Session 3 - Case histories KARIBA DAM

Size: px
Start display at page:

Download "Session 3 - Case histories KARIBA DAM"

Transcription

1 ICOLD COMMITTEE ON CONCRETE DAMS SPANISH COMMITTEE ON CONCRETE FOR DAMS INTERNATIONAL JOURNAL ON HYDROPOWER & DAMS WORKSHOP October 18 & 19, 2007 Granada, Spain CHEMICAL EXPANSION OF CONCRETE IN DAMS & HYDRO-ELECTRIC PROJECTS Session 3 - Case histories KARIBA DAM by Bernard GOGUEL and Kozanai GURUKUMBA bernard.goguel@coyne-et-bellier.fr kgurukumba@yahoo.co.uk

2 Kariba ZIMBABWE ZIMBABWE

3 KARIBA DAM : H 128 m L 617 m C SOUTH C 181 km 3, of which 116 /Min Op. Lev. ICOLD Durban 1994 Q 68 R 86 Int. WP&DC Jan 1996 NORTH

4

5 million m 3 concrete All existing tests in for checking the cement aggregate compatibility were done, without detecting any sign of expansion risk

6 30 years 10 years Construction 1963 Impounding complete 1983 Dam behaviour study => additional instrumentation Int. WP&DC (June) 1992 FREDERICTON CEA-CANCOLD Conference 1994 ICOLD Durban Q.68-R Int. WP&DC (Jan.) 1997 ICOLD Florence Q years 2007 GRANADA workshop

7 Monitoring show moderate concrete expansion: /year * * vertically, far from the spillway 1989: AAR typical gel was detected by LCPC (on 1 sample) 1994: drilling works 6 bays=> gated more submerged laboratory spillway analyses which confirmed

8 Min Op. Lev. + 0,50 m

9 Relatively small reservoir level operating range, compared to the dam high Nevertheless => significant upper arch stresses variations

10 KARIBA : gravity thrust block... and underground buttresses Zambezi River after dam concreting completion (C 1959)

11 50 m KARIBA South Abutment (Upper Right Bank) Gravity thrust block and underground buttresses across quartzites and weathered gneiss, down to the sound deep gneiss : m 3 concrete before end of impounding in 1963 Réf. Proc. Inst. Civ. Engr / 1962 and, with associated monitoring : CIGB 1991 (Q.66 R.14) & 1994 (Q.68 R.86)

12 Kariba South Bank General layout plan view: (1) Power station intakes (2) Tailrace tunnels (3) PHAT portal (4) Underground buttresses (and SCAT Surge Chamber Access Tunnel below) DA Drainage Adit EA Exploratory Adit Q Quartzite mass with mica seams FQ Fresh Quartzite WGn Weathered Gneiss Gn Sound Gneiss A Ref. Q.68 R. 86 (ICOLD 1994)

13 South Abutment, seen from downstream: Section A - A (2) = tailrace tunnels (4) = Thrust Block and Buttresses Q Quartzite mass with mica seams WGn Weathered Gneiss Gn Sound Gneiss P8 SCAT Surge Chambers Access Tunnel EA Exploratory Adit: old adit, parallel to the Power House Access Tunnel PHAT. Note: both are orientated at 45 to this cross section. P9 = pendulum n 9, in P1 shaft P8 bank side, down to PHAT P13 not shown (at thrust block toe) Additional instrumentation (1) = pendulums in Dam Wall & South Bank Ref. Q.68 R. 86 (ICOLD 1994)

14 COYNE vibrating wire strainmeters : extensometers embedded in the concrete Kariba : 263 nos. ( ), 207 i.e. 79 % in 2007

15 Average : Fredericton 1992

16 Strainmeters Group 0.4 Upstream (central block, mid height) RWL C /year UC /year U2 0.4U3 0.4U U /year RWL / Granada 2007

17 Precise levelling : crest rise Geodetic : mm? upstreamwards crest deflection Fredericton 1992

18 RWL KARIBA CREST RISE (mm) 1.2 mm/yr mm/yr

19 Additional instrumentation (1) 14 pendulums (direct and inverted), 25 reading points (Huggenberger) 2 borehole extensometers (6 m) New geodetic : few points on the crest, no more targets on the d/s face, improved reference pillars, traverses (polygonals) in 2 galleries

20

21 Downstream (mm) 50 mm (+ downstream) T434 data (and geodetic meas. dates) Pendulums Target T434 Lake Level Geodetic m Upstream janv-1960 janv-1965 janv-1970 janv-1975 janv-1980 janv-1985 janv-1990 janv-1995 janv-2000 janv years Calculs

