GEOTECHNICAL ENGINEERING SERVICES REPORT. STATE HIGHWAY 48 BRIDGE 'A' OVER INTERSTATE 40 OKFUSKEE COUNTY, OKLAHOMA STATE JOB PIECE No.

Similar documents
Geotechnical Engineering Report

Geotechnical Engineering Report

GEOTECHNICAL ENGINEERING SERVICES REPORT

Geotechnical Engineering Report

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.


GEOTECHNICAL ENGINEERING SERVICES REPORT

Geotechnical Data Report

APPENDIX C HYDROGEOLOGIC INVESTIGATION


DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

Geotechnical Engineering Report

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants


Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Geotechnical Engineering Report

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

GEOTECHNICAL INVESTIGATION REPORT

Pierce County Department of Planning and Land Services Development Engineering Section

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

APPENDIX E SOILS TEST REPORTS

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

SITE INVESTIGATION 1

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Chapter 12 Subsurface Exploration

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Geotechnical Data Report

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

3.0 SUMMARY OF FINDINGS

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

APPENDIX C. Borehole Data

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

Northern Colorado Geotech

REPORT OF SUBSURFACE EXPLORATION

B-1 SURFACE ELEVATION

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

KDOT Geotechnical Manual Edition. Table of Contents

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

AN EMPLOYEE OWNED COMPANY

ENGINEERING ASSOCIATES

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012

Geotechnical Engineering Report

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

Geotechnical Data Report

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

NAPLES MUNICIPAL AIRPORT

RED ROCK. Report of Geotechnical Investigation TRIPLE SPAN BRIDGE OVER THE WASHITA RIVER CADDO COUNTY, OKLAHOMA STP-108C(299)CI; 28389(04)

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Appendix 11-B Preliminary Geotechnical Investigation

Geotechnical Aspects of the Seismic Update to the ODOT Bridge Design Manual. Stuart Edwards, P.E Geotechnical Consultant Workshop

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW


GEOTECHNICAL EXPLORATION REPORT

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

PERIODIC SAFETY FACTOR ASSESSMENT

6.2 Geotechnical Investigation and Construction Material Survey

GZA GeoEnvironmental, Inc.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

TIERRA. Florida License No Florida License No

NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS


December 8, 2016 EEI Project No Mr. Gary Cowles Cowles, Murphy Glover & Associates, LLC 457 St. Michael Street Mobile, Alabama 36602

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Geotechnical Engineering Report

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

Appendix G GEOLOGICAL INVESTIGATION

SOIL STABILITY ANALYSES

Appendix J. Geological Investigation

Appendix A. Producer Statement Advisory Note

Preliminary Geotechnical Engineering Report

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

10. GEOTECHNICAL EXPLORATION PROGRAM

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

Geotechnical Engineering Report

Technical Memorandum. Soil Borings

APPENDIX A GEOTECHNICAL REPORT

Preliminary Geotechnical Engineering Report

FIFTH STREET GRADE SEPARATION CARSON CITY, NEVADA

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT


GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

Transcription:

GEOTECHNICAL ENGINEERING SERVICES REPORT STATE HIGHWAY 48 BRIDGE 'A' OVER INTERSTATE 4 OKFUSKEE COUNTY, OKLAHOMA STATE JOB PIECE No. 2755(4) Prepared For: Oklahoma Department of Transportation Prepared By: EST, Inc. Approved by: Alseny Diop, P.E. Sr. Geotechnical Engineer EST PROJECT NUMBER 64246 April 2, 215

GEOTECHNICAL ENGINEERING SERVICES REPORT STATE HIGHWAY 48 BRIDGE 'A' OVER INTERSTATE 4 OKFUSKEE COUNTY, OKLAHOMA STATE JOB PIECE No. 2755(4) EST, Inc. 48 24 th Avenue NW, Suite 244, Norman, OK 7369 (45) 37-8378 Certificate of Authority Number 3639, Renewal Date 6/3/216 EST PROJECT NUMBER 64246 April 2, 215 Alseny Diop, P.E. Sr. Geotechnical Engineer Eric Agossou, E.I. Project Manager

Comprehensive Engineering Services 48 24 th Avenue NW, Suite 224 Norman, Oklahoma 7369 P (45) 37.8378 F (45) 329.1914 TABLE OF CONTENTS 1. Executive Summary... 1 2. Project Description... 1 2. Subsurface Exploration... 1 4. Subsurface Conditions... 3 4.1 Site Geology... 3 4.2 Soil Conditions... 4 4.3 Seismic Classification/ Spectral Accelerations... 4 4.4 Groundwater... 5 5. Laboratory Evaluation... 6 6. Evaluation and Recommendations... 6 6.1 Driven Pile Foundations... 6 6.2 Drilled Shafts... 8 7. General... 12 Appendix A Boring Location Plan Appendix B Foundation Boring Logs Appendix C Boring Logs Appendix D General Notes, Boring Log Acronym Library, General Notes for Rock Classification Colorado Oklahoma Texas

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 1. Executive Summary The geotechnical engineering services are complete for the proposed Bridge A along State Highway 48 over Interstate 4 in Okfuskee County, Oklahoma. This report describes the subsurface conditions encountered in the borings, furnishes the laboratory data acquired, and provides geotechnical recommendations for the design and construction of the proposed bridge. Exploration of the subsurface materials at the project site consisted of six (6) structural borings drilled to depths ranging from 16 to 129 feet below the existing ground surface elevation. Samples obtained from the borings were brought to our laboratory for further evaluation and testing. Groundwater was encountered in the borings at depths ranging from 34 to 65 feet below existing grades. The final boring logs and a diagram showing the approximate locations of the borings are included in this report. The Engineer s evaluation and laboratory test results indicate the subsurface materials generally consist of cohesive and cohesionless overburden soils over shale, sandstone or an interbedding of these rock formations. 2. Project Description We understand that the proposed project consists of constructing a new, approximately 268 feet- 1 inches long, four-span, bridge. The proposed project is located along State Highway 48 over Interstate 4 in Okfuskee County, Oklahoma. The General Plan and Elevation sheet provided indicates that the abutments and wing walls will be supported on HP 1 X 42 driven piles, and the approach embankments to the bridge would require less than 5 feet of fill to meet the proposed finish grade elevation. At the time of our fieldwork, the existing highways and bridge were operational. 2. Subsurface Exploration The subsurface exploration was performed between December 29, 214 and January 26, 215. The exploration consisted of six (6) structural borings drilled to depths of approximately 16 to 129 feet below existing grades. The borings were located in the field by EST personnel using the preliminary plans provided. The approximate locations of the borings have been identified and are shown on the boring location plan included in Appendix A of this report. The surface elevations near the boring locations were determined by EST Survey Personnel. The borings were advanced with a CME-55 rotary drill rig using hollow stem augers in the overburden soil and a rock bit in the bedrock. Representative soil samples were obtained using the standard penetration test (SPT) sampling procedures in general accordance with ASTM Specification D-1586. In boring B-3A, the sedimentary rock cores were obtained using the EST, Inc. 1

