1 Drilling Operations of the first Iceland Deep Drilling Well (IDDP) Sveinbjörn Hólmgeirsson Project Manager Landsvirkjun Power Ásgrímur Guðmundsson, Bjarni Pálsson, Kristinn Ingason, Hinrik Árni Bóasson, Sverrir Þórhallsson
2 What is IDDP? IDDP is a long-term geothermal research program, established in year 2000 The goal is to improve the economics of geothermal energy by producing supercritical fluids from 4-5 km depth National Energy Authority
3
4 Saga Rig 0-87 m June 2008 Surface casing 36 hole to 87 m (26 bit and 36 under-reamer) 32 x 0,5 steel casing
5 Jötunn Rig m Nov-Dec 2008 Intermediate Casing 1 26 ½ Drillbit 24 ½ Casing 162 lb/ft, K55 Intermediate Casing 2 23 Drillbit 18 ⅝ Casing 114 lb/ft, K55
6 Týr Rig 796 m - final depth March-July ton hook load Topdrive Automatic pipehandling system 3 x Mudpumps 180 m 3 mudtanks
7 Broken Float Sub at 1194 m Standpipe pressure drops Torque drops
8 Broken Float Sub at 1194 m
9 Broken Float Sub at 1194 m Equipment downhole: 16 ½ Drillbit 9 ½ Mudmotor with 16 ⅜ sleeve stabilizer 16 ½ Stabilizer The other part of the Float Sub.
10 Fish #1 on surface Complete success of fishing with an Overshot
11 Broken 8 DC at 2074 m
12 Fish #2 on surface Managed to retrieve the fish to surface. The broken thread box
13 Stuck at 2101 m depth Pulled out three singles for reaming when hook load dropped suddenly of 20 tons Standpipe pressure drops Torque increases Drop in hook load No rotation
14 Part of Fish #3 on surface Left in hole, 32 m of fish The fishing tool could not be relased Explosives to blast the string a part
15 Fishing attempt RIH with a fishing assembly Connect to the box of the collar and tried to pull Unable to rotate or pull where the connection did not hold. Unable to reload the JAR because of the bad connection
16 Cementing a Side Track plug #1 100 m cement plug planned to side track and drill pass the fish. Three attempts needed to get desired depth of TOC. Time drilling and sidetracking Success at 1934 m
17 Stuck at 2005 m Decided to set the Anchor casing at 2005 m due to hazard zones higher up in the well (brittle formation because of cooling and heating). After having reached 2005 m and after 25 min. of circulation, the string got stuck. Circulation was maintained to clean the fill. The string was pulled and jarred for 3 days before it was loose.
18 Wiper trip and circulate the fill of bottom Wiper trip before running the anchor casing. Bottom found at 1972 m (33 m fill). Tried to clean the fill with high viscous pills. Increased torque. Decided to POOH and deal with the fill after having cemented the Anchor casing.
19 (18-24) Run and cement Anchor Casing Run the 13 ⅝ and 13 ⅜ casing. Casing set at 1957 m (not to close to the fill). Cemented in two steps: Traditional inner string job, with a float collar and a float shoe up to known loss zones at 1600 m. Fill the annulus through the killline.
20 Drilling for Production casing The well was drilled to 2016 m with a 12 ¼ bit. Total loss of circulation. Difficult cleaning because of a larger diameter hole below shoe (1957 m m). POOH for a cementing job from bottom to casing shoe. Fiberglass cementing pipes used with good results (easily drillable if stuck). Continued drilling.
21 Coring Decided to drill a spot core (9 m) from 2040 m. Known loss zones from previous track. Managed to drill 2 m until no penetration observed. No core inside the barrel.
22 (04-07) Junk basket and cement to shoe RIH with a Mill tooth bit and a Junk Basket trying to retrieve the rest of the core bit. Drill the well to 2060 m and cement possible junk in hole and clog the losses. Fiberglass drill pipes used for the cementing job. TOC found at 1970 m.
23 Stuck at 2103 m Continued drilling until the string got stuck at 2103 m. Managed to get loose by pulling 160 tons. Circulated for 1 ½ hour. RIH again slowly and when the bit was on bottom the torque increased and the string was stuck. Returns lost imediately and the string was blocked for circulation.
24 Pulled out Stuck at 2103 m (bit at 2090 m) Pill for sweeping Torque increases RIH slowly
25 Stuck at 2103 m (bit at 2090 m) The Hook load decreases by tons! String blocked for circ. Bit pushed up Pulled out Torque increases Torque increases RIH
26 Blind Back off A Blind Back off was carried out. A factory made up connection on the Anderdrift tool broke. Left in hole, 17 m of fish RIH with a fishing BHA without results.
