1 Report No: 2 Report Date: 12/22/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 2 Rpt T. Activity: 24 - Idle AFE #: PB Operation Desc: MOVE AND RIG UP. AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: -4 Rig Supervisor 1: ROY KIMBEL Daily Costs: $35,775 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $462,900 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $462,900 Start Depth(ft): 110 Formation: Total Project Costs: $766,181 Ending Depth(ft): 110 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $0 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: LOWER SUB BASE AND DERRICK, LOAD OUT TRUCKS, 85% MOVE AND 10% RIG UP ON NEW LOCATION. WAIT ON DAY LIGHT TO COMPLETE MOVE. RIG MOVE 55 MILES DAILY COST: $35,775 CUM COST: $462,900 CMIC: RON PULLIAM BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: LOWER SUB BASE AND DERRICK, LOAD OUT TRUCKS, 85% MOVE AND 10% RIG UP NIH ON NEW LOCATION. 18: WAIT ON DAY LIGHT TO COMPLETE MOVE NIH Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: : Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Percision Drilling RIG MOVERS Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $3,000 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $49,000 IDC - DRILL - FLUIDS $65,000 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $8,000 Total IDC: $30,000 $462,900 Total Cumulative Well Costs: $30,000 $462,900 12/22/ Idle $35,775 $462,900 $6,862,800 Page 1 of 1 Powered by Production Access 12/27/2012

2 Report No: 3 Report Date: 12/23/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 3 Rpt T. Activity: 24 - Idle AFE #: PB Operation Desc: RIG UP AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: -3 Rig Supervisor 1: ROY KIMBEL Daily Costs: $62,301 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $525,201 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $525,201 Start Depth(ft): 110 Formation: Total Project Costs: $766,181 Ending Depth(ft): 110 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $0 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: COMPLETE RIG MOVE FROM UNIVERSITY #1H TO UNIVERSITY 8-19 #1. RIG UP WORKING PITS, SET IN MUD PUMPS AND GENERATORS. SET SUB BASE AND DERRICK. 75% RIG UP. WAIT ON DAY LIGHT TO RAISE DERRICK AND SUB BASE. INCIDENT AT 10:20 HOUR, 12/21/2012. WAS NOT REPORTED TO RIG PUSHER AND ENERGEN CONSULTANT UNTIL 08:10 HOUR 12/22/2012. THIRD PARTY TRUCK DRIVER WAS OFF LOADING STEEL MUD TANK ON UNIVERSITY 8-19 #1H. WINCH LINE BROKE, LINE BROKE BACK GLASS OF TRUCK, SOME GLASS STRIKING DRIVER. HE WAS TAKEN TO HOSPITAL FOR OBSERVATION, NO TREATMENT WAS PERFORMED ON TRUCK DRIVER. THIRD PARTY INCIDENT REPORT WILL FOLLOW. DAILY COST: $62,301 CUM COST: $525,201 CMIC: RON PULLIAM BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: COMPLETE RIG MOVE FROM UNIVERSITY #1H TO UNIVERSITY 8-19 #1. RIG UP NIH WORKING PITS, SET IN MUD PUMPS AND GENERATORS. SET SUB BASE AND DERRICK. 18: WAIT ON DAY LIGHT TO RAISE DERRICK AND SUB BASE NIH Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: : Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Percision Drilling RIG MOVERS Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $4,500 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $73,500 IDC - DRILL - FUEL POW WESTERN PETROLEU DIESEL FUEL FOR RIG $24,927 $24,927 IDC - DRILL - HAULING RAM ROD HOT SHOT SCOUT TOOL. $1,299 $1,299 IDC - DRILL - FLUIDS $65,000 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $12,000 Total IDC: $56,226 $525,201 Total Cumulative Well Costs: $56,226 $525,201 12/23/ Idle $62,301 $525,201 $6,862,800 Page 1 of 1 Powered by Production Access 12/27/2012

3 Report No: 4 Report Date: 12/24/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 4 Rpt T. Activity: 24 - Idle AFE #: PB Operation Desc: RIG UP AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: -2 Rig Supervisor 1: ROY KIMBEL Daily Costs: $67,735 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $592,936 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $592,936 Start Depth(ft): 110 Formation: Total Project Costs: $766,181 Ending Depth(ft): 110 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $0 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: RAISE SUB BASE AND DERRICK, FINISH SETTING EQUIPMENT. RIG UP FLOOR AND TOP DRIVE. RIG UP MUD LINES. CONNECT ELECTRICAL LINES FOR PUMPS, DRAW WORKS. CONNET HYDRAULIC LINES TO TOP DRIVE. CUT DITCHES AROUND RIG AND INSTALL GROUND RODS. 95% RIG UP. RIG HAND STEP THROUGH FLOOR GRADDING AND SKIN RIGHT LEG DUE TO WELD BROKE ON FLOOR GRADING. FIRST AID ONLY, WELDER REWELDED HINDGE ON FLOOR GRADING. DAILY COST: $67,735 CUM COST: $592,936 CMIC: RON PULLIAM BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: SET IN EQUIPMENT, RAISE SUB BASE AND DERRICK. RIG UP MUD LINES AND RIG NIH FLOOR. CONNECT ELECTRICAL LINES TO PUMPS, DRAW WORKS. CUT DITCHES AROUND RIG AND INSTALL GROUND RODS. CONNECT HYDRAULIC LINES FOR TOP DRIVE. 0: WAIT ON DAY LIGHT CREW NIH Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: : Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Percision Drilling RIG MOVERS Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 12/23/2012 PRECISION DRILLING RIG HAND STEP THROUGH FLOOR GRADDING AND SKIN RIGHT LEG DUE TO WELD BROKE ON FLOOR GRADING. FIRST AID ONLY, WELDER REWELDED HINDGE ON FLOOR GRADING. Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $6,000 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $98,000 IDC - DRILL - FUEL POW WESTERN PETROLEU DIESEL FUEL FOR RIG $24,471 $49,398 IDC - DRILL - HAULING $1,299 IDC - DRILL - FLUIDS $65,000 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $16,000 Total IDC: $54,471 $592,936 Total Cumulative Well Costs: $54,471 $592,936 Lost Time First Aid Med Visit 12/24/ Idle $67,735 $592,936 $6,862,800 Page 1 of 1 Powered by Production Access 12/27/2012

4 Report No: 5 Report Date: 12/25/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 5 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PB Operation Desc: AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: -1 Rig Supervisor 1: ROY KIMBEL Daily Costs: $40,719 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $633,655 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $633,655 Start Depth(ft): 110 Formation: Total Project Costs: $766,181 Ending Depth(ft): 110 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $4,469 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $4,469 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: SPOOL DRILLING LINE ON DRUM, UNHANG BLOCKS, LATCH ON TOP DRIVE, MAKE UP SAVER SUB. WELD ON 20" CONDUCTOR PIPE AND FLANGE UP FLOW LINE. MIX SPUD MUD, MADE MODIFICATION TO DOOR SUPPORTS ON PITS. LAY OUT BHA, STRAP AND CALIPER. FINISH HANGING TONGS AN RIG UP WIRELINE UNIT. PRE RIG INSPECTION. MU SCOUT TOOL ON 8" MOTOR AND BIT NOTIFIED TRRC AT 20:15 HOURS 12/24/2012 PRIOR TO SPUD, OPERATOR # 1O, GWEN. PREPARE TO SPUD 12 1/4" HOLE. DAILY COST: $40,179 CUM COST: $633,655 CMIC: RON PULLIAM BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: SPOOL DRILLING LINE ON DRUM, UNHANG BLOCKS, LATCH ON TOP DRIVE, MAKE UP NIH SAVER SUB. WELD ON 20" CONDUCTOR PIPE AND FLANGE UP FLOW LINE. WELD SUPPORTS FOR DOORS ON PITS. MU WATER LINES AND TIGHT ALL SUCTION LINES. MU SCOUT TOOL ON 8" MOTOR AND BIT. Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: : Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) / / / / / / / Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator Totals /25/ Rig Up & Tear Down $40,719 $633,655 $6,862,800 Page 1 of 2 Powered by Production Access 12/27/2012

5 Report No: 5 Report Date: 12/25/2012 Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $7,500 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $122,500 IDC - DRILL - MUD & CH OMEGA DRILLING CHEMICALS $4,469 $4,469 IDC - DRILL - FUEL POW $49,398 IDC - DRILL - HAULING $1,299 IDC - DRILL - FLUIDS $65,000 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $20,000 Total IDC: $34,469 $633,655 Total Cumulative Well Costs: $34,469 $633,655 12/25/ Rig Up & Tear Down $40,719 $633,655 $6,862,800 Page 2 of 2 Powered by Production Access 12/27/2012

