissn 1226-7988, eissn 1976-3808

More information

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT 4 th International Conference on Earthquake Geotechnical Engineering June 25-28, 2007 Paper No. 1637 TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT Mohammad

More information

Determination of Excess Pore Pressure in Earth Dam after Earthquake

Determination of Excess Pore Pressure in Earth Dam after Earthquake ABSTRACT: Determination of Excess Pore Pressure in Earth Dam after Earthquake S.M. Nasrollahi Faculty of Islamic Azad University Qaenat Branch, Qaen, Iran. Email: s.m.nasrollahi@gmail.com Pore pressure

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting Mass Wasting Movement of earth materials downslope, driven by Gravitational Forces. Landslides - general term for rock or soil movement. In U.S., on average, mass wasting causes 1 to 2 billion dollars

More information

Mitigation measures: stabilization works

Mitigation measures: stabilization works Intensive Course in Quantitative Landslide Risk Assessment and Risk management Mitigation measures: stabilization works E.E. Alonso Department of Geotechnical Engineering and Geosciences UPC, Barcelona

More information

Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu

Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu Local cracking stability analysis of super high arch dam *Peng Lin 1), Qingbin Li, Dong Zheng, Senying Hu State Key Laboratory of Hydroscience and Engineering, TsinghuaUniversity, Beijing 100084, China

More information

Site Investigation and Landfill Construction I

Site Investigation and Landfill Construction I Site Investigation and Landfill Construction I Gernot Döberl Vienna University of Technology Institute for Water Quality, Resources and Waste Management Contents Site Investigation Base Liners Base Drainage

More information

Seismic Evaluation of Tailing Storage Facility

Seismic Evaluation of Tailing Storage Facility Australian Earthquake Engineering Society 2010 Conference, Perth, Western Australia Seismic Evaluation of Tailing Storage Facility Jonathan Z. Liang 1, David Elias 2 1 Senior Geotechnical Engineer, GHD

More information

RESULTS OF THE SITE CHARACTERISATION OBTAINED AT THE TARIFA EXPERIMENTAL GALLERY

RESULTS OF THE SITE CHARACTERISATION OBTAINED AT THE TARIFA EXPERIMENTAL GALLERY RESULTS OF THE SITE CHARACTERISATION OBTAINED AT THE TARIFA EXPERIMENTAL GALLERY Pliego, J.M. 1 ; Esteras, M. 1 ; Celada B. 2 ; Galera J.M. 2 ABSTRACT The 570 m long Tarifa Experimental Gallery has allowed

More information

Appendix C Surface Water and Groundwater Interaction Memorandum

Appendix C Surface Water and Groundwater Interaction Memorandum Texas Custodial Trust 2301 West Paisano Drive El Paso, Texas 79922 Appendix C Surface Water and Groundwater Interaction Memorandum 6835001 Malcolm Pirnie, Inc. 410 N. 44 th Street, Suite 1000 Phoenix,

More information

1 INTRODUCTION 1.1 General

1 INTRODUCTION 1.1 General #701 475 Howe Street Vancouver, British Columbia V6C 2B3 August 1, 2014 Robin McCall Wolverine Mine Environmental Superintendent Dear Mr. McCall: 1 INTRODUCTION 1.1 General This letter report presents

More information

Introduction to Soil Mechanics Geotechnical Engineering

Introduction to Soil Mechanics Geotechnical Engineering Introduction to Soil Mechanics Geotechnical Engineering Dr. Attaullah Shah ground SIVA 1 Soil Mechanics= Soil+Mechanics Branch of Science dealing with the structure, Engineering properties and reactions

More information

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). J. Baztán and A. Martín Gas Natural Fenosa Engineering, S.L.U, Madrid, Spain. J. M. Galera and D. Santos Subterra Ingeniería

More information

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Soil Mechanics Chapter # 1 INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak Chapter Outlines Introduction to Soil Mechanics, Soil

More information

SEEPAGE ANALYSIS AND SEISMIC BEHAVIOUR OF EARTH FILL DAM USING GEO-STUDIO

SEEPAGE ANALYSIS AND SEISMIC BEHAVIOUR OF EARTH FILL DAM USING GEO-STUDIO SEEPAGE ANALYSIS AND SEISMIC BEHAVIOUR OF EARTH FILL DAM USING GEO-STUDIO Mr. PAVAN N¹, Mrs. BARNALI GHOSH², Dr.S.K.PRASAD³ 1 P.G STUDENT, East Point College Of Engineering & Technology 2 ASSOCIATE PROFESSOR,

More information

AN IMPORTANT PITFALL OF PSEUDO-STATIC FINITE ELEMENT ANALYSIS

AN IMPORTANT PITFALL OF PSEUDO-STATIC FINITE ELEMENT ANALYSIS AN IMPORTANT PITFALL OF PSEUDO-STATIC FINITE ELEMENT ANALYSIS S. Kontoe, L. Pelecanos & D.M. Potts ABSTRACT: Finite Element (FE) pseudo-static analysis can provide a good compromise between simplified

More information

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY.

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY. By Er. S. Muthu Parvatha Vardhini, Asst. Executive Engineer, (Designs) Water Resources

More information

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition Roy E. Hunt Taylor & Francis Taylor & Francis Croup Boca Raton London New York Singapore A CRC title, part of the Taylor & Francis imprint,

More information

CONSTRUCTION DEWATERING AT SALUDA DAM

CONSTRUCTION DEWATERING AT SALUDA DAM CONSTRUCTION DEWATERING AT SALUDA DAM Paul C. Rizzo, P.E., Ph.D., Jeffrey M. Bair. P.E., John P. Osterle, P.E., Howard W. Gault, P.G. Saluda Dam, owned and operated by South Carolina Electric & Gas Company

More information

Dams may either be human-built or result from natural phenomena, such as

Dams may either be human-built or result from natural phenomena, such as Chapter 1 Dam failures C. Deangeli 1, G.P. Giani 2, B. Chiaia 1 & A.P. Fantilli 1 1 Politecnico di Torino, Turin, Italy 2 State University of Milan, Milan, Italy Abstract Dams may either be human-built

More information

Behaviour of Earth Dam under Seismic Load Considering Nonlinearity of the Soil

Behaviour of Earth Dam under Seismic Load Considering Nonlinearity of the Soil Open Journal of Civil Engineering, 216, 6, 75-83 Published Online March 216 in SciRes. http://www.scirp.org/journal/ojce http://dx.doi.org/1.4236/ojce.216.627 Behaviour of Earth Dam under Seismic Load

More information

NUMERICAL MODELLING OF THE BRUSNICE TUNNEL

NUMERICAL MODELLING OF THE BRUSNICE TUNNEL NUMERICAL MODELLING OF THE BRUSNICE TUNNEL Matouš Hilar 1, Jakub Nosek 2 1 D2 Consult Prague and FCE CTU, Zelený pruh 95/97, Prague 4, 140 00, Czech Republic 2 D2 Consult Prague, Zelený pruh 95/97, Prague

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

APPLICATION OF COMPOSITE CLAY AS CORE MATERIAL IN EARTHFILL EMBANKMENT DAMS

APPLICATION OF COMPOSITE CLAY AS CORE MATERIAL IN EARTHFILL EMBANKMENT DAMS International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 8, August 2018, pp. 790 797, Article ID: IJCIET_09_08_080 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=8

More information