27 (15-22) Cementing a Side Track plug #2 and side track Cement a plug from top of fish at 2072 m and up to 1928 m (30 m inside the casing). Two attempts needed to get desired depth of TOC. Time drilling and side tracking. At 1985 m the bit was in formation. Continued drilling.
28 Stuck in Magma! At 2100 m the bit was pulled up to casing and the well was cleaned. No fill was on bottom. At 2104 m the torque increased and the ROP doubled from 2 m/hr to 4 m/hr. The hook load decraesed by 40 tons. Managed to keep circulation and returns. Quenched glass in the returns. Proof of Magma.
29 Stuck in Magma at 2104 m The Hook load decreases by 50 tons! RIH Pulled out RIH Bit pushed off bottom Torque increases Torque increases Hook load decreases
30 Stuck in Magma! The circulation was maintained for 24 hrs. The string was loose.
31 Running casing and liner Decided to run 9 ⅝ production casing. Set it at the same depth as the Anchor casing 1957 m and cement it to surface. In the open hole section a 9 ⅝ slotted liner was set from 1957 to 2080 m.
32 Into magma 3 rd time Into magma 1 st time Into magma 2 nd time
33 Depth(m) Pre - Drilling of IDDP - 01 Days Actual Estimated
34 Depth(m) Broken Mud pump Drilling works I - IDDP - 01 Days IC IC Broken mud pump Actual Estimated
35 Depth(m) 0 Drilling works II - IDDP - 01 Days m Broken BHA AC Junk basket Drilled into magma 1st time Sidetrack I Coring Sidetrack II Running Anchor casing and cementing Drilled into magma 2nd time Drilled into magma 3rd time 2500 Bit change 2400 m Stuck at 2005 m 3000 PC Corings 3500 m PZ 4500 Actual 7 Corings 4500 m Estimated 5000
36 Thank you!
37 IDDP Consortium National Energy Authority Principal Science Investigators: Gudmundur Omar Fridleifsson, HS orka hf Wilfred A. Elders, University of California at Riverside
38 1600 m (18-24) CBL log 14 hrs after cementation
39 (18-24) Running and cement Anchor Casing
40
41
Case History of First Liner Drilling Application in Romania
Case History of First Liner Drilling Application in Romania Ali Qureshi Well Delivery Team Leader-Team-5 OMV Petrom S.A. Bucharest, 28 th April 2016 Agenda Introduction Background (well design, prognosis
More informationCoring at Extreme Temperatures, Design and Operation of a Core barrel for the Iceland Deep Drilling Project (IDDP)
Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 Coring at Extreme Temperatures, Design and Operation of a Core barrel for the Iceland Deep Drilling Project (IDDP) Alister Skinner
More informationDRILLING IN MENENGAI FIELD SUCCESS AND CHALLENGES
Presented at Short Course VIII on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Oct. 31 Nov. 22, 2013. GEOTHERMAL TRAINING PROGRAMME
More informationRotary Drilling Rotary Drilling Bits
GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives
More informationInstructional Objectives
GE 343 SUBSURFACE EXPLORATION CH 8 Rock Drilling, Testing, and Sampling Text Ch. 7. Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives
More informationHISTORY OF DRILLING OPERATIONS IN THE KIRISHIMA GEOTHERMAL FIELD
HISTORY OF DRILLING OPERATIONS IN THE KIRISHIMA GEOTHERMAL FIELD Ken Soda Nittetsu Kagoshima Geothermal 1468-10 Manzen-area-aza-Ginyu, Makizono-cho, Aira-Gun, Kagoshima 899-66 Japan Key Words: geothermal
More informationCornish Institute of Engineers Conference th October 2013
Wellbore Stability and Real Time Drilling Optimisation: Delivered Worldwide from Cornwall Sarah Marks Cornish Institute of Engineers Conference 2013 11 th October 2013 GeoScience Limited, Falmouth Business
More informationA Brief Guide to Geothermal Wells
A Brief Guide to Geothermal Wells Key Features, Fundamental Differences Ralph Winmill Senior Drilling Engineer, Contact Energy 21 June 2011 WHO ARE CONTACT ENERGY? Publically-Listed New Zealand Energy
More informationOil Company Company et al Foothills W6
800, 555 4 th Avenue SW, Calgary, AB T2P 3E7 Off: 403-234-7625, www.wellsitegeologists.com Cell: 660-9883, Dennis@WellsiteGeologists.com Geological Report for Oil Company Company et al Foothills 06-06-060-06W6