22 MODAP KARIBA MODAP : MODel Accompanying the Projet

23 Reservoir level influence on concrete swelling rate : modelisation in the case of Kariba ICOLD Florence 1997, Q74-9 Calculs BETHY

24 Thrust / South Abutment over years model Identified possible adverse effects

25 Identified possible adverse effects Additional (3) instrumentation & monitoring Plumblines Borehole extensometers Piezometers

26

27

28 Maxi storage 181 km 3 Max June km 2 = 5 km 3 /m 13 m Dead storage 116 km 3 Sealing plane 20 m 6 caterpillar gates 9.14 m Stopbeams (one set) 6 x 1500 m 3 /s

29 Upstream stopbeam rollerpath upper section (in the dry) Construction joint open due to concrete vertical expansion

30

31 Upstream stopbeam U/S BIP joint Expanding concrete

32 Gate Smooth concrete, supporting the gate front seal Plane is deforming => Gate scrapping

33 1992 : gate scraping => smooth concrete surveys & restoration Ref. Water Power & D C Jan additional instrumentation 2 (borehole extensometers) => local expansion rates measured as 33 x 10-6 /yr

34 B A A B B A Front seal Gate B B Smooth concrete deflection

35 Additional Instrumentation (2): Borehole extensometers in the spillway section and some other locations in dam wall

36

37 30 x 10-6 /yr (min 23, max 47) 13 & 38 (middle) 33 x 10-6 /yr 16 x 10-6 /yr 7 & 15 (17 /end pier) 20 (average)

38 Mid height leaks : downstream BIP s cracking on a construction welding level => specific maintenance works

39 Gate anchoring Roller tracks

40 1959

41

42 30 years 20 years Construction 1963 Impounding complete 1983 Dam behaviour study 1987 Additional monitoring (1: pendulums & geodetic) 1992 Int. WP&DC (June) / maintenance & monitoring 1992 FREDERICTON CEA-CANCOLD Conference 1994 ICOLD Durban Q.68-R.86 / addit. monit. (2) 1996 Int. WP&DC / gate sealing plane restoration 1997 ICOLD Florence Q.74-9 / modern calculations 2005 Additional monitoring (3 = South Abutment) 2007 GRANADA workshop / intrusive examinations

43 Concrete expansion = long term process of understanding, monitoring, modelling + special surveillance & maintenance works

44 Concrete expansion = long term process of understanding, monitoring, modelling Chemistry explanation not developed here Rheology: calculation model / observations help appraisal of adverse effects (dam stability) for optimizing remedial measures

45 Concrete expansion = long term process of understanding, monitoring, modelling Chemistry explanation not developed here Rheology: calculation model / observations help appraisal of adverse effects (dam stability) Mechanical (spillway gate reliability): smooth sealing plane restoration, load gauges and hoist load monitoring, stopbeam and gate grooves surveys, gate anchors intrusive examination (++)

46 Survey and maintenance works needs close joint studies on M&E and Civil Works Examplary working relationship developed for years between GIBB (now JACOBS) and COYNE ET BELLIER experts, acting jointly for Zambezi River Authority To be encouraged elsewhere!!

47 Thanks for your attention

Dam Safety Aspects of Reservoir-Triggered Seismicity

Dam Safety Aspects of Reservoir-Triggered Seismicity Dam Safety Aspects of Reservoir-Triggered Seismicity Dr. Martin Wieland Chairman, Committee on Seismic Aspects of Dam Design, International Commission on Large Dams (ICOLD) Poyry Energy Ltd., Zurich, Switzerland

More information

Practical aspects of dam break analysis

Practical aspects of dam break analysis Practical aspects of dam break analysis Louis C Hattingh Hattingh Anderson Associates CC Dam break analysis It is a model You need to understand what you model & have an idea of the answers that you expect

More information

AN OVERVIEW OF KONAR DAM ON NEED OF REHABILITATION

AN OVERVIEW OF KONAR DAM ON NEED OF REHABILITATION AN OVERVIEW OF KONAR DAM ON NEED OF REHABILITATION Dipankar Chaudhuri, SE (Civil) A. K. Dubey, SE (Civil) and S. B. Pandey, DCE (Civil) DAMODAR VALLEY CORPORATION OVER VIEW Problems Cracks Potential Conclusion

More information

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM Martin WIELAND 1 And Sujan MALLA 2 SUMMARY A horizontal crack first appeared along the downstream wall of

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

1.1 Problem Statement

1.1 Problem Statement 1.0 INTRODUCTION Safety is the primary and most important reason for monitoring (measurement of change over time) the deformations of dams. A secondary reason is the need for improving our knowledge of

More information

Geotechnical Engineering and Dams

Geotechnical Engineering and Dams Geotechnical Engineering and Dams Solving Geotechnical Challenges for Hydropower and Water Resources Projects Geological and geotechnical challenges are often very demanding when planning hydraulic structures.