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 wire-line coring techniques in general accordance with ASTM Specification D-2113 and AASHTO Specification T-255. The SPT process requires a split-barrel (two-piece) sampling tube be used to obtain soil samples. A 2-inch outside diameter sampling tube is hammered into the bottom of the boring with a 14- pound weight falling 3 inches. The number of blows required to advance the tube the last 12 inches of an -inch sampling interval or portion thereof, is recorded as the standard penetration resistance value, N. The in-situ relative density of granular soils, the consistency of cohesive soils, and the hardness of weathered bedrock can be estimated from the N value. The uncorrected N values recorded for each test are shown on the attached boring logs at their relative sampling depths. In addition, the hardness of portions of the bedrock was evaluated using the Texas Highway Department cone penetration () test. The is a standard test developed by the Texas Highway Department to evaluate the strength and hardness of subsurface bearing materials for bridge foundations. The process requires use of a solid steel 3-inch diameter cone of standard dimensions attached to the drill rod. The cone is hammered at the bottom of the boring with a 14-pound weight falling 3-inches. After the cone is seated with 1 blows, the penetrations for two 5-blow intervals are recorded. If the number of blows to advance the cone six inches is less than 5, then the number of blows for the 6-inch interval is recorded. If the amount of penetration is less than 6 inches for 5 blows, the amount of penetration is recorded for the 5 blows. The number of blows with penetrations recorded for each test is shown on the attached boring logs at their relative test depths. A CME automatic drive hammer was used to advance the split-barrel sampler and. A greater mechanical efficiency is achieved with the automatic drive hammer when compared to a conventional safety drive hammer operated with a cathead and rope. The effect of this higher efficiency on the N values has been considered in our interpretation and analysis of the subsurface information provided with this report. As part of the drilling operations, the engineer prepared field boring logs. The engineer examined the samples retrieved during drilling operations and recorded a material description on the field boring logs. The split-barrel samples were packaged in plastic bags to reduce moisture loss, tagged for identification and transported to our laboratory for further evaluation. The field boring logs also include visual classifications of the auger sample materials encountered during drilling and the engineer s interpretation of the subsurface conditions between split-barrel samples. This report contains the final boring logs that represent modifications based on laboratory test results of the soil samples. EST, Inc. 2

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 4. Subsurface Conditions 4.1 Site Geology The subject bridge is situated in a geologic area best described as being part of the Coffeyville Unit (Pcf), the Seminole Unit (Psl) or a combination of the two with Terrace Deposits. Based on the subsurface materials encountered during our explorations, we anticipate the most likely unit to be encountered may be the Coffeyville. However, according to published materials (Engineering Classification of Geologic Materials, Division Three, 1969, Oklahoma Highway Department), descriptions of both units are summarized below: The Coffeyville Unit consists of two sandstone members, two or more shale members, and a basal limestone member (DeNay) which is present in southern Seminole County. The sandstone members are soft to moderately hard, range from 5 to 4 feet thick, are thin-bedded to massive, and are generally buff to brown but may locally contain red and yellow colors. The shales are soft, yellowish brown to dark gray and occur in sequences up to 2 feet thick. The total thickness of the Coffeyville Unit is irregular and varies from 15 to 26 feet. Topographically, the sandstone members generally cap prominent eastward facing scarps with long westward dip slopes. The shales generally underlie valleys and steep slopes of scarps that are capped by the sandstone members. The Seminole Unit (Psl) consists of conglomerate, sandstone and shale. The conglomerates and sandstones are most prominent in southeastern Seminole County where they comprise most of the unit. The division of the sandstones northward results in at least three moderately soft sandstone members and three shale members in Okfuskee County. Here, the basal sandstone is conglomeratic and varies from 4 to 17 feet in thickness. The shale sequences thicken up to 14 feet. The total thickness of this unit thins to about 27 feet in Okfuskee County. Topographically, the sandstones and conglomerates cap prominent tree covered scarps. The shales generally underlie the valleys and the ridges which are capped by sandstones. Terrace deposits consist of sand, silt, clay, gravel, and/or combinations of these. Terrace materials occur adjacent to or near streams at higher elevations than the flood plain (bottom land). The engineering properties of the unconsolidated materials are normally the same as the C horizon of the overlying soil. EST, Inc. 3

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 4.2 Soil Conditions The near surface cohesive soils were found to be very soft to very hard in consistency. Cohesionless soils were generally very loose to very dense in relative density. The sedimentary bedrock encountered exhibited SPT refusal (i.e. 5 blows for 6 inches or less of penetration) at depths indicated in the boring logs and as shown in Table I below: Boring No. B-1 B-2 B-3 B-3A B-4 B-5 TABLE I Station and Offset 511+55.75, 21.82 Left of CL Survey 512+27.93, 37.29 Right of CL Survey 513+8.29, 21.5 Left of CL Survey 513+13.29, 21.5 Left of CL Survey 514+32.89, 21.95 Right of CL Survey 514+49.81, 23.5 Left of CL Survey Surface Elevation (feet) Top of Rock Top of Rock Elevation Depth (feet) (feet) 941.69 846.19 95.5 923.68 847.68 76 92.7 844.7 76 92.7 843.57 76.5 941.9 842.9 99 942.11 855.11 87 4.3 Seismic Classification/ Spectral Accelerations Based on the subsurface materials encountered during our investigation and Table 1613.5.2 entitled Site Class Definitions in the 29 International Building Code, the seismic site class is D. This site class should be used when designing the foundation systems for this bridge. The following geotechnical parameters estimated based on the 29 AASHTO Guide Specifications for LRFD Seismic Bridge Design can be used; however, we recommend the latest edition of the AASHTO Guide Specifications for LRFD Seismic Bridge Design be reviewed prior to using these parameters. EST, Inc. 4

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 TABLE II Seismic Site Class ( Table 1613.5.2 of the 29 IBC) D Estimated Site Coordinates Latitude 35.433 o N Longitude 96.3769 o W PGA peak seismic ground acceleration coefficient on rock.57g A S peak seismic ground acceleration coefficient modified by short-period site factor.91g S S horizontal response spectral acceleration coefficient at.2-s period on rock.122g S DS horizontal response spectral acceleration coefficient at.2-s period modified by short-period site factor.196g S 1 horizontal response spectral acceleration coefficient at 1.-s period on rock.41g S D1 horizontal response spectral acceleration coefficient at 1.-s period modified by long-period site factor.99g The following adjustment factors were used for a seismic site class D : TABLE III Seismic Site Class D Adjustment Factors PGA.1 F PGA 1.6 F a 1.6 F v 2.4 Seismic Design Category A 4.4 Groundwater Groundwater was encountered in the borings at depths ranging from 34 to 65 feet below existing grades. Once bedrock was encountered, a rock bit with water to wash and stabilize the borings was used to advance the borings to the required rock testing depths. As a result, water level observations are based on observation of the augered materials while drilling and the field Engineer s judgment of the samples retrieved during drilling operations. EST, Inc. 5

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Groundwater level fluctuations and perched water conditions may occur due to seasonal variations in the amount of rainfall and other factors such as drainage characteristics. The possibility of groundwater level fluctuations should be considered during the preparation of construction plans. After completion, the borings were abandoned in accordance with the Oklahoma Water Resources Board (OW) requirements. 5. Laboratory Evaluation All samples obtained from the project site were transferred to our laboratory for processing and testing. Laboratory tests were performed on the soil samples in agreement with the applicable ASTM test procedures. Laboratory testing included estimation of the natural moisture content (ASTM D2266), Atterberg limits (ASTM D43) and sieve analysis (ASTM D2487). The test results can be found in the appropriate column of the boring logs included in appendix C of this report. 6. Evaluation and Recommendations Steel H-piles can be used to support the abutments of the proposed four-span bridge. Drilled, cast-in-place concrete piers can be used for the interior spans. More detailed recommendations concerning end bearing and frictional resistance values are provided in the following sections. 6.1 Driven Pile Foundations The proposed bridge abutments can be supported using steel H-piles. Driven piles will develop their capacity from a combination of end bearing and frictional resistance in the bedrock. Because of the relatively high driving forces required to penetrate the bedrock, we recommend using low displacement piles such as H-piles. Piles should be spaced at minimum center-tocenter distances equal to 2.5 times the maximum pile width or 3 inches, whichever is greater. The estimated combined capacities at different elevations for the HP 1X42 driven piles are shown in Tables IVA & IVB. It is important to note that variations in the overburden soils and in the depth and quality of the bedrock will occur with distance away from the soil borings. Therefore, we recommend the piles be driven until twice the design requirement is obtained in accordance with the appropriate procedure. An appropriate pile driving formula, wave equation analysis, static load test, or dynamic load test should be used during pile driving to determine that satisfactory resistance is obtained. Driven piles constructed as recommended are expected to have negligible long-term settlements. EST, Inc. 6