More informationHydraulics and wellbore cleaning
Hydraulics and wellbore cleaning 01 Hydraulics & wellbore cleaning Introduction 1.0 Drilling fluid essentials 1.1 Objectives The objectives of this section are to; 1. Present the key aspects of hydraulics
More informationSAGA REPORT No June 2016
Introduction IDDP-2 Kick-Off Meeting 23 June 2016 SAGA REPORT No. 10 24 June 2016 An IDDP-2 Kick-Off Meeting (KOM), a joint effort of the IDDP-Consortium and DEEPEGS, was held 23th June 2016. The meeting
More informationRIG HYDRAULICS. P 1 = Eρ 0.8 Q 1.8 (PV) 0.2. psi or bar. P 1 ρ. = pressure loss, psi or bar = Density, ppg or kg/l = flow rate, gpm, l/min
RIG HYDRAULICS This chapter covers the following items: Pressure losses Surface connection losses Pressure drop across the bit Optimization of bit hydraulics Surface pressure drop Hydraulic criteria Comparison
More informationSKM DRILLING ENGINEERING. Chapter 4 - Drilling Problems
SKM 3413 - DRILLING ENGINEERING Chapter 4 - Drilling Problems Assoc. Prof. Abdul Razak Ismail Petroleum Engineering Dept. Faculty of Petroleum & Renewable Energy Eng. Universiti Teknologi Malaysia 2 Contents
More informationIODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G
IODP Expedition 341S: SCIMPI and 858G ReCORK Week 1 Report (19 27 May 2013) Operations Victoria Port Call and Transit to Hole 858G IODP SCIMPI and 858G ReCORK Expedition (341S) officially began when the
More informationPractical Application of Directional Drilling at Takigami Geothermal Field
Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005 Practical Application of Directional Drilling at Takigami Geothermal Field Hisashi Jotaki 1 and Keisuke Ushijima 2 1 Idemitsu
More informationThe Deepest Geothermal Well in Indonesia: A Success Story of Aerated Drilling Utilization
GRC Transactions, Vol. 40, 2016 The Deepest Geothermal Well in Indonesia: A Success Story of Aerated Drilling Utilization Apriyansah Toni, Raka Aditya Pratama, Imam M. Prasetyo, and Muhamad Bayu Saputra
More informationFluids, Hole Cleaning and Tripping Optimization
Fluids, Hole Cleaning and Tripping Optimization Overview Hole cleaning in highly deviated wells is probably one of the most misunderstood concepts. Primarily, relying on Plastic Viscosity and Yield Point
More informationLESSONS LEARNED IN DRILLING DB-1 AND DB-2 BLUE MOUNTAIN, NEVADA
PROCEEDINGS, Thirtieth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, January 31-February 2, 25 SGP-TR-176 LESSONS LEARNED IN DRILLING DB-1 AND DB-2 BLUE MOUNTAIN,
More informationExploration Drilling Techniques
Exploration Techniques Why do we need natural resources? average increase in demand: 5 % per year How do we find new resources? How do we find new resources? Fun! Geological methods: In my view the greatest
More informationEGYPT: SILDRIL Gives Top Performance in Nile Delta Well
PERFORMANCE REPORT EGYPT: SILDRIL Gives Top Performance in Nile Delta Well The operator (PETROBEL) was faced with drilling a 8½ hole through reactive Kafr El-Sheikh shales and unconsolidated sands from
More informationProduce arrays of semi-permanent deep access holes for a variety of investigations (climatological, geological, glaciological, biological)
CTDI Coiled Tubing Drill for Ice An Exploration Tool for Polar Sciences The CTDI drilling system uses a high-pressure pump and coiled tubing to deliver fluid to a steerable downhole hydraulic motor that
More informationStudy of Prevention and Mitigation of Stuck Pipe in Geothermal Drilling
PROCEEDINGS, 41st Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 22-24, 2016 SGP-TR-209 Study of Prevention and Mitigation of Stuck Pipe in Geothermal
More informationDrilling Engineering Design and Application of Well Fengshen-x601
Advances in Petroleum Exploration and Development Vol. 8, No. 1, 2014, pp. 85-89 DOI:10.3968/5609 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Drilling Engineering Design