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). J. Baztán and A. Martín Gas Natural Fenosa Engineering, S.L.U, Madrid, Spain. J. M. Galera and D. Santos Subterra Ingeniería

More information

ICOLD TCDS - Technical Committe on Dam Surveillance

ICOLD TCDS - Technical Committe on Dam Surveillance Click to edit Master title ICOLD TCDS - Technical Committe on Dam Surveillance Sam Johansson TCDS Foundation SwedCold, 2017-10-09 1 Click TCDS to - edit Master title Technical Committe on Dam Surveillance

More information

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING 6 TH INTERNATIONAL CONFERENCE ON DAM ENGINEERING C.Pina, E.Portela, J.Gomes (ed.) Lisbon, Portugal, February 15-17, 2011 NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING S. Moll *,

More information

Moglicë HPP - Albania. Jorge Terron

Moglicë HPP - Albania. Jorge Terron Moglicë HPP - Albania Jorge Terron DEVOLL MOGLICË PROJECT Background Location Project Summary Sweco duties Plant overview Geology Cavern complex Layout Site investigations Rock mass characterization Geology

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

Rogun Hydropower Project

Rogun Hydropower Project Rogun Hydropower Project Dam site Geological investigations in the Downstream Right Bank Ascencio Lara Coyne et Bellier Almaty, 11-12 February 2013 Objectives of the presentation As the stability conditions

More information

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization J. David Rogers Dams Symposium Association of Engineering Geologists Annual Meeting Las Vegas, Nevada September 22, 2005 The

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack Evaluation of the behaviour of an arch-gravity dam featuring a pre-existing crack Dr Aïssa Mellal, Civil Engineer STUCKY SA, Switzerland NUMERICS IN GEOTECHNICS AND STRUCTURES - ZSoil Days - 1-2 September

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir

More information

Geoscientific Instrumentation in River Valley Projects

Geoscientific Instrumentation in River Valley Projects J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL

DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL Ricardo José Barbosa de SOUZA 1, Aurélio Alves de VASCONCELOS 2, Alberto Jorge C CAVALCANTI 3 Companhia Hidro Elétrica do São Francisco CHESF

More information

LE BARRAGE FAIT PEAU NEUVE

LE BARRAGE FAIT PEAU NEUVE LE BARRAGE FAIT EAU NEUVE 02 février 2016 1 Context 2 reliminary studies 3 Numerical Modelling 4 Rehabilitation works CONTEXT HISTORY 1947 1951 : Building LE BARRAGE FAIT EAU NEUVE THE CRACKS 1963: The

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM IL FUTURO DI SELI SPECIAL DESIGNS AND MEASURES IMPLEMENTED TO FACE ONE OF THE MOST DIFFICULT EVENT IN THE HISTORY OF TUNNELING Condivisione

More information

The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity).

The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity). Location The La Yesca Hydroelectric Project named Ing. Elías Ayub in honor of a former General Director of CFE, is part of the Santiago Hydrological System, 105 km northwest of the city of Guadalajara,

More information

The first steps in the hydropower project cycle:

The first steps in the hydropower project cycle: The first steps in the hydropower project cycle: Initial investigations and feasibility studies 12 September 2013 Bruce Taylor Introduction Objectives of early stage studies Tools and methods Case study

More information

DISTRIBUTION of WATER RESOURCES

DISTRIBUTION of WATER RESOURCES DAM GEOLOGY DISTRIBUTION of WATER RESOURCES Definition A dam is a structure which prevents the flow of water and accumulates it in a reservoir Karakaya Dam/Diyarbakır Atatürk Dam/Şanlıurfa Needs for Dam

More information

Ridracoli Dam: surveillance and safety evaluation reported on internet page

Ridracoli Dam: surveillance and safety evaluation reported on internet page Ridracoli Dam: surveillance and safety evaluation reported on internet page P.P. MARINI; P. BALDONI; F. FARINA; F. CORTEZZI - Romagna Acque, Forlì, Italy A. MASERA - Enel.Hydro, ISMES Division, Bergamo,

More information

Additional information as desired by EAC in 56 th meeting held on st March 2012.

