Precision of Environmental Dredging Factors and Processes

Size: px
Start display at page:

Download "Precision of Environmental Dredging Factors and Processes"

Transcription

1 Precision of Environmental Dredging Factors and Processes Michael Palermo - Mike Palermo Consulting, Inc. John Kern Kern Statistical Services, Inc. Presented at DREDGING 2012 October 22-25, 2012, San Diego, CA 1

2 Overview of Presentation.. in some cases, the attainable accuracy in locating the cut is greater than the accuracy of the sediment characterization data. This presentation builds on that statement, focusing on Dredging Precision and Removal Precision for Environmental Dredging. 4 Background 4 Definitions 4 Factors Related to Dredging Precision and Removal Precision 4 Potential Influences and Sources of Errors 4 Conclusions 4 Next Steps 2

3 Background The Applicable Scenario 4 Full Dredging is a common remedy approach (i.e., not a combined dredging/capping remedy) 4 Removal of all target sediment with COC concentrations above a set clean up level (not a dredge to elevation requirement) with minimal removal of non-target sediment 4 Conditions with no visual/physical distinction between contaminated and underlying clean sediments (i.e., no rock or hardpan) 4 Post dredging monitoring for verification The Environmental Dredging Removal R Objective: Precise removal of all inventory with last production pass 3

4 Definitions 4 Accuracy vs Precision - How close we can come to the target vs. How tight is the pattern around the target both terms are used interchangeably in the dredging context. 4 Dredging Precision How precisely we can place the dredgehead to a desired target elevation (related to dredging equipment, positioning instrumentation). 4 Removal Precision How precisely we can remove targeted sediment with minimal removal of underlying non-targeted sediment (related to multiple factors including dredging precision and how precisely can we define where the contamination is located, usually by coring). 4

5 Dredging Precision Removal Precision Non-target Target Non-target Target 5

6 Factors Affecting Dredging Precision 4 Dredging equipment type and design 4 Positioning equipment and software 4 Linkages for positioning installation 4 Stabilization of floating plant via spudding, etc. 4 Site conditions (debris, waves, water depth) 4 Operator experience and skill 4 OTHERS? 4 Bottom line: Modern dredging equipment and state-of-the-art electronic positioning systems now available will allow placement of the dredgehead to within a few inches of a target elevation. 6

7 Factors Affecting Removal Precision 4 Surveying 4 Characterization and Sampling Design 4 Sediment Coring 4 Data Interpretation 4 Dredging Design/ Operations Plan 4 Contracting 4 Dredging and Positioning Equipment (Dredging Precision) 4 Generated Residuals 4 Monitoring considerations 4 OTHERS? Each of these is subject to or may cause error (error here in the broadest sense includes mistakes, inaccuracies, uncertainties). 7

8 Surveying Potential influences or sources of error: 4 Referencing core data only to sediment depth 4 Inaccuracy of acoustic surveying to define the water or sediment surface 4 Poor survey control for nearshore sites 4 Uncertainty of rodding to define sediment surface 4 Misapplication of data from Tide gages, etc. 4 Golden Rule: Tie core data to elevations. 8

9 Fox River 4RI Cores were tied to the Mudline (a big mistake); sediments move Elevation datum Water Mudline (RI data) Sediment Bedrock

10 Characterization and Sampling Design Potential influences or sources of error: 4 Incomplete definition of the area of concern 4 Poor selection of boring locations, spacing, etc. 4 Error in selection of boring depths 4 Inappropriate core segmentation for testing 4 SOPs for addressing refusal, core loss/ compaction, sampling handling, etc. Kern, J.W., Wolfe, J. and N. Barabás Sampling Density for Refinement of Dredge Prism Design in the Lower Fox River, Wisconsin OU 2-5. Battelle

11 Sediment Coring Potential influences or sources of error: 4 Depth of cores insufficient to define EOC 4 Core loss and Core Compaction h Core recovery is usually less than core push h Fluff and soft sediment near the mudline (core barrel pushes through without material entering the core tube) h Loss from the core bottom (very soupy sediment or poor performance of core catcher ) h Compression in the sediment column (sandy sediment vs fine grained) h 80% recovery is normally considered satisfactory (but 80% recovery is 20% uncertainty in geometry of the sediment profile) 4 Inappropriate core transport, handling, and processing 11

12 DoC Variation in Paired Type 1A Cores Maximum Distance 20 Feet -- N=255 (Hudson River Phase I Program)

13 Data Interpretation Potential influences or sources of error: 4 Inaccurate correlation of EOC between discrete boring locations 4 Geospatial modeling error (error of the model, selection of alpha value) 4 Isolated anomalies in stratigraphy 4 Time lag effects from characterization to implementation due to sedimentation or additional contaminant sources Golden Rule: ID the EOC 13

14 EoC Uncertainties Moderate Problem Typical of unknown extent Failure to Incorporate bathymetric gradient into interpolation Could be improved by explicitely incorporating relationship between thickness and slope Data are available to investigate Small problems in shallow deposits Due to errors in measurement of DoC Incomplete Cores Poor recovery DoC relative percent deviation (+/- 9 inches) Larger errors due to incomplete sampling of 80 foot grid and failure to tie deposits in through sampling near the banks (i.e. within 40 feet or so) Modeled Surface Bathymetry True Surface Major Problem Typical of CU Problem due to incomplete cores 2. Exacerbated by regression to the mean due to failure to stratify modeling based on nav-channel boundaries vertical and lateral 14

15 Residual Dredging and Sand Cover Rates at Fox River 4 Statistical analysis forecasted approximately 10 to 15% need for re-dredging to correct un-captured target inventory with infill sampling. 4 Actual rates for correcting inventory misses have been approximately 17% in OU-3. 4 Overall re-dredging and sand cover rates including disturbed residuals management and inventory misses have been approximately 25% to 30% 15

16 Dredging Design/ Operations Plan Potential influences or sources of error include: 4 Inappropriate selection of target dredge cut elevations as compared to EOC 4 Dredge Prism level cuts result in more nontarget sediment removed vs. contour dredging 4 Slopes and transitions 4 Selection of number and thicknesses of production cuts 4 Insufficient tolerance or overdredging allowances 16

17 Contracting Potential influences or sources of error: 4 Type of contract - Rental vs. Fixed Cost 4 Performance based vs. defined methods 4 Specified overdredging allowances 4 Pay items and payment methods 4 Incentives or Disincentives 4 Contractors means and methods 4 Operator experience and skill 17

18 Generated Residuals Potential influences or sources of error: 4 Generated residuals erroneously characterized as undisturbed residuals (inventory) 4 Misinterpretation of thickness and concentration of generated residual layers due to resettlement, fallback, and sloughing 4 Bathtub geometries can exacerbate this problem 18

19 Monitoring/Verification If no one looks, environmental dredging is always precise. Potential influences and sources of error: 4 Overly restrictive or complex criteria for redredging or residuals management 4 Method of sampling (grab vs. core) 4 Selection of increment(s) for testing 4 Method of sample handling and processing 4 Misinterpretation of generated vs. undisturbed residuals (density and thickness) 19

20 Conclusions 4 Dredging precision is a function of the dredging equipment type and design, positioning instrumentation, operator skill, and site conditions. Modern dredges commonly used for remediation equipped with state-of-the-art positioning can place the dredgehead within a few inches of a target elevation under conditions common to most remediation projects. 4 Removal precision is influenced by differing project activities and technical factors including dredging precision, site characterization, and decisions made during project design and implementation. 4 Potential inaccuracies in defining the EOC can greatly reduce removal precision and outweigh operational inaccuracies in cutting to a desired target elevation. 4 Selecting a target cut elevation with a tolerance below the EOC and/or setting an appropriate overdredging allowance is one approach for improving removal precision. 4 The criteria for removal success should include appropriate balancing of complete removal with approaches for residuals management.

21 Next Steps 4 Solicit input mike@mikepalermo.com 4 Determine a range of the various inaccuracies based on field experiences 4 Evaluate methods to consider the aggregate errors for precision removal 4 Battelle 2013 Dallas paper and platform presentation 21

22 QUESTIONS? 22

Estimating Remedial Volumes for a GLLA Project on the Milwaukee River

Estimating Remedial Volumes for a GLLA Project on the Milwaukee River Estimating Remedial Volumes for a GLLA Project on the Milwaukee River Mike Ciarlo, Jamie Beaver, Mike Powell, Jason Byler EA Engineering, Science, and Technology, Inc. Marsha Burzynski, William Fitzpatrick

More information

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017 Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group September 14, 2017 Agenda Pre-Design Investigation (PDI) Status Geophysical, Bathymetric,

More information

High Resolution Geophysics: A Better View of the Subsurface. By John Jansen, P.G., Ph.D., Aquifer Science and Technology

High Resolution Geophysics: A Better View of the Subsurface. By John Jansen, P.G., Ph.D., Aquifer Science and Technology High Resolution Geophysics: A Better View of the Subsurface By John Jansen, P.G., Ph.D., Aquifer Science and Technology Geologist Use Only Part of the Information Available To Them Most Geologist rely

More information

Highland Lake Bathymetric Survey

Highland Lake Bathymetric Survey Highland Lake Bathymetric Survey Final Report, Prepared For: The Town of Highland Lake 612 Lakeshore Drive Oneonta, AL 35121 Prepared By: Tetra Tech 2110 Powers Ferry Road SE Suite 202 Atlanta, GA 30339

More information

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018 DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN 53561 June 6, 2018 SUBJECT: Gruber s Grove Bay Sediment Sampling Work Plan Addendum Mr. Bill Fitzpatrick, P.E.,

More information

Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities

Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities WEDA Cincinnati April 10, 2014 Ray Wood C.Eng Executive Vice President Fugro Consultants Inc Advantages

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

J.B. Shaw and D. Mohrig

J.B. Shaw and D. Mohrig GSA DATA REPOSITORY 2014008 J.B. Shaw and D. Mohrig Supplementary Material Methods Bathymetric surveys were conducted on 26 June- 4 July, 2010 (Fig. 2A), 7 March, 2011 (Fig. 2B), 11-12 August, 2011 (Figs.

More information

Sediment Geotechnical Characterization Work Plan (Appendix C-2 to PDI WP)

Sediment Geotechnical Characterization Work Plan (Appendix C-2 to PDI WP) Sediment Geotechnical Characterization Work Plan (Appendix C-2 to PDI WP) Remedial Design Lower 8.3 Miles of the Lower Passaic River Operable Unit Two of the Diamond Alkali Superfund Site In and About

More information

CHARACTERIZATION OF SOFT CLAY- A CASE STUDY AT CRANEY ISLAND

CHARACTERIZATION OF SOFT CLAY- A CASE STUDY AT CRANEY ISLAND National Defense Industrial Association 2005 Tri-Service Infrastructure Systems Conference and Exhibition Re-Energizing Engineering Excellence CHARACTERIZATION OF SOFT CLAY- A CASE STUDY AT CRANEY ISLAND

More information

March 13, 2015 Presented at the Western Dredging Association, Midwest Chapter Meeting March 11 13, 2015, Milwaukee, Wisconsin

March 13, 2015 Presented at the Western Dredging Association, Midwest Chapter Meeting March 11 13, 2015, Milwaukee, Wisconsin In Situ Stabilization/Solidification (ISS), Another Tool for Remediation of Contaminated Sediments Christopher A. Robb, PE Thomas J. degrood Richard H. Weber, PE Natural Resource Technology, Inc. March

More information

7.1 PROTOCOL FOR SEDIMENT MONITORING FOR NUTRIENTS, METALS AND PHYSICAL CHARACTERISTICS

7.1 PROTOCOL FOR SEDIMENT MONITORING FOR NUTRIENTS, METALS AND PHYSICAL CHARACTERISTICS 7.1 PROTOCOL FOR SEDIMENT MONITORING FOR NUTRIENTS, METALS AND PHYSICAL CHARACTERISTICS Overview Sediments can be collected using either a grab or core sampler. Core samplers are tube-like devices that

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF:

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Paulsboro Marine Terminal Sediment and Benthic Sampling and Characterization Plan Addendum No. 1 SUBMISSION DEADLINE: May 27, 2009 at 11:00 A.M. FAIR

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

GEOTECHNICAL TESTING OF SEDIMENT

GEOTECHNICAL TESTING OF SEDIMENT ApPENDIX El. GEOTECHNICAL TESTING OF SEDIMENT (Modified from Exponent, 20Q1c) E.I Introduction This appendix presents information regarding geotechnical testing performed in 2000 on sediments in Onondaga

More information

TABLE 1 SSFL CHEMICAL SOIL BACKGROUND STUDY DATA QUALITY OBJECTIVES

TABLE 1 SSFL CHEMICAL SOIL BACKGROUND STUDY DATA QUALITY OBJECTIVES Problem Statement: Soil chemical concentration data for selected constituents are needed from off-site chemical background reference areas (CBRAs) to establish a regulatory-compliant, publicly-reviewed,

More information

Rotating Dual Axis Blending Technology at MGP Sites

Rotating Dual Axis Blending Technology at MGP Sites Applicability of ISCO Using Rotating Dual Axis Blending Technology at MGP Sites MGP 2012 March 28 30, 2012 Scott Tarmann AECOM ISCO at MGP Sites In-situ chemical oxidation (ISCO) has been used with varied

More information

Appendix E. Phase 2A Geotechnical Data

Appendix E. Phase 2A Geotechnical Data Appendix E Phase 2A Geotechnical Data Appendix E1 Geotechnical Testing of Sediment ApPENDIX El. GEOTECHNICAL TESTING OF SEDIMENT (Modified from Exponent, 20Q1c) E.I Introduction This appendix presents

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

3. MARINE HABITAT RESTORATION

3. MARINE HABITAT RESTORATION Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 3. MARINE HABITAT RESTORATION Marine habitat restoration at Titlow Park could include restoration

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Table 5- Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Transformer Pads (9 pads: PAD 9) Evaluate if PCBs presently exist in soils adjacent to, and/or beneath the transformer

More information

MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to:

MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to: LEARNING OBJECTIVES MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS Coring Operations Basics By the end of this lesson, you will be able to: Understand why cores are justified and who needs core data

More information

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River September 2015 0 Table of Contents 1. Introduction... 2 2. Data collection... 3 2.1 Additional data...

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Remedial Program. GE Hudson Falls Plant Site. GE Hudson Falls Plant Site. TDCS Status

Remedial Program. GE Hudson Falls Plant Site. GE Hudson Falls Plant Site. TDCS Status Updates on Remedial Programs at the GE Hudson Falls Plant Site and GE Fort Edward Plant Site GE Hudson Falls USEPA Community Advisory Group Meeting September 11, 2008 GE Fort Edward Division of Environmental

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

In-situ management. The other approach to remediating contaminated sediments. SAO Environmental Consulting AB. Vattendagarna Oktober, 2012

In-situ management. The other approach to remediating contaminated sediments. SAO Environmental Consulting AB. Vattendagarna Oktober, 2012 1 In-situ management The other approach to remediating contaminated sediments SAO Environmental Consulting AB Managing (remediating) contaminated 2 sediments Reason Contamination poses unacceptable risks