More informationSTICK-SLIP WHIRL INTERACTION IN DRILLSTRING DYNAMICS
STICK-SLIP WHIRL INTERACTION IN DRILLSTRING DYNAMICS R. I. Leine, D. H. van Campen Department of Mechanical Engineering, Eindhoven University of Technology, P. O. Box 513, 5600 MB Eindhoven, The Netherlands
More informationThermasource,Nc. GEOTHERMAL CONSULTING SERVICES
Thermasource,Nc. GEOTHERMAL CONSULTING SERVICES TRUE GEOTHERMAL ENERGY COMPANY KMERZ WELL NO. KA2-1 GEOTHERMAL DRILLING PROGRAM COUNTY OF HAWAII Submitted to: Department of Land and Natural Resources Honolulu,
More informationStuck Pipe Prevention
SUGAR LAND LEARNING CENTER Stuck Pipe Prevention SELF - LEARNING COURSE USEFUL PRE-REQUISITES A Primer of Oilwell Drilling Sugar Land Learning Center Introduction to self-learning: Self-learning enables
More informationHot Creek Valley Oil Field
Hot Creek Valley Oil Field Discovery Well Eblana - 1 MAJOR OIL INTERNATIONAL LLC Brief on well sidetracking down to 13,000 ft Prepared by Soran Talabani and Karim Akrawi Field Location Eblana-1 (well status)
More informationHelping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer
TM Helping people understand what drilling data is telling them. Frode Sørmo, Chief Technology Officer Artificial Intelligence 2 Artificial Intelligence 3 3 Artificial Intelligence 4 Artificial Intelligence
More informationECONOMICS OF INCREASED BIT LIFE IN GEOTHERMAL WELLS BY COOLING WITH A TOP DRIVE SYSTEM
ECONOMICS OF INCREASED BIT LIFE IN GEOTHERMAL WELLS BY COOLING WITH A TOP DRIVE SYSTEM Seiji Saito, Sumio Sakuma 2, Tohoku University, Aramaki-Aza-Aoba 0, Sendai, 980-8579,Japan 2 JMC Geothermal Engineering
More informationCase Study: Direct Circulation Drilling
Case Study: Direct Circulation Drilling Power Swivel Adapter Sub with Pin PSG 146 Sliding Sleeve for PSG 146 A Typical Drill-String for Direct Circulation Drilling: Pulling Device for PSG 146 with box
More informationTHE IDDP-2 DEEPEGS DEMONSTRATOR AT REYKJANES
THE IDDP-2 DEEPEGS DEMONSTRATOR AT REYKJANES Guðmundur Ómar Friðleifsson IDDP-PI and DEEPEGS Coordinator & co-authors: Albert Albertsson, Geir Þórólfsson, Ómar Sigurðsson, Robert A. Zierenberg, Wilfred
More informationRisk Management and Contingency Planning for the First Icelandic Deep Drilling Project Well in Krafla, Iceland
Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 Risk Management and Contingency Planning for the First Icelandic Deep Drilling Project Well in Krafla, Iceland Sebastian Homuth
More informationMASTER S THESIS. Study program/ Specialization: Spring semester, Petroleum Engineering/Drilling Technology. Open access.
Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering/Drilling Technology Spring semester, 2014 Open access Writer: Dishni Altamirov (Writer s signature)
More informationRecent updates from the world s hottest geothermal energy drilling
Recent updates from the world s hottest geothermal energy drilling Guðmundur Ómar Friðleifsson IDDP PI DEEPEGS Coordinator HS Orka Chief Geologist Forsíða með eigin ljósmynd Skref til innsetningar myndar:
More informationIntroduction to Oil and Gas Production
Introduction to Oil and Gas Production Steven Marzuola ATA Energy Conference May 4-6, 2007 Houston Texas Introduction Dope, Joints, Tripping Strippers Casing, Tubing, Liner API - American Petroleum Institute
More informationIntroduction to Oil&Gas Well Drilling
Introduction to Oil&Gas Well Drilling Drilling Introduction to Oil&Gas Well Drilling The term drilling indicates the whole complex of operations necessary to construct wells of circular section applying
More informationPERFORMANCE EVALUATION OF DEEPENED WELLS 420DA AND 517DA IN THE LEYTE GEOTHERMAL PRODUCTION FIELD, PHILIPPINES
PROCEEDINGS, Thirty-Eighth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 11-13, 213 SGP-TR-198 PERFORMANCE EVALUATION OF DEEPENED WELLS 42DA AND 517DA
More informationState of the Art in Coalbed Methane Drilling Fluids SPE Len V. Baltoiu, P.Eng. Brent K. Warren, Ph.D. Thanos Natras, P.Geol.
State of the Art in Coalbed Methane Drilling Fluids SPE 101231 Len V. Baltoiu, P.Eng. Brent K. Warren, Ph.D. Thanos Natras, P.Geol. 1 Key Points Introduction Geology & Rock Mechanics Drilling Recommendations
More informationThe Challenge of Lost Circulation
Chapter 1 The Challenge of Lost Circulation Drilling a well is the most common way to access oil and gas resources and geothermal reservoirs. During drilling, a fluid is circulated in the well. This fluid
More informationGermany`s Deepest Hydro-Geothermal Doublet, Drilling Challenges and Conclusions for the Design of Future Wells
GRC Transactions, Vol. 42, 2018 Germany`s Deepest Hydro-Geothermal Doublet, Drilling Challenges and Conclusions for the Design of Future Wells Daniel Lackner, David Lentsch & Klaus Dorsch ERDWERK GmbH
More informationPROGRESS AT THE EUROPEAN HDR PROJECT AT SOULTZ-SOUS-FORÊTS: PRELIMINARY RESULTS FROM THE DEEPENING OF THE WELL GPK2 TO 5000 m
PROCEEDINGS, Twenty-Fifth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, January 24-26, 2000 SGP-TR-165 PROGRESS AT THE EUROPEAN HDR PROJECT AT SOULTZ-SOUS-FORÊTS:
More informationPART I Hot Dry Rock Geothermal Energy: History and Potential of the Newest and Largest Renewable Energy Resource
Contents PART I Hot Dry Rock Geothermal Energy: History and Potential of the Newest and Largest Renewable Energy Resource Chapter 1 Serendipity A Brief History of Events Leading to the Hot Dry Rock Geothermal
More informationGEOTHERMAL BOREHOLE INVESTIGATIONS DURING AND AFTER DRILLING
Presented at Workshop for Decision Makers on Geothermal Projects in Central America, organized by UNU-GTP and LaGeo in San Salvador, El Salvador, 26 November to 2 December 2006. GEOTHERMAL BOREHOLE INVESTIGATIONS
More information1 General introduction
1 General introduction 1.1 Oil well drilling system Oil and other hydrocarbons are the primary source of global energy. However, the exploration of these hydrocarbons presents a myriad of challenges resulting
More informationDrilling a geothermal well into a deep sedimentary geothermal reservoir conclusions from case study Gross Schoenebeck
Drilling a geothermal well into a deep sedimentary geothermal reservoir conclusions from case study Gross Schoenebeck Wulf Brandt & Geothermics Group GeoForschungsZentrum Potsdam In situ Geothermal Laboratory
More informationSubsurface Geology of oil and Gas Fields The Faculty of the Earth Resources Zhu Fangbing
Subsurface Geology of oil and Gas Fields The Faculty of the Earth Resources Zhu Fangbing 2017.10. Subsurface Geology of oil and Gas Fields What? Why? How? Subsurface geology of oil and gas fields is the
More informationA deeper understanding
DEEP GEOTHERMAL DRILLING 17 Drilling activity at the Hellisheidi geothermal power plant in Iceland. Mechanical design and drilling consulting were undertaken by Mannvit A deeper understanding GeoDrilling
More informationCan Geomechanics Improve Your Drilling and Completions?
Can Geomechanics Improve Your Drilling and Completions? Spoiler Alert Yes. CSPG Operations Geology Division March 15, 2018 Presented by Amy Fox, Ph.D., P.Geo. Introduction Montney AFE vs. Actual Drilling
More informationAnalyses of Field Measured Data With Rheology and Hydraulics Models
International Journal of Fluids Engineering. ISSN 0974-3138 Volume 8, Number 1 (2016), pp. 1-12 International Research Publication House http://www.irphouse.com Analyses of Field Measured Data With Rheology
More informationDRILLING EXPERIENCE AT DARAJAT GEOTHERMAL FIELD, WEST JAVA, INDONESIA
Proceedings 20th NZ Geothermal Workshop 1998 DRLLNG EXPERENCE AT DARAJAT GEOTHERMAL FELD, WEST JAVA, NDONESA. B.R. Amoseas ndonesia nc., Jakarta, ndonesia SUMMARY Slimhole drilling operations were successfblly
More informationAGENDA. Criteria for Fluid Selection Controlling Cost Continuously Improving Performance
AGENDA Criteria for Fluid Selection Controlling Cost Continuously Improving Performance WELLBORE STABILITY & HOLE ENLARGEMENT DRILLING FLUIDS COMPARISON Non Aqueous Fluids (diesel, synthetic, etc.) Brine
More information2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS
2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS Preparation for MSB-2 started in April 2002. Drilling and planned field work in both MSB-2 and 4 were carried out at the same time. After completion of the
More informationExploring and Drilling for Oil and Gas. Prepared by Tom Sheeran
Exploring and Drilling for Oil and Gas What are Oil and Gas? Oil and Gas are substances found within the earth s crust. They are thought to come from decomposed plant and animal matter. Scientists believe
More informationDEEP CORE DRILLING IN THE EAST ANTARCTIC ICE SHEET: A PROSPECTUS
Reproduced from Ice-Core Drilling edited by John F. Splettstoesser by permission of the University of Nebraska Press. Copyright 1976 by the University of Nebraska Press. Copyright renewed 2004 by the University
More informationShale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it?
P E T R O L E U M E N G I N E E R I N G D E P A R T M E N T Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it? Dr. Will Fleckenstein, PE Colorado School of Mines 1 Who is involved
More informationDaily Operational and Science Report UT-GOM2-1: Hydrate Pressure Coring Expedition
Daily Operational and Science Report UT-GOM2-1: Hydrate Pressure Coring Expedition 1. DATE: 22-May-2017, 0000-2400hr 2. LOCATION: 0000 2400 hr, 22-May-2017 Hole UT-GOM2-1-H005 Location: Lat: 27 00.04665',
More informationFeasibility Study of Casing While Drilling Application on Geothermal Drilling Operation
PROCEEDINGS, Thirty-Ninth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 24-26, 2014 SGP-TR-202 Feasibility Study of Casing While Drilling Application
More informationSite investigation in rock
Site investigation in rock masses Geotechnical Core Drilling & Logging Core Orientation Borehole Surveying Logging g Core Borehole Log Face Mapping Scanline Data Analysis Influence of Joints Orientation
More informationWell Name: UNIVERSITY H. Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Rpt T. Activity: 24 - Idle
Report No: 2 Report Date: 12/22/2012 Surface Location: 300 FNWL, 907 FNEL / Bottom Hole Location: 200 FSEL, 567 FNEL - WARD, TX Report No: 2 Rpt T. Activity: 24 - Idle AFE #: PB070212 Operation Desc: MOVE
More informationPetrophysical Data Acquisition Basics. Coring Operations Basics
Petrophysical Data Acquisition Basics Coring Operations Basics Learning Objectives By the end of this lesson, you will be able to: Understand why cores are justified and who needs core data Identify which
More informationMASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013
Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Master of Science in Petroleum Technology, Drilling Specialization Spring semester, 2013 Restricted Access Writer: Anders
More informationDirectional Drilling. History
Directional Drilling Directional drilling is the science of deviating a well bore along a planned course to a subsurface target whose location is a given lateral distance and direction from the vertical.
More informationChallenges faced in drilling high-temperature geothermal wells in Iceland. Sverrir Thorhallsson Iceland GeoSurvey July 3, 2007
Challenges faced in drilling high-temperature geothermal wells in Iceland Sverrir Thorhallsson Iceland GeoSurvey July 3, 2007 ENGINE Workshop 4 Reykjavík July 2-5, 2007 1 ÍSOR geothermal map of Iceland
More informationTemperature Condition Modelling for well IDDP-1 in Krafla, N-Iceland
Proceedings of SIMS 2012, the 53 rd Scandinavian Simulation and Modelling Society Conference Reykjavik, Iceland, 4 6 October 2012 Temperature Condition Modelling for well IDDP-1 in Krafla, N-Iceland Gudni
More informationUtilizing Instrumented Stand Pipe for Monitoring Drilling Fluid Dynamics for Improving Automated Drilling Operations
Proceedings of the 212 IFAC Workshop on Automatic Control in Offshore Oil and Gas Production, Norwegian University of Science and Technology, Trondheim, Norway, May 31 - June 1, 212 FrAT1.2 Utilizing Instrumented
More informationEnsuring integrity of shale gas wells in Europe
M4Shale Gas Final Conference, Krakow, Poland 19.10.2017 Ensuring integrity of shale gas wells in Europe M. Torsæter, K. Gawel, J. Todorovic, A. Stroisz, R. Skorpa and A. Lavrov SINTEF Petroleum Research,
More informationMULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE
6 JOURNEES SCIENTIFIQUES ET TECHNIQUES Hôtel Hilton, 20 to 22 june 2004, Algiers, Algeria MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE FOSTER, L. AIDOO, A. TOURQUI,
More informationMulti-target wells: a new concept to improve well economics
Multi-target wells: a new concept to improve well economics OMV AG, Vienna, Austria ABSTRACT: The Vienna Basin is a sedimentary basin more than 10 km in thickness and composed of more than a dozen hydrocarbon
More informationGeotechnical Geotechnical Assessment
Site Investigation Site Investigation Pile Probing Pile Probing Geotechnical Logging Geotechnical and Sampling Logging and Sampling Streetworks and Utilities Streetworks Avoidance and Utilities Avoidance
More informationInnovaRig - an Instrument for a European Geothermal Drilling Program
InnovaRig - an Instrument for a European Geothermal Drilling Program Lothar Wohlgemuth, Bernhard Prevedel, and Ernst Huenges GeoForschungsZentrum Potsdam GeoForschungsZentrum Potsdam Member of the Helmholtz
More informationCOOPERATIVE PATENT CLASSIFICATION
CPC - E21B - 2014.07 - Interleaved - page 1 CPC COOPERATIVE PATENT CLASSIFICATION E21B EARTH DRILLING, e.g. DEEP DRILLING ( mining, quarrying E21C; making shafts, driving galleries or tunnels E21D ); OBTAINING
More informationREPORT OF WORKSHOP No 1 OF THE ICELAND DEEP DRILLING PROJECT, NESJAVELLIR, ICELAND, MARCH 17-19, 2002
REPORT OF WORKSHOP No 1 OF THE ICELAND DEEP DRILLING PROJECT, NESJAVELLIR, ICELAND, MARCH 17-19, 2002 EXECUTIVE SUMMARY The Iceland Deep Drilling Project (IDDP) is an investigation of supercritical phenomena
More informationStrategies for Combating Rock
Strategies for Combating Rock Tod Michael Trenchless Product Manager, Vermeer Corporation Curt Dubbin Sale Manager HDD Division, Mincon Inc. Strategies for Combating Rock This presentation is intended
More informationDrilling Fluid Thixotropy & Relevance
ANNUAL TRANSACTIONS OF THE NORDIC RHEOLOGY SOCIETY, VOL. 13, 2005 Drilling Fluid Thixotropy & Relevance Richard Jachnik1, 1Baker Hughes INTEQ, Stoneywood Park North, Dyce, Aberdeen, Scotland, UK ABSTRACT
More informationPETROLEUM 101. Mark Shrimpton Jacques Whitford
PETROLEUM 101 Mark Shrimpton Jacques Whitford PRESENTATION STRUCTURE The Offshore Petroleum Industry Petroleum Geology Petroleum Technology: Exploration agreements Geophysical exploration Drilling Development
More informationMULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute
MULTIPLE CHOICE QUESTIONS ON OIL, GAS, AND PETROCHEMICALS The Energy and Resources Institute Preface Petroleum as everyone knows consists of hydrocarbons of various molecular weights and other organic
More informationExperimenting with Deflagration for Stimulating Geothermal Wells
Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Experimenting with Deflagration for Stimulating Geothermal Wells Omar Sigurdsson HS Orka hf. Brekkustigur 36, IS-260 Reykjanesbaer,
More informationOil and Gas Production and Exploration, Part I
Oil and Gas Production and Exploration, Part I Presented by: Steven Marzuola American Translators Association 52 nd Annual Conference Boston, October 26, 2011 1 Introduction Dope, Joints, Tripping Internal
More informationHorizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi
Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania Authors: John Lavelle, Amin Yaghoobi About Suplac Oil Field Discovered 1958 Oil Density 960 kg/m3 (16 API) Viscosity 2300
More informationMUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to:
LEARNING OBJECTIVES MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS Coring Operations Basics By the end of this lesson, you will be able to: Understand why cores are justified and who needs core data
More informationDRILLING RIG INFORMATION SYSTEMS
Presented at Short Course on Geothermal Drilling, Resource Development and Power Plants, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, January 16-22, 2011. GEOTHERMAL TRAINING PROGRAMME
More informationAADE-02-DFWM-HO-30. Lost Circulation Solutions for Severe Sub-Salt Thief Zones M. Ferras, Sonatrach; M. Galal and D. Power, M-I L.L.C.
AADE-02-DFWM-HO-30 Lost Circulation Solutions for Severe Sub- Thief Zones M. Ferras, Sonatrach; M. Galal and D. Power, M-I L.L.C. Copyright 2002 AADE Technical Conference This paper was prepared for presentation
More informationAADE-06-DF-HO-15. A. Arbizu, P Reid and H Santos, Impact Solutions Group
AADE-06-DF-HO-15 Field Results of Ultra-low Invasion Drilling Fluids Demonstrate Reduced Wellbore Instability, Reduced Mud Losses, Wellbore Strengthening and Improved Well Productivity A. Arbizu, P Reid
More informationWell Construction and Cementing Practices in Shale and Salt Water Disposal Wells
Well Construction and Cementing Practices in Shale and Salt Water Disposal Wells 2017 Shale Network Workshop Roger Myers, President RRM Completions, LLC 1 Agenda Well Construction Importance and Examples
More informationReplicate Coring System for 98mm Electromechanical Drill Whipstock Conceptual Documentation
Replicate Coring System for 98mm Electromechanical Drill Whipstock Conceptual Documentation Ice Drilling Design and Operation (IDDO) University of Wisconsin-Madison Kyle Zeug Contents Overview... 3 Introduction...
More informationIdeas to Design an in situ Diamond Drilling Core Splitter within Soft Rocks*
Ideas to Design an in situ Diamond Drilling Core Splitter within Soft Rocks* G. M. Tetteh, J. A. Aluah, J. Ahmed and S. Alornyo Tetteh, G. M., Aluah, J. A., Ahmed, J. and Alornyo, S. (2015), Ideas to Design
More informationDeep Drilling Experience for Pohang Enhanced Geothermal Project in Korea
Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Deep Drilling Experience for Pohang Enhanced Geothermal Project in Korea YOON Kern-Shin, JEON Jae-Soo, HONG Hoon-Ki, KIM
More informationIceland Deep Drilling Project (IDDP): Drilling Targets for Supercritical Fluid
Iceland Deep Drilling Project (IDDP): Drilling Targets for Supercritical Fluid Guðmundur Ómar Friðleifsson 1), Halldór Ármannsson 1), Knútur Árnason 1), Ingi Þ. Bjarnason 2) and Gestur Gíslason 3) 1) Orkustofnun,
More informationGuideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS
Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS 1. Introduction The requirement to prepare and submit a Final Well Report is specified by subsection 201(1) of the Newfoundland
More informationPresented at ASEAN Geothermal Workshop Bandung, Indonesia 1 May 1984
Presented at ASEAN Geothermal Workshop Bandung, Indonesia 1 May 1984 DRILLING AND TESTING GEOTHERMAL WELLS IN AN ACTIVE VOLCANIC DOMAIN, PUNA GEOTHERMAL FIELD, HAW An, USA W.L. D'Olier, Vice President
More informationRotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment
AADE-07-NTCE-71 Rotary Steerable System Technology Case Studies in the Canadian Foothills: A Challenging Drilling Environment Essam Adly, Schlumberger Copyright 2007, AADE This paper was prepared for presentation
More informationCalculating Method for the Axial Force of Washover String During Extracting Casing in Directional Well
Advances in Petroleum Exploration and Development Vol. 9, No., 05, pp. 86-9 DOI:0.3968/6634 ISSN 95-54X [Print] ISSN 95-5438 [Online] www.cscanada.net www.cscanada.org Calculating Method for the Axial
More informationEnhanced Geothermal Systems The Technical Challenge
Enhanced Geothermal Systems The Technical Challenge Melanie Vonthethoff AGEG TIG 11 Drilling and Well Construction Presenter: Melanie Vonthethoff Types of Geothermal Australia vast resource potential 48
More informationbeen drilled specifically the resource that further between the
AADE-13-FTCE- 7 Application of High Performance Water-Based Mud in Woodbine Horizontal Wells Tyler Langford and Lance Blanchard, Halcón Resources; Shannon Comeaux and Harry Dearing, Newpark Drilling Fluids
More informationEarly Exploration Permit Activity Information
Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater
More informationHalliburton Engineering for Success in Developing Shale Assets
Halliburton Engineering for Success in Developing Shale Assets Nov 30, 2010 Shale is a Very Broad Name Used to Describe a Large Category of Rock In conventional petroleum geology shale is thought of as
More informationEngineering in Support of Transformative Science
Engineering in Support of Transformative Science Scientific Ocean Drilling of Mid-Ocean Ridge and Ridge-Flank Setting Workshop August 27, 2009 Austin, Texas Greg Myers IODP-MI Outline o Main engineering
More informationHydraulics! 10 An Overview!
Hydraulics! 10 An Overview! Introduction to Well Engineering - 10 - Hydraulics 1 Contents 1. Introduction 3 2. Flow Regime & Reynolds Number 9 2.1 Introduction 9 2.2 Laminar / Turbulent Boundary in a Newtonian
More informationCoupling Axial Vibration With Hook Load/Bit Force And The Effect Of Shock Absorber
International Journal of Engineering Research and Technology. ISSN 0974-3154 Volume 10, Number 1 (017), pp. 61-69 International Research Publication House http://www.irphouse.com Coupling Axial Vibration
More informationInvestigation of Drill Bit Heave Response to Drill Rig Heave Excitation
Investigation of Drill Bit Heave Response to Drill Rig Heave Excitation Liqing Huang, Galin V. Tahchiev and Yusong Cao MARINTEK USA Inc 263 Augusta Drive, Suite 2, Houston, Texas, 7757, USA ABSTRACT Managing
More information