Additional information as desired by EAC in 56 th meeting held on st March 2012. Subject: Additional information as desired by EAC in 56 th meeting held on 30-31 st March 2012. In the 56 th meeting of EAC held on 30 th -31 st March 2012, it was informed that the project Dam site location

More information

Geotechnical & Mining Engineering Services

Geotechnical & Mining Engineering Services Geotechnical & Mining Engineering Services Southwest Research Institute San Antonio, Texas A s an independent, nonprofit research and development organization, Southwest Research Institute (SwRI ) uses

More information

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams Michael McKay 1 and Francisco Lopez 2 1 Dams Engineer, GHD Pty 2 Principal Dams/Structural Engineer, GHD Pty

More information

BEST PRACTICES ON SURVEY AND INVESTIGATIONS OF HYDRO ELECTRIC PROJECTS

BEST PRACTICES ON SURVEY AND INVESTIGATIONS OF HYDRO ELECTRIC PROJECTS CHAPTER - 1 BEST PRACTICES ON SURVEY AND INVESTIGATIONS OF HYDRO ELECTRIC PROJECTS Survey and Investigation of the proposed hydro power project site is the preliminary requirement that needs to be met

More information

Reservoir Sedimentation and Its Control

Reservoir Sedimentation and Its Control Reservoir Sedimentation and Its Control GUO, Qingchao Ph.D, Professor of IWHR International Workshop on Management of Flood Control and Disaster Mitigation June 17-30 2010, Beijing, China Contents Why

More information

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams

Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams Seismic Studies of Foz Tua and Fridão Dams DDDamsDAdams D. Silva Matos & José Paixão EDP - Gestão da Produção de Energia, S.A., Porto J.V. Lemos & N. Azevedo Laboratório Nacional de Engenharia Civil, Lisboa

More information

POTENTIALLY ACTIVE FAULTS IN THE FOUNDATIONS OF LARGE DAMS PART I: VULNERABILITY OF DAMS TO SEISMIC MOVEMENTS IN DAM FOUNDATION

POTENTIALLY ACTIVE FAULTS IN THE FOUNDATIONS OF LARGE DAMS PART I: VULNERABILITY OF DAMS TO SEISMIC MOVEMENTS IN DAM FOUNDATION POTENTIALLY ACTIVE FAULTS IN THE FOUNDATIONS OF LARGE DAMS PART I: VULNERABILITY OF DAMS TO SEISMIC MOVEMENTS IN DAM FOUNDATION M. Wieland 1 R.P. Brenner 2 and A. Bozovic 3 1 Chairman, ICOLD Committee

More information

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING EMILIO MARTINEZ Senior Hydraulic Engineer, Department of Hydraulic, CVG EDELCA Hid. Macagua I, Apartado 28

More information

Gravity dam and earthquake

Gravity dam and earthquake Gravity dam and earthquake Tardieu s Dynamic simplified method Patrick LIGNIER, Tractebel Engineering Coyne et Bellier Château des Comtes de Challes 9 octobre 2014 CONTENTS 2 Vulnerability of gravity dam

More information

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model

Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Seismic Analyses of Concrete Gravity Dam with 3D Full Dam Model Haibo Wang, Deyu Li & Huichen Yang China Institute of Water Resources and Hydropower Research, Beijing, China SUMMARY: Seismic analyses of

More information

Progress with the excavation and support of the Mingtan power cavern roof

Progress with the excavation and support of the Mingtan power cavern roof Progress with the excavation and support of the Mingtan power cavern roof D. Moy, Golder Associates, (UK) Ltd. E. Hoek, University of Toronto Originally published as: Moy, D. and Hoek, E. 1989. Progress

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

DESIGN AND CONSTRUCTION OF LARGE

DESIGN AND CONSTRUCTION OF LARGE DESIGN AND CONSTRUCTION OF LARGE TUNNELS IN SOIL AND FAULTED ROCK SENTVID TUNNEL MOTORWAY BYPASS OF LJUBLJANA Josef Daller, ic consulenten, Vienna - Austria International NATM Workshop Singapore 2010 LAYOUT