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE IVA Boring No.1 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for Steel H Piles 1X42 End Bearing Q pall (tons) Skin Friction T all (tons) Q pall +T all FS of 3 (tons) Elevation (feet) 941.69 5* 936.69 1.4.22 1.59 1 931.69 3.9.88 4.81 15 926.69 7.2 2.1 9.25 16.25 925.44 4.5 2.36 6.88 2 921.69 4.5 3.43 7.95 25 916.69 13.3 4.84.19 3 911.69 1.8 6.26 17.3 35 96.69 9. 7.68.45 4 91.69 9. 9.1.14 45 896.69 9. 1.52 19.56 5 891.69 1.8 11.94 22.7 55 886.69 4.5 13.36 17.88 6 881.69 1.8 14.78 25.54 65 876.69 13.3 16.2 29.54 7 871.69 31.2 17.62 48.83 75 866.69 16.6 19.3 35.61 8 861.69 9. 2.45 29.49 85 856.69. 2.45 2.45 96 845.69 4.8 23.57 31.11 11 84.69 17. 86.5 13.53 16 835.69 3.7 143.86 174.55 111 83.69 19. 25.35 224.37 116 825.69 24.6 261.52 286.13 121 82.69 31. 333.35 364.35 126 815.69 23.7 43.63 427.29 *The top 5 feet should be neglected EST, Inc. 7

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE IVB Boring No.5 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for Steel H Piles 1X42 End Bearing Q pall (tons) Skin Friction T all (tons) Q pall +T all FS of 3 (tons) Elevation (feet) 942.11 5* 937.11 1.2.21 1.36 1 932.11 2.7.85 3.55 15 927.11 7.1 1.93 8.99 16.25 925.86 4.6 2.28 6.89 2 922.11 5.3 3.37 8.64 25 917.11 9.2 4.81 14.3 3 912.11 16.9 6.26 23.16 35 97.11 11. 7.71.68 4 92.11 7.7 9.16 16.84 45 897.11 6.4 1.6 16.97 5 892.11 4.6 12.5 16.66 55 887.11 7.7 13.5 21. 6 882.11.9 14.94 33.82 65 877.11 16.9 16.39 33.29 7 872.11.5 17.66.17 75 867.11 1. 19.59 2.62 8 862.11 1.7 21.56 23.31 87 855.11 5.1 24.46 29.52 92 85.11 14.6 44.12 58.67 97 845.11 24.6 92. 116.61 12 84.11 81.6 19.99 272.57 17 835.11 31. 38.63 339.63 112 83.11 2.7 373.56 394.23 117 825.11 35.2 441.77 477. *The top 5 feet should be neglected 6.2 Drilled Shafts The proposed 48-inch and 6-inch diameter piers can be used to support the interior spans of the bridge. Tables VA, VB and VC provide the allowable end bearing pressure and allowable side friction for the drilled piers near the boring locations. Excavation of the overburden soils can be accomplished using an earth auger. However, rock teeth will be required to penetrate the bedrock. EST, Inc. 8

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Based on the soil conditions observed in the test borings, we anticipate that casing will be required to prevent caving of the soils encountered at the site. The drilled piers, and all materials and construction procedures shall be in accordance with the Oklahoma Department of Transportation (ODOT), 29 Standard Specification for Highway Construction and the latest special provisions adopted by ODOT to supplement the Standard Specifications. To facilitate pier construction, concrete should be on-site and ready for placement as pier excavations are completed. Drilled shaft excavations should not be allowed to remain open for more than 4 hours. Drilled shafts constructed as recommended are expected to have less than ½- inch long-term settlement. TABLE VA Boring No.2 Depth (feet) State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) 923.68 5* 9.68 82.94 9.46 46.67 129.59 11.83 71.3 1 913.68 15.56 26.5 67.36 164.93 33.13 1.69 15 98.68 196.4 56.83 129.27 36.31 71.4 192.22 2 93.68 113.1 81.62 11.44 176.72 12.3 144.47 25 898.68 98.2 16.76 17.73 153.15 133.45 149.97 3 893.68 15.8 14.62 152.74 235.62 175.78 214.49 35 888.68 6.32 162.11 119.32 94.25 22.64 158.58 4 883.68 376.99 226.48 313.6 589.5 283.9 45.23 45 878.68 354.37 287.22 335.16 553.71 359.3 474.32 5 873.68 361.91 35.31 373.62 565.49 437.88 523.58 55 868.68 324.21 41.75 388.2 56.58 513.44 535.68 6 863.68 113.1 445.4 31.32 176.72 556.3 394.92 65 858.68 73.53 456.28 287.72 114.9 57.35 371.14 7 853.68 22.62 473. 271.56 35.34 591.47 342.98 76.5 847. 376.99 572.1 471.8 489. 715.1 637.75 81.5 842. 564.58 78.54 671.98 539.85 885.67 928.2 86.5 837. 689.48 953.86 869.36 97.1 1192.32 1194.44 91.5 832. 414.42 1158.43 844.35 88.88 1448.3 112.19 96.5 827. 515.97 134.6 995.2 7.21 1675.8 1324.4 11.5 822. 1236.69 1627.8 1513.63 1137.73 234.75 285.28 16.5 817.68 125.15 27.79 1651.51 1751.61 2588.48 2224.57 *The top 5 feet should be neglected EST, Inc. 9

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE VB Boring No.3 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) 92.7 5* 915.7 15.56 11.7 58.87 164.93 13.84 9.8 1 91.7 158.34 32.99 97.31 247.4 41.24 146.38 15 95.7 158.34 59.52 111.9 247.4 74.4 164.62 2 9.7 12.64 85.11 17.13 8.5 16.39 152.76 25 895.7 12.64 113.25 122.61 8.5 141.57 172.11 3 89.7 39.58 119.3 85.41 61.85 149.12 112.94 35 885.7 15.56 149.32 134.9 164.93 6.65 5.12 4 88.7 158.34 8.85 3.3 247.4 236.6 253.53 45 875.7 324.21 251.19 3.26 56.58 313.99 425.99 5 87.7 158.34 294.69 241.25 247.4 368.36 329.3 55 865.7 128. 335.14 284.42 2.28 4.93 33.55 6 86.7 52.78 362.49 225.76 82.47 453.12 29.45 65 855.7 79.19 374.59 245.62 123.73 468.24 319.39 7 85.7 98.2 413.5 276.44 153.15 516.88 36.86 76 844.7 242.85 431.13 358.55 379.45 538.91 486.12 81 839.7 461.2 613.3 567.82 72.34 766.63 781.81 86 834.7 592.48 847.43 762.33 925.75 159.29 145.49 91 829.7 53.1 156.87 846.28 828.14 1321.9 114.67 96 824.7 53.1 1266.31 961.47 828.14 1582.89 1284.66 11 819.7 692.55 1539.98 1193.26 2.1 1924.97 1599.79 16 814.7 623.29 1786.28 1294.1 973.89 2232.85 1715.1 *The top 5 feet should be neglected EST, Inc. 1