6 Report No: 6 Report Date: 12/26/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 6 Rpt T. Activity: 02 - Drilling AFE #: PB Operation Desc: DRILLING AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 1 Rig Supervisor 1: ROY KIMBEL Daily Costs: $71,591 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $705,246 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $705,246 Start Depth(ft): 110 Formation: Anhy Total Project Costs: $766,181 Ending Depth(ft): 1865 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $0 Rig Company: PRECISION DRIL 24 Hr. Footage: 1755 Develop To: 0 Cum Mud Costs: $4,469 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: NOTIFIED TRRC OF SPUD TIME CHANGE TO 09:30 HOUR 12/25/2012, OPERATOR # 8 LINDA. SPUD 12 1/4" HOLE AT 09:30 HOUR 12/25/2012 DRLG FROM 110' TO 1865' = 1755' ROP FT/HR WOB-14 TO 19K RPM- 72 VIS- 28 MW- 8.9 PPG SURVEYS AT 219' 0.50 DEGREES 596' 0.30 DEGREES 946' 0.90 DEGREES 1314' 0.40 DEGREES 1762' 0.30 DEGREES DAILY COST: $67,541 CUM COST: $701,196 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 4 12/26/ /26/ /26/ BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp SPUD WITH 40 VIS SPUD MUD Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: MU BHA, PRIME PUMPS NIH 9: DRILLING/SURVEYS FROM 110' TO 1200' : RIG SERVICE : DRILLING/SURVEYS FROM 1200' TO 1865' Total: Drilling Data Hook Load: 145 Pick Up: 150 Slack Off: 140 Over Pull: 10 ROP: Pres on Bot: 2751 Press Off Bot: 2450 Kickoff Depth: 0 WOB: 15 Rotary RPM: 75 Motor RPM: 118 Torque: 6800 BHA Hours: 0.00 Crew Status: : 12/26/ Drilling 8.6 $71,591 $705,246 $6,862,800 Page 1 of 2 Powered by Production Access 12/27/2012

7 Report No: 6 Report Date: 12/26/2012 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) / / / / / / / Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $9,000 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA DB BITS 12 1/4" SS616 SN D3717 $12,925 $12,925 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $147,000 IDC - DRILL - MUD & CH $4,469 IDC - DRILL - EQUIPMEN KENNY'S WELDING WELDER $561 $561 IDC - DRILL - FUEL POW $49,398 IDC - DRILL - HAULING $1,299 IDC - DRILL - FLUIDS $65,000 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $24,000 Total IDC: $43,486 $705,246 Total Cumulative Well Costs: $43,486 $705,246 12/26/ Drilling 8.6 $71,591 $705,246 $6,862,800 Page 2 of 2 Powered by Production Access 12/27/2012

8 Report No: 7 Report Date: 12/27/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 7 Rpt T. Activity: 02 - Drilling AFE #: PB Operation Desc: DRILLING AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 2 Rig Supervisor 1: ROY KIMBEL Daily Costs: $60,935 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $766,181 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $766,181 Start Depth(ft): 1865 Formation: Anhy/Shale Total Project Costs: $766,181 Ending Depth(ft): 3451 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $766,181 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $0 Rig Company: PRECISION DRIL 24 Hr. Footage: 1586 Develop To: 0 Cum Mud Costs: $4,469 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: DRLG FROM 1865' TO 3451 = 1586' ROP FT/HR WOB-18 TO 21K RPM- 72 TO 80 VIS- 28 MW- 10 PPG SURVEYS AT 2385' 0.80 DEGREES 2745' 0.30 DEGREES 3168' 0.50 DEGREES 3376' 0.50 DEGREES DAILY COST: $60,935 CUM COST: $766,181 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 8 12/27/ /27/ /27/ BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp SPUD WITH 40 VIS SPUD MUD Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: DRILLING/SURVEYS FROM 1865' TO 2888' : RIG SERVICE TOP DRIVE : DRILLING/SURVEYS FROM 2888' TO 3157' : RIG SERVICE TOP DRIVE : DRILLING/SURVEYS FROM 3157' TO 3451' Total: Drilling Data Hook Load: 175 Pick Up: 180 Slack Off: 170 Over Pull: 10 ROP: Pres on Bot: 2980 Press Off Bot: 2650 Kickoff Depth: 0 WOB: 19 Rotary RPM: 75 Motor RPM: 118 Torque: 6800 BHA Hours: 0.00 Crew Status: : 12/27/ Drilling 8.6 $60,935 $766,181 $6,862,800 Page 1 of 2 Powered by Production Access 12/27/2012

9 Report No: 7 Report Date: 12/27/2012 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) / / / / / / / Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 40/0 50/0 2 FD /160 40/255 50/350 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $10,500 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA $12,925 IDC - DRILL - CEMENT & Weatherford 9 5/8" FLOAT EQUIPMENT $11,154 $11,154 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $171,500 IDC - DRILL - MUD & CH $4,469 IDC - DRILL - EQUIPMEN $561 IDC - DRILL - FUEL POW $49,398 IDC - DRILL - HAULING $1,299 IDC - DRILL - FLUIDS $65,000 IDC - F&C - CEMENT & S CHAD'S CLEAN DRIFT TALLY CASING $1,656 $1,656 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $28,000 Total IDC: $42,810 $766,181 Total Cumulative Well Costs: $42,810 $766,181 12/27/ Drilling 8.6 $60,935 $766,181 $6,862,800 Page 2 of 2 Powered by Production Access 12/27/2012

10 Report No: 8 Report Date: 12/28/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 8 Rpt T. Activity: Circulating Samples AFE #: PB Operation Desc: CIRCULATE SAMPLES UP. AFE Total: $6,862,800 Spud Date: 11/16/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 3 Rig Supervisor 1: ROY KIMBEL Daily Costs: $71,056 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $837,237 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $837,237 Start Depth(ft): 3451 Formation: Anhy/Shale Total Project Costs: $837,237 Ending Depth(ft): 4977 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $837,237 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $19,432 Rig Company: PRECISION DRIL 24 Hr. Footage: 1526 Develop To: 0 Cum Mud Costs: $23,901 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: DRLG FROM 3451' TO 4977' = 1526' CIRCULATE SAMPLES AT 4977', LOST RETURNS, PUMP PAPER SWEEP TO REGAIN CIRCULATION. LOOKING FOR CASING SEAT. ROP FT/HR WOB- 19 TO 28K RPM- 78 TO 80 VIS- 28 MW- 10 PPG SURVEYS AT 3640' 0.80 DEGREES 4451' 0.90 DEGREES 4809' 0.70 DEGREES 4899' 0.70 DEGREES DAILY COST: $71,056 CUM COST: $837,237 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 15 12/28/ /28/ /28/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 12/27/ L BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp SPUD WITH 40 VIS SPUD MUD Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: DRILLING/SURVEYS FROM 3451' TO 4059' : RIG SERVICE : DRILLING/SURVEYS FROM 4059' TO 4511' : RIG SERVICE : DRILLING/SURVEYS FROM 4511' TO 4977' : CS CIRCULATE BOTTOMS UP TO CHECK SAMPLES Total: Drilling Data Hook Load: 195 Pick Up: 200 Slack Off: 190 Over Pull: 5 ROP: Pres on Bot: 3000 Press Off Bot: 2650 Kickoff Depth: 0 WOB: 25 Rotary RPM: 80 Motor RPM: 118 Torque: 8500 BHA Hours: 0.00 Crew Status: : 12/28/ Circulating Samples 10 $71,056 $837,237 $6,862,800 Page 1 of 2 Powered by Production Access 12/28/2012

11 Report No: 8 Report Date: 12/28/2012 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) / / / / / / / Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 40/0 50/0 2 FD /160 40/255 50/350 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $12,000 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA $12,925 IDC - DRILL - CEMENT & $11,154 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $197,125 IDC - DRILL - CONTRAC CAMI'S CLEAN TRAILERS $1,125 $197,125 IDC - DRILL - MUD & CH Venture Mud MUD COST $19,432 $23,901 IDC - DRILL - EQUIPMEN $561 IDC - DRILL - FUEL POW $49,398 IDC - DRILL - HAULING SYNERGY SERVICES DELIVER WELL HEAD $450 $1,749 IDC - DRILL - FLUIDS $65,000 IDC - F&C - CEMENT & S $1,656 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $32,000 Total IDC: $51,007 $837,237 Total Cumulative Well Costs: $51,007 $837,237 12/28/ Circulating Samples 10 $71,056 $837,237 $6,862,800 Page 2 of 2 Powered by Production Access 12/28/2012