More information

Evaluation of Public Safety at Run-of-River Dams

Evaluation of Public Safety at Run-of-River Dams Evaluation of Public Safety at Run-of-River Dams - An Illinois Statewide Program By G. Nicholas Textor, PE, CFM Daniel W. Tornil Lee Von Gynz-Guethle, CFM Authority Section 23a of the Rivers, Lakes and

More information

Seepage Analyses and Monitoring of Khlong Tha Dan Dam

Seepage Analyses and Monitoring of Khlong Tha Dan Dam Seepage Analyses and Monitoring of Khlong Tha Dan Dam Warakorn Mairaing Chinoros Thongtamachat Nattapol Chisiwamongcol ABSTRACT The Khun Dan Prakarnchon Dam, the largest RCC gravity dam in Thailand, has

More information

GTU. Shantilal Shah Engineering College, Bhavnagar

GTU. Shantilal Shah Engineering College, Bhavnagar GTU Shantilal Shah Engineering College, Bhavnagar 2 Around 40,000 large reservoirs worldwide used for water supply, power generation, flood control etc. About 1 % of the total storage volume is lost annually

More information

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage Proceedings of the Ninth International Symposium on River Sedimentation October 18 21, 2004, Yichang, China RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN Tetsuya SUMI Graduate School

More information

Concrete pathologies. Concrete chemical degradation causes. Alkali-silica reaction in concrete

Concrete pathologies. Concrete chemical degradation causes. Alkali-silica reaction in concrete Concrete pathologies The concrete is not an inert material: LABORATORY AND MICROSTRUCTURAL TESTS ON THE DETECTION AND PREDICTION OF AAR António Santos Silva 1 & Isabel Fernandes 2 1 - Materials Department,

More information

SONIC PULSE VELOCITY TESTING TO ASSESS CONDITION OF A CONCRETE DAM

SONIC PULSE VELOCITY TESTING TO ASSESS CONDITION OF A CONCRETE DAM SONIC PULSE VELOCITY TESTING TO ASSESS CONDITION OF A CONCRETE DAM Edward D. Billington, AG&E-Schnabel, Greensboro, NC Dennis A. Sack and Larry D. Olson, Olson Engineering Inc., Wheat Ridge, CO Abstract

More information

SAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3

SAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3 ABSTRACT SAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3 The paper presents Seismic Hazard Analysis (SHA) of Sondur dam situated in Chhattisgarh

More information

An introduction to the Rock Mass index (RMi) and its applications

An introduction to the Rock Mass index (RMi) and its applications Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering

More information

Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL)

Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL) Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL) Amirreza Ghasemi 1. Introduction Deformability is recognized as one of the most important parameters governing the behavior of rock

More information

Phase II Report: Project Definition Options. Dam Safety

Phase II Report: Project Definition Options. Dam Safety OSHPC BARKI TOJIK Phase II Report: Project Definition Options Dam Safety Part 1: Basic data & Dam Design DAM Safety 2 Geology / Geotechnics...: Tectonics / Seismicity : DAM Design - Dam Location - Type

More information

UPLIFT PRESSURES FOR SEISMIC AND POST-SEISMIC SAFETY ASSESSMENT OF GRAVITY DAMS

UPLIFT PRESSURES FOR SEISMIC AND POST-SEISMIC SAFETY ASSESSMENT OF GRAVITY DAMS 1 UPLIFT PRESSURES FOR SEISMIC AND POST-SEISMIC SAFETY ASSESSMENT OF GRAVITY DAMS Pierre Léger (Ph.D, UCB 1982-86), Ecole Polytechnique, Montreal University, Canada Pr. A.K Chopra Retirement Symposium

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Design of Restricted Orifice Surge Tank

Design of Restricted Orifice Surge Tank Design of Restricted Orifice Surge Tank August 3, 13 Contents 1. Necessity of Surge Tank 1. Requirements for Hydraulic Design of Restricted Orifice Surge Tank 1 3. Fundamental Differential Equations 1

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

Transactions on Modelling and Simulation vol 16, 1997 WIT Press, ISSN X

Transactions on Modelling and Simulation vol 16, 1997 WIT Press,   ISSN X A Comparison between Actual Displacements and Numerical Results from a Finite Element Model in an Arch Dam L.E. Romera, S. Hernandez E.T.S. Ingenieros de Caminos, Canales y Puertos University of La Coruna,

More information

Dam Monitoring With Tiltmeters

Dam Monitoring With Tiltmeters Dam Monitoring With Tiltmeters INTRODUCTION What is a Tiltmeter? Applied Geomechanics tiltmeters are simple yet precise instruments that work on the concept of a trapped air bubble inside a glass or ceramic