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE VC Boring No.4 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) 941.9 5* 936.9 52.78 6.72 3.9 82.47 8.41 45.86 1 931.9 6.32.29 4.22 94.25 22.86 59.7 15 926.9 135.72 41.42 9.64 212.6 51.78 134.51 2 921.9 75.4 6.44 7.94 117.81 75.56 1.46 25 916.9 173.42 94.26 138.55 27.96 117.83 2.29 3 911.9 346.83 149.63 255.71 541.93 7.3 373.83 35 96.9 211.12 193.41 211.93 329.87 241.77 297.9 4 91.9 135.72 229.52 194.9 212.6 286.9 263.82 45 896.9 9.48 26.15 8.32 141.37 325.19 249.54 5 891.9 6.32 286.39 7.67 94.25 357.98 244.2 55 886.9 135.72 327.21 247.83 212.6 49.2 33.99 6 881.9 376.99 46.77 412.22 589.5 58.46 574. 65 876.9 286.51 472.47 43.11 447.68 59.58 548.66 7 871.9 39.6 478.52 282.98 61.88 598.15 359.92 75 866.9 62.23 488.2 299.53 97.23 61.3 384.13 8 861.9 96.14 52.71 324.56 15.22 628.39 42.73 85 856.9 452.39 571.83 54.7 76.86 714.78 746.56 87 854.9 24.74 593.48 446.79 376.16 741.86 596.1 92 849.9 8.65 668.3 461.74 294.76 835.4 66.65 97 844.9 459.66 849.67 697.15 7.21 162.9 943.25 12 839.9 95.14 1225.13 1148.89 1484.59 1531.41 1584.57 17 834.9 1129.15 1671.32 1483.8 1764.3 289.16 231.19 112 829.9 623.29 1917.63 1366.34 973.89 2397.3 5.31 117 824.9 654.72 2176.34 1524.35 123. 272.43 27.74 EST, Inc. 11

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 7. General This report was prepared for the Oklahoma Department of Transportation in reference to the four-span bridge over Interstate 4 (Bridge A ), along State Highway 48 in Okfuskee County, Oklahoma. This report provides geotechnical evaluation based on the subsurface conditions encountered in the borings. The scope of services contained in this report does not include any environmental assessment or identification of contaminated or hazardous materials. Any statements in this report or in the boring logs concerning suspicious odors, colors, irregular textures or abnormal conditions are for informational purpose only and have not been verified by the engineer or testing. Subsurface conditions may vary between borings. Therefore, we recommend EST be retained to provide construction testing and inspection. If variations appear during construction, it may be necessary to revise the recommendations contained in this report. However, EST warrants that the findings contained herein have been made with generally accepted professional geotechnical practices in the local area. No other warranties are implied or expressed. EST, Inc. 12

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Appendix A Boring Location Plan EST, Inc.

,... N I") Borln B-G1 STA 511+55.75, 21.82' Left of CL.Survey Borln B-G3 STA 513+8.29, 21.5' Left of CL Survey Borln B-G3A STA 513+13.29, 21.5' Left of CL.Survey Borln B-G5 STA 514+49.81, 23.5' Left of CL.Survey \ -..., ----::::.._ 1;( I.;~ //; 1 ;11! ""----- - ---- ---~ - - 11: ------- ----- --- _.//I( 1'11 ' '111 111 ' : 3 "-.- ------ -- - ---S..._..._....--;:J/./l) / r/l1j l/ B-G2.J&-- --- - --------" --- -- /~; 1 111 11 1' 937- - ---------- --- :: - ~- -- --- ::/:!.J/ 1 ;, /l j l 93. -~ - --- - -- - -- - --- -~;.?~-:;!/; 1/1 il,i 93~ -------- -- -----~/ /_,- t j//1 OJ - - --- -- ------- //_,.-;:;.;:.2 ' JI 933 - --- --------~ --...-:::./_,- / / / _...,..-./ I 1 932-- - - - - - - ---- -----,,/;:.;:.;:-;.--;. ~ \, 931- - ------ ----- -----... / / /::::: ' -- -~/ / //// / --~ - 93ci ---9 Jr o-,~' / ~;!Pef..~o,'C..~ ce;:.1 // //?J?..or1~~~~o-,i"'>~il /// - r. \ ~)' --. ~ Borin B-2 STA 512+27.93, 37.29' Right of CL. Survey I I I OJ "' ;, ~ I I ~ I I \ I I ~ I I I I & fj ~ I ~ Borin B-G4 STA 514+32.89, 21.95' Right of CL Survey ~ w 1-- <( 1-- (/) et: w 1-- z - et: w > <( ~ w C> ēt: CD co ~ I :::c (/) <( :."!!: r--.. :::c ~ <( _J ~~ :g ::E ~ " >- a:: N 1-- (.!) z z!! ::::> z (.) j:: CD w (.) ~..., ~ g w (/) (.!) 1-- ::::> L... z <( ii: 1-- ~ (/) Ill DATE 4/2/215 SCALE NOT TO SCALE PROJECT NUMBER 64246

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Appendix B Foundation Boring Logs EST, Inc.