12 Report No: 9 Report Date: 12/29/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 9 Rpt T. Activity: Circulating AFE #: PB Operation Desc: MIXING AND PUMPING LCM PILLS. AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 4 Rig Supervisor 1: ROY KIMBEL Daily Costs: $75,657 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $912,894 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $912,894 Start Depth(ft): 4977 Formation: Anhy/Shale Total Project Costs: $1,441,241 Ending Depth(ft): 5173 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $1,441,241 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $26,404 Rig Company: PRECISION DRIL 24 Hr. Footage: 196 Develop To: 0 Cum Mud Costs: $50,305 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: DRY DRLG FROM 4977' TO 5173' = 196' TD 12 1/4" SURFACE HOLE. ROP FT/HR WOB- 9 TO 21K RPM- 78 TO 80 VIS- 28 MW- 10 PPG PUMP 2-50 BBL 15#/BBL SWEEPS, NO RETURNS. TOOH FROM 5173' TO 3957', MIX LCM PILL AND WORK PIPE SLOWLY, PIPE START PULLING TIGHT, ATTMPT TO TOH AND COULD NOT PULL ABOVE 3966' WITH OUT CIRCULATION. STOP WORKING PIPE AND START MIXING AND PUMPING 100 BBL LCM PILLS. MIX AND PUMP BBL 30# PER BBL LCM PILLS WAITING 2 1/2 HOURS BETWEEN 100 BBL PILLS. PUMP TOTAL OF 700 BBL LCM 30# PER BBL PILLS. PRESENT OPERATION: PUMPING 200 BBL 32# PER BBL LCM PILL. DAILY COST: $75,657 CUM COST: $912,894 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 15 12/28/ /28/ /28/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 12/27/ L BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp MIX AND PUMP LCM PILL TO REGAIN CIRCULATION. Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: CS LOST CIRCULATION AT 4977' : DRY DRILLING FROM 4977' TO 5153' : PUMP 50 BBL 15#/BBL LCM : DRY DRILL FROM 5153' TO 5173', TD 12 1/4" SURFACE HOLE, WEIGHT ON BIT 17K : PUMP 50 BBL 15# LCM : TOOH FROM 5173' TO 3957' : MIX AND PUMP 100 BBLS 20#/BBL LCM OUT BIT. WORK PIPE, WITH NO CIRCULATION, PIPE STARTING TO DRAG. 12: ROTATE PIPE THROUGH TIGHT HOLE FROM 3890' TO 3866', NO CIRCULATION COULD NOT WORK PIPE THROUGH 3867'. 16: MIX AND PUMP BBL 30# PER BBL LCM PILLS WAITING 2 1/2 HOURS BETWEEN BBL PILLS. MIX AND PUMP 200 BBL 32# PER BBL LCM PILL. Total: /29/ Circulating 9.6 $75,657 $912,894 $6,862,800 Page 1 of 2 Powered by Production Access 1/2/2013

13 Report No: 9 Report Date: 12/29/2012 Drilling Data Hook Load: 195 Pick Up: 200 Slack Off: 190 Over Pull: 5 ROP: Pres on Bot: 3000 Press Off Bot: 2650 Kickoff Depth: 0 WOB: 20 Rotary RPM: 80 Motor RPM: 118 Torque: 8500 BHA Hours: 0.00 Crew Status: : Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out 1/1/2013 Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) 2 / 2 / CT / NO / H / 0 / 1/16 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 40/0 50/0 2 FD /160 40/255 50/350 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator VENTURE MUD MUD ENGINEER Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $13,500 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA $12,925 IDC - DRILL - CEMENT & $11,154 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $221,625 IDC - DRILL - MUD & CH Venture Mud MUD COST $26,404 $50,305 IDC - DRILL - EQUIPMEN $561 IDC - DRILL - FUEL POW $49,398 IDC - DRILL - HAULING $1,749 IDC - DRILL - FLUIDS $65,000 IDC - F&C - CEMENT & S $1,656 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $36,000 Total IDC: $56,404 $912,894 Total Cumulative Well Costs: $56,404 $912,894 12/29/ Circulating 9.6 $75,657 $912,894 $6,862,800 Page 2 of 2 Powered by Production Access 1/2/2013

14 Report No: 10 Report Date: 12/30/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 10 Rpt T. Activity: WP - Work Stuck Pipe AFE #: PB Operation Desc: AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 5 Rig Supervisor 1: ROY KIMBEL Daily Costs: $90,187 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $1,003,081 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $1,003,081 Start Depth(ft): 5173 Formation: Total Project Costs: $1,441,241 Ending Depth(ft): 5173 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $1,441,241 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $22,100 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $72,405 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: CONTINUE PUMP 200 BBL 32# PER BBL LCM PILL, ESTABLISH CIRCULATION, WORK PIPE FREE. BACK REAM FROM 3866' TO 3830' PULL BIT FROM 3830' TO 3772' WITH OUT ROTATION. AIR LINE FROZZEN ON BREAK DRUM LINE. CIRCULATE AT 3772' 40 SPM WHILE THAWING OUT DRUM BREAK LINE. TOOH FROM 3772' TO 3566' WITH OUT PUMP. DOWN DUE TO BREAK SYSTEM. TOOH FROM 3566' TO 373' AND PULLED INTO TIGHT SPOT. NO PIPE MOVEMENT UP OR DOWN. CIRCULATE AND WORK STUCK BHA FROM 373' TO 358'. BACK OUT LIFT SUB AND SCREW IN SURFACE JARS. JAR ON FISH FOR 4 1/2 HRS 50K OVER STRING WEIGHT, NO PROGRESS. DAILY COST: $92,532 CUM COST: $1,005,426 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 15 12/28/ /28/ /28/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 12/27/ L BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp MIX AND PUMP LCM PILL TO REGAIN CIRCULATION. Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Start Depth End Depth Run 6: CONTINUE PUMP 200 BBL 32# PER BBL LCM PILL, ESTABLISH CIRCULATION, WORK PIPE FREE. BACK REAM FROM 3866' TO 3830' PULL BIT FROM 3830' TO 3772' WITH OUT ROTATION. AIR LINE FROZEN ON BREAK DRUM LINE. 9: CIRCULATE AT 3772' 40 SPM WHILE THAWING OUT DRUM BREAK LINE : TOOH FROM 3772' TO 3566' WITH OUT PUMP : DOWN DUE TO BREAK SYSTEM : TOOH FROM 3566' TO 373' AND PULLED INTO TIGHT SPOT. NO PIPE MOVEMENT UP OR DOWN. 15: WP CIRULATE AND WORK STUCK BHA FROM 373' TO 358'. BACK OUT LIFT SUB AND SCREW IN SURFACE JARS. JAR ON FISH FOR 4 1/2 HRS 50K OVER STRING WEIGHT, NO PROGRESS Total: Drilling Data Hook Load: 195 Pick Up: 200 Slack Off: 190 Over Pull: 5 ROP: 0.00 Pres on Bot: 3000 Press Off Bot: 2650 Kickoff Depth: 0 WOB: 20 Rotary RPM: 80 Motor RPM: 118 Torque: 8500 BHA Hours: 0.00 Crew Status: : 12/30/ WP - Work Stuck Pipe 9.6 $90,187 $1,003,081 $6,862,800 Page 1 of 2 Powered by Production Access 1/2/2013

15 Report No: 10 Report Date: 12/30/2012 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out 1/1/2013 Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) 2 / 2 / CT / NO / H / 0 / 1/16 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 40/0 50/0 2 FD /160 40/255 50/350 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM Percision Drilling Rig Crews Scout Downhole Operator VENTURE MUD MUD ENGINEER Totals Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $15,000 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA $12,925 IDC - DRILL - CEMENT & $11,154 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $246,125 IDC - DRILL - MUD & CH Venture Mud MUD COST $22,100 $72,405 IDC - DRILL - EQUIPMEN $561 IDC - DRILL - FUEL POW WESTERN PETROLEU DIESEL FOR RIG $23,302 $72,700 IDC - DRILL - HAULING $1,749 IDC - DRILL - FLUIDS $65,000 IDC - F&C - CEMENT & S $1,656 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $40,000 Total IDC: $75,402 $1,003,081 Total Cumulative Well Costs: $75,402 $1,003,081 12/30/ WP - Work Stuck Pipe 9.6 $90,187 $1,003,081 $6,862,800 Page 2 of 2 Powered by Production Access 1/2/2013