More information

Les problèmes de la sédimentation dans les prises d'eau des centrales hydro-électriques

Les problèmes de la sédimentation dans les prises d'eau des centrales hydro-électriques Sediment problems at intakes for hydropower plants H. D, Sharma and H. R. Sharma Abstract. Unique solutions evolved to solve sediment problems at the intake structures of some major Himalayan run-of-river

More information

COMPARISON BETWEEN 2D AND 3D ANALYSES OF SEISMIC STABILITY OF DETACHED BLOCKS IN AN ARCH DAM

COMPARISON BETWEEN 2D AND 3D ANALYSES OF SEISMIC STABILITY OF DETACHED BLOCKS IN AN ARCH DAM COMPARISON BETWEEN 2D AND 3D ANALYSES OF SEISMIC STABILITY OF DETACHED BLOCKS IN AN ARCH DAM Sujan MALLA 1 ABSTRACT The seismic safety of the 147 m high Gigerwald arch dam in Switzerland was assessed for

More information

Sedimentation in the Nile River

Sedimentation in the Nile River Advanced Training Workshop on Reservoir Sedimentation Sedimentation in the Nile River Prof. Dr. Abdalla Abdelsalam Ahmed 10-16 Oct. 2007, IRTCES, Beijing, China CWR,Sudan 1 Water is essential for mankind

More information

Engineering 2 (2016) Contents lists available at ScienceDirect. Engineering. journal homepage:

Engineering 2 (2016) Contents lists available at ScienceDirect. Engineering. journal homepage: Engineering (016) 94 301 Contents lists available at ScienceDirect Engineering journal homepage: www.elsevier.com/locate/eng Research Hydro Projects Review An Enhanced Physically Based Scour Model for

More information

Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton. 1.

Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton. 1. Foundation Preparation for RCC Dams Founded on Difficult Foundation Conditions By Paul C. Rizzo and John Charlton 1.0 Introduction RCC Dams, normally designed as traditional gravity structures similar

More information

Cavitation occurs whenever the pressure in the flow of water drops to the value of the pressure of the saturated water vapour, pv (at the prevailing

Cavitation occurs whenever the pressure in the flow of water drops to the value of the pressure of the saturated water vapour, pv (at the prevailing Cavitation occurs whenever the pressure in the flow of water drops to the value of the pressure of the saturated water vapour, pv (at the prevailing temperature); cavities filled by vapour, and partly

More information

Application of pseudo-symmetric technique in dynamic analysis of concrete gravity dams

Application of pseudo-symmetric technique in dynamic analysis of concrete gravity dams Application of pseudo-symmetric technique in dynamic analysis of concrete gravity dams V. Lotfi Department of Civil and Environmental Engineering, Amirkabir University, Iran Abstract A new approach is

More information

Hydraulic Structures. Notes and Handouts

Hydraulic Structures. Notes and Handouts Hydraulic Structures Notes and Handouts Introduction Free surface flows in particular often have hydraulic structures to control flow Dams Spillways Stilling Basins Weirs Gates Can have hydraulic/structural/geotechnical

More information

ASPECTS REGARDING THE ANALYSIS OF HORIZONTAL DISPLACEMENTS AT CUMPĂNA DAM, ARGEŞ COUNTY

ASPECTS REGARDING THE ANALYSIS OF HORIZONTAL DISPLACEMENTS AT CUMPĂNA DAM, ARGEŞ COUNTY Abstract AgroLife Scientific Journal - Volume 6, Number 1, 2017 ISSN 2285-5718; ISSN CD-ROM 2285-5726; ISSN ONLINE 2286-0126; ISSN-L 2285-5718 ASPECTS REGARDING THE ANALYSIS OF HORIZONTAL DISPLACEMENTS

More information

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ENGINEERING GEOLOGY AND ROCK ENGINEERING 1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:

More information

The 2011 Tohoku earthquake and dams

The 2011 Tohoku earthquake and dams The 2011 Tohoku earthquake and dams N. Matsumoto & T. Sasaki Japan Dam Engineering Center, Japan T. Ohmachi Tokyo Institute of Technology, Japan ABSTRACT: The magnitude 9.0 Tohoku earthquake occurred on

More information

Predicting rock conditions ahead of the face

Predicting rock conditions ahead of the face Predicting rock conditions ahead of the face Dr Thomas Dickmann, Product Manager Geophysics, Amberg Technologies AG Seismic methods of predicting rock conditions ahead of the tunnel face have developed