BORING NO. B-1 STATION 511'55.75, 21.82' LEFT OF CL. Sl.11VEY <DRILLED DECEt.llER 29 AND DECEt.llER 3, 214> SURF ACE ELEVA HON - 941.69 APPROXIMATELY 11" OF ASPHALT PAVEfv'ENT 94.77 LOOSE TO MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT M:DIL.M DENSE, LIGHT BROWN, SIL TY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, SIL TY SAND M:DIL.M DENSE, RED-BROWN, SIL TY SAND M:DIL.M DENSE, RED-BROWN, POORLY GRADED SAMJ WITH Sil T DENSE, RED-BROWN, SIL TY SAM> LOOSE, RED-BROWN, SIL TY SAND DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT VERY DENSE, LIGHT BROWN, POORLY GRADED SAMJ WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF TO VERY STIFF, Plff'LE-GRAY, Sil T WITH SAMJ VERY SOFT, BROWN, SANDY SILT M::DILM DENSE, DARK BROWN, SIL TY SAND WITH TRACES OF RIVER GRAVEL SOFT TO MODERATELY HARD, OLIVE-GREEN, WEATHERED SHALE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE 928.69 923.69 9.69 914.69 94.69!'. 9.69 898.69 :<!. ~~~:~ 888.69 'SJ. ~~~:~ 873.69 868.69 862.69 858.69 851.69 B46.19 B37.69 BOTTOM OF BORING - B 15.56 936.69 - -1; N = S: MC= 6.1% ; Pl = NP; #2 = BA%; RECOVERY = 12"' 931.69 - ss-2; N = 14: MC= 7.1'1 ; Pl = NP; #2 = B.'1; RECOVERY = "' 926.69 - -3; N = 17". MC = 6.8% ; Pl = NP; #2 = 13.7%; RECOVERY = 14" 921.69 - -4; N = S: MC = 4.8% ; Pl = NP; #2 = 5.3%; RECOVERY = 16'' 916.69 - -5; N = 32: MC = 11.8% ; Pl = NP; #2 = 9.2%; RECOVERY = 1 a 911.69 - -6; N = 25: MC = 1'1 LL= NP; Pl= NP; #2 = 17.1%; RECOVERY= " 96.69--7;N = 25: MC= 11% ; Pl = NP; #2 = 232%; RECOVERY = " 91.69 - -8; N = 22: MC = 14.8% ; Pl = NP; #2 = 22.7'%; RECOVERY = " B96.69 - -9; N = 21: MC = 5.5'1 ; Pl = NP; #2 = 5.3%; RECOVERY = 1 B"' B91.69 - -1; N = 25: MC = 15.B% ; Pl = NP; #2 = 13.3%; RECOVERY = " BB6.69 - -11; N = B: MC= 16.7% ; Pl = NP; #2 = 33.9%; RECOVERY = " BB1.69 - -12; N = 27". MC =.3% ; Pl = NP; #2 = 9.5%; RECOVERY = 1 B"' B76.69 - -13; N = 34: MC= 17.2% ; Pl = NP; #2 = 1.6'%; RECOVERY = " B71.69 - -14; N = 74: MC= 17.2% ; Pl = NP; #2 = 7A%; RECOVERY = "' B66.69 - -15; N = 44: MC= 1a1% ; Pl = NP; #2 = 5.6'1; RECOVERY = 1 B"' B61.69 - -16; N = 2: MC= 17% ; Pl = NP; #2 = 72.5'%; RECOVERY = " B56.69 - -17; N = : MC = 2.B% ; Pl = NP; #2 = 67.7%; RECOVERY = " B51.69 - -; N = 16: MC = 16.6% ; Pl = NP; #2 = 4.4'%; RECOVERY = " B46.69 - -19; N = 15/6.'~ 5/6.'~ 5/.25'~ MC = 2.3% LL= 32; Pl= 15; #2 = 71.'1; RECOVERY= 12"' 845.67 - -1; = 5/.38'~ 5/.3B'" B4.67 - -2; = 5/1.19'~ 5/.63'" B35.67 - -3; = 5/.63'~ 5/.3B'" B3.67 - -4; = 5/1.13'~ 5/.5'" B25.67 - -5; = 5/.88'~ 5/.3B'" B2.67 - -6; = 5/.5'~ 5/.5'" B15.67 - -7; = 5/.81'~ 5/.5'" MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE TO DENSE, LIGHT BROWN, SIL TY SAND MEDIUM DENSE, YELLOW-BROWN, SIL TY SAND LOOSE, YELLOW-BROWN, SIL TY SAND BORING NO. B-2 STATION 512'27.93, 37.29' RIGHT OF CL. SURVEY <DRILLED DECEMBER 31 214 AND JANUARY 5, 215> SURFACE ELEVATION - 923.6B 915.6B 95.6B B9.6B BB5.6B VERY DENSE TO DENSE, YELLOW-BROWN, SIL TY SAND 'Sj_ B79.6B DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF, GRAY, SANDY LEAN CLAY VERY LOOSE TO LOOSE, GRAY, SILTY SAND WITH GRAVEL POORLY CEti.ENTED, OLIVE-BROWN, WEATHERED SANDSTONE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE HARD, GRAY, WEATHERED SHALE B75.6B B65.6B B6.6B B55.6B B47.6B B37.6B B2B.6B BOTTOM OF BORING - 817.12 91B.68 - -1; N = 11: MC = 14'% ; Pl = NP; #2 = 11.2%; RECOVERY = "' 913.68 - -2; N = 14: MC = 162'% ; Pl = NP; #2 = 1 B.2t.; RECOVERY = 14"' 9B.68 - -3; N = 26: MC = 1.5'1 ; Pl = NP; #2 = 2.6'%; RECOVERY = 1 B"' 93.68 - -4; N = 15: MC = 14.6'% ; Pl = NP; #2 = 25.'1; RECOVERY = 6" B9B.68 - -5; N = 13: MC = BA'l. ; Pl = NP; #2 = 15. 7"; RECOVERY = 1 B"' B93.68 - -6; N = 2: MC = 16.5% ; Pl = NP; #2 = 26.2%; RECOVERY = 1 B"' BBB.68 - -7; N = S: MC= 17'1 ; Pl = NP; #2 = 33.6'%; RECOVERY = 1 B"' BB3.68 - -B; N = 54: MC = 16.5'% ; Pl = NP; #2 = 1 B.2t.; RECOVERY = 1 B"' B7B.68 - -9; N = 47". MC = 15.6% ; Pl = NP; #2 = 16. 7"; RECOVERY = "' B73.68 - -1: N = 4B: MC = 16.B% ; Pl = NP; #2 = BAX; RECOVERY = " B6B.68 - -11; N = 43: MC= 17.5% ; Pl = NP; #2 = 5.9%; RECOVERY = 1 B" B63.68 - -12; N = 15; RECOVERY= O" B5B.68 - -13; N = 13: MC= 1a6% LL = 3; Pl = 11; #2 = 64.5'1; RECOVERY = 1 B" B53.68 - -14; N = 3; RECOVERY = a B4B.68 - -15; N = 4/6."; 716."; 5/6.'~ MC = 15.6'1 ; Pl = NP; #2 = 33.B%; RECOVERY = 6" B47. - -1; = 5/1.63'~ 5/1.5" B42. - -2; = 5/1.13"~ 5/25" B37. - -3; = 5/.63"~ 5/.5" B32. - -4; = 5/1,13'~ 5/.75" B27. - -5; = 5/.63"~ 51.BB" B22. - -6; = 5/.38"~ 5/25" B17. - -7; = 5/.38"~ 5/.3B" SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION 4.1 OF THE GEOTECHNICAL REPORT. EXCAVATION CONSIDERATION & RIPPABILITY SEIIC CLA AND SPECTRAL RESPONSE ACCELERATIONS SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF Tl-ESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, Tl BORINGS WERE SITE CLA ''D"' ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE ROOS RANGED FROM '1 TO B3% AM> Tl UNCONFl~D COMPREIVE SEIIC CATEGORY A STRENGT (UCS) RANGED FROM 229 KSF TO B46 KSF. BASED ON Tl-ESE VALUES, WE EXPECT THE BEDROCK AT THE PRQ..ECT SITE WILL BE READILY RIPPABLE WITH REGlA.AR EXCAVATION...919 EQUIPMENT. s,,.1969 s,,.999 LEGEND = SPLIT SPOON SAMPLER DCD N = NUMBER OF BLOWS PER 12 INCHES ucs MC = MOISTURE CONTENT DD LL = LIQUID LIMIT ROD Pl = PLASTICITY INDEX 'SJ. #2 = PERCENT PAING #2 SIEVE!'. = TEXAS COM: PENETROMETER :<!. = DIAMOND CORE BARREL DRILLING = UNCONFl~D COMPREIVE STRENGTH = DRY DENSITY = ROCK QUALITY DESIGNATION = WATER LEVEL WHILE DRILLING OR SAMPLING = WATER LEVEL AFTER DRILLING = WATER LEVEL 24 HOURS AFTER DRILLING NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF THE GEOTECHNICAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT Tl TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN Tl COMPLETE GEOTECHNICAL REPORT CONTACT Tl BRIDGE DIVISION OF Tl OKLAHOMA DEPARTMENT OF TRANSPORTATION AT <45l 521-266 STATE HIGHWAY 4B OVER INTERSTATE 4 BRIDGE "A' FOUNDATION BORING LOGS CSHEET NO. 1 OF 3l OKFUSKEE COUNTY STATE.JOB NO. 2755(4) Sl-EET NO. 1