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

Coring and sediment sampling

Coring and sediment sampling Coring and sampling Principle: In order to ground-truth geophysical data, it is necessary to obtain a sample of the seabed. There are two main techniques available for sampling unconsolidated s : (1) seabed

More information

Bishopville Prong Study

Bishopville Prong Study Bathymetric and Sediment Assessment in the Bishopville Prong of St. Martin River Darlene V. Wells, Richard A. Ortt, Jr., and Stephen Van Ryswick Funded by MCBP 2011-2012 Implementation Grant Objectives

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS 51 SASKATCHEWAN STRATIGRAPHY GLACIAL SURFICIAL STRATIFIED DEPOSITS 52 SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE OF SEDIMENT DEPOSITION

More information

Illinois River Sediment Quality and Beneficial Use Options

Illinois River Sediment Quality and Beneficial Use Options Illinois River Sediment Quality and Beneficial Use Options John C. Marlin Illinois Sustainable Technology Center Robert G. Darmody Dept. of Natural Resources and Environmental Science University of Illinois

More information

ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON RESIDENCE SITE, PORT CLYDE, ME. For: St.Germain-Collins

ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON RESIDENCE SITE, PORT CLYDE, ME. For: St.Germain-Collins ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON RESIDENCE SITE, PORT CLYDE, ME For: St.Germain-Collins 4 Union Street, Suite 3 Bangor, Maine 441 July, 218 ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON

More information

Submarine Debris flow Project Proposal to Force August 2018/v1.02

Submarine Debris flow Project Proposal to Force August 2018/v1.02 Submarine Debris flow Project Proposal to Force August 2018/v1.02 Summary The main objective of the Submarine Debris Flow study is to implement the concept of debris flow in the MassFlow3DÔ code as an

More information

Appendix D. Sediment Texture and Other Soil Data

Appendix D. Sediment Texture and Other Soil Data 5 6 7 8 Appendix D. Sediment Texture and Other Soil Data This appendix describes the sediment texture of the aquifer system in the Restoration Area. The contents of this appendix describe the: Importance

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

September 2017 Revision 3 LPROU

September 2017 Revision 3 LPROU (Appendix C-3 to PDI WP) Remedial Design Lower 8.3 Miles of the Lower Passaic River Operable Unit Two of the Diamond Alkali Superfund Site In and About Essex, Hudson, Bergen and Passaic Counties New Jersey

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

6 PREPARING THE SAMPLING AND ANALYSIS PLAN (SAP)

6 PREPARING THE SAMPLING AND ANALYSIS PLAN (SAP) 6 PREPARING THE SAMPLING AND ANALYSIS PLAN (SAP) Once the required numbers of DMMUs and field samples have been calculated and a dredging plan conceived, a sampling plan must be developed. The DMMUs and

More information

THIN-LAYER PLACEMENT OF DREDGE MATERIAL FOR MARSH NOURISHMENT, RESOTRATION, AND RESPONSE TO SEA LEVEL RISE

THIN-LAYER PLACEMENT OF DREDGE MATERIAL FOR MARSH NOURISHMENT, RESOTRATION, AND RESPONSE TO SEA LEVEL RISE THIN-LAYER PLACEMENT OF DREDGE MATERIAL FOR MARSH NOURISHMENT, RESOTRATION, AND RESPONSE TO SEA LEVEL RISE Case studies and lesson learned regarding thin-layer deposition projects in Delaware, New Jersey,

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Source Control Early Action Focused Feasibility Study

Source Control Early Action Focused Feasibility Study Source Control Early Action Focused Feasibility Study Empirical Mass Balance Model Results or the Lower Passaic River Edward A. Garvey, PhD, PG Malcolm Pirnie, Inc. Remedial Options Workgroup Meeting June

More information

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus

More information

Habitat Monitoring Update Hudson River CAG November 16, 2017

Habitat Monitoring Update Hudson River CAG November 16, 2017 Habitat Monitoring Update Hudson River CAG November 16, 2017 Habitat Reconstruction Overview: Habitats A habitat replacement program is being implemented in an Adaptive Management context to reconstruct

More information

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries StreamStats: Delivering Streamflow Information to the Public By Kernell Ries U.S. Department of the Interior U.S. Geological Survey MD-DE-DC District 410-238-4317 kries@usgs.gov StreamStats Web Application

More information

Historical Bathymetric Data for the Lower Passaic River

Historical Bathymetric Data for the Lower Passaic River Historical Bathymetric Data for the Lower Passaic River 4th Passaic River Symposium June 22nd, 2010 Dr. William Hansen Jeffrey Cranson Worcester State College Project Supported by The Hudson River Foundation

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Colorado River: Mile 8 to Mile 13.5

Colorado River: Mile 8 to Mile 13.5 Colorado River: Mile to Mile. +00 +00 +00 0+00 0+00 +00 00+00 +00 +00 +00 +00 +00 +00 +00 +00 +00 +00 0+00 +00 +00 +00 +00 +00 0+00 +00 +00 0+00 +00 +00 +00 +00 0+00 +00 +00 +00 +00 +00 +00 +00 0+00 0+00

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Geophysical Exploration in Water Resources Assessment. John Mundell, P.E., L.P.G., P.G. Ryan Brumbaugh, L.P.G. Mundell & Associates, Inc.

Geophysical Exploration in Water Resources Assessment. John Mundell, P.E., L.P.G., P.G. Ryan Brumbaugh, L.P.G. Mundell & Associates, Inc. Geophysical Exploration in Water Resources Assessment John Mundell, P.E., L.P.G., P.G. Ryan Brumbaugh, L.P.G. Mundell & Associates, Inc. Presentation Objective Introduce the use of geophysical survey methods

More information

Lake Sedimentation Survey of Siloam Springs State Park Lake, Adams County, Illinois

Lake Sedimentation Survey of Siloam Springs State Park Lake, Adams County, Illinois Contract Report 567 Lake Sedimentation Survey of Siloam Springs State Park Lake, Adams County, Illinois by Richard L. Allgire Office of Sediment & Wetland Studies Prepared for the Illinois Department of

More information

SLOSH New Orleans Basin 2012 Update

SLOSH New Orleans Basin 2012 Update SLOSH New Orleans Basin 2012 Update Michael Koziara Science and Operations Officer National Weather Service Slidell, LA The Basics What is storm surge? What is SLOSH? Details Assumptions Inundation = Storm

More information

Introduction to GIS I

Introduction to GIS I Introduction to GIS Introduction How to answer geographical questions such as follows: What is the population of a particular city? What are the characteristics of the soils in a particular land parcel?

More information

GSA DATA REPOSITORY

GSA DATA REPOSITORY GSA DATA REPOSITORY 2009206 Miner et al. Supplemental Material Bathymetric Survey Methods The bathymetric data for the area were gathered using a single-beam bathymetric survey rig mounted aboard a 21-foot

More information

Variability in Geotechnical Properties of Sediments and Dredged Materials

Variability in Geotechnical Properties of Sediments and Dredged Materials Variability in Geotechnical Properties of Sediments and Dredged Materials PURPOSE: This technical note provides an overview of selected uncertainties involved in estimating or characterizing pre-dredged

More information

How to Interpret Mining Company Drill Reports & Announcements

How to Interpret Mining Company Drill Reports & Announcements How to Interpret Mining Company Drill Reports & Announcements A Simple Guide amscot Stockbroking Pty Ltd A division of State One Stockbroking Ltd (AFSL 247 100) Disclaimer: All information in this document

More information

Analysis of soil failure modes using flume tests

Analysis of soil failure modes using flume tests Analysis of soil failure modes using flume tests A. Spickermann & J.-P. Malet Institute of Earth Physics, CNRS UMR 751, University of Strasbourg, Strasbourg, France Th.W.J. van Asch, M.C.G. van Maarseveen,

More information

Horizontal well Development strategy

Horizontal well Development strategy Horizontal well Development strategy Pakawas Mangkang Team Member Yoseph Partono Stephan Otero Duangdao Chutanukarn Warin Lobtong Suarporn Ketpreechasawat B8/32 Asset, Thailand Chiangmai, 11 th Nov-13

More information

Changes in Hudson River sediment distribution after storms Irene and Sandy

Changes in Hudson River sediment distribution after storms Irene and Sandy Changes in Hudson River sediment distribution after storms Irene and Sandy Frank Nitsche and Timothy Kenna Lamont Doherty Earth Observatory, Columbia University USGS - Landsat Changes in Hudson River sediment

More information

Mark H. Horwitz Ping Wang PhD Coastal Research Laboratory, School of Geosciences University of South Florida

Mark H. Horwitz Ping Wang PhD Coastal Research Laboratory, School of Geosciences University of South Florida Mark H. Horwitz Ping Wang PhD Coastal Research Laboratory, School of Geosciences University of South Florida American Shore & Beach Preservation Association 2015 National Coastal Conference, New Orleans,

More information

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts Imagine the result General Electric Company Pittsfield, Massachusetts 2012 Sediment Sampling Plan 1½-Mile Reach of the Housatonic River March 2012 2012 Sediment Sampling Plan 1½-Mile Reach of the Housatonic

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Water Level Analysis of Lower St. Marys River September 15, 2010

Water Level Analysis of Lower St. Marys River September 15, 2010 Water Level Analysis of Lower St. Marys River September 15, 21 Purpose and Scope This report presents the results of the data analysis of the St. Marys River levels and flows in support of several study

More information

ADSC Research Project Update: Rock Sockets in the Southeastern U.S.

ADSC Research Project Update: Rock Sockets in the Southeastern U.S. ADSC Research Project Update: Rock Sockets in the Southeastern U.S. W. Robert Thompson, III, P.E., D.GE, M.ASCE 1 ABSTRACT The bearing capacity of drilled shafts in rock has traditionally been assessed

More information

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015 1 Redwood City Harbor, California, Navigation Improvement Feasibility Study Appendix D Geotechnical Engineering DRAFT April 2015 2 Contents 1 Purposes of Report... 3 2 Background... 3 3 References and

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Donald K. Stauble and Bill Birkemeier Coastal and Hydraulics Laboratory US Army Corps of Engineers

Donald K. Stauble and Bill Birkemeier Coastal and Hydraulics Laboratory US Army Corps of Engineers Donald K. Stauble and Bill Birkemeier Coastal and Hydraulics Laboratory US Army Corps of Engineers Define the Problem Navigation Shore Protection Environmental Political So what is the problem? Management

More information

Case Study: Sediment Contamination by Mercury and DDT and Ecological Risk Assessment for Aquatic Biota, Lake Maggiore, Italy

Case Study: Sediment Contamination by Mercury and DDT and Ecological Risk Assessment for Aquatic Biota, Lake Maggiore, Italy Intersol March 19th, 2014 Case Study: Sediment Contamination by Mercury and DDT and Ecological Risk Assessment for Aquatic Biota, Lake Maggiore, Italy CO-AUTHORED BY E Bizzotto and F Colombo PRESENTED

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

QUANTITATIVE INTERPRETATION

QUANTITATIVE INTERPRETATION QUANTITATIVE INTERPRETATION THE AIM OF QUANTITATIVE INTERPRETATION (QI) IS, THROUGH THE USE OF AMPLITUDE ANALYSIS, TO PREDICT LITHOLOGY AND FLUID CONTENT AWAY FROM THE WELL BORE This process should make

More information

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA Prepared by: Louisiana Coastal Protection and Restoration Authority Engineering Division March 2016 The geology of Louisiana s coastal zone is intimately

More information

Steven Noble MDEQ - WRD Enbridge Response Unit

Steven Noble MDEQ - WRD Enbridge Response Unit EPA situation report, October 19, 2012 Steven Noble MDEQ - WRD Enbridge Response Unit Brief history of the spill Monitoring Monitoring the impacts Follow the oil The Current Situation A Look at the Future

More information

A surficial. P^HiHI waste disposal site, Bureau County, Illinois. east of the Sheffield low-level radioactive. electrical resistivity survey

A surficial. P^HiHI waste disposal site, Bureau County, Illinois. east of the Sheffield low-level radioactive. electrical resistivity survey ISGS CONTRACT/GRANT REPORT 1981-6 WATER RESOURCES DIVISION/USGS P^HiHI 100240 557.09773 IL6cr 1981-6 A surficial electrical resistivity survey east of the Sheffield low-level radioactive waste disposal

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

FINAL REPORT GEOPHYSICAL INVESTIGATION WATER TOWER NO. 6 SITE PLANT CITY, FL

FINAL REPORT GEOPHYSICAL INVESTIGATION WATER TOWER NO. 6 SITE PLANT CITY, FL APPENDIX B FINAL REPORT GEOPHYSICAL INVESTIGATION WATER TOWER NO. 6 SITE PLANT CITY, FL Prepared for Madrid Engineering Group, Inc. Bartow, FL Prepared by GeoView, Inc. St. Petersburg, FL February 28,

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

C. STUDENT FIELD DATA SHEETS

C. STUDENT FIELD DATA SHEETS C. STUDENT FIELD DATA SHEETS Student Name Date Time Stream Location Parameter to find Your Group s Results Units trial trial average Transparency cm Water Temperature Air Temperature Weather N sunny N

More information

Foundations on Deep Alluvial Soils

Foundations on Deep Alluvial Soils Canterbury Earthquakes Royal Commission Hearings 25 October 2011, Christchurch GEO.CUB.0001.1-35.1 Foundations on Deep Alluvial Soils Misko Cubrinovski, Ian McCahon, Civil and Natural Resources Engineering,

More information

SAND DISTRIBUTION AND RESERVOIR CHARACTERISTICS NORTH JAMJUREE FIELD, PATTANI BASIN, GULF OF THAILAND

SAND DISTRIBUTION AND RESERVOIR CHARACTERISTICS NORTH JAMJUREE FIELD, PATTANI BASIN, GULF OF THAILAND SAND DISTRIBUTION AND RESERVOIR CHARACTERISTICS NORTH JAMJUREE FIELD, PATTANI BASIN, GULF OF THAILAND Benjawan KIinkaew Petroleum Geoscience Program, Department of Geology, Faculty of Science, Chulalongkorn

More information

Introduction to Weather Data Cleaning

Introduction to Weather Data Cleaning Introduction to Weather Data Cleaning Speedwell Weather Limited An Introduction Providing weather services since 1999 Largest private-sector database of world-wide historic weather data Major provider

More information

Sediment Sampling Protocols

Sediment Sampling Protocols Sediment Sampling Protocols February 2017 Sampler Training Workshop Thomas Seal, ES III Watershed Monitoring Section (WMS) Water Quality Assessment Program DEAR Tallahassee Sediment Sampling in Large and

More information

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS 2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS Preparation for MSB-2 started in April 2002. Drilling and planned field work in both MSB-2 and 4 were carried out at the same time. After completion of the

More information

An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study

An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study Prepared for Sefton Resources Inc. Jennifer Dunn, Chief Geologist Petrel Robertson Consulting Ltd. Outline Background

More information

Radioactivity as a Basis for Correlation of Glacial Deposits in Ohio

Radioactivity as a Basis for Correlation of Glacial Deposits in Ohio The Ohio State University Knowledge Bank kb.osu.edu Ohio Journal of Science (Ohio Academy of Science) Ohio Journal of Science: Volume 57, Issue 6 (November, 1957) 1957-11 Radioactivity as a Basis for Correlation

More information