More information

Lessons learnt from the Wenchuan earthquake 11 September 2009

Lessons learnt from the Wenchuan earthquake 11 September 2009 Lessons learnt from the Wenchuan earthquake 11 September 2009 Several dams and power plants damaged by the earthquake which occurred in China s Sichuan province on 12 May 2008 were visited during a joint

More information

Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam

Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam Effects of perimetrical and vertical joint opening on the seismic response of a concrete arch dam Soheil RAZAVI DARBAR', Hiroyuki WATANABE' *Ph.D. Candidate, Earthquake Engineering Laboratory, Department

More information

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick Terms of Reference for the Comparative Environmental Review (CER) of Options for the Mactaquac Project, Mactaquac, New Brunswick Preamble The New Brunswick Power Corporation ( NB Power ) operates the Mactaquac

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

ANALYSIS OF IRREVERSIBLE DISPLACEMENTS IN MULTIPLE ARCH CONCRETE DAM USING PRINCIPAL COMPONENT ANALYSIS

ANALYSIS OF IRREVERSIBLE DISPLACEMENTS IN MULTIPLE ARCH CONCRETE DAM USING PRINCIPAL COMPONENT ANALYSIS ANALYSIS OF IRREVERSIBLE DISPLACEMENTS IN MULTIPLE ARCH CONCRETE DAM USING PRINCIPAL COMPONENT ANALYSIS Luc Chouinard 1, Richard Larivière 2, Patrice Côté 3, Wendong Zhao 4 ABSTRACT Irreversible displacements

More information

CASE STUDY SOLIS, SWITZERLAND

CASE STUDY SOLIS, SWITZERLAND SEDIMENT MANAGEMENT CASE STUDY SOLIS, SWITZERLAND Key project features Name: Solis Country: Switzerland Category: bypass channel/tunnel Reservoir volume (original): 4.1 Mm 3 Installed capacity: 64 MW Date

More information

Hardened Concrete. Lecture No. 16

Hardened Concrete. Lecture No. 16 Hardened Concrete Lecture No. 16 Fatigue strength of concrete Modulus of elasticity, Creep Shrinkage of concrete Stress-Strain Plot of Concrete At stress below 30% of ultimate strength, the transition

More information

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3)

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3) 2.1 View of Wonogiri Reservoir (1/3) Wonogiri dam abutment on the left side of dam Spillway forebay on thet left side of dam Bank erosion around Wonogiri reservoir. Wonogiri Dam view from chersonese. An

More information

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT 4 th International Conference on Earthquake Geotechnical Engineering June 25-28, 2007 Paper No. 1637 TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT Mohammad

More information

Recommandations barrages-voûtes

Recommandations barrages-voûtes Recommandations barrages-voûtes Marc Hoonakker et Guirec Prevot Symposium AG du CFBR 31 Janvier 2019 Marseille 1 A CFBR (French-COLD) Working Group French inventory: 88 arch dams (VA) Goal: a state-of-the

More information

Proceedings Third International Conference on Scour and Erosion. November 1-3, 2006 Amsterdam, The Netherlands

Proceedings Third International Conference on Scour and Erosion. November 1-3, 2006 Amsterdam, The Netherlands Proceedings Third International Conference on Scour and Erosion November 1-3, 2006 Amsterdam, The Netherlands Copyright All rights reserved. No part of this publication may be reproduced, stored in a retrieval

More information

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM Esen Yalım KARADUMAN BAR-SU Eng. & Conc. Inc. Ankara Turkey

More information

DESIGN AND ANALYSIS OF MULTI-SENSOR DEFORMATION DETECTION SYSTEMS

DESIGN AND ANALYSIS OF MULTI-SENSOR DEFORMATION DETECTION SYSTEMS DESIGN AND ANALYSIS OF MULTI-SENSOR DEFORMATION DETECTION SYSTEMS Anna SZOSTAK-CHRZANOWSKI 1, Adam CHRZANOWSKI 1, Nianwu DENG 1,2, and Maciej BAZANOWSKI 1, 1 Canadian Centre for Geodetic Engineering, University

More information

Design of large underground caverns

Design of large underground caverns Discussion paper # 2 Design of large underground caverns A case history based on the Mingtan Pumped Storage Project in Taiwan This document has been prepared as a replacement for Chapter 13 in Practical

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification Table of Contents 1 Development of rock engineering...1 1.1 Introduction...1 1.2 Rockbursts and elastic theory...4 1.3 Discontinuous rock masses...6 1.4 Engineering rock mechanics...7 1.5 Geological data