BORING NO. B-3 STATION 513<JB.29, 21.5' LEFT OF CL. Sl.11VEY <DRILLED JANUARY 6, 215l SURFACE ELEVATION - 92.7 BORING NO. B-3A STATION 513 13.29, 21.5' LEFT OF CL. SURVEY <DRILLED JANUARY 12, 215l SURFACE ELEVATION - 92.7 ti.edil.m DENSE, LIGHT BROWN, SIL TY SAND ti.edil.m DENSE, LIGHT BROWN, POORLY GRADED SAMJ WITH SILT ti.edil.m DENSE, LIGHT BROWN, SIL TY SAND ti.edil.m STIFF, RED-BROWN, SANDY SILTY CLAY ti.edilia DENSE, RED-BROWN, SIL TY SAND DENSE TO ti.edium DENSE, RED-BROWN, POORLY GRADED SAND WITH Siil T ti.edil.m STIFF, RED-BROWN, SANDY SILT STIFF, RED-BROWN, SANDY LEAN CLAY STIFF, BROWN, SANDY SILT STIFF, GRAY, LEAN CLAY ($HALEY) CEti.ENTED, BROWN, WEATHERED SANDSTONE WITH SHALE SEAMS HARD, GRAY, WEATl RED SHALE WITH SANDSTONE SEAMS HARD, CEMENTED, INTEEDDED SHALE AND SANDSTONE BOTTOM OF BORING - 92.7 8971)7 892.7 8771)7 863.7 8571)7 852.7 847.7 844.7 832.7 823.7 813.77 915.7--1;N = 14: MC= 9.6X ; Pl = NP; #2 = 3.X; RECOVERY = 6" 91.7 - -2; N = 21: MC = 1.4X ; Pl = NP; #2 = 37.7X; RECOVERY = " 95.7--3;N = 21: MC= 11.1X ; Pl = NP; #2 = 252X; RECOVERY = 6" 9.7 - -4; N = 16: MC = 1 O'I LL= NP; Pl= NP; #2 = 12X; RECOVERY= " 895.7--5;N = 16: MC= 14.7X LL= NP; Pl= NP; #2 = 14.7X; RECOVERY= " 89.7 - -6; N = 7: MC = 16.5X LL = 23; Pl = 7; #2 = 52.9X; RECOVERY = 12" 885.7 - -7; N = 14: MC = 17.6X ; Pl = NP; #2 = 17.8X; RECOVERY = " 8S.7 - -8; N = 21: MC = 16'% ; Pl = NP; #2 = 12.3X; RECOVERY = " 875.7 - -9; N = 43: MC = 17.3X LL= NP; Pl= NP; #2 = 1.5X; RECOVERY= " 87.7 - -1; N = 21: MC=.7X ; Pl = NP; #2 = 9.7%; RECOVERY = " 865.7 - -11; N = 17: MC =.6X ; Pl = NP; #2 = 7.9'%; RECOVERY = " 8.7 - -12; N = 7: MC = 221 ; Pl = NP; #2 = 7.X; RECOVERY = " 855.7 - -13; N = 14: MC= 2.7% LL = 26; Pl = 8; #2 = 59.5%; RECOVERY = " BROWN, SIL TY SAND LIGHT BROWN, POORLY GRADED SAND WITH SILT LIGHT BROWN, SIL TY SAND RED-BROWN, SAM>Y SIL TY CLAY RED-BROWN, SIL TY SAND RED-BROWN, POORLY GRADED SAND WITH Siil T RED-BROWN, SAM>Y SILT RED-BROWN, SAM>Y LEAN CLAY 85.7 - -14; N = 13: MC=.7X ; Pl = NP; #2 = 54.9X; RECOVERY = 6" BROWN, SANDY SILT 845.7 - -15; N = 42/6.'~ 17/6.'~ 5/2.'~ MC= 17.3X GRAY, LEAN CLAY CSHALEYJ LL= 38; Pl= ; #2 = 91.91; RECOVERY= 14" 843.9 - -1; = 5/125'~ 5/.75" 838.9 - -2; = 5/.75'~ 5/.63" CE...rNTED, BROWN, WEATHERED SANDSTOt SHALE SEAMS OPEN JOINTS C1 "- 8"J 833.9 - -3; = 5/.75'~ 5/.5'" 92.7 897.7 892.7 887.7.!: 886.7 877.7 863.7 857.7 852.7 847.7 843.57 843.44 - -1; N = 25/6.'~ 5/1.5"; RECOVERY = 3'" 838.44 - DCD-1; UCS = 846, PSF; DD = 134. PCF; ROD = 571 828.9 - -4; = 5/.94'~ 5/.75'" HARD, GRAY, WEATtERED SHALE WITH SANDSTOt SEAMS OPEN JOINTS (1 "- 8") 828.44 - DCD-3; ROD = OX 823.9 - -5; = 5/.75'~ 5/.5" 823.44 823.44 - DCD-4; ROD = OX 8.9 - -6; = 51.15'~ 5/.25" HARD, CEMENTED, INTEEDDED SHALE AND SANDSTONE OPEN JOINTS C1 "- 8") 8.44 - DCD-5; ROD = 43'1. 813.9 - -7; = 5/.75'~ 5/.75'" BOTTOM OF BORING - 813.44 813.44 - DCD-6; UCS = 229, PSF; DD = 149. PCF; ROD = 83X 832.7 833.44 - DCD-2; ROD = 33'% SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION <!1.1 OF THE GEOTECHNICAL REPORT. N MC LL Pl EXCAVATION CONSIDERATION & RIPPABILITY SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF TtESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, TtE BORINGS WERE ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE RODS RANGED FROM O'I TO 831 AM> TtE UNCONFlt D COMPREIVE STRENGT CUCSJ RANGED FROM 229 KSF TO 846 KSF. BASED ON TtESE VALUES, WE EXPECT THE BEDROCK AT THE PRO..ECT SITE Will BE READILY RIPPABLE WITH REGlA.AR EXCAVATION EQUIPMENT. LEGEND = SPLIT SPOON SAMPLER DCD = DIAMOND CORE BARREL DRILLING = NUMBER OF BLOWS PER 12 INCHES ucs = UNCONFlt D COMPREIVE STRENGTH = MOISTURE CONTENT DD = DRY DENSITY = LIQUID LIMIT ROD = ROCK QUALITY DESIGNATION = PLASTICITY INDEX 'Sl. = WATER LEVEL WHILE DRILLING OR SAMPLING #2 = PERCENT PAING #2 SIEVE.!'. = WATER LEVEL AFTER DRILLING = TEXAS cot PENETROMETER :<I. = WATER LEVEL 24 HOURS AFTER DRILLING SEIIC CLA ANO SPECTRAL RESPONSE ACCELERATIONS SITE CLA SEIIC CATEGORY...919 "D" A s...1969 s,,.999 NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF TtE GEOTECl-f..llCAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT TtE TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN TtE COMPLETE GEOTECHNICAL REPORT CONTACT TtE BRIDGE DIVISION OF TtE OKLAHOMA DEPARTMENT OF TRANSPORTATION AT <451 521-266 STATE HIGHWAY 48 OVER INTERSTATE 4 OKFUSKEE COUNTY BRIDGE.A. FOUNDATION BORING LOGS CSHEET NO. 2 OF 3l STATE JOB NO. 2755(4) StEET NO. 2