16 Report No: 11 Report Date: 12/31/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 11 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PB Operation Desc: AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 6 Rig Supervisor 1: ROY KIMBEL Daily Costs: $56,623 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $1,059,704 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $1,059,704 Start Depth(ft): 5173 Formation: Total Project Costs: $1,441,241 Ending Depth(ft): 5173 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $1,441,241 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $5,106 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $77,511 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: JAR ON FISH WITH 50K OVER STRING WEIGHT AT 358', NO PROGRESS. LOAD HOLE WITH 23 BBLS HIGH VIS WITH LCM, CIRCULATE 70 BBLS OIL AROUND FISH. WORK JARS FOR 1/2 HOUR, NO PROGRESS. BREAK OUT JARS AND LAY DOWN, HANG BAKERS SHEEVES AND RIG UP BAKER WIRELINE TRUCK. BACK OFF 8" DRILL COLLAR AT 248'. RIG DOWN WIRELINE TRUCK. TOOH WITH 3-6 1/2" DRILL COALLARS, TOP OF FISH 77'. TIH WITH 6 1/2" DRILL COLLARS AND SCREW IN TOP OF FISH AT 77'. RIG UP BAKER WIRELINE SHEEVES. RUN FREE POINT, 77' FROM SURFACE 100% FREE, JOINT BELOW SHOWING RESTRICTION ON TORQUE. BACK OFF PIPE AT 77'. TOOH AND REC DRILL COLLARS. BREAK OUT AND LAY DOWN DRILL COLLARS. CHANGE HANDLING EQUIPMENT FOR WASH PIPE. MU 10 3/4" SHOE ON 9 5/8" ON 2 JTS WASH PIPE TOP SUB JARS AND 1 STAND OF HWDP. BREAK CIRCULATION ABOVE TOP OF FISH AT 77'. WASH OVER FISH FROM 77' TO 177', CIRCULATE CLEAN. TOOH AND LAY DOWN TOOLS AND WASH PIPE.. MU 2-6 1/2" DRILL COLLARS AND PUP JOINT, SCREW INTO FISH AT 77'. RIG UP WIRELINE TRUCK. DAILY COST: $53,862 CUM COST: $1,059,288 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 15 12/28/ /28/ /28/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 12/27/ L BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other /31/ Rig Up & Tear Down 8.5 $56,623 $1,059,704 $6,862,800 Page 1 of 3 Powered by Production Access 1/2/2013

17 Report No: 11 Report Date: 12/31/2012 Operations Start Hrs Code Start Depth End Depth Run 6: WP JAR ON FISH WITH 50K OVER STRING WEIGHT AT 358', NO PROGRESS. LOAD HOLE WITH 23 BBLS HIGH VIS WITH LCM, CIRCULATE 70 BBLS OIL AROUND FISH. WORK JARS FOR 1/2 HOUR, NO PROGRESS. 10: BREAK OUT JARS AND LAY DOWN, HANG BAKERS SHEEVES AND RIG UP BAKER WIRELINE TRUCK. BACK OFF 8" DRILL COLLAR AT 248'. RIG DOWN WIRELINE TRUCK. 14: TOOH WITH 3-6 1/2" DRILL COALLARS, TOP OF FISH 77'. TIH WITH 6 1/2" DRILL COLLARS AND SCREW IN TOP OF FISH AT 77'. 17: RIG UP BAKER WIRELINE SHEEVES. RUN FREE POINT, 77' FROM SURFACE 100% FREE, JOINT BELOW SHOWING RESTRICTION ON TORQUE. BACK OFF PIPE AT 77'. TOOH AND REC DRILL COLLARS. BREAK OUT AND LAY DOWN DRILL COLLARS. 21: CHANGE HANDLING EQUIPMENT FOR WASH PIPE. MU 10 3/4" SHOE ON 9 5/8" ON JTS WASH PIPE TOP SUB JARS AND 1 STAND OF HWDP. 0: W BREAK CIRCULATION ABOVE TOP OF FISH AT 77'. WASH OVER FISH FROM 77' TO ', CIRCULATE CLEAN. 3: TOOH AND LAY DOWN TOOLS AND WASH PIPE : MU 2-6 1/2" DRILL COLLARS AND PUP JOINT, SCREW INTO FISH AT 77' : RIG UP WIRELINE TRUCK Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: 0 Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: : Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq /25/ DOWDC SS616XU D Date Out 1/1/2013 Jets 14 / 14 / 14 / 14 / 14 / 14 / 0 / 0 TFA 0.90 Char (I/O/D/O/L/B/G/R) 2 / 2 / CT / NO / H / 0 / 1/16 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 8 PHOENIX 7/8 LOBE 4.0 STAGE Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Bit - Core - PDC SS616 DB Other SCOUT TOOL Sub - XO /8" DOUBLE PIN Motor /8 STB PHOENIX Teledrift FLODRIFT Drill collar PD COLLAR Stab - IB STABILDRILL 12 1/8 BLADE Drill collar PD COLLARS Sub - XO X-OVER Drill collar PD COLLARS Sub - XO X-OVER HWDP PD HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 40/0 50/0 2 FD /0 40/0 50/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANDY ERWIN CONSUL RON PULLIAM BAKER wireline truck Percision Drilling Rig Crews Scout Downhole Operator Smith Services FISHING TOOLS VENTURE MUD MUD ENGINEER Totals /31/ Rig Up & Tear Down 8.5 $56,623 $1,059,704 $6,862,800 Page 2 of 3 Powered by Production Access 1/2/2013

18 Report No: 11 Report Date: 12/31/2012 Daily Cost Details IDC IDC - COMPANY SUPER RK PULLIAM CONSULT CONSULTANT $1,500 $16,500 IDC - ROAD & SITE CON $160,000 IDC - RIGHT OF WAY & $35,000 IDC - PERMITS SURVEY $15,000 IDC - DRILL - BIT & STA $12,925 IDC - DRILL - CEMENT & $11,154 IDC - DRILL - CONTRAC PRECISION DRILLING DAY RATE $24,500 $270,625 IDC - DRILL - MUD & CH Venture Mud MUD COST $5,106 $77,511 IDC - DRILL - EQUIPMEN $561 IDC - DRILL - FUEL POW $72,700 IDC - DRILL - HAULING $1,749 IDC - DRILL - FLUIDS $65,000 IDC - F&C - CEMENT & S $1,656 IDC - AFE CONTINGENC AFE CONTIGENCY DAILY CHARGE $4,000 $44,000 Total IDC: $35,106 $1,059,704 Total Cumulative Well Costs: $35,106 $1,059,704 12/31/ Rig Up & Tear Down 8.5 $56,623 $1,059,704 $6,862,800 Page 3 of 3 Powered by Production Access 1/2/2013

19 Report No: 12 Report Date: 1/1/2013 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 12 Rpt T. Activity: 06 - Trips AFE #: PB Operation Desc: TOOH WITH FISH AFE Total: $6,862,800 Spud Date: 12/25/2012 API Code: AFE DHC: $3,677,550 Days from Spud: 7 Rig Supervisor 1: ROY KIMBEL Daily Costs: $83,576 Field Name:EORGES (BONE S Rig Supervisor 2: RON PULLIAM ( ) - This AFE DHC to Date: $1,143,280 Sec/Twn/Rng: 8 / / Tool Pusher: STACEY This AFE CWC to Date: $1,143,280 Start Depth(ft): 5173 Formation: Total Project Costs: $1,441,241 Ending Depth(ft): 5173 RKB to MSL: 2765 RKB to THF: 0 Total w/ Assoc AFEs : $1,441,241 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $22,607 Rig Company: PRECISION DRIL 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $100,118 Rig Name: PRECISION #593 Location Survey: Univ Lands Abstract: 24-Hour Summary/: 24 HOUR REPORT: RIG UP WIRELINE TRUCK AND REHEAD SINKER BAR CIRCULATE THROUGH FISH WHILE WAITING.. TIH WITH STRING SHOT, BACK OFF 6 1/2" DRILL COLLAR AT 168'. TOOH WITH 2-6 1/2" DRILL COLLARS, SCREW IN SUB AND RECOVER 3-6 1/2" DRILL COLLARS, TOP OF FISH AT 168' RIG DOWN WIRELINE SHEEVES.. TIH WITH 10 3/4" SHOE, 3 - JOINTS 9 5/8 WASH PIPE, JARS PUP JOINT, 1 JOINT 5" HWDP." WASH OVER FISH FROM 167' TO 212, WASH FROM 212 TO 366', FISH TURN LOOSE AND WENT DOWN HOLE, CIRCULATE CLEAN AT 366'. TOH WITH HWDP AND LAY DOWN JARS AND 9 5/8 WASH PIPE. TIH WITH SCREW IN SUB, BUMPER SUB, JARS /2" DRILL COLLARS, ACCELERATOR ON 5" DRILL PIPE TO 4961' AND TAG FISH. SCREW INTO FISH, SET JARS OF TWO TIMES, ROLLED PUMP OVER AND PIPE PRESSURE UP TO 1400 PSI AND BLEED DOWN, PULL FISH OFF BOTTOM. TOOH WITH 5" DRILL PIPE FROM 4961' TO 431'. BACK REAM FROM 431' TO 170' WITH IBS, PULL FREE TO TOP OF FISH, LAY DOWN JARS AND SCREW IN SUB. PRESENT OPERATION: LAY DOWN FISH. DAILY COST: $83,576 CUM COST: $1,143,280 CMIC: RON PULLIAM Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 15 12/28/ /28/ /28/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 12/27/ L BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /0/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other /1/ Trips 8.5 $83,576 $1,143,280 $6,862,800 Page 1 of 3 Powered by Production Access 1/2/2013

EP WELLS DAILY OPERATIONS REPORT Report 1 04/03/2016

EP WELLS DAILY OPERATIONS REPORT Report 1 04/03/2016 Report 1 04/03/2016 Company Type bore WBS No/API No PERMIAN Development 30246103 / 4230132766.00 Event Summary Event Type Drilling only Event Start Date 04/03/2016 Days on Location 0.63 Objective Drill

More information

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G IODP Expedition 341S: SCIMPI and 858G ReCORK Week 1 Report (19 27 May 2013) Operations Victoria Port Call and Transit to Hole 858G IODP SCIMPI and 858G ReCORK Expedition (341S) officially began when the

More information

Fluids, Hole Cleaning and Tripping Optimization

Fluids, Hole Cleaning and Tripping Optimization Fluids, Hole Cleaning and Tripping Optimization Overview Hole cleaning in highly deviated wells is probably one of the most misunderstood concepts. Primarily, relying on Plastic Viscosity and Yield Point

More information

Drilling Operations of the first Iceland Deep Drilling Well (IDDP)

Drilling Operations of the first Iceland Deep Drilling Well (IDDP) Drilling Operations of the first Iceland Deep Drilling Well (IDDP) Sveinbjörn Hólmgeirsson Project Manager Landsvirkjun Power Ásgrímur Guðmundsson, Bjarni Pálsson, Kristinn Ingason, Hinrik Árni Bóasson,

More information

Cornish Institute of Engineers Conference th October 2013

Cornish Institute of Engineers Conference th October 2013 Wellbore Stability and Real Time Drilling Optimisation: Delivered Worldwide from Cornwall Sarah Marks Cornish Institute of Engineers Conference 2013 11 th October 2013 GeoScience Limited, Falmouth Business

More information

Oil Company Company et al Foothills W6

Oil Company Company et al Foothills W6 800, 555 4 th Avenue SW, Calgary, AB T2P 3E7 Off: 403-234-7625, www.wellsitegeologists.com Cell: 660-9883, Dennis@WellsiteGeologists.com Geological Report for Oil Company Company et al Foothills 06-06-060-06W6

More information

AGENDA. Criteria for Fluid Selection Controlling Cost Continuously Improving Performance

AGENDA. Criteria for Fluid Selection Controlling Cost Continuously Improving Performance AGENDA Criteria for Fluid Selection Controlling Cost Continuously Improving Performance WELLBORE STABILITY & HOLE ENLARGEMENT DRILLING FLUIDS COMPARISON Non Aqueous Fluids (diesel, synthetic, etc.) Brine

More information

Thermasource,Nc. GEOTHERMAL CONSULTING SERVICES

Thermasource,Nc. GEOTHERMAL CONSULTING SERVICES Thermasource,Nc. GEOTHERMAL CONSULTING SERVICES TRUE GEOTHERMAL ENERGY COMPANY KMERZ WELL NO. KA2-1 GEOTHERMAL DRILLING PROGRAM COUNTY OF HAWAII Submitted to: Department of Land and Natural Resources Honolulu,

More information

W E L L S I T E S E R V I C E S

W E L L S I T E S E R V I C E S WELL SITE SERVICES TABLE OF CONTENTS Gravel Pack Product List...GP-1 Washpipe Specifi cation Guide...GP-2 Baskets: Tool Baskets...GP-3 Handling Equipment: Becket and Bails...GP-4 Handling Equipment: Tongs...GP-5

More information

Daily Operational and Science Report UT-GOM2-1: Hydrate Pressure Coring Expedition

Daily Operational and Science Report UT-GOM2-1: Hydrate Pressure Coring Expedition Daily Operational and Science Report UT-GOM2-1: Hydrate Pressure Coring Expedition 1. DATE: 22-May-2017, 0000-2400hr 2. LOCATION: 0000 2400 hr, 22-May-2017 Hole UT-GOM2-1-H005 Location: Lat: 27 00.04665',

More information

RIG HYDRAULICS. P 1 = Eρ 0.8 Q 1.8 (PV) 0.2. psi or bar. P 1 ρ. = pressure loss, psi or bar = Density, ppg or kg/l = flow rate, gpm, l/min

RIG HYDRAULICS. P 1 = Eρ 0.8 Q 1.8 (PV) 0.2. psi or bar. P 1 ρ. = pressure loss, psi or bar = Density, ppg or kg/l = flow rate, gpm, l/min RIG HYDRAULICS This chapter covers the following items: Pressure losses Surface connection losses Pressure drop across the bit Optimization of bit hydraulics Surface pressure drop Hydraulic criteria Comparison

More information

Practical Application of Directional Drilling at Takigami Geothermal Field

Practical Application of Directional Drilling at Takigami Geothermal Field Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005 Practical Application of Directional Drilling at Takigami Geothermal Field Hisashi Jotaki 1 and Keisuke Ushijima 2 1 Idemitsu

More information

DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS. *V. Rasouli, B.

DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS. *V. Rasouli, B. DESIGN OF AN ULTRA-SPEED LAB-SCALE DRILLING RIG FOR SIMULATION OF HIGH SPEED DRILLING OPERATIONS IN HARD ROCKS *V. Rasouli, B. Evans Department of Petroleum Engineering, Curtin University ARRC Building,

More information

DRILLING IN MENENGAI FIELD SUCCESS AND CHALLENGES

DRILLING IN MENENGAI FIELD SUCCESS AND CHALLENGES Presented at Short Course VIII on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Oct. 31 Nov. 22, 2013. GEOTHERMAL TRAINING PROGRAMME

More information

AADE-06-DF-HO-33. Copyright 2006, AADE Drilling Fluids Technical Conference

AADE-06-DF-HO-33. Copyright 2006, AADE Drilling Fluids Technical Conference AADE-6-DF-HO-33 Flexible Drilling Fluid Helps to Drill High Pressure Wells Offshore Louisiana Dave Smalling, Fairways Offshore Exploration, Inc; Mike Reid, Newpark Drilling Fluids, LLC; Mike Deshotels,

More information

Instructional Objectives

Instructional Objectives GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives

More information

Rotary Drilling Rotary Drilling Bits

Rotary Drilling Rotary Drilling Bits GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives

More information

Case History of First Liner Drilling Application in Romania

Case History of First Liner Drilling Application in Romania Case History of First Liner Drilling Application in Romania Ali Qureshi Well Delivery Team Leader-Team-5 OMV Petrom S.A. Bucharest, 28 th April 2016 Agenda Introduction Background (well design, prognosis

More information

Introduction to Oil&Gas Well Drilling

Introduction to Oil&Gas Well Drilling Introduction to Oil&Gas Well Drilling Drilling Introduction to Oil&Gas Well Drilling The term drilling indicates the whole complex of operations necessary to construct wells of circular section applying

More information

MULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute

MULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute MULTIPLE CHOICE QUESTIONS ON OIL, GAS, AND PETROCHEMICALS The Energy and Resources Institute Preface Petroleum as everyone knows consists of hydrocarbons of various molecular weights and other organic

More information

AADE-04-DF-HO-37. Copyright 2004, AADE Drilling Fluids Technical Conference

AADE-04-DF-HO-37. Copyright 2004, AADE Drilling Fluids Technical Conference AADE-4-DF-HO-37 A New Approach to Deepwater Drilling Using SBM with Flat Rheology J. Lee, M-I SWACO; J. Friedheim, M-I SWACO; B. Toups, M-I SWACO, E. van Oort, Shell E&P Co Copyright 24, AADE Drilling

More information

Exploring and Drilling for Oil and Gas. Prepared by Tom Sheeran

Exploring and Drilling for Oil and Gas. Prepared by Tom Sheeran Exploring and Drilling for Oil and Gas What are Oil and Gas? Oil and Gas are substances found within the earth s crust. They are thought to come from decomposed plant and animal matter. Scientists believe

More information

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania Authors: John Lavelle, Amin Yaghoobi About Suplac Oil Field Discovered 1958 Oil Density 960 kg/m3 (16 API) Viscosity 2300

More information

Faculty of Science and Technology. Master Thesis

Faculty of Science and Technology. Master Thesis Faculty of Science and Technology Master Thesis Study program/ Specialization: Petroleum Engineering /Drilling Technology Spring semester, 2014 Open Writer: Jonathan Adzokpe Faculty supervisor: Mesfin

More information

Exploration Drilling Techniques

Exploration Drilling Techniques Exploration Techniques Why do we need natural resources? average increase in demand: 5 % per year How do we find new resources? How do we find new resources? Fun! Geological methods: In my view the greatest

More information

Produce arrays of semi-permanent deep access holes for a variety of investigations (climatological, geological, glaciological, biological)

Produce arrays of semi-permanent deep access holes for a variety of investigations (climatological, geological, glaciological, biological) CTDI Coiled Tubing Drill for Ice An Exploration Tool for Polar Sciences The CTDI drilling system uses a high-pressure pump and coiled tubing to deliver fluid to a steerable downhole hydraulic motor that

More information

Introduction to Oil and Gas Production

Introduction to Oil and Gas Production Introduction to Oil and Gas Production Steven Marzuola ATA Energy Conference May 4-6, 2007 Houston Texas Introduction Dope, Joints, Tripping Strippers Casing, Tubing, Liner API - American Petroleum Institute

More information

MASTER S THESIS. Study program/ Specialization: Spring semester, Petroleum Engineering/Drilling Technology. Open access.

MASTER S THESIS. Study program/ Specialization: Spring semester, Petroleum Engineering/Drilling Technology. Open access. Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering/Drilling Technology Spring semester, 2014 Open access Writer: Dishni Altamirov (Writer s signature)

More information

AADE Mid Continent Chapter. Bakken Shale Resource Play. Revisited. January 14, 2009 Jim Thompson

AADE Mid Continent Chapter. Bakken Shale Resource Play. Revisited. January 14, 2009 Jim Thompson AADE Mid Continent Chapter Bakken Shale Resource Play Revisited January 14, 2009 Jim Thompson Marathon 2007 History One Year Ago Today Re-entered basin in May 2006 Hit the ground running with two conventional

More information

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS 1. Introduction The requirement to prepare and submit a Final Well Report is specified by subsection 201(1) of the Newfoundland

More information

SKM DRILLING ENGINEERING. Chapter 4 - Drilling Problems

SKM DRILLING ENGINEERING. Chapter 4 - Drilling Problems SKM 3413 - DRILLING ENGINEERING Chapter 4 - Drilling Problems Assoc. Prof. Abdul Razak Ismail Petroleum Engineering Dept. Faculty of Petroleum & Renewable Energy Eng. Universiti Teknologi Malaysia 2 Contents

More information

Guideline Petroleum Drilling Regulations (CNR 1150/96)

Guideline Petroleum Drilling Regulations (CNR 1150/96) Government of Newfoundland and Labrador Department of Natural Resources Guideline Petroleum Drilling Regulations (CNR 1150/96) Topic: Final Well Report Onshore Petroleum Exploratory Wells Ref: Section

More information

Drilling Engineering Design and Application of Well Fengshen-x601

Drilling Engineering Design and Application of Well Fengshen-x601 Advances in Petroleum Exploration and Development Vol. 8, No. 1, 2014, pp. 85-89 DOI:10.3968/5609 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Drilling Engineering Design

More information

Real Time Rock Destruction for Engineered Performance Improvement

Real Time Rock Destruction for Engineered Performance Improvement Real Time Rock Destruction for Engineered Performance Improvement Peach Holtzman AADE Technical Symposium Tulsa, OK February 17 th 2016 NYSE: DVN devonenergy.com Rock Destruction Foundation Some Times

More information

Check-Q-meter. Table of contents. Features. Functions. RE 27551/ /10 Replaces: Type FD

Check-Q-meter. Table of contents. Features. Functions. RE 27551/ /10 Replaces: Type FD Check-Q-meter RE /0.0 /0 Replaces: 09.9 Type FD Nominal size... Series ax. Operating pressure 0 bar ax. Flow 0 l/min K9/ Table of contents Contents Page Features Functions Ordering details Symbols Functional

More information

PETROLEUM 101. Mark Shrimpton Jacques Whitford

PETROLEUM 101. Mark Shrimpton Jacques Whitford PETROLEUM 101 Mark Shrimpton Jacques Whitford PRESENTATION STRUCTURE The Offshore Petroleum Industry Petroleum Geology Petroleum Technology: Exploration agreements Geophysical exploration Drilling Development

More information

Oil and Gas Production and Exploration, Part I

Oil and Gas Production and Exploration, Part I Oil and Gas Production and Exploration, Part I Presented by: Steven Marzuola American Translators Association 52 nd Annual Conference Boston, October 26, 2011 1 Introduction Dope, Joints, Tripping Internal

More information

Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia

Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia Petroleum and Mineral Resources 97 Torque and drag modelling for Redhill South-1 in the Northern Perth Basin, Australia S. Smith & V. Rasouli Department of Petroleum Engineering, Curtin University, Australia

More information

Case Study: Direct Circulation Drilling

Case Study: Direct Circulation Drilling Case Study: Direct Circulation Drilling Power Swivel Adapter Sub with Pin PSG 146 Sliding Sleeve for PSG 146 A Typical Drill-String for Direct Circulation Drilling: Pulling Device for PSG 146 with box

More information

EGYPT: SILDRIL Gives Top Performance in Nile Delta Well

EGYPT: SILDRIL Gives Top Performance in Nile Delta Well PERFORMANCE REPORT EGYPT: SILDRIL Gives Top Performance in Nile Delta Well The operator (PETROBEL) was faced with drilling a 8½ hole through reactive Kafr El-Sheikh shales and unconsolidated sands from

More information

Analyses of Field Measured Data With Rheology and Hydraulics Models

Analyses of Field Measured Data With Rheology and Hydraulics Models International Journal of Fluids Engineering. ISSN 0974-3138 Volume 8, Number 1 (2016), pp. 1-12 International Research Publication House http://www.irphouse.com Analyses of Field Measured Data With Rheology

More information

CVR System. Critical Velocity Reduction A Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift

CVR System. Critical Velocity Reduction A Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift CVR System Critical Velocity Reduction A Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift Presented By: Scott Campbell - Weatherford - Denver, Colorado Petey Erwin Newfield Exploration

More information

BAUER MeBo Sea Bed Drill Rig

BAUER MeBo Sea Bed Drill Rig BAUER MeBo Sea Bed Drill Rig Spotlights BAUER Maritime Experiences 1993 Diamond deposit exploration with a BC cutter in water depth of 160 m (South Africa) Atlantic Ocean 2005 Drilling inside of a monopile

More information

Hydraulics and wellbore cleaning

Hydraulics and wellbore cleaning Hydraulics and wellbore cleaning 01 Hydraulics & wellbore cleaning Introduction 1.0 Drilling fluid essentials 1.1 Objectives The objectives of this section are to; 1. Present the key aspects of hydraulics

More information

Coupling Axial Vibration With Hook Load/Bit Force And The Effect Of Shock Absorber

Coupling Axial Vibration With Hook Load/Bit Force And The Effect Of Shock Absorber International Journal of Engineering Research and Technology. ISSN 0974-3154 Volume 10, Number 1 (017), pp. 61-69 International Research Publication House http://www.irphouse.com Coupling Axial Vibration

More information

Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING FLUIDS**

Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING FLUIDS** AGH DRILLING, OIL, GAS Vol. 34 No. 1 2017 http://dx.doi.org/10.7494/drill.2017.34.1.169 Rafał Wiśniowski*, Krzysztof Skrzypaszek*, Piotr Kiebzak* ECD OPTIMIZATION WITH SPECIALLY DESIGNED LOW RHEOLOGY DRILLING

More information

A Brief Guide to Geothermal Wells

A Brief Guide to Geothermal Wells A Brief Guide to Geothermal Wells Key Features, Fundamental Differences Ralph Winmill Senior Drilling Engineer, Contact Energy 21 June 2011 WHO ARE CONTACT ENERGY? Publically-Listed New Zealand Energy

More information

How Oil Drilling Works by Craig C. Freudenrich, Ph.D.

How Oil Drilling Works by Craig C. Freudenrich, Ph.D. How Oil Drilling Works by Craig C. Freudenrich, Ph.D. Oil Exploration Oil is a fossil fuel that can be found in many countries around the world. In this section, we will discuss how oil is formed and how

More information

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc.

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc. Antelope Hills Directionally Drilled Water Well Theresa Jehn-Dellaport Directional Well Applications Deep Bedrock Aquifers Proven Oil field technology Initial Analysis indicates up to 4 times the production

More information

International Construction Consulting, LLC

International Construction Consulting, LLC International Construction Consulting, LLC HDD Design, Calculations, and Cost Estimate Bow Tie to Industrial Park; Soyo, Angola www.oil-gas-consulting.com JOB No: NA PREPRD.BY: G Lamberson DATE: 16-Jan-18

More information

(Table of Contents is Hyperlinked, Just click on Topic & go)

(Table of Contents is Hyperlinked, Just click on Topic & go) IADC ISP PROGRAM 2008 Summary of Occupational Incidents (Asia Pacific Water Totals) Issued 15 June 2009 Table of Contents (Table of Contents is Hyperlinked, Just click on Topic & go) IADC 2008 ASIA PACIFIC

More information

Directional Drilling. History

Directional Drilling. History Directional Drilling Directional drilling is the science of deviating a well bore along a planned course to a subsurface target whose location is a given lateral distance and direction from the vertical.

More information

Geotechnical Geotechnical Assessment

Geotechnical Geotechnical Assessment Site Investigation Site Investigation Pile Probing Pile Probing Geotechnical Logging Geotechnical and Sampling Logging and Sampling Streetworks and Utilities Streetworks Avoidance and Utilities Avoidance

More information

Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer

Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer TM Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer Artificial Intelligence 2 Artificial Intelligence 3 3 Artificial Intelligence 4 Artificial Intelligence

More information

TOM HEINZ M-I SWACO SANTOSH PRABHU M-I SWACO DONNY VANVRANKEN M-I SWACO

TOM HEINZ M-I SWACO SANTOSH PRABHU M-I SWACO DONNY VANVRANKEN M-I SWACO 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009-NTCE-15-01: NEW INVERT EMULSION FLUID PRODUCES EXCEPTIONAL CORRELATION BETWEEN YIELD POINT, GEL STRENGTHS AND LOW-END DIAL

More information

geovision Resistivity imaging for productive drilling

geovision Resistivity imaging for productive drilling geovision Resistivity imaging for productive drilling geovision Resistivity imaging while drilling helps position wells in the best place in the reservoir in less time. Real-time resistivity measurements

More information

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS 2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS Preparation for MSB-2 started in April 2002. Drilling and planned field work in both MSB-2 and 4 were carried out at the same time. After completion of the

More information

Exploration Dirlling on the TPGP Tangkuban Parahu Concession, West Java, Indonesia

Exploration Dirlling on the TPGP Tangkuban Parahu Concession, West Java, Indonesia Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Exploration Dirlling on the TPGP Tangkuban Parahu Concession, West Java, Indonesia Herman Darnel IBRAHIM 1, Antonius RT

More information

Hot Creek Valley Oil Field

Hot Creek Valley Oil Field Hot Creek Valley Oil Field Discovery Well Eblana - 1 MAJOR OIL INTERNATIONAL LLC Brief on well sidetracking down to 13,000 ft Prepared by Soran Talabani and Karim Akrawi Field Location Eblana-1 (well status)

More information

DRILLING REPORT NO.1 FOR DUNNART-2 IN EP437, PERTH BASIN, WESTERN AUSTRALIA FOR THE PERIOD 0600 HOURS 13 JULY 2014 TO 0600 HOURS 21 JULY 2014

DRILLING REPORT NO.1 FOR DUNNART-2 IN EP437, PERTH BASIN, WESTERN AUSTRALIA FOR THE PERIOD 0600 HOURS 13 JULY 2014 TO 0600 HOURS 21 JULY 2014 21 July 2014 The Manager The Australian Securities Exchange The Announcements Officer Level 4/20 Bridge Street SYDNEY NSW 2000 Dear Sir DRILLING REPORT NO.1 FOR DUNNART-2 IN EP437, PERTH BASIN, WESTERN

More information

Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment

Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment AADE-07-NTCE-71 Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment Essam Adly, Schlumberger Copyright 2007, AADE This paper was prepared for presentation

More information

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Master of Science in Petroleum Technology, Drilling Specialization Spring semester, 2013 Restricted Access Writer: Anders

More information

Well Construction and Cementing Practices in Shale and Salt Water Disposal Wells

Well Construction and Cementing Practices in Shale and Salt Water Disposal Wells Well Construction and Cementing Practices in Shale and Salt Water Disposal Wells 2017 Shale Network Workshop Roger Myers, President RRM Completions, LLC 1 Agenda Well Construction Importance and Examples

More information

LESSONS LEARNED IN DRILLING DB-1 AND DB-2 BLUE MOUNTAIN, NEVADA

LESSONS LEARNED IN DRILLING DB-1 AND DB-2 BLUE MOUNTAIN, NEVADA PROCEEDINGS, Thirtieth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, January 31-February 2, 25 SGP-TR-176 LESSONS LEARNED IN DRILLING DB-1 AND DB-2 BLUE MOUNTAIN,

More information

Can Geomechanics Improve Your Drilling and Completions?

Can Geomechanics Improve Your Drilling and Completions? Can Geomechanics Improve Your Drilling and Completions? Spoiler Alert Yes. CSPG Operations Geology Division March 15, 2018 Presented by Amy Fox, Ph.D., P.Geo. Introduction Montney AFE vs. Actual Drilling

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 01/05/2016

More information

Study of Prevention and Mitigation of Stuck Pipe in Geothermal Drilling

Study of Prevention and Mitigation of Stuck Pipe in Geothermal Drilling PROCEEDINGS, 41st Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 22-24, 2016 SGP-TR-209 Study of Prevention and Mitigation of Stuck Pipe in Geothermal

More information

Deep Drilling Experience for Pohang Enhanced Geothermal Project in Korea

Deep Drilling Experience for Pohang Enhanced Geothermal Project in Korea Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Deep Drilling Experience for Pohang Enhanced Geothermal Project in Korea YOON Kern-Shin, JEON Jae-Soo, HONG Hoon-Ki, KIM

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

The Evolution of Drilling Techniques at the Camden Gas Project. Chris Holmes and Jon Black AGL 27 th June 2007

The Evolution of Drilling Techniques at the Camden Gas Project. Chris Holmes and Jon Black AGL 27 th June 2007 The Evolution of Drilling Techniques at the Camden Gas Project Chris Holmes and Jon Black AGL 27 th June 2007 1 Camden Gas Project Status AGL acquired operatorship from Sydney Gas February 2006 106 production

More information

Peter Polito 27 July 2012 BEG Summer Seminar Series

Peter Polito 27 July 2012 BEG Summer Seminar Series Peter Polito 27 July 2012 BEG Summer Seminar Series Motivation Working with IODP What is the T2PMDHDSERSMFTM anyway? the old and the new four parts Out to sea and life on the JR Testing The next steps

More information

HISTORY OF DRILLING OPERATIONS IN THE KIRISHIMA GEOTHERMAL FIELD

HISTORY OF DRILLING OPERATIONS IN THE KIRISHIMA GEOTHERMAL FIELD HISTORY OF DRILLING OPERATIONS IN THE KIRISHIMA GEOTHERMAL FIELD Ken Soda Nittetsu Kagoshima Geothermal 1468-10 Manzen-area-aza-Ginyu, Makizono-cho, Aira-Gun, Kagoshima 899-66 Japan Key Words: geothermal

More information

Drilling a Deep-Water Well in a Subsalt Structure in Mexico

Drilling a Deep-Water Well in a Subsalt Structure in Mexico ID number: 145 Drilling a Deep-Water Well in a Subsalt Structure in Mexico Victor Gerardo Vallejo A, Pemex; Epitacio Solis F, Pemex; Aciel Olivares, Pemex; Leonardo E. Aguilera G, Pemex; Manuel E. Torres

More information

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW)

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW) APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW) Operator: Pursuant to section 8 and 9 of the Petroleum and Natural Gas Act (R.S.N.L. 1990, c. P-10) and in compliance with section 29 of the Petroleum Drilling

More information

1 General introduction

1 General introduction 1 General introduction 1.1 Oil well drilling system Oil and other hydrocarbons are the primary source of global energy. However, the exploration of these hydrocarbons presents a myriad of challenges resulting

More information

AADE 2009NTCE DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM

AADE 2009NTCE DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-14-06 DEVELOPMENT AND TESTING OF HIGH DOGLEG ROTARY STEERABLE SYSTEM AUTHOR(S) & AFFILIATIONS: SONNY BRYAN, JOE COX,

More information

Stuck Pipe Prevention

Stuck Pipe Prevention SUGAR LAND LEARNING CENTER Stuck Pipe Prevention SELF - LEARNING COURSE USEFUL PRE-REQUISITES A Primer of Oilwell Drilling Sugar Land Learning Center Introduction to self-learning: Self-learning enables

More information

Optimizing Hole Cleaning Using Low Viscosity Drilling Fluid

Optimizing Hole Cleaning Using Low Viscosity Drilling Fluid Advances in Petroleum Exploration and Development Vol. 14, No. 1, 2017, pp. 55-61 DOI:10.3968/9658 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Optimizing Hole Cleaning

More information

M O D U L E - 3A Model A10V0 Piston Pump Manual A10V0 PUMP. Features

M O D U L E - 3A Model A10V0 Piston Pump Manual A10V0 PUMP. Features T E C H N I C A L I N F O R M A T I O N M A N U A L F O R T H E A 1 0 V 0 V A R I A B L E D I S P L A C E M E N T P U M P S A10V0 PUMP Features High Efficiency through load sensing (= fuel savings) Maximum

More information

Applied Fluid Mechanics

Applied Fluid Mechanics Applied Fluid Mechanics 1. The Nature of Fluid and the Study of Fluid Mechanics 2. Viscosity of Fluid 3. Pressure Measurement 4. Forces Due to Static Fluid 5. Buoyancy and Stability 6. Flow of Fluid and

More information

Petrophysical Data and Open Hole Logging Operations Basics COPYRIGHT. Introduction to Petrophysical Data and Open Hole Logging Operations Basics

Petrophysical Data and Open Hole Logging Operations Basics COPYRIGHT. Introduction to Petrophysical Data and Open Hole Logging Operations Basics Learning Objectives Petrophysical Data and Open Hole Logging Operations Basics Introduction to Petrophysical Data and Open Hole Logging Operations Basics By the end of this lesson, you will be able to:

More information

For Customer Service, Rev A - 6/ OF 6

For Customer Service,  Rev A - 6/ OF 6 Item SP-6219 50 Universal Snow Plow Package RED Plow Item SP-6257 64 Universal Snow Plow Package RED Plow For Customer Service, Email CustomerService@yourfingertips-online.com Please read and understand

More information

AADE-06-DF-HO-15. A. Arbizu, P Reid and H Santos, Impact Solutions Group

AADE-06-DF-HO-15. A. Arbizu, P Reid and H Santos, Impact Solutions Group AADE-06-DF-HO-15 Field Results of Ultra-low Invasion Drilling Fluids Demonstrate Reduced Wellbore Instability, Reduced Mud Losses, Wellbore Strengthening and Improved Well Productivity A. Arbizu, P Reid

More information

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual 70 8TH AVE W PO BOX 7 SPENCER, IA 0 PHONE: 7-6-9 FAX: 7-6-08 SERVICE: 800-8- E-MAIL: ccac@cyclecountry.com www.cyclecountry.com A.R.M. PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER 0-00 BLACK MODEL

More information

AADE-04-DF-HO-21. A Unique Technical Solution to Barite Sag in Drilling Fluids Jarrod Massam, Andy Popplestone, and Andrew Burn, M-I SWACO

AADE-04-DF-HO-21. A Unique Technical Solution to Barite Sag in Drilling Fluids Jarrod Massam, Andy Popplestone, and Andrew Burn, M-I SWACO AADE-04-DF-HO-21 A Unique Technical Solution to Barite Sag in Drilling Fluids Jarrod Massam, Andy Popplestone, and Andrew Burn, M-I SWACO This paper was prepared for presentation at the AADE 2004 Drilling

More information

Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it?

Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it? P E T R O L E U M E N G I N E E R I N G D E P A R T M E N T Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it? Dr. Will Fleckenstein, PE Colorado School of Mines 1 Who is involved

More information

The Deepest Geothermal Well in Indonesia: A Success Story of Aerated Drilling Utilization

The Deepest Geothermal Well in Indonesia: A Success Story of Aerated Drilling Utilization GRC Transactions, Vol. 40, 2016 The Deepest Geothermal Well in Indonesia: A Success Story of Aerated Drilling Utilization Apriyansah Toni, Raka Aditya Pratama, Imam M. Prasetyo, and Muhamad Bayu Saputra

More information

Lewis A. Buitrago Gomez*, Stefan Z. Miska*, Małgorzata B. Ziaja* EXPERIMENTAL STUDY OF LAYOUTS OF PDC CUTTERS IN CORE BIT DRILLING

Lewis A. Buitrago Gomez*, Stefan Z. Miska*, Małgorzata B. Ziaja* EXPERIMENTAL STUDY OF LAYOUTS OF PDC CUTTERS IN CORE BIT DRILLING AGH DRILLING, OIL, GAS Vol. 33 No. 2 2016 http://dx.doi.org/10.7494/drill.2016.33.2.341 Lewis A. Buitrago Gomez*, Stefan Z. Miska*, Małgorzata B. Ziaja* EXPERIMENTAL STUDY OF LAYOUTS OF PDC CUTTERS IN

More information

STATICS. Friction VECTOR MECHANICS FOR ENGINEERS: Eighth Edition CHAPTER. Ferdinand P. Beer E. Russell Johnston, Jr.

STATICS. Friction VECTOR MECHANICS FOR ENGINEERS: Eighth Edition CHAPTER. Ferdinand P. Beer E. Russell Johnston, Jr. Eighth E 8 Friction CHAPTER VECTOR MECHANICS FOR ENGINEERS: STATICS Ferdinand P. Beer E. Russell Johnston, Jr. Lecture Notes: J. Walt Oler Texas Tech University Contents Introduction Laws of Dry Friction.

More information

PORTMORE COMMUNITY COLLEGE ASSOCIATE DEGREE IN ENGINEERING TECHNOLOGY

PORTMORE COMMUNITY COLLEGE ASSOCIATE DEGREE IN ENGINEERING TECHNOLOGY PORTMORE COMMUNITY COLLEGE ASSOCIATE DEGREE IN ENGINEERING TECHNOLOGY RESIT EXAMINATIONS SEMESTER 2 JUNE 2011 COURSE NAME: Mechanical Engineering Science CODE: GROUP: ADET 1 DATE: JUNE 28 TIME: DURATION:

More information

TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT. Abstract:

TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT. Abstract: 29 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 29NTCE-5-4 srotary ssteerable TECHNOLOGY CREATES VALUE IN WESTERN CANADIAN DRILLING ENVIRONMENT HAMMAD ZAFAR, NINO SUAREZ, RAYMOND

More information

INSTALLATION INSTRUCTIONS FRONT PLOW MOUNT KIT Part Number: Application: Polaris Sportsman 400, 500, 800

INSTALLATION INSTRUCTIONS FRONT PLOW MOUNT KIT Part Number: Application: Polaris Sportsman 400, 500, 800 WARN INDUSTRIES, INC. 12900 S.E. Capps Road, Clackamas, OR USA 97015-8903, 1-503-722-1200, FAX: 1-503-722-3000 Customer Service: 1-800-543-9276 Dealer Locator Service: 1-800-910-1122 International Sales/Customer

More information

ECONOMICS OF INCREASED BIT LIFE IN GEOTHERMAL WELLS BY COOLING WITH A TOP DRIVE SYSTEM

ECONOMICS OF INCREASED BIT LIFE IN GEOTHERMAL WELLS BY COOLING WITH A TOP DRIVE SYSTEM ECONOMICS OF INCREASED BIT LIFE IN GEOTHERMAL WELLS BY COOLING WITH A TOP DRIVE SYSTEM Seiji Saito, Sumio Sakuma 2, Tohoku University, Aramaki-Aza-Aoba 0, Sendai, 980-8579,Japan 2 JMC Geothermal Engineering

More information

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 NOVEMBER 13 TH TO NOVEMBER 17 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1

More information

Investigation of Blowout High Island Block A-368 OCS-G 2433 May 9, 2001

Investigation of Blowout High Island Block A-368 OCS-G 2433 May 9, 2001 OCS Report MMS 2002-080 Investigation of Blowout High Island Block A-368 OCS-G 2433 May 9, 2001 Gulf of Mexico Off the Texas Coast U.S. Department of the Interior Minerals Management Service Gulf of Mexico

More information

New Well. Iplication. General Well Information. RKB Elevation 105 Drive Depth ft 3765 Subsea BOP Yes. SWF om ft

New Well. Iplication. General Well Information. RKB Elevation 105 Drive Depth ft 3765 Subsea BOP Yes. SWF om ft U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Seniice MMS 0MB Approel Expires 11/30/2011 Form MMS 123A1123S Electronic Version Iplication for Permit to Drill New Well

More information

Universal bumper to frame hitch for 27,000 33,000 lbs. GVWR trucks. Optional: carbide cutting edge, mushroom shoes, snow deflectors

Universal bumper to frame hitch for 27,000 33,000 lbs. GVWR trucks. Optional: carbide cutting edge, mushroom shoes, snow deflectors DATA SPECIFICATION SHEET MEYER RP SERIES (ROAD PRO) Specifications RP-10 10 feet long by 36 inches tall, weight approximately 1600 lbs. Universal bumper to frame hitch for 27,000 33,000 lbs. GVWR trucks

More information

CONTENTS. Preface. Introduction 1. Oil and Gas 3. Exploration 9. Drilling Rigs 15. Drilling a Well 31

CONTENTS. Preface. Introduction 1. Oil and Gas 3. Exploration 9. Drilling Rigs 15. Drilling a Well 31 CONTENTS Preface ix Introduction 1 First Offshore Operations in the U.S. 1 The Scope of Offshore Operations 2 Oil and Gas 3 Characteristics of Oil and Gas 3 Characteristics of Rock 4 Types of Rocks 4 Origin

More information

MicroScope. Resistivity- and imagingwhile-drilling

MicroScope. Resistivity- and imagingwhile-drilling MicroScope Resistivity- and imagingwhile-drilling service MicroScope Magnify your reservoir Multidepth laterolog resistivity Multidepth borehole images Mud resistivity Azimuthal gamma ray Bit resistivity

More information

MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE

MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE 6 JOURNEES SCIENTIFIQUES ET TECHNIQUES Hôtel Hilton, 20 to 22 june 2004, Algiers, Algeria MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE FOSTER, L. AIDOO, A. TOURQUI,

More information