More information

Nipigon River Landslide, Ontario, Canada

Nipigon River Landslide, Ontario, Canada Nipigon River Landslide, Ontario, Canada A. Abdelaziz, S. Besner, R. Boger, B. Fu, J. Deng, and A. Farina Presenter: Jian Deng, Ph.D, P.Eng Centre of Excellence for Sustainable Mining and Exploration,

More information

LANDSLIDES - Causes, Impacts and Countermeasures

LANDSLIDES - Causes, Impacts and Countermeasures LANDSLIDES - Causes, Impacts and Countermeasures 17-21 June 2001 Davos, Switzerland Adverse Tunnelling Conditions Arising from Slope Instabilities A Case History Kurosch Thuro, Engineering Geology, ETH

More information

Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station

Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station Journal of Rock Mechanics and Geotechnical Engineering. 0, (): 6 7 Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station Aiqing Wu *, Qigui Yang, Xiuli Ding, Huoming Zhou,

More information

Investigation of crack development in concrete dams due to water level fluctuation during earthquakes

Investigation of crack development in concrete dams due to water level fluctuation during earthquakes River Basin Management VIII 271 Investigation of crack development in concrete dams due to water level fluctuation during earthquakes S. A. Neshaei 1, M. K. Abadi 2 & R. Vahedzadegan 3 1 Faculty of Engineering,

More information

Geological Investigation for Environmental Impact Assessment (EIA): Case Studies from Some of Mini Hydropower Projects in Sri Lanka

Geological Investigation for Environmental Impact Assessment (EIA): Case Studies from Some of Mini Hydropower Projects in Sri Lanka Geological Investigation for Environmental Impact Assessment (EIA): Case Studies from Some of Mini Hydropower Projects in Sri Lanka Nanda Wipula Bandara Balasooriya Faculty of Applied Sciences, South Eastern

More information

Geotechnical Engineering

Geotechnical Engineering Geotechnical Engineering CE 4348 Lecture 1: Introduction Instructor: Reza Ashtiani, Ph.D. Fall 2015 Physical Science Bldg., Room 314 Lecture Sessions : MW 12:30-1:20 pm Laboratory Sessions: MW 1:30-4:30

More information

Static and Dynamic Analyses of Concrete Dams

Static and Dynamic Analyses of Concrete Dams Dr Aïssa Mellal, Civil Engineer STUCKY SA, Switzerland NUMERICS IN GEOTECHNICS AND STRUCTURES 2012 30-31 August 2012, EPFL, Lausanne Outline o Introduction o Types of Concrete Dams o Purpose of Numerical

More information

STRESS MEASUREMENT IN ROCK MASS

STRESS MEASUREMENT IN ROCK MASS IGC 2009, Guntur, INDIA Measurement in Rock Mass STRESS MEASUREMENT IN ROCK MASS D.V. Sarwade Research Officer, CSMRS, New Delhi 110 016, India. E-mail: sarwadedv@rediffmail.com K.K. Mishra Research Assistant,

More information

Critical Borehole Orientations Rock Mechanics Aspects

Critical Borehole Orientations Rock Mechanics Aspects Critical Borehole Orientations Rock Mechanics Aspects By R. BRAUN* Abstract This article discusses rock mechanics aspects of the relationship between borehole stability and borehole orientation. Two kinds

More information

VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS

VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS Anna SZOSTAK-CHRZANOWSKI, Canada, Michel MASSIERA, Canada, Adam CHRZANOWSKI, Canada, Fabien LE HOAN,

More information

Forces on piles preventing debris slope slips

Forces on piles preventing debris slope slips Risk Analysis VII PI-637 Forces on piles preventing debris slope slips J. Vacek & S. Hrachová Czech Technical University, Klokner Institute, Czech Republic Abstract Failure of rock mass is not a static

More information

Climate effects on landslides

Climate effects on landslides GEORAMP ONE DAY SYMPOSIUM Climate effects on landslides E. E. Alonso, M. Sondón, N. M. Pinyol Universitat Politècnica de Catalunya October 14th, 2016. UPC, Barcelona Infiltration (evaporation) and slope

More information

The relationship between large reservoirs and seismicity

The relationship between large reservoirs and seismicity The relationship between large reservoirs and seismicity 08 February 2010 Following the 12 May 2008 Wenchuan earthquake in China, Chen Houqun, Xu Zeping and Li Ming discuss the question of whether large

More information