BROWN, SIL TY SAND LIGHT BROWN, SIL TY SAND ORANGE-BROWN, SIL TY SAND ORANGE BROWN, CLAYEY SAND LIGHT BROWN, SIL TY SAND RED-BROWN, SIL TY SAtt> LIGHT BROWN, CLAYEY SAND RED-BROWN, LEAN CLAY WITH SAND DARK GRAY, LEAN CLAY CEt.::NTED, BROWN, WEATHERED SANDSTONE BORING NO. B-4 BORING NO. B-5 STATION 514 32.89, 21.95' RIGHT OF CL. SURVEY CDRILLED JANUARY 21, 215> 51.ffACE ELEVATION - 9<!11.9 933.9 93.9 893.9 888.9 883.9 878.9 YI. 876.9 873.9 851.9 8<!12.9 835.9 842.9 - -1; N = 5/1.5"; RECOVERY = O" 842.77 - -1; = 5/.25'~ 5/.13" 837.77 - -2; = 5/.5'~ 5/.38" 832. 77 - -3; = 5/.25'~ 5/.13" SlffACE ELEVATION - 9<!12.11 APPROXIMATELY 11" OF ASPHALT PAVEM::NT 941.19 LOOSE, BROWN, SIL TY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT t.::dilia DENSE, LIGHT BROWN, SIL TY SAND LOOSE TO MEDILlv'I DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT CAUGER SAMPLE TAKEN AT 25 FEETl DENSE, LIGHT BROWN, Sil TY SAND ~Dll..M DENSE, ORANGE-BROWN, Sil TY SAND LOOSE, ORANGE BROWN, CLAYEY SAND ~Dll..M DENSE, LIGHT BROWN, Sil TY CLAYEY SAND VERY DENSE TO DENSE, LIGHT BROWN, SILTY SAND ~Dll..M STIFF TO STIFF, RED-BROWN, LEAN CLAY WITH SAND STIFF, DARK GRAY, LEAN CLAY VERY HARO, DARK GRAY, LEAN CLAY CSHALEY> SOFT TO MODERATELY HARD, GRAY, WEATHERED SHALE HARD, GRAY, WEATtERED SHALE STATION 514<49.81, 23.5' LEFT OF CL. SURVEY CDRILLED JANUARY 26, 215> ~ 93o!l.11 929.11 925.11 914.11 94.11 894.11 889.11 884.11 882.11 874.11 864.11 859.11 855.11 846.11 937.11 --1;N = 7: MC= 7.3X LL = tt='; Pl = tt='; #2 = 1 BAX; RECOVERY = 12" 932.11 - -2; N = 8: MC = 6.3X LL = tt='; Pl = tt='; #2 = 6.6X; RECOVERY = 12" 927.11--3;N=: MC= 8.2X LL= tt='; Pl = tt='; #2 = 19.7X; RECOVERY= " 922.11--4;N=1: MC= 5.6X LL = tt='; Pl = tt='; #2 = a.ox; RECOVERY = 15" 917.11--5;N=23: MC= 7.1X LL = tt='; Pl = tf'; #2 = 7.6X; RECOVERY = O" 912.11--6;N=46: MC= 9.4X LL = tt='; Pl = tt='; #2 = 26.1 X; RECOVERY = 16" 97.11 - -7; N = 28: MC= 12.1X LL = tf'; Pl = tf'; #2 = 2.6X; RECOVERY = 16" 92.11--B;N=: MC= 1.8X LL = tf'; Pl = tf'; #2 = 12.9X; RECOVERY = 16" 897.11--9;N=12: MC= 13.3X LL = tf'; Pl = tf'; #2 = 29.5X; RECOVERY = " 892.11--1;N=8: MC= 15.7X LL = 22; Pl = 9; #2 = 39.6X; RECOVERY = " 887.11 - ss-11; N = : MC= 14.9X LL = 21; Pl = 6; #2 = 27.9%; RECOVERY = 9" aa2.11 - ss-12; N = 56: MC= 16.n LL = tt='; Pl = tt='; #2 = 14.22:; RECOVERY = " 877.11 - -13; N = 38: MC= 17.7t. LL= tf'; Pl = tf'; #2 = 13.7X; RECOVERY= " 872.11 --14;N = 7: MC= 2.3X LL = 29; Pl = 13; #2 = 71.9X; RECOVERY = 14" 867.11 - -15; N = 11: MC= 2.71. LL = 29; Pl = 13; #2 = 79.92:; RECOVERY = " 862.11 - -16; N = 17: MC= 19.5X LL = 27; Pl = 9; #2 = 85.4X; RECOVERY = " 857.11 - -17; N = 7CJ. MC= 17.2X LL = 43; Pl = 22; #2 = 92.3X; RECOVERY = " 855.61 - -; N = 47/6.'~ 5/4,75'': MC = 16.32: LL = 45; Pl = 23; #2 = 92.62:; RECOVERY = 11" 854.71 - -1; = 5/3.'~ 5/3.13" 849.71 - -19; N = 34/6.'~ 5/4.5": MC= 16.8X LL = 47; Pl = 23; #2 = 98.4X; RECOVERY = 1" 848.81 - -2; = 5/1.13'~ 5/1.'' 843.81 - -3; = 5/.63'~ 5/.63" 838.81 - -4; = 5/.13'~ 5/.25" 833.81 - -5; = 5/.5'~ 5/.5'' 827.77 - -4; = 5/.63'~ 5/25" 828.81 - -6; = 5/.75'~ 5/.75" HARD, GRAY, WEATHERED SHALE 822. 77 - -5; = 5/. 75 ~ 5/25" BOTTOM OF BORING - 823.74 823.81 - -7; = 5/.5'~ 5/.38" 817.77 - -6; = 5/.75'~ 5/.38" BOTTOM OF BORING - 812.72 812.77 - -7; = 5/.38'~ 5/.19" EXCAVATION CONSIDERATION & RIPPABILITY SEIIC CLA AND SPECTRAL RESPONSE ACCELERATIONS SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION <!1.1 OF THE GEOTECHNICAL REPORT. N MC LL Pl SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF TtESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, TtE BORINGS WERE ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE RODS RANGED FROM OX TO 83X AM> TtE UNCONFl~D COMPREIVE STRENGT (UCS) RANGED FROM 229 KSF TO 846 KSF. BASED ON TtESE VALUES, WE EXPECT THE BEDROCK AT THE PRO..ECT SITE Will BE READILY RIPPABLE WITH REGlA.AR EXCAVATION EQUIPMENT. LEGEND = SPLIT SPOON SAMPLER DCD = DIAMOND CORE BARREL DRILLING = NUMBER OF BLOWS PER 12 INCHES ucs = UNCONFl~D COMPREIVE STRENGTH = MOISTURE CONTENT DD = DRY DENSITY = LIQUID LIMIT ROD = ROCK QUALITY DESIGNATION = PLASTICITY INDEX YI. = WATER LEVEL WHILE DRILLING OR SAMPLING #2 = PERCENT PAING #2 SIEVE.!'. = WATER LEVEL AFTER DRILLING = TEXAS COM: PENETROMETER :<I. = WATER LEVEL 24 HOURS AFTER DRILLING SITE CLA SEIIC CATEGORY...919 ''O" A s,,,.1969 s,,.999 NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF THE GEOTECHNICAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT TtE TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN TtE COMPLETE GEOTECHNICAL REPORT CONTACT TtE BRIDGE DIVISION OF TtE OKLAHOMA DEPARTMENT OF TRANSPORTATION AT C45l 521-266 STATE HIGHWAY 48 OVER INTERSTATE 4 OKFUSKEE COUNTY BRIDGE 'A' FOUNDATION BORING LOGS CSHEET NO. 3 OF 3l STATE.JOB NO. 2755(4) StEET NO. 3

State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: 64246 Okfuskee County, Oklahoma April 2, 215 Appendix C Boring Logs EST, Inc.

BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No. 2755 (4) SAMPLES PAGE 1 OF 3 TESTS GRAPHICS LOG LAYER / MATERIAL DESCRIPTION Station= 511+55.75, 21.82' Lt of CL. Survey Surface Elev. = 941.69 feet Vegetation Thickness : N/A APPROXIMATELY 11" El. = 94.77 OF ASPHALT PAVEMENT DEPTH, FT. USCS SYMBOL NUMBER TYPE RECOVERY, IN. SPT- N BLOWS / FT. MOISTURE, % DRY DENSITY, PCF UNCONFINED STRENGTH, PSF LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE L:\GEOTECH\215 GEOTECH PROJECTS\64246 - STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE REMARKS: LOOSE TO MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, SILTY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT El. = 928.69 El. = 923.69 El. = 9.69 DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT El. = 914.69 DENSE, LIGHT BROWN, SILTY SAND El. = 94.69 MEDIUM DENSE, RED-BROWN, SILTY SAND El. = 898.69 MEDIUM DENSE, RED-BROWN, POORLY GRADED SAND WITH SILT 5 1 15 2 25 3 35 4 45 SP- SP- SP- SP- SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER 321 S. Berry Road Norman, OK 7372 (OFF.) (45) 37-8378 (FAX) (45) 329-1914 WATER LEVEL OBSERVATIONS 59 Ft-WD 48 Ft-24Hrs. AB 1 2 3 4 5 6 7 8 41 Ft-AB RIG 12 14 16 1 9 14 17 9 32 25 25 22 CME-55 APPROVED 6.1 7.1 6.8 4.8 11.8 1. 11. 14.8 BORING STARTED BORING COMPLETED A.D. 12/29/14 12/3/14 FOREMAN R.J. JOB# 64246 -#2 = 8.4% -#2 = 8.% -#2 = 13.7% -#2 = 5.3% -#2 = 9.2% -#2 = 17.1% -#2 = 23.2% -#2 = 22.7%

BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No. 2755 (4) SAMPLES PAGE 2 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\64246 - STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG REMARKS: Station= 511+55.75, 21.82' Lt of CL. Survey (Continued) LAYER / MATERIAL DESCRIPTION MEDIUM DENSE, RED-BROWN, POORLY GRADED SAND WITH SILT (continued) El. = 892.69 DENSE, RED-BROWN, SILTY SAND LOOSE, RED-BROWN, SILTY SAND DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT VERY DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF TO VERY STIFF, PURPLE-GRAY, SILT WITH SAND El. = 858.69 VERY SOFT, BROWN, SANDY SILT 321 S. Berry Road Norman, OK 7372 (OFF.) (45) 37-8378 (FAX) (45) 329-1914 El. = 888.69 El. = 883.69 El. = 873.69 El. = 868.69 El. = 862.69 El. = 851.69 59 Ft-WD DEPTH, FT. 5 55 6 65 7 75 8 85 9 48 Ft-24Hrs. AB USCS SYMBOL SP- SP- SP- SP- SP- ML ML NUMBER 9 1 11 12 13 14 15 16 17 41 Ft-AB TYPE RECOVERY, IN. RIG SPT- N BLOWS / FT. CME-55 APPROVED MOISTURE, % 5.5 15.8 16.7.3 17.2 17.2.1 17. 2.8 BORING STARTED BORING COMPLETED A.D. DRY DENSITY, PCF 12/29/14 UNCONFINED STRENGTH, PSF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS 21 25 8 27 34 74 44 2 12/3/14 FOREMAN R.J. JOB# 64246 LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 = 5.3% -#2 = 13.3% -#2 = 33.9% -#2 = 9.5% -#2 = 1.6% -#2 = 7.4% -#2 = 5.6% -#2 = 72.5% -#2 = 67.7%

BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No. 2755 (4) SAMPLES PAGE 3 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\64246 - STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG Station= 511+55.75, 21.82' Lt of CL. Survey (Continued) REMARKS: LAYER / MATERIAL DESCRIPTION MEDIUM DENSE, DARK BROWN, SILTY SAND WITH TRACES OF RIVER GRAVEL SOFT TO MODERATELY HARD, OLIVE-GREEN, WEATHERED SHALE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE Bottom of Boring at 126.1 feet 321 S. Berry Road Norman, OK 7372 (OFF.) (45) 37-8378 (FAX) (45) 329-1914 El. = 846.19 El. = 837.69 El. = 815.56 59 Ft-WD DEPTH, FT. 95 1 15 11 115 12 125 13 135 48 Ft-24Hrs. AB USCS SYMBOL NUMBER 19 1 2 3 4 5 6 7 TYPE RECOVERY, IN. 12 SPT- N BLOWS / FT. MOISTURE, % 16.6 2.3 BORING STARTED BORING COMPLETED RIG CME-55 APPROVED A.D. DRY DENSITY, PCF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS 41 Ft-AB 16 15/6." 5/6." 5/.25" 5/.38" 5/.38" 5/1.19" 5/.63" 5/.63" 5/.38" 5/1.13" 5/.5" 5/.88" 5/.38" 5/.5" 5/.5" 5/.81" 5/.5" 12/29/14 FOREMAN JOB# UNCONFINED STRENGTH, PSF 12/3/14 64246 LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 = 4.4% LL = 32 PL = 17 PI = 15 -#2 = 71.% R.J.

BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-2 ENGINEER: EST, Inc. PROJECT: State Job No. 2755 (4) SAMPLES PAGE 1 OF 3 TESTS GRAPHICS LOG LAYER / MATERIAL DESCRIPTION Station= 512+27.93, 37.29' Rt of CL. Survey Surface Elev. = 923.68 feet Vegetation Thickness : 4" Grass DEPTH, FT. USCS SYMBOL NUMBER TYPE RECOVERY, IN. SPT- N BLOWS / FT. MOISTURE, % DRY DENSITY, PCF UNCONFINED STRENGTH, PSF LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE L:\GEOTECH\215 GEOTECH PROJECTS\64246 - STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE REMARKS: MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE TO DENSE, LIGHT BROWN, SILTY SAND MEDIUM DENSE, YELLOW-BROWN, SILTY SAND LOOSE, YELLOW-BROWN, SILTY SAND El. = 885.68 VERY DENSE TO DENSE, YELLOW-BROWN, SILTY SAND 321 S. Berry Road Norman, OK 7372 (OFF.) (45) 37-8378 (FAX) (45) 329-1914 El. = 915.68 El. = 95.68 El. = 89.68 44 Ft-WD 5 1 15 2 25 3 35 4 N/A-24Hrs. AB SP- 1 2 3 4 5 6 7 N/A-AB RIG 6 14. 16.2 1.5 14.6 8.4 2 16.5 SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS 11 14 26 15 13 8 CME-55 17. BORING STARTED BORING COMPLETED APPROVED A.D. 12/31/14 JOB# 1/5/15 FOREMAN 64246 -#2 = 11.2% -#2 =.2% -#2 = 2.6% -#2 = 25.% -#2 = 15.7% -#2 = 26.2% -#2 = 33.6% R.J.

BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-2 ENGINEER: EST, Inc. PROJECT: State Job No. 2755 (4) SAMPLES PAGE 2 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\64246 - STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG Station= 512+27.93, 37.29' Rt of CL. Survey (Continued) REMARKS: LAYER / MATERIAL DESCRIPTION VERY DENSE TO DENSE, YELLOW-BROWN, SILTY SAND (continued) DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF, GRAY, SANDY LEAN CLAY VERY LOOSE TO LOOSE, GRAY, SILTY SAND WITH GRAVEL POORLY CEMENTED, OLIVE-BROWN, WEATHERED SANDSTONE 321 S. Berry Road Norman, OK 7372 (OFF.) (45) 37-8378 (FAX) (45) 329-1914 El. = 875.68 El. = 865.68 El. = 86.68 El. = 855.68 El. = 847.68 44 Ft-WD DEPTH, FT. 45 5 55 6 65 7 75 8 N/A-24Hrs. AB USCS SYMBOL SP- SP- CL NUMBER 8 9 1 11 12 13 14 15 1 N/A-AB RECOVERY, IN. RIG 6 SPT- N BLOWS / FT. 16.5 15.6 16.8 17.5.6 15.6 BORING COMPLETED CME-55 APPROVED MOISTURE, % BORING STARTED A.D. DRY DENSITY, PCF 12/31/14 JOB# UNCONFINED STRENGTH, PSF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS TYPE 54 47 48 43 15 13 3 4/6." 7/6." 5/6." 5/1.63" 5/1.5" 1/5/15 FOREMAN 64246 LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 =.2% -#2 = 16.7% -#2 = 8.4% -#2 = 5.9% LL = 3 PL = 19 PI = 11 -#2 = 64.5% -#2 = 33.8